Loading...
HomeMy WebLinkAboutSW6170801 - JSOC, SOF Truck Inspection Point (6)CIVIL CALCULATIONS SOF TRUCK INSPECTION POINT PN 87604 The civil calculations attached are for the storm water management and erosion and sediment control analysis. 100% Submittal: 20 July 2017 Prepared by: Stantec Consulting Services Inc. 801 Jones Franklin Road, Suite 300 Raleigh, North Carolina, 27606 (919) 851-6866 //Fax (919) 851-7024 RECEIVED �.I_lm 02 M11 0 1CA`e R � SEA ty�'' a 1 7F ISj1120 s4i DENR.LAND QUALITY STORMWATER PERMITTING TABLE OF CONTENTS Stormwater Management Project Narrative.......................................................p.1 Mapof Drainage Area............................................................................................p.3 Soils Map — Hydrologic Groups..............................................................................p.4 Army LID Planning and Cost Tool Report & Land Use (EISA Section 438)........ p.8 Infiltration Basin #1 1.8 -Inch Water Quality Volume (DA to Device)...............p.10 Project Area 1.8 -Inch Volume & Summary Calculations....................................p.11 Infiltration Basin #1 Stage/storage & Surface Area............................................p.12 Infiltration Basin #1 Draw Down Calculations.....................................................p. 13 Infiltration Basin #1 Anti -Floatation Calculation.................................................p. 14 TR -55 Curve Number & Time of Concentration Calculations ............................p. 15 Infiltration Basin #1 Routing Report.....................................................................p.19 Storm Drain Pipe Calculations & C Coefficients Calculations ...........................p.46 Permanent Ditch, Liner, and Riprap Outlet Calculations..................................p.49 Concrete Pavement and Asphalt Pavement Calculations.................................p.61 Ft. Bragg, SOF Truck Inspection Point Project Stormwater Management Narrative The proposed project known as Fort Bragg JSOC Truck Inspection Point project consists of a new truck inspection canopy, processing building, a personnel holding area, asphalt pavement, concrete pavement, and stormwater management infiltration basin #1 device. The new access road and truck inspection point will allow the compound to inspect commercial vehicles before they enter the JSOC compound and will alleviate congestion at the main compound entry point from Butner Road. Construction of this project will relocate commercial vehicle inspection activities to this new location. This report presents the stormwater management calculations for the project. The property is located on Fort Bragg in Cumberland County, North Carolina with access to the site from Hurst Drive and Malvesti Street. The SOF Truck Inspection Point project is located in the Northwest section of the Joint Special Operations Command (JSOC) compound between Malvesti Street to the east and the JSOC compound limits to the north and west. The existing partially developed site is situated just south of the Hurst Drive security checkpoint. An asphalt parking lot is located southeast of site, which serves as parking for building 3-3254. Building 3-3254 is located south of the site. An addition larger parking lot is also located southeast of the site, and this serves building 3-3352. The scope of work for the Truck Inspection Point project includes civil site work and site utilities design along with demolition of the existing site to support the construction of the new SOF Truck Inspection Point project. The project site is located on a partially developed site primarily consisting of grass areas with some areas of existing woods to the north and west of the project site as well as a perimeter security gravel road paralleling the existing security fence along Hurst Drive. Hurst Drive, Malvesti Street, and existing asphalt parking lots border the project site. The proposed site will disturb greater than 1.0 acre and the built upon area will be greater than 24% of the site area, and is therefore considered a high density project. The state of North Carolina's Stormwater Management Phase II Post Construction ordinance requires new high density development projects to provide stormwater management water quality treatment for the first inch of runoff for the newly created impervious areas. This project is also required to meet EISA 2007 requirements; therefore, water quality treatment for the 1.8 -inch storm event will be provided instead of the first inch of runoff. The site has been broken down into one overall area for the purposes of determining the required stormwater management volume requirements with all bypass stormwater being accounted for in the calculations. Because of the site topography and site physical characteristics the project has been designed such that infiltration basin #1 will capture untreated existing impervious areas exceeding the amount of newly created impervious areas and the treatment of the existing impervious areas will substitute for the treatment of the newly created impervious areas. Infiltration basin #1 Page 1 of 2 Page 1 has been sized based upon the actual drainage area it receives. The existing asphalt parking lot that serves as parking for building 3-3254, half of building 3-3254, and approximately half the drive aisle that serves both building 3-3254 and 3-3352 impervious areas are treated in infiltration basin #1. Stormwater pretreatment measures consist of a trash guard device at the upstream inlet (CB -8) that will capture sediment, trash, and debris before discharging into infiltration basin #1. Water quality stormwater management is provided in infiltration basin #1. Water quality control is provided for the 1.8 -inch of runoff and infiltration basin #1 provide 85% total suspended solids removal. The analysis followed the Simple method and other generally accepted engineering practices. The Simple method was used to calculate the required stormwater management volume. The developed site will add approximately 21,720 sf of impervious area and infiltration basin #1 will receive and treat approximately 31,200 sf of impervious areas, thus the volume associated with the newly created impervious areas is being treated and accounted for. The required 1.8" water quality management volume, which does not reduce the required volume by taking into account the existing site impervious area, is 6,758 cf and infiltration basin #1 provides 8,064 cf of storage. The drainage areas were delineated from field prepared topographic survey. Existing impervious area calculations were based on existing field surveys. Post development impervious areas were based on the proposed site plan. A geotechnical engineer has performed two infiltration tests and seasonal high water table reading of the existing soils within the limits of infiltration basin #1 and the infiltration rates were found to be approximately 9.0 and 1.5 inches per hour with the seasonal high water table to be at approximate elevation 220.50. To be more conservative, infiltration basin #1 will be designed using the lower infiltration rate of approximately 1.50 inches/hour. The infiltration rates were tested at the approximate bottom of infiltration basin #1 elevation of 223.00. Infiltration basin #1 has a proposed ponding depth of 1.90 -feet with an inlet structure to serve as the overflow to bypass the larger storm events. The overflow inlet structure's grate will be set at the ponding depth elevation with adequate freeboard provided above the ponding depth elevation. Infiltration basin #1 will be planted with sod and will be contained almost entirely by use of concrete retaining walls. The water quality volume requirements will be provided in the surface ponding volume and the infiltration through the bottom of infiltration basin #1 that occurs during the infiltration basin initial filling up with stormwater. The bottom of infiltration basin #1 is greater than 2.0' feet above the seasonal high water elevation with the draw down within a maximum of 72 hours (see attached calculations). The design storm events were based on the rainfall data from NRCS for Ft. Bragg, NC. Page 2 of 2 Page 2 VAULT W �.r �"�r.'4._ 1 /�l - `gni- _ _\ •-"- . � ',.� orb�Ucr t � oo � - _ _ - . 1 .q � 9 �0��} �* x � t. EX r _ EX DI -41 ----------' CB -8 �;� , '� � R06-16 #1 15 Di— D#3 Uff'14 'o Al /n1 � DRAINAGE AREA MAP 1'=30' w s ss so so PLAN NORTH eaaFlrlc scue 5 �a asncwesss WILNMGTON aD z 00 ao Y� Z Ua Q �RF a 9jO SHEET IDENTIFIDATIDN DA FOUO- FOR OFFICIAL USE ONLY C 35" If 5V N 35' 446 N } a Hydrologic Soil Group—Cumberland County, North Carolina 3 p (SOF Truck Inspection Point) m a e 61010 681000 6810M 681100 681130 681160 601190 3 a a MapSde.l•1,4406pv1tedonAlarldsmpe(11"x8.5")sF7e6.4. N M63es 0 ?D 40 fiD 120 A0 50 100 2)0 300 Map projection Web Merm00r Conner mordrzte5• WGS84 Edge 116 UrM Za 17N WGSD4 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 35" 456N 8 35' 946 N 68122D 681250 651780 681310 3 r� b Page 4 5/2/2017 Page 1 of 4 Hydrologic Sall Group—Cumberland County, North Carolina (SOF Truck Inspection Point) MAPLEGEND MAP INFORMATION Area of Interest (AOI) ❑ C The soil surveys that comprise your AOI were mapped at Area of Interest (AOI) CID 124,000 Soils ❑ D Warning Soil Map may not be valid at this scale Sod Rating Polygons © Not rated or not available Enlargement of maps beyond the scale of mapping can cause A misunderstanding of the detail of mapping and accuracy of soil 0 AID Water Features line placement The maps do not show the small areas of streams and canals contrasting sods that could have been shown at a more detailed B I_,_, scale Transportation B/D i -F -F Rads Please rely on the bar scale on each map sheet for map 0 C Interstate Highways measurements CID US Routes Source of Map Natural Resources Conservation Service D Web Soil Survey URL, Major Roads Coordinate System Web Mercator (EPSG 3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection, which preserves direction and shape but distorts A distance and area A projection that preserves area, such as the ® Aenal Photography Albers equal-area conic projection, should be used if more ,fyr AID accurate calculations of distance or area are required B This product is generated from the USDA-NRCS certified data as of the version date(s) listed below ,.� BID Soil Survey Area Cumberland County, North Carolina C Survey Area Data Version 17, Sep 19, 2016 CID Sod map units are labeled (as space allows) for map scales �. D 150,000 or larger. Not rated or not available Date(s) aenal images were photographed Feb 14, 2011—Mar 3, 2011 Soil Rating Points © A The orthophoto or other base map on which the sod lines were compiled and digitized probably differs from the background ®i ND imagery displayed on these maps As a result, some minor ❑ B shifting of map unit boundaries may be evident Ell BID Page 5 USDA Natural Resources Web Sod Survey 5/2/2017 Conservation Service National Cooperative Sod Survey Page 2 of 4 r Hydrologic Soil Group—Cumberland County, North Carolina Hydrologic Soil Group SOF Truck Inspection Point Hydrologic Soil Group— Summary by Map Unit — Cumberland County, North Carolina (NC051) Map unit symbol 'Map unit name Rating Acres in AOI Percent of AOI GdB Gilead loamy sand, 2 to 8 percent slopes C 0.0 0.0% WgB Wagram-Urban land complex, 0 to 8 percent slopes A 4.4 100.0% Totals for Area of Interest 4.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 5/2/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 6 C t Hydrologic Sod Group—Cumberland County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie-break Rule: Higher SOF Truck Inspection Point USDA Natural Resources Web Sod Survey 5/2/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 Page 7 Army LID Planning and Cost Tool Report PROJECT INFO SITE INFO AND EISA VOLUME Date 6/9/2017 REQUIREMENT Army command IMCOM Project limit of disturbance (AC) 2.35 Army installation Fort Bragg 95% rainfall depth (IN) 1.8� Project name Truck Inspection Point Soil type Sandy j Hydrologic Soil Group (HSG) A Project description –---- Add access road, buildings, and associated I Pre -project curve number (CN) 48 improvements for truck inspection point �— Post -project curve number (CN) 61– User Name J Sesler Pre -project runoff volume (CF) 0 Master Planner Post -project runoff volume (CF) 335 EISA section 438 retention volume 335 requirement (CF) LID PLANNING SUMMARY Structural BMP Surface area Runoff volume (SF) retained (CF) Bioretention: —0 -- - Swale: ------- -- ---0--- 1 Permeable pavement: 0 Rainwater harvesting: 0 Green roof: Infiltration practice: 4138 4946 Total retention volume provided by BMPs (CF): 4946 Project complies with EISA Section 438. Non-structural BMP Veg. Filter Strip (Slope >2%, Short Grass): Veg. Filter Strip (Slope >2%, Tall Grass): Veg. Filter Strip (Slope <2%, Short Grass): Veg. Filter Strip (Slope <2%, Tall Grass): Reforestation (Trees - Short Grass): Reforestation (Trees - Shrubs and Tall Grass) LID COST SUMMARY Surface area (AC) 0.00 0.00 0.00 0.00 0.00 0.00 Page 8 ILand Use Inputs for Project Area Ar , y LID P1ann g Tool � 1Vlinn�xum runoffiretentio" tno.: — Simplified runoff curve number method for planning level selection and sizingof D with EISA ivolume conte ' ,practices,'fo comply wziFIi the runoff �v-olume control requirement of EIS. ;Section 43£. cre fee. $ C x . �'��� �R�e�enUonarolumeproricledb}aE. To calculate the EISA runoff requirement enter the pre -and post -project land use in acres The runofFvolume difference between pre- and post -project is the EISA volume required to be retained on site. Note: If the runoff difference is a negative number, the post -project volume is reduced from the pre -project condition and no additional retention volume is required. Land Use CL Pie-projec[ Percentag Post-prolectPercents Bare soil: 77 area m acres of site area in acres of site Wooded (poor): 45 _ 0-i 0 0 0 i !ooded (fair): 36 0 0 0 0 Wooded (good): Wooded 34 1-0-51 21.7 r 0.05 2.13 39 ` 0 0 ; 0 Brush and weeds (poor): 48 _0� 0 0 0 0 Brush and weeds (fair):35 0.19 1 5.09 0 0 0 0 Brush and weeds (good): 30 0 I 0 0 0 `-awn: 49 0 0 _ 0 Roads and drives (w/o C and G): 83 0 0 I 0.4� 19.1 Roads and drives (w/ C and G): 98 0.29 12.3 0.33 14.0 Parking, driveways and sidewalks: 98 _ 6 O 1.70 0.0 i 2.98 Runofi'volume calculations Pre -project Post -project D fference Site CN: 48 61 Acre-feet: 0.000 0.008 0.008 Gallons: 0 2505 2505 Cubic feet 0 335 335 CFS: 0.00 0.00 0.00 335 cubic feet is the EISA runoff volume required to be retained on site. ruildmgrooE 98 D�� 0��0.1 4.26 Bare soil: 77 1 0 0 �D 0 Trees - grassy (poor): 57 0 I 0 0 gees - grassy (fair): 43 � 0 � 0 ' 0 Trees -!may (good): 32 y' 0 t 0 I. 0 4 P pen space (lawns, parks, cem-) <50% grass: 68 9 0 �� 0 0 0 Pen space (lawns, parks, cem.) <75°h grass: 49_ 0 0 ass Open space (laums, parks, cem.) >7S%cr: 39 f— — 1 56.2 �� 1-28 54-5 (G ravel road: 76 0.19 1 5.09 0,07_1 2.95 Dirt road: 72 0 _ 0 0 0 _ ^ I d Page 9 q� _J 7/1012017 Updated for EISA 438 and 2017 NCDEQ BMP Manual INFILTRATION BASIN #1 1.8" Water Quality Volume (WQv) (ACTUAL DRAINAGE AREA TO SWM DEVICE) Rv = runoff coefficient (Runoff/Rainfall) Rv = 0.05 + 0.009(1) Where "I"=% Impervious ("Simple Method" - Schueler, 1987) WQv= 1.812 12 Fill in Values: 0.716 1 Impervious Area (Existing) 1.1" = 63.3853 Percent Impervious of Site I.N. =1 1.13 Acres Answer: WQv = 0.105 Ac. Ft. 4.581 Cubic Feet Required 1.8" = EISA required storm depth for Ft. Bragg = 31,200 SF existing impervious area A = Actual Drainage Area to SWM Device Rv-- 0.620467 WQv-- 0.62 inches CN(WQv)= 95.9 Use to comp. Q1. Page 10 PROJECT AREA & IMPERVIOUS AREA Existing Impervious Area (Within Project Area) 22,650 SF Proposed Impervious Area (Within Project Area) 44,370 SF Project Limit of Disturbance (Using as Project Area) 102,400 SF 1.8" Volume For Project Area Using Simple Method Per Runoff Volume Simple Method NCDEQ Stormwater BMP Manual POST DEVELOPMENT RvaosT = 0 05 + 0 9 ' IA Developed Site Impervious Area IA_ Total Area (Project Area) 44,370 IA_ 102,400 IA= 043 RvPosT = 044 NI ewly created Impervious area for the Protect Area = 21,720 SF 1.8" VOLUME REQUIRED For Project Area Using Simple Method Simple Method V = 3630' P' (RvPosT)• DA P (1 8") = 1 8 IN 18" = EISA required storm depth for Ft. Bragg DA= 102,400 SF DA= 235 AC V = 6,758 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (DOESN'T FACTOR IN EX IMPERVIOUS AREA) PROVIDE STORAGE FOR LARGEST REQUIRED VOLUME: V = 6,758 CF STORMWATER VOLUME SUMMARY CALCULATIONS 'Adjustment to the total volume provided to account for the volume of water which exfiltmtes out the bottom of the Infiltration basin during the period of time required to fill the infiltration basin is as follows Volume = Infiltration Rate (ft/hr)' Filling Time (hrs )' Surface Area of infiltration basin Use Filling Time = 2 hours •• Based on observation from the geotechnical engineer SHWT= Seasonal High Water Table Impervious Area Treating 31,200 sf Newly created Impervious Area 21,720 sf 1 8" Water Quality Volume Required 6,758 cf 1 8" Water Quality Volume Provided 9,099 Cf Page 11 'VOLUME "APPROX TOP OF TOP OF IMPERVIO US INFILTRATION SURFACE DEPTH OF VOLUME "INFILTRATION PROVIDED BY TOTAL SHWT BOTTOM OVERFLOW EMBANKMENT AREA BASIN # AREA PONDING PONDING RATE INFILTRATION VOLUME ELEVATION OF BASIN INLET PONDING TREATING SF (FT CF (IN HR) CF CF FT FT SF 1 4,138 1 90 8,084 1.50 1,035 9 099 220 50 223 00 224 90 226 00 31,200 'Adjustment to the total volume provided to account for the volume of water which exfiltmtes out the bottom of the Infiltration basin during the period of time required to fill the infiltration basin is as follows Volume = Infiltration Rate (ft/hr)' Filling Time (hrs )' Surface Area of infiltration basin Use Filling Time = 2 hours •• Based on observation from the geotechnical engineer SHWT= Seasonal High Water Table Impervious Area Treating 31,200 sf Newly created Impervious Area 21,720 sf 1 8" Water Quality Volume Required 6,758 cf 1 8" Water Quality Volume Provided 9,099 Cf Page 11 Infiltration Basin #1 ELEVATION AREA (FT) (SF) 223.0 4,138.001 224.0 4,250.00 224.9 4,350.001 226.0 4,400.001 STORAGE CUMULATIVE (CU FT) (CU FT) 0.00 0.00 4,194.00 4,194.00 3,870.00 8,064.00 4,81250 12,876.50 SA = DV (K/12/FS-T) DV-- 8,064.00 cu ft K= 1.50 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) = 1,792 Surface Area Provided = 4,138 Page 12 Draw Down Time: Infiltration Basin #1 Total Volume @ Inv out of Overflow Inlet: 8,064 cu.ft. Infiltration Bottom Area: 4,138 Isq ft. Maximum Release Time: 72 hrs Overflow Inlet Grate Elev: 224.90 Bottom of Basin: 1 223.00 Infiltration Rate: 1.50 in/hr Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 223.00 Draw Down Time for only Infiltration with FS: 311 hrs Page 13 ANTI -FLOTATION DEVICE Infiltration Basin #1 LENGTH OF RISER - LR 4.00 FT WIDTH OF RISER - WR 3.00 FT HEIGHT OF WATER - Hw 1.90 FT HEIGHT OF RISER - HR 9.65 FT AREA OR RISER - AR 12.00 SF WEIGHT OF WATER - Ww 62.4 LB/CF RISER UPLIFT (Wu) = Ar*HW*Ww 1422.72 LB FACTOR OF SAFETY(Fs) 1.10 UNIT WEIGHT OF CONCRETE - Uc 150.00 LB/CF VOLUME NEEDED (VN) = (WU*Fs)/UC 10.43 CF VOLUME OF 15" DIA OUTFALL PIPES 1.23 CF WALL THICKNESS -TW 0.50 FT VOLUME OF WALLS - VW 56.67 CF LENGTH OF PAD - L 4.00 FT WIDTH OF PAD - W 3.00 FT HEIGHT OF PAD - H 0.50 FT VOLUME OF PAD - Vp 6.00 CF PAD=BOTTOM OF STD INLET VW+VP 62.67 CF Vw+Vp>VN YES Page 14 J Sesler SOF Truck Inspection Point Infiltration Basin #1 Cumberland NOAA County, North Carolina Storm Data Rainfall Depth by Rainfall Return Period 2 -Yr 5 -Yr 10 -Yr 25 -Yr 50 -Yr 100 -Yr 1 -Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.7 4.7 5.4 6.5 7.3 8.2 3.1 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 Used for Inputs into PondPack Routing Software 5/5/2017 11:01:27 AM Page 15 J Sesler SOF Truck Inspection Point Infiltration Basin #1 Cumberland NOAA County, North Carolina Sub -Area Summary Table Sub -Area Drainage Time of Curve Receiving Sub -Area Identifier Area Concentration Number Reach Description (ac) (hr) -------------------------------------------------------------------------------- Basin #1 1.13 0.100 77 Outlet Total Area: 1.13 (ac) WinTR-55, Version 1.00.10 Page 1 Used for Inputs into Pond Pack Routing Software 5/5/2017 11:01:27 AM Page 16 J Sesler SOF Truck Inspection Point Infiltration Basin #1 Cumberland NOAA County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Basin #1 SHEET 25 0.0200 0.150 0.050 SHALLOW 60 0.0200 0.025 0.006 SHALLOW 140 0.0440 0.025 0.009 Time of Concentration 0.1 WinTR-55, Version 1.00.10 Page 1 5/5/2017 11:01:27 AM Page 17 J Sesler SOF Truck Inspection Point Infiltration Basin #1 Cumberland NOAA County, North Carolina Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- Basin #1 Open space; grass cover > 75% (good) A .41 39 Paved parking lots, roofs, driveways A .72 98 Total Area / Weighted Curve Number 1.13 77 WinTR-55, Version 1.00.10 Page 1 5/5/2017 11:01:27 AM Page 18 SOF Truck Inspection Point Project Summary Notes PondPack Routing Output for Infiltration Basin #1 Bentley Systems, Inc Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack VBi [08.11.01.56] Page 1 of 26 Page 19 SOF Truck Title Inspection Point - Infiltration Basin #1 Engineer jsesler Company Date 5/22/2017 Notes PondPack Routing Output for Infiltration Basin #1 Bentley Systems, Inc Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack VBi [08.11.01.56] Page 1 of 26 Page 19 Infiltration Basin 1 (IN) Elevation -Volume -Flow Table (Pond), 10 years Pond Infiltration Calculations, 10 years Detention Time, 10 years Level Pool Pond Routing Summary, 10 years Pond Inflow Summary, 10 years 2 3 5 7 9 13 17 21 22 23 24 25 Page 20 Table of Contents User Notifications Master Network Summary Ft. Bragg, NC Time -Depth Curve, 10 years Prop Da #1 Unit Hydrograph Summary, 10 years Infiltration Basin 1 (IN) Time vs. Elevation, 10 years Infiltration Basin 1 Time vs. Volume, 10 years Riser Barrel Outlet Outlet Input Data, 10 years Infiltration Basin 1 Infiltration Basin 1 (IN) Elevation -Volume -Flow Table (Pond), 10 years Pond Infiltration Calculations, 10 years Detention Time, 10 years Level Pool Pond Routing Summary, 10 years Pond Inflow Summary, 10 years 2 3 5 7 9 13 17 21 22 23 24 25 Page 20 SOF Truck Inspection Point Subsection: User Notifications User Notifications Message Id 7 Scenario R. Bragg, NC - , 1 yrs Element Type Catchment Element Id 98 Label Prop Da #1 Time (N/A) Message The difference between calculated peak flow and interpolated peak flow 1.7 % is greater than 1.5 %. Computed peak flow= 1.29 ft3/s Interp. peak flow= 1.27 ft3/s. Output increment for this catchment may be too large. Source Warning Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V& [08.11.01.56] Page 2 of 26 Page 21 SOF Truck Inspection Point Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) (ft3/s) (vears) (ac -ft) Prop Da #1 Yt Bragg, NC - , 1 1 0.105 12.100 1.27 Elevation yrs (ft) - , 1 yrs Prop Da #1 yrs Bragg, NC - , 2 2 0.150 12.100 1.82 1 yrs 0.000 0.00 223.49 0.047 Prop Da #1 R. Bragg, NC - , 10 10 0.282 12.100 3.45 Infiltration Ft. Bragg, NC 2 0.150 Prop Da #1 Yt Bragg, NC - , 25 25 0.368 12.100 4.48 Prop Da #1 y. Bragg, NC - , 50 50 0.440 12.100 5.32 Prop Da #1 Yt Bragg, NC - , 100 100 0.514 12.100 6.18 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) (ft3/s) (vears) (ac -ft) Out 10 Ft. Bragg, NC - , 1 1 0.000 0.000 0.00 Elevation yrs (ft) - , 1 yrs Out 10 Ft. Bragg, NC - , 2 2 0.000 0.000 0.00 1 yrs 0.000 0.00 223.49 0.047 Out 10 yrs Bragg, NC - , 10 10 0.000 0.000 0.00 Infiltration Ft. Bragg, NC 2 0.150 Out 10 Yt Bragg, NC - , 25 25 0.060 12.650 0.54 Out 10 yrs Bragg, NC - , 50 50 0.119 12.400 1.92 Out 10 Ft. s Bragg, NC - , 100 100 0.182 12.250 3.38 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) (ft3/s) (years) (ac -ft) Maximum Maximum Water Pond Storage Surface (ac -ft) Elevation (N/A) (ft) - , 1 yrs Infiltration Ft. Bragg, NC 1 0.105 12.100 1.27 (N/A) (N/A) Basin 1 (IN) - , 1 yrs Infiltration Basin 1 Ft. Bragg, NC 1 0.000 0.000 0.00 223.49 0.047 (OUT) _ 1 yrs Infiltration Ft. Bragg, NC 2 0.150 12.100 1.82 (N/A) (N/A) Basin 1 (IN) - , 2 yrs Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 3 of 26 Page 22 SOF Truck Inspection Point Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (hours) W/s) Water Pond Storage (years) (ac -ft) Surface (ac -ft) Elevation (ft) Infiltration Ft. Bragg, NC Basin 1 2 0.000 0.000 0.00 223.78 0.075 (OUT) _ 2 yrs Infiltration Ft. Bragg, NC 10 0.282 12.100 3.45 (N/A) (N/A) Basin 1 (IN) - , 10 yrs Infiltration Ft. Bragg, NC Basin 1 _ 10 yrs 10 0.000 0.000 0.00 224.80 0.175 (OUT) Infiltration Ft. Bragg, NC 25 0.368 12.100 4.48 (N/A) (N/A) Basin 1 (IN) - , 25 yrs Infiltration Ft. Bragg, NC Basin 1 25 0.060 12.650 0.54 224.96 0.190 (OUT) _ 25 yrs Infiltration Ft. Bragg, NC 50 0.440 12.100 5.32 (N/A) (N/A) Basin 1 (IN) - , 50 yrs Infiltration Ft. Bragg, NC Basin 1 50 0.119 12.400 1.92 225.04 0.198 (OUT) _ 50 yrs Infiltration Ft. Bragg, NC 100 0.514 12.100 6.18 (N/A) (N/A) Basin 1 (IN) - , 100 yrs Infiltration Ft. Bragg, NC Basin 1 _ 100 yrs 100 0.182 12.250 3.38 225.09 0.204 roun Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 4 of 26 Page 23 tZ a6ed 9991-99L-EOZ-L+ `dsn 96L9010 'U O)JOIBM 9Z 10 9 06ed M OOZ 93mS enup Auedwoo uowelS LZ MUZZ19 I99 w LL 901 18;uaO odd•pasodad-uoi;oadsuj Noru1 19n Vedpuod AaOuag uognioS spoylaW pe3s8eH •oul 'swa;sAS faguag 6'1 617 817 817 811 000'91 817 817 817 817 L17 OOS'ST L'1 L'1 L'1 L17 917 000'ST 917 917 917 917 S17 00S'1T S17 S17 S'1 1'1 1'1 000171 1'1 117 £17 £17 £17 OOS'£T Z'1 Z17 Z17 117 T'1 000'£T 017 031 6'£ 6'£ 8'£ OOS'ZT L'£ 9'£ 1'£ Z'£ L'Z 0007T £'Z 07 8'1 L'T 9'T OOS'TT 9'T TT 1'T 1'T 1'T 0001T £'T £'T Z'T Z'T Z'T OOS'OT VT 1'T VT VT 0'T 000'0T 0'T 0'T 0'T 6'0 6'0 005'6 6'0 6'0 8'0 8'0 8'0 000'6 8'0 8'0 L'0 L'0 L'0 00S'8 L'O Co 9'0 9'O 9'0 000'8 9'0 9'O 9'0 9'0 9'0 OOS'L S'0 TO S'0 TO TO 000'L TO S'0 TO 1'0 1'O OOS'9 1'0 1'0 1'0 1'O 1'0 000'9 1'O 1'0 1'0 1'O £'O OOS'S Co £'0 £'O £'O £'0 000'5 £'O £'0 £'0 £'0 £'O OOS'1 £'0 £'0 Z'O Z'O Z'O 00011 Z10 Z'O Z'0 Z'O Z'O OOS'E Z'O Z'O Z'O Z'0 Z'O 000'£ Z'O Z'O T'O T'0 T'O OOS'Z T'O T'0 T'0 T'0 T'O 0007 T'0 T'0 T'O T'O T'0 OOS'T T'0 T'0 T'O T'0 T'0 0001 0'O O'0 0'0 0'0 0'0 OOS'O 0'0 10.0 10.0 10.0 10.0 1000.0 (ul) (ul) (ul) (ul) (ul) (sinoq Lgdaa ypdaa y;daa y;dap ypdaa aw!1 •nnoi pea ui amen Is.all jo; atup s;uesaidw :gad uo awil sanoy 00T'0 = ;uawaJOUX awil;ndIno (a!) IIVdNIrf21 3miLvinWn:) sjeaA OT 1uan3 wn;a-1 sinoq 000'1Z awil Pu3 sinoq 00T'0 ;uawaj:)ul sinoq 000'0 awLL IjEqs (A OT) j41Z IIIadAl lagel (jA 06) jgtZ IlladA1 :anjno gjd9a-ew!1 (A Oi) jWt z IIIadA-L quan3 waoTs saeaA OT :}uan3 wnna-d W1.0d uoi;aadsul 3janil dAS ON '66ea8 'fid :Iagel wunD gjdaCI-awli :uolpasgnS m ca CD N CT �0 N O j V D N K O T v 0 w a v W N C CD V o cn cn CD 3 1 N O 4 3 cc, m-0 n Ul>>_ C,< a m (n O m rt D :3, m + CCD a o r_ fD wm Er 0 CA O y O1 O co m o � c rn � 0 7 m voo co °D n CD : T C) o o � x rn 2C, N N N N N N N N N r r r r r r r W W N N r r O 0 CO CO p p V V p Cl in o in 0 in o in o w O w O w o in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ? -P -D. -91 W W W N N N r r 0 0 kO %O D �n cn cn cn cn to cn cn art to vt cn rn �n � .A W W W N N N r+ r i-+ 0 Cl to D to to to cn cn � cn to cn cn to to to to A .A W W W W N N r i-+ i-+ 0 0 t0 Z vi cn � cn cn � cn vi to to to cn cn cn � .A W W W N N N 0 0 ko z D cn to cn to to cn �n to cn � cn to cn rn � 4 W W W N N N r r 0 0 %O C: 0 CD CA 3 mn CD i, u rTt O ..0 :3 W A 3 z M ='D F 0 n v S c n C 3 =! 0 fD O Z rt ^v v ..s � �� > Z APF. H F+ IV C 0 � A 0. rt O � -s ^ 0 m rn m rt co rn M N = -N .. S O O CD U) SOF Truck Inspection Point Subsection: Unit Hydrograph Summary Return Event: 10 years Label: Prop Da #1 Storm Event: TypeIII 24hr (10 yr) Storm Event TypeIII 24hr (10 yr) Return Event 10 years Duration 35.000 hours Depth 5.4 in Time of Concentration 0.100 hours (Composite) Area (User Defined) 1.130 acres Computational Time 0.013 hours Increment Time to Peak (Computed) 12.107 hours Flow (Peak, Computed) 3.46 ft3/s Output Increment 0.050 hours Time to Flow (Peak 12.100 hours Interpolated Output) Flow (Peak Interpolated 3.45 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 1.130 acres Maximum Retention 3.0 in (Pervious) Maximum Retention 0.6 in (Pervious, 20 percent) Cumulative Runoff Cumulative Runoff Depth 3.0 in (Pervious) Runoff Volume (Pervious) 0.282 ac -ft Hydrograph Volume (Area under Hydrograph curve) Volume 0.282 ac -ft SCS Unit Hydrograph Parameters Time of Concentration 0.100 hours (Composite) Computational Time 0.013 hours Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 7 of 26 Page 26 SOF Truck Inspection Point Subsection: Unit Hydrograph Summary Return Event: 10 years Label: Prop Da #1 Storm Event: TypeIII 24hr (10 yr) SCS Unit Hydrograph Parameters Unit peak, qp 12.80 ft3/s Unit peak time, Tp 0.067 hours Unit receding limb, Tr 0.267 hours Total unit time, Tb 0.333 hours Bentley Systems, Inc. Haestad Methods Solution Truck Inspection -Proposed ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08 11.01.56] Page 8 of 26 Page 27 SOF Truck Inspection Point Subsection: Time vs. Elevation Return Event: 10 years Label: Infiltration Basin 1 (IN) Storm Event: TypeIII 24hr (10 yr) Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 0.000 223.00 223.00 223.00 223.00 223.00 0.250 223.00 223.00 223.00 223.00 223.00 0.500 223.00 223.00 223.00 223.00 223.00 0.750 223.00 223.00 223.00 223.00 223.00 1.000 223.00 223.00 223.00 223.00 223.00 1.250 223.00 223.00 223.00 223.00 223.00 1.500 223.00 223.00 223.00 223.00 223.00 1.750 223.00 223.00 223.00 223.00 223.00 2.000 223.00 223.00 223.00 223.00 223.00 2.250 223.00 223.00 223.00 223.00 223.00 2.500 223.00 223.00 223.00 223.00 223.00 2.750 223.00 223.00 223.00 223.00 223.00 3.000 223.00 223.00 223.00 223.00 223.00 3.250 223.00 223.00 223.00 223.00 223.00 3.500 223.00 223.00 223.00 223.00 223.00 3.750 223.00 223.00 223.00 223.00 223.00 4.000 223.00 223.00 223.00 223.00 223.00 4.250 223.00 223.00 223.00 223.00 223.00 4.500 223.00 223.00 223.00 223.00 223.00 4.750 223.00 223.00 223.00 223.00 223.00 5.000 223.00 223.00 223.00 223.00 223.00 5.250 223.00 223.00 223.00 223.00 223.00 5.500 223.00 223.00 223.00 223.00 223.00 5.750 223.00 223.00 223.00 223.00 223.00 6.000 223.00 223.00 223.00 223.00 223.00 6.250 223.00 223.00 223.00 223.00 223.00 6.500 223.00 223.00 223.00 223.00 223.00 6.750 223.00 223.00 223.00 223.00 223.00 7.000 223.00 223.00 223.00 223.00 223.00 7.250 223.00 223.00 223.00 223.00 223.00 7.500 223.00 223.00 223.00 223.00 223.00 7.750 223.00 223.00 223.00 223.00 223.00 8.000 223.00 223.00 223.00 223.00 223.00 8.250 223.00 223.00 223.00 223.00 223.00 8.500 223.00 223.00 223.00 223.00 223.00 8.750 223.01 223.01 223.01 223.01 223.01 9.000 223.01 223.01 223.01 223.01 223.01 9.250 223.01 223.02 223.02 223.02 223.02 9.500 223.02 223.02 223.03 223.03 223.03 9.750 223.03 223.03 223.04 223.04 223.04 10.000 223.04 223.04 223.05 223.05 223.05 Bentley Systems, Inc Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Slemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V81 [08.11.01.56] Page 9 of 26 Page 28 SOF Truck Inspection Point Subsection: Time vs. Elevation Label: Infiltration Basin 1 (IN) Time vs. Elevation (ft) Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 10.250 223.06 223.06 223.06 223.07 223.07 10.500 223.07 223.08 223.08 223.08 223.09 10.750 223.09 223.10 223.10 223.11 223.11 11.000 223.12 223.12 223.13 223.13 223.14 11.250 223.15 223.16 223.16 223.17 223.18 11.500 223.19 223.20 223.22 223.24 223.26 11.750 223.29 223.32 223.37 223.42 223.48 12.000 223.58 223.70 223.84 223.97 224.08 12.250 224.17 224.24 224.30 224.35 224.39 12.500 224.43 224.46 224.48 224.50 224.52 12.750 224.53 224.54 224.56 224.57 224.58 13.000 224.59 224.60 224.61 224.62 224.63 13.250 224.64 224.64 224.65 224.66 224.67 13.500 224.67 224.68 224.68 224.69 224.70 13.750 224.70 224.71 224.71 224.72 224.72 14.000 224.73 224.73 224.74 224.74 224.74 14.250 224.75 224.75 224.75 224.76 224.76 14.500 224.76 224.77 224.77 224.77 224.77 14.750 224.78 224.78 224.78 224.78 224.79 15.000 224.79 224.79 224.79 224.79 224.79 15.250 224.80 224.80 224.80 224.80 224.80 15.500 224.80 224.80 224.80 224.80 224.80 15.750 224.80 224.80 224.80 224.80 224.80 16.000 224.80 224.80 224.80 224.80 224.80 16.250 224.80 224.80 224.80 224.80 224.79 16.500 224.79 224.79 224.79 224.79 224.79 16.750 224.79 224.79 224.78 224.78 224.78 17.000 224.78 224.78 224.78 224.77 224.771 17.250 224.77 224.77 224.77 224.76 224.76 17.500 224.76 224.76 224.76 224.75 224.75 17.750 224.75 224.75 224.74 224.74 224.74 18.000 224.74 224.73 224.73 224.73 224.72 18.250 224.72 224.72 224.72 224.71 224.71 18.500 224.71 224.70 224.70 224.70 224.70 18.750 224.69 224.69 224.69 224.68 224.68 19.000 224.68 224.67 224.67 224.67 224.66 19.250 224.66 224.66 224.66 224.65 224.65 19.500 224.65 224.64 224.64 224.64 224.63 19.750 224.63 224.63 224.62 224.62 224.62 20.000 224.61 224.61 224.61 224.60 224.60 20.250 224.60 224.59 224.59 224.59 224.58 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V81 [08.11.01.56] Page 10 of 26 Page 29 SOF Truck Inspection Point Subsection: Time vs. Elevation Return Event: 10 years Label: Infiltration Basin 1 (IN) Storm Event: TypeIII 24hr (10 yr) Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 20.500 224.58 224.58 224.57 224.57 224.56 20.750 224.56 224.56 224.55 224.55 224.55 21.000 224.54 224.54 224.54 224.53 224.53 21.250 224.53 224.52 224.52 224.51 224.51 21.500 224.51 224.50 224.50 224.50 224.49 21.750 224.49 224.48 224.48 224.48 224.47 22.000 224.47 224.46 224.46 224.46 224.45 22.250 224.45 224.45 224.44 224.44 224.43 22.500 224.43 224.43 224.42 224.42 224.41 22.750 224.41 224.41 224.40 224.40 224.39 23.000 224.39 224.38 224.38 224.38 224.37 23.250 224.37 224.36 224.36 224.36 224.35 23.500 224.35 224.34 224.34 224.33 224.33 23.750 224.33 224.32 224.32 224.31 224.31 24.000 224.30 224.30 224.29 224.29 224.28 24.250 224.28 224.27 224.26 224.26 224.25 24.500 224.24 224.24 224.23 224.23 224.22 24.750 224.21 224.21 224.20 224.19 224.19 25.000 224.18 224.18 224.17 224.16 224.16 25.250 224.15 224.14 224.14 224.13 224.13 25.500 224.12 224.11 224.11 224.10 224.10 25.750 224.09 224.08 224.08 224.07 224.06 26.000 224.06 224.05 224.05 224.04 224.03 26.250 224.03 224.02 224.01 224.01 224.00 26.500 224.00 223.99 223.98 223.98 223.97 26.750 223.96 223.96 223.95 223.95 223.94 27.000 223.93 223.93 223.92 223.91 223.91 27.250 223.90 223.90 223.89 223.88 223.88 27.500 223.87 223.86 223.86 223.85 223.85 27.750 223.84 223.83 223.83 223.82 223.81 28.000 223.81 223.80 223.79 223.79 223.78 28.250 223.78 223.77 223.76 223.76 223.75 28.500 223.74 223.74 223.73 223.73 223.72 28.750 223.71 223.71 223.70 223.69 223.69 29.000 223.68 223.68 223.67 223.66 223.66 29.250 223.65 223.65 223.64 223.63 223.63 29.500 223.62 223.61 223.61 223.60 223.60 29.750 223.59 223.58 223.58 223.57 223.56 30.000 223.56 223.55 223.55 223.54 223.53 30.250 223.53 223.52 223.51 223.51 223.50 30.500 223.50 223.49 223.48 223.48 223.47 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i Truck Inspection -Proposed ppc Center [08.11.01.56] 5/22/2017 27 Siemon Company Drive Suite 200 W Page 11 of 26 Watertown, CT 06795 USA +1-203-755-1666 Page 30 SOF Truck Inspection Point Subsection: Time vs. Elevation Return Event: 10 years Label: Infiltration Basin 1 (IN) Storm Event: TypeIII 24hr (10 yr) Time vs. Elevation (ft) Bentley Systems, Inc. Haestad Methods Solution Truck Inspection -Proposed ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 12 of 26 Page 31 Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 30.750 223.47 223.46 223.45 223.45 223.44 31.000 223.44 223.43 223.43 223.42 223.42 31.250 223.41 223.41 223.40 223.40 223.39 31.500 223.39 223.38 223.38 223.37 223.37 31.750 223.36 223.36 223.35 223.35 223.34 32.000 223.34 223.34 223.33 223.33 223.32 32.250 223.32 223.32 223.31 223.31 223.30 32.500 223.30 223.30 223.29 223.29 223.28 32.750 223.28 223.28 223.27 223.27 223.27 33.000 223.26 223.26 223.26 223.25 223.25 33.250 223.25 223.25 223.24 223.24 223.24 33.500 223.23 223.23 223.23 223.22 223.22 33.750 223.22 223.22 223.21 223.21 223.21 34.000 223.21 223.20 223.20 223.20 223.20 34.250 223.19 223.19 223.19 223.19 223.18 34.500 223.18 223.18 223.18 223.17 223.17 34.750 223.17 223.17 223.17 223.16 223.16 35.000 223.16 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Truck Inspection -Proposed ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 12 of 26 Page 31 SOF Truck Inspection Point Subsection: Time vs. Volume Return Event: 10 years Label: Infiltration Basin 1 Storm Event: TypeIII 24hr (10 yr) Time vs. Volume (ac -ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ac -ft) (ac -ft) (ac -ft) (ac -ft) (ac -ft) 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0.750 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.000 0.000 0.000 0.000 1.500 0.000 0.000 0.000 0.000 0.000 1.750 0.000 0.000 0.000 0.000 0.000 2.000 0.000 0.000 0.000 0.000 0.000 2.250 0.000 0.000 0.000 0.000 0.000 2.500 0.000 0.000 0.000 0.000 0.000 2.750 0.000 0.000 0.000 0.000 0.000 3.000 0.000 0.000 0.000 0.000 0.000 3.250 0.000 0.000 0.000 0.000 0.000 3.500 0.000 0.000 0.000 0.000 0.000 3.750 0.000 0.000 0.000 0.000 0.000 4.000 0.000 0.000 0.000 0.000 0.000 4.250 0.000 0.000 0.000 0.000 0.000 4.500 0.000 0.000 0.000 0.000 0.000 4.750 0.000 0.000 0.000 0.000 0.000 5.000 0.000 0.000 0.000 0.000 0.000 5.250 0.000 0.000 0.000 0.000 0.000 5.500 0.000 0.000 0.000 0.000 0.000 5.750 0.000 0.000 0.000 0.000 0.000 6.000 0.000 0.000 0.000 0.000 0.000 6.250 0.000 0.000 0.000 0.000 0.000 6.500 0.000 0.000 0.000 0.000 0.000 6.750 0.000 0.000 0.000 0.000 0.000 7.000 0.000 0.000 0.000 0.000 0.000 7.250 0.000 0.000 0.000 0.000 0.000 7.500 0.000 0.000 0.000 0.000 0.000 7.750 0.000 0.000 0.000 0.000 0.000 8.000 0.000 0.000 0.000 0.000 0.000 8.250 0.000 0.000 0.000 0.000 0.000 8.500 0.000 0.000 0.000 0.000 0.000 8.750 0.000 0.001 0.001 0.001 0.001 9.000 0.001 0.001 0.001 0.001 0.001 9.250 0.001 0.002 0.002 0.002 0.002 9.500 0.002 0.002 0.002 0.003 0.003 9.750 0.003 0.003 0.003 0.004 0.004 10.000 0.004 0.004 0.004 0.005 0.005 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 13 of 26 Page 32 SOF Truck Inspection Point Subsection: Time vs. Volume Label: Infiltration Basin 1 Time vs. Volume (ac -ft) Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V& [08.11.01.56] Page 14 of 26 Page 33 Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ac -ft) (ac -ft) (ac -ft) (ac -ft) (ac -ft) 10.250 0.005 0.006 0.006 0.006 0.006 10.500 0.007 0.007 0.008 0.008 0.008 10.750 0.009 0.009 0.010 0.010 0.011 11.000 0.011 0.012 0.012 0.013 0.013 11.250 0.014 0.015 0.016 0.016 0.017 11.500 0.018 0.019 0.021 0.022 0.025 11.750 0.027 0.031 0.035 0.040 0.046 12.000 0.055 0.067 0.080 0.093 0.104 12.250 0.112 0.119 0.125 0.130 0.134 12.500 0.138 0.141 0.143 0.145 0.146 12.750 0.148 0.149 0.150 0.152 0.153 13.000 0.154 0.155 0.156 0.156 0.157 13.250 0.158 0.159 0.160 0.160 0.161 13.500 0.162 0.162 0.163 0.163 0.164 13.750 0.165 0.165 0.166 0.166 0.167 14.000 0.167 0.168 0.168 0.168 0.169 14.250 0.169 0.169 0.170 0.170 0.170 14.500 0.171 0.171 0.171 0.172 0.172 14.750 0.172 0.172 0.172 0.173 0.173 15.000 0.173 0.173 0.173 0.174 0.174 15.250 0.174 0.174 0.174 0.174 0.174 15.500 0.174 0.174 0.174 0.175 0.175 15.750 0.175 0.175 0.175 0.175 0.174 16.000 0.174 0.174 0.174 0.174 0.174 16.250 0.174 0.174 0.174 0.174 0.174 16.500 0.174 0.173 0.173 0.173 0.173 16.750 0.173 0.173 0.173 0.173 0.172 17.000 0.172 0.172 0.172 0.172 0.172 17.250 0.171 0.171 0.171 0.171 0.171 17.500 0.170 0.170 0.170 0.170 0.169 17.750 0.169 0.169 0.169 0.168 0.168 18.000 0.168 0.168 0.167 0.167 0.167 18.250 0.167 0.166 0.166 0.166 0.165 18.500 0.165 0.165 0.165 0.164 0.164 18.750 0.164 0.163 0.163 0.163 0.162 19.000 0.162 0.162 0.162 0.161 0.161 19.250 0.161 0.160 0.160 0.160 0.159 19.500 0.159 0.159 0.158 0.158 0.158 19.750 0.157 0.157 0.157 0.156 0.156 20.000 0.156 0.155 0.155 0.155 0.154 20.250 0.154 0.154 0.153 0.153 0.153 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V& [08.11.01.56] Page 14 of 26 Page 33 {' A SOF Truck Inspection Point Subsection: Time vs. Volume Label: Infiltration Basin 1 Time vs. Volume (ac -ft) Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ac -ft) (ac -ft) (ac -ft) (ac -ft) (ac -ft) 20.500 0.152 0.152 0.152 0.151 0.151 20.750 0.151 0.150 0.150 0.150 0.149 21.000 0.149 0.149 0.148 0.148 0.147 21.250 0.147 0.147 0.146 0.146 0.146 21.500 0.145 0.145 0.145 0.144 0.144 21.750 0.143 0.143 0.143 0.142 0.142 22.000 0.142 0.141 0.141 0.140 0.140 22.250 0.140 0.139 0.139 0.138 0.138 22.500 0.138 0.137 0.137 0.136 0.136 22.750 0.136 0.135 0.135 0.134 0.134 23.000 0.134 0.133 0.133 0.132 0.132 23.250 0.132 0.131 0.131 0.130 0.130 23.500 0.130 0.129 0.129 0.128 0.128 23.750 0.128 0.127 0.127 0.126 0.126 24.000 0.125 0.125 0.124 0.124 0.123 24.250 0.123 0.122 0.121 0.121 0.120 24.500 0.120 0.119 0.118 0.118 0.117 24.750 0.117 0.116 0.115 0.115 0.114 25.000 0.113 0.113 0.112 0.112 0.111 25.250 0.110 0.110 0.109 0.109 0.108 25.500 0.107 0.107 0.106 0.106 0.105 25.750 0.104 0.104 0.103 0.103 0.102 26.000 0.101 0.101 0.100 0.100 0.099 26.250 0.098 0.098 0.097 0.097 0.096 26.500 0.095 0.095 0.094 0.094 0.093 26.750 0.092 0.092 0.091 0.090 0.090 27.000 0.089 0.089 0.088 0.087 0.087 27.250 0.086 0.086 0.085 0.084 0.084 27.500 0.083 0.083 0.082 0.081 0.081 27.750 0.080 0.080 0.079 0.078 0.078 28.000 0.077 0.077 0.076 0.075 0.075 28.250 0.074 0.073 0.073 0.072 0.072 28.500 0.071 0.070 0.070 0.069 0.069 28.750 0.068 0.067 0.067 0.066 0.066 29.000 0.065 0.064 0.064 0.063 0.063 29.250 0.062 0.061 0.061 0.060 0.060 29.500 0.059 0.058 0.058 0.057 0.057 29.750 0.056 0.055 0.055 0.054 0.054 30.000 0.053 0.053 0.052 0.051 0.051 30.250 0.050 0.050 0.049 0.048 0.048 30.500 0.047 0.047 0.046 0.045 0.045 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 15 of 26 Page 34 SOF Truck Inspection Point Subsection: Time vs. Volume Return Event: 10 years Label: Infiltration Basin 1 Storm Event: TypeIII 24hr (10 yr) Time vs. Volume (ac -ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ac -ft) (ac -ft) (ac -ft) (ac -ft) (ac -ft) 30.750 0.044 0.044 0.043 0.043 0.042 31.000 0.042 0.041 0.040 0.040 0.039 31.250 0.039 0.038 0.038 0.038 0.037 31.500 0.037 0.036 0.036 0.035 0.035 31.750 0.034 0.034 0.034 0.033 0.033 32.000 0.032 0.032 0.031 0.031 0.031 32.250 0.030 0.030 0.030 0.029 0.029 32.500 0.028 0.028 0.028 0.027 0.027 32.750 0.027 0.026 0.026 0.026 0.025 33.000 0.025 0.025 0.024 0.024 0.024 33.250 0.024 0.023 0.023 0.023 0.022 33.500 0.022 0.022 0.022 0.021 0.021 33.750 0.021 0.020 0.020 0.020 0.020 34.000 0.019 0.019 0.019 0.019 0.019 34.250 0.018 0.018 0.018 0.018 0.017 34.500 0.017 0.017 0.017 0.017 0.016 34.750 0.016 0.016 0.016 0.016 0.015 35.000 0.015 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Slemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V81 [08 11 01.56] Page 16 of 26 Page 35 SOF Truck Inspection Point Subsection: Outlet Input Data Return Event: 10 years Label: Riser Barrel Outlet Storm Event: TypeIII 24hr (10 yr) Requested Pond Water Surface Elevations Minimum (Headwater) 223.00 ft Increment (Headwater) 0.50 ft Maximum (Headwater) 226.00 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Bentley Systems, Inc Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 17 of 26 Page 36 Barrel Inlet Box Riser Forward (Outlet 224.90 226.00 Pipe) Barrel Culvert -Circular (Outlet Forward TW 215.25 226.00 Pipe) Tailwater Settings Tailwater (N/A) (N/A) Bentley Systems, Inc Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 17 of 26 Page 36 SOF Truck Inspection Point Subsection: Outlet Input Data Return Event: 10 years Label: Riser Barrel Outlet Storm Event: TypeIII 24hr (10 yr) Structure ID: Riser Structure Type: Inlet Box Number of Openings 1 Elevation 224.90 ft Orifice Area 6.0 ft2 Orifice Coefficient 0.600 Weir Length 10.00 ft Weir Coefficient 3.00 (ft^0.5)/s K Reverse 1.000 Manning's n 0.000 Kev, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: Barrel (Outlet Pipe) Structure Type: Culvert -Circular Number of Barrels 1 Diameter 15.0 in Length 63.00 ft Length (Computed Barrel) 63.01 ft Slope (Computed) 0.021 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.200 Kb 0.023 Kr 0.200 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio (HW/D) 1.084 T2 ratio (HW/D) 1.186 Slope Correction Factor -0.500 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V81 [08.11.01 56] Page 18 of 26 Page 37 SOF Truck Inspection Point Subsection: Outlet Input Data Return Event: 10 years Label: Riser Barrel Outlet Storm Event: TypeIII 24hr (10 yr) Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... T1 Elevation 216.61 ft TI Flow 4.80 ft3/s T2 Elevation 216.73 ft T2 Flow 5.49 ft3/s Bentley Systems, Inc. Haestad Methods Solution Truck Inspection -Proposed ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 19 of 26 Page 38 Subsection: Outlet Input Data Label: Riser Barrel Outlet SOF Truck Inspection Point Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 40 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Headwater Tolerance 0.50 ft (Maximum) Flow Tolerance (Minimum) 0.001 ft3/s Flow Tolerance (Maximum) 10.000 ft3/s Bentley Systems, Inc Haestad Methods Solution Truck Inspection -Proposed ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 20 of 26 Page 39 SOF Truck Inspection Point Subsection: Elevation -Volume -Flow Table (Pond) Label: Infiltration Basin 1 Infiltration 0.00 Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 1.5000 in/h 0.00 0.048 Initial Conditions 0.14 Elevation (Water Surface, Initial) 223.00 ft Volume (Initial) 0.000 ac -ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Elevation Outflow Storage Area (ff) (ft3/s) (ac -ft) (acres) Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Infiltration Flow (Total) 2S/t + 0 (ft3/S) (ft3/S) (ft3/S) 223.00 0.00 0.000 0.094 0.00 0.00 0.00 223.50 0.00 0.048 0.096 0.14 0.14 23.16 224.00 0.00 0.096 0.097 0.15 0.15 46.49 224.50 0.00 0.145 0.098 0.15 0.15 70.15 224.90 0.00 0.184 0.100 0.15 0.15 89.33 225.00 0.95 0.194 0.100 0.15 1.10 95.11 225.50 13.94 0.244 0.100 0.15 14.09 132.31 226,001 19.871 0.2941 0.100 0.15 1 20.02 162.43 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 21 of 26 Page 40 SOF Truck Inspection Point Subsection: Pond Infiltration Calculations Return Event: 10 years Label: Infiltration Basin 1 (IN) Storm Event: TypeIII 24hr (10 yr) Average Infiltration Rating Table Elevation (Water Area (Total) Flow (Infiltration) Surface) W) (ft3/S) (ft) 223.00 4,116.4 0.00 223.50 4,170.7 0.14 224.00 4,225.3 0.15 224.50 4,290.4 0.15 224.90 4,342.8 0.15 225.00 4,356.0 0.15 225.50 4,356.0 0.15 226.00 4,356.0 0.15 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V& [08.11.01.56] Page 22 of 26 Page 41 SOF Truck Inspection Point Subsection: Detention Time Label: Infiltration Basin 1 (IN) Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 1.5000 in/h Approximate Detention Times Time to Peak (Outflow + Infiltration, Peak to Peak 15.800 hours Detention Time) Time to Peak (Inflow, Peak 12.100 hours to Peak Detention Time) Detention Time (Peak to 3.700 hours Peak) Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Bentley PondPack V8i [08.11.01 56] Page 23 of 26 Page 42 SOF Truck Inspection Point Subsection: Level Pool Pond Routing Summary Label: Infiltration Basin 1 (IN) Infiltration 3.45 ft3/s Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 1.5000 in/h Time to Peak (Flow, Outlet) 0.000 hours Initial Conditions 0.000 ac -ft Elevation (Water Surface, Initial) 223.00 ft Volume (Initial) 0.000 ac -ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Return Event: 10 years Storm Event: TypeIII 24hr (10 yr) Flow (Peak In) 3.45 ft3/s Time to Peak (Flow, In) 12.100 hours Infiltration (Peak) 0.15 ft3/s Time to Peak (Infiltration) 15.800 hours Flow (Peak Outlet) 0.00 ft3/s Time to Peak (Flow, Outlet) 0.000 hours Volume (Initial) 0.000 ac -ft Elevation (Water Surface, 224.80 ft Peak) Volume (Peak) 0.175 ac -ft Mass Balance (ac -ft) Volume (Initial) 0.000 ac -ft Volume (Total Inflow) 0.282 ac -ft Volume (Total Infiltration) 0.267 ac -ft Volume (Total Outlet 0.000 ac -ft Outflow) Volume (Retained) 0.015 ac -ft Volume (Unrouted) 0.000 ac -ft Error (Mass Balance) 0.0% Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Slemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.56] Page 24 of 26 Page 43 SOF Truck Inspection Point Subsection: Pond Inflow Summary Return Event: 10 years Label: Infiltration Basin 1 (IN) Storm Event: TypeIII 24hr (10 yr) Summary for Hydrograph Addition at'Infiltration Basin 1' Upstream Link Upstream Node <Catchment to Outflow Node> Prop Da #1 Node Inflows Inflow Type Element Volume Time to Peak Flow (Peak) (ac -ft) (hours) (ft3/s) Flow (From) Prop Da #1 0.282 12.100 3.45 Flow (In) Infiltration 0.282 12.100 3.45 Basin 1 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11 01 56] Page 25 of 26 Page 44 SOF Truck Inspection Point Index F Ft. Bragg, NC (Time -Depth Curve, 10 years) ... 5, 6 I Infiltration Basin 1 (Elevation -Volume -Flow Table (Pond), 10 years) ... 21 Infiltration Basin 1 (IN) (Detention Time, 10 years) ... 23 Infiltration Basin 1 (IN) (Level Pool Pond Routing Summary, 10 years) ... 24 Infiltration Basin 1 (IN) (Pond Infiltration Calculations, 10 years) ... 22 Infiltration Basin 1 (IN) (Pond Inflow Summary, 10 years) ... 25 Infiltration Basin 1 (IN) (Time vs. Elevation, 10 years) ... 9, 10, 11, 12 Infiitration Basin 1 (Time vs. Volume, 10 years) ... 13, 14, 15, 16 M Master Network Summary ... 3, 4 P Prop Da #1 (Unit Hydrograph Summary, 10 years) ... 7, 8 R Riser Barrel Outlet (Outlet Input Data, 10 years)... 17, 18, 19, 20 U User Notifications ... 2 Bentley Systems, Inc. Haestad Methods Solution Truck Inspection-Proposed.ppc Center 5/22/2017 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i 108.11.01.56] Page 26 of 26 Page 45 STORM DRAINAGE SCHEDULE Track Tncnectinn 7/10/2017 1:19 PM I -Temp PVC Pipe (Install solid PVC cap on both ends afterTaatration Basin #1 is constructed and ready for operation) I I I I I I I I I I I I I Nge4s StormDmin Calcs_truckinspection.xB DeslgnedH :JSS JSS Project#• Trucklnspee Checked By:JSS JSS Date: 10-Jul17 Te T, leo HO C, Q10 Q10 Q10 Actual Upstream Downstream Upstream Structure Fmm To Inlet Total Inlet Pipe Pipe Pipe Inlet Composift Side- Cumulative Total Slope alculate Pipe Actual Velocity length Segment Invert Invert Pepe Rim Nnunum Nlimmum (upstream) downstream Area Area rime of Con fravelTimerime ofCono Intensity Intensity Runoff Stream ilde-Strearr Discharge Diameter Diameter Velocity Full Time (From) (To) Material Elevation Depth Cover (Acres) Acres (Mln) (Min) (Nun) (In/Rr) (la/Hr Coeffielen (cfs) (cfs) (cfs) (Ft/Ft (In) (in) (fps) s Ft (Ft) Ft (Ft Ft (FT) C11-8 FES -7 0.98 0.98 5.00 0.00 5.00 7 91 7.91 0.78 0.00 6.05 0 0100 14.19 15 6.46 5.7 20 00 0.05 223 20 223 00 CLASS IV RCP 226.20 3.00 1.56 INF BASIN # 1)I.4 0.15 1.13 5.00 0.05 5.05 7.91 7.91 0.30 0.00 0.00 canner Veal D1-5 0.01 0.01 5.00 0.00 5.00 7.91 7.91 0.95 0.00 (OT08J■ 0.0150 2.54 4 2.51 2.9 216.50 216.13 PVC 222.50 6.00 5.58 C00�3 RCO-6 DI -5 0.08 0.08 5 00 0.00 5.00 791 7.91 0.95 0.00 0.60 0 0370 4.67 8 5.95 7.2 223 00 218 71 PVC 226.20 3 20 2.45 DI.5 DIA 0.24 0.33 5.00 0.32 5.32 7.91 7.81 0.35 [01087 0.08 1.33 0.0120 7.78 15 4.81 6.2 216.05 215.35 CLASS MRCP 222.00 3.29 4.51 DI -4 EX DI3 1.13 1.46 5 00 0.53 5.53 7.91 7.75 0.00 0.08 1.33 0.0215 6.97 15 5.97 8.4 63.00 0.18 215 25 213.90 CLASS HIRCP 224.90 9.55 8.21 EX DI -3 EX DI -2 0 56 2.02 5.00 0.70 5.70 7.91 7.69 0.53 0.08 3.61 0.0286 9.61 15 8.40 9.6 14.00 0.03 213.80 213.40 CLASS IV RCP 217.20 3.30 1.96 EX 111.2 EX HW -1 0.73 2.75 5.00 0.73 5.73 7.91 7.69 0.86 0.08 8.44 00479 11.99 15 12.64 12.5 71.00 0.09 213.40 21000 CLASS IV RCP 216.30 2.90 1.46 RCO-16 DI -15 0.02 0 02 5 00 0.00 5.00 7.91 7 91 0.95 0.00 0.15 0.0150 3.29 6 3.02 3.8 58.00 0.32 226.00 225.13 PVC 228.45 2.55 1.87 DI -15 FES -14 0.73 0.75 5.00 0.32 5 32 7 91 7.81 0.37 0 00 2.26 0.0093 9.94 15 4 89 5.5 108.00 0.37 224 60 223.60 CLASS IV RCP 226.85 1.72 0.81 EX ES -13 EX ES -12 0.48 1.23 5.00 0.00 5.00 7.91 7.91 0.54 2.26 2.26 4.31 0.0125 11.98 24 6.55 8.7 32.00 0.08 223.50 223.10 CLASS IV RCP 225.75 2.25 0.00 EX HW -11 EX MH -10 0 25 1.48 5 00 0.00 5.00 7.91 7.91 0.56 4.31 4 31 5.42 0.0477 10.16 18 11.38 14.0 132.00 0.19 223 30 217.00 CLASS W RCP 225.96 2.66 0.95 Te mp CH -8 DI -5 0 98 0.98 5.00 0.00 5.00 7.91 7.91 0.78 0 00 6.05 0 1240 8.85 10 16.60 15.3 25.00 0.03 221.10 218.00 PVC 226 20 5 20 4 18 Notes: Design forthe 10- earstorm assumes the Time of CB -Catch Basin Concentration m an Individual Culve rt lnle t = 5 minutes. Cl - Curb Inlet DCI -Double Curb Inlet Actual Velocity Is calculated based upon percentage DDI -Double Drop Inlet of Full-Flowmg pipe and acmalde th of How from DI - Drop Inlet Hydraulic elements i DIS -Drop Inlet, Slab rap RCP CMP PVC HDPE EXDI - Existing Drop inlet Manning's 'h"Factor- 0.012 0.024 0.01 0.012 JB - Junction Box Rune ff Coefftcfe nts I MH -Manhole for Rational Method. C - 0.30 (grass), C = 0.95 (pavt.), C=0.50 (single fn S -Detention Structure EW -End Wall FES -Flared End Section DS -Downspout ES -End Section Notes • Pond Pack 10 -Year Discharge from Infiltration Basin 01 = 0.00 cis I -Temp PVC Pipe (Install solid PVC cap on both ends afterTaatration Basin #1 is constructed and ready for operation) I I I I I I I I I I I I I Nge4s StormDmin Calcs_truckinspection.xB C Coefficient and Discharge Calculations - Permanent Ditches and Storm Drainage System CB -8 DA = 0.72 Impervious Ac 0.26 Grass Ac I 0.98 (Ac) C Coef. 0.95 0.30 I RCo-6 DA = 0.08 Impervious Ac 0.00 1 Grass Ac 0.08 (Ac) C Coef. 0.95 0.30 C= 0.778 C= 0.950 12 ear= 6.16 Q(2)= 4.69 1 2 ear- 6.16 Q(2)= 0.47 1 10 ear= 7.91 Q(1 0 = 6.03 1 10year- 7.91 Q(10)= 0.60 Scanner Vault DA = 0._01 Ac C Coef. 0.01 Impervious Ac 0.95 0.00 Grass Ac 0.30 D1-5 DA = 0.02 Impervious Ac 0.22 Grass Ac 0.24 (Ac) C Coef. 0.95 0.30 C= 0.950 C= 0.354 12 ear= 6.16 Q(2)=10.06 12year- 6.16 Q(?h- 0.52 1 10year= 7.91 Q(10)= 0.08 1 10year- 7.91 Q(10)=10.67 DI -4_ DA = 0.00 Impervious Ac 0.15 Grass Ac 0.15 Ac C Coef. 0.95 0.30 EX DI -3 DA =; 0.20_ Impervious Ac 0.36 Grass Ac 0.56 Ac C Coef. 0.95 0.30 C= 0.300 C= 0.532 1 2year= 6.16 Q(2)= 0.28 1 2year- 6.16 Q(2)= 1.84 1 10year= 7.91 Q(10)= 0.36 1 10year= 7.91 Q(10)= 2.36 EX DI -2 DA =; ___0.6_3 Impervious (Ac) 0.10 Grass (Ac) 0.73 (Ac) C Coef. 0.95 0.30 L DI -15___ DA = 0.73 (Ac) F C Coef. 0.08 Impervious (Ac) 0.95 0 65 Grass (Ac) 0.30 C= 0.861 C= 0.371 1 2year= 6.16 Q(2)= 3.87 1 2year- 6.16 Q(2)= 1.67 1 10year- 7 91 Q(10)= 4.97 1 10year- 7.91 Q(10)= 2.14 EX ES -13__ DA = j 0.18 Impervious (Ac) 0.30 Grass (Ac) 0.48 (Ac) C Coef. 0.95 0.30 EX HW_ -11 DA="- 0.25_ (Ac) I C Coef. 0.10 Impervious (Ac) 0.95 0.15 Grass (Ac) 0.30 C= 0.544 C= 0.560 1 2year= 6.16 Q(2)= 1.61 1 2year= 6.16 Q(2)= 0.86 1 10year= 7.91 Q(10)= 2.06 1 10year- 7.91 Q(10)= 1.11 Page 47 RCO-16 DA = 0.02 (Ac) C Coef. 0.02 Impervious (Ac) 0.95 0.00 Grass (Ac) 0.30 C= 0.950 12year= 6.16 Q(2)= 0.12 110year= 7.91 Q(10)= 0.15 Grass Ditch D#1 (Same as D-5) Q(2)= 0.52 Q(10)= 0.67 Grass Ditch (D#2) DA = 0.07 0.01 Impervious Ac 0.06 Grass Ac Ac C Coef. 0.95 0.30 C= 0.393 1 2year- 6.16 Q(2)= 0.17 1 10ear=7.91 Q10=0.22 Grass Ditch (D#3) (Includes D#2 DA = '0.27 Ac C Coef. 0.04 Impervious Ac 0.95 Grass Ditch (D#4) DA = 0.11 ' Ac C Coef. 0.0_9 Impervious Ac 0.95 0.23 Grass Ac 0.30 0.02 Grass Ac 0.30 C= 0.396 C= 0.832 12year= 6.16 Q(2)= 0.66 1 2year- 6.16 Q 2= 0.56 1 10year= 7.91 Q(10)= 0.85 1 10year= 7.91 Q(10)= 0.72 Page 48 Worksheet for D#1 - - ;Pro�ect Descrlptlon - -- --- --- ---- ----- - ---- --- -- - - -- -- - - --- ----------- - --- -- Friction Method Manning Formula Solve For Normal Depth Input Data Grass; Manning's N from Roughness Coefficient 0.135 figure 8.05c Erosion and Channel Slope 0.03500 f 1ft Sediment Control Manual Left Side Slope 3.00 ft/ft (H V) Right Side Slope 3.00 ft/ft (H:V) 10 -year Q (See Discharge Discharge 0.67 ft3/s Calcs for Ditches) Results— ---- -- — ---- -- ------ ---- ---- -- - — —_ —__-_—_-------- Normal Depth 0.52 ft Flow Area 0.82 ft2 Wetted Perimeter 3.31 ft Hydraulic Radius 0.25 ft Top Width 3.14 It Critical Depth 0.31 ft Critical Slope 0.52757 ft/ft Ok, Velocity < 5.0 fps Velocity 0.81 ft/s (max allowed for grass Velocity Head 0.01 ft channels with Specific Energy 0.53 ft Bermudagrass at 0-5% Froude Number 0.28 slopes per Table 8.05a) Flow Type Subcritical G p Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 iGVF Output Data — — — _ _—-- Upstream Depth 0.00 ft Profile Description Profile Headloss 000 ft Downstream Velocity Infinity fits Upstream Velocity Infinity ft/s Normal Depth 0.52 ft Critical Depth 0.31 ft Channel Slope 0.03500 ft/ft Critical Slope 0.52757 ft/ft Bentley Systems, Inc. Haestad Methods Sol6kiiii4efiibmMaster V81(SELECTseries 1) 108.11.01.03] 5/31/2017 1:55:01 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 49 Worksheet for D#1 Bare Soil Project Description Friction Method Manning Formula Solve For Normal Depth - - - - ----- -- - Input Data - - - - - - - - - -- - - - - Bare Soil Conditions Roughness Coefficient 0.023 Manning's N from figure Channel Slope 003500 ft/ft 8.05f Erosion andSediment Left Side Slope 3.00 ft/ft (H.V) Control Manual Right Side Slope 3.00 ft/ft (H V) Discharge 0.52 ft'/s 2 -year Q .Results Normal Depth 025 ft Flow Area 018 ft2 Wetted Perimeter 1.55 ft Hydraulic Radius 0.12 ft Top Width 147 ft Critical Depth 0.28 ft Critical Slope 0.01584 ft/ft Velocity 2.88 ft/5 Velocity > 2.0 fps (max Velocity Head 013 ft allowed for bare soil). Specific Energy 0.37 ft Froude Number 1.45 Liner required. Flow Type Supercritical -- - GVF Input Data-- -- -- --- ----------- - --------------- --- --- --- --- Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data i R--- - --- — — - -- — — -- - - ---- - - — -- ---- --- - — --- - ----- - - - Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.25 ft Critical Depth 0.28 ft Channel Slope 0.03500 fUft Critical Slope 001584 ft/ft Bentley Systems, Inc. Haestad Methods Solids Wdl --FitewMaster Vol (SELECTseries 1) [08.11.01.03] 5/31/2017 1:4:37 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 50 Flow Type Subcntical -- -- ---- - --- --- ---- ---- --- -- ----- - - --------- -- - -- -- - - ------ --- — GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 - --- -- ---- --- --- ---- ---- --- -- --- ---- --- - - - -- - ---- GVF Out Put Data L--_----------------•- - -- ------ -------------------- Upstream Depth 000 ft Profile Description Profile Headloss Worksheet for D#1 Liner Downstream Velocity Project Description -- - - - - -- - - - - - - - - - - - - - - - - - -- - -- Friction Method Manning Formula 0.34 ft Solve For Normal Depth ft Channel Slope Input Data ft/ft Critical Slope 0.09057 Roughness Coefficient 0 055 Manning's N from Product Channel Slope 003500 ft/ft S75 brochure (Straw with Left Side Slope 300 ft/ft (H:V) Net) Right Side Slope 300 ft/ft (H V) Discharge 0.52 ft3/s 2 -year Q - -- - - -- --- - - - - - - - -- ,Results -- - - - - - - - - Normal Depth 0.34 ft Calculated Shear Stress Flow Area 0.35 ft2 0.74 = 62.4*0.34*0.035 Wetted Perimeter 2.15 ft Hydraulic Radius 0.16 ft Top Width 2.04 ft Ok, Allowed Shear Stress Critical Depth 028 ft from Product S75 Critical Slope 009057 ft/ft brochure (Straw with Net) Velocity 1 50 fvs = 1.55 Velocity Head 0.03 ft Specific Energy 038 ft Froude Number 064 Flow Type Subcntical -- -- ---- - --- --- ---- ---- --- -- ----- - - --------- -- - -- -- - - ------ --- — GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 - --- -- ---- --- --- ---- ---- --- -- --- ---- --- - - - -- - ---- GVF Out Put Data L--_----------------•- - -- ------ -------------------- Upstream Depth 000 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity fUs Normal Depth 0.34 ft Critical Depth 0.28 ft Channel Slope 0.03500 ft/ft Critical Slope 0.09057 ft/ft Bentley Systems, Inc. Haestad Methods SoIfi&W*K1ewMaster V81 (SELECTseries 1) [08.11.01.03] 5/31/20171:45:11 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 51 Y ;GVF Input Data Downstream Depth 000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth Worksheet for D#2 ft Profile Description --- - ---- -- -- ;Project Description - - -- ------ - - - - - - Downstream Velocity Friction Method Manning Formula Upstream Velocity Infinity Solve For Normal Depth 0.33 ft ;Input Data 0.20 ft Channel Slope 0.09000 ft/ft Critical Slope Grass; Manning's N from Roughness Coefficient 0.200 figure 8.05c Erosion and Channel Slope 0.09000 ft/ft Sediment Control Manual Left Side Slope 300 ft/ft (H V) Right Side Slope 3.00 ft/ft (H V) 10 -year Q (See Discharge Discharge 0.22 ft'/s _ Calcs for Ditches) Results Normal Depth 0.33 ft Flow Area 034 ft2 Wetted Perimeter 212 ft Hydraulic Radius 0.16 ft Top Width 201 ft Critical Depth 020 ft Critical Slope 1.34325 ft/ft Ok, Velocity < 4.5 fps Velocity o.s5 ft/s (max allowed for grass Velocity Head 0.01 ft channels with Specific Energy o.3a ft Bermudagrass at 5-10% Froude Number 0 28 slopes per Table 8.05a) Flow Type Subcritical ;GVF Input Data Downstream Depth 000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 000 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.33 ft Critical Depth 0.20 ft Channel Slope 0.09000 ft/ft Critical Slope 1.34325 ft/ft Bentley Systems, Inc. Haestad Methods Sol ii ' I *FilawMaster VSi (SELECTseries 1) [08.11.01.03] 5/31/20171:57:34 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 52 Worksheet for D#2 Bare Soil -- - - --- - Project Description - - - -- - - -- - - - -- - - - - Friction Method Manning Formula Solve For Normal Depth ,Input Data — Bare Soil Conditions Roughness Coefficient 0.023 Manning's N from figure Channel Slope 009000 ft/ft 8.05f Erosion and Left Side Slope 300 fUft (H V) Sediment Control Manual Right Side Slope 3.00 ft/ft (H V) Discharge 017 ft3/s 2 -year Q ,Results Normal Depth 0.14 ft Flow Area 005 ftz Wetted Perimeter 086 ft Hydraulic Radius 006 ft Top Width 081 ft Critical Depth 018 ft Critical Slope 0.01838 ft/ft Velocity 3.10 ft/s Velocity > 2.0 fps (max Velocity Head 0.15 ft allowed for bare soil). Specific Energy 0.28 ft Froude Number 210 Liner required. Flow Type Supercritical ----- ---- GVF Input Data — — ---------- - ---- ---- — — ---------------- ------ --- Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 IGVF Output Data ---- ----- ------ — — - — ---- -- - --- -- Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.14 ft Critical Depth 0.18 ft Channel Slope 009000 ft/ft Critical Slope 0.01838 ft/ft Bentley Systems, Inc. Haestad Methods SolfiWaddipfilbawMaster V81 (SELECTseries 1) [08.11.01.03] 5/31/2017 1:58:11 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 53 Worksheet for D#2 Liner - - - - - -- - 'Project Description -- - - - - - - -- -- --- - - - - - - --- - - - - -- - - - - - - - - - -- -- --- ----- -- Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.055 Manning's N from Product Channel Slope 009000 ft/ft S75 brochure (Straw with Left Side Slope 3.00 ft/ft (H -V) Net) Right Side Slope 3.00 ft/ft (H V) Discharge 0.17 ft3/s 2 -year Q Results - - --- - - ----- - - - - - - - - - - - - -- - - - - -- - --- - - - - Normal Depth 0.19 ft Calculated Shear Stress Flow Area 0.11 ft2 1.07 = 62.4*0.19*0.09 Wetted Perimeter 1.18 ft Hydraulic Radius 0.09 ft Top Width 1.12 ft Ok, Allowed Shear Stress Critical Depth 0.18 ft from Product S75 Critical Slope 010513 ft/ft brochure (Straw with Net) Velocity 1.62 ft/s = 1.55 Velocity Head 0.04 ft Specific Energy 0.23 ft Froude Number 0.93 Flow Type Subcritical GVF Input Data - --- --- - - -- ---- -- - --- -- - --- — - - - -- ---- — -- - --� Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 FVF Output Data -- - - --- - - -- - - - - --------- -- -� - - -_ -- Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.19 ft Critical Depth 0.18 ft Channel Slope 0.09000 ft/ft Critical Slope 010513 ft/ft Bentley Systems, Inc. Haestad Methods Sol/ilikW*fitewMaster V8l (SELECTseries 1) [08.11.01.03] 5/31/2017 1:58:34 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 54 Worksheet for D#3 - --------------- --------- --- — --- - - --------- -- ----------------- ---- - ,Project Description- ------ Friction Method Manning Formula Solve For Normal Depth InputData -- -- -- -- -- ---- ---- -------------- --- ---------- -------------- -- — --- ----- Results Normal Depth ft Grass; Mannings N from Roughness Coefficient— 0.160 Wetted Perimeter figure 8.05c Erosion and Channel Slope 0.00200 ft/ft Sediment Control Manual Left Side Slope 3.00 ft/ft (H:V) Critical Depth Right Side Slope 3.00 fttft (H:V) 10 -year Q (See Discharge Discharge 085 ft3/s Calcs for Ditches) Results Normal Depth 104 ft Flow Area 327 ft2 Wetted Perimeter 6.60 ft Hydraulic Radius 0.50 ft Top Width 6.26 ft Critical Depth 0.35 ft Critical Slope 0.71778 ft/ft Velocity 0.26 ft/s Velocity Head 0.00 ft Specific Energy 1.04 ft Froude Number 0.06 ft Flow Type Subcritical ft Ok, Velocity < 5.0 fps (max allowed for grass channels with Bermudagrass at 0-5% slopes per Table 8.05a) IGVF Input Data Downstream Depth 0.00 ft Length 000 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.04 ft Critical Depth 0.35 ft Channel Slope 0.00200 ft/ft Critical Slope 0.71778 ft/ft Bentley Systems, Inc. Haestad Methods Sol0kWdleFi owMaster V81(SELECTseries 1) [08.11.01.03] 5/31/2017 2:01:58 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 55 Worksheet for 13#3 Bare Soil Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Bare Soil Conditions Roughness Coefficient 0 023 Mannings N from figure Channel Slope 0.00200 ft/ft 8.05f Erosion and Left Side Slope 3.00 ft/ft (H:V) Sediment Control Manual Right Side Slope 300 ft/ft (H:V) Discharge ---- ---- - -- --- 066 -- - - -- ---- --- - - ft3/s - ------ 2 -year Q -- Results Normal Depth 0.46 ft Flow Area 063 ft2 Wetted Perimeter 290 ft Hydraulic Radius 022 ft Top Width 2.75 ft Critical Depth 0.31 ft Critical Slope 0.01534 ft/ft Velocity 105 ft/s Velocity < 2.0 fps (max Velocity Head 0.02 ft allowed for bare soil). Specific Energy 0.48 ft Froude Number 038 No Liner required. Flow Type Subcritical GVF Input Data - - --- --- --- ----- - - Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data - -- -- -- - - - - - - ------ -- --------- - ------ --, Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity fUs Upstream Velocity Infinity ft/s Normal Depth 046 ft Critical Depth 031 ft Channel Slope 0.00200 ft/ft Critical Slope 0.01534 ft/ft Bentley Systems, Inc. Haestad Methods Sol®i"djef9towMaster V81 (SELECTseries 1) [08.11.01.03] 5/31/2017 2:02:22 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 56 Worksheet for D#4 - Project Description - - --- -- - -- Friction Method Manning Formula Solve For Normal Depth Input Data Grass; Manning's N from Roughness Coefficient 0200 figure 8.05c Erosion and Channel Slope 0.00200 ft/ft Sediment Control Manual Left Side Slope 300 ft/ft (H.V) Right Side Slope 300 ft/ft (H:V) 10 -year Q (See Discharge Discharge -- - - - -- -- - --- - --- - 0.72 ft3/s Calcs for Ditches) ,Results Normal Depth 1.07 ft Flow Area 3.41 ft2 Wetted Perimeter 675 ft Hydraulic Radius 0.51 ft Top Width 6.40 ft Critical Depth 032 ft Critical Slope 1.14668 ft/ft Ok, Velocity < 5.0 fps Velocity 0.21 ft/s (max allowed for grass Velocity Head 0.00 ft channels with Specific Energy 107 ft Bermudagrass at 0-5% Froude Number 0.05 slopes per Table 8.05a) Flow Type Subcntical GVF Input Data --- - - -- - --- - - - -- - - -- - Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 'GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 000 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.07 ft Critical Depth 0.32 ft Channel Slope 0.00200 fUft Critical Slope 1.14668 fUft Bentley Systems, Inc. Haestad Methods Solfiil6oil*R1ewMaster V81 (SELECTseries 1) [08.11.01.03] 5/31/2017 2:04:42 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 57 Worksheet for D#4 Bare Soil Project Description _ Friction Method Manning Formula Solve For Normal Depth Input Data Bare Soil Conditions Roughness Coefficient 0.023 Manning's N from figure Channel Slope 0.00200 ft/ft 8.05f Erosion and Left Side Slope 3.00 11 (H:V) Sediment Control Manual Right Side Slope 3.00 ft/ft (H:V) Discharge -- - - 0.56 - - - -- - - - - - - - - - - -- -- ft3/s - 2 -year Q .Results Normal Depth 043 ft Flow Area 056 ftz Wetted Perimeter 273 ft Hydraulic Radius 020 ft Top Width 259 ft Critical Depth 029 ft Critical Slope 001568 ft/ft Velocity 100 ft/s Velocity < 2.0 fps (max Velocity Head 0.02 ft allowed for bare soil). Specific Energy 0.45 ft Froude Number 0.38 No Liner required. Flow Type Subcritical GVF Input Data -- - - - --- - - - Downstream Depth 000 ft Length 000 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 000 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.43 ft Critical Depth 029 ft Channel Slope 000200 ft/ft Critical Slope 001568 ft/ft Bentley Systems, Inc. Haestad Methods SoliloiililijefitewMaster Val (SELECTseries 1) [08.11.01.03] 5/31/2017 2:05:04 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Page 58 20 10 0 Outlet: FES -7 15" OUTLET Project No.: Truck Gate Designed by: iss Checked by: Date: 31 -May -17 3 10 outwel ti' = 00 ' La pipe dlamQter {i -b) La —+d i water - 0.7ap E� 3 5 1e Q = 6.05 cfs V = 6.46 fps Do = 1.25 ft La = 10 ft W = 11.25 ft d50 (chart)= 0.30 ft dmax = 1.00 ft H = 1.00 ft 20 50 100 200 Discharge (Olsec) d (chart) = depth in pipe dm. = 1.5*(d50) Do = Pipe Diameter 15 in W = Do + La H = minimum height of rip rap channel 3.6 in Use Class B RipRap d50= 8 in 12 in 12.00 in LJ U 100I7 Riprap_Protection.xls Page 59 a t, 20 10 0 Outlet: FES -14 15" OUTLET Project No.: Truck Gate Designed by: iss Checked by: Date: 31 -May -17 3 Q COONk = Do I La Alpe cll�rta©tcr {Dql La —+d lwater - 0.5DO o��� ro .. �•, �� �16� 3 5 ID Q = 4.48 cfs V = 6.8 fps Do = 1.25 ft La = 8 ft W = 9.25 ft d5o (chart)= 0.30 ft dmax = 1.00 ft H = 1.00 ft 20 50 100 200 Discharge (01sec) d (chart) = depth in pipe dm. = 1.5*(d5O) Do = Pipe Diameter 15 in W = Do + La H = minimum height of rip rap channel 3.6 in Use Class B RipRap d50= 8 in 12 in 12.00 in LJ 0 10110 Riprap_Protection.xls Page 60 19 -B-d OLKIM spool -Isy-IBmS Ju-IeAInb33SV LLLBKL 00009 3l%tl 57 oma LLL6091 LLLSKI DD009 3W 9717f1HL sussed Pu -6s opland (g)WB*M s-pAl-A l 1-0 -upl1 y eay -PV Ll-Jl J 91-3 .4o5also opmBgnS PIBIH-dglu-w-n-d P"ivv -dellsloft-uy Z'S110f1H1 -w-N w -%-d 0 90 DODSL DOZ L l ON 0 0 0 0 0 0 PnuoPl 0 0 0 0 OOL 9L SdN 00-A1s-4o0-P-IBVS PIM -N 0SE0 00049 D 0 0 VIN 0 0 9 0 f P-ueW 0 0 0 0 SE l 9 SdN -ms P-4-0 —8 OOOI SL 0 0000004 0 L l MN 0 O LS S 9 ES 9 9 B 90900 0 099 0 Sri 0 SdN tlM 00d lndwo0 is ld (Pd) (pd) mla-j mp-1 LAd-0 spa Now No wo NO ,SPI (uo SpAjOvV PWS % g010 (Isd) (U rolgo (U rofgD Ploluo0 opoO I—j -dAj l -u -PW od I,M-1 snPWW g1Bu-gS.Cu .CuspAinb31P-1-po1-0 Degeued LOBLm4S -s-wplyL mLDPFU-wgy(u0 esewpryl 410uMS HI -u -O WBPM engsPW N -r.—b3 Os -9 opwSgns opmBgnS 1 u&so0---wp,gl --w 1-1=1 A o eeeggns pellw[7 pmnpoH u-Pnlnb3 W Ju -N pMnboH w SL .ngeumiO loM-0 h 009L Lnumll-»00 u100 Z1 Bup-dS P—O u 04 Buo-dS luPf G luno0 au -seas E luno0 ala( -1 0(pd)N--M"3 VS P® -Ml "Z(od)N_Wus S l-Lsual P--1 % se EE (uO glp,m,.P..M D 10S 0 (m) )smd to gld-0 N odA.L.IOARuV teed-6Alw-ual Pe -H edAl PPOH tlM - 1 -Dl -1 PIBIH edA.Llu-wooed spe-H adA.L u51 -0 313H0N0371 --N UDI -0 J Design Name. JCK_CONCRETE Design Type Roads Pavement Type Rigid Road Type• Road Terrain Type Flat Analysis Type • K Depth of Frost (in) 0 Wander Width (in) 33.35 % Load Transfer. 0 Effective K (pci) : 241 Reduced Sub Effective K (pci) 0 Joint Spacing 40 ft Dowel Spacing • 12 00 in Dowel Length 16 00 in Dowel Diameter, 75 in Pavement Thickness Report U.S. Army Corps of Engineers PCASE Version 2.09.05 Date : 5/31/2017 Layer Information Flexural Non frost Reduced Limited Layer Type Material Type Frost Code Strength % Analysis Design Subgrade Subgrade Strength (psi) Steel Thickness Strength Penetration (pci) (in) (in) (in) PCC N/A NFS 650 0.081 Compute 6 0 0 0 Base pound Crushed Sh NFS 0 0 Manual 4 0 0 0 Natural Subgrade Cohesive Cut NFS 0 0 Manual 0 0 0 200 Traffic Information Pattern Name : TRUCKS -2 Vehicles Weight (lb) Passes per Life Equivalent Span Passes TRUCK, 5 AXLE 80000 1549777 1549777 TRUCK, 5 AXLE 80000 1549777 PCASE Equivalent Single Axle Loads 6533870 Page 62 Design Nam. KSISPNALT Design Type Roads PavelnealType Flmdble Traffic Area NIA Read Type Read imam Type Flat Analysis Type CBR Depth of Frest (,n) 0 SCI 0 Wander Width (,n) 3335 %Lend Transfer 0 Effect"o K(pa) 0 .._d Sub Efloctive K (pd) 0 Layers Count 3 Seasons Count 1 Joint Spacing 0 Dmvel Spadng , 0 Dowel Length 0 Dowel Diameter 0 Required Non fmsl EqunalenReduced Limited Subbase Dry Fimmrel Mm amara Thltlmoss Design t Subgrede Subgrede B. B Eq—.1. Moisture Wdghl Density Strength TNdmess On)Above Thiclmess Thdmess Strength Penebatl Calculate el Equivalency ncy CBR Modulus Layor Type Metend Type Fmst Code Content Qb/w fl) pb/a1fl) (pal) CrCb %Sled Analysis On) Lays On) (in) On) an(in) this Depth factor Factor Strength (psi) Pr Compu Asphalt Asphalt NFS 0 145 0 0 0 0 a 35 0 35 35 0 0 No 115 23 0 350000 035 Unbound Crushed Comput Bose Stone NFS 5 135 0 0 0 0 4 0 537 1024 0 0 NW 1 2 100 91000 035 Natural Subgrado Conserve Cut 19 100 0 0 0 Mem. 0 Mem D 1024 0 0 0 0 No 1 1 7 1.00 04 PedantPed.Name TRUCKS -2 Ansly.I.Type Mixed Pavement Type Flenble Subgrede Category Cat Traffic Area A—A Traffic Count 1 Vehicles Weight(to) per Life Sermm Passes TRUCK, 5 AXLE 90000 15097771549777 TRUCK, 5 AXLE 80000 1549M ASE EquNdeat Single Axle Londe 6429907 Siry 0 I Pal Design Name. TUCKS ASPHALT Pavement Design Report U.S Army Corps of Engineers PCASE Version 2.09.05 Date 5/31/2017 Design Type • Roads Pavement Type. Flexible Road Type • Road Terrain Type Flat Analysis Type CBR Depth of Frost (in) 0 Wander Width (in) : 3335 Layer information Non frost Reduced Limited Design Subgrade Subgrade CBR Layer Type Material Type Frost Code Analysis Thickness Strength Penetratio Strength (in) (in) n (in) Asphalt Asphalt NFS Compute 3.5 0 0 0 Base Unbound NFS Compute 5.37 0 0 100 Crushed Stone Natural Subgrade Cohesive Cut NFS Manual 0 0 0 7 Traffic Information Pattern Name TRUCKS -2 Vehicles Weight (lb) Passes per Life Equivalen Span t Passes TRUCK, 5 AXLE 80000 1549777 1549777 TRUCK, 5 AXLE 80000 1549777 PCASE Equivalent Single Axle Loads 6428907 Page 64