Loading...
HomeMy WebLinkAboutSW6160101 - SOF Engineer Training Facility151 Poole Road, Suite 100 Belvllle, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefearengineering com To: NCDENR - Central Office 1601 Mail Service Center Raleigh, NC 27699-1601 Original Attn: Bill Diuguid Transmittal ► : _ Date: September 6, 201 File- 559-71 "36" Subject: Designer Certifications SOF Engineer Training Facility Fort Bragg, NC SW6 610101 ❑ As Requested ❑ For Your Files ' ❑ For Distribution ® For your Review / Action / Approval ® Sent via Mail ❑ Sent via Courier Quantity Drawing No Description 1 Original Designer Certification Pond #1 1 Original Designer Certification Pond #2 1 Original Designer Certification Pond #3 RECEIVED 2 STORMWATER PERMITTING REMARKS Please find the enclosed documents for NCDENR Stormwater permit cert. for the SOF Engineer Training Facility. Please call with any questions or comments. CC File 559-71 "36" Lee Ward, Fort Bragg Water Management Branch Cape Fear Engineering, Inc. Signed: IXAJ� Matthew Maley, P Received By - Date: P \559\559-71 SOF Engineer Training Facility-Engineering\ADMIN\STORMWATER\CERTIFICATIONS\2017-09-06 Trans—NCDENR doc State Stormwater Permit Permit No. SW6160101 SOF Engineer Training Facility — PN 68526 Fort Bragg Military Reservation, Cumberland County Stormwater Permit No. SW6160101 Designer's Certification as a duly registered�1�auP�t1GWl in the State of North Carolina, having been authorized to observe eno ica weekly/ full time) the construction of the project, SOF Engineer Training Facility — PN 68526, Fort Bragg, Cumberland County (.Po,c® -w1�) (Project Name) for dgq- cf=— Q&uG WB%S (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 6 of this permit is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Ossw5 Date -S- l Page Page 5 of 6 RECEIVED DENR-LAND QUALIT( STORMWATER PERMITTING SEAL \ n��rrr�„ Q�Zt3 15 of iia Gv .v v V/ State Stormwater Permit Permit No. SW6160101 Certification Requirements: (PONOt-o'- 1 ) ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓/ 7. Trash rack is provided on the outlet/bypass structure. !/ 8. All slopes are grassed with permanent vegetation, per the vegetation plan. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. `S 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. cc: Mike Lawyer, Land Quality Section NCDEQ-DEMLR, Fayetteville Regional Office 225 Green Street Systel Building, Suite 714 Fayetteville, North Carolina 28301-5043 Page 6 of 6 State Stormwater Permit Permit No. SW6160101 SOF Engineer Training Facility — PN 68526 Fort Bragg Military Reservation, Cumberland County Stormwater Permit No. SW6160101 Designer's Certification as a duly registere( in the State of North Carolina, having been authorized to observe enodicall weekly/ full time) the construction of the project, SOF Engineer Training Facility — PN 68526, Fort Bragg, Cumberland County ��t�1r� Z� (Project Name) for i:A W,'x g;K;: R�U4 WV=S (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 6 of this permit is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number 0?>8&lJEP :' ate C/ Date �(-S �"'l = �0.�� C3 15 VV, T. Page 5 of 6 State Stormwater Permit Permit No. SW6160101 Certification Requirements: (P®mr-->2� ✓ 1. The drainage area to the system contains approximately the permitted ✓ 2. acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. V/ 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outlet/bypass structure. -1,/ 8. All slopes are grassed with permanent vegetation, per the vegetation plan. t✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. +� 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. V'*�15. The required system dimensions are provided per the approved plans. cc: Mike Lawyer, Land Quality Section NCDEQ-DEMLR, Fayetteville Regional Office 225 Green Street Systel Building, Suite 714 Fayetteville, North Carolina 28301-5043 Page 6 of 6 State Stormwater Permit Permit No. SW6160101 SOF Engineer Training Facility — PN 68526 Fort Bragg Military Reservation, Cumberland County Stormwater Permit No. SW6160101 Designer's Certification I, l , as a duly registere %oNft'IU4G1 in the State of North Carolina, having been authorized to observe jjenodicall weekly/ full time) the construction of the project, SOF Engineer Training Facility — PN 68526, Fort Bragg, Cumberland County (eowvvl� (Project Name) for . goff EVtLkaL S (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 6 of this permit is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature „nuruunrnruu,, ("r'1,t��s Registration Number o7,q&19 _ J`•'o� S�c�'`°%jam , Date 9 -IS -In Page 5 of 6 State Stormwater Permit Permit No. SW6160101 Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outlet/bypass structure. �8. All slopes are grassed with permanent vegetation, per the vegetation plan. ✓ 9. Vegetated slopes are no steeper than 3:1. _ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. X14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. cc: Mike Lawyer, Land Quality Section NCDEQ-DEMLR, Fayetteville Regional Office 225 Green Street Systel Building, Suite 714 Fayetteville, North Carolina 28301-5043 Page 6 of 6