Loading...
HomeMy WebLinkAboutNC0038377_CSA Figures_20171101148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL ES1 - MAYO 10/09/2017 10/29/2017 2:37 PM P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\3D SCM\Mayo_3D_ES1.dwg FIGURE ES-1 APPROXIMATE EXTENT OF IMPACTS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA PROGRESS MAYO LAKE MAYO LAKE ROAD BOSTON RD. (HIGHWAY 501)1981 C & D LANDFILL MAYO STEAM ELECTRIC PLANT SURFICIAL TRANSITION ZONE VISUAL AID ONLY - DEPICTION NOT TO SCALE NORTH BEDROCK CRUTCHFIELD BRANCH ASH BASIN ASH BASIN WASTE BOUNDARY GENERALIZED GROUNDWATER FLOW DIRECTION APPROXIMATE LANDFILL WASTE BOUNDARY NOTE: 1.OCTOBER, 2016 AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27, 2017, DATED JUNE 13, 2016. 2.STREAM FROM WSP SURVEY, 2014. 3.GENERALIZED GROUNDWATER FLOW DIRECTION BASED ON APRIL 10, 2017 WATER LEVEL DATA. 4.PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY. 5.GENERALIZED AREAL EXTENT OF MIGRATION REPRESENTED BY NCAC 02L EXCEEDANCES. STREAM WITH FLOW DIRECTION RESIDENTIAL UNIT DUKE ENERGY PROPERTY BOUNDARY LEGEND AREA OF CONCENTRATION IN GROUNDWATER ABOVE NC2L (SEE NOTE 5) INFERRED AREA OF CONCENTRATION IN GROUNDWATER ABOVE NC2L (SEE NOTE 5) PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:JOHN CHASTAIN FIG1-1_SITELOC 08/16/2015 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO SiteLocationMap.dwg FIGURE 1-1 SITE LOCATION MAP MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA CONTOUR INTERVAL: MAP DATE: 10 FEET 1968 2000 GRAPHIC SCALE 1000 IN FEET 10000 SOURCE: 1984 U.S. GEOLOGICAL SURVEY TOPO QUAD, CLUSTER SPRINGS, VA QUADRANGLE, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA PHONE 864-421-9999 www.synterracorp.com RALEIGH WILMINGTON GREENVILLE GREENSBORO PERSON COUNTY MAYO LAKEFUTU R E R AI L R O A D Y A R D ASH BASIN 1981 C&D LANDFILL US HWY 501 (BOSTON RD)RAIL R O A D Y A R D US HWY 501(BOSTON RD)PLANT ACCESS ROA D MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE POWER PLANT ASH BASIN WASTE BOUNDARY HA U L R O A D ASH BASIN COMPLIANCE BOUNDARY <<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<RAILROADR.O.W. 100' 1981 C&DLANDFILL ASH BASIN LOUISIANA PACIFIC CORPORATION MAYO PLANT CCP MONOFILL(PERMIT 7305) MAYO LAKE FGDPONDS PERSON COUNTY HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE)RAILROADRAILROADR T HESTER RD SUGARTREE LNDEAN LNN POINTE DRBETHEL HILL SCHOOL RDM U L L I N S L N FONTAINE RDOLD US HWY 501WOODYS STORE RD M A Y O L A K E R D US HWY 501BOSTON RDFIGURE 2-1MAYO PLANT VICINITY MAPMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. ROBINSONCHECKED BY: K. DONOVANPROJECT MANAGER: J. WYLIE DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Plant Vicinity Map.mxd GRAPHIC SCALE6000600 1,200300 IN FEET ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <STREAM NOTES:PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:JOHN CHASTAIN FIG 2-2 (1968 MAP) 08/16/2015 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO 1968 USGS TOPO MAP.dwg FIGURE 2-2 1968 USGS TOPOGRAPHIC MAP MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA CLUSTER SPRINGS VA-NC QUADRANGLE CONTOUR INTERVAL: MAP DATE: 10 FEET 1968 2000 GRAPHIC SCALE 1000 IN FEET 10000 SOURCE: USGS TOPOGRAPHIC MAP OBTAINED FROM NRCS GEOSPTIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ RALEIGH WILMINGTON GREENVILLE GREENSBORO PERSON COUNTY FUTU R E R AI L R O A D Y A R D US HWY 501 (BOSTON RD)FUTURE M A Y O L A K E R D FUTURE MAYO LAKE FUTURE ASH BASIN FUTURE 1981 C&D LANDFILL FUTURE PLANT ACCESS ROAD MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE FUTURE POWER PLANT FUTURE ASH BASIN WASTE BOUNDARY FUTURE MONOFILL PROGRESS HIGHWAY 501 100' RIGHT-OF-WAY FUTURE RAILROADFUTURE FGD PONDS GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: MARCH 25, 1948 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT http://earthexplorer.usgs.gov/ 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL FIG 2-3 (1948 AERIAL) 08/11/2015 10/25/2017 6:24 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO HISTORICAL AERIALS.dwg FIGURE 2-3 1948 AERIAL PHOTOGRAPH MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA FUTURE M A Y O L A K E R D CURRENT US HWY 501R T HESTER RD FUTU R E R AI L R O A D Y A R D CURRENT US HWY 501M A Y O C R E E K MAYO C R E E K CRUTCHFIELD BRANCHCRUTCHFIELD BRANCHHIGH P L AI N S R D FUTURE MAYO LAKE FUTURE ASH BASIN FUTURE 1981 C&D LANDFILL FUTURE PLANT ACC E S S R O A D MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE FUTURE POWER PLANT FUTURE ASH BASIN WASTE BOUNDARY FUTURE MAYO LAKE BOUNDARY VA-NC STATE LINE FUTURE US HWY 501 (BOSTON RD)FUTURE 100' RIGHT-OF-WAYFUTURE RAILROADPROGRESS GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: JANUARY 24, 1981 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT http://earthexplorer.usgs.gov/ 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL FIG 2-4 (1981 AERIAL) 08/11/2015 10/25/2017 6:24 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO HISTORICAL AERIALS.dwg FIGURE 2-4 1981 AERIAL PHOTOGRAPH MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA FUTURE M A Y O L A K E R D CURRENT US HWY 501R T HESTER RD FUTU R E R AI L R O A D Y A R D CURRENT US HWY 501M A Y O C R E E KMAYO CREEKHIGH P L AI N S R D CRUTCHFIELD BRANCHCRUTCHFIELD BRANCHFUTURE MAYO LAKE FUTURE ASH BASIN 1981 C&D LANDFILL FUTURE PLANT ACC E S S R O A D MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE POWER PLANT FUTURE ASH BASIN WASTE BOUNDARY FUTURE MAYO LAKE BOUNDARY VA-NC STATE LINE FUTURE US HWY 501 (BOSTON RD)FUTURE 100' RIGHT-OF-WAYFUTURE RAILROAD GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: 1993 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT http://earthexplorer.usgs.gov/ 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL FIG 2-5 (1993 AERIAL) 08/11/2015 10/25/2017 6:24 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO HISTORICAL AERIALS.dwg FIGURE 2-5 1993 AERIAL PHOTOGRAPH MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA FUTURE M A Y O L A K E R D OLD US HWY 501R T HESTER RD RAIL R O A D Y A R DOLD US HWY 501MAYO CREEKCRUTCHFIELD BRANCHHIGH P L AI N S R D ASH BASIN 1981 C&D LANDFILL PLANT ACCESS ROA D MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE POWER PLANT ASH BASIN WASTE BOUNDARY VA-NC STATE LINE MAYO LAKE US HWY 501 (BOSTON RD)100' RIGHT-OF - W A YRAILROAD GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: 1993 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT http://earthexplorer.usgs.gov/ 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL FIG 2-6 (2008 AERIAL) 08/11/2015 10/25/2017 6:24 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO HISTORICAL AERIALS.dwg FIGURE 2-6 2008 AERIAL PHOTOGRAPH MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINAUS HWY 501 (BOSTON RD)OLD US HWY 501R T HESTER RD RAIL R O A D Y A R DOLD US HWY 501MAYO CREEKCRUTCHFIELD BRANCHHIGH P L AI N S R D ASH BASIN 1981 C&D LANDFILL PLANT ACCESS ROA D MAYO STEAM ELECTRIC PLANT PARCEL LINE VA-NC STATE LINE POWER PLANT ASH BASIN WASTE BOUNDARY VA-NC STATE LINE MAYO LAKE MAYO LAKE ROAD 100' RIGHT-OF - W A YRAILROAD 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comFIGURE 2-7NPDES FLOW DIAGRAMMAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINASource: NPDESPermit No. NC 0038377 (October 2014) RAILROAD RAI LROAD RAI LROADHAUL RD10/27/2017 1:34 PMP:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP BASE MAP.dwgDATE PRINTED:FILE PATH:FIGURE 2-8SITE LAYOUT MAPMAYO STEAM ELECTRIC PLANT10660 BOSTON RDROXBORO, NORTH CAROLINADUKEENERGYPROGRESSFIG 2-8 (SITE LAYOUT MAP)KYLE DONOVANJOHN CHASTAIN\ C. NEWELLPROJECT MANAGER:LAYOUT NAME:DRAWN BY:CHECKED BY:JERRY WYLIEDATE:DATE:www.synterracorp.com148 River Street, Suite 220Greenville, South Carolina 29601864-421-9999GRAPHIC SCALE600300150030010/17/201710/17/2017BG-2CW-5MW-5BRMW-14BRBG-1MW-13BRCW-4MW-2CW-3MW-3BRMW-16BRMW-16DMW-16SCW-2CW-2DS-3S-10S-8CW-6MW-6BRMW-4S-1AS-2S-2BS-2AMW-3MW-8BRMW-8SMW-8DMW-9BRLMW-9BRCW-1DCW-1MW-18DMW-18BRMW-19BRMW-19DS-4S-1S-5ABMW-3SABMW-3ABMW-1ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4SABMW-4STORM WATEROUTFALL 004STORM WATEROUTFALL 005SW-CBT1SW-CB1SW-CB2SB-4SB-3SB-2SB-6SB-5AB-1P2AP1AP1P2P3P4P3AP4ASB-1MY-05MY-03CRUTCHFIELD BRANCHUNNAMED BRANCHBOX CULVERTCULVERT48" CMPVIRGINIANORTH CAROLINAVIRGINIANORTH CAROLINAGRATEGRATE24" RCPFORMER POND BASED ON 1968USGS TOPOGRAPHIC MAPFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPSOU T H B O S T O N R D ( U S H W Y 5 0 1 )FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHFORMER CRUTCHFIELD BRANCH(PERENNIAL) BASED ON 1968USGS TOPOGRAPHIC MAPFORMER INTERMITTENTSTREAM BASED ON 1968USGS TOPOGRAPHIC MAPFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPFORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHMW-12SSW-REF1S-7S-6S-9FORMER SLUICE POINTSMW-10BRMAYO LAKEWL ± 433'ASH BASIN1981 C&D LANDFILLMW-7BRMW-7DFGD FORWARDFLUSH PONDMW-15BRDEP-2DEP-3DEP-1MW-11BRBGSB-3BGSB-5BGSB-9BGSB-2BGSB-8BGSB-1BGSB-4MY-1002MY-1001MY-1003NPDES OUTFALL 002MW-17BRSTORM WATEROUTFALL 006ASTORM WATEROUTFALL 006BSTORM WATEROUTFALL 006ESTORM WATEROUTFALL 006DSTORM WATEROUTFALL 006CCULVERTCULVERTHEADWALL-48" RCP48" RCP APPROXIMATENPDES OUTFALL 002CMF #1CMF #2DIDICOAL PILEPOWER PLANTRAW WATER INTAKE15"18"RT HESTER RDHAUL RDHAUL RDHAUL RDMAYO LAKE RDMAYO LAKE RDRAILROAD CAR STORAGERAILROAD CAR STORAGETRAIN STOPRA I L R O A D L I N E RAILROAD LINEFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPVIRGINIANORTH CAROLINAB B'AA'AA'SECTION LOCATIONFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPCRUTCHFIELD BRANCHBEAVER PONDMW-12DSB-7AB-4AB-2AB-3FGD SETTLING PONDPRIMARY AND SECONDARYSETTLING PONDSFORMER POND BASED ON 1968USGS TOPOGRAPHIC MAPFORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHFOREBAYSOURCE NOTES:NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDSTO LOCATE THE STREAMS AND WETLANDS IN THE FIELD. THE HORIZONTAL LOCATION AND THE VERTICALLOCATIONS HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE.LEGENDCULVERT LOCATION500 ft COMPLIANCE BOUNDARYPARCEL LINE DUKE ENERGY (APPROXIMATE)ASH BASIN WASTE BOUNDARYSURFACE WATER FLOW DIRECTIONAPPROXIMATE STREAM (NON-JD)APPROXIMATE POND OR RESERVOIR (NON-JD)APPROXIMATE EFFLUENT CHANNELAPPROXIMATE ASH BASIN PONDED WATERC C'MW-3MW-12SWELL IN TRANSITION ZONEWELL IN SAPROLITE MATERIALWELL IN ALLUVIUM MATERIALMW-14BRWELL IN COMPETENT BEDROCKABMW-1WELL IN ASH PORE WATERPIEZOMETER IN BEDROCKDEP-1MW-3WATER SUPPLY WELL SAMPLED BY NC DEQSW-CB1SURFACE WATER SAMPLE LOCATIONMY-03SOIL BORING LOCATIONSB-3PIEZOMETER IN EARTH DAM (FILL)P1AS-16AOW SAMPLE LOCATIONTHE TOPOGRAPHY IS A COMPILATION OF LIDAR DATA OBTAINED FROM FRIS- NORTH CAROLINA FLOOD RISKINFORMATION SYSTEM AT ftp://ftp1.ncem.org/Data_Requests/County_LIDAR_Data/Personcounty/ AND ANAERIAL TOPOGRAPHIC SURVEY-MAYO PLANT BY WSP, DATER JULY 24, 2015, JOB NUMBER: 1570002.00, DWGNAME: MAYO OVERALL WK.DWG100' RIGHT OF WAY FIGURE 3-1KNOWN SAMPLE OF ASH FOR COMPARISON(SOURCE: DUKE ENERGY 2014)MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\FiguresRange (10th percentile – 90th percentile) in bulk composition of fly ash, bottom ash, rock, and soil. (Source: EPRI 2009a) FIGURE 3-2ELEMENTAL COMPOSITION FOR BOTTOM ASH, FLY ASH, SHALE, AND VOLCANIC ASH (SOURCE: EPRI 2009A)MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 3-3COAL ASH TCLP LEACHATE CONCENTRATION RANGES COMPARED TO REGULATORY LIMITS(SOURCE: EPRI 2010)MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures RAIL R O A D Y A R D PLANT ACCESS ROAD VA-NC STATE LINE ASH BASIN WASTE BOUNDARY HAUL R O A D ASH BASIN MAYO STEAM ELECTRIC PLANT PARCEL LINE 1981 C&D LANDFILL ASH BASIN COMPLIANCE BOUNDARY US HWY 501 (BOSTON RD)HIGHWAY 501 100' RIGHT-OF-WAY ASH BASIN FGD PONDS MAYO LAKE POWER PLANTRAILROAD FIGURE 4-1 USGS MAP WITH WATER SUPPLY WELLS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA GRAPHIC SCALE 1000 IN FEET 0 1000 2000 SOURCE: 2016 USGS TOPOGRAPHIC MAP (CLUSTER SPRINGS, VA-NC 1:24000) OBTAINED FROM THE USGS MAP STORE AT http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: J. WYLIE DATE:B. YOUNG FIG 4-1(2016 USGS TOPO MAP) 10/20/2017 10/25/2017 5:41 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSA SUP 2016 USGS TOPO MAP.dwg LEGEND WATER SUPPLY WELL - LOCATION VERIFIED WATER SUPPLY WELL - LOCATION NOT VERIFIED PROGRESS <<<<<<<<<<<<<<<<<<<<<<<<< < <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<< < <<<<<R.O.W. 100' FGD PONDS ASH BASIN 1981 C&D LANDFILLCCP MONOFILL HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE (APPROXIMATE)R T HEST ER RDBOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL R A ILR O A DRAILROAD R A IL R O A D LOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKE MAYO PLANT CRUCTHFIELD BRANCH UNNAMED BRANCH M A Y O L A K E R D MY-3 MY-5 MY2013-RAW MY-7 MY-1001 MY-1002 MY-1003 MY2003-RAW MY-1000 MY-1004MY2016-RAW FIGURE 4-2 WATER SUPPLY WELL LOCATIONS AND DATA MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINADRAWN BY: B. YOUNG PROJECT MANAGER: J. WYLIE CHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Water Supply Map.mxd 1,000 0 1,000 2,000500 GRAPHIC SCALE IN FEET PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. OCTOBER, 2016 AERIAL PHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIAL DATA GATEWAY (https://gdg.sc.egov.usda.gov.GDGOrder.aspx). DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND WATER SUPPLY WELL SAMPLED BY NCDEQ (2015) OR BY DUKE ENERGY (2017) WATER SUPPLY WELL NOT SAMPLED (LOCATION VERIFIED) WATER SUPPLY WELL NOT SAMPLED (LOCATION NOT VERIFIED) <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY HALF-MILE RADIUS OF COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS MAYO PLANT SITE BOUNDARY Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013. SU = Standard Units umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. NTU = Nephelometric Turbidity Unit ^ = NC DHHS Health Screening Level. mg/L = milligrams per liter NE = Not established ug/l = microgram per liter Deg C = Degrees Celsius * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. Reporting Units S.U. mV mg/L umhos/cm NTUs mg/L mg/L mg/L ug/L mg/L mg/L ug/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L mg/L ug/L mg/L ug/L ug/L ug/L Deg C mV mg/L 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE 700 NE 250 NE 250 500 NE 1* 10 700 4* 2 10 10 1* 1000 300 15 NE 50 1 NE 100 NE 20 NE 0.2* 0.3* 1000 NE NE NE Provisional Background Threshold Values (Surficial Unit) 4.9-6.5 NE NE NE NE 13 13 NE 50 2.89 3.3 25 1.6 85 566 1 1 19 1 1 0.088 3.23 1.02 1.9 385 1 0.753 253 0.2 3.15 3.03 3.78 1 5.49 0.2 0.974 227 NE NE 5 Provisional Background Threshold Values (Transition Zone Unit) 5.7-6.5 NE NE NE NE 302 302 NE 50 59.2 33.3 391 7.5 430 490 1 1 78.3 1 1 1.26 6 1 5 1319 1 13.5 298 0.2 1 5 3.61 1 53.3 0.2 5.88 12 NE NE 5 Provisional Background Threshold Values (Bedrock Unit) 5.0-7.3 NE NE NE NE 223 223 NE 50 73.3 43 418 18 340 536 1 1 97 1 1 0.4 7 1.19 5 2550 1 13.1 544 0.05 13.1 5 6.56 1 72.6 0.2 5.52 37.9 NE NE 5 MY-03 (Vendor) 12015 Boston Road Roxboro, NC 27574 Water Bedrock 36.54107000 -78.90237000 08/19/2015 5.6 NM 5.48 261 <1 26.9 26.9 <2.5 <5 22 32.2 391 55.6 226 <10 <0.5 <0.5 60.4 <0.2 <0.08 0.13 0.6 <0.5 132 <50 5.9 2.64 8 <0.2 <0.5 1.2 1.16 1.3 30.7 <0.1 <1 31.1 18 NM <5 MY-05 (Vendor) Roxboro Road DB446/309 in Alton, VA Water Bedrock 36.54224000 -78.90265000 05/04/2015 7.1 NM 1.80 572 1.5 <5 <5 <5 <50 84.8 39.7 621 5.7 349 430 <5 <5 54.5 <2 <0.8 <0.03 <5 <5 41.9 953 2.7 4.83 517 <0.2 <5 <5 8.35 <5 <0.5 <1 <10 <50 16 NM <5 MY-07 (Vendor) 1025 Woody Loop Water Bedrock 36.54619000 -78.90144000 09/01/2015 6.1 NM 7.07 85 <1 37 37 <2.5 <5 7.49 5.5 106 2.7 88 <10 <0.5 <0.5 30 <0.2 <0.08 0.63 0.86 <0.5 67.8 <50 1.8 2.41 0.78 <0.2 3.8 1.5 1.4 <0.5 9.66 <0.1 2.5 36.4 18 NM <5 MY-1000 1044 Woody Loop Rd, Alton, VA 24520 Water Unknown 36.54587000 -78.90361000 1/18/2017 7.0 NM 2.70 294 <1 132 132 <2.5 <25 36.1 9.1 474 12.2 152 NA <0.5 0.15 43.5 <0.1 <0.08 0.046 <0.5 <0.1 6.8 83.1 1.1 9.16 67.8 <0.2 14.8 0.64 3.74 <0.5 13.4 <0.1 <0.3 84.4 NM NM <5 MY-1001 682 Old US 501 Hwy, Roxboro, NC 27574 Water Unknown 36.52052000 -78.90183000 1/17/2017 6.3 NM 5.00 144 1.8 71.8 71.8 <2.5 <25 18.3 2.5 91.9 <2 93 NA <0.5 <0.1 8.9 <0.1 <0.08 1.2 1.5 <0.1 47 163 1.1 2.89 4.9 <0.2 <0.5 1.2 1.56 <0.5 8.08 <0.1 2.2 342 NM NM <5 MY-1002 582 Old US 501 Hwy, Roxboro, NC 27574 Water Unknown 36.51943000 -78.90294000 1/17/2017 6.0 NM 5.50 72 <1 32.7 32.7 <2.5 <25 <0.2 2.8 <0.5 2.1 47 NA <0.5 <0.1 <0.3 <0.1 <0.08 2 1.5 <0.1 22.7 81.3 0.56 <0.01 <0.5 <0.2 <0.5 <0.5 0.072 <0.5 17.1 <0.1 <0.3 48.3 NM NM <5 MY-1003 209 Mullins Rd Roxboro NC 27574 Water Unknown 36.51933000 -78.90014000 4/12/2017 6.4 261 0.50 314 1.6 145 145 <2.5 <25 38.4 8.5 107 15.6 237 <10 <0.5 0.23 20.3 <0.1 <0.08 <0.025 <0.5 0.22 4.1 504 0.64 8.51 586 <0.2 <0.5 0.72 6.76 <0.5 13.5 <0.1 0.42 140 NM 56 <5 MY-1004 11167 Huell Matthews Hwy, Alton, VA 24520 Water Unknown 36.55175000 -78.88918000 1/18/2017 7.6 NM 5.50 781 <1 300 300 <2.5 <25 0.307 40.6 1.4 48.1 485 NA <0.5 0.14 <0.3 <0.1 <0.08 0.14 <0.5 <0.1 74.7 <50 1.4 0.147 <0.5 <0.2 1.1 <0.5 1.22 <0.5 199 <0.1 6.2 46.4 NM NM <5 MY-2003-RAW 11243 Huell Matthews Hwy Alton VA 24520 Water Unknown 36.54854222 -78.89874935 7/10/2017 6.3 NM NM NM <0.5 19.5 19.5 <2.7 <25 12.7 33.4 262 2.1 121 <10 <0.5 <0.1 150 <0.1 <0.08 0.093 <0.5 <0.1 8.6 50.7 0.19 3 6.2 <0.2 1 1.4 2.1 <0.5 15.2 <0.1 0.46 153 NM NM <5 MY-2016-RAW 11171 Huell Matthew Hwy, Alton VA 24520 Water Unknown 36.55177000 -78.89740000 7/10/2017 6.2 NM NM NM <0.5 46.7 46.7 <5.3 <25 23.7 33.3 336 1.9 231 <10 <0.5 <0.1 122 <0.1 0.18 0.69 1.3 <0.1 5 <50 3.4 4.8 10.7 <0.2 <0.5 1.7 2.4 <0.5 22.3 <0.1 0.88 141 NM NM <5 FIELD PARAMETERS Total Suspended Solids Bicarbonate AlkalinityAlkalinity WATER QUALITY PARAMETERS WATER QUALITY PARAMETERS FIELD PARAMETERS Thallium INORGANIC PARAMETERS (TOTAL CONCENTRATION) Carbonate Alkalinity Oxidation Reduction Potential TemperatureArsenicAntimony IronCopperCobaltChromiumChromium (VI) SELECTED 40CFR257 APPENDIX III CONSTITUENTS plus Sr Total Dissolved Solids SulfateStrontiumChlorideCalciumBoron SELECTED 40CFR257 APPENDIX III CONSTITUENTS plus Sr INORGANIC PARAMETERS (TOTAL CONCENTRATION) SeleniumPotassiumNickelMolybdenumMercuryManganeseMagnesiumLead SodiumAluminum ZincVanadiumCadmiumBerylliumBariumSample ID Sample Media TurbiditySpecific Conductance Dissolved OxygenEhpHLocation Description Well Screen Location Sample Collection Date LongitudeLatitude 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: R. FALTA PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 4-3 WATER SUPPLY WELL CAPTURE ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA WATER SUPPLY WELLS WELL CAPTURE ZONE PARTICLE TRACKS FORWARD PARTICLE TRACKS (FROM WITHIN ASH BASIN) LEGEND 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com MODIFIED BY: R. ISHAM PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 5-1 REGIONAL GEOLOGIC MAP MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA Source: Modified from Chapman, M.J., Clark, T.W., and Williams, J.H. 2013, Geophysical Logging and Geologic Mapping Data in the Vicinity of the GMH Electronics Superfund Site Near Roxboro, North Carolina. USGS Data Series 763; Reston, VA. 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: EPRI, 2004 PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 5-2 PIEDMONT SLOPE-AQUIFER SYSTEM MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA Source: A Master Conceptual Model for Hydrogeological Site Characterization in the Piedmont and Mountain Region of North Carolina. North Carolina Department of Environment and Natural Resources, Division of Water Quality, Groundwater Section, 2004. <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &<&< &<&< &< &< &< &< #* #* &< &<&<&<&< &<&<&< &< &< &< &< &< &< &<&< &<&<&< &< &< &< &<&< &< &< &< &<&<&< &< &<CRUTCHFIELDBRANCHCZfv CZfv CZfv CZfg CZfg di ZhZh MAYO C R E E K HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE BAIRD CTHIGH PLAINS RDOLD US HWY 501MULLINS LNNEW MAYO DR R T H E S T E R R D US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN BG-1 BG-2 CW-1 CW-1D CW-2 CW-2D CW-3 CW-4 CW-5 CW-6 S-1 S-2 ABMW-1 ABMW-2ABMW-2BR ABMW-3 ABMW-3S ABMW-4ABMW-4BR ABMW-4D MW-2 MW-3 MW-3BR MW-4 MW-5BR MW-6BR MW-7BR MW-7D MW-8BRMW-8D MW-8S MW-9BR MW-10BR MW-11BR MW-12D MW-12S MW-13BR MW-14BR MW-15BR MW-16BR MW-16D MW-16S ABMW-2BRL MW-17BR NOTES:NORTH CAROLINA GEOLOGIC BOUNDARIES MODIFED TO CORRESPOND WITHSYNTERRA FIELD OBSERVATIONS. MAP BASED ON GEOLOGIC SHAPEFILES OBTAINEDFROM THE USGS. USGS OPEN-FILE REPORT 2005-1323, PRELIMINARY INTEGRATEDGEOLOGIC MAP DATABASE FOR THE UNITED STATES: ALABAMA, FLORIDA, GEORGIA,MISSISSIPPI, NORTH CAROLINA AND SOUTH CAROLINA, DATED 2007.(https://pubs.usgs.gov/of/2005/1323/) VIRGINIA GEOLOGIC BOUNDARIES WERE NOT MODIFIED, AND ARE SHOWN FORREFERENCE. GEOLOGIC FEATURE CLASSES OBTAINED FROM THE USGS. OPEN-FILEREPORT 2005-1325. PRELIMINARY INTEGRATED GEOLOGIC MAP DATABASE FOR THEUNITED STATES: DELAWARE, MARYLAND, NEW YORK, PENNSYLVANIA, AND VIRGINIA.(http://pubs.usgs.gov/of/2005/1325/) SHADED RELIEF MAP BASED ON LIDAR DEM 20 DATA FROM NORTH CAROLINA FLOODRISK INFORMATION SYSTEM ACCESSED ON JANUARY 2, 2015. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. OCTOBER, 2016 AERIAL PHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIALDATA GATEWAY (https://gdg.sc.egov.usda.gov.GDGOrder.aspx). DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 6-1GENERALIZED GEOLOGIC MAPMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Generalized Geologic Map.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET NORTH CAROLINA GEOLOGIC UNITS CZfg - FELSIC MICA GNEISS(CHARLOTTE TERRANE) CZfv - FELSIC / MAFIC METAVOLCANIC ROCK(CAROLINA TERRANE) VIRGINIA GEOLOGIC UNITS Zh - PROTEROZOIC METAVOLCANIC SCHIST di - PROTEROZOIC QUARTZ DIORITE &<MONITORING WELL #*TOE DRAIN WATER SUPPLY WELL ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <STREAM LEGEND 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:JOHN CHASTAIN SECTION A-A' 09/01/2017 10/27/2017 5:27 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP X-SECTIONS.dwg FIGURE 6-2 GENERAL CROSS-SECTION A-A' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA PROFILE BASED ON HISTORIC USGS TOPOGRAPHIC MAPRAILROADASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY BOSTON RD (US HWY 501)DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY VERTICAL EXAGGERATION 5X REGOLITH ASH BEDROCK 1981 LANDFILL FORMER CHANNEL OF CRUTCHFIELD BRANCH PROFILE BASED ON HISTORIC USGS TOPOGRAPHIC MAP MAYO LAKE ASH BASINTOP OF DAM 488' ASH TOP OF DAM 444 WATER ELEVATION=433 PROFILE BASED ON HISTORIC USGS TOPOGRAPHIC MAP GENERALIZED GROUNDWATER FLOW DIRECTION PROFILE BASED ON HISTORIC USGS TOPOGRAPHIC MAP GENERALIZED GROUNDWATER FLOW DIRECTIO N WATER ELEVATION=480' BEDROCK REGOLITH REGOLI T H BEDROCK GENERALIZED GROUN D W A T E R FLOW DIRECTION A A' NORTHWEST SOUTHEAST MY-3MY-5GROUNDWATERDIVIDEGROUNDWATERDIVIDEGROUNDWATERDIVIDECW-5MW-5BRMW-14BRMW-4MW-18DMW-18BRMW-19BRMW-19DASH BASIN CRUTCHFIELD BRANCH MAYO LA K E R D RAIL R O A D T R A C K S SOUTH BOSTON RD (US HWY 501)A' A POWER PLANT 0 125 250 500 HORIZONTAL SCALE: 1" = 500' VERTICAL SCALE: 1" = 100' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION: SURFICIAL FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION TRANSITION ZONE FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION BEDROCK FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION ASH FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION NOTE: CROSS SECTION A-A' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE MEASURED JUNE 19 - 20, 2017. 2.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:JOHN CHASTAIN SECTION B-B' 10/17/2017 10/27/2017 5:29 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP X-SECTIONS.dwg FIGURE 6-3 GENERAL CROSS-SECTION B-B' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA ASH BASIN WASTE BOUNDARY VERTICAL EXAGGERATION 5X ASH ASH BASIN BEDROCK PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP WATER ELEVATION=480 GENERALIZED GROU N D W A T E R FLOW DIRECTION B B' SOUTHWEST NORTHEAST RAILROAD TRACKRAILROAD TRACKRAILROAD TRACKASH BASIN DAMCW-2CW-2DDEP-2MY-1001ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY MW-16BRMW-16DMW-16SEARTHEN DAM (FILL)ABMW-3SABMW-3ASH COAL PILE AREA PZ-4PZ-4ASMALL STREAM BEDROCK CRUTCHFIELD BRANCH TRANS I T I O N ALLUVIUM PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP TRANSITION SAPROLITEMW-12SMW-12DSAPROLITEPLANT ACCESS ROADTOP OF DAM 488ABMW-2BRLABMW-2BRABMW-2BEDROCK TRANSITION ASH BASIN CRUTCHFIELD BRANCH MAYO LA K E R D B'RAIL R O A D T R A C K S SOUTH BOSTON RD (US HWY 501)GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL BPOWER PLANT 0 125 250 500 HORIZONTAL SCALE: 1" = 500' VERTICAL SCALE: 1" = 100' 5X VERTICAL EXAGGERATIONMAYO LAKE RDLEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK NOTE: CROSS SECTION B-B' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. SURFICIAL FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION TRANSITION ZONE FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION BEDROCK FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION ASH FLOW LAYER GROUNDWATER WELL WATER LEVEL ELEVATION EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION: NOTES 1.GROUNDWATER WELLS WERE MEASURED JUNE 19 - 20, 2017. 2.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 4 9 0 480 550490500540 4305105 3 0 4405004505 2 0 4903704905105 0 0 410420480380400390430 4604404504 8 0 4 9 0440420450460 480 4 8 0 470 460 4 7 0 440450 ABMW-3482.84 ABMW-4484.51ABMW-4BR484.8 ABMW-4D484.47 MW-3BR421.46 MW-8D432.84 MW-10BR500.09 MW-12D556.58 MW-14BR503.2 MW-15BR405.57 MW-16S367.59 MW-17BR455.84 MW-9BRLNA MW-19DNA ABMW-1NA ABMW-2482.79ABMW-2BR482.5 ABMW-3S482.8 MW-5BR500.25 MW-6BR450.79 MW-7BR444.59 MW-7D442.55 MW-8BR431.38 MW-8S437.01 MW-9BR466.47 MW-11BR490.42 MW-12S556.25 MW-13BR499.28 MW-16BR367.47 MW-16D367.67 ABMW-2BRL482.14 MW-18DNA MW-18BRNA MW-19BRNA MW-2434.05 MW-3377.36 MW-4492.14 BG-1510.48 BG-2512.11 CW-1471.54 CW-1D471.41 CW-2375.08 CW-2D373.57 CW-3420.62 CW-4429.21 CW-5499.68 CW-6449.13 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-4GENERALIZED WATER LEVEL MAPNOVEMBER 2-3, 2016MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, NOVEMBER 2-3. 2016. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 540 530 550 520 370 510 500 490 410420430380450 440460400470390 480 ABMW-1NA ABMW-2482.79 ABMW-2BR ABMW-4484.51 MW-5BR MW-7BR MW-9BR MW-10BR MW-12D MW-12S556.25 MW-16BR MW-18D MW-18BR MW-19DABMW-4BR ABMW-4D MW-3BR MW-6BR MW-7D MW-8BR MW-8D MW-11BR MW-13BR MW-14BR MW-15BR MW-16D ABMW-2BRL MW-17BR MW-9BRL MW-19BR MW-2 MW-4 ABMW-3482.84 ABMW-3S482.8 MW-8S437.01 MW-16S367.59 BG-2 BG-1 MW-3377.36 CW-1 CW-2 CW-4 CW-6 CW-1D CW-2D CW-3 CW-5 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-5SURFICIAL WATER LEVEL MAPNOVEMBER 2-3, 2016MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, NOVEMBER 2-3. 2016. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 440450490 550 490460 540470530 520 480490 500 370510 450 4404604304704204104003 80390480 440ABMW-1 ABMW-2BR ABMW-4BR MW-5BR MW-7BR MW-8BR MW-11BR MW-12S MW-16S ABMW-2 ABMW-3 ABMW-3S ABMW-4 MW-3BR MW-6BR MW-8S MW-9BR MW-10BR MW-13BR MW-14BR MW-15BR MW-16BR ABMW-2BRL MW-17BR MW-9BRL MW-18BR MW-19BR CW-1471.54 CW-2375.08 CW-3420.62 ABMW-4D484.47 MW-7D442.55 MW-8D432.84 MW-12D556.58 MW-16D367.67 MW-18DNA MW-19DNA MW-3 MW-4 MW-2 BG-1 BG-2512.11 CW-5 CW-6 CW-1D CW-2D CW-4 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-6TRANSITION ZONE WATER LEVEL MAPNOVEMBER 2-3, 2016MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, NOVEMBER 2-3. 2016. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 4 9 0 480 490 500450 430510440460500490370490 5105 0 0 4104 8 0380400390430 460 4 9 0 440 470 4 8 0 490 4 8 0 480 470 450450470 460 450 420CW-1 CW-2 CW-3 ABMW-1 ABMW-2 ABMW-4 MW-8S MW-16D MW-18D MW-19D ABMW-3 ABMW-3S ABMW-4D MW-7D MW-8D MW-12DMW-12S MW-16S CW-1D471.41 CW-2D373.57 CW-4429.21 CW-5499.68 CW-6449.13 ABMW-2BR482.5 ABMW-4BR484.8 MW-3BR421.46 MW-5BR500.25 MW-6BR450.79 MW-7BR444.59 MW-8BR431.38 MW-9BR466.47 MW-10BR500.09 MW-11BR490.42 MW-13BR499.28 MW-14BR503.2 MW-15BR405.57 MW-16BR367.47 ABMW-2BRL482.14 MW-17BR455.84 MW-9BRLNA MW-18BRNA MW-19BRNA MW-3 MW-2434.05 MW-4492.14 BG-2 BG-1510.48 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-7BEDROCK WATER LEVEL MAPNOVEMBER 2-3, 2016MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, NOVEMBER 2-3. 2016. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 4 9 0 480 550490500500510 4903704905 0 0 5104104204803804003904 3 0 440 4 6 0 4504905 2 0 5 3 0 5 4 0 460 4504404304204504504504904904 8 0 440450 460 470 4 8 0 4 9 0 ABMW-1480.2 ABMW-2482.9ABMW-2BR482.68 ABMW-3482.88 ABMW-3S482.92 ABMW-4484.72ABMW-4BR484.98 ABMW-4D484.69 MW-3BR420.94 MW-5BR501.17 MW-6BR450.26 MW-7BRABANDONED MW-7DABANDONED MW-8BR431.23 MW-8D431.7 MW-8S437.02 MW-9BR465.15 MW-10BR499.95 MW-11BR491.27 MW-12D556.81 MW-12S556.54 MW-13BR499.69 MW-14BR503.12 MW-15BR405.04 MW-16BR365.36 MW-16D365.72MW-16S367.28 ABMW-2BRL482.36 MW-17BR455.51 MW-18D492.96 MW-9BRLNA MW-18BR496.71 MW-19BR486.31 MW-19D487.59 MW-2434.45 MW-3377.31 MW-4491.98 BG-1510.47 BG-2511.31 CW-1471.17 CW-1D471.01 CW-2374.98 CW-2D373.44 CW-3420.34 CW-4429.31 CW-5501.16 CW-6450.07 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4P4A FIGURE 6-8GENERALIZED WATER LEVEL MAPJUNE 19-20, 2017MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, JUNE 19-20, 2017. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 370 540 530 550 520 510 500 490 410420430 3 8 0 450 440460 4 0 0 470 3 9 0 480 ABMW-2BR ABMW-4BR ABMW-4D MW-3BR MW-5BR MW-6BR MW-7BR MW-7D MW-8BR MW-8D MW-9BR MW-10BR MW-11BR MW-12D MW-13BR MW-14BR MW-15BR MW-16BR MW-16D ABMW-2BRL MW-17BR MW-18D MW-9BRL MW-18BR MW-19BRMW-19D MW-2 MW-4 ABMW-1480.2 ABMW-2482.9 ABMW-3482.88 ABMW-3S482.92 ABMW-4484.72 MW-8S437.02 MW-12S556.54 MW-16S367.28 BG-1 BG-2 MW-3377.31 CW-1 CW-1D CW-2 CW-2D CW-3 CW-4 CW-5 CW-6 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-9SURFICIAL WATER LEVEL MAPJUNE 19-20, 2017MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, JUNE 19-20, 2017. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 440 450 550 4604 7 0 540530 500 490 520 370510 450 440 46043 047042041 0400380390480 4804 9 0490ABMW-1 ABMW-2 ABMW-2BR ABMW-3 ABMW-3S ABMW-4 ABMW-4BR MW-3BR MW-5BR MW-6BR MW-7BR MW-8BR MW-8S MW-9BR MW-10BR MW-11BR MW-12S MW-13BR MW-14BR MW-15BR MW-16BRMW-16S ABMW-2BRL MW-17BR MW-9BRL MW-18BR MW-19BR CW-1471.17 CW-2374.98 CW-3420.34 ABMW-4D484.69 MW-7DABANDONED MW-8D431.7 MW-12D556.81 MW-16D365.72 MW-18D492.96 MW-19D487.59 MW-2 MW-3 MW-4 BG-1 BG-2511.31 CW-1D CW-2D CW-4 CW-5 CW-6 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-10TRANSITION ZONE WATER LEVEL MAPJUNE 19-20, 2017MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, JUNE 19-20, 2017. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY &<&< &<&< &<&< &<&< & & & < < < & & < < & &&&& &&& & & & && &&& & & & && & & & &&& & & & & & && < <<<< <<< < < < << <<< < < < << < < < <<< < < < < < << && && & & & & << << < < < < 4 9 0 480 490 500450 430510440460500 450490370490 5105 0 0 3804104 8 0400390430 490 440 460 470 4 8 0 450490 470 4 8 0 460450440420480 470 460 450 CW-1 CW-2 CW-3 ABMW-1 ABMW-2 ABMW-3 ABMW-3S ABMW-4 ABMW-4D MW-7D MW-8D MW-8S MW-12DMW-12S MW-16DMW-16S MW-18D MW-19D CW-1D471.01 CW-2D373.44 CW-4429.31 CW-5501.16 CW-6450.07 ABMW-2BR482.68 ABMW-4BR484.98 MW-3BR420.94 MW-5BR501.17 MW-6BR450.26 MW-7BRABANDONED MW-8BR431.23 MW-9BR465.15 MW-10BR499.95 MW-11BR491.27 MW-13BR499.69 MW-14BR503.12 MW-15BR405.04 MW-16BR365.36 ABMW-2BRL482.36 MW-17BR455.51 MW-9BRLNA MW-18BR496.71 MW-19BR486.31 MW-3 MW-2434.45 MW-4491.98 BG-2 BG-1510.47 R.O.W. 100' FGDPONDS ASH BASINWATER LEVEL 480' HALIFAX COUNTY PERSON COUNTYPERSON COUNTY HALIFAX COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) R T H E S T E R R D BOSTON RD (US HWY 501)M A Y O L A K E R D MAYO LAKE RD BOSTON RD (US HWY 501)HAUL ROAD TO LANDFILL HAUL ROAD TO LANDFI LLRAILROADRAILROADRAILROADLOUISIANA PACIFIC CORPORATION PLANT ACCESS ROAD MAYO LAKEWATER ELEVATION 432.3' MAYO PLANT RAW WATERINTAKESTRUCTURE CRUCTHFIELDBRANCH UNNAMED BRANCH 1981 C&DLANDFILL P1 P1A P2 P2A P3 P3A P4 P4A FIGURE 6-11BEDROCK WATER LEVEL MAPJUNE 19-20, 2017MAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo_CSA_Sup2_WL_Report_Display.mxd 400 0 400 800200 IN FEET GRAPHIC SCALE NOTES:WATER LEVELS COLLECTED BY SYNTERRA, JUNE 19-20, 2017. NA = NOT AVAILABLE PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88(NAVD 88). AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JULY 13, 2017.AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). LEGEND &<ASSESSMENT WELLELEVATION IN FEET (NAVD 88) &<BACKGROUND COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<DOWNGRADIENT COMPLIANCE WELLELEVATION IN FEET (NAVD 88) &<MONITORING WELLELEVATION IN FEET (NAVD 88) WATER SUPPLY WELL WATER LEVEL CONTOUR IN FEET (NAVD 88) <STREAM WETLAND PER AMEC 2015 NRTR REPORT DUKE ENERGY PROGRESS PARCEL LINE GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY LANDFILL BOUNDARY ASH BASIN COMPLIANCE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< <<<<<<< &< &< &< &< &< &<&< &<&< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE (APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION R A IL R O A D R A IL R O A D RAILROADR.O.W. 100' FGD PONDS MAYO LAKE R T HESTER RD NEW MAYO DRUS HWY 501BOSTON RDM A Y O L A K E R D 1981 C&D LANDFILL ASH BASIN CW-1 to CW-1D 0.0119 CW-2 to CW-2D 0.0408 CW-3 to MW-03BR -0.0128 CW-5 to MW-05BR -0.0005 CW-6 to MW-6BR 0.0314 ABMW-02 to ABMW-02BRL 0.0043 ABMW-03 to ABMW-03S -0.0025 ABMW-04 to ABMW-04BR -0.0048 MW-18D to MW-18BR -0.0627 MW-19D to MW-19BR 0.0319 MW-08S to MW-08BR 0.2689 MW-12S to MW-12D -0.0058 MW-16S to MW-16BR 0.0403 NOTES:WATER LEVELS WERE COLLECTED BY SYNTERRAJUNE 19-20, 2017. SURFACE/CONTOUR DATA TRUNCATED AT EXTENT OFSAMPLING DATA. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PROON SEPTEMBER 27, 2017. AERIAL WAS COLLECTED ON JUNE13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTHCAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 FIGURE 6-12 POTENTIAL VERTICAL GRADIENT BETWEEN SHALLOW AND DEEP ZONES MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINADRAWN BY: B. YOUNG PROJECT MANAGER: J. WYLIE CHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Potential Vertical Gradient.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND &<MONITORING WELL WATER SUPPLY WELL ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANT SITE BOUNDARY <STREAM Well ID Hydraulic Gradient (ft per ft) Flow Direction ABMW-02 to ABMW-02BRL 0.0043 Down ABMW-03 to ABMW-03S -0.0025 Up ABMW-04 to ABMW-04BR -0.0048 Up CW-1 to CW-1D 0.0119 Down CW-2 to CW-2D 0.0408 Down CW-3 to MW-03BR -0.0128 Up CW-5 to MW-05BR -0.0005 Up CW-6 to MW-6BR 0.0314 Down MW-08S to MW-08BR 0.2689 Down MW-12S to MW-12D -0.0058 Up MW-16S to MW-16BR 0.0403 Down MW18D to MW-18BR -0.0627 Up MW-19D to MW-19BR 0.0319 Down 0 WELL ID VERTICAL GRADIENT (FT per FT)FLOW DIRECTION POTENTIAL VERTICAL GRADIENT UPWARD: -0.13332 DOWNWARD: 0.268197 POTENTIAL VERTICAL GRADIENT (foot per foot)1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<< <<<<<<<<<<<<<<<<<<<<< <<<<<<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&< &< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADCCP MONOFILL RAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD M ULLINS LNOLD US HWY 501W O O D Y S S T O R E R D US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILL ASH BASIN NOTES:SHADED RELIEF MAP BASED ON LIDAR DEM 20 DATA FROM NORTH CAROLINA FLOODRISK INFORMATION SYSTEM ACCESSED ON JANUARY 2, 2015. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. OCTOBER, 2016 AERIAL PHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIALDATA GATEWAY (https://gdg.sc.egov.usda.gov.GDGOrder.aspx). DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 6-13FRACTURE TRACE ANALYSISMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - FractureTraceAnalysis.mxd 600 0 600 1,200300 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL FRACTURE TRACE <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND !( !( !(!( !(!< !< !( !( !( FGDPONDS RAILROADRAILROAD RAILROADBOSTON ROADHIGHWAY 501(100' RIGHT-OF-WAY)ABMW-01 ABMW-02BR MW-16BR ABMW-03S MW-03BR SB-07 MW-15BR SB-05 SB-06 1981 C&DLANDFILL ASH BASIN FIGURE 7-1POTENTIAL SECONDARY SOURCESOIL ANALYTICAL RESULTSMAYO ST EAM ELECTRIC PL ANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORT H C AROLIN ADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Fig07-01 - SecondarySoilResults_Mayo.mxd 0 300 600 900150 GRAPHIC SCALE IN FEET NOTES:BOUNDARIES PROVIDED BY DUKE ENERGY PROGRESS. 2016 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIAL DATAGATEWAY (https://gdg.sc.egov.usda.gov/GDGOrder.aspx). DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). ASH BASIN WASTE BOUNDARY LEGEND ASH BASIN COMPLIANCE BOUNDARY UNSATURATED SOIL SAMPLE LOCATION AND DEPTH(FEET BELOW GROUND SURFACE)!( SATURATED SOIL SAMPLE LOCATION AND DEPTH(FEET BELOW GROUND SURFACE)!( 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Fig07-01 - SecondarySoilResults_Mayo.mxd MAYO LAKE COI RESULT UNITS PBTV PSRG ARSENIC 11.2 mg/kg 5.68 5.8 STRONTIUM 83.7 mg/kg 62.5 NE AB-03 (41.7 - 42.5) MAYO LAKE ROAD LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY FIGURE 9-1PIPER DIAGRAM ̶ SURFACE WATER AND AOWSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\PiperWell ID % DifferenceNotes:Cyan– Surface WatersPurple–AOWsOpen symbols – Reference LocationsData with charge balance >10% are omitted from plotData included for analysis from May / July 201720%40%60%80%Ca20%40%60%80%ClIIIJJJKKKLLLOOOHHHJJJEEELLLPPPIIIEEEIS-01 0.419JS-02 1.471KS-02B 3.045LS-05 4.303OS-08 8.566HS-09 4.373JS-03 1.100ES-06 8.566LSW-CB1 2.688PSW-CB2 4.145ISW-CBT1 8.285ESW-REF1 9.813 FIGURE 10-1PIPER DIAGRAM SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Piper\Well ID % DifferenceNotes:Black – Within or below ashBlue - DowngradientGreen – BackgroundData with charge balance >10% are omitted from plot.Data included for analysis from March / April 2017.PorewaterPorewaterPorewater20%40%60%80%Ca20%40%60%80%ClPPPMMMBBBKKKJJJAAAPABMW-2 2.233MABMW-3 0.271BABMW-4 6.984KABMW-3S 3.997JMW-3 4.599AMW-16S 2.495MW-12S 11.224 FIGURE 10-2PIPER DIAGRAMTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\PiperWell ID % DifferenceNotes:Black – Within or below ashBlue - DowngradientGreen – BackgroundData with charge balance >10% are omitted from plotData included for analysis from March / April 2017.PorewaterPorewaterPorewater20%40%60%80%Ca20%40%60%80%ClPPPMMMBBBKKKBBBIIIMMMOOOPPPJJJMMMPABMW-2 2.233MABMW-3 0.271BABMW-4 6.984KABMW-4D 2.001BCW-1 9.185ICW-2 0.883MCW-3 3.596OCW-4 4.146MW-12D 11.619MW-16D 13.726PMW-18D 6.348JMW-19D 4.217MBG-2 7.201 20%40%60%80%Ca20%40%60%80%ClPPPMMMBBBKKKIIIAAAJJIIICCCOOOGGGMMMAAACCDPPPBBBIIIMMMJJJPPPPABMW-2 2.139MABMW-3 0.336BABMW-4 6.879KABMW-2BR 7.177IABMW-2BRL 8.002AABMW-4BR 5.799ICW-2D 7.941CCW-6 7.714OMW-2 8.947GMW-3BR 6.847MMW-4 6.500AMW-8BR 4.468CMW-13BR 3.710PMW-18BR 5.451BMW-19BR 8.112IMW-14BR 6.914MMW-10BR 5.714JMW-5BR 4.240PCW-5 4.926FIGURE 10-3PIPER DIAGRAMBEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTROXBORO, NORTH CAROLINA148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.comDRAWN BY: E. KINSEYPROJECT MANAGER: J. WYLIELAYOUT: DATE: AUGUST 2017FILEPATH: P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\PiperWell ID % DifferenceNotes:Black – Within or below ashBlue - DowngradientGreen – BackgroundOrange – UpgradientData with charge balance >10% are omitted from plot.Data included for analysis from March / April 2017.PorewaterPorewaterPorewaterCW-1D 10.505MW-16BR 16.056 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1 ABMW-1*323 MW-12S†1.11 ABMW-4*547 ABMW-2*957 M4 ABMW-3*191 MW-3ND ABMW-3SND MW-16SND NOTES:THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 1μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-1ISOCONCENTRATION MAP -ARSENIC IN SUR FICIA L GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL ARSENIC CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1 10ABMW-4D26.9 MW-7DND MW-12DND BG-2ND CW-1ND CW-2ND CW-3ND MW-18DND MW-19DND MW-16DND NOTES:THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 1μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-2ISOCONCENTRATION MAP -ARSENIC IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL ARSENIC CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1ABMW-4BR1.26 MW-5BR1.06 ABMW-2BR3.06 ABMW-2BRL1.88 MW-7BRND MW-2ND BG-1ND CW-1DND CW-2DND CW-4ND CW-5ND CW-6ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-19BRND MW-13BRND MW-14BRND MW-4ND MW-16BRND MY-3ND MY-5ND MY-7ND MW-11BR NOTES:THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 1μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-3ISOCONCENTRATION MAP -ARSENIC IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL ARSENIC CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1 9 ABMW-1*520 MW-356 MW-12S13 ABMW-4*592 ABMW-2*113 ABMW-3*258 ABMW-3S22 MW-16S70 NOTES:THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 19 μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-4ISOCONCENTRATION MAP -BARIUM IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BARIUM CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 80700MW-7D18 MW-12D15 BG-247 CW-2122 CW-316 MW-19D62 ABMW-4D890 MW-16D6 CW-1NDMW-18DND NOTES:THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 80 μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-5ISOCONCENTRATION MAP -BARIUM IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BARIUM CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D97 97 97MW-7BR157 MW-251 CW-427 BG-184 CW-2D31 CW-642 MW-3BR38 MW-8BR22 MW-18BR96 MW-19BR53 ABMW-4BR113 CW-546 MW-5BR37 MW-13BR32 MW-14BR15 ABMW-2BR115ABMW-2BRL72 MW-48 MW-16BR12 MY-360.4 MY-554.5 MY-730 CW-1DND MW-10BRND MW-11BR NOTES:THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 97 μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-6ISOCONCENTRATION MAP -BARIUM IN B ED ROCK GROUND WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BARIUM CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 5 0 7 0 0 ABMW-1*5820 MW-3982 ABMW-4*6520 ABMW-2*8800 ABMW-3*2000 ABMW-3S1330 MW-16S179 MW-12SND NOTES:THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 50μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-7ISOCONCENTRATION MAP -BORON IN SURFICIAL GROU NDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BORON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 50 700CW-2808 B3 ABMW-4D3470 MW-7DND MW-12DND BG-2ND CW-1ND CW-3ND MW-18DND MW-19DND MW-16DND NOTES:THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 50μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-8ISOCONCENTRATION MAP -BORON IN TR ANSITION ZONE GROUN DWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BORON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 507 0 0 CW-2D290 B3 MW-7BRND MW-2ND BG-1ND CW-1DND CW-6ND CW-4ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-19BRND ABMW-4BRND CW-5ND MW-5BRND MW-13BRND MW-14BRND ABMW-2BRNDABMW-2BRLND MW-4ND MW-16BRND MY-3ND MY-5ND MY-7ND MW-11BR NOTES:THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 50μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-9ISOCONCENTRATION MAP -BORON IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL BORON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D ABMW-1*50.6 B2 MW-329.5 MW-12S†5.1 ABMW-4*122 ABMW-2*50.4 ABMW-3*61.4 ABMW-3S3.32 MW-16S14.1 NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR CALCIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 3 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-10ISOCONCENTRATION MAP -CALCIUM IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CALCIUM CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 60 6 0 MW-7D53.5 B1 MW-12D12.1 BG-255.3 CW-19.73 CW-217.1 CW-364.5 MW-18D42.1 MW-19D110 ABMW-4D119 MW-16D26 NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR CALCIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 60 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-11ISOCONCENTRATION MAP -CALCIUM IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CALCIUM CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 75 7 5 75MW-7BR52.5 B1 MW-218.6 BG-112.9 CW-1D47.6 CW-2D85.7 CW-412.7 CW-556.1 CW-6†112 MW-3BR148 MW-8BR74.4 MW-10BR32 MW-18BR99.4 MW-19BR126 ABMW-4BR75.3 MW-5BR†93.3 MW-13BR64.4 MW-14BR13.9 ABMW-2BR76.5 ABMW-2BRL69.9 MW-430.1 MW-16BR29.4 MY-322 MY-5†84.8 MY-77.49 MW-11BR NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR CALCIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 75 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-12ISOCONCENTRATION MAP -CALCIUM IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CALCIUM CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 3 ABMW-1*13 MW-350 MW-12S0.56 ABMW-4*12 ABMW-2*15 ABMW-3*70 ABMW-3S12 MW-16S35 NOTES:THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 3 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-13ISOCONCENTRATION MAP -CHLORIDE IN SUR FICIA L GR OUND WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CHLORIDE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 3333 33 MW-7D†73 MW-12D4.3 BG-2†35 CW-118 CW-250 CW-392 MW-18D25 MW-19D150 ABMW-4D13 MW-16D10 NOTES:THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 33 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-14ISOCONCENTRATION MAP - CHLORIDE INTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CHLORIDE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 45 4545 4 5 MW-7BR11 MW-214 BG-110 CW-1D10 CW-2D35 CW-692 CW-47.3 MW-3BR150 MW-8BR110 MW-10BR20 MW-18BR66 MW-19BR160 ABMW-4BR5.2 CW-539 MW-5BR69 MW-13BR33 MW-14BR13 ABMW-2BR28ABMW-2BRL23 MW-47.6 MW-16BR8.1 MY-332.2 MY-539.7 MY-75.5 MW-11BR NOTES:THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 45 mg/L * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-15ISOCONCENTRATION MAP -CHLORIDE IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND CHLORIDE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &<&< &<&< &<&< &<&<&<&<&<&< &<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONR AILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROAD1981 C&DLANDFILL ASH BASIN R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-12S1.06 MW-16S2.66 ABMW-1*0.83 MW-30.19 MW-12S4.4 ABMW-2*0.084 MW-16S0.028 ABMW-1*ND MW-3ND ABMW-4*ND ABMW-2*ND ABMW-3*ND ABMW-3SND ABMW-4*ND ABMW-3*ND ABMW-3SND NOTES:THE NORTH CAROLINA 2L FOR TOTAL CHROMIUM IS 10 μg/L. PROVISIONAL THRESHOLD BACKGROUND VALUE IS 3.2 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-16ISOCONCENTRATION MAP -CHROMIUM (VI) AND CHROMIUM (TOTAL) IN SURFICIALGROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps_Chromium.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND TOTAL CHROMIUM CONCENTRATION (μg/L)1 TOTAL CHROMIUM NOT DETECTED ABOVEREPORTING LIMITND CHROMIUM (VI) CONCENTRATION (µg/L)1 CHROMIUM (VI) NOT DETECTED ABOVEREPORTING LIMITND NORTH CAROLINA 2L CONTOUR PBTV CONTOUR <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &<&< &<&< &<&< &<&< &<&< &<&< &<&< &<&< &<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONR AILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROAD1981 C&DLANDFILL ASH BASIN R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D6 MW-12D1.25 CW-11.55 CW-39.58 ABMW-4D1.3 MW-12D0.63 CW-10.21 CW-20.19 M1 CW-30.083 MW-18D0.054 MW-16D0.67 MW-7DND BG-2ND CW-2ND MW-18DND MW-19DND MW-16DND MW-7DND BG-2ND MW-19DND ABMW-4DND NOTES:THE NORTH CAROLINA 2L FOR TOTAL CHROMIUM IS 10 μg/L. PROVISIONAL THRESHOLD BACKGROUND VALUE IS 6 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-17ISOCONCENTRATION MAP -CHROMIUM (VI) AND CHROMIUM (TOTAL) IN TRANSITIONZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps_Chromium.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND TOTAL CHROMIUM CONCENTRATION (μg/L)1 TOTAL CHROMIUM NOT DETECTED ABOVEREPORTING LIMITND CHROMIUM (VI) CONCENTRATION (µg/L)1 CHROMIUM (VI) NOT DETECTED ABOVEREPORTING LIMITND NORTH CAROLINA 2L CONTOUR PBTV CONTOUR <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &<&< &< &< &< &< &< &<&< &< &< &< &< &<&< &<&< &<&< &<&< &<&< &<&< &<&<&< &>&> &<&< &<&< &<&<&<&< &<&< &<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONR AILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROAD1981 C&DLANDFILL ASH BASIN R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-8BR2.34 MW-13BR1.54 MY-30.6 MY-70.86 MW-20.08 BG-10.25 CW-1D0.041 CW-40.26 MW-10BR0.074 CW-50.043MW-14BR0.048 ABMW-2BR0.7 ABMW-2BRL0.91 MW-40.06 MY-30.13 MY-70.63 MW-7BRND MW-2ND CW-1DND CW-2DND CW-4ND CW-5ND CW-6ND BG-1ND MW-3BRND MW-10BRND MW-18BRND MW-19BRND ABMW-4BRND MW-5BRND MW-14BRND ABMW-2BRND ABMW-2BRLND MW-4ND MW-16BRND MY-5ND MW-11BR MW-7BRND CW-2DND CW-6ND MW-3BRND MW-8BRND MW-18BRND MW-19BRND ABMW-4BRND MW-5BRND MW-13BRND MW-16BRND MY-5ND NOTES:THE NORTH CAROLINA 2L FOR TOTAL CHROMIUM IS 10 μg/L. PROVISIONAL THRESHOLD BACKGROUND VALUE IS 7 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-18ISOCONCENTRATION MAP -CHROMIUM (VI) AND CHROMIUM (TOTAL) IN BEDROCKGROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps_Chromium.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND TOTAL CHROMIUM CONCENTRATION (μg/L)1 TOTAL CHROMIUM NOT DETECTED ABOVEREPORTING LIMITND CHROMIUM (VI) CONCENTRATION (µg/L)1 CHROMIUM (VI) NOT DETECTED ABOVEREPORTING LIMITND NORTH CAROLINA 2L CONTOUR PBTV CONTOUR <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D1 ABMW-1*3.87 MW-12S†1.59 ABMW-4*2.5 ABMW-3S2.04 MW-3ND ABMW-2*ND ABMW-3*ND MW-16SND NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR COBALT IS 1 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 1 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-19ISOCONCENTRATION MAP -COBALT IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL COBALT CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1ABMW-4D5.9 MW-7DND MW-12DND BG-2ND CW-1ND CW-2ND CW-3ND MW-18DND MW-19DND MW-16DND NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR COBALT IS 1 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 1μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-20ISOCONCENTRATION MAP -COBALT IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL COBALT CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1.25MW-21.88 MW-13BR†3.08 MW-7BRND BG-1ND CW-1DND CW-2DND CW-5ND CW-6ND CW-4ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-19BRND ABMW-4BRND MW-5BRND MW-14BRND ABMW-2BRND ABMW-2BRLND MW-4ND MW-16BRND MY-3ND MY-5ND MY-7ND MW-11BR NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR COBALT IS 1 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 1.25 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-21ISOCONCENTRATION MAP -COBALT IN BEDR OCK GR OUND WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL COBALT CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 3 8 5 ABMW-1*1450 MW-12S†6820 ABMW-4*7170 ABMW-2*95 ABMW-3*15800 ABMW-3S1520 MW-16S94 MW-3ND NOTES:THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 385 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-22ISOCONCENTRATION MAP -IRON IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL IRON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1 3 2 0 MW-7D353 MW-12D242 BG-2500 CW-1289 CW-3211 MW-19D2030 ABMW-4D58800 MW-16D316 CW-2ND MW-18DND NOTES:THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 1,320 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-23ISOCONCENTRATION MAP -IRON IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL IRON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 3359MW-7BR369 MW-2574 BG-149 CW-1D27 CW-2D226 CW-62040 CW-4153 MW-3BR313 MW-8BR†587 MW-18BR241 MW-19BR1080 ABMW-4BR438 CW-5360 MW-5BR†7100 MW-13BR†3260 MW-14BR52 ABMW-2BR1230ABMW-2BRL1840 MW-4182 MW-16BR505 MY-5953 MW-10BRND MY-3ND MY-7ND MW-11BR NOTES:THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 3,359 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-24ISOCONCENTRATION MAP -IRON IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL IRON CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 253ABMW-1*982 MW-31280 MW-12S†395 ABMW-4*2620 ABMW-2*452 ABMW-3*836 ABMW-3S364 MW-16S129 NOTES:THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 253 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-25ISOCONCENTRATION MAP -MAN GANESE IN SURFICIAL GROU NDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MANGANESE CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 300300MW-7D77 MW-12D45 BG-2117 CW-118 CW-2118 CW-319 MW-19D1100 ABMW-4D6960 MW-16D124 MW-18DND NOTES:THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 300 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-26ISOCONCENTRATION MAP - MANGANESE INTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MANGANESE CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 545 545 545 545MW-7BR198 MW-2564 BG-16 CW-1D11 CW-2D785 CW-6†1440 MW-3BR550 MW-8BR278 MW-10BR54 MW-18BR1360 MW-19BR1220 ABMW-4BR363 CW-5464 MW-5BR†1830 MW-13BR383 MW-14BR130 ABMW-2BR242ABMW-2BRL341 MW-4178 MW-16BR158 MY-38 MY-5†517 MY-70.78 CW-4ND MW-11BR NOTES:THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 545 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-27ISOCONCENTRATION MAP -MANGANESE IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MANGANESE CONCENTRATION (μg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D ABMW-1*304 MW-12S1.97 ABMW-4*471 ABMW-2*1560 M4 ABMW-3*39.8 MW-3ND ABMW-3SND MW-16SND NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR MOLYBDENUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 3.15 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-28ISOCONCENTRATION MAP -MOLYBD EN UM IN SUR FICIA L GR OUND WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MOLYBDENUM CONCENTRATION (μg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1 1 ABMW-4D8.1 MW-16D5.98 MW-7DND MW-12DND BG-2ND CW-1ND CW-2ND CW-3ND MW-18DND MW-19DND NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR MOLYBDENUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS SET AT REPORTING LIMIT OF 1μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-29ISOCONCENTRATION MAP - MOLYBD EN UM INTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MOLYBDENUM CONCENTRATION (μg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1313MW-7BR2.39 MW-21.63 CW-1D22 CW-2D1.13 CW-63.53 MW-8BR2.46 MW-18BR1.85ABMW-4BR8.57 MW-5BR1.02 MW-13BR2.2 MW-14BR4.34 ABMW-2BR10.9ABMW-2BRL2 MW-42.7 MW-16BR49.2 MY-73.8 BG-1ND CW-4ND MW-3BRND MW-10BRND MW-19BRND CW-5ND MY-3ND MY-5ND MW-11BR NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR MOLYBDENUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 13 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-30ISOCONCENTRATION MAP -MOLYBDENUM IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL MOLYBDENUM CONCENTRATION (μg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 25ABMW-1*1890 MW-3334 MW-12S†27 ABMW-4*3160 ABMW-2*1380 ABMW-3*1650 ABMW-3S75 MW-16S178 NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR STRONTIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 25 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-31ISOCONCENTRATION MAP -STRON TIUM IN SU RFICIAL GROUN DWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND STRONTIUM CONCENTRATION (µg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 391 391391MW-7D447 MW-12D85 BG-2309 CW-167 CW-2232 CW-3317 MW-18D159 MW-19D398 ABMW-4D1740 MW-16D176 NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR STRONTIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 391 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-32ISOCONCENTRATION MAP - STRON TIUM INTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND STRONTIUM CONCENTRATION (µg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 418 418418MW-7BR1040 MW-2184 BG-1169 CW-1D172 CW-2D411 CW-6336 CW-4132 MW-3BR402 MW-8BR342 MW-10BR201 MW-18BR477 MW-19BR447 ABMW-4BR1940 CW-5167 MW-5BR231 MW-13BR360 MW-14BR143 ABMW-2BR1110 ABMW-2BRL2320 MW-4112 MW-16BR109 MY-3391 MY-5†621 MY-7106 MW-11BR NOTES:NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE CONCENTRATIONESTABLISHED FOR STRONTIUM. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 418 μg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-33ISOCONCENTRATION MAP -STRON TIUM IN BEDROC K GROU NDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND STRONTIUM CONCENTRATION (µg/L)1 STANDARD CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D1.6 ABMW-1*21 MW-322 MW-12S0.95 ABMW-4*56 ABMW-2*36 ABMW-3*33 ABMW-3S0.49 MW-16S10 NOTES:THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 1.6 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-34ISOCONCENTRATION MAP -SULFATE IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND SULFATE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 7.5 7 .5 7.57.57.5MW-7D10 MW-12D1.1 BG-25.5 CW-18.5 CW-237 CW-315 MW-18D37 MW-19D56 ABMW-4D0.78 MW-16D7.6 NOTES:THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 7.5 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-35ISOCONCENTRATION MAP -SU LFATE IN TRAN SITION ZONE GR OUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND SULFATE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &<&< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 181818 MW-7BR2.8 MW-218 BG-10.27 CW-1D3.5 CW-2D62 CW-425 CW-426 CW-56.4 CW-638 CW-1D3.3 CW-2D61 CW-424 MW-3BR11 MW-8BR37 MW-10BR87 MW-18BR13 MW-19BR53 ABMW-4BR30 CW-56.3MW-5BR1.4 MW-13BR15 MW-14BR8.9 ABMW-2BR8.2 ABMW-2BRL0.28 MW-439 MW-16BR0.62 MY-3†55.6 MY-55.7 MY-72.7 MW-11BR NOTES:THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 18 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-36ISOCONCENTRATION MAP -SULFATE IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND SULFATE CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 85ABMW-1*370 MW-3200 MW-12S51 ABMW-4*560 ABMW-2*440 ABMW-3*350 ABMW-3S96 MW-16S140 NOTES:THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 85 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-37ISOCONCENTRATION MAP - TOTAL DISSOLVEDSOLIDS IN SURFICIAL GROU NDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 430430500 500 MW-7D370 MW-12D96 BG-2320 CW-1120 CW-2160 CW-3390 MW-18D280 MW-19D620 ABMW-4D600 MW-16D160 NOTES:THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 430 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-38ISOCONCENTRATION MAP - TOTAL DISSOLVEDSOLIDS IN TR ANSITION ZONE GROUN DWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 3403403 4 0 500 500 500 MW-7BR270 MW-2210 BG-1110 CW-1D210 CW-2D320 CW-6520 CW-4160 MW-3BR700 MW-8BR†490 MW-10BR310 MW-18BR440 MW-19BR730 ABMW-4BR330 CW-5310 MW-5BR440 MW-13BR340 MW-14BR210 ABMW-2BR360ABMW-2BRL310 MW-4210 MW-16BR200 MY-3226 MY-5†349 MY-788 MW-11BR NOTES:THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 340 mg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-39ISOCONCENTRATION MAP - TOTAL DISSOLVEDSOLIDS IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &<&<&< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D ABMW-1*56.7 MW-12S†2.8 ABMW-4*3.66 ABMW-2*0.87 ABMW-3*0.475 MW-3ND ABMW-3SND MW-16SND NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR VANADIUM IS 0.3μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 1 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-40ISOCONCENTRATION MAP -VAN ADIU M IN SURFICIAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL VANADIUM CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 5.9MW-7D0.734 MW-12D0.805 BG-25.06 CW-11.08 CW-31.92 MW-18D1.3ABMW-4D10.4 MW-16D0.795 CW-2ND MW-19DND NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR VANADIUM IS 0.3μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 5.9 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-41ISOCONCENTRATION MAP - VAN ADIU M INTRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL VANADIUM CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &> &< &< &<&< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-20.684 BG-13.76 CW-1D1.19 CW-2D0.677 CW-41.34 MW-8BR1.22 MW-10BR2.11 ABMW-4BR0.308 MW-14BR2.45 MW-41.03 MY-72.5 MW-7BRND CW-6ND MW-3BRND MW-18BRND MW-19BRND CW-5ND MW-5BRND MW-13BRND ABMW-2BRND ABMW-2BRLND MW-16BRND MY-3ND MY-5ND MW-11BR NOTES:THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR VANADIUM IS 0.3μg/L. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 5.5 µg/L. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-42ISOCONCENTRATION MAP -VANADIUM IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND TOTAL VANADIUM CONCENTRATION (μg/L)1 IMAC CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &<&< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-35.9 MW-12S6.2 ABMW-1*7.7 ABMW-3*6.9 ABMW-3S4.9 ABMW-4*7.4 MW-16S6.7 ABMW-2*7.8 NOTES:THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 4.9 - 6.5 S.U. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-43ISOCONCENTRATION MAP -pH IN SURFIC IAL GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND pH CONCENTRATION (S.U.)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-12D5.9 BG-26.5 CW-15.9 CW-25.2 CW-36.5 ABMW-4D6.3 MW-16D6.9 MW-18D6.4 MW-19D6.8 NOTES:THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 5.7 - 6.6 S.U. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 11-44ISOCONCENTRATION MAP -pH IN TRANSITION ZONE GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND pH CONCENTRATION (S.U.)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &< &< &< &< &<&< &< &< &< &< &< &< &< &> &< &< &< &< &< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D MW-25.7 CW-1D7.0 CW-2D6.7 CW-46.1 CW-56.7 CW-66.5 ABMW-2BR7.8ABMW-2BRL7.8 ABMW-4BR7.8 BG-15.6 MW-3BR7.0 MW-46.9 MW-5BR7.1 MW-8BR6.4 MW-10BR6.2 MW-13BR7.1 MW-14BR6.6 MW-16BR7.9 MW-18BR7.1 MW-19BR7.0 MY-35.6 MY-57.1 MY-76.1 MW-11BR NOTES:THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND THRESHOLD VALUE IS 5.0 - 7.3 S.U. * ASH PORE WATER WELL DISPLAYED IN THE SURFICIAL GROUNDWATER UNIT FORANALYSIS BUT NOT USED TO CONTOUR. † CONCENTRATION GREATER THAN CURRENT SITE SPECIFIC PBTV BUT WITHIN THEBACKGROUND CONCENTRATION RANGE FOR SIMILAR PIEDMONT GEOLOGICSETTINGS. DUE TO GROUNDWATER FLOW DIRECTION AND OTHER CONSTITUENTMIGRATION PATTERNS, CONCENTRATION DOES NOT SUGGEST IMPACT FROM THEASH BASIN. DATA MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLENOTES FOR QUALIFIER DEFINITIONS. CONCENTRATIONS REPORTED ON FIGURE REPRESENT MOST RECENT VALIDSAMPLE RESULTS FOR EACH WELL. DATA WITH HIGH TURBIDITY (>10 NTU) ORRESULTS THAT INDICATE GROUT CONTAMINATION OF THE WELL (PH>9) HAVE BEENREMOVED FROM DATASET. COLLECTION DATES DEPICTED ON FIGURE RANGE FROMMARCH 2015 TO JULY 2017. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). WATER SUPPLY WELL SAMPLED BY NCDEQ BETWEEN MARCH 2015 AND SEPTEMBER2015. FIGURE 11-45ISOCONCENTRATION MAP -pH IN BEDROCK GROUNDWATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORTH C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Isoconcentration Maps.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND NOT DETECTED ABOVE REPORTING LIMITND pH CONCENTRATION (S.U.)1 NORTH CAROLINA 2L CONTOUR PBTV CONTOUR &<DOWNGRADIENT MONITORING WELL &<BACKGROUND MONITORING WELL &>PIEZOMETER WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY FIGURE 11-46 CONCENTRATION VERSUS DISTANCE FROM SOURCE – pH, BORON, STRONTIUM, SULFATE, TDS, ARSENIC CONSTITUENTS DUKE ENERGY PROGRESS, LLC MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures LEGEND 15 NCAC 02L Standard Surficial Well Transition Zone Well Bedrock Well Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 11-47 CONCENTRATION VERSUS DISTANCE FROM SOURCE – BARIUM, CHROMIUM (VI), CHROMIUM, COBALT, IRON, MANGANESE DUKE ENERGY PROGRESS, LLC MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures LEGEND 15 NCAC 02L Standard Surficial Well Transition Zone Well Bedrock Well Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 11-48 CONCENTRATION VERSUS DISTANCE FROM SOURCE – MOLYBDENUM, VANADIUM, RADIUM DUKE ENERGY PROGRESS, LLC MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA Note: Wells used for each graph within this figure are consistent and are as follows: Source Area Surficial Zone: ABMW-04 Transition Zone: ABMW-04D Bedrock: ABMW-04BR Roughly 3000’ from Source Area Surficial Zone: MW-03 Transition Zone: CW-02 Bedrock: CW-02D Roughly 4000’ from Source Area Surficial Zone: MW-16S Transition Zone: MW-16D Bedrock: MW-16BR 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures LEGEND 15 NCAC 02L Standard Surficial Well Transition Zone Well Bedrock Well Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 3.06 1.88 ND ND ND ND ND 957 ND 547 1.26 ND 191 1026.9 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-ARSENIC 10/18/2017 10/27/2017 5:53 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-49 ARSENIC ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD 3.06 ND CONCENTRATION IN µg/L ARSENIC ISOPLETH IN µg/L (2L STANDARD = 10 µg/L) CONCENTRATION IS NON-DETECT ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR ARSENIC IS 1 μg/L WITHIN THE SURFICIAL, TRANSITION ZONE, AND BEDROCK FLOW LAYERS. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. ASH BASIN DAM PROGRESS ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 113 115 72 258 22 122 31 70 6 12 12 56 592 890 113 700 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-BARIUM 10/18/2017 10/27/2017 5:32 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-50 BARIUM ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 122 CONCENTRATION IN µg/L BARIUM ISOPLETH IN µg/L (2L STANDARD = 700 µg/L) 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR BARIUM IS 19 μg/L WITHIN THE SURFICIAL FLOW LAYER, 78.3 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 97 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS ND ND 1330 2000 808 290 179 ND ND 700 8800 700 700 6520 3470 ND 982 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-BORON 10/18/2017 10/27/2017 5:33 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-51 BORON ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR BORON IS 50 μg/L WITHIN THE SURFICIAL, TRANSITION ZONE, AND BEDROCK FLOW LAYERS. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. 808 ND CONCENTRATION IN µg/L BORON ISOPLETH IN µg/L (2L STANDARD = 700 µg/L) CONCENTRATION IS NON-DETECT GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK PROGRESS 46.5 69.9 3.32 61.4 17.1 85.7 14.1 26 29.4 50.4 122 29.5 119 75.3 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 75 75 75 75 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-CALCIUM 10/18/2017 10/27/2017 5:34 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-52 CALCIUM ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR CALCIUM IS NOT ESTABLISHED. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR CALCIUM IS 2.89 mg/L WITHIN THE SURFICIAL FLOW LAYER, 59.2 mg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 73.3 mg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING, BACKGROUND CONCENTRATIONS RANGE UP TO 106 mg/L. 3.32 CONCENTRATION IN mg/L CALCIUM ISOPLETH IN mg/L (INTERMEDIATE VALUE = 75 mg/L) GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK PROGRESS 28 23 12 70 50 35 35 10 8.1 15 12 50 13 5.2 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-CHLORIDE 10/18/2017 10/27/2017 5:36 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-53 CHLORIDE ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR CHLORIDE IS 3.3 mg/L WITHIN THE SURFICIAL FLOW LAYER, 33.3 mg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 43 mg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. 50 CONCENTRATION IN mg/L GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK PROGRESS VI: ND T: ND ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH VI: ND T: 1.3 VI: ND T: ND VI: 0.7 T: ND VI: 0.084 T: ND VI: 0.91 T: ND VI: ND T: ND VI: ND T: ND VI: 0.19 T: ND VI: ND T: ND VI: 0.19 T: ND VI: 0.028 T: 2.66 VI: 0.67 T: ND VI: ND T: ND 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-CHROMIUM(VI & TOTAL) 10/18/2017 10/27/2017 5:37 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-54 CHROMIUM (HEXAVALENT AND TOTAL) ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR HEXAVALENT AND TOTAL CHROMIUM IS 10 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR HEXAVALENT CHROMIUM IS 0.088 μg/L WITHIN THE SURFICIAL FLOW LAYER, 1.26 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 0.40 μg/L WITHIN THE BEDROCK FLOW LAYER. PROVISIONAL BACKGROUND CONCENTRATION FOR TOTAL CHROMIUM IS 3.23 μg/L WITHIN THE SURFICIAL FLOW LAYER, 6 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 7 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. VI: 0.7 T: 1.3 ND CONCENTRATION IN µg/L (VI = HEXAVALENT RESULT; T = TOTAL RESULT) CONCENTRATION IS NON-DETECT GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. PROGRESS ND ND ND ND 2.04 ND ND ND ND ND 2.5 5.9 ND ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH ND 1 1 1 1 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-COBALT 06/14/2016 10/27/2017 5:38 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-55 COBALT ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 5.9 ND CONCENTRATION IN µg/L COBALT ISOPLETH IN µg/L (IMAC STANDARD = 1 µg/L) CONCENTRATION IS NON-DETECT 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR COBALT IS 1 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR COBALT IS 1.02 μg/L WITHIN THE SURFICIAL FLOW LAYER, 1 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 1.19 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS 1230 1840 1520 15800 ND 226 94 505 95 7170 438 ND 316 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 58800 2,550 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-IRON 06/14/2016 10/27/2017 5:41 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-56 IRON ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 226 ND CONCENTRATION IN µg/L CONCENTRATION IS NON-DETECT 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR IRON IS 385 μg/L WITHIN THE SURFICIAL FLOW LAYER, 1,319 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 2,550 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING,BACKGROUND CONCENTRATIONS RANGE UP TO 4,227 μg/L. PROGRESS IRON ISOPLETH IN µg/L (BACKGROUND BEDROCK = 2,550 µg/L) 242 341 364 836 118 785 129 124 158 452 2620 363 1280 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 500 6960 500 500 500 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-MANGANESE 06/14/2016 10/27/2017 5:44 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-57 MANGANESE ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 226 CONCENTRATION IN µg/L 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR MANGANESE IS 253 μg/L WITHIN THE SURFICIAL FLOW LAYER, 298 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 519 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING,BACKGROUND CONCENTRATIONS RANGE UP TO 1,198 μg/L. MANGANESE ISOPLETH IN µg/L (INTERMEDIATE VALUE = 500 µg/L) PROGRESS 10.9 2 ND 39.8 ND 1.13 ND 5.98 49.2 1560 ND 8.57 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 10 10 10 10 8.1 471 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-MOLYBDENUM 06/14/2016 10/27/2017 5:45 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-58 MOLYBDENUM ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 8.57 ND CONCENTRATION IN µg/L MOLYBDENUM ISOPLETH IN µg/L (INTERMEDIATE VALUE = 10 µg/L) CONCENTRATION IS NON-DETECT 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR MOLYBDENUM IS NOT ESTABLISHED. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR MOLYBDENUM IS 3.15 μg/L WITHIN THE SURFICIAL FLOW LAYER, 5 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 13.1 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING,BACKGROUND CONCENTRATIONS RANGE UP TO 35 μg/L. PROGRESS 7.8 6.9 4.9 7.8 7.8 6.7 6.9 7.9 5.2 6.7 7.4 5.9 7.8 6.3 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-PH 06/14/2016 10/27/2017 5:46 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-59 pH ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 7.8 CONCENTRATION IN STANDARD UNITS (S.U.) 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR pH IS A RANGE FROM 6.5 - 8.5 S.U. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR pH IS A RANGE FROM 4.9 - 6.5 S.U. WITHIN THE SURFICIAL FLOW LAYER, 5.7 - 6.6 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 5.0 - 7.3 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION.PROGRESS 1380 1650 178 176 109 411 232 1110 2320 3160 334 1940 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 400 418 75 418 418 1740 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-STRONTIUM 06/14/2016 10/27/2017 5:47 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-60 STRONTIUM ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 411 CONCENTRATION IN µg/L STRONTIUM ISOPLETH IN µg/L (BACKGROUND BEDROCK = 418 µg/L) 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR STRONTIUM IS NOT ESTABLISHED. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR STRONTIUM IS 25 μg/L WITHIN THE SURFICIAL FLOW LAYER, 391 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 418 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING, BACKGROUND CONCENTRATIONS RANGE UP TO 760 mg/L. PROGRESS 36 33 0.49 10 7.6 39 0.62 62 8.2 0.28 56 22 0.78 30 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-SULFATE 06/14/2016 10/27/2017 5:48 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-61 SULFATE ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 122 CONCENTRATION IN mg/L 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR SULFATE IS 1.6 mg/L WITHIN THE SURFICIAL FLOW LAYER, 7.5 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 18 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS 440 350 96 140 160 160 320 200 360 310 330 200 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH 560 600 500 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-TDS 06/14/2016 10/27/2017 5:49 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-62 TOTAL DISSOLVED SOLIDS ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 122 CONCENTRATION IN mg/L TOTAL DISSOLVED SOLIDS (TDS) ISOPLETH IN mg/L (2L VALUE = 500 mg/L) 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL LEGEND GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS (TDS) IS 500 mg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR TDS IS 85 mg/L WITHIN THE SURFICIAL FLOW LAYER, 430 mg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 340 mg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. PROGRESS 0.87 0.475 ND ND 0.795 ND 0.677ND 3.66 ND 0.308 ASH BASIN WASTE BOUNDARY ASH C C' SOUTHWEST NORTHEAST MAYO LAKE RDASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY MAYO STEAM ELECTRIC PLANT PROPERTY TRANSITION ALLUVIUM SAPROLITE BEDROCK GRAVEL ROADASH BASIN TOP OF DAM 488' PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP ASH BASIN MAYO LA K E R D C'CRAIL R O A D T R A C K S PROFILE BASED ON 1968 USGS TOPOGRAPHIC MAP BEDROCK BEDROCK ASH ASH ND ND 6 10.4 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: JERRY WYLIE DATE:ADAM FEIGL CC-VANADIUM 06/14/2016 10/27/2017 5:52 PM P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP CC Analytical.dwg FIGURE 11-63 VANADIUM ANALYTICAL RESULTS CROSS-SECTION C-C' MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA VERTICAL EXAGGERATION 5X MW-16BRMW-16DMW-16SABMW-3SABMW-3ABMW-4ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4BRCW-2DCW-2MW-3WATER ELEVATION=480' EARTHEN DAM (FILL) CRUTCHFIELD BRANCH ASH BASIN DAM CRUTCHFIELD BRANCH SW-CB2BOX CULVERT UNDER ROAD ASH BASIN MAYO LA K E R D C'CGROUNDWATER FLOW DIRECTION 0.87 ND CONCENTRATION IN µg/L VANADIUM ISOPLETH IN µg/L (INTERMEDIATE VALUE = 6 µg/L) CONCENTRATION IS NON-DETECT 0 75 150 300 HORIZONTAL SCALE: 1" = 300' VERTICAL SCALE: 1" = 60' 5X VERTICAL EXAGGERATION GENERALIZED WATER TABLE ASH ASH PORE WATER LITHOLOGIC CONTACT MW-16BR MW-16D MW-16S MW-12S ABMW-2 MY-1001 WELL IN TRANSITION ZONE WELL IN SAPROLITE MATERIAL WELL IN ALLUVIUM MATERIAL WELL IN COMPETENT BEDROCK WELL IN ASH PORE WATER NCDEQ WATER SUPPLY WELL GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION BEDROCK EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "MAYO PLANT FINAL", DATED MAY 19, 2015. HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR CLUSTER SPRINGS, VA DATED 1968. PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS SOURCE INFORMATION NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND ALL LOCATIONS NOT ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. NOTES 1.GROUNDWATER WELLS WERE SAMPLED JUNE 19 - 20, 2017. 2.THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION (IMAC) FOR VANADIUM IS 0.3 μg/L. 3.PROVISIONAL BACKGROUND CONCENTRATION FOR VANADIUM IS 0.974 μg/L WITHIN THE SURFICIAL FLOW LAYER, 5.90 μg/L WITHIN THE TRANSITION ZONE FLOW LAYER, AND 5.52 μg/L WITHIN THE BEDROCK FLOW LAYER. 4.ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM (NAVD) OF 1988. AT NEARBY ROXBORO PLANT, IN A SIMILAR GEOLOGIC SETTING, BACKGROUND CONCENTRATIONS RANGE UP TO 30 mg/L. LEGEND PROGRESS !(!( !(!(!( !( !( !( !( !( &< &< &<&< &<&< &< &< &< &< &< &<&<&<&< &<&<&< &< &< &< &< &< &< &<&< &<&<&< &< &< &< &<&< &< &< &< &<&<&< &>&> &>&> &>&> &>&> !(#* !(#* !(#* !(#* !(#* !(#* !(#* ") ") !(#*!(#*!(#* !(#* &< &> &< &<&< !( ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADSOUTH CREEKEXPOSURE AREA CRUTCHFIELD BRANCHEXPOSURE AREA ASH BASINEXPOSURE AREA NEW MAYO DR OLD US HWY 501MULLINS LNR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D S-06 SW-CB1 BG-1 BG-2 CW-1 CW-1D CW-2 CW-2D CW-3 CW-4 CW-5 CW-6 ABMW-1 ABMW-2 ABMW-2BR ABMW-3 ABMW-3S ABMW-4ABMW-4BR ABMW-4D MW-2 MW-3 MW-3BR MW-4 MW-5BR MW-6BR MW-7BR MW-7D MW-8BR MW-8D MW-8S MW-9BR MW-10BR MW-11BR MW-12D MW-12S MW-13BR MW-14BR MW-15BR MW-16BR MW-16D MW-16S ABMW-2BRL DEP-1 DEP-2 DEP-3 S-01S-01A S-02 S-02A S-02B S-03 S-04 S-07 S-08 S-09 P1 P1A P2 P2A P3P3A P4 P4A MW-17BR SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 AB-1 AB-2 AB-3 AB-4 SW-CB2 SW-REF1 NOTES:GENERALIZED AREAL EXTENT OF MIGRATION REPRESENTED BY NCAC 02LEXCEEDANCES OF BORON, MANGANESE, AND STRONTIUM. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 12-1EXPOSURE AREASHUMAN HEALTH RISK ASSESSMENTMAYO ST EAM ELECTRIC PL ANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORT H C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Human Health.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND &<MONITORING WELL &>PIEZOMETER !(#*SOIL BORING ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL AREA OF CONCENTRATION IN GROUNDWATERABOVE NC2L (SEE NOTES) ASH BASIN EXPOSURE AREA CRUTCHFIELD BRANCH EXPOSURE AREA SOUTH CREEK EXPOSURE AREA <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY !(!( !(!(!( !( !( !( !( !( ") ") !( ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION ASH BASIN 1981 C & DLANDFILL RAILROADRAILROADMAYO LAKE RAILROADFGDPONDS R.O.W. 100' SOUTH CREEKEXPOSURE AREA CRUTCHFIELD BRANCHEXPOSURE AREA ASH BASINEXPOSURE AREA ASH BASINDOWNGRADIENTEXPOSURE AREA NEW MAYO DR OLD US HWY 501MULLINS LNR T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D S-06 SW-CB1 S-01 S-01A S-02 S-02A S-02B S-03S-04 S-07 S-08 S-09 SW-CB2 SW-REF1 NOTES:GENERALIZED AREAL EXTENT OF MIGRATION REPRESENTED BY NCAC 02LEXCEEDANCES OF BORON, MANGANESE, AND STRONTIUM. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 12-2EXPOSURE AREASECOLOGICAL RISK A SSESSMENTMAYO ST EAM ELECTRIC PL ANTDUKE ENERGY PROGRESS, LLCROXBORO, N ORT H C AROLIN ADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/27/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Ecological Risk.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET LEGEND ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL AREA OF CONCENTRATION IN GROUNDWATERABOVE NC2L (SEE NOTES) ASH BASIN EXPOSURE AREA ASH BASIN DOWNGRADIENT EXPOSURE AREA CRUTCHFIELD BRANCH EXPOSURE AREA SOUTH CREEK EXPOSURE AREA <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHABMW-3S 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-12S 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-3 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-16S 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 14-1 TIME VERSUS CONCENTRATION pH IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHBG-2 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHCW-3 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-16D 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHABMW-4D 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHCW-2 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-12D FIGURE 14-2 TIME VERSUS CONCENTRATION pH IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHABMW-2BRL 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHABMW-2BR 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHABMW-4BR 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHBG-1 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHCW-2D 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Nov-10Apr-12Aug-13Dec-14May-16Sep-17pHCW-6 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-3BR 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 Dec-14Apr-15Jul-15Oct-15Jan-16May-16Aug-16Nov-16Mar-17Jun-17Sep-17pHMW-16BR FIGURE 14-3 TIME VERSUS CONCENTRATION pH IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)ABMW-3S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-12S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-3 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-16S 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures FIGURE 14-4 TIME VERSUS CONCENTRATION ARSENIC IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial ALLUVIUM Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-5 TIME VERSUS CONCENTRATION ARSENIC IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 0 20 40 60 80 100 120 140 160 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)ABMW-4D 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)BG-2 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)CW-2 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)CW-3 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-12D 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-16D 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)ABMW-2BR 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)ABMW-2BRL 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)ABMW-4BR 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)BG-1 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)CW-2D 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-3BR 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Arsenic Concentration (μg/L)CW-6 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Arsenic Concentration (μg/L)MW-16BR FIGURE 14-6 TIME VERSUS CONCENTRATION ARSENIC IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-3 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-16S 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)ABMW-3S 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-12S FIGURE 14-7 TIME VERSUS CONCENTRATION BARIUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 200 400 600 800 1000 1200 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)ABMW-4D 0 200 400 600 800 1000 1200 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)BG-2 0 200 400 600 800 1000 1200 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)CW-2 0 200 400 600 800 1000 1200 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)CW-3 0 200 400 600 800 1000 1200 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-12D 0 200 400 600 800 1000 1200 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-16D FIGURE 14-8 TIME VERSUS CONCENTRATION BARIUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)ABMW-2BR 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)ABMW-4BR 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)CW-2D 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-3BR 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)ABMW-2BRL 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)BG-1 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Barium Concentration (μg/L)CW-6 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Barium Concentration (μg/L)MW-16BR FIGURE 14-9 TIME VERSUS CONCENTRATION BARIUM IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 200 400 600 800 1000 1200 1400 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)ABMW-3S 0 200 400 600 800 1000 1200 1400 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-12S 0 200 400 600 800 1000 1200 1400 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-3 0 200 400 600 800 1000 1200 1400 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-16S FIGURE 14-10 TIME VERSUS CONCENTRATION BORON IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 1000 2000 3000 4000 5000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)ABMW-4D 0 1000 2000 3000 4000 5000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (μg/L)CW-2 0 1000 2000 3000 4000 5000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-12D 0 1000 2000 3000 4000 5000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-16D 0 1000 2000 3000 4000 5000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (μg/L)CW-3 0 1000 2000 3000 4000 5000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (ug/L)BG-2 FIGURE 14-11 TIME VERSUS CONCENTRATION BORON IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (ug/L)ABMW-2BR 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (ug/L)ABMW-4BR 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (μg/L)CW-2D 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-3BR 0 100 200 300 400 500 600 700 800 May-16Aug-16Nov-16Mar-17Jun-17Sep-17Boron Concentration (μg/L)ABMW-2BRL 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (μg/L)BG-1 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Boron Concentration (μg/L)CW-6 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Boron Concentration (μg/L)MW-16BR FIGURE 14-12 TIME VERSUS CONCENTRATION BORON IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-13 TIME VERSUS CONCENTRATION TOTAL AND HEXAVALENT CHROMIUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Total Chromium - Alluvial Total Chromium - Surficial 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-3 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)ABMW-3S 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-16S 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-12S Hexavalent Chromium - Surficial Hexavalent Chromium - Alluvial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 0.5 1 1.5 2 2.5 3 3.5 4 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)ABMW-4D 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)BG-2 0 1 2 3 4 5 6 7 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)CW-2 0 2 4 6 8 10 12 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)CW-3 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-12D 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-16D FIGURE 14-14 TIME VERSUS CONCENTRATION TOTAL AND HEXAVALENT CHROMIUM IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Total Chromium Transition Zone Hexavalent Chromium Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)ABMW-2BR 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)ABMW-4BR 0 1 2 3 4 5 6 7 8 9 10 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)CW-2D 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-3BR 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)MW-16BR 0 1 2 3 4 5 6 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)CW-6 0 2 4 6 8 10 12 14 16 18 20 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Chromium Concentration (μg/L)BG-1 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Chromium Concentration (μg/L)ABMW-2BRL FIGURE 14-15 TIME VERSUS CONCENTRATION TOTAL AND HEXAVALENT CHROMIUM IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Hexavalent Chromium Bedrock Total Chromium Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-16 TIME VERSUS CONCENTRATION COBALT IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-3 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-16S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)ABMW-3S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-12S Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)ABMW-4D 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)CW-2 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)CW-3 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)BG-2 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-12D 0 1 2 3 4 5 6 7 8 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-16D FIGURE 14-17 TIME VERSUS CONCENTRATION COBALT IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)ABMW-2BR 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)ABMW-4BR 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)CW-2D 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-3BR 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)MW-16BR 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)CW-6 0 0.2 0.4 0.6 0.8 1 1.2 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Cobalt Concentration (μg/L)BG-1 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Cobalt Concentration (μg/L)ABMW-2BRL FIGURE 14-18 TIME VERSUS CONCENTRATION COBALT IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-19 TIME VERSUS CONCENTRATION IRON IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial 0 500 1000 1500 2000 2500 3000 3500 4000 4500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-3 0 2000 4000 6000 8000 10000 12000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)ABMW-3S 0 2000 4000 6000 8000 10000 12000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-12S 0 500 1000 1500 2000 2500 3000 3500 4000 4500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-16S Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-20 TIME VERSUS CONCENTRATION IRON IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone 0 10000 20000 30000 40000 50000 60000 70000 80000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)ABMW-4D 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)BG-2 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)CW-2 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-12D 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-16D 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)CW-3 Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)ABMW-4BR 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)CW-2D 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-3BR 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)ABMW-2BR 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)ABMW-2BRL 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)BG-1 0 500 1000 1500 2000 2500 3000 3500 4000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Iron Concentration (μg/L)CW-6 0 500 1000 1500 2000 2500 3000 3500 4000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Iron Concentration (μg/L)MW-16BR FIGURE 14-21 TIME VERSUS CONCENTRATION IRON IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-3 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)ABMW-3S 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-12S 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-16S FIGURE 14-22 TIME VERSUS CONCENTRATION MANGANESE IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 1000 2000 3000 4000 5000 6000 7000 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)ABMW-4D 0 200 400 600 800 1000 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)CW-2 0 100 200 300 400 500 600 700 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-12D 0 100 200 300 400 500 600 700 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-16D 0 100 200 300 400 500 600 700 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)CW-3 0 100 200 300 400 500 600 700 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)BG-2 FIGURE 14-23 TIME VERSUS CONCENTRATION MANGANESE IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)ABMW-2BR 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)ABMW-4BR 0 200 400 600 800 1000 1200 1400 1600 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)CW-2D 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-3BR 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)ABMW-2BRL 0 200 400 600 800 1000 1200 1400 1600 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)BG-1 0 200 400 600 800 1000 1200 1400 1600 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Manganese Concentration (μg/L)CW-6 0 200 400 600 800 1000 1200 1400 1600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Manganese Concentration (μg/L)MW-16BR FIGURE 14-24 TIME VERSUS CONCENTRATION MANGANESE IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-25 TIME VERSUS CONCENTRATION MOLYBDENUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-3 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-16S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)ABMW-3S 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-12S Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-26 TIME VERSUS CONCENTRATION MOLYBDENUM IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone 0 50 100 150 200 250 300 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)ABMW-4D 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)BG-2 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)CW-2 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)CW-3 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-12D 0 2 4 6 8 10 12 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-16D Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)ABMW-2BR 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)ABMW-4BR 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)CW-2D 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-3BR 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)ABMW-2BRL 0 2 4 6 8 10 12 14 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Molybdenum Concentration (μg/L)BG-1 0 2 4 6 8 10 12 14 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)CW-6 0 10 20 30 40 50 60 70 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Molybdenum Concentration (μg/L)MW-16BR FIGURE 14-27 TIME VERSUS CONCENTRATION MOLYBDENUM IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-28 TIME VERSUS CONCENTRATION SULFATE IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial 0 5 10 15 20 25 30 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-3 0 5 10 15 20 25 30 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-12S 0 5 10 15 20 25 30 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-16S 0 5 10 15 20 25 30 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)ABMW-3S Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 10 20 30 40 50 60 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)ABMW-4D 0 10 20 30 40 50 60 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)CW-2 0 10 20 30 40 50 60 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-12D 0 10 20 30 40 50 60 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)BG-2 0 10 20 30 40 50 60 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)CW-3 0 10 20 30 40 50 60 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-16D FIGURE 14-29 TIME VERSUS CONCENTRATION SULFATE IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 10 20 30 40 50 60 70 80 90 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)ABMW-2BR 0 10 20 30 40 50 60 70 80 90 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)ABMW-2BRL 0 10 20 30 40 50 60 70 80 90 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)ABMW-4BR 0 10 20 30 40 50 60 70 80 90 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)CW-2D 0 10 20 30 40 50 60 70 80 90 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-3BR 0 10 20 30 40 50 60 70 80 90 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Sulfate Concentration (mg/L)MW-16BR 0 10 20 30 40 50 60 70 80 90 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)CW-6 0 10 20 30 40 50 60 70 80 90 Nov-10Apr-12Aug-13Dec-14May-16Sep-17Sulfate Concentration (mg/L)BG-1 FIGURE 14-30 TIME VERSUS CONCENTRATION SULFATE IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-3 0 100 200 300 400 500 600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-16S 0 100 200 300 400 500 600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)ABMW-3S 0 100 200 300 400 500 600 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-12S FIGURE 14-31 TIME VERSUS CONCENTRATION TOTAL DISSOLVED SOLIDS IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial SAPROLITE Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)ABMW-4D 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)BG-2 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)CW-2 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)CW-3 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-12D 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-16D FIGURE 14-32 TIME VERSUS CONCENTRATION TOTAL DISSOLVED SOLIDS IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)ABMW-2BR 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)ABMW-4BR 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)CW-2D 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-3BR 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)MW-16BR 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)CW-6 0 100 200 300 400 500 600 700 800 Nov-10Apr-12Aug-13Dec-14May-16Sep-17TDS Concentration (mg/L)BG-1 0 100 200 300 400 500 600 700 800 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17TDS Concentration (mg/L)ABMW-2BRL FIGURE 14-33 TIME VERSUS CONCENTRATION TOTAL DISSOLVED SOLIDS IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-3 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μug/L)MW-16S 0 0.2 0.4 0.6 0.8 1 1.2 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)ABMW-3S 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-12S FIGURE 14-34 TIME VERSUS CONCENTRATION VANADIUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Alluvial Surficial Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)ABMW-4D 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)CW-2 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-12D 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)BG-2 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)CW-3 0 5 10 15 20 25 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-16D FIGURE 14-35 TIME VERSUS CONCENTRATION VANADIUM IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Transition Zone Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)ABMW-2BR 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)ABMW-4BR 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)CW-2D 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-3BR 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)MW-16BR 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)CW-6 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)BG-1 0 1 2 3 4 5 6 7 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Vanadium Concentration (μg/L)ABMW-2BRL FIGURE 14-36 TIME VERSUS CONCENTRATION VANADIUM IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. FIGURE 14-37 TIME VERSUS CONCENTRATION STRONTIUM IN SURFICIAL ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures ALLUVIUM SAPROLITE 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) (September 1, 2017) Alluvial Surficial 0 50 100 150 200 250 300 350 400 450 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)ABMW-3S 0 50 100 150 200 250 300 350 400 450 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-12S Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 50 100 150 200 250 300 350 400 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-3 0 50 100 150 200 250 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-16S FIGURE 14-38 TIME VERSUS CONCENTRATION STRONTIUM IN TRANSITION ZONE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) (September 1, 2017) Transition Zone 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-12D 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)ABMW-4D 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)CW-2 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)BG-2 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)CW-3 0 500 1000 1500 2000 2500 3000 3500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-16D Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)ABMW-2BR 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)ABMW-4BR 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)CW-2D 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-3BR 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)MW-16BR 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)CW-6 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)BG-1 0 500 1000 1500 2000 2500 Dec-14Jul-15Jan-16Aug-16Mar-17Sep-17Strontium Concentration (μg/L)ABMW-2BRL FIGURE 14-39 TIME VERSUS CONCENTRATION STRONTIUM IN BEDROCK MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC ROXBORO, NORTH CAROLINA 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: E. KINSEY PROJECT MANAGER: J. WYLIE LAYOUT: DATE: AUGUST 2017 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\CSA Sup 2\Figures 15 NCAC 02L Standard LEGEND Provisional Background Threshold Values (PBTVs) (September 1, 2017) Bedrock Note: Data presented may include lab-qualified results. Refer to analytical data table notes for qualifier definitions. Non-detect analytical results are plotted at the corresponding reporting limit. <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &< &<&< &<&< &<&<&< &< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN ABMW-4D26.9 MW-16BRND ABMW-2957 M4ABMW-2BR3.06 ABMW-2BRL1.88 ABMW-3191 MW-7BRND MW-7DND ABMW-1323 MW-2ND MW-3ND MW-12DND MW-12S1.11 BG-1ND BG-2ND CW-1ND CW-1DND CW-2ND CW-2DND CW-3ND CW-4ND CW-5ND CW-6ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-18DND MW-19BRND MW-19DNDABMW-4547 ABMW-4BR1.26 MW-5BR1.06 MW-13BRND MW-14BRND ABMW-3SND MW-4ND MW-16DNDMW-16SND NOTES:ARSENIC CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 10ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-40GROUNDWATER CONCENTRATIONTREND ANALYSIS -ARSENIC IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &<&< &< &< &< &<&< &< &<&< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-7D18 MW-12D15 BG-184 BG-247 MW-8BR22 MW-18BR96 MW-19BR53 MW-19D62 MW-48 ABMW-4592 ABMW-2BRL72 MW-7BR157 ABMW-1520 MW-251 MW-356 MW-12S13 CW-1ND CW-1DND CW-427 CW-2122 CW-2D31 CW-642 CW-316 MW-3BR38 MW-10BRND MW-18DND ABMW-4BR113 ABMW-4D890 CW-546 MW-5BR37 MW-13BR32 MW-14BR15 ABMW-2113 ABMW-3258 ABMW-3S22 MW-16BR12 MW-16D6 MW-16S70 NOTES:BARIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 700ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-41GROUNDWATER CONCENTRATIONTREND ANALYSIS -BARIUM IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &< &< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN ABMW-4D3470 MW-3982 CW-2808 B3 ABMW-46520 ABMW-32000 ABMW-3S1330 MW-16S179 MW-7BRND MW-7DND ABMW-15820 MW-2ND MW-12DND MW-12SND BG-1ND CW-1DND BG-2ND CW-1ND CW-2D290 B3 CW-6ND CW-3ND CW-4ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-18DND MW-19BRND MW-19DND ABMW-4BRND CW-5ND MW-5BRND MW-13BRND MW-14BRND ABMW-28800ABMW-2BRND ABMW-2BRLND MW-4ND MW-16BRND MW-16DND NOTES:BORON CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 700ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-42GROUNDWATER CONCENTRATIONTREND ANALYSIS -BORON IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &< &< &< &< &< &< &< &<&< &< &< &<&< &<&< &<&<&< &< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-7BR52.5 B1 MW-7D53.5 B1 ABMW-150.6 B2 MW-218.6 MW-329.5 MW-12D12.1 MW-12S5.1 BG-112.9 CW-1D47.6 CW-2D85.7 CW-412.7 CW-556.1 CW-6112 BG-254.6 CW-19.73 CW-217.1 CW-364.5 MW-3BR148 MW-8BR74.4 MW-10BR32 MW-18BR99.4 MW-18D42.1 MW-19BR126 MW-19D110ABMW-4122 ABMW-4BR75.3 ABMW-4D119 MW-5BR93.3 MW-13BR64.4 MW-14BR13.9 ABMW-250.4 ABMW-2BR76.5 ABMW-361.4 ABMW-3S3.32 MW-430.1 MW-16BR29.4 MW-16D26 MW-16S14.1 NOTES:CALCIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD ISNOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-43GROUNDWATER CONCENTRATIONTREND ANALYSIS -CALCIUM IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-7BR11 MW-7D73 ABMW-113 MW-214 MW-350 MW-12D4.3 MW-12S0.56 BG-110 BG-235 CW-118 CW-1D10 CW-250 CW-2D35 CW-692 CW-392 CW-47.3 MW-3BR150 MW-8BR110 MW-10BR20 MW-18BR66 MW-18D25 MW-19BR160 MW-19D150ABMW-412 ABMW-4BR5.2 ABMW-4D13 CW-539 MW-5BR69 MW-13BR33 MW-14BR13 ABMW-215 ABMW-2BR28 ABMW-370 ABMW-3S12 MW-47.6 MW-16BR8.1 MW-16D10 MW-16S35 NOTES:CHLORIDE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS250 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-44GROUNDWATER CONCENTRATIONTREND ANALYSIS -CHLORIDE IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&<&<&< &<&< &<&< &<&< &<&<&<&< &< &< &< &< &< &< &<&< &< &<&<&< &<&<&< &< &<&< &< &<&< &<&< &<&< &<&<&<&< &<&<&<&< &<&<&<&<&<&< &<&<&< &<&< &<&< &<&<&<&<&<&<&<&<&<&< &<&< &<&<&<&<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE MW-7BR(VI)ND MW-7BR(TOTAL)ND MW-7D(VI)ND MW-7D(TOTAL)ND ABMW-1(TOTAL)ND MW-2(TOTAL)ND MW-3(VI)0.19 MW-12D(VI)0.63 MW-12D(TOTAL)1.25 MW-12S (TOTAL)1.06 BG-2(TOTAL)ND CW-1D(TOTAL)ND CW-2D (TOTAL)ND CW-4(TOTAL)ND CW-5 (TOTAL)ND CW-6(TOTAL)ND BG-1 (VI)0.25 BG-1(TOTAL)ND BG-2 (VI)ND CW-1 (VI)0.21 CW-1(TOTAL)1.55 CW-1D(VI)0.041 CW-2 (VI)0.19 M1 CW-2 (TOTAL)ND CW-3 (VI)0.083 CW-3 (TOTAL)9.58 MW-3BR(VI)ND MW-3BR(TOTAL)ND MW-8BR(VI)ND MW-8BR(TOTAL)2.34 MW-10BR (VI)0.074 MW-10BR(TOTAL)ND MW-18BR(TOTAL)ND MW-18D(TOTAL)ND MW-19BR(TOTAL)ND MW-19D(VI)NDABMW-4 (VI)ND ABMW-4(TOTAL)ND ABMW-4BR(VI)ND MW-5BR (VI)ND MW-5BR(TOTAL)ND MW-13BR(VI)ND MW-14BR(VI)0.048 MW-14BR(TOTAL)ND ABMW-2(TOTAL)ND ABMW-2BR(TOTAL)ND ABMW-3 (VI)ND ABMW-3(TOTAL)ND MW-4 (VI)0.06 MW-4(TOTAL)ND MW-16BR(VI)ND MW-16D(TOTAL)ND MW-16S (VI)0.028 ABMW-1(VI)0.83 MW-12S(VI)4.4 MW-19BR (VI)ND MW-13BR(TOTAL)1.54 MW-2(VI)0.08 CW-6 (VI)ND CW-4 (VI)0.26 CW-5(VI)0.043 MW-16D(VI)0.67 ABMW-2BRL (VI)0.91 ABMW-4D (TOTAL)1.3 MW-16S(TOTAL)2.66 MW-16BR(TOTAL)ND ABMW-3S(TOTAL)ND ABMW-3S (VI)ND ABMW-2BRL(TOTAL)ND ABMW-2BR (VI)0.7 ABMW-2 (VI)0.084 ABMW-4D (VI)ND ABMW-4BR(TOTAL)ND MW-19D(TOTAL)ND MW-18D (VI)0.054 MW-18BR (VI)ND CW-2D(VI)NDMW-3(TOTAL)ND R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN NOTES:CHROMIUM (VI & TOTAL) CONCENTRATION IS MEASURED IN µg/L AND THE NCAC 02LSTANDARD IS 10 µg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-45GROUNDWATER CONCENTRATIONTREND ANALYSIS -CHROMIUM (VI & TOTAL) IN ALL FLOW LAYERSDUKE ENERGY PROGRESS, LLCMAYO STEAM ELECTRIC PLANTROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis - ChromeMix.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &< &<&< &<&< &<&<&< &< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN ABMW-42.5 ABMW-4D5.9 MW-13BR3.08 MW-7BRND MW-7DND ABMW-13.87 MW-3ND MW-12DND MW-12S1.59 BG-1ND BG-2ND CW-1ND CW-1DND CW-2ND CW-2DND CW-3ND CW-5ND CW-6ND CW-4ND MW-3BRND MW-8BRND MW-10BRND MW-18BRND MW-18DND MW-19BRND MW-19DND ABMW-4BRND MW-5BRND MW-14BRND ABMW-2NDABMW-2BRND ABMW-2BRLND ABMW-3ND ABMW-3S2.04 MW-4ND MW-16BRND MW-16DND MW-16SND NOTES:COBALT CONCENTRATION IS MEASURED IN ug/L AND THE IMAC STANDARD IS 1 ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 14-46GROUNDWATER CONCENTRATIONTREND ANALYSIS -COBALT IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-2574 BG-149 MW-3BR313 MW-8BR587 MW-18DND MW-4182 MW-16S94 MW-12S6820 CW-62040 MW-19D2030 ABMW-47170 MW-5BR7100 ABMW-2BR1230 MW-16BR505 MW-7BR369 MW-7D353 ABMW-11450 MW-3ND MW-12D242 BG-2500 CW-1289 CW-1D27 CW-2ND CW-2D226 CW-3211 CW-4153 MW-10BRND MW-18BR241 MW-19BR1080 ABMW-4BR438 ABMW-4D58800 CW-5360 MW-13BR3260 MW-14BR52 ABMW-295 ABMW-315800 ABMW-3S1520 MW-16D316 NOTES:IRON CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 300ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-47GROUNDWATER CONCENTRATIONTREND ANALYSIS -IRON IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-7BR198 MW-7D77 MW-2564 MW-12D45 CW-319 BG-16 MW-3BR550 MW-8BR278 MW-18BR1360 MW-18DND MW-19BR1220 ABMW-2452 MW-31280 CW-61440 ABMW-42620 ABMW-4D6960 ABMW-2BR242 MW-16BR158 ABMW-1982 MW-12S395 BG-2117 CW-118 CW-2118 CW-1D11 CW-2D785 CW-4ND MW-10BR54 MW-19D1100 ABMW-4BR363 CW-5464 MW-5BR1830 MW-13BR383 MW-14BR130 ABMW-3836 ABMW-3S364 MW-4178 MW-16D124MW-16S129 NOTES:MANGANESE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARDIS 50 ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-48GROUNDWATER CONCENTRATIONTREND ANALYSIS -MANGANESE IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-8BR2.46 MW-18BR1.85 ABMW-4D8.1 MW-13BR2.2 MW-16D5.98 ABMW-4BR8.57 ABMW-339.8 MW-7BR2.39 MW-7DND ABMW-1304 MW-21.63 MW-3ND MW-12DND MW-12S1.97 BG-1ND BG-2ND CW-1ND CW-1D22 CW-2ND CW-2D1.13 CW-63.53 CW-3ND CW-4ND MW-3BRND MW-10BRND MW-18DND MW-19BRND MW-19DND ABMW-4471 CW-5ND MW-5BR1.02 MW-14BR4.34 ABMW-2BR10.9 ABMW-2BRL2 ABMW-3SND MW-42.7 MW-16BR49.2MW-16SND NOTES:MOLYBDENUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARDIS NOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-49GROUNDWATER CONCENTRATIONTREND ANALYSIS -MOLYBDENUM IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN ABMW-4D1740 CW-2D411 ABMW-43160 MW-16S178 MW-7BR1040 MW-7D447 ABMW-11890 MW-2184 MW-3334 MW-12D85 MW-12S27 BG-1169 BG-2309 CW-167 CW-1D172 CW-2232 CW-6336 CW-3317 CW-4132 MW-3BR402 MW-8BR342 MW-10BR201 MW-18BR477 MW-18D159 MW-19BR447 MW-19D398 ABMW-4BR1940 CW-5167 MW-5BR231 MW-13BR360 MW-14BR143 ABMW-21380ABMW-2BR1110 ABMW-2BRL2320 ABMW-31650 ABMW-3S75 MW-4112 MW-16BR109 MW-16D176 NOTES:STRONTIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD ISNOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-50GROUNDWATER CONCENTRATIONTREND ANALYSIS -STRONTIUM IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &<&< &< &< &< &<&< &<&< &<&< &< &< &< &< &< &< &<&< &<&<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-18BR13 ABMW-4D0.78 CW-424 ABMW-456 ABMW-236 ABMW-333 MW-16S10 MW-7BR2.8 MW-7D10 ABMW-121 MW-218 MW-322 MW-12D1.1 MW-12S0.95 BG-10.27 BG-25.5 CW-18.5 CW-1D3.3 CW-237 CW-2D61 CW-638 CW-315 MW-3BR11 MW-8BR37 MW-10BR87 MW-18D37 MW-19BR53 MW-19D56 MW-19D56 ABMW-4BR30 CW-56.3 MW-5BR1.4 MW-13BR15 MW-14BR8.9 ABMW-2BR8.2 ABMW-3S0.49 MW-439 MW-16BR0.62 MW-16D7.6 NOTES:SULFATE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS250 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-51GROUNDWATER CONCENTRATIONTREND ANALYSIS -SULFATE IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN ABMW-4D600 MW-16S140 MW-7BR270 MW-7D370 ABMW-1370 MW-2210 MW-3200 MW-12D96 MW-12S51 BG-1110 BG-2320 CW-1120 CW-1D210 CW-2160 CW-2D320 CW-6520 CW-3390 CW-4160 MW-3BR700 MW-8BR490 MW-10BR310 MW-18BR440 MW-18D280 MW-19BR730 MW-19D620ABMW-4560 ABMW-4BR330 CW-5310 MW-5BR440 MW-13BR340 MW-14BR210 ABMW-2440 ABMW-2BR360 ABMW-3350 ABMW-3S96 MW-4210 MW-16BR200 MW-16D160 NOTES:TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATION IS MEASURED IN ug/L AND THENCAC 02L STANDARD IS 500 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-52GROUNDWATER CONCENTRATIONTREND ANALYSIS -TOTAL DISSOLVED SOLIDS IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &<&< &< &< &< &<&< &< &< &<&< &<&< &< &< &< &< &< &< &<&< &<&< &<&<&< &<&< &< &< &<&<&<&<&< &< &<&<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-7D0.734 MW-18BRND MW-18D1.3 MW-19BRND ABMW-20.87 MW-16BRND MW-8BR1.22MW-7BRND ABMW-156.7 MW-20.684 MW-3ND MW-12D0.805 MW-12S2.8 BG-13.76 BG-25.06 CW-11.08 CW-1D1.19 CW-2ND CW-2D0.677 CW-6ND CW-31.92 CW-41.34 MW-3BRND MW-10BR2.11 MW-19DND ABMW-43.66 ABMW-4BR0.308 ABMW-4D10.4 CW-5ND MW-5BRND MW-13BRND MW-14BR2.45 ABMW-2BRND ABMW-30.475ABMW-3SND MW-41.03 MW-16D0.795MW-16SND NOTES:VANADIUM CONCENTRATION IS MEASURED IN ug/L AND THE IMAC STANDARD IS 0.3ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-53GROUNDWATER CONCENTRATIONTREND ANALYSIS -VANADIUM IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< &< &< &<&< &< &<&< &<&< &< &< &< &< &< &<&<&<&< &<&<&< &< &< &< &< &< &< &< &< &<&<&< &<&< &<&< &< &<&< HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION RAILROADRAILROADRAILROADR.O.W. 100' FGDPONDS MAYO LAKE R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN MW-25.7 MW-16BR7.9 ABMW-2BRL7.8 ABMW-27.8 MW-35.9 MW-12D5.9 MW-12S6.2 BG-26.5 CW-15.9 CW-1D7.0 CW-25.2 CW-2D6.7 CW-36.5 CW-46.1 CW-56.7 CW-66.5 ABMW-17.7 ABMW-2BR7.8 ABMW-36.9ABMW-3S4.9 ABMW-47.4 ABMW-4BR7.8BG-15.6 MW-3BR7.0 MW-46.9 MW-5BR7.1 MW-8BR6.4 MW-10BR6.2 MW-13BR7.1 MW-14BR6.6 MW-16D6.9MW-16S6.7 MW-18BR7.1 MW-18D6.4 MW-19BR7.0 MW-19D6.8 MW-7BRND MW-7DND NOTES:pH CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS A RANGEOF 6.5 - 8.5 S.U. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE FIGURE 14-54GROUNDWATER CONCENTRATIONTREND ANALYSIS -pH IN ALL FLOW LAYERSMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET &<MONITORING WELL WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND UNKNOWN CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-053.05 S-06<1 S-09<1 SW-CB2<1 SW-CBT1<1 SW-REF1<1 NOTES:ARSENIC CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 10ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-55GROUNDWATER CONCENTRATIONTREND ANALYSIS -ARSENIC IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-08<1 S-03<1 S-02<1 S-02B<1 SW-CB1<1 S-042.66S-012.24 S-10NA S-01A<1 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0535 SW-CB290 S-0624 S-0965 SW-CBT131 SW-REF125 NOTES:BARIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 700ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-56GROUNDWATER CONCENTRATIONTREND ANALYSIS -BARIUM IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ")S-0345 S-04136 S-02122 S-01139 S-0881 S-02B32 SW-CB151 S-10NA S-01A25 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-051100 S-06<50 S-09<50 SW-CB2973 SW-CBT1<50 SW-REF1<50 NOTES:BORON CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 700ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-57GROUNDWATER CONCENTRATIONTREND ANALYSIS -BORON IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-081830 S-041270 S-021580 S-02B1660 SW-CB11250S-011850 S-031170 S-10NA S-01A213 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0531.5 B1 S-0611.5 B2 S-0925.6 B2 SW-CB225.6 B3 SW-CBT113.1 B2 SW-REF16.5 B2 NOTES:CALCIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD ISNOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-58GROUNDWATER CONCENTRATIONTREND ANALYSIS -CALCIUM IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-10NA S-0423.5 S-01A17.1 S-0828.6 B1 S-0327.8 B2 S-0224.2 B2 S-0123.6 B2 S-02B34.1 B2 SW-CB126.9 B2 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0547 S-069.3 S-0920 SW-CB241 SW-CBT19.2 SW-REF14.2 NOTES:CHLORIDE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS250 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-59GROUNDWATER CONCENTRATIONTREND ANALYSIS -CHLORIDE IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-1031 S-0880 S-0455 S-0353 S-0263 S-0157 S-02B62 S-01A16 SW-CB150 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATION SW-REF1(TOTAL)<1 SW-REF1(VI)<0.12 D3RAILROADR.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADSW-CB2 (VI)<0.12 D3 SW-CBT1 (VI)0.037 S-05(TOTAL)<1 S-06(TOTAL)<1 S-09(TOTAL)<1 S-09(VI)NA S-06(VI)NA S-05 (VI)NA SW-CBT1(TOTAL)<1 SW-CB2(TOTAL)<1 OLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN NOTES:CHROMIUM (VI & TOTAL) CONCENTRATION IS MEASURED IN µg/L AND THE NCAC 02LSTANDARD IS 10 µg/L. ND = NON-DETECTTHE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 14-60GROUNDWATER CONCENTRATIONTREND ANALYSIS -CHROMIUM (VI & TOTAL) IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: B. YOUNGPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW - ChromeMix.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANT SITEBOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ")!( !( !(!( !( !( !( !( ") S-08 (TOTAL)<1 S-04 (TOTAL)<1 S-03 (TOTAL)<1 S-02 (TOTAL)<1 S-01 (TOTAL)<1 S-02B (TOTAL)<1 SW-CB1 (TOTAL)<1 SW-CB1 (VI)<0.12 D3 S-10 (VI)NA S-08 (VI)NA S-04 (VI)NA S-03 (VI)NA S-02 (VI)NA S-02B (VI)NA S-01A (VI)NA S-10 (TOTAL)NA S-01A (TOTAL)<1 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 DECREASING CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-05NA S-06NA S-09NA SW-CB21.48 SW-REF1<1 SW-CBT1<1 NOTES:COBALT CONCENTRATION IS MEASURED IN ug/L AND THE IMAC STANDARD IS 1 ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 14-61GROUNDWATER CONCENTRATIONTREND ANALYSIS -COBALT IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") SW-CB1<1 S-10NA S-08NA S-04NA S-03NA S-02NA S-01NA S-02BNA S-01ANA ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-06412 B2 S-0911900 B2 SW-CB22140 SW-CBT149 S-0538 SW-REF11620 NOTES:IRON CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS 300ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-62GROUNDWATER CONCENTRATIONTREND ANALYSIS -IRON IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-0414200 S-024320 B2 S-0114700 B2 S-081190 SW-CB1597 S-03174 B2 S-02B74 B2 S-10NA S-01A926 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0552 S-06168 S-092190 SW-CB23130 SW-CBT154 SW-REF1100 NOTES:MANGANESE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARDIS 50 ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-63GROUNDWATER CONCENTRATIONTREND ANALYSIS -MANGANESE IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ")S-03873 S-042860 S-022170 S-013150 S-082260 SW-CB1819 S-02B2840 S-10NA S-01A1240 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0513.1 S-06<1 S-09<1 SW-CB2<1 SW-CBT1<1 SW-REF1<1 NOTES:MOLYBDENUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARDIS NOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-64GROUNDWATER CONCENTRATIONTREND ANALYSIS -MOLYBDENUM IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-08<1 S-04<1 S-03<1 S-02<1 S-01<1 S-02B<1 SW-CB1<1 S-10NA S-01A<1 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-05NA S-06NA S-09NA SW-CB2320 SW-CBT1116 SW-REF153 NOTES:STRONTIUM CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD ISNOT ESTABLISHED. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-65GROUNDWATER CONCENTRATIONTREND ANALYSIS -STRONTIUM IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") SW-CB1369 S-10NA S-08NA S-04NA S-03NA S-02NA S-01NA S-02BNA S-01ANA ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-0547 S-066 S-099 SW-CB224 SW-CBT16.8 SW-REF14.4 NOTES:SULFATE CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS250 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-66GROUNDWATER CONCENTRATIONTREND ANALYSIS -SULFATE IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-0862 S-0438 S-0330 S-0242 S-0145 S-02B27 SW-CB129 S-1032 S-01A10 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-05230 SW-CBT1370 S-06100 S-09210 SW-CB2210 SW-REF1120 NOTES:TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATION IS MEASURED IN ug/L AND THENCAC 02L STANDARD IS 500 mg/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-67GROUNDWATER CONCENTRATIONTREND ANALYSIS -TOTAL DISSOLVED SOLIDS IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-08280 S-03210 S-01250 SW-CB1230 S-04210 S-02220 S-02B220 S-10100 S-01A110 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-05NA S-06NA S-09NA SW-CB20.54 SW-CBT10.349 SW-REF11.43 NOTES:VANADIUM CONCENTRATION IS MEASURED IN ug/L AND THE IMAC STANDARD IS 0.3ug/L. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-68GROUNDWATER CONCENTRATIONTREND ANALYSIS -VANADIUM IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") SW-CB10.482 S-10NA S-08NA S-04NA S-03NA S-02NA S-01NA S-02BNA S-01ANA ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< < < < <<<<<<<<< < <<<<<<< !(!( !(!( !( !( !( !( !( !( !( ") ") ") ") HALIFAX COUNTY PERSON COUNTY HALIFAX COUNTY PERSON COUNTY NORTH CAROLINA-VIRGINIA STATE LINE(APPROXIMATE) MAYO PLANT LOUISIANA PACIFIC CORPORATIONRAILROAD R.O.W. 100' FGDPONDS MAYO LAKE RAILROADRAILROADOLD US HWY 501MULLINS LNNEW MAYO DR R T HESTER RD US HWY 501BOSTON RDM A Y O L A K E R D 1981 C&DLANDFILLASH BASIN S-058.7 S SW-CB27.3 S-067.3 S-096.1 SW-CBT17.1 SW-REF16.9 NOTES:pH CONCENTRATION IS MEASURED IN ug/L AND THE NCAC 02L STANDARD IS A RANGEOF 6.5 - 8.5 S.U. ND = NON-DETECT THE DETERMINATION OF CONCENTRATION TRENDS OVER TIME ARE GENERALIZEDBASED ON AVAILABLE DATA AND WERE NOT STATISTICALLY DETERMINED. DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICALDATA TABLE NOTES FOR QUALIFIER DEFINITIONS. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON SEPTEMBER 27,2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANECOORDINATE SYSTEM FIPS 3200 (NAD83/2011).FIGURE 14-69GROUNDWATER CONCENTRATIONTREND ANALYSIS -pH IN SURFACE WATERMAYO STEAM ELECTRIC PLANTDUKE ENERGY PROGRESS, LLCROXBORO, NORTH CAROLINADRAWN BY: A. FEIGLPROJECT MANAGER: J. WYLIECHECKED BY: K. DONOVAN DATE: 10/25/2017 148 RIVER STREET, SUITE 220GREENVILLE, SOUTH CAROLINA 29601PHONE 864-421-9999www.synterracorp.com P:\Duke Energy Progress.1026\00 GIS BASE DATA\Mayo\Map_Docs\CSA_Supplement_2\Mayo - Groundwater Concentration Trend Analysis_SW.mxd 500 0 500 1,000250 GRAPHIC SCALE IN FEET ")SURFACE WATER SAMPLE LOCATION !(AOW SAMPLE LOCATION WATER SUPPLY WELL <STREAM ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY LANDFILL BOUNDARY DUKE ENERGY PROGRESS MAYO PLANTSITE BOUNDARY LEGEND <<<<<<<<<<!( !( !(!( !( !( !( !( ") S-087.0 S-026.2 S-016.4 S-02B6.5 SW-CB16.7 S-046.5 S-036.8 S-10NM S-01A7.1 ASH BASIN MAYO LAKE RD INSETSCALE: 1" = 300' SEE INSET DECREASING CONCENTRATION OVER TIME1 INCREASING CONCENTRATION OVER TIME1 STABLE CONCENTRATION OVER TIME1 UNKNOWN CONCENTRATION OVER TIME1 RAILROAD RAI LROAD RAI LROADHAUL RDMW-12S (40-50): pH=6.2, Eh=163, k=2.21E-02,As=1.11, Ba=13, B=<50, Cr=1.06, Cr (VI)=4.4,Co=1.59, Fe=6820, Mn=395, Mo=1.97,Sr=27, SO4=0.95, TDS=51, V=2.8MW-13BR (89-99): pH=7.1, Eh=148, k=1.62E+00,As=<1, Ba=32, B=<50, Cr=1.54, Cr (VI)=<0.12 D3,Co=3.08, Fe=3260, Mn=383, Mo=2.2,Sr=360, SO4=15, TDS=340, V=<0.3ABMW-1 (3-13): pH=7.7, Eh=36, k=4.12E+00,As=323, Ba=520, B=5820, Cr=<1, Cr (VI)=0.83,Co=3.87, Fe=1450, Mn=982, Mo=304,Sr=1890, SO4=21, TDS=370, V=56.7ABMW-2BRL (155-165): pH=7.8, Eh=121, k=1.19E-02,As=1.88, Ba=72, B=<50, Cr=<1, Cr (VI)=0.91,Co=<1, Fe=1840, Mn=341, Mo=2,Sr=2320, SO4=0.28, TDS=310, V=<0.3BG-2 (25-45): pH=6.5, Eh=168, k=NM,As=<1, Ba=45, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=221, Mn=105, Mo=<1,Sr=296, SO4=5.6, TDS=320, V=3.87MW-18BR (96-111): pH=7.1, Eh=206, k=1.44E-02,As=<1, Ba=96, B=<50, Cr=<1, Cr (VI)=<0.025,Co=<1, Fe=241, Mn=1360, Mo=1.85,Sr=477, SO4=13, TDS=440, V=<0.3MW-18D (39-49): pH=6.4, Eh=257, k=1.59E-01,As=<1, Ba=<5, B=<50, Cr=<1, Cr (VI)=0.054,Co=<1, Fe=<10, Mn=<5, Mo=<1,Sr=159, SO4=37, TDS=280, V=1.3MW-12D (87-97): pH=5.9, Eh=367, k=3.02E+00,As=<1, Ba=15, B=<50, Cr=1.25, Cr (VI)=0.63,Co=<1, Fe=242, Mn=45, Mo=<1,Sr=85, S=1.1, TDS=96, V=0.805MW-10BR (48-58): pH=6.2, Eh=266, k=8.84E-03,As=<1, Ba=<5, B=<50, Cr=<1, Cr (VI)=0.074,Co=<1, Fe=<10, Mn=54, Mo=<1,Sr=201, SO4=87, TDS=310, V=2.11MW-8BR (62-67): pH=6.4, Eh=263, k=8.50E-02,As=<1, Ba=22, B=<50, Cr=2.34, Cr (VI)=<0.12,Co=<1, Fe=587, Mn=278, Mo=2.46,Sr=342, SO4=37, TDS=490, V=1.22MW-7D (20-30): pH=6.4, Eh=286,k=1.92E-02, As=<1, Ba=18, B=<50,Cr=<1,Cr (VI)=<0.025, Co=<1, Fe=353,Mn=77, Mo=<1,Sr=447, SO4=10, TDS=370, V=0.734MW-3BR (69-74): pH=7.0, Eh=107, k=6.35E-02,As=<1, Ba=38, B=<50, Cr=<1, Cr (VI)=<0.025,Co=<1, Fe=313, Mn=550, Mo=<1,Sr=402, SO4=11, TDS=700, V=<0.3CW-6 (72-77): pH=6.5, Eh=215, k=NM,As=<1, Ba=43, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=2440, Mn=1590, Mo=3.9,Sr=334, SO4=38, TDS=530, V=<0.3CW-5 (36-41): pH=6.7, Eh=196, k=NM,As=<1, Ba=46, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=390, Mn=431, Mo=<1,Sr=165, SO4=6.4, TDS=260, V=<0.3CW-3 (17-32): pH=6.5, Eh=195, k=NM,As=<1, Ba=17, B=<50, Cr=8, Cr (VI)=NA,Co=<1, Fe=176, Mn=25, Mo=<1,Sr=322, SO4=17, TDS=360, V=1.77CW-4 (35-40): pH=6.1, Eh=203, k=NM,As=<1, Ba=27, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=125, Mn=<5, Mo=<1,Sr=127, SO4=25, TDS=140, V=1.31CW-2 (8-18): pH=5.2, Eh=331, k=NM,As=<1, Ba=123, B=796, Cr=<5, Cr (VI)=NA,Co=<1, Fe=11, Mn=119, Mo=<1,Sr=227, SO4=39, TDS=160, V=<0.3CW-2D (45-55): pH=6.7, Eh=275, k=NM,As=<1, Ba=32, B=303, Cr=<5, Cr (VI)=NA,Co=<1, Fe=240, Mn=709, Mo=1.03,Sr=452, SO4=62, TDS=340, V=0.812BG-1 (42-52): pH=5.6, Eh=204, k=NM,As=<1, Ba=90, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=40, Mn=6, Mo=<1,Sr=176, SO4=0.27, TDS=120, V=3.89ABMW-04D (56-61): pH=6.3, Eh=134, k=5.88E-02,As=26.9, Ba=890, B=3470, Cr=1.3, Cr (VI)=<0.5 D3,Co=5.9, Fe=58800, Mn=6960, Mo=8.1,Sr=1740, SO4=0.78, TDS=600, V=10.4ABMW-4 (48-53): pH=7.4, Eh=54, k=5.34E-01,As=547, Ba=592, B=6520, Cr=<1, Cr (VI)=<0.12 D3,M1,Co=2.5, Fe=7170, Mn=2620, Mo=471,Sr=3160, SO4=56, TDS=560, V=3.66ABMW-4BR (98-108): pH=7.8, Eh=78, k=9.46E-03,As=1.26, Ba=113, B=<50, Cr=<1, Cr (VI)=<0.12 D3,Co=<1, Fe=438, Mn=363, Mo=8.57,Sr=1940, SO4=30, TDS=330, V=0.308ABMW-3S (50-60): pH=4.9, Eh=429, k=4.55E-01,As=<1, Ba=22, B=1330, Cr=<1, Cr (VI)=<0.12 D3,Co=2.04, Fe=1520, Mn=364, Mo=<1,Sr=75, SO4=0.49, TDS=96, V=<0.3ABMW-3 (35-40): pH=6.9, Eh=114, k=1.18E-01,As=191, Ba=258, B=2000, Cr=<1, Cr (VI)=<0.5 D3,M6,Co=<1, Fe=15800, Mn=836, Mo=39.8,Sr=1650, S04=33, TDS=350, V=0.475ABMW-2 (34-39): pH=9.6, Eh=232, k=4.79E-02,As=957 M4, Ba=113, B=8800, Cr=<1, Cr (VI)=0.084,Co=<1, Fe=95, Mn=452, Mo=1560 M4,Sr=1380, SO4=36, TDS=440, V=0.8710/27/2017 1:41 PMP:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP BASE MAP.dwgDATE PRINTED:FILE PATH:FIGURE 14-70COMPREHENSIVEGROUNDWATER DATAMAYO STEAM ELECTRIC PLANT10660 BOSTON RDROXBORO, NORTH CAROLINADUKEENERGYPROGRESSFIG 14-70 (GW MAP)KYLE DONOVANJOHN CHASTAINPROJECT MANAGER:LAYOUT NAME:DRAWN BY:CHECKED BY:JERRY WYLIEDATE:DATE:www.synterracorp.com148 River Street, Suite 220Greenville, South Carolina 29601864-421-9999GRAPHIC SCALE600300150030010/17/201710/17/2017MW-3BRS-3S-10S-8MW-6BRS-1AS-2S-2BS-2AMW-8SMW-8DMW-9BRLMW-9BRMW-19BRMW-19DS-4S-1S-5STORM WATEROUTFALL 004STORM WATEROUTFALL 005SW-CBT1SW-CB1SW-CB2SB-4SB-3SB-2SB-6SB-5AB-1P2AP1AP1P2P3P4P3AP4ASB-1CRUTCHFIELD BRANCHUNNAMED BRANCHBOX CULVERTCULVERT48" CMPVIRGINIANORTH CAROLINAVIRGINIANORTH CAROLINAGRATEGRATE24" RCPFORMER INTERMITTENT STREAM BASEDON 1968 USGS TOPOGRAPHIC MAPSOU T H B O S T O N R D ( U S H W Y 5 0 1 )FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHFORMER INTERMITTENTSTREAM BASED ON 1968USGS TOPOGRAPHIC MAPFORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHSW-REF1S-7S-6S-9FORMER SLUICE POINTSMAYO LAKEWL ± 433'1981 C&D LANDFILLFGD SETTLING PONDFGD FORWARDFLUSH PONDMW-15BRDEP-2DEP-3DEP-1MW-11BRBGSB-3BGSB-5BGSB-9BGSB-2BGSB-8BGSB-1BGSB-4FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHNPDES OUTFALL 002MW-17BRSTORM WATEROUTFALL 006ASTORM WATEROUTFALL 006BSTORM WATEROUTFALL 006ESTORM WATEROUTFALL 006DSTORM WATEROUTFALL 006CCULVERTCULVERTHEADWALL-48" RCP48" RCP APPROXIMATENPDES OUTFALL 002CMF #1CMF #2DIDICOAL PILEPOWER PLANTRAW WATER INTAKE15"18"RT HESTER RDHAUL RDHAUL RDHAUL RDMAYO LAKE RDMAYO LAKE RDRAILROAD CAR STORAGERAILROAD CAR STORAGETRAIN STOPRA I L R O A D L I N E RAILROAD LINECRUTCHFIELD BRANCHBEAVER PONDCW-1 (15-25): pH=5.9, Eh=210, k=NM,As=<1, Ba=<5, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=147, Mn=12, Mo=<1,Sr=71, SO4=9.6, TDS=130, V=0.805CW-1D (30-40): pH=7.0, Eh=206, k=NM,As=<1, Ba=<5, B=<50, Cr=<5, Cr (VI)=NA,Co=<1, Fe=69, Mn=34, Mo=23,Sr=180, SO4=3.5, TDS=190, V=1.33MW-2 (38-48): pH=5.7, Eh=186, k=NM,As=<1, Ba=51, B=<50, Cr=<1, Cr (VI)=0.08,Co=1.88, Fe=574, Mn=564, Mo=1.63,Sr=184, SO4=18, TDS=210, V=0.684MW-3 (8-18): pH=5.9, Eh=238, k=NM,As=<1, Ba=56, B=982, Cr=<1, Cr (VI)=0.19,Co=<1, Fe=<10, Mn=1280, Mo=<1,Sr=334, SO4=22, TDS=200, V=<0.3MW-4 (35-55): pH=6.9, Eh=349, k=NM,As=<1, Ba=8, B=<50, Cr=<1, Cr (VI)=0.06,Co=<1, Fe=182, Mn=178, Mo=2.7,Sr=112, SO4=39, TDS=210, V=1.03MW-5BR (58-63): pH=7.1, Eh=97, k=1.26E-01,As=1.06, Ba=37, B=<50, Cr=<1, Cr (VI)=<0.25 D3,Co=<1, Fe=7100, Mn=1830, Mo=1.02,Sr=231, SO4=1.4, TDS=440, V=<0.3MW-7BR (67-77): pH=7.6, Eh=-38, k=1.73E+00,As=<1, Ba=157, B=<50, Cr=<1, Cr (VI)=<0.025,Co=<1, Fe=369, Mn=198, Mo=2.39,Sr=1040, SO4=2.8, TDS=270, V=<0.3MW-14BR (29-34): pH=6.6, Eh=205, k=3.59E-02,As=<1, Ba=15, B=<50, Cr=<1, Cr (VI)=0.048,Co=<1, Fe=52, Mn=130, Mo=4.34,Sr=143, SO4=8.9, TDS=210, V=2.45MW-16D (29-39): pH=6.9, Eh=216, k=1.33E+00,As=<1, Ba=6, B=<50, Cr=<1, Cr (VI)=0.67,Co=<1, Fe=316, Mn=124, Mo=5.98,Sr=176, SO4=7.6, TDS=160, V=0.795MW-16S (5-7.5): pH=6.7, Eh=210, k=1.73E-02,As=<1, Ba=70, B=179, Cr=2.66, Cr (VI)=0.028,Co=<1, Fe=94, Mn=129, Mo=<1,Sr=178, SO4=10, TDS=140, V=<0.3MW-16BR (49-59): pH=7.9, Eh=96, k=3.17E-03,As=<1, Ba=12, B=<50, Cr=<1, Cr (VI)=<0.12D3, Co=<1, Fe=505, Mn=158, Mo=49.2,Sr=109, SO4=0.62, TDS=200, V=<0.3SB-7AB-4AB-2AB-3SOURCE NOTES:NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDSTO LOCATE THE STREAMS AND WETLANDS IN THE FIELD. THE HORIZONTAL LOCATION AND THE VERTICALLOCATIONS HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE.LEGENDCULVERT LOCATION500 ft COMPLIANCE BOUNDARYPARCEL LINE DUKE ENERGY (APPROXIMATE)ASH BASIN WASTE BOUNDARYSURFACE WATER FLOW DIRECTIONAPPROXIMATE STREAM (NON-JD)APPROXIMATE POND OR RESERVOIR (NON-JD)APPROXIMATE EFFLUENT CHANNELAPPROXIMATE ASH BASIN PONDED WATERASH BASINPRIMARY AND SECONDARYSETTLING PONDSFOREBAYWETLAND BY AMEC FOSTER WHEELERDATA NOTES:DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLE NOTES FORQUALIFIER DEFINITIONS.DATA SHOWN ON MAP IS THE MOST RECENT DATA AVAILABLE THROUGH Q2 2017.NA=NOT ANALYZEDNM=NOT MEASUREDDATA IS EXCLUDED FOR THE WELLS WITH A MEASURED TURBIDITY GREATER THAN 10 NTU's AND /ORHIGH pH VALUES THAT MAY INDICATE POSSIBLE GROUT INTRUSION INTO THE WELL SCREEN.ABMW-2BR (94-104): pH=7.8, Eh=100, k=8.75E-01,As=3.06, Ba=115, B=<50, Cr=<1, Cr (VI)=0.7,Co=<1, Fe=1230, Mn=242, Mo=10.9,Sr=1110, SO4=8.2, TDS=360, V=<0.3MY-1001 (NA): pH=6.3, Eh=NM, k=NM,As=<0.1, Ba=8.9, B=<25, Cr=1.5, Cr (VI)=1.2,Co=<0.1, Fe=163, Mn=4.9, Mo=<0.5,Sr=91.9, SO4=<2, TDS=93, V=2.2MY-1003 (NA): pH=6.4, Eh=261, k=NM,As=0.23, Ba=20.3, B=<25, Cr=<0.5, Cr (VI)=<0.025,Co=0.22, Fe=504, Mn=586, Mo=<0.5,Sr=107, SO4=15.6, TDS=237, V=0.42MY-1002 (NA): pH=6.0, Eh=NM, k=NM,As=<0.1, Ba=<0.3, B=<25, Cr=1.5, Cr (VI)=2,Co=<0.1, Fe=81.3, Mn=<0.5, Mo=<0.5,Sr=<0.5, SO4=2.1, TDS=47, V=<0.3MY-5 (Vendor) (NA): pH=7.1, Eh=NM, k=NM,As=<5, Ba=54.5, B=<50, Cr=<5, Cr (VI)=<0.03,Co=<5, Fe=953, Mn=517, Mo=<5,Sr=621, SO4=5.7, TDS=349, V=<10MY-3 (Vendor) (NA): pH=5.6, Eh=NM, k=NM,As=<0.5, Ba=60.4, B=<5, Cr=0.6, Cr (VI)=0.13,Co=<0.5, Fe=<50, Mn=8, Mo=<0.5,Sr=391, SO4=55.6, TDS=226, V=<1MW-3MW-12SWELL IN TRANSITION ZONEWELL IN SAPROLITE MATERIALWELL IN ALLUVIUM MATERIALMW-14BRWELL IN COMPETENT BEDROCKABMW-1WELL IN ASH PORE WATERPIEZOMETER IN BEDROCKDEP-1MW-3WATER SUPPLY WELL SAMPLED BY NC DEQSW-CB1SURFACE WATER SAMPLE LOCATIONMY-03SOIL BORING LOCATIONSB-3PIEZOMETER IN EARTH DAM (FILL)P1AS-16AOW SAMPLE LOCATIONTHE TOPOGRAPHY IS A COMPILATION OF LIDAR DATA OBTAINED FROM FRIS- NORTH CAROLINA FLOOD RISKINFORMATION SYSTEM AT ftp://ftp1.ncem.org/Data_Requests/County_LIDAR_Data/Personcounty/ AND ANAERIAL TOPOGRAPHIC SURVEY-MAYO PLANT BY WSP, DATER JULY 24, 2015, JOB NUMBER: 1570002.00, DWGNAME: MAYO OVERALL WK.DWGWETLAND AND STREAM BOUNDARIES PROVIDED BY AMECFOSTER WHEELER. NOTE THESE DO NOT APPEAR TO TO BEINCLUSIVE OF ALL THE BOUNDARIES AS SHOWN IN THE AMECFOSTER WHEELER NRTR MAYO REPORT.ABMW-4BR (98-108): pH=7.8, Eh=78, k=9.46E-03,As=1.26, Ba=113, B=<50, Cr=<1, Cr (VI)=<0.12 D3,Co=<1, Fe=438, Mn=363, Mo=8.57,Sr=1940, SO4=30, TDS=330, V=0.308Well ID (SCREENED INTERVAL IN ft. bgs): pH (S.U.), Eh (mV), k= hydraulic conductivity (ft/day)As=Arsenic (ug/L): Ba=Barium (ug/L): B= Boron (ug/L): Cr (VI)=Hexavalent Chromium (ug/L): Cr=Total Chromium (ug/L): Co=Cobalt (ug/L): Fe=Iron (ug/L):Mn=Manganese (ug/L): Mo=Molybdenum (ug/L): Sr=Strontium (ug/L): SO4=Sulfate (mg/L): TDS=Total Dissolved Solids (mg/L): V=Vanadium (ug/L)WELL KEY100' RIGHT OF WAY RAILROAD RAILROAD RAILROADHAUL RDS-6: pH=7.3, Eh=325,As=<1, Ba=24, B=<50,Cr=<1, Cr (VI)=NA, Co=NA, Fe=412 B2, Mn=168, Mo=<1,Sr=NA, SO4=6, TDS=100, V=NASW-REF1: pH=6.9, Eh=265,As=<1, Ba=25, B=<50,Cr=<1, Cr (VI)=<0.12 D3, Co=<1, Fe=1620, Mn=100, Mo=<1,Sr=53, SO4=4.4, TDS=120, V=1.4310/27/2017 1:46 PMP:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP BASE MAP.dwgDATE PRINTED:FILE PATH:FIGURE 14-71COMPREHENSIVE SURFACEWATER AND AREA OFWETNESS DATAMAYO STEAM ELECTRIC PLANT10660 BOSTON RDROXBORO, NORTH CAROLINADUKEENERGYPROGRESSFIG 14-71(WATER AND AOW)KYLE DONOVANJOHN CHASTAIN/ C. NEWELLPROJECT MANAGER:LAYOUT NAME:DRAWN BY:CHECKED BY:JERRY WYLIEDATE:DATE:www.synterracorp.com148 River Street, Suite 220Greenville, South Carolina 29601864-421-9999GRAPHIC SCALE600300150030010/17/201710/17/2017BG-2CW-5MW-5BRMW-14BRBG-1MW-13BRCW-4MW-2CW-3MW-3BRMW-16BRMW-16DMW-16SCW-2CW-2DCW-6MW-6BRMW-4MW-3MW-8BRMW-8SMW-8DMW-9BRLMW-9BRCW-1DCW-1MW-18DMW-18BRMW-19BRMW-19DABMW-3SABMW-3ABMW-1ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4SABMW-4SB-4SB-3SB-2SB-6SB-5AB-1P2AP1AP1P2P3P4P3AP4ASB-1MY-05MY-03CRUTCHFIELD BRANCHUNNAMED BRANCHBOX CULVERTCULVERT48" CMPVIRGINIANORTH CAROLINAVIRGINIANORTH CAROLINAGRATEGRATE24" RCPSOU T H B O S T O N R D ( U S H W Y 5 0 1 )FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHFORMER INTERMITTENTSTREAM BASED ON 1968USGS TOPOGRAPHIC MAPFORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHMW-12SMW-12DS-7FORMER SLUICE POINTSMW-10BRMAYO LAKEWL ± 433'ASH BASIN1981 C&D LANDFILLMW-7BRMW-7DFGD SETTLING PONDFGD FORWARDFLUSH PONDMW-15BRDEP-2DEP-3DEP-1MW-11BRBGSB-3BGSB-5BGSB-9BGSB-2BGSB-8BGSB-1BGSB-4MY-1002MY-1001MY-1003FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHMW-17BRSTORM WATEROUTFALL 006ASTORM WATEROUTFALL 006BSTORM WATEROUTFALL 006ESTORM WATEROUTFALL 006DSTORM WATEROUTFALL 006CCULVERTCULVERTHEADWALL-48" RCP48" RCP APPROXIMATENPDES OUTFALL 002CMF #1CMF #2DIDICOAL PILEPOWER PLANTRAW WATER INTAKE15"18"RT HESTER RDHAUL RDHAUL RDHAUL RDMAYO LAKE RDMAYO LAKE RDRAILROAD CAR STORAGERAILROAD CAR STORAGETRAIN STOPRA I L R O A D L I N E RAILROAD LINECRUTCHFIELD BRANCHBEAVER PONDSW-CB2: pH=7.3, Eh=264,As=<1, Ba=90, B=973, Cr=<1, Cr (VI)=<0.12 D3,Co=1.48, Fe=2140, Mn=3130, Mo=<1,Sr=320, SO4=24, TDS=210, V=0.54SW-CB1: pH=6.7, Eh=276,As=<1, Ba=51, B=1250, Cr=<1, Cr (VI)=<0.12 D3,Co=<1, Fe=597, Mn=819, Mo=<1,Sr=369, SO4=29, TDS=230, V=0.482SW-CBT1: pH=7.1, Eh=264,As=<1, Ba=31, B=<50, Cr=<1, Cr (VI)=0.037,Co=<1, Fe=49, Mn=54, Mo=<1,Sr=116, SO4=6.8, TDS=370, V=0.349S-9: pH=7, Eh=246.3,Sb=<1, As=<1, Ba=50, Be=NA, B=1180, Cd=<1, Cl=9.6,Cr (VI)=NA, Cr=<1, Co=NA, Fe=511, Mn=221, Mo=<1, Se=2.18,Sr=NA, S=230, Tl=<0.2, TDS=360, V=NAS-8: pH=7.0, Eh=382,As=<1, Ba=81, B=1830, Cr=<1, Cr (VI)=NA,Co=NA, Fe=1190, Mn=2260, Mo=<1, Sr=NA, SO4=62, TDS=280, V=NAS-10: pH=5.3, Eh=457,As=<1, Ba=114, B=729, Cr=<1, Cr (VI)=NA,Co=NA, Fe=68, Mn=918, Mo=<1, Sr=NA, SO4=NA, TDS=NA, V=NAS-1A: pH=7.1, Eh=285,As=<1, Ba=25, B=213, Cr=<1, Cr (VI)=NA,Co=NA, Fe=926, Mn=1240, Mo=<1, Sr=NA, SO4=10, TDS=110, V=NAS-1: pH=6.4, Eh=199,As=2.24, Ba=139, B=1850, Cr=<1, Cr (VI)=NA,Co=NA, Fe=14700 B2, Mn=3150, Mo=<1, Sr=NA, SO4=45, TDS=250, V=NAS-5: pH=8.7 S, Eh=346,As=3.05, Ba=35, B=1100, Cr=<1, Cr (VI)=NA,Co=NA, Fe=38, Mn=52, Mo=13.1, Sr=NA, SO4=47, TDS=230, V=NAS-3: pH=6.8, Eh=293,As=<1, Ba=45, B=1170, Cr=<1, Cr (VI)=NA,Co=NA, Fe=174 B2, Mn=873, Mo=<1, Sr=NA, SO4=30, TDS=210, V=NAS-2: pH=6.2, Eh=267,As=<1, Ba=122, B=1580, Cr=<1, Cr (VI)=NA,Co=NA, Fe=4320 B2, Mn=2170, Mo=<1, Sr=NA, SO4=42, TDS=220, V=NAS-2B: pH=6.5, Eh=308,As=<1, Ba=32, B=1660, Cr=<1, Cr (VI)=NA,Co=NA, Fe=74 B2, Mn=2840, Mo=<1, Sr=NA, SO4=27, TDS=220, V=NAS-4: pH=6.5, Eh=223,As=2.66, Ba=136, B=1270, Cr=<1, Cr (VI)=NA,Co=NA, Fe=14200, Mn=2860, Mo=<1, Sr=NA, SO4=38, TDS=210, V=NASB-7OUTFALL 002OUTFALL 004OUTFALL 005AB-4AB-2AB-3SOURCE NOTES:NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDSTO LOCATE THE STREAMS AND WETLANDS IN THE FIELD. THE HORIZONTAL LOCATION AND THE VERTICALLOCATIONS HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE.LEGENDCULVERT LOCATION500 ft COMPLIANCE BOUNDARYPARCEL LINE DUKE ENERGY (APPROXIMATE)ASH BASIN WASTE BOUNDARYSURFACE WATER FLOW DIRECTIONAPPROXIMATE STREAM (NON-JD)APPROXIMATE POND OR RESERVOIR (NON-JD)APPROXIMATE EFFLUENT CHANNELAPPROXIMATE ASH BASIN PONDED WATERWETLAND BY AMEC FOSTER WHEELERDATA NOTES:DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLE NOTES FORQUALIFIER DEFINITIONS.DATA SHOWN ON MAP IS THE MOST RECENT DATA AVAILABLE THROUGH Q2 2017.NA=NOT ANALYZEDNM=NOT MEASUREDFOREBAYS-2APRIMARY AND SECONDARYSETTLING PONDSMW-3MW-12SWELL IN TRANSITION ZONEWELL IN SAPROLITE MATERIALWELL IN ALLUVIUM MATERIALMW-14BRWELL IN COMPETENT BEDROCKABMW-1WELL IN ASH PORE WATERPIEZOMETER IN BEDROCKDEP-1MW-3WATER SUPPLY WELL SAMPLED BY NC DEQSW-CB1SURFACE WATER SAMPLE LOCATIONMY-03SOIL BORING LOCATIONSB-3PIEZOMETER IN EARTH DAM (FILL)P1AS-16AOW SAMPLE LOCATIONWETLAND AND STREAM BOUNDARIES PROVIDED BY AMECFOSTER WHEELER. NOTE THESE DO NOT APPEAR TO TO BEINCLUSIVE OF ALL THE BOUNDARIES AS SHOWN IN THE AMECFOSTER WHEELER NRTR MAYO REPORT.THE TOPOGRAPHY IS A COMPILATION OF LIDAR DATA OBTAINED FROM FRIS- NORTH CAROLINA FLOOD RISKINFORMATION SYSTEM AT ftp://ftp1.ncem.org/Data_Requests/County_LIDAR_Data/Personcounty/ AND ANAERIAL TOPOGRAPHIC SURVEY-MAYO PLANT BY WSP, DATER JULY 24, 2015, JOB NUMBER: 1570002.00, DWGNAME: MAYO OVERALL WK.DWGSample ID: pH (S.U.), Eh (mV),As=Arsenic (ug/L): Ba=Barium (ug/L): B= Boron (ug/L): Cr (VI)=Hexavalent Chromium (ug/L): Cr=Total Chromium (ug/L): Co=Cobalt (ug/L): Fe=Iron (ug/L):Mn=Manganese (ug/L): Mo=Molybdenum (ug/L): Sr=Strontium (ug/L): SO4=Sulfate (mg/L): Tl=Thallium (ug/L): TDS=Total Dissolved Solids (mg/L):V=Vanadium (ug/L)SAMPLE KEY100' RIGHT OF WAY RAILROAD RAI LROAD RAI LROADHAUL RDAB-410/27/2017 1:55 PMP:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\CSA_UPDATE_2017\DWG\DE MAYO CSAUP BASE MAP.dwgDATE PRINTED:FILE PATH:FIGURE 14-72COMPREHENSIVE SOIL ANDSEDIMENT DATAMAYO STEAM ELECTRIC PLANT10660 BOSTON RDROXBORO, NORTH CAROLINADUKEENERGYPROGRESSFIG 14-72 (SOIL-SED)KYLE DONOVANJOHN CHASTAIN/ C.NEWELLPROJECT MANAGER:LAYOUT NAME:DRAWN BY:CHECKED BY:JERRY WYLIEDATE:DATE:www.synterracorp.com148 River Street, Suite 220Greenville, South Carolina 29601864-421-9999GRAPHIC SCALE600300150030010/17/201710/17/2017BG-2CW-5MW-5BRMW-14BRBG-1MW-13BRCW-4MW-2CW-3MW-3BRMW-16BRMW-16DMW-16SCW-2CW-2DS-3S-10S-8CW-6MW-6BRMW-4S-1AS-2S-2BS-2AMW-3MW-8BRMW-8SMW-8DMW-9BRLMW-9BRCW-1DCW-1MW-18DMW-18BRMW-19BRMW-19DS-4S-1S-5ABMW-3SABMW-3ABMW-1ABMW-2BRLABMW-2BRABMW-2ABMW-4DABMW-4SABMW-4SB-4SB-3SB-2SB-6SB-5AB-1P2AP1AP1P2P3P4P3AP4ASB-1MY-05MY-03CRUTCHFIELD BRANCHUNNAMED BRANCHBOX CULVERTCULVERT48" CMPVIRGINIANORTH CAROLINAVIRGINIANORTH CAROLINAGRATEGRATE24" RCPSOU T H B O S T O N R D ( U S H W Y 5 0 1 )FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHFORMER INTERMITTENTSTREAM BASED ON 1968USGS TOPOGRAPHIC MAPFORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHMW-12SMW-12DS-7S-6S-9FORMER SLUICE POINTSMW-10BRMAYO LAKEWL ± 433'ASH BASIN1981 C&D LANDFILLMW-7BRMW-7DFGD SETTLING PONDFGD FORWARDFLUSH PONDMW-15BRDEP-2DEP-3DEP-1MW-11BRBGSB-3BGSB-5BGSB-9BGSB-2BGSB-8BGSB-1BGSB-4MY-1002MY-1001MY-1003MW-17BRSTORM WATEROUTFALL 006ASTORM WATEROUTFALL 006BSTORM WATEROUTFALL 006ESTORM WATEROUTFALL 006DSTORM WATEROUTFALL 006CCULVERTCULVERTHEADWALL-48" RCP48" RCP APPROXIMATENPDES OUTFALL 002CMF #1CMF #2DIDICOAL PILEPOWER PLANTRAW WATER INTAKE15"18"RT HESTER RDHAUL RDHAUL RDHAUL RDMAYO LAKE RDMAYO LAKE RDRAILROAD CAR STORAGERAILROAD CAR STORAGETRAIN STOPRA I L R O A D L I N E RAILROAD LINECRUTCHFIELD BRANCHBEAVER PONDSB-7FORMER SOUTH BOSTON HWY BASEDON 1951 AERIAL PHOTOGRAPHOUTFALL 002OUTFALL 004OUTFALL 005AB-1 (4-5): Ash Pore: pH=6.2,As=<3.1, Ba=38.6, B=<3.1,Cr=2.2, Co=<3.1, Fe=1100, Mn=17.7, Mo=0.42 j,Sr=11, SO4=<311, V=2.7 jAB-1 (34.3-35): Ash Pore: pH=7.2,As=2.9 j, Ba=34.6, B=9.2,Cr=10.6, Co=4.2, Fe=2230, Mn=9.4, Mo=0.55 j,Sr=19.5, SO4=<379, V=19AB-1 (48-50): Ash Pore: pH=7.3,As=2.6 j, Ba=34.7, B=5.9,Cr=8, Co=3.4 j, Fe=1820, Mn=9.4, Mo=0.63 j,Sr=17.9, SO4=<352, V=13.7SW-CB1SW-CBT1SW-REF1ABMW-2BR (45-45.5): Surficial: pH=7.8,As=<6, Ba=92.2, B=<15,Cr=8, Co=6 j, Fe=18300, Mn=579, Mo=<3,Sr=23.2, SO4=<289, V=30.3ABMW-2BR (57.5-58): Surficial: pH=7.4,As=<5.1, Ba=41.2, B=<12.8,Cr=56.7, Co=37.4, Fe=43400, Mn=782, Mo=<2.6,Sr=49.4, SO4=<263, V=84.9:KD= As=169, B=1, Cr=39, Co=1141, Tl=1653, V=54ABMW-2BR (97-100): Bedrock:KD=As=6.5, B=0, Cr=IDNA, Co=1732, Tl=539, V=38AB-2AB-3AB-3 (4-5): Ash Pore: pH=6.4,As=<3.3, Ba=38.7, B=2.6 j,Cr=2, Co=<3.3, Fe=1010, Mn=11.9, Mo=0.38 j,Sr=8, SO4=<322, V=2.9 jAB-3 (21.6-23.4): Ash Pore: pH=6.4,As=3.3 j, Ba=41.1, B=7.3,Cr=13.3, Co=4, Fe=2470, Mn=14.1, Mo=0.59 j,Sr=20.6, SO4=326 j, V=15AB-3 (41.7-42.5): Surficial: pH=6.4,As=11.2, Ba=83.2, B=32.9,Cr=54.7, Co=17.7, Fe=3020, Mn=69.4, Mo=1.4,Sr=83.7, SO4=<332, V=88.1AB-4 (4-5): Ash Pore: pH=6.6,As=<3.5, Ba=16.9, B=<3.5,Cr=1.9, Co=<3.5, Fe=554, Mn=37.7, Mo=0.38 j,Sr=4.7, SO4=<344, V=<3.5AB-4 (33-35): Ash Pore: pH=8,As=13.4, Ba=80.9, B=31.3,Cr=31.9, Co=13.6, Fe=3290, Mn=21.1, Mo=1.6,Sr=53, SO4=<350, V=63.6AB-4 (53-55): Ash Pore: pH=7.8,As=10, Ba=67.3, B=25.5,Cr=24.5, Co=12.9, Fe=2860, Mn=13.6, Mo=1.2,Sr=60.6, SO4=<418, V=64.7ABMW-1 (1-1.5): Ash Pore: pH=10.4,As=16.6, Ba=150, B=27.4,Cr=25, Co=7.6 j, Fe=2240, Mn=18.4, Mo=<4.3,Sr=71.8, SO4=<425, V=39.3ABMW-1 (3.5-5): Ash Pore: HFO=741.1ABMW-1 (11.5-12): Ash Pore: pH=8.2,As=26.2, Ba=152, B=27.4,Cr=26.9, Co=8.3, Fe=2710, Mn=31.3, Mo=<3.9,Sr=111, SO4=<381, V=46.2ABMW-1 (13-13.5): Surficial: pH=4.9,As=<6.2, Ba=53.8, B=<15.5,Cr=3.7, Co=<6.2, Fe=8770, Mn=92.2, Mo=<3.1,Sr=10.8, SO4=<316, V=11.9AB-2 (4-5): Ash Pore: pH=6.3,As=<4.4, Ba=9.9, B=<4.4,Cr=0.86, Co=<4.4, Fe=320, Mn=1.7, Mo=<0.88,Sr=2.9, SO4=<416, V=<4.4AB-2 (18-20): Ash Pore: pH=6.4,As=3.3 j, Ba=44.1, B=7.3,Cr=10.6, Co=4.5, Fe=2840, Mn=24.1, Mo=0.53 j,Sr=25.4, SO4=200 j, V=16.9AB-2 (32.9-33.7): Ash Pore: pH=6.4,As=3.4 j, Ba=51.8, B=7.7,Cr=10.2, Co=4.7, Fe=2420, Mn=22.6, Mo=0.54 j,Sr=28.9, SO4=216 j, V=16.7ABMW-03 (15-18): Ash Pore: HFO=174.8ABMW-3S (51-53): Surficial: pH=5.9,As=<6.8, Ba=56.1, B=<17,Cr=1.3 j, Co=6.6 j, Fe=16900, Mn=319, Mo=<3.4,Sr=3.3 j, SO4=<338, V=28.8BGSB-2 (4-5): Surficial: pH=6.08,As=0.49 j, B, Ba=55 M, B=<2.5 M,Cr=3.3 M, Co=6.1, Fe=16000 M, Mn=190, Mo=<2 M,Sr=4.8, SO4=<12, V=36BGSB-2 (9-10): Surficial: pH=6.25,As=0.53 B, Ba=80, B=<2.7,Cr=34, Co=8.8, Fe=15000, Mn=210, Mo=1 j,Sr=10, SO4=<11, V=42BGSB-2 (14-15): Surficial: pH=6.21,As=0.55 B, Ba=34, B=<2.8,Cr=1.4, Co=3.5, Fe=7900, Mn=120, Mo=<2.2,Sr=10, SO4=<11, V=15BGSB-4 (4-5): Surficial: pH=6.83,As=1.6 B, Ba=69, B=<3.2,Cr=12, Co=17, Fe=27000, Mn=120, Mo=0.81 j,Sr=8.9, SO4=<13, V=94BGSB-4 (9-10): Surficial: pH=6.62,As=0.6 B, Ba=210, B=<3.1,Cr=3.4, Co=24, Fe=22000, Mn=310, Mo=<4.9,Sr=17, SO4=<13, V=69BGSB-4 (14-15): Surficial: pH=6.72,As=0.58 j, B, Ba=270, B=<3.2,Cr=10, Co=24, Fe=42000, Mn=130, Mo=<2.6,Sr=49, SO4=<14, V=160BGSB-5 (4-5): Surficial: pH=6.19,As=2.6 B, Ba=41, B=<2.9,Cr=40, Co=17, Fe=27000, Mn=240, Mo=1 j,Sr=9.8, SO4=<12, V=130BGSB-5 (9-10): Surficial: pH=5.81,As=2 B, Ba=53, B=<5.3,Cr=20, Co=12, Fe=36000, Mn=280, Mo=1.2 j,Sr=10, SO4=<12, V=120BGSB-5 (14-15): Surficial: pH=Out,As=0.34 j, B, Ba=250, B=<5.7,Cr=6.1, Co=38, Fe=31000, Mn=1200, Mo=<4.5,Sr=54, SO4=<13, V=110BGSB-8 (4-5): Surficial: pH=Out,As=0.34 j, B, Ba=120, B=<2.6,Cr=4.6, Co=4.7, Fe=11000, Mn=200, Mo=0.6 j,Sr=46, SO4=<11, V=30BGSB-8 (8-9): Surficial: pH=7.11,As=0.33 j, B, Ba=83, B=<4.2,Cr=Out, Co=24, Fe=25000, Mn=410, Mo=0.53 j,Sr=19, SO4=<11, V=45BGSB-9 (4-5): Surficial: pH=6.81,As=3.5 B, Ba=350, B=<5.8,Cr=61, Co=Out, Fe=46000, Mn=450, Mo=Out,Sr=60, SO4=<12, V=140BGSB-9 (9-10): Surficial: pH=6.66,As=1.8 B, Ba=520, B=<13,Cr=Out, Co=37, Fe=69000, Mn=2900, Mo=Out,Sr=69, SO4=<12, V=110BGSB-9 (14-15): Surficial: pH=6.81,As=1.6 B, Ba=490, B=<13,Cr=70, Co=34, Fe=69000, Mn=3100, Mo=1.9 j,Sr=38, SO4=<11, V=170MW-3BR (14.75-15): Surficial: pH=8.4,As=<2.5, Ba=74.4, B=<25.4,Cr=1.5 j, Co=4.3, Fe=7750, Mn=468, Mo=<5.1,Sr=9.6, SO4=<255, V=7.6MW-3BR (17-18): Surficial: pH=8.6,As=<2.7, Ba=74.5, B=<2.7,Cr=<2.7, Co=3.6, Fe=4450, Mn=459, Mo=<5.5,Sr=10.7, SO4=<280, V=4.4MW-3BR (22-25): Transition Zone:KD= As=9.5, B=1, Cr=IDNA, Co=IDNA, Tl=973.9, V=4.5MW-3BR (0.8-1.2): Surficial: pH=5,As=<3, Ba=57.6, B=<3,Cr=11.3, Co=5.4, Fe=8480, Mn=327, Mo=<6,Sr=5.4, SO4=<299, V=16MW-5BR (61-63): Bedrock: KD=As=3.5, B=0,Cr=IDNA, Co=6552, Tl=1140, V=IDNAMW-7BR (1-2): Surficial: pH=5.6,As=<5.1, Ba=21.5, B=<12.8,Cr=4.1, Co=<5.1, Fe=7320, Mn=27.7, Mo=<2.6,Sr=2 j, SO4=<257, V=12.8MW-7BR (22-24): Transition Zone: HFO=1471.4MW-8BR (19-22): Surficial:KD= As=525, B=2, Cr=IDNA, Co=909, Tl=2257, V=388MW-8BR (25.5-26): Surficial: pH=Out,As=<2.7, Ba=193, B=Out,Cr=Out, Co=32.9, Fe=31300, Mn=933, Mo=Out,Sr=33.6, SO4=Out, V=75.8MW-8BR (30.5-31): Surficial: pH=6.9,As=<2.7, Ba=130, B=<53.1,Cr=67.1, Co=7.4, Fe=11400, Mn=875, Mo=<10.6,Sr=9.9, SO4=<267, V=25.2MW-8BR (0.75-1.25): Surficial: pH=6,As=<3.2, Ba=147, B=<63.4,Cr=62.2, Co=21.3, Fe=24700, Mn=1230, Mo=Out,Sr=13.2, SO4=Out, V=50.6MW-9BR (44-46): Bedrock: HFO=432.7MW-10BR (0.75-1.0): Surficial: pH=6.3,As=1.4, Ba=81.8, B=13.6 j,Cr=41.9, Co=12.4, Fe=18600, Mn=527, Mo=<0.57,Sr=9.4, SO4=NA, V=35.1MW-10BR (13.0-13.75): Transition Zone: pH=8,As=1.1, Ba=479, B=26.4 j,Cr=68.3, Co=22.2, Fe=35500, Mn=3200, Mo=<5.6,Sr=28.4, SO4=<269, V=46.2MW-10BR (51.5-53.5): Bedrock: HFO=1006.9MW-11BR (0-2): Surficial: pH=5.2,As=<7.5, Ba=43.1, B=<18.8,Cr=22.6, Co=6.4 j, Fe=52900, Mn=52.6, Mo=<3.8,Sr=18.6, SO4=<354, V=208MW-11BR (30-32): Transition Zone: pH=7.4,As=<5.3, Ba=179, B=<13.1,Cr=2.3, Co=40.9, Fe=44000, Mn=212, Mo=<2.6,Sr=23.7, SO4=<257, V=191: HFO=861.5MW-12D (25-26): Surficial: pH=5.9,As=<6, Ba=67.4, B=9.8 j,Cr=3.2, Co=6, Fe=11900, Mn=395, Mo=<3,Sr=<3, SO4=Out, V=8.2MW-12D (34-35): Surficial: pH=5.5,As=<6.3, Ba=81.5, B=9.2 j,Cr=1.9, Co=9.2, Fe=10700, Mn=855, Mo=<3.1,Sr=4.6, SO4=<313, V=7.7MW-12D (50-51.5): Surficial:KD= As=591, B=1, Cr=3, Co=67, Tl=1515, V=587MW-12D (1-2): Surficial: pH=Out,As=3.6 j, Ba=19.6, B=Out,Cr=43.6, Co=<6, Fe=31200, Mn=Out, Mo=<3,Sr=<3, SO4=Out, V=61MW-12D (88.5-90.0): Bedrock: pH=7.3,As=<5.6, Ba=179, B=<14,Cr=141, Co=19.9, Fe=31500, Mn=2820, Mo=3.3,Sr=24.4, SO4=<278, V=50.1:HFO=894.7:KD= As=1715, B=1.4, Cr=IDNA, Co=2241, Tl=1759, V=557MW-13BR (0-2): Surficial: pH=4.9,As=<6.5, Ba=72.9, B=<16.3,Cr=6.1, Co=<6.5, Fe=19600, Mn=82.8, Mo=0.42 j,Sr=1.8, SO4=<334, V=32.4MW-13BR (17-27): Surficial: HFO=452.8:KD= As=56, B=0,Cr=12, Co=1132, Tl=822, V=54MW-13BR (52-54): Transition Zone: pH=8.3,As=<5.1, Ba=62.3, B=<2.5,Cr=9.2, Co=6.6, Fe=10400, Mn=789, Mo=0.75,Sr=17.6, SO4=<266, V=13.1MW-14BR (40-41.5): Bedrock: HFO=1375.3MW-15BR (0.5-1): Surficial: pH=5.2,As=<6.2, Ba=64.6, B=<15.5,Cr=10.4, Co=3.9 j, Fe=15600, Mn=108, Mo=<3.1,Sr=11.2, SO4=<305, V=27.1MW-15BR (58-63): Bedrock: HFO=2283.6MW-16BR (23-24): Surficial: pH=7.8,As=<5, Ba=28.2, B=10 j,Cr=2.1, Co=4.6 j, Fe=10600, Mn=885, Mo=<2.5,Sr=23.3, SO4=<256, V=8.4MW-16BR (33-35): Transition Zone: pH=8.1,As=<7.5, Ba=131, B=16.8 j,Cr=9.2, Co=12, Fe=19100, Mn=1630, Mo=2.9 j,Sr=37.5, SO4=<359, V=16.3MW-16BR (36.5-38): Transition Zone:KD= As=80, B=0, Cr=IDNA, Co=IDNA, Tl=564, V=40MW-16BR (1-2): Surficial: pH=5.1,As=<6.5, Ba=95.4, B=<16.2,Cr=7.6, Co=6 j, Fe=7710, Mn=1250, Mo=<3.2,Sr=3.2 j, SO4=<333, V=17.3MW-16BR (54.5-55.5): Bedrock: pH=9.6,As=<5.2, Ba=237, B=32.3,Cr=37.2, Co=19.6, Fe=38300, Mn=1010, Mo=<2.6,Sr=40, SO4=<266, V=87:KD= As=8.5, B=0, Cr=418, Co=6552, Tl=338, V=2SB-1 (1-2): Surficial: pH=6.3,As=1.2 j, Ba=49.6, B=9.6,Cr=15.7, Co=3.7, Fe=12400, Mn=104, Mo=<0.7,Sr=6, SO4=Out, V=28.3SB-1 (13.5-14.5): Surficial: pH=5.5,As=1.2 j, Ba=61.5, B=Out,Cr=<1.6, Co=8.9, Fe=8490, Mn=678, Mo=<3.2,Sr=8.3, SO4=Out, V=17.8SB-2 (0.5-2): Surficial: pH=5.3,As=1.9, Ba=65.7, B=16.3 j,Cr=12.9, Co=6.4, Fe=18300, Mn=365, Mo=<0.8,Sr=4.3, SO4=<392, V=44.8SB-2 (11.0-12.5): Surficial: pH=6,As=1.5, Ba=31.3, B=7.8,Cr=10.8, Co=1.6, Fe=10300, Mn=69.4, Mo=0.89,Sr=1.1, SO4=<309, V=23.8SB-3 (5-6): Surficial: pH=8.6,As=0.64 j, Ba=55.2, B=5.7,Cr=20.7, Co=4.9, Fe=8070, Mn=348, Mo=1.1,Sr=11, SO4=<272, V=15SB-3 (17-18.5): Surficial: pH=4.9,As=1.6, Ba=51.4, B=12.9,Cr=35.6, Co=5.2, Fe=18100, Mn=120, Mo=<0.75,Sr=4.4, SO4=<360, V=38.4SB-05 (1-2): Surficial: pH=6,As=1.8, Ba=47.1, B=<17,Cr=<1.7, Co=2.8, Fe=8280, Mn=406, Mo=<3.4,Sr=4.2, SO4=<346, V=6.8SB-05 (2.3-3.3): Surficial: pH=5.9,As=1.1, Ba=40.9, B=<13.5,Cr=<1.4, Co=1.7, Fe=6670, Mn=393, Mo=<2.7,Sr=5.2, SO4=<271, V=5.9SB-05 (8-9): Surficial: pH=6.5,As=1 j, Ba=22.2, B=<13.7,Cr=<1.4, Co=2.2, Fe=5790, Mn=195, Mo=0.36 j,Sr=3.1, SO4=<272, V=4.8SB-06 (1-2): Surficial: pH=5.9,As=1.2 j, Ba=54.8, B=2.9 j,Cr=0.74, Co=2.5, Fe=3920, Mn=192, Mo=<0.64,Sr=4.1, SO4=<309, V=2.7SB-07 (1-2): Surficial: pH=5.1,As=<5.8, Ba=68.8, B=<14.5,Cr=11.4, Co=5.9, Fe=9460, Mn=693, Mo=<2.9,Sr=5.7, SO4=<286, V=17.6SB-07 (4.5-7.5): Surficial: pH=6.4,As=<6, Ba=15.5, B=<15,Cr=8.2, Co=<6, Fe=6040, Mn=226, Mo=<3,Sr=2.9 j, SO4=<300, V=8.2: KD=As=4925, B=IDNA, Cr=6, Co=1077, Tl=1310,V=2971FOREBAYSOURCE NOTES:NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDSTO LOCATE THE STREAMS AND WETLANDS IN THE FIELD. THE HORIZONTAL LOCATION AND THE VERTICALLOCATIONS HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE.LEGENDCULVERT LOCATION500 ft COMPLIANCE BOUNDARYPARCEL LINE DUKE ENERGY (APPROXIMATE)ASH BASIN WASTE BOUNDARYSURFACE WATER FLOW DIRECTIONAPPROXIMATE STREAM (NON-JD)APPROXIMATE POND OR RESERVOIR (NON-JD)APPROXIMATE EFFLUENT CHANNELAPPROXIMATE ASH BASIN PONDED WATERWETLAND BY AMEC FOSTER WHEELERWETLAND AND STREAM BOUNDARIES PROVIDED BY AMECFOSTER WHEELER. NOTE THESE DO NOT APPEAR TO TO BEINCLUSIVE OF ALL THE BOUNDARIES AS SHOWN IN THE AMECFOSTER WHEELER NRTR MAYO REPORT.DATA NOTES:DATA PRESENTED MAY INCLUDE LAB-QUALIFIED RESULTS. REFER TO ANALYTICAL DATA TABLE NOTES FORQUALIFIER DEFINITIONS.DATA SHOWN ON MAP IS THE MOST RECENT DATA AVAILABLE THROUGH Q2 2017.NA=NOT ANALYZEDNM=NOT MEASUREDS-1: pH=6.4,As=56.4, Ba=271, B=40.4,Cr=5.8, Co=<14.4, Fe=247000, Mn=511, Mo=<7.2, SO4=<706, V=<14.4S-2: pH=6.5,As=<6.8, Ba=49.1, B=<17,Cr=8, Co=16.4, Fe=16000, Mn=1060, Mo=<3.4, SO4=<341, V=13.3S-2B: pH=6.6,As=<6.3, Ba=31.8, B=<15.8,Cr=3.4, Co=4.7 j, Fe=12700, Mn=427, Mo=<3.2, SO4=<312, V=5.8 jSW-CB1: pH=6.3,As=<7.1, Ba=53.1, B=<17.8,Cr=13.1, Co=4.5 j, Fe=9660, Mn=186, Mo=<3.6, SO4=<349, V=16.5S-4: pH=6.9,As=14.1, Ba=164, B=16.9 j,Cr=15.4, Co=14, Fe=101000, Mn=2400, Mo=<6, SO4=<585, V=22.3S-08: pH=6.8,As=<8.7, Ba=179, B=<21.8,Cr=4.5, Co=40.6, Fe=10700, Mn=7090, Mo=<4.4, SO4=<435, V=7.3 jS-06: pH=6.6,As=<9.9, Ba=80.9, B=<24.7,Cr=18.5, Co=7.4 j, Fe=17400, Mn=436, Mo=<4.9, SO4=<517, V=33.6SW-REF1: pH=6.4,As=<7.1, Ba=23.7, B=<17.8,Cr=17.3, Co=<7.1, Fe=7100, Mn=122, Mo=<3.6, SO4=<333, V=15.1SW-CB2SW-CB2: pH=7.0,As=<11.1, Ba=98.2, B=<27.7,Cr=13.9, Co=6.1 j, Fe=11400, Mn=383, Mo=<5.5, SO4=399 j, V=19.2PRIMARY AND SECONDARYSETTLING PONDSMW-3MW-12SWELL IN TRANSITION ZONEWELL IN SAPROLITE MATERIALWELL IN ALLUVIUM MATERIALMW-14BRWELL IN COMPETENT BEDROCKABMW-1WELL IN ASH PORE WATERPIEZOMETER IN BEDROCKDEP-1MW-3WATER SUPPLY WELL SAMPLED BY NC DEQSW-CB1SURFACE WATER SAMPLE LOCATIONMY-03SOIL BORING LOCATIONSB-3PIEZOMETER IN EARTH DAM (FILL)P1AS-16AOW SAMPLE LOCATIONTHE TOPOGRAPHY IS A COMPILATION OF LIDAR DATA OBTAINED FROM FRIS- NORTH CAROLINA FLOOD RISKINFORMATION SYSTEM AT ftp://ftp1.ncem.org/Data_Requests/County_LIDAR_Data/Personcounty/ AND ANAERIAL TOPOGRAPHIC SURVEY-MAYO PLANT BY WSP, DATER JULY 24, 2015, JOB NUMBER: 1570002.00, DWGNAME: MAYO OVERALL WK.DWGSOIL OR SEDIMENT ID (INTERVAL IN ft. bgs): FLOW LAYER, pH (S.U.),As=Arsenic (mg/kg): Ba=Barium (mg/kg): B= Boron (mg/kg): Cr (VI)=Hexavalent Chromium (mg/kg): Cr=Total Chromium (mg/kg): Co=Cobalt (mg/kg): Fe=Iron(mg/kg): Mn=Manganese (mg/kg): Mo=Molybdenum (mg/kg): Sr=Strontium (mg/kg): SO4=Sulfate (mg/kg): Tl=Thallium (mg/kg): V=Vanadium (mg/kg)SOIL AND SEDIMENT KEYBLUE COLOR DENOTES THAT THIS SEDIMENT LOCATION HAS CORRESPONDING SURFACE WATER DATA.GREEN COLOR DENOTES THAT THIS SOIL LOCATION HAS CORRESPONDING GROUNDWATER DATA.BLACK COLOR DENOTES THAT THIS SOIL LOCATION DOES NOT HAVE CORRESPONDING GROUNDWATER DATA100' RIGHT OF WAYHFO=HYDROXIDE PHASES OF IRONKD=DISTRIBUTION COEFFICIENT