Loading...
HomeMy WebLinkAbout25-0752 MVPSG Mitigation Framework Response 03.10.20264—.0moh, NNW� UiHGATE Michael J. Mussomeli, PWS Environmental Specialist II Office of Wetlands and Stream Protection Virginia Department of Environmental Quality 1111 East Main Street, Suite 1400 Richmond VA 23219 (804) 659-1986 SENT VIA EMAIL: michael.mussomeli(a,deg.virginia.gov 2200 Energy Drive I Canonsburg, PA 15317 833-MV-SOUTH I mail@mvpsouthgate.com www.mvpsouthgate.com Re: Joint Permit Application No. 25-0752 MVP Southgate Amendment Project Pittsylvania County, Virginia Mitigation Framework Dear Mr. Mussomeli: Thank you for your comments on the Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework. Mountain Valley has reviewed the comments and made the appropriate changes to the Mitigation Framework. Responses to the comments are provided below. Accompanying this response letter are redline pages of the changes indicated as well as a clean updated version of the Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework. 1. VDEQ Comment: The Source for Wetland Attributes in Column A. Baseline Assessment of the Table (Table) on page 1-3 includes the project delineation report. Please provide a copy with the Baseline Assessment as a separate attachment. MVPSG Response: Acknowledged. The delineation reports will be submitted under separate cover. 2. VDEQ Comment: The narrative and Table notes the use of data sheets as source for various metrics (e.g. dominant vegetation, invasive species, hydric soils, etc.). There are a number of small wetland systems throughout the project corridor. Are data forms available for all these wetlands? Please ensure that appropriate documentation for wetland systems that may contain two (2) or more different Cowardin classes (e.g. PFO and PEM). MVPSG Response: Yes, each wetland system has a data form and corresponding upland data form. Additionally, any areas where a smaller portion of the same wetland (and same Cowardin classification) reappears within the LOD with a different wetland ID, the data form for that wetland is associated with the larger main wetland system. For wetlands that have multiple Cowardin classifications, a data form was created for each classification. For example, a single wetland with two Cowardin classifications would have two data forms and at least one upland data form. 3. VDEQ Comment: Column F (Supplemental Credit Determination Methodology) of the Table notes that no additional compensatory mitigation of palustrine scrub -shrub (PSS) or palustrine forested (PFO) wetland impacts are proposed because compensatory mitigation has already been provided for conversion impacts. Please note that DEQ may require that additional compensation could be required if a palustrine emergent (PEM) condition is not achieved post -construction. Michael J. Mussomeli, PWS March 10, 2026 Mitigation Framework Response to Comments MVPSG Response: Mountain Valley acknowledges this and had included stipulations within the Maintenance & Adaptive Management Plan to ensure this situation occurs. As already stated in the Plan: "If Mountain Valley determines that adaptive management has not been and is not likely to be successful in fully restoring an impacted resource, it may propose —subject to approval by the USACE and relevant state agency, VDEQ or NCDEQ—that additional compensatory mitigation credits or in -lieu -fee (ILF) payments be provided. This backstop measure provides assurance that there will be no net loss of aquatic resources." 4. VDEQ Comment: Please update the first paragraph of Section 7.0 to reflect type of impact and mitigation proposed and approved in the VWP Individual Permit. MVPSG Response: Section 7.0 of the Narrative has been updated to reflect the mitigation strategy being implemented in both Virginia and North Carolina. 5. VDEQ Comment: Appendix A (Baseline Assessment Plan) references impacts identified within the JPA. Please include applicable tables as an attachment or exhibit and reference them in the narrative, including Sections 1.1 and 1.2. MVPSG Response: References to Table 2 (Stream Impacts) and Table 3 (Wetland Impacts) have been incorporated into Sections 1 and 2 and provided in Exhibit E. 6. VDEQ Comment: Section 1.1.4, 1.1.5, and 1.1.6 note that dominant vegetation and invasive species cover would utilize existing data forms to determine cover. For larger systems a thirty-foot radius plot may not be sufficient to adequately represent coverage. Please ensure additional photographs are provided that represents the condition of the system. MVPSG Response: A sufficient number of photos will be taken to appropriately document the condition of invasive species cover. Any supplemental photos will be taken during the pre - crossing field meeting. All pre -crossing photos will be used to adequately compare dominant vegetation and invasive species coverage to determine any adaptive management measures that would need deployed during Year-1 monitoring. 7. VDEQ Comment: Please correct reference to visual assessment in Section 2.1.3 (Stream Vegetation). MVPSG Response: Correct reference to Section 2.2.4 has been made. 8. VDEQ Comment: In Appendix F (Supplemental Credit), please correct typographic error in credit required first row of Table 2. MVPSG Response: Typographic error has been corrected. 9. VDEQ Comment: Please advise anticipated mitigation strategy for temporal loss. Page 12 Michael J. Mussomeli, PWS March 10, 2026 Mitigation Framework Response to Comments MVPSG Response: As shown in Tables 3 and 4, temporal loss will be mitigated through the purchase of mitigation bank and ILF credits. These banks are listed within the tables. Upon securing mitigation bank credits, Mountain Valley will provide the Bill of Sale to the DEQ. Mountain Valley looks forward to continuing to work with the DEQ regarding this Project. Please contact Cory Chalmers at cory.chalmers(a),egt.com if you have any questions. Sincerely, Jeffrey J. Klinefelter Mountain Valley Pipeline, LLC. cc (via email): Cory Chalmers, MVP Justin Curtis, AquaLaw PLC Christian King, Burns & McDonnell Engineering Company, Inc. Lori Ferry, Burns & McDonnell Engineering Company, Inc. Steven VanderPloeg, USACE Richard Harmon, USACE Samantha Wooten, NCDEQ Page 13