Loading...
HomeMy WebLinkAboutDuke Energy Progress - Hope MIlls Rockfish Road Substation - HMRR Permit Set (2017-08-02)1"=2000' ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 VICINITY MAP DMP PROJECT: 170147 RDC-71201, SH 1 PROJECT #140430A04 SITE W 78.969 N 34.978 (N34.9784, W78.9690) DRAWING LIST CUMBERLAND COUNTY, NORTH CAROLINA Rockfish CreekRockfish Cree kBuckhead CreekBeaverRockfishCreek RockfishLittleLittleRailroadCSXRailroadCSXKnoll Pine ROCKF ISH RD .NCSR 1112 LAKEW OOD DR. NCSR 1108 NCSR 1003 NCSR 1003 CAMDEN RD. NCSR 1115 GOLFVIEW RD.HOP E MI LLS RD.S. MAI N ST.NCSR 1131NCSR 1132NCSR 1363 59 162 HOPE MILLS ROCKFISH RD. 230kV SUBSTATION 5890 HUNTING RIDGE ROAD, HOPE MILLS EROSION CONTROL DETAILS EROSION AND SEDIMENT CONTROL NOTES SECTIONS & DETAILS EROSION CONTROL PLAN GRADING & DRAINAGE PLAN DIMENSION LAYOUT PLAN OVERALL SITE PLAN BOUNDARY AND TOPOGRAPHIC SURVEY BOUNDARY AND TOPGRAPHIC SURVEY COVER SHEET RDC-71201, SH 10 RDC-71201, SH 9 RDC-71201, SH 8 RDC-71201, SH 7 RDC-71201, SH 6 RDC-71201, SH 5 RDC-71201, SH 4 RDC-71201, SH 3 RDC-71201, SH 2 RDC-71201, SH 1 07/17/2017 FLOOD CERTIFICATION SITE DATA - STORMWATER/ISA PANEL # 3720040400J. BY DETAILED MAP STUDY. SEE COMMUNITY JANUARY 5, 2007, SUBJECT TO VERIFICATION FROM MAPS FURNISHED BY HUD/FIRM, DATED A SPECIAL FLOOD HAZARD AREA, AS SCALED THE SUBJECT PROPERTY IS NOT LOCATED IN45'45'90' PROGRESSENERGY R/W(SEE DATUM DESCRIPTION)NAD 83/2011 NC GRIDGR A VEL DRI VE POETRY LANE (PRIVATE)E: 2,009,035.51 N: 446,744.36 NAD 83(2011) NC GRID ECM N84°39'45"W 230.19' 114.99' 140.24'N88°10'13"W OF LINE 1.15' SOUTH REBAR 498.86' 88.85'91.44'63.35' ECM OF LINE 1.08' NORTH EIP (1.5") OF LINE 0.26' NORTH EIP (1") OF LINE 1.10' NORTH EIP (1.5")605.39'SO3°28'13"WEIP (3") 128.36' S86°46'14"E 588.86' 725.53' ECM FROM ECM N29°24'E, 0.24' EIP (1") OF LINE 0.09' NORTH REBAR OF LINE 0.10' SOUTH EIP (1") 8.31'NO3°46'17"E609.13'28.83' (TIE) N41°41'52"W (TIE)333.78' (GROUND)NAVD 88 ELEV: 174.94 E: 2,009,272.59 N: 446,979.25 NAD 83(2011) NC GRID 'HOPE MILLS' DEP LIDAR MONUMENT N-S BASELINEN3°45'32"EE-W BASELINE S86°14'28"E FROM EIP N17°36'E, 0.57' ECM EIP (1") D.B. 5487 PG. 223 ZYGMUNT C. & DONNA M. GROMANDZKI PIN# 0404-97-3687 D.B. 8983 PG. 627 AMERICAN TOWERS, LLC PIN# 0404-97-9438P.B. 121, PG. 101D.B. 5771 PG. 92WAL-MART STORES EAST, INC.PIN# 0414-07-4883D.B. 9344 PG. 719STORAGE PARTNER-FAYETTEVILLE, NC, INC.PIN# 0404-98-6931D.B. 8206 PG. 157 TENANTS IN COMMON JAMES DAVID BLANTON & CELIA MARIE FURR, VANCE ANDREW BLANTON, RONALD LARRY BLANTON PIN# 0414-06-3928 D.B. 7357 PG. 321 JOHNSON W. & DORIS C. HAYES PIN# 0404-86-9636 D.B. 7104 PG. 825 JOHNSON W. & DORIS C. HAYES PIN# 0404-96-1345 D.B. 8959 PG. 410 KEVIN & BRENDA BOLTON PIN# 0404-96-4625 D.B. 7874 PG. 763 ANNABELLE RUSHING PIN# 0404-96-5664 D.B. 9900 PG. 230 LARRY & CARLA MORGAN, JR. PIN# 0404-96-6654 D.B. 2701 PG. 107 ROXIE K. GARNER PIN# 0404-96-7643 (10.22+/- ACRES) REF. P.B. 70 PG. 78 D.B. 2776 PG. 621 DUKE ENERGY PROGRESS, INC. PIN# 0404-97-4023R/W LIMITR/W LIMITSTR 397 S O I LT R A I LW O O D E D W O O D E D W O O D E D W O O D E D EX. 18" RCP 174.57' INV 174.50' INVC A S T L E F I E L D A T M I L L S T O N ES E C T I O N T W OP. B. 1 2 4, P G. 1 2 5CASTLEFIELD AT MILLSTONESECTION ONEP.B. 123, PG. 171D.B. 8181 PG. 123 CASTLEFIELD AT MILLSTONE HOA, INC. 20' UNDEVELOPABLE BUFFER LOT PIN# 040-86-3985 CASTLEFIELD LANEPAVED 50' RIGHT-OF-WAY HUNTING RIDGE ROAD176175175175 175175 180180 179 179 178178 178177 177 177177 177 176 17617 6 176178FAYETTEVILLE-RAEFORD 230 KV LINELINE INDEX OL061 AND OL0831 inch = ft. ( IN FEET ) GRAPHIC SCALE 050 50 100 50 20025ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 DMP PROJECT: 170147 PREPARED BY: BUILDING CONTROL PROPOSED PROPERTY LINE RIGHT-OF-WAY EX. CONTOUR PROP. TREELINE EX. TREELINE LEGEND SUBSTATION GRAVEL ACCESS DRIVE GRAVEL SHOULDER GRAVEL PROP. FENCELINE FENCE (BY OTHERS) PROPOSED CHAIN-LINK H1 H2 H3 X0 X1 X2 X3 CONTROL BUILDING NO AREAS OF ENVIRONMENTAL CONCERN EXIST ON-SITE.17. PERIMETER OF PARCEL TO SERVE AS REQUIRED BUFFER. BUFFER REQUIREMENTS - INTEND TO UTILIZE EXISTING VEGETATION ALONG16. FEATURES IDENTIFIED. WETLAND DELINEATION PERFORMED BY ESI (JANUARY 2017). NO WETLAND/STREAM15. ESP ASSOCIATES, PA, DATED FEBRUARY 21, 2017. EXISTING CONDITIONS TAKEN FROM A SITE SURVEY PREPARED BY14. RDC-71201, SH 8 SECTIONS AND DETAILS FOR STONE/GRAVEL PROFILES & DETAILS. SUBSTATION AREA WILL BE FENCED (7' CHAIN-LINK W/1' BARBED WIRE). SEE13. PARCEL IS LOCATED WITHIN THE CAPE FEAR RIVER BASIN (NO BUFFER RULES)12. EFFECTIVE DATE 01/05/2007. SITE IS NOT IN A FEMA 100-YR FLOODWAY, MAP NUMBER 3720040400J,11. NO GARBAGE/SOLID WASTE COLLECTION REQUIRED.10. NO WATER SERVICE OR SEWER SERVICE REQUIRED.9. PROPERTY ADDRESS: 5890 HUNTING RIDGE ROAD, HOPE MILLS, NC 8. DEED BOOK 2776 PAGE 621 & PLAT BK 70 PAGE 787. PARCEL IDENTIFICATION NUMBER: 0404-97-40236. TEL. (919) 546-2235 CHARLOTTE, NC 28202-4200 550 SOUTH TRYON STREET DUKE ENERGY PROGRESS, INC.PROPERTY OWNER:5. PROPOSED USE: STATIC ELECTRIC TRANSFORMER STATION.4. CURRENT ZONING: R-10 3. TOTAL DISTURBED AREA: 4.94 AC2. TOTAL LOT AREA: 10.22 AC1. SITE INFORMATION: GRAVEL RESURFACING APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION OVERALL SITE PLAN 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 4 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING PROPOSED - 10.93% ISA COVERAGE (% OF LOT): EXISTING - 8.11% TOTAL ISA: 48,673 S.F. ISA PROPOSED: 12,583 S.F. (ACCESS DRIVE & SHOULDER) ISA EXISTING: 36,090 S.F. (ACCESS DRIVE & STATION) MAX. LOT COVERAGE ALLOWED PER LOW DENSITY: 24 % (CAPE FEAR BASIN) WATERSHED: UT NEAR HOPE MILLS (PERMASTONE LAKE), B 07/17/2017 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 050 50 100 50 20025ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 DMP PROJECT: 170147 PREPARED BY:45'45'90' PROGRESSENERGY R/W(SEE DATUM DESCRIPTION)NAD 83/2011 NC GRIDGR A VEL DRI VE POETRY LANE (PRIVATE)E: 2,009,035.51 N: 446,744.36 NAD 83(2011) NC GRID ECM N84°39'45"W 230.19' 114.99' 140.24'N88°10'13"W OF LINE 1.15' SOUTH REBAR 498.86' 88.85'91.44'63.35' ECM OF LINE 1.08' NORTH EIP (1.5") OF LINE 0.26' NORTH EIP (1") OF LINE 1.10' NORTH EIP (1.5")605.39'SO3°28'13"WEIP (3") 128.36' S86°46'14"E 588.86' 725.53' ECM FROM ECM N29°24'E, 0.24' EIP (1") OF LINE 0.09' NORTH REBAR OF LINE 0.10' SOUTH EIP (1") 8.31'NO3°46'17"E609.13'28.83' (TIE) N41°41'52"W (TIE)333.78' (GROUND)NAVD 88 ELEV: 174.94 E: 2,009,272.59 N: 446,979.25 NAD 83(2011) NC GRID 'HOPE MILLS' DEP LIDAR MONUMENT N-S BASELINEN3°45'32"EE-W BASELINE S86°14'28"E FROM EIP N17°36'E, 0.57' ECM EIP (1") D.B. 5487 PG. 223 ZYGMUNT C. & DONNA M. GROMANDZKI PIN# 0404-97-3687 D.B. 8983 PG. 627 AMERICAN TOWERS, LLC PIN# 0404-97-9438P.B. 121, PG. 101D.B. 5771 PG. 92WAL-MART STORES EAST, INC.PIN# 0414-07-4883D.B. 9344 PG. 719STORAGE PARTNER-FAYETTEVILLE, NC, INC.PIN# 0404-98-6931D.B. 8206 PG. 157 TENANTS IN COMMON JAMES DAVID BLANTON & CELIA MARIE FURR, VANCE ANDREW BLANTON, RONALD LARRY BLANTON PIN# 0414-06-3928 D.B. 7357 PG. 321 JOHNSON W. & DORIS C. HAYES PIN# 0404-86-9636 D.B. 7104 PG. 825 JOHNSON W. & DORIS C. HAYES PIN# 0404-96-1345 D.B. 8959 PG. 410 KEVIN & BRENDA BOLTON PIN# 0404-96-4625 D.B. 7874 PG. 763 ANNABELLE RUSHING PIN# 0404-96-5664 D.B. 9900 PG. 230 LARRY & CARLA MORGAN, JR. PIN# 0404-96-6654 D.B. 2701 PG. 107 ROXIE K. GARNER PIN# 0404-96-7643 (10.22+/- ACRES) REF. P.B. 70 PG. 78 D.B. 2776 PG. 621 DUKE ENERGY PROGRESS, INC. PIN# 0404-97-4023R/W LIMITR/W LIMITSTR 397 W O O D E D W O O D E D W O O D E D W O O D E D EX. 18" RCPC A S T L E F I E L D A T M I L L S T O N ES E C T I O N T W OP. B. 1 2 4, P G. 1 2 5CASTLEFIELD AT MILLSTONESECTION ONEP.B. 123, PG. 171D.B. 8181 PG. 123 CASTLEFIELD AT MILLSTONE HOA, INC. 20' UNDEVELOPABLE BUFFER LOT PIN# 040-86-3985 CASTLEFIELD LANEPAVED 50' RIGHT-OF-WAY HUNTING RIDGE ROADFAYETTEVILLE-RAEFORD 230 KV LINELINE INDEX OL061 AND OL0830+001+002+00MONUMENT N-W BASELINE MONUMENT E-W BASELINE P-1 E: 2,009,341.63 N: 447,054.87 NC GRID NAD 83(2011) E-W BASELINE MONUMENT E: 2,009,288.47 N: 447,008.25 NC GRID NAD 83(2011) N-W BASELINE MONUMENT 90°0'0" 235.03'281.37'89°28'14" 20.00' 118.01' 54.93'20.00'20.00' 140.23' 32.78' 140.29'221.53'15.00'R 120.00' R23.57'55.13'181.43'20.00' APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION DIMENSION LAYOUT PLAN 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 5 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING 07/17/2017 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 050 50 100 50 20025ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 DMP PROJECT: 170147 PREPARED BY: PROPERTY LINE RIGHT-OF-WAY EX. CONTOUR PROP. TREELINE EX. TREELINE PROP. CONTOUR LEGEND POWER LINES. WORKING AROUND ENERGIZED SHALL USE CAUTION WHILE OF WORK AREA. CONTRACTOR OVERHEAD POWER IN VICINITY WARNING: PIPE SCHEDULE P-1 PIPE NO. FROM TO SIZE LENGTH INV. IN INV. OUT SLOPE MATERIAL PIPEPATH INLET 18"174.5544'174.80 0.56%RCP (CLASS IV)OUTLET NO. CHANNEL (acres) AREA DRAINAGE CHANNEL SLOPE SLOPES LINING D-1 0.27 3:1 1.0 DITCH SCHEDULE TEMPORARY D-2 0.57 (%) 1.0 1.0 N.A. GREEN S150 N.A. GREEN S150 REQUIRED* *AN 'OR EQUAL' PRODUCT MAY BE SUBSTITUTED D-3 3.87 0.3 N.A. GREEN S150 BOTTOM (feet) SIDE DEPTH (feet) 3 5 3:1 1.0 4:1 1.2 LINE, TYP. PROPOSED TREE D-1 INV IN P-1 ACCESS DRIVE PROP 20' GRAVEL D-2 D-3 0.50% 2.0% GATE 24-FT DOUBLE WASHOUT PIT CONCRETE 0.50% 2.0% 178.02 (FG) 177.52 (SG) 178.02 (FG) 177.52 (SG)45'45'90' PROGRESSENERGY R/W(SEE DATUM DESCRIPTION)NAD 83/2011 NC GRIDGR A VEL DRI VE POETRY LANE (PRIVATE)E: 2,009,035.51 N: 446,744.36 NAD 83(2011) NC GRID ECM N84°39'45"W 230.19' 114.99' 140.24'N88°10'13"W OF LINE 1.15' SOUTH REBAR 498.86' 88.85'91.44'63.35' ECM OF LINE 1.08' NORTH EIP (1.5") OF LINE 0.26' NORTH EIP (1") OF LINE 1.10' NORTH EIP (1.5")605.39'SO3°28'13"WEIP (3") 128.36' S86°46'14"E 588.86' 725.53' ECM FROM ECM N29°24'E, 0.24' EIP (1") OF LINE 0.09' NORTH REBAR OF LINE 0.10' SOUTH EIP (1") 8.31'NO3°46'17"E609.13'28.83' (TIE) N41°41'52"W (TIE)333.78' (GROUND)NAVD 88 ELEV: 174.94 E: 2,009,272.59 N: 446,979.25 NAD 83(2011) NC GRID 'HOPE MILLS' DEP LIDAR MONUMENT N-S BASELINEN3°45'32"EE-W BASELINE S86°14'28"E FROM EIP N17°36'E, 0.57' ECM EIP (1") D.B. 5487 PG. 223 ZYGMUNT C. & DONNA M. GROMANDZKI PIN# 0404-97-3687 D.B. 8983 PG. 627 AMERICAN TOWERS, LLC PIN# 0404-97-9438P.B. 121, PG. 101D.B. 5771 PG. 92WAL-MART STORES EAST, INC.PIN# 0414-07-4883D.B. 9344 PG. 719STORAGE PARTNER-FAYETTEVILLE, NC, INC.PIN# 0404-98-6931D.B. 8206 PG. 157 TENANTS IN COMMON JAMES DAVID BLANTON & CELIA MARIE FURR, VANCE ANDREW BLANTON, RONALD LARRY BLANTON PIN# 0414-06-3928 D.B. 7357 PG. 321 JOHNSON W. & DORIS C. HAYES PIN# 0404-86-9636 D.B. 7104 PG. 825 JOHNSON W. & DORIS C. HAYES PIN# 0404-96-1345 D.B. 8959 PG. 410 KEVIN & BRENDA BOLTON PIN# 0404-96-4625 D.B. 7874 PG. 763 ANNABELLE RUSHING PIN# 0404-96-5664 D.B. 9900 PG. 230 LARRY & CARLA MORGAN, JR. PIN# 0404-96-6654 D.B. 2701 PG. 107 ROXIE K. GARNER PIN# 0404-96-7643 (10.22+/- ACRES) REF. P.B. 70 PG. 78 D.B. 2776 PG. 621 DUKE ENERGY PROGRESS, INC. PIN# 0404-97-4023R/W LIMITR/W LIMITSTR 397 S O I LT R A I LW O O D E D W O O D E D W O O D E D W O O D E D EX. 18" RCP 174.57' INV 174.50' INVC A S T L E F I E L D A T M I L L S T O N ES E C T I O N T W OP. B. 1 2 4, P G. 1 2 5CASTLEFIELD AT MILLSTONESECTION ONEP.B. 123, PG. 171D.B. 8181 PG. 123 CASTLEFIELD AT MILLSTONE HOA, INC. 20' UNDEVELOPABLE BUFFER LOT PIN# 040-86-3985 CASTLEFIELD LANEPAVED 50' RIGHT-OF-WAY HUNTING RIDGE ROAD178175175175 175175 180180 179 179 178178 178177 177 177177 177 176 17617 6 176178FAYETTEVILLE-RAEFORD 230 KV LINELINE INDEX OL061 AND OL0830+001+002+00175 175 176 176 177177176 178 179 178178 1774+003+00P-1 D-4 4.99 0.3 N.A. GREEN S15046:1 1.0 174 SEE NOTE #9 GRADE TO DRAIN B B 178.61 (FG) 178.11 (SG) 178.61 (FG) 178.11 (SG) D-4 4.5 IN THE LENGTHS SHOWN. *PROVIDE FLARED-END SECTIONS (FES) ON INLET AND OUTLET OF P-1. FES INCLUDED SEE NOTE #8 FINE GRADING OPERATIONS. 3" #57 STONE DURING REPLACED WITH 3" CABC & TO BE UNDERCUT 6" AND EXISTING SUBSTATION YARD APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION GRADING & DRAINAGE PLAN 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 6 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING CONTRACTOR LAYDOWN/ STOCKPILE AREA ELEVATION: 173.8' D-4 TERMINATION POLES AND GUY WIRES. GRADE SWALE/DITCH TO DRAIN AREA TO THE NORTH AND WEST, AROUND THE EXISTING9. ACCORDANCE WITH APPLICABLE RULES & REGULATORY REQUIREMENTS. BY CONTRACTOR INTO BE TESTED BEFORE REMOVAL FROM SITE AND DISPOSED OF SURPLUS/EXCESS EXCAVATED MATERIAL, INCLUDING UNDERCUT FROM EXISTING YARD,8. COMPACTED ABC STONE - SEE SECTIONS AND DETAILS, RDC-71201, SH 8. TOP 3" OF SUBGRADE INSIDE EXPANDED SUBSTATION FENCE AREA SHALL BE 7. USE. ON-SITE. CONSTRUCTION EQUIPMENT SHOULD BE PLACED ON CONTAINMENT WHEN NOT IN CONTRACTOR SHALL PROVIDE PROPER SECONDARY CONTAINMENT FOR ANY FUEL STORED6. LINES WILL BE ENERGIZED DURING CONSTRUCTION. CONTRACTOR SHALL EXERCISE CAUTION IN WORKING AROUND TRANSMISSION LINES, AS5. SECTIONS FOR FURTHER CLARITY. FINISHED GRADE (FG), SUBGRADE (SG) OR EXISTING GRADE (EG) AS INDICATED. SEE PROPOSED CONTOURS REFLECT FINISHED GRADE ELEVATIONS. SPOT ELEVATIONS REFLECT4. SHOULD RECEIVE 98% COMPACTION. TO 95% STANDARD PROCTOR MAXIMUM DENSITY (ASTM-698) IN 8" LIFTS. TOP 12" CUT AND FILL SLOPES WILL BE 3:1 (H:V), UNLESS OTHERWISE SHOWN. COMPACT FILL3. FILL: 1,750 CY (A FILL FACTOR OF 1.15 HAS BEEN APPLIED) CUT: 705 CY ESTIMATED EARTHWORK QUANTITIES (TOTAL SITE-GROSS):2. THE PLANS. EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING A DEVIATION FROM PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IN THE SHALL NOTIFY THE NC ONE CALL CENTER OR THEIR SUCCESSORS AT 1-800-632-4949 REPAIRED IMMEDIATELY WITH NO ADDITIONAL COST TO THE OWNER. CONTRACTOR BEGINNING CONSTRUCTION. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO1. GENERAL NOTES: 07/17/2017 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 050 50 100 50 20025ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 DMP PROJECT: 170147 PREPARED BY: POWER LINES. WORKING AROUND ENERGIZED SHALL USE CAUTION WHILE OF WORK AREA. CONTRACTOR OVERHEAD POWER IN VICINITY WARNING: ACCESS DRIVE PROP 20' GRAVEL 45'45'90' PROGRESSENERGY R/W(SEE DATUM DESCRIPTION)NAD 83/2011 NC GRIDGR A VEL DRI VE POETRY LANE (PRIVATE)N84°39'45"W 230.19' 114.99' 140.24'N88°10'13"W 498.86' 88.85'91.44'63.35' ECM 605.39'SO3°28'13"WEIP (3") 128.36' S86°46'14"E 588.86' 725.53' ECM NO3°46'17"E609.13'28.83' (TIE) N41°41'52"W (TIE)333.78' (GROUND)N-S BASELINEN3°45'32"EE-W BASELINE S86°14'28"E EIP (1") D.B. 5487 PG. 223 ZYGMUNT C. & DONNA M. GROMANDZKI PIN# 0404-97-3687 D.B. 8983 PG. 627 AMERICAN TOWERS, LLC PIN# 0404-97-9438P.B. 121, PG. 101D.B. 5771 PG. 92WAL-MART STORES EAST, INC.PIN# 0414-07-4883D.B. 9344 PG. 719STORAGE PARTNER-FAYETTEVILLE, NC, INC.PIN# 0404-98-6931D.B. 8206 PG. 157 TENANTS IN COMMON JAMES DAVID BLANTON & CELIA MARIE FURR, VANCE ANDREW BLANTON, RONALD LARRY BLANTON PIN# 0414-06-3928 D.B. 7357 PG. 321 JOHNSON W. & DORIS C. HAYES PIN# 0404-86-9636 D.B. 7104 PG. 825 JOHNSON W. & DORIS C. HAYES PIN# 0404-96-1345 D.B. 8959 PG. 410 KEVIN & BRENDA BOLTON PIN# 0404-96-4625 D.B. 7874 PG. 763 ANNABELLE RUSHING PIN# 0404-96-5664 D.B. 9900 PG. 230 LARRY & CARLA MORGAN, JR. PIN# 0404-96-6654 D.B. 2701 PG. 107 ROXIE K. GARNER PIN# 0404-96-7643 (10.22+/- ACRES) REF. P.B. 70 PG. 78 D.B. 2776 PG. 621 DUKE ENERGY PROGRESS, INC. PIN# 0404-97-4023R/W LIMITR/W LIMITSTR 397 S O I LT R A I LW O O D E D W O O D E D W O O D E D W O O D E D EX. 18" RCPC A S T L E F I E L D A T M I L L S T O N ES E C T I O N T W OP. B. 1 2 4, P G. 1 2 5CASTLEFIELD AT MILLSTONESECTION ONEP.B. 123, PG. 171CASTLEFIELD LANEPAVED 50' RIGHT-OF-WAY HUNTING RIDGE ROAD 175 175175 175175 180180 179 179 178178 178177 177 177177 177 176 17617 6 176178FAYETTEVILLE-RAEFORD 230 KV LINELINE INDEX OL061 AND OL0830+001+002+00175 175 176 176 177177 178 179 178178 1774+003+00P-1 EROSION CONTROL LEGEND RIP-RAP OUTLET PROTECTION LIMITS OF DISTURBANCE TEMP. PIPE INLET PROTECTION SEDIMENT FENCE OUTLET TEMP. COIR WATTLE TEMP SILT FENCE EROSION CONTROL MATTING LINE, TYP. PROPOSED TREE D-1 D-2 D-3 WASHOUT PIT CONCRETE E: 2,009,035.51 N: 446,744.36 NAD 83(2011) NC GRID ECM OF LINE 1.15' SOUTH REBAR OF LINE 1.08' NORTH EIP (1.5") OF LINE 0.26' NORTH EIP (1") FROM ECM N29°24'E, 0.24' EIP (1") OF LINE 0.09' NORTH REBAR OF LINE 0.10' SOUTH EIP (1") 8.31' FROM EIP N17°36'E, 0.57' ECM D.B. 8181 PG. 123 CASTLEFIELD AT MILLSTONE HOA, INC. 20' UNDEVELOPABLE BUFFER LOT PIN# 040-86-3985 D-4 GATE 24-FT DOUBLE BARBED WIRE FENCE W/1-FT 7-FT CHAIN-LINK OF LINE 1.10' NORTH EIP (1.5") WATTLE, TYP. TEMP. COIR PROTECTION, TYP. PIPE INLET PROTECTION, TYP. PIPE OUTLET ENTRANCE CONSTRUCTION TEMPORARY LIMITS, TYP. DISTURBED LIMITS, TYP. DISTURBED CONSTRUCTION FENCE PROPERTY LINE RIGHT-OF-WAY EX. CONTOUR PROP. TREELINE EX. TREELINE PROP. CONTOUR LEGEND APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION EROSION CONTROL PLAN 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 7 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING CONTRACTOR LAYDOWN/ STOCKPILE AREA SEE NOTE #5 176 174 NO. CHANNEL (acres) AREA DRAINAGE CHANNEL SLOPE SLOPES LINING D-1 0.27 3:1 1.0 TEMPORARY D-2 0.57 (%) 1.0 1.0 N.A. GREEN S150 N.A. GREEN S150 REQUIRED* *AN 'OR EQUAL' PRODUCT MAY BE SUBSTITUTED D-3 3.87 0.3 N.A. GREEN S150 BOTTOM (feet) SIDE DEPTH (feet) 3 5 3:1 1.0 4:1 1.2 D-4 4.99 0.8 N.A. GREEN S15036:1 1.0 4.5 DITCH LINING SCHEDULE GREEN S150 MATTING (OR EQUAL). AND SMOOTHED. SEED AND MAT DISTURBED AREA WITH N.A. LAYDOWN/STOCKPILE AREA TO BE CLEARED, GRUBBED5. MULCH/STRAW & TACK. NOTED. ALL SLOPES GREATER THAN 4:1 SHALL ALSO RECEIVE ALL SLOPES TO BE SEEDED & COMPOSTED, UNLESS OTHERWISE4. LAST LAND-DISTURBING ACTIVITY. GRASS DITCHLINES SHALL BE STABILIZED WITHIN 7 DAYS FROM 3. GENERAL EROSION CONTROL NOTES. REFER TO RDC-71201, SH 9 FOR CONSTRUCTION SEQUENCE AND2. TOTAL DISTURBED AREA: 4.94 ACRES1. EROSION CONTROL NOTES: TRANSITION CF TO SF TRANSITION CF TO SF TRANSITION CF TO SF TRANSITION CF TO SF BETWEEN ROWS 5' MIN. APART OUTLETS, TYP. SILT FENCE & DOUBLE ROW BETWEEN ROWS 5' MIN. APART OUTLETS, TYP. SILT FENCE & DOUBLE ROW 07/17/2017 ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 PREPARED BY: DMP PROJECT: 170147 1"= 5' (V) 1"=50' (H)SCALE: ABC (COMPACTED) INSITU SOILS 30 1 1 6 SUBGRADE COMPACTED PROFILE VIEW PLAN VIEW 15 ' 20 '15'GATE SUBSTATION FENCE SUBSTATION GATE ENTRANCE DETAIL6'6 '6 ' 6 ' 20' 6' EDGE OF GRADE DETAIL 3" CABC 3" #57 FENCE 2:1 3:1 SHOULDER ROADBED 1 C ACCESS DRIVE COMPACTED SOIL SEEDED SLOPES (TYPICAL) SHOULDER ROADBED C ACCESS DRIVE COMPACTED SOIL 1 1 1 C DITCH SEEDED SLOPES (TYPICAL) ROADBED SHOULDER C DITCH ROADBED SHOULDER SEEDED SLOPES (TYPICAL) 1/4 INCH PER FOOT (2%) SIDE SLOPE (TYPICAL) 1/4 INCH PER FOOT (2%) SIDE SLOPE (TYPICAL) LL L L TYPICAL SUBSTATION ACCESS DRIVE SECTION FOR FILL AREA TYPICAL SUBSTATION ACCESS DRIVE SECTION FOR CUT AREA THE GRADING PLAN. 2. ALL SLOPES AND DITCHES SHALL BE SEEDED & MULCHED UNLESS OTHERWISE NOTED ON OR FLATTER UNLESS OTHERWISE NOTED ON THE GRADING PLAN. 1. ALL CUT & FILL SLOPES SHALL BE GRADED TO A 3:1 HORIZONTAL TO VERTICAL SLOPE NOTES: SEEDED SLOPES (TYPICAL) APP.CK.REVISION BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO EDIT THE TEXT HERE AS NEEDED 1" = 1'-0" 1:1 INITIAL RELEASE SEDIMENT AND EROSION CONTROL DETAIL TRANSMISSION ENGINEERING TYPICAL ACCESS DRIVE DETAIL 05-06-2013 SFP BGT SFP SFP BGT SFP 05-06-2013 CT-65388 SH 1 OF 1 12-21-2015 REVISIONS LOE BGT BGT 1 DATENO. 0 1 12" COMPACTED ABC STONE 12" COMPACTED ABC STONE 10' - 0 '' 12' - 0'' 24' - 0 ''2''3''VARIES 10' - 0 ''2' -0'' NTS NTS3''2''2' -0" 12' - 0 '' 10' - 0 '' 24' - 0 '' 10' - O ''2' - 0 '' 2' -0" 3 (MAX.) 3 (MAX) 3 (MAX.)3 (MAX.) 3 (MAX.) SECTION B-B Profile View of (SUBGRADE) 3" CABC 3" CABC3" #57 0+00 1+00 2+00 3+00 4+00 5+00 (SUBGRADE) 3" CABC 3" CABC3" #57 0+00 1+00 2+00 170 175 PROP. FENCE180 185 170 175 180 185 ACCESS DRIVE & SUBSTATION Profile View of 170 175 180 170 175 180 PROP. FENCEPROP. FENCEDRIVE ACCESS 12" CABC P-1 180 180 PREPARED BY: APP.CK.REVISIONDATENO.BY 0 INITIAL RELEASE LOCATION SCALE DRAWN DATE CHK.APP. SCALE RATIO SEDIMENT AND EROSION CONTROL DETAILS 1" = 1'-0" 1:1 TRANSMISSION ENGINEERING STANDARD DRAWING SFP 05-06-13 DWG. NO. WASHOUT PIT (TYP) STAKE (TYP) STRAW BALE STEEL WIRE 1/8" DIA. 6" HEIGHT BLACK LETTERS SCREWS 0.5" LAG 3" X 3" X 8' WOOD POST PLASTIC LINING 10 MIL BINDING WIRE STRAW BALE (OPTIONAL) NATIVE MATERIAL (2 PER BALE) METAL STAKES WOOD OR B B (OR EQUIVALENT) SIGN DETAIL CONCRETE WASHOUT WASHOUT CONCRETE STAPLE DETAIL CONCRETE WASHOUT FACILITY 30 FT. OF THE TEMPORARY SHALL BE INSTALLED WITHIN THE CONCRETE WASHOUT SIGN2. IN THE FIELD ACTUAL LAYOUT DETERMINED 1. SECTION B-B NOT TO SCALE PAINTED WHITE 48" X 24" PLYWOOD 10' MIN.VARIESPLAN 05-06-2013 SFP BGT SFP BGT SFP CT-65387 SH 1 OF 1 2" 3' 3' EDGE OF LINER WITH STRAW BALES TYPE "ABOVE GRADE" NOT TO SCALE 4" BALE WITH STAPLES ATTACH LINER TO TOP OF STRAW 12-21-2015 1 REVISIONS LOE BGT BGT AT LEAST 6" 2 2-22-2015 REVISIONS LOE BGT BGT STAPLES (2 PER BALE) STAKE CAPS INSPECTION / MAINTENANCE / REMOVAL NOTES NEEDED AND RESTORE THE DISTURBED AREAS TO THEIR ORIGINAL CONDITION. REMOVE TEMPORARY CONCRETE WASHOUT FACILITIES WHEN THEY ARE NO LONGER7. IF A LINED BASIN IS USED, IMMEDIATELY REPLACE THE LINER IF IT BECOMES DAMAGED.6. PROPERLY. VACUUM TRUCK). ALL HARDENED MATERIAL CAN THEN BE REMOVED AND DISPOSED OF ALLOW SLURRY TO EVAPORATE OR REMOVE FROM THE SITE IN A SAFE MANNER (IE.5. CONCRETE INTO THE FACILITY UNTIL IT HAS BEEN CLEANED OUT. DESIGNED CAPACITY. IF THE CONTENTS REACH 75% CAPACITY, DISCONTINUE POURING CONTENTS OF EACH CONCRETE WASHOUT FACILITY ARE NOT TO EXCEED 75% OF ITS4. ACCUMULATION AND OVERFLOW OF PRECIPITATION. COVER SHALL BE PLACED OVER THE WASHOUT FACILITY AND SECURED TO PREVENT IF A RAIN OR SNOW EVENT IS FORECASTED, A NON-COLLAPSING, NON-WATER COLLECTING3. AND REMOVED WITHIN 24 HOURS OF DISCOVERY. ANY OVERFLOWING OF THE WASHOUT FACILITIES ONTO THE GROUND MUST BE CLEANED UP2. COMPROMISED. ARE NO LEAKS, NO SPILLS AND THAT THE FACILITIES CAPACITY HAS NOT YET BEEN BEEN POURED ON THE CONSTRUCTION SITE. THE INSPECTOR IS TO ENSURE THAT THERE A STORM EVENT OF ½”OR GREATER AND AT THE END OF ANY DAY WHEN CONCRETE HAS ENGINEER DURING HIS/HER WEEKLY EROSION AND SEDIMENT CONTROL INSPECTION, AFTER TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE INSPECTED BY THE RESIDENT1. FRONT VIEW SIDE VIEW NTS CONSTRUCTION/SAFETY FENCE DETAIL (TEMPORARY)EX. FENCETO BE REMOVED6" CABC 6" CABCEX. FENCETO REMAIN-1+00 3" #57 3" CABC SEE NOTE #4 AND 3" #57 STONE - DURING FINE GRADING OPERATIONS. EXISTING SUBSTATION YARD TO BE UNDERCUT 6" AND REPLACED WITH 3" ABC4. STONE MAY REQUIRE REPAIR AND/OR REGRADING. PRIOR TO PLACEMENT OF FINAL STONE INSIDE SUBSTATION (3"+3"), SUBGRADE3. 98% MAXIMUM DRY DENSITY AS DETERMINED BY AASHTO T-180. SUBSTATION SUBGRADE SHALL CONSIST OF 3" ABC, COMPACTED TO A MINIMUM2. COMPACTION TEST, AASHTO T-180 AS MODIFIED BY NCDOT. 98% MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR ACCESS DRIVE STONE SHALL CONSIST OF 12" ABC, COMPACTED TO A MINIMUM1. NOTES: 3" CABC 6" CABC SUBGRADE GRADE FINISHED GRADE FINISHED 12"6"3" ABC3" #57 STONE3" ABC VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX. GRADE ORANGE, UV RESISTANT, HIGH-TENSILE STRENGTH, POLY BARRICADE FABRIC (TYPICAL) STAKE CAP 2'-0"26"GRADE4'-0"POLY BARRICADE FABRIC (TYPICAL) HIGH-TENSILE STRENGTH, ORANGE, UV RESISTANT, STEEL POST WITH STAKE CAP APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION SECTIONS & DETAILS 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 8 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING 07/17/2017 ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 PREPARED BY: DMP PROJECT: 170147 energy-mineral-land-permits/stormwater-permits/construction-sw FOUND AT: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/ 4. ADDITIONAL INFORMATION ON THE SELF-INSPECTION PROGRAM/REQUIREMENTS CAN BE SUITABLE FOR CLOSURE. NOTIFIED AND HAS ANNOTATED IN THE FINAL INSPECTION REPORT THE PROJECT IS RESTRAIN EROSION AND THE REGULATORY AGENCY THAT APPROVED THE PLAN HAS BEEN F. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO E. COMPLETION OF CONSTRUCTION OR DEVELOPMENT; AND D. COMPLETION OF STORM DRAINAGE FEATURES; OF TEMPORARY OR PERMANENT GROUND COVER PURSUANT TO G.S. 113A-57(2); C. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS THAT REQUIRES PROVISION B. CLEARING AND GRUBBING OF EXISTING GROUND COVER; A. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; PHASES OF A PLAN: 3. THE INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE. A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON CERTIFICATIONS MAY ALSO BE INCLUDED. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR THE INSPECTION AND THE DATE OF THE INSPECTION. ANY RELEVANT LICENSES AND ADDRESS, AFFILIATION, TELEPHONE NUMBER, AND SIGNATURE OF THE PERSON CONDUCTING SEDIMENTATION CONTROL PLAN OR AN INSPECTION REPORT, SHALL INCLUDE THE NAME, 2. THE DOCUMENTATION, WHETHER ON A COPY OF THE APPROVED EROSION AND INTENDED. OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION, OR RELOCATION OF AN EROSION CONTROL PLAN OR BY COMPLETING, DATING, AND SIGNING AN INSPECTION REPORT. A BY INITIALING AND DATING A COPY OF THE APPROVED EROSION AND SEDIMENTATION COMPLETIONG OF THE CORRECTIVE ACTIONS. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED CONTROL PLAN, CORRECTIVE ACTIONS REQUIRED TO CORRECT THE DEVISION, AND E. ANY SIGNIFICANT DEVIATIONS FROM THE APPROVED EROSION AND SEDIMENTATION BE USED TO VERIFY THE MAINTENANCE AND REPAIR REQUIREMENTS); AND SIGNING AN INSPECTION REPORT (THE GENERAL STORM WATER PERMIT MONITORING FORM MAY PERFORMED. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY COMPLETING, DATING, AND EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES, AND DEVICES HAVE BEEN D. THAT MAINTENANCE AND REPAIR REQUIREMENTS FOR ALL TEMPORARY AND PERMANENT DATING, AND SIGNING AN INSPECTION REPORT; A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, CONTROL PLAN. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING SUB-ITEM (1)(E) OF THIS RULE) FROM THE APPROVED EROSION AND SEDIMENTATION INSTALLATION OF THE GROUND COVER DOES NOT SIGNIFICANTLY DEVIATE (AS DEFINED IN C. THE LOCATION OF TEMPORARY OR PERMANENT GROUND COVER, AND THAT THE REPORT; SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING, AND SIGNING AN INSPECTION BE ACCOMPLISHED BY INITIALING AND DATING A COPY OF THE APPROVED EROSION AND LOCATION AND CONDITION OF THE GRADED SLOPES AND FILLS. SUCH DOCUMENTATION SHALL ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, SPECIFICALLY NOTING THE B. THE COMPLETION OF ANY PHASE OF GRADING FOR ALL GRADED SLOPES AND FILLS SHOWN MODIFIED AFTER INITIAL INSTALLATION; SEDIMENTATION CONTROL PLAN OR IF THE MEASURES, PRACTICES, AND DEVICES ARE MEASURES, PRACTICES, AND DEVICES AS SET FORTH BY THE APPROVED EROSION AND IS REQUIRED ONLY UPON THE INITIAL INSTALLATION OF THE EROSION AND SEDIMENTATION SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THIS DOCUMENTATION AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE, OR DEVICE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING, ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. SUCH DOCUMENTATION SHALL BE OF THIS RULE) FROM THE LOCATIONS, DIMENSIONS, AND RELATIVE ELEVATIONS SHOWN ON BEEN INSTALLED AND DO NOT SIGNIFICANTLY DEVIATE (AS DEFINED IN SUB-ITEM (1)(E) ENERGY DISSIPATORS, AND STABILIZATION METHODS OF OPEN CHANNELS, HAVE INITIALLY FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK EROSION AND SEDIMENTATION CONTROL PLAN, INCLUDING BUT NOT LIMITED TO DEVICES, AS CALLED FOR IN A CONSTRUCTION SEQUENCE CONSISTENT WITH THE APPROVED A. ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES, AND INSPECTION BY DOCUMENTING THE FOLLOWING ITEMS: 1. THE PERSON WHO PERFORMS THE INSPECTION SHALL MAKE A RECORD OF THE SITE WHERE INSPECTIONS ARE REQUIRED BY G.S.113A-54.1(E), THE FOLLOWING APPLY: 15A NCAC 04B .0131 SELF-INSPECTIONS (EFFECTIVE OCTOBER 1, 2010) SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1 GAUGE ONSITE (MIN. 6-INCH CAPACITY). 9. APPROVED PERMIT SHALL BE KEPT ONSITE IN PROJECT PERMIT BOX. INSTALL RAIN ACTIVITIES. SELF-MONITORING PROGRAM OF THE NPDES STORM WATER PERMIT FOR CONSTRUCTION REQUIREMENTS. THE SELF-INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT THEY HAVE THE LATEST STATUTE REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1. THE 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE SELF-INSPECTION NOTES THIS SHEET. 7. FOR PROJECT SPECIFIC EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE, SEE INSPECTOR PRIOR TO REMOVING EROSION CONTROL MEASURES. 6. SITE STABILIZATION MUST BE APPROVED BY NCDEQ PROJECT EROSION CONTROL PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT. MUST TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT 5. IF UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR CONTRACTOR TO ELIMINATE ALL SUCH PROBLEMS. SURFACES INVOLVED, ADDITIONAL MEASURES MUST BE IMMEDIATELY IMPLEMENTED BY THE REMOVING SEDIMENT FROM ON-SITE FLOWS PRIOR TO DISCHARGE OR OF STABILIZING THE 4. SHOULD ANY MEASURES CONTAINED WITHIN THE PLAN PROVE INCAPABLE OF ADEQUATELY RELATED ITEMS INCLUDED WITHIN THE PLAN. STABILIZATION, AND MAINTENANCE OF ALL EROSION AND SEDIMENTATION CONTROLS AND 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER CONSTRUCTION, BE PERFORMED IMMEDIATELY. OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN SEDIMENTATION CONTROLS AFTER EACH 1/2" RAINFALL OR GREATER STORM EVENT AND ON A MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND 2. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION CONTROLS MUST BE CONTROLS MUST BE STABILIZED. SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE 1. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND GENERAL EROSION AND SEDIMENT CONTROL NOTES ACCORDANCE WITH THE GENERAL PERMIT - NCG 010000 MAINTAINED FOR EACH INSPECTION EVENT AND FOR EACH DISCHARGE LOCATION IN DIVISION OF WATER QUALITY. INSPECTION RECORDS MUST BEFORM PROVIDED BY THE "INSPECTION RECORD FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCG010000" RECORD THE REQUIRED RAINFALL AND NPDES MONITORING OBSERVATIONS ON THE TERMS AND CONDITIONS SET FORTH HEREIN." IN ADDITION, THE CONTRACTOR SHALL SEWER SYSTEM CONVEYING STORMWATER TO THE SURFACE WATERS IN ACCORDANCE WITH THE STORMWATER TO THE SURFACE WATERS OF NORTH CAROLINA OR TO A SEPARATE STORM RESULTING IN THE DISTURBANCE OF LAND ARE HEREBY AUTHORIZED TO DISCHARGE CONSTRUCTION ACTIVITIES INCLUDING CLEARING, GRADING, AND EXCAVATION ACTIVITIES "ALL OWNERS OR OPERATORS OF STORMWATER POINT SOURCE DISCHARGES ASSOCIATED WITH FEDERAL WATER POLLUTION CONTROL ACT AS AMENDED: ADOPTED BY NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION AND THE STATUE 143-215.1. OTHER LAWFUL STANDARDS AND REGULATIONS PROMULGATED AND THE CONTRACTOR SHALL COMPLY WITH THE PROVISION OF NORTH CAROLINA GENERAL1. CONSTRUCTION STORMWATER NOTE: MEASURES. SEED RESULTING BARE AREAS. REFER TO SEEDING SCHEDULE SHOWN. IF SITE IS APPROVED, REMOVE REMAINING EROSION MEASURES AND TEMPORARY SITE 15. FOR INSPECTION BY PROJECT EROSION CONTROL INSPECTOR.ARRANGE WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, 14. EROSION CONTROL INSPECTOR. BY THE PROJECT UNTIL THE ENTIRE SITE IS PERMANENTLY STABILIZED AND APPROVED ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE AS SHOWN ON THE DRAWINGS 13. EROSION CONTROL INSPECTOR. PROJECT FINALIZE CONSTRUCTION. STABILIZE REMAINING AREAS. CALL FOR INSPECTION BY 12. AGGREGATE BASE, ETC. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH VEGETATION, 11. ENTRANCE DRIVE. INSTALL ABC STONE IN THE SUBSTATION YARD AND INSTALL ABC STONE ON THE 10. FOLLOW TEMPORARY SEEDING INSTRUCTIONS AS SHOWN.9. D-3 AND STABILIZE. BEGIN SUBSTATION CONSTRUCTION. CONSTRUCT CUT/FILL SLOPES, SWALES D-1 THRU 8. MAINTAIN DEVICES AS NEEDED PER NCDEQ MAINTENANCE INSTRUCTIONS. 7. CONSTRUCT SWALE D-4 AND STAIBILIZE.6. STONE TO FINAL GRADE. NEEDED. INSTALL PIPES AND INLET/OUTLET PROTECTION. STABILIZE DRIVEWAY WITH BEGIN GRADING FOR DRIVEWAY CONSTRUCTION. INSTALL SEDIMENT CONTROL DEVICES AS5. IF APPROVED COMPLETE REMAINING CLEARING AND GRUBBING.4. CALL PROJECT EROSION CONTROL INSPECTOR FOR ONSITE INSPECTION.3. DEVICES. CONTROL PLAN. CLEAR AND GRUB ONLY AS NECESSARY FOR THE INSTALLATION OF THESE FENCE AND TEMPORARY SEDIMENT FENCE OUTLETS AS SHOWN ON THE EROSION AND SEDIMENT TEMPORARY CONSTRUCTION ENTRANCE, ORANGE CONSTRUCTION/SAFETY FENCE, SEDIMENT IN COORDINATION WITH THE PROJECT EROSION CONTROL INSPECTOR, INSTALL 2. OFFICE 1-910-433-3300) AT LEAST 48 HOURS PRIOR TO START OF CONSTRUCTION. BEGINNING PROJECT. NOTIFY NCDEQ LAND QUALITY SECTION (FAYETTEVILLE REGIONAL OBTAIN EROSION AND SEDIMENT CONTROL PERMIT AND SITE PLAN APPROVAL BEFORE 1. CONSTRUCTION SEQUENCE: APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION EROSION CONTROL NOTES 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 9 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING 07/17/2017 OTHER CAUSES PRIOR TO ACCEPTANCE SHALL BE REPAIRED BY REFILLING WITH TOPSOIL, PROCEDURE SPECIFIED HEREIN. DAMAGE RESULTING FROM EROSION, GULLIES, WASHOUTS, OR STAND FOR ANY REASON WHATSOEVER, SHALL BE RETREATED FOLLOWING THE GRASSING BY WATERING, MOWING, AND WEEDING. ANY AREAS WHICH FAIL TO SHOW A SATISFACTORY THE CONTRACTOR SHALL MAINTAIN ALL SEEDED AREAS, UNTIL ACCEPTANCE OF THE WORK REPAIRED AND KEPT WORKING UNTIL ACCEPTANCE OF PROJECT. 2. ALL EROSION CONTROL IMPROVEMENTS SHALL BE MAINTAINED, FOLLOWING TIMETABLE: 1. ALL DENUDED AREAS ARE TO BE STABILIZED WITHIN THE THE FOLLOWING: RESOURCES. THESE REQUIREMENTS SHALL INCLUDE BUT NOT BE LIMITED TO QUALITY SECTION OF THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL STATE OF NORTH CAROLINA AS ESTABLISHED AND ENFORCED BY THE LAND SEDIMENTATION AND EROSION CONTROL LAWS AND REGULATIONS OF THE THE CONTRACTOR SHALL CONFORM WITH ALL REQUIREMENTS OF THE SOIL EROSION CONTROL PROCEDURE SITE AREA DESCRIPTION Slopes equal to 3:1 or flatter Perimeter dikes, swales, ditches, slopes High Quality Water (HQW) Zones Slopes steeper than 3:1 Areas w/no slope STABILIZATION 7 Days 7 Days 7 Days 10 Days 14 Days TIMEFRAME EXCEPTIONS NONE NONE NTS NONE NONE NONE MAINTENANCE AND RESEEDING: ESTABLISHING VEGETATION APPROPRIATE PERMANENT SEEDING SCHEDULE. ACCORDANCE WITH THE PREVIOUS SPECIFICATIONS AND THE FOLLOWING BE PERFORMED WITHIN 7 CALENDAR DAYS AFTER FINAL PHASE OF GRADING AND IN UNLESS SHOWN OTHERWISE, THE PERMANENT SEEDING OF DENUDED AREAS SHALL ESTABLISHING PERMANENT VEGETATION A CULTIPACKER ROLLER OR OTHER APPROVED EQUIPMENT. TO A DEPTH OF APPROXIMATELY 1/2 INCH AND THEN COMPACTED BY MEANS OF APPROVED SEEDER AT THE APPROPRIATE RATE, THE SEED WORKED INTO THE SOIL MIXTURE OF GRASS SEED, AS SPECIFIED, SHALL BE SOWED BY MEANS OF AN AFTER THE SEEDBEDS HAVE BEEN PREPARED AND APPROVED BY THE OWNER, THE SEEDING: BE APPROVED PRIOR TO PLANTING THE SEED. THAN PERMIT IT TO ACCUMULATE AT THE FOOT OF THE SLOPE. SEEDBED SHALL PREPARATION OF SEEDBEDS ON SLOPES TO KEEP LOOSE SOIL IN PLACE RATHER PULVERIZED SIX-INCH DEEP SEEDBED IS OBTAINED. CARE SHALL BE EXERCISED IN PREPARATION SHALL BE CONTINUED UNTIL A FRIABLE AND THOROUGHLY DISKING AND CROSS-DISKING, HARROWING, OR OTHER APPROVED METHODS OF BE PREPARED BY MEANS OF DISKING TO A MINIMUM DEPTH OF SIX INCHES. THE SURFACE SHALL BE MADE SMOOTH AND TRUE TO GRADE. THE AREAS SHALL PREPARATION OF SEEDBED: ELLOWPARTINMVISAD ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSE: F-0245 PREPARED BY: DMP PROJECT: 170147 GROUND STABILIZATION REQUIREMENTS COASTAL REGION APP.CK.REVISION BY INITIAL RELEASE LOCATION SCALE DRAWN DATE CHK.APP. SCALE RATIO SEDIMENT AND EROSION CONTROL DETAILS 1" = 1'-0" 1:1 TRANSMISSION ENGINEERING STANDARD DRAWING SFP 05-06-13 DWG. NO. NTS SILT FENCE OUTLET DETAIL (TEMPORARY) SILT FENCE OUTLET DETAIL REMOVE ACCUMULATED SEDIMENT AND REPLACE STONE AS NECESSARY.2. RAINFALL EVENT 1/2 INCH OR GREATER. INSPECT SILT FENCE OUTLET EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER EVERY 1. MAINTENANCE: FLOW #57 WASHED STONE 1 2 SILT FENCE METAL FENCE POST CLASS 'B' RIP RAP SILT FENCE BOTTOM OF CROSS SECTION OVER WIRE MESH SILT FENCE OVER WIRE MESH SILT FENCE TOP VIEW 1.0' 1.5' MIN. 6" 6" 2' 2' MAX. 3'FLOWPOST FABRIC STONE DEPENDING ON FILL SLOPE. METAL T-POST 5 FEET OR 6 FEET IN HEIGHT SPECIFICATIONS FOR EROSION CONTROL. 36 INCHES IN WIDTH MUST MEET ENGINEERS 12 INCHES DEEP AT SILT FENCE. #57 WASHED STONE TO BE PLACED SFP BGT SFP BGT SFP CT-65393 SH 1 OF 1 WIRE MESH REVISIONS LOE BGT BGT POST WITH STAKE CAP LOE BGT BGTREVISIONS 5' MIN DATENO. 0 (USE FABRIC UNDER RIP RAP). DOWNSTREAM SIDE OF SILT FENCE SPLASH PAD CONSTRUCTED ON 12" DEEP BED OF CLASS "B" RIP-RAP 4' MAX 8' MAX STONE: #57 WASHED STONE TO BE PLACED 12" DEEP AT SILT FENCE FABRIC: 36" IN WIDTH (MUST MEET ENGINEERS SPECIFICATIONS FOR EROSION CONTROL). POST: METAL T-POSTS 5' OR 6' IN HEIGHT DEPENDING ON THE FILL SLOPE. STRUCTURAL STONE SHALL BE CLASS "B" STONE FOR EROSION CONTROL PURPOSES. NOTES: 2:1 MAX 5' 2' MIN. 3' WIRE MESH 1' MAX STONE HEIGHT 6" MIN. 05-06-2013 #57 WASHED STONE ON UPSTREAM SIDE OF WIRE MESH. 12-21-2015 1 2-22-2015 2 STAKE CAP APP.CK.REVISIONDATENO.BY 0 INITIAL RELEASE 05-06-2013 LOCATION SCALE DRAWN DATE CHK.APP. SCALE RATIO SEDIMENT AND EROSION CONTROL DETAILS 1" = 1'-0" 1:1 TRANSMISSION ENGINEERING STANDARD DRAWING SFP 05-06-13 DWG. NO. NTS TYPICAL 50' CONSTRUCTION ENTRANCE (TEMPORARY)50' MI N(MIN.)12' 50' CONSTRUCTION ENTRANCE GEOTEXTILE FABRIC **SURGE STONE AND CRUSHED CONCRETE ARE NOT ACCEPTABLE FOR 2"-3" WASHED STONE SEE 100' CONSTRUCTION ENTRANCE DETAIL FOR SC NOTES. SCDHEC NOTES: 100' CONSTRUCTION ENTRANCE). ALLOW CONSTRUCTION EQUIPMENT TO GAIN TRACTION BEFORE ENTERING PUBLIC ROADS (SEE DUKE ENERGY PROGRESS REQUIRES, WHERE NECESSARY, AN ADDITIONAL 50' OF ABC STONE TO - 6" MIN. DEPTH - 50' MIN. LENGTH - 2"-3" WASHED STONE NCDENR-LQS CONSTRUCTION ENTRANCE REQUIRES: NCDENR- LQS NOTES: ABC STONE 6" MIN DEPTH (6" MIN. DEPTH) WASHED AGGREGATE 2-3" COARSE SFP BGT SFP BGT SFP CT-65381 SH 1 of 1 SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. REMOVE ALL OBJECTIONABLE MATERIALS SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EVERY RAINFALL, INSPECT ANY MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION MAINTENANCE: PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET.4. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT.3. DUKE ENERGY PROGRESS. SEEPAGE OR HIGH WATER TABLE UNLESS OTHERWISE DIRECTED BY THE DESIGNATION REPRESENTATIVE OF ALWAYS USE GEOTEXTILE FABRIC TO IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO 2. PROPERLY TO GRADE IT. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL 1. CONSTRUCTION SPECIFICATIONS: AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT WILL NOT BE REMOVED WHERE HEAVY MATS ARE DEEMED INSUFFICIENT BY DUKE ENERGY PROGRESS AND ITS REPRESENTATIVES. CONSTRUCTION ENTRANCE DETAIL IS SHOWN FOR REFERENCE ONLY. CONSTRUCTION ENTRANCES SHALL BE USED DETAIL NOTES: 12-21-2015 1 REVISIONS LOE BGT BGT APP.CK.REVISIONDATENO.BY 0 INITIAL RELEASE 05-06-2013 DOWN SLOPE STAKE FLOW SEE INSET A AND B STAPLESSTAKES SEE PLANS VARIES INSET A INSET B OVERLAP DETAIL LOCATION SCALE DRAWN DATE CHK.APP. SCALE RATIO SEDIMENT AND EROSION CONTROL DETAILS 1" = 1'-0" 1:1 TRANSMISSION ENGINEERING STANDARD DRAWING SFP 05-06-13 DWG. NO. WATTLE DETAIL NTS WATTLE DETAIL (TEMPORARY) UP SLOPE CT-65376 SH 1 OF 1 BGT SFPSFPBGTSFP 12" STAKE AND STAPLE IN DITCH ONLY 4' x 12' EXCELSIOR MATTING REPLACE AS REQUIRED. WATTLES SHOULD BE CHECKED AND CLEARED OF ACCUMULATED DEBRIS AND SEDIMENT. MAINTENANCE SECURE IT TO THE SOIL. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON THE UP SLOPE SIDE OF THE WATTLE AND AT EACH END TO 5. PROVIDE STAPLES OF 0.125" DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 6" IN LENGTH.4. GRADE. INSTALL A MINIMUM OF 2 UP SLOPE STAKES AND 4 DOWN SLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO EXISTING 3. USE 2' WOODEN STAKES WITH A 2" NOMINAL CROSS SECTION.2. USE MINIMUM 12" DIAMETER EXCELSIOR WATTLE (LARGER WATTLES MAY BE REQUIRED TO KEEP SEDIMENT ON SITE).1. NOTES: 12-21-2015 LOE BGT1REVISIONSBGT APP.CK.REVISIONDATENO.BY 0 INITIAL RELEASE 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE MESH 24" UPSLOPE 24" MIN 8" MIN 4" 18"-24" POLE STEEL WIRE TIES PLASTIC OR GROUND NATURAL FABRIC FILTER THE TRENCH FORWARD ALONG 8" DOWN & 4" POST STEEL FABRIC FILTER THOROUGHLY AND COMPACT BACKFILL TRENCH GROUND NATURAL VIEW CROSS-SECTION2'-0" MIN.3'-0" MAX.LOCATION SCALE DRAWN DATE CHK.APP. SCALE RATIO SEDIMENT AND EROSION CONTROL DETAILS 1" = 1'-0" 1:1 TRANSMISSION ENGINEERING STANDARD DRAWING SFP 05-06-13 DWG. NO. SILT FENCE DETAIL NTS SILT FENCE DETAIL (TEMPORARY) WIRE TIES PLASTIC OR2' MIN BETWEEN TIES CT-65380 SH 1of1 BGT SFPSFPBGTSFP05-06-2013 MESH WIRE MESH WIRE GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING REMOVE ACCUMULATED SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT 3. IT PROMPTLY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE 2. GREATER. INSPECT SILT FENCE EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER EVERY RAINFALL EVENT 1/2 INCH OR 1. MAINTENANCE: FLOW. DO NOT INSTALL SILT FENCE ACROSS STREAMS, DITCHES, WATERWAYS, OR OTHER AREAS OF CONCENTRATED 8. DO NOT ATTACH FILTER FABRIC TO TREES.7. MINIMUM OF 4 FEET OF OVERLAP TO THE NEXT POST. WHEN JOINTS ARE NECESARY, SECURELY FASTEN THE FILTER FABRIC ONLY AT A SUPPORT POST WITH A CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL, CUT TO LENTH OF THE BARRIER TO AVOID JOINTS. 6. FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE). ENSURE THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 36" ABOVE THE GROUND SURFACE. (HIGHER 5. RUNOFF IS FORCED TO GO THROUGH THE FENCE AND CANNOT GO UNDER IT. BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT 4. BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND 4" ACROSS THE BOTTOM OF THE TRENCH. ATTACH THE FILTER FABRIC TO THE WIRE MESH ON THE UPSLOPE SIDE OF THE FENCE POST AND EXTEND THE 3. THE WIRE MESH SUPPORT TO THE BOTTOM OF THE 8" TRENCH. 2. SUPPORT FILTER FABRIC WITH WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND )MAX. 8' BETWEEN POSTS( DRIVE STEEL POST 24" INTO THE GROUND AND EXCAVATE A 8"x4" TRENCH UPHILL ALONG THE LINE OF THE POSTS. 1. CONSTRUCTION: WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH.5. A MAXIMUM MESH SPACING OF 6 INCHES. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE MESH WITH A MINIMUM 14 GUAGE AND 4. SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE 3. DEGREES FAHRENHEIT. MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A 2. CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. USE SYNTHETIC FIBER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS 1. MATERIALS: SILT FENCE INSTALLATION SPECIFICATIONS: 12-21-2015 REVISIONS1 LOE BGT BGT STAKE CAPS 2-22-2015 REVISIONS LOE BGT 2 BGT SPECIFICATIONS FOR THE COASTAL REGION TEMPORARY AND PERMANENT SEEDING AND RETREATED FOLLOWING THE GRASSING PROCEDURE SPECIFIED HEREIN. WHICHEVER IS LESS. SOIL FOUNDATION. 4. A FILTER BLANKET OR FILTER CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TALLWATER DEPTH OR TO TOP OF THE BANK, FABRIC SHOULD BE INSTALLED BETWEEN THE RIP-RAP AND do A 3d o 1. La IS THE LENGTH OF RIPRAP 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP ON THE SECTION A-A 8' BLANKET APRON FILTER NOTES PLAN A 2. d = 18" MINIMUM, FOR NCDOT CLASS 'B' RIP-RAP NTS RIP-RAP OUTLET PROTECTION OR DISLODGED STONES IMMEDIATELY. 1/2' OR GREATER RAINFALL. REPAIR ERODED AREAS INSPECT OUTLET PROTECTION WEEKLY AND AFTERMAINTENANCE: 10' 18" ROCK PIPE INLET PROTECTION WITH SEDIMENT STORAGE SECTION BACKFILL SEDIMENT STORAGE AREA & SEED ON FINAL CLEANOUT (AFTER SITE IS STABILIZED). REPLACE CONTAMINATED GRAVEL FACING AND RESTORE STONES DISLODGED OR DISPLACED. AND RESTORE TO ORIGINAL DIMENSIONS WHEN SEDIMENT REACHES 1/2 DESIGN DEPTH. INSPECT OUTLET PROTECTION WEEKLY AND AFTER 1/2" OR GREATER RAINFALL. REMOVE SEDIMENT MAINTENANCE: 4' MIN. Storage Area Temp. Forebay/Sediment 1.5'2'2:112'2:12' MIN. RIP-RAP CLASS 'B' PIPE 3' 1'STONE #57 WASHED PLAN PIPE RIP-RAP CLASS 'B' STONE #57 WASHED NTS DITCH/CHANNEL INSTALLATION RECOMMENDATIONS. STAPLE/STAKE MAT IN A STAGGERED PATTERN ACCORDING TO THE MATTING MANUFACTURERS 9. 6 INCHES (MINIMUM), WITH THE UPSTREAM MAT OVERLAPPING ON TOP OF THE NEXT DOWNSTREAM MAT. OVERLAP OR ABUT THE ROLL EDGES PER MANUFACTURER RECOMMENDATIONS. OVERLAP ROLL ENDS BY 8. PLACE, REPLACING THE EXCAVATED MATERIAL, AND TAMPING TO SECURE THE MAT END. UPSTREAM END OF THE MATTING, PLACING THE ROLL END IN THE TRENCH, STAPLING THE MAT IN KEY-IN UPSTREAM END OF EACH MAT ROLL BY DIGGING A 6 INCH (MINIMUM) TRENCH AT THE 7. SURFACE. AVOID STRETCHING THE MATTING. FOR SLOPES - UNROLL MATTING DOWNSLOPE. LAY MAT SMOOTHLY AND FIRMLY UPON THE SEEDED 6. SMOOTHLY AND FIRMLY ON THE SEEDED SURFACE. AVOID STRETCHING THE MATTING. CHANNEL CENTERLINE. WORK FROM CENTER OF CHANNEL OUTWARD WHEN PLACING ROLLS. LAY MAT FOR CHANNELS - UNROLL MATTING IN DIRECTION OF WATER FLOW, CENTERING THE FIRST ROLL ON THE 5. OPERATIONS. ACCORDANCE WITH SPECIFICATIONS. PLACE MATTING WITHIN 48 HOURS OF COMPLETING SEEDING PERFORM FINAL GRADING, TOPSOIL APPLICATION, SEEDBED PREPARATION, AND PERMANENT SEEDING IN 4. 12 TO 24 INCHES IN LENGTH, 1x3 INCH IN CROSS SECTION, AND WEDGE SHAPED AT THE BOTTOM. SECONDARY LEG, AND A MINIMUM 4 INCH HEAD. WOOD STAKES MUST BE ROUGH-SAWN HARDWOOD, 6 INCHES LONG. "T" SHAPED STAPLES MUST HAVE A MINIMUM 8 INCH MAIN LEG, A MINIMUM 1 INCH INCHES WIDE AND BE A MINIMUM OF2 1RESPECTIVELY. "U" SHAPED STAPLES MUST AVERAGE 1 TO 1 MUST BE "U" OR "T" SHAPED STEEL WIRE HAVING A MINIMUM GAUGE OF NO. 11 AND NO. 8 SECURE MATTING USING STEEL STAPLES, WOOD STAKES, OR BIODEGRADABLE EQUIVALENT. STAPLES 3. PREVENT SEPARATION OF THE NET FROM THE PARENT MATERIAL. SUFFICIENTLY BONDED OR SEWN ON 2 INCH CENTERS ALONG LONGITUDINAL AXIS OF THE MATERIAL TO NETTING MUST BE EXTRUDED PLASTIC WITH A MAXIMUM MESH OPENING OF 2x2 INCHES AND NON-TOXIC TO VEGETATION AND SEED GERMINATION AND NON-INJURIOUS TO THE SKIN. IF PRESENT, THROUGHOUT AND BE SMOLDER RESISTANT. CHEMICALS USED IN THE MAT MUST BE NON-LEACHING AND (PERMANENT) FIBERS OR ELEMANTS. MAT MUST HAVE UNIFORM THICKNESS AND DISTRIBUTION OF FIBERS USE SOIL STABILIZATION MATTING MADE OF DEGRADABLE (TEMPORARY) OR NON-DEGRADABLE 2. USE MATTING BY TENSAR/NORTH AMERICAN GREEN AS DESIGNATED ON APPROVED PLANS.1. ESTABLISHMENT ARE CONTINUOUSLY MET. ESTABLISH AND MAINTAIN VEGETATION SO THAT REQUIREMENTS FOR ADEQUATE VEGETATIVE 10. CONSTRUCTION SPECIFICATIONS SLOPES INSTALLATION MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED.5. ERODED AREA PROTECTED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE 4. BE REPAIRED AND STAPLED. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL 3. THE RECP. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH 2. OR GREATER) RAIN FALL EVENT. IF DAMAGED, REPAIR IMMEDIATELY. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" 1. MAINTENANCE NTS STABILIZED). BACKFILL SEDIMENT STORAGE AREA & SEED ON FINAL CLEANOUT (AFTER SITE IS 6. POLLUTION HAZARD. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR 5. DESIGN DEPTH. REMOVE SEDIMENT AND RESTORE TO ORIGINAL DIMENSIONS WHEN SEDIMENT REACHES 1/3 4. AND MAKE REPAIRS AS NECESSARY. CHECK THE STRUCTURE AND SURROUNDING CHANNEL BANKS FOR DAMAGE FROM OVERTOPPING3. INSPECT THE BANKS FOR SLUMPING OR EXCESSIVE SCOUR.2. INSPECT EXCAVATED STORAGE TRAPS WEEKLY AND AFTER 1/2" OR GREATER RAINFALL. 1. MAINTENANCE: EXCAVATED SEDIMENT STORAGE 2' DITCH BASE OF DITCH SLOPE TOP OF DITCH SLOPE TOP OF FLOW LINE BASE OF DITCH FLOW LINE BASE OF DITCH(MAX.) 1.5:1 NTS TYPICAL 'V' CHANNEL SECTION TEMPORARY LINING N.A. GREEN S150 OR EQUAL FOR GRASSED CHANNEL 3 1 MIN.CONSTRUCTION PER MFG. SPECIFICATIONS. REPAIR ANY DAMAGED PORTIONS AT END OF MAINTENANCE: NTS EROSION CONTROL MATTING SEED IN PLACE PREPARED SURFACE WITH ROLL (TYP.) FOR UPPER END OF DOWNSLOPE 6 IN MIN. DEPTH KEY TRENCH(TYP.) AT ROLL END 6 IN MIN. OVERLAP ROLL EDGE (TYP.) OVERLAP OR ABUT END (TYP.) KEY TRENCHFOR ROLL 6 IN MIN. DEPTHFLOWSEED IN PLACE (SEEDBED) WITH PREPARED SLOPE ROLL EDGES (TYP.) OVERLAP OR ABUT AT ROLL END (TYP.) 6 IN MIN. OVERLAP KEY IN TRENCH (MIN.) 6 IN DEEP GENERAL REQUIREMENTS: THE WORK INCLUDES SEEDBED PREPARATION, COMPOSTING AND SEEDING FOR ALL DISTURBED AREAS. MATERIALS: A.GRASS SEED SHALL BE AN APPROVED MIXTURE BASED ON REGIONAL AND SEASONAL CONSIDERATIONS. PURITY OF SEED SHALL BE A MINIMUM OF 90% AND THE GERMINATION SHALL BE A MINIMUM OF 85%. THE SEED LABEL SHALL BE 'CERTIFIED SEED' LABEL. B.COMPOST SHALL CONTAIN A MOISTURE CONTENT OF AT LEAST 30% AND CONTAIN BETWEEN 25% AND 65% ORGANIC MATTER WITH A PREFERRED CONTENT OF APPROXIMATELY 45% AND SHALL BE SUPPLIED FROM McGILL ENVIRONMENTAL SYSTEMS OR APPROVED EQUAL. PROVIDE 1" BLANKET OF COMPOST ON PREPARED SEEDBED. 20' 8'VAR.VAR.12"**QUANTITY OF FERTILIZER AND LIME SHALL BE COMFIRMED BY SOILS TEST. COMPOST MAY BE USED IN LIEU OF FERTILIZER & LIME. *OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. 80 LBS/ACRETRIPLE A TALL FESCUE 50 LBS/ACRE (OUTSIDE EDGE OF GRADE & NON-TRAVELED AREAS)SERICEA LESPEDEZA 20 LBS/ACRECOMMON BERMUDAGRASS 20 LBS/ACRECENTIPEDEGRASS BY DEP ONLY AS DIRECTED FEB. 1 - MAR. 31 135 CY/ACRE3500 LBS/ACRE1000 LBS/ACREPENSACOLA-BAHIA GRASS 50 LBS/ACREAPR. 1 - JULY 15 10-10-10 BLEND COMPOSTLIMESTONE**FERTILIZER**PLANTING RATETYPEDATE PERMANENT SEEDING 4000 LBS/ACRE2000 LBS/ACRE1000 LBS/ACRE120 LBS/ACRERYE (GRAIN)AUG. 15 - DEC. 30 4000 LBS/ACRE2000 LBS/ACRE750 LBS/ACRE40 LBS/ACREGERMAN MILLETAPR. 15 - AUG. 15 60 LBS/ACREKOBE LESPEDEZA* 4000 LBS/ACRE2000 LBS/ACRE750 LBS/ACRE120 LBS/ACRERYE (GRAIN)DEC. 1 - APR. 15 & TACK10-10-10 BLEND STRAW MULCHLIMESTONEFERTILIZERPLANTING RATETYPEDATE TEMPORARY SEEDING APP.CK.REVISIONDATENO.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO HOPE MILLS ROCKFISH ROAD 230kV SUBSTATION EROSION CONTROL NOTES 5890 HUNTING RIDGE RD, HOPE MILLS, NC 1"=50'1:1 BAP CAR MVC 06-09-2017 RDC-71201, SH 10 OF 10 BAP CAR MVC007-21-2017 INITIAL RELEASE - BIDDING & PERMITTING 07/17/2017