HomeMy WebLinkAboutMVPSG Mitigation Framework_3.10.2026MVP SOUTHGATE AMENDMENT PROJECT COMPREHENSIVE STREAM AND WETLAND MONITORING, RESTORATION, AND MITIGATION FRAMEWORK MARCH 2O26 Last Updated March 10, 2026 CONTENTS 1.0 Introduction...............................................................................................1-1 2.0 Baseline Assessment Plan........................................................................2-1 3.0 Restoration Work Plan..............................................................................3-1 4.0 Performance Standards............................................................................4-1 5.0 Monitoring Plan.........................................................................................5-1 6.0 Maintenance & Adaptive Management Plan.............................................6-1 6.1 Maintenance............................................................................................... 6-1 6.2 Adaptive Management................................................................................ 6-1 7.0 Supplemental Credit Determination Methodology.....................................7-1 8.0 References................................................................................................8-1 Last Updated March 10, 2026 APPENDICES Appendix A Baseline Assessment Plan Appendix B Restoration Work Plan Appendix C Performance Standards Appendix D Monitoring Plan Appendix E Maintenance & Adaptive Management Plan Appendix F Supplemental Credit Determination Methodology Last Updated March 10, 2026 MVP Southgate Introduction 1.0 Introduction Mountain Valley Pipeline, LLC (Mountain Valley) is seeking an Individual Permit (IP) for the MVP Southgate Amendment Project (the Project) from the United States Army Corps of Engineers (USACE) Norfolk and Wilmington Districts to conduct regulated activities in navigable waters under Section 10 of the Rivers and Harbors Act of 1899 and for the discharge of dredged and fill material into "Waters of the United States" (WOTUS) under Section 404 of the Clean Water Act (CWA). Mountain Valley is also seeking CWA Section 401 Water Quality Certifications from the Virginia Department of Environmental Quality (VDEQ) and the North Carolina Department of Environmental Quality (NCDEQ) for portions of the Project within their respective jurisdictions. Although the application contains extensive stream and wetland monitoring, restoration, and mitigation measures, Mountain Valley is taking the utmost care of aquatic resources by providing additional mitigation requirements to improve the Project's approach to stream and wetland monitoring, restoration, and mitigation. A significant set of additional voluntary measures were developed as a result of that review and further consultation with USACE, VDEQ and NCDEQ. This Comprehensive Stream and Wetland Monitoring, Restoration and Mitigation Framework (Mitigation Framework) does not replace the mitigation that is required for permanent fill but is a voluntary proffered supplement for temporary impacts associated with the Project. The primary purpose of this document is to consolidate the Project's proposed stream and wetland monitoring, restoration, and mitigation measures into a comprehensive framework and to outline a systematic approach to verifying that the impacts to jurisdictional aquatic resources, both wetlands and streams, associated with the construction of the Project are appropriately mitigated. Although this document is focused on long-term restoration, it starts with the understanding that the foundation for successful restoration is laid before restoration activities begin. Accordingly, the Mitigation Framework lays out a methodical approach to preparing for crossings and other activities that involve temporary aquatic impacts, including by gathering baseline information to guide restoration decisions; preparing site -specific construction and restoration workplans for joint review by construction crews, environmental inspectors, other involved parties to facilitate consistent compliance with the expectations; ensuring construction crews and inspectors are well -trained in environmental compliance, in addition to their specific jobs; and documenting comprehensive pre -construction inspections to ensure that the conditions, equipment, and plans are right for successful construction and restoration. Next, the Mitigation Framework assumes the prospects for achieving successful restoration are greatly increased if impacts to a stream or wetland are minimized in the first instance. Furthermore, this document outlines a system of enhanced oversight, monitoring, and documentation during construction, including through the onsite presence of environmental inspectors, to ensure faithful compliance with the workplan and regulatory requirements that are designed to minimize adverse effects to water quality. Moreover, every person involved in the activity, including the inspectors, foreman, and equipment operators, are trained on these requirements and given the duty to immediately stop work if they witness non-compliance or conditions that create a potential for unanticipated impacts to stream or wetland resources. Lastly, Mountain Valley believes that measures that minimize the duration of post -construction effects to streams and wetlands also set restoration on the quickest path to success. Accordingly, consistent adherence to the restoration workplans, as monitored and verified by environmental inspectors, will ensure that stream substrate and wetland soils are correctly restored to pre -construction contours. Doing so minimizes the magnitude and duration of post -construction effects to water quality, such as sedimentation and turbidity, when flow is restored to a resource. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Introduction This Mitigation Framework incorporates the following elements, each of which is attached hereto, to meet these objectives described above: A. Baseline Assessment Plan B. Restoration Work Plan C. Performance Standards D. Monitoring Plan E. Maintenance & Adaptive Management Plan F. Supplemental Credit Determination Methodology The Baseline Assessment Plan (Appendix A) identifies metrics for each stream and wetland. Those metrics are tracked and utilized in the other elements of the Mitigation Framework. For example, the stream survey information collected under the Baseline Assessment Plan is used to restore streams under the Restoration Work Plan (Appendix B). The information is then used to define the restoration success criteria in the Performance Standards (Appendix C) which, in turn, are monitored under the Monitoring Plan (Appendix D). If restoration is not proceeding as intended, the survey information will inform the measures to be taken under the Maintenance & Adaptive Management Plan (Appendix E). Additionally, mitigation for temporal impacts is discussed in the Supplemental Credit Determination Methodology (Appendix F). The relationships between the metrics are summarized in the Mitigation Framework Process Summary table on the following page. The numbering system in the table is consistent through each plan element to show the metrics' relationships through the restoration process. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Introduction MVP Southgate Amendment Project — Baseline Assessment Plan, Restoration Work Plan, Performance Standards, Monitoring Plan, and Maintenance & Adaptive Management Plan Process Summary B. Restoration Work E. Maintenance & Adaptive F. Supplemental Credit Determination A. Baseline Assessment Plan C. Performance Standards D. Monitoring Plan Management Plan Methodology (Temporary Impacts) (Annually for 3 years Metric Source post restoration) Wetlands - Attributes' For all: Varies by location in (a) Check soil fertility, pH, organic fight -of -way (ROW). matter percentage, and density. (b) Correct any issues found in (a) Project Delineation Report Construction procedures to Temporary impacted wetlands will progress Wetland Determination Forms to be and then replant/reseed during and related Preliminary support reestablishment of o a PEM system at maturity. Where required, completed per each monitoring appropriate timeframe. Cowardin Classification Jurisdictional Determination alustrine emergent (PEM) are -root saplings will be planted with a event. Where required, stems per (c) Or if no issues found - then characteristics. equired success rate of 400/acre with a acre to be counted in years 1 and 2, replant/reseed during appropriate Table 3 in IP Application required success rate of 75 /o at year 3. and if not met in year 2, at year 3. timeframe. ere required, hand (d) If not achieved on or before lantings in accordance with year 3, will require agency itigation requirements. coordination (subject to the n VA, approval of the USAGE, VADEQ, he Unified Stream methodology (USM) forms will N e used to calculate temporal impacts at a standard 3% per year. Evaluate wetland area, including Project Delineation Report Existing topographical Restored wetland area shall be greater than or Delineated and survey egrade/reseed if necessary; if not In NC, Wetland Area and related Preliminary surveys and field equal to the original wetland area. located to compare to pre- achieved on or before year 3, will require Temporary wetland impacts associated with pipeline installation: Jurisdictional Determination delineations. crossing area. agency coordination (USACE, VADEQ, PEM wetland vegetation is expected to CDEQ). return within one full growing season. To conservatively ompensate for any lingering temporal loss following restoration of the wetland crossing, an additional two Existing topographical surveys Existing topographical Return as close as practicable to the Delineated and survey located to valuate wetland area; regrade/reseed if ears of compensatory mitigation will be provided (6% Topographical Survey and field delineations surveys and field reconstruction contours to maintain compare to pre- crossing area. necessary. total). delineations. original wetland hydrology. Temporary wetland impacts associated with temporary Restoring upper 12 inches of ill placement: The duration of the assumed construction Vegetation Strata - re -segregated topsoil with Meets one or more of the hydrophytic vegetation Vegetation Strata -Wetland impact will extend from the date of the installation of the Dominant Vegetation Wetland Determination wetland seedbank; seeding if indicators per the 1987 Corps of Engineers Determination Data Forms. See Cowardin Classification section. temporary fill until the date it is removed, plus an Data Forms Wetlands Delineation Manua12. additional two years to remain consistent with the pipeline necessary. temporary impacts. Determine if invasives recolonized from adjacent area or introduced. No additional compensatory mitigation is proposed for Vegetation Strata - Manual removal or erbicide (with Less than 5/o o coverage of invasive species or estoration of palustrine scrub -shrub (PSS) or PFO vegetation because, as discussed in applicable sections, vasive Plant Species Cover Wetland Determination required approval) of consistent with invasive species population Vegetation Strata -Wetland Remove with herbicides, if approved, compensatory mitigation has already been provided for Data Forms invasive plant species. density immediately adjacent to the restored Determination Data Forms. or mechanical/hand weeding. hose conversion impacts. resource. 1 Studies are limited to the Project's limits of disturbance and only reflects current conditions at the time of the study. Results can be affected by weather and other external environmental factors. 2 USACE 1987 Wetland Delineation Manual (Environmental Laboratory, 1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region Version 2.0 (USAGE, 2012) Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Introduction Native (non-invasive) Vegetation Vegetation Strata - Restoring upper 12 inches of re -segregated topsoil with o Plant coverage shall be at least 70 /o unless Vegetation Strata - Wetland Coverage Wetland Determination wetland seedbank• seeding if shrub and/or canopy/crown coverage is at Determination Data Forms. Same applicable sections. ata Forms least 30%. necessary. B. Restoration Work E. Maintenance & Adaptive F. Supplemental Credit Determination A. Baseline Assessment Plan C. Performance Standards D. Monitoring Plan Management Plan Methodology (Temporary Impacts) (Annually for 3 years Metric Source post restoration) ydric Soil Indicators - Presence of positive indicators of hydric soil If positive indicators of hydric soils cannot ydric Soils Wetland Determination Restoring upper 12 inches of formation per the 1987 Corps of Engineers Hydric Soil Indicators - Wetland be identified on or before year 3, subject Data Forms re -segregated topsoil. Wetlands Delineation Manual and regional Determination DataForms. agency coordination (USACE, VADEQ, supplement. CDEQ). Check precipitation data for drought indices. If it is determined that drought conditions are present, additional actions N/A Presence of one primary hydrology are not required. If drought conditions do Wetland Hydrology Re-establishing original indicator or the presence of two of exist, the following measures will be Hydrology Indicators ndicators -Wetland surface hydrology and secondary hydrologic indicators as listed Wetland Hydrology Indicators considered: regrading, redirecting Determination Data Forms contours to maintain on the Wetland Determination Data - Wetland Determination Data Forms. overland flow and/or installing overland flow patterns. Forms. groundwater monitoring wells. If efforts o restore hydrology are not achieved on r before year 3, agency coordination (USACE, VADEQ, NCDEQ) is required. Standard decompaction If standard decompaction practices have Bulk Density N/A practices (disking, plowing, N/A N/A of sufficiently de -compacted the soil, cultivating, tilling, or then bulk density testing may be incorporation of organic matter completed for the topsoil. into the topsoil horizon). Wetlands - Resource Valuation Visual Assessment Documentation Field Photographs N/A Utilized for visual comparison. Repeat field photographs per protocol. Utilize for visual comparison. C WAM —Wetland Assessment Welland Functional N/A Meet the initial rating and function. AM Field Assessment to be completed after each monitoring Develop adaptive management based on N/A Method (NC Only) Assessment Summary. event. ratings and function. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-4 Last Updated March 10, 2026 Mountain Valley MVP Southgate Introduction Baseline Assessment IB. Restoration Work IC. Performance Standards Monitoring Plan Metric Source ((Annually for 3 years post restoration) Attributes3 ream Survey ongitudinal surveys of field conditions, cross-section ream Cross -Section Area analysis, and in -stream icluding pool -to -pool spacing, surveys 3,x pool depth, average riffle >pe, average reach slope, bble count). Vegetation JVisual Assessment; See pplicable sections. ag segregated native Stream Cross -Sectional Area: substrate. • No increase or decrease of>25% of baseline, unless consistent with ng according to pre- upstream and downstream channel cross -sectional and (Perennial only). dinal profiles, cross- s and visual assessments. . Restored to stable configuration (Ephemeral and Intermittent). • Pool -to -Pool Spacing: No increase or decrease of >25% of baseline pool -to - pool range. • Max Pool Depth: No increase or decrease of >50% of baseline (Perennial only); restored to stable configuration (Ephemeral and Intermittent). • Average Reach Slope: No increase or decrease > 10%. • Average Riffle Slope: No increase or decrease >10%. • Pebble Count: Maintain Category. -ding as per FERC, and Monitor for a stable 70% herbaceous vegetative requirements; where cover of the riparian buffer and 75% survival of red, hand planting in site- woody stems (where required). fie locations, with owner approval. Supplement for impaired waters: Monitor for a stable 80% herbaceous vegetative cover of the riparian buffer and 75% survival of woody stems. Less than 5% coverage of invasive species or consistent with invasive species population density immediately adjacent to the restored ,ongitudinal surveys of field ;onditions, cross-section analysis one point), and in -stream surveys. ,ongitudinal and cross-section urveys will be completed for the fii ,ear only unless conditions indicate additional surveys are required. ipplement for Impaired Waters: xarterly monitoring by biologist. modified USEPA RBP Physical iaracterization/Water Quality eld Data Sheet and modified zbitat Assessment Field Data Beet will be completed for each ent. Photographs will be taken sing both upstream and ,wnstream at the following points: �wnstream edge of ROW, center of DW, and upstream edge of ROW. iditionally, photos will be taken 'both the left descending and right scendinR banks. assessment and photo -ment for Impaired Waters: to applicable sections. 3 Studies are limited to the Project's limits of disturbance (LOD) and only reflects current conditions at the time of the study. Results can be affected by weather and other external environmental factors. Maintenance & Adaptive anagement Plan or all: (1) If monitoring indicates that success criteria issues are caused by deficiencies in adjacent ROW - correct issue. (2) If caused by offsite watershed changes (outside of Mountain Valley's control) - propose site - specific stabilization plan to USACE, VADEQ, NCDEQ and implement if approved. (3) Pursue potential Credits/ILF (subject to the approval of the USACE, VADEQ, NCDEQ). (1) Check soil fertility, pH, organic matter percentage, and density. (2) Correct any issues and then reseed and/or replant. (3) If no issues found, replant/reseed. )ordinate with the agencies to termine if the riparian area is trimental to the resource restoration and additional mitigation credits or provriate ILF contributions are . Supplemental Credit Determination (Temporary Impacts) VA, e Unified Stream methodology (USM) forms will be A to calculate temporal impacts at a standard 3% per NC, mporary wetland impacts associated with pipeline >tallation: PEM wetland vegetation is expected to urn within one full growing season. To conservatively mpensate for any lingering temporal loss following Aoration of the wetland crossing, an additional two ars of compensatory mitigation will be provided (6% nporary wetland impacts associated with temporary placement: The duration of the assumed construction )act will extend from the date of the installation of the ►porary fill until the date it is removed, plus an litional two years to remain consistent with the eline temporary impacts. additional compensatory mitigation is proposed for oration of palustrine scrub -shrub (PSS) or PFO etation because, as discussed in applicable section s, ipensatory mitigation has already been provided for se conversion impacts. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-5 Last Updated March 10, 2026 Mountain Valley MVP Southgate Introduction B. Restoration Work E. Maintenance & Adaptive F. Supplemental Credit Determination A. Baseline Assessment C. Performance Standards D. Monitoring Plan Plan Management Plan Methodology (Temporary Impacts) (Annually for 3 years Metric Source post restoration) Streams — Attributes Field water quality Dissolved Oxygen Meet the baseline conditions or the Consult with agencies (USACE, EQ, NCDEQ) to address minimum state water quality standards. differences, if any, as watershed/time of year and precipitation will change many of these measurements. Adaptive management actions may include: Removing instream (a) additional monitoring (to see if Field Assessment using YSI diversions to restore stream rang Specific ecific Conductivity:Within e of 0-1,500 Field Assessment using YSI water the changes are just temporal), Specific conductivity water quality meter or similar flow to channel. µs/cm (typical range of freshwater resources in quality meter or similar. (b) additional plantings (where he ecoregion) required), (c) adding woody debris, N/A implementing stream structural changes, (e) translocating benthic macroinvertebrates with Habitubes (if appropriate), and/or H Meet the baseline conditions or the minimum (f) the purchase of additional credits state water quality standards. or ILF contributions. Field Assessment in accordance Field Assessment using USEPA with Environmental Protection Starting with 1st year post construction, P data collection forms. Rapid Bioassessment Protocol (RBP) Agency (USEPA) Rapid continued or maintained scores during ioassessment Protocol (RBP) Monitoring Period. Supplement for Impaired Waters: data collection forms Restoring segregated native Refer to applicable sections. stream substrate. according to pre - -Restoring crossing cross -sectional and longitudinal profiles, cross - sections, and visual assessments. Field Assessment using USEPA enthic Macroinvertebrates Field Assessment using USEPA Field Assessment using USEPA RBP data P data collection forms. P data collection forms ollection forms. Supplement for Impaired Waters: Refer to applicable sections. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-6 Last Updated March 10, 2026 Mountain Valley MVP Southgate Introduction B. Restoration Work E. Maintenance & Adaptive F. Supplemental Credit Determination A. Baseline Assessment C. Performance Standards D. Monitoring Plan Plan Management Plan Methodology (Temporary Impacts) Annually for 3 years Metric Source �ostrestoration) Streams — Resource Valuation Visual Assessment Field PicturesPhoto-document crossing and Utilized for visual comparison. Repeat Field Pictures per protocol. Utilized for visual comparison. Documentation restoration. Supplement for Impaired Waters: Refer to applicable sections. Restoring segregated native stream substrate. Restoring according to pre- s appropriate, Mountain Valley and USM — VA Unified Stream Methodology Field Assessment to assign a crossing cross -sectional and Relevant elements of USM covered by Relevant elements of USM covered he applicable agencies may use the data summarized in the baseline USM econstruction USM scores used to calculate temporal loss each Conditions Index longitudinal profiles, cross- sections applicable sections. by applicable sections. assessment in the adaptive management mitigation. sections, and visual decision -making process. assessments. eseeding as required. estoring segregated native stream substrate. estoring according to pre- s appropriate, Mountain Valley and the C SAM —Stream Assessment Method Overall Function Class Rating rossing cross -sectional and Relevant elements of SAM covered by applicable Relevant elements of SAM covered by applicable agencies may use the data summarized in the baseline NC SAM Preconstruction NC SAM scores used to calculate temporal Summary longitudinal profiles, cross- sections. applicable sections. assessment in the adaptive management loss mitigation. sections, and visual decision -making process. assessments. Reseeding as required. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 1-0 Last Updated March 10, 2026 Mountain Valley MVP Southgate Baseline Assessment Plan 2.0 Baseline Assessment Plan The Baseline Assessment Plan (Appendix A) was developed to supplement the information presented in the IP application. It relies on a broad suite of assessment and monitoring methods that, in concert with the existing information in the application, will provide a detailed picture of each stream and wetland crossing included in the application. Gathering appropriate baseline data about each proposed stream and wetland impact is valuable for several purposes, including characterizing the resource and the nature of the impact to the resource, developing appropriate mitigation measures, guiding the post -construction restoration of impacts, and assessing whether the resources have been successfully restored. The Baseline Assessment Plan was prepared to ensure that Mountain Valley and the relevant regulatory agencies (USACE, VDEQ, NCDEQ) have adequate site -specific information for each temporary impact to fulfill the goals and objectives of the Mitigation Framework. The pre -crossing information collected pursuant to this Baseline Assessment Plan also may provide additional support for the factual determinations the USACE must make under 40 C.F.R. § 230.11. Data collected under the Baseline Assessment Plan will be provided upon request to the USACE, VDEQ, and NCDEQ under separate cover. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Restoration Work Plan 3.0 Restoration Work Plan The Restoration Work Plan (Appendix B) provides a comprehensive picture of the stream and wetland construction and restoration procedures to be employed on the Project. The Restoration Work Plan serves two purposes. First, it consolidates various existing construction and restoration procedures, as well as enhanced restoration procedures developed for the Mitigation Framework, into one document. Second, it outlines how the elements of the Mitigation Framework will be implemented in the field during the post -construction restoration of temporarily impacted streams and wetlands. The Project is subject to rigorous impact restoration requirements imposed by federal and state agencies acting within their respective jurisdictions, which are consolidated in the Restoration Work Plan. As detailed in the Federal Energy Regulatory Commission (FERC) Final Environmental Impact Statement (FEIS) issued in February 2020, Environmental Assessment issued on October 3, 2025, and Order Amending Certificate issued December 18, 2025. Mountain Valley agreed to adopt the FERC's general construction, restoration, and operational mitigation measures outlined in the FERC Upland Erosion Control, Revegetation and Maintenance Plan and the FERC Wetland and Waterbody Construction and Mitigation Procedures. Project construction activities also must adhere to state requirements for pipeline construction/land disturbing activities. In Virginia, Project construction must comply with Mountain Valley's Standards and Specifications and site -specific Erosion and Sediment Control Plans (ESCPs). In North Carolina, the Project's stormwater discharges are regulated through site -specific ESCPs approved by the NCDEQ. In addition to consolidating the restoration requirements noted above, the Restoration Work Plan documents how the site -specific data gathered through the Baseline Assessment Plan will be used by environmental work crews in the field to restore the impacted resources. It further explains how the post - construction restoration activities will foster attainment of the performance standards prescribed for restored streams and wetlands. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 3-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Performance Standards 4.0 Performance Standards Immediately after construction, temporarily impacted streams and wetlands will be restored, and restored resources will be monitored and maintained based on established performance standards. Performance standards are a defined set of measurable goals for restored streams and wetlands that can be evaluated through post -restoration monitoring. The performance standards utilized here are based on mitigation guidance developed by the respective USACE districts. If a restored resource is not meeting one or more performance standards during the monitoring period, targeted maintenance and/or adaptive management actions will be taken in accordance with the Maintenance & Adaptive Management Plan. Restoration of a stream or wetland will be considered successful when post -restoration monitoring demonstrates that the resource has met relevant performance standards. Performance Standards for assessing the successful restoration of stream and wetland impacts are documented in Appendix C. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 4-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Monitoring Plan 5.0 Monitoring Plan Mountain Valley will conduct post -restoration monitoring of each restored stream and wetland in accordance with the Monitoring Plan in Appendix D. The Monitoring Plan is designed to ensure that all necessary data are collected to evaluate whether restored resources are meeting the defined performance standards. If the performance standards are not being met, data collected under the Monitoring Plan also will be used to determine what Maintenance & Adaptive Management Plan actions should be implemented to achieve a successful restoration. It is anticipated that the monitoring period will last up to three years unless relevant performance standards have been met sooner and the agencies agree that restoration has been achieved. If the relevant performance standards at a particular monitored site have not been met after three years, a plan for corrective actions, which may include continued monitoring, will be submitted to the relevant agencies for approval. To maintain clear communication with the agencies, Mountain Valley will submit annual monitoring reports to the appropriate USACE district and the relevant state agency, VDEQ, or NCDEQ, that address the previous year's monitoring activities. Each annual report will include: • All data collected for each restored stream and wetland site in accordance with the Monitoring Plan; • Any findings that warrant action under the Maintenance & Adaptive Management Plan and, if necessary, a corrective action plan based on those findings; and • Recommended determination of whether each monitored site has achieved the applicable performance standards or if additional monitoring is required. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 5-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Maintenance & Adaptive Management Plan 6.0 Maintenance & Adaptive Management Plan Mountain Valley's Maintenance & Adaptive Management Plan is attached as Appendix E. 6.1 Maintenance Mountain Valley will conduct annual inspections of the restored aquatic resources for the timeframes prescribed in the Monitoring Plan. This includes inspections for the presence of invasive plant species in restored wetlands. Restoration areas will be maintained and repaired as needed during the monitoring period to meet the objectives of this Mitigation Framework as well as other regulatory requirements. During the post -restoration monitoring period, Mountain Valley will conduct maintenance as required for all related erosion and sediment control and stormwater management plans developed for this Project. Additionally, as monitoring indicates, any and all maintenance actions needed shall be implemented promptly, such as invasive -species controls, reseeding/replanting or soil modifications, subject to growing season and as weather conditions allow. 6.2 Adaptive Management Aquatic ecosystems are complex and dynamic entities that will often respond to natural and anthropogenic disturbances in a unique, watershed -specific manner. Adaptive management, which is often referred to as "learning by doing," is a problem -solving environmental management approach for learning through deliberately designing and applying management actions as experiments. Adaptive management is a very useful tool that emphasizes the critical role of ongoing monitoring and evaluation. Adaptive management is a cyclic process where one assesses, designs, implements, monitors, evaluates, and adjusts as projects progress. If an annual monitoring event identifies a stream or wetland that is not meeting the performance standards, Mountain Valley will utilize adaptive management principles to develop a plan for remedial action. The plan will identify the probable cause for why the performance standard has not been met. The proposed plan, including a description of the corrective actions appropriate to probable cause and a timeline to implement them, will be included in the annual monitoring report submitted to the USACE, VDEQ, and NCDEQ for review. If necessary, corrective actions and any associated supplemental monitoring may extend beyond the three-year post -construction monitoring period. If Mountain Valley determines that adaptive management has not been and is not likely to be successful in fully restoring an impacted resource, it may propose — subject to approval by the USACE and relevant state agency, VDEQ or NCDEQ — that additional compensatory mitigation credits or in -lieu -fee (ILF) payments be provided. This backstop measure provides assurance that there will be no net loss of aquatic resources. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 6-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Supplemental Credit Determination Methodology 7.0 Supplemental Credit Determination Methodology Compensatory mitigation is being provided for all permanent impacts. In Virginia, mitigation bank credits in appropriate ratios and implementing the Snow Creek Perm ittee-Responsible Mitigation (PRIM) project will offset permanent stream and wetland conversion impacts. In North Carolina, permanent stream and wetland conversion impacts will be offset with ILF credits through the NCDEQ. Restoration was proposed as a primary form of compensatory mitigation for temporary impacts. In consideration of the comments on the application, Mountain Valley developed the Supplemental Credit Determination Methodology in Appendix F. The Supplemental Credit Determination Methodology outlines a proposal to provide voluntary supplemental compensatory mitigation for each temporary stream and wetland impact. To determine the quantity of supplemental mitigation credit, Mountain Valley identified the expected duration of each temporary impact associated with Project construction — which includes the time from when the impact first occurs until it is restored. Because resources are not likely to meet the Performance Standards immediately after they are restored, Mountain Valley added one year of additional compensatory mitigation to stream impacts and two years to wetland impacts. Building on a methodology developed by the West Virginia Interagency Review Team, Mountain Valley proposes to provide supplemental compensatory mitigation at a rate of 3% per year for projected period of potential impact (i.e., sum of direct impacts during construction and post -construction restoration period). This approach to supplemental compensatory mitigation exceeds the applicable federal and state regulatory requirements and the standard practices in each of the respective USACE districts. Most importantly, this proposal provides additional assurance that the goal of "no net loss" will be achieved — if not result in a net lift in aquatic resources. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 7-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate References 8.0 References Cowardin, L.M., Carter, V., Golet, F.C., and LaRoe, E.T. 1979. Classification of Wetlands and Deepwater Habitats of the United States. Technical Report FWS/OBS-79/31. U.S. Department of the Interior, Fish and Wildlife Service, Office of Biological Services, Washington, D.C. Modified for National Wetlands Inventory Mapping Convention. Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-87-1. United States Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. Environmental Laboratory. 2007. Habitat equivalency analysis: A potential tool for estimating environmental benefits. Wetlands Regulatory Assistance Program ERDC TN-EMRRP-EI-02. United States Army Corps of Engineers, Research and Development Center, Vicksburg, Mississippi. Environmental Laboratory. 2012. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (Version 2.0). Wetlands Regulatory Assistance Program ERDC/EL TR-12-9. United States Army Corps of Engineers, Research and Development Center, Vicksburg, Mississippi. National Oceanic and Atmospheric Administration (NOAA). 1999. Discounting and the treatment of uncertainty in natural resource assessment. NOAA Damage Assessment and Restoration North Carolina Department of Environment and Natural Resources, Division of Water Quality. North Carolina Stream Assessment Method (NCSAM): Draft User Manual. 18 Mar. 2013. Program, NOAA. Washington, DC. Available online at https://casedocuments.darrp.noaa.gov/northeast/athos/pdf/NOAA%201999.pdf USACE and VADEQ, January 2007. Unified Stream Methodology for Use in Virginia. U.S. Army Corps of Engineers, Norfolk District and Virginia Department of Environmental Quality. 37 pp. Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework 8-1 Mountain Valley Last Updated March 10, 2026 APPENDIX A - BASELINE ASSESSMENT PLAN Last Updated March 10, 2026 CONTENTS 1.0 Wetlands...................................................................................................1-1 1.1 Wetlands - Attributes.................................................................................. 1-1 1.1.1 Cowardin Classification................................................................... 1-1 1.1.2 Wetland Area.................................................................................. 1-1 1.1.3 Topographical Survey..................................................................... 1-1 1.1.4 Dominant Vegetation...................................................................... 1-1 1.1.5 Invasive Species Cover.................................................................. 1-1 1.1.6 Native (Non -Invasive) Herbaceous Vegetation Coverage .............. 1-1 1.1.7 Hydric Soils..................................................................................... 1-2 1.1.8 Hydrology Information..................................................................... 1-2 1.1.9 Bulk Density.................................................................................... 1-2 1.2 Wetlands — Resource Evaluation............................................................... 1-2 1.2.1 North Carolina Wetland Assessment Method ................................. 1-2 2.0 Streams.....................................................................................................2-1 2.1 Streams — Attributes................................................................................... 2-1 2.1.1 Stream Survey................................................................................ 2-1 2.1.2 Riffle -Pool Complex Identification................................................... 2-3 2.1.3 Stream Vegetation.......................................................................... 2-5 2.2 Streams — Resource Valuation................................................................... 2-5 2.2.1 Field Water Quality......................................................................... 2-6 2.2.2 Rapid Bioassessment Protocol (RBP)............................................ 2-6 2.2.3 Benthic Macroinvertebrates............................................................ 2-7 2.2.4 Visual Assessment Documentation ................................................ 2-7 2.2.5 Virginia Unified Stream Methodology (Virginia Streams Only)............................................................................................... 2-9 2.2.6 North Carolina Stream Assessment Method (North Carolina Streams Only)................................................................. 2-10 3.0 Quality Assurance/Quality Control(QA/QC)..............................................3-1 4.0 Data Analysis and Reporting Procedures..................................................4-1 5.0 References................................................................................................5-1 Last Updated March 10, 2026 EXHIBITS Exhibit A Checklist for Field Equipment Exhibit B Figures Exhibit C Rapid Bioassessment Protocol and Field Forms Exhibit D Examples of Unified Stream Methodology & Stream Assessment Method Forms Exhibit E Table 2--Stream Impacts Table 3--Wetland Impacts Last Updated March 10, 2026 MVP Southgate Wetlands Every stream and wetland proposed to be temporarily impacted in the IP application has been evaluated in accordance with this Baseline Assessment Plan. 1.0 Wetlands 1.1 Wetlands -Attributes Wetland evaluations have been completed on all planned wetland crossings (Table 3 of the IP Application and provided in Exhibit E). Please note that field evaluations are not necessary to complete the NC Wetland Assessment Method (NC WAM) evaluation for wetland impacts and will only require desktop analysis utilizing the previously prepared and USACE approved aquatic resources delineation data for this project; the NC WAM forms can be generated for wetlands based on existing acreages and wetland type information. 1.1.1 Cowardin Classification All wetlands that are proposed to be temporarily impacted in the application have been classified by their respective Cowardin classifications (Cowardin et al., 1979) using data from the project delineation forms (Attachment I of the IP application) and its related Preliminary Jurisdictional Determination (PJD) issued by the USACE. 1.1.2 Wetland Area The area of all wetlands that are proposed to be temporarily impacted is provided in the IP application (Table 3 is provided in Exhibit E), which will be the source of information for this baseline metric. 1.1.3 Topographical Survey Existing topographical surveys used in the Project's construction plans and lidar data have been utilized as the Baseline Topographical survey for wetlands areas. Additionally, wetland boundaries mapped during delineation efforts have also been used. 1.1.4 Dominant Vegetation Existing Wetland Determination Data Forms from the project delineation report and its related PJD have been referenced to determine existing dominant vegetation in wetlands that are proposed to be temporarily impacted. 1.1.5 Invasive Species Cover Existing Wetland Determination Data Forms from the project delineation report and its related PJD have been referenced to determine the prevalence of invasive species cover in wetlands that are proposed to be temporarily impacted. 1.1.6 Native (Non -Invasive) Herbaceous Vegetation Coverage Existing Wetland Determination Data Forms from the project delineation report and its related PJD have been referenced to determine native (non-invasive) herbaceous vegetation cover in wetlands that are proposed to be temporarily impacted. Appendix A - Baseline Assessment Plan 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetlands 1.1.7 Hydric Soils Existing Wetland Determination Data Forms from the project delineation report and its related PJD have been referenced to determine the presence of hydric soils in wetlands that are proposed to be temporarily impacted. 1.1.8 Hydrology Information Existing Wetland Determination Data Forms from the project delineation report and its related PJD have been referenced to determine hydrology information in wetlands that are proposed to be temporarily impacted. 1.1.9 Bulk Density Bulk density for baseline assessment assumptions is assumed not to exceed root growth restriction ranges and thus will not be measured during the baseline assessment. Bulk density may be measured during restoration if the Lead Environmental Inspector determines it is necessary or as part of the adaptive management strategy. 1.2 Wetlands — Resource Evaluation 1.2.1 North Carolina Wetland Assessment Method The NC WAM was developed by the NCDEQ and the User Manual was prepared by the North Carolina Wetland Functional Assessment Team. The NC WAM will be used for assessing the success of restoration for wetlands in North Carolina and also in Virginia, if necessary. The form evaluates wetlands based on three major functions —hydrology, water quality, and habitat —and uses indicators of condition as a surrogate for directly measuring function. Appendix A - Baseline Assessment Plan 1-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams 2.0 Streams 2.1 Streams —Attributes 2.1.1 Stream Survey Stream surveys were completed to document stream pattern (sinuosity), profile (bed form) and dimension (cross -sections) within the limits of disturbance (LOD) as established by the existing perimeter controls. The surveys were performed using modern survey techniques by several two -person crews consisting of a Burns & McDonnell geomorphologist and a surveyor from the TRC Companies, Inc. The cross section survey was used to identify area at the lowest significant change in bank slope, entrenchment and width - depth ratios and other parameters. The longitudinal profile was used to identify bed features, their maximum depth, bed feature spacing, and bed feature slope. A reach -wide, representative pebble count was also performed to document the sediment substrate composition and the median particle size for the surveyed stream reach. Stream survey data was post processed with RiverMorph and AutoCAD Civil 3D software. Once processed and reviewed, stream morphology parameters were known in order to classify each stream with two methodologies, Rosgen (1996) and Montgomery -Buffington (1997), identify riffle - pool complexes and to establish baseline conditions for each stream that may be impacted. Please note that it was not possible to collect this data at every crossing for safety concerns (e.g., pebble count, long -pro survey at Dan River), when that occurred, best professional judgment was used by the survey crew on how to proceed. The following survey procedures were followed by each crew to perform gemorphic stream surveys. It should be noted that survey methods for longitudinal profiles, cross -sections, and pebble counts are similar to those found in Rosgen's River Stability Field Guide (2008) but have been updated for use with modern survey techniques (TRC data collection). Use of data sheets similar to those found in Rosgen publications is recommended but is not required. Survey procedures: (Office) Collect adequate base mapping for field survey. Identify a distinct starting point for mapping that will be easy to correlate in the field. For streams that crossed the proposed pipeline, this was the intersection point of stream and pipeline. For streams that do not cross the pipeline, the upstream extent of the feature should be identified. Use field equipment and prepare for field mobilization (Exhibit A). 2. (Field) Where practicable, field observations should only be made during normal flow conditions. High flows will remove bed features and produce inaccurate designations. Low flow or non - normal no flow conditions make it difficult to assess transition points and stream types that are found in the lower portions of the continuum. Proceeding under these conditions should be done with extreme care and only by more experienced investigators. Additionally, data should be flagged as being obtained during low flow. The Burns & McDonnell geomorphologist shall classify the stream reach according to the Montgomery and Buffington classification methodology as detailed in Table 1. It is recommended that the classification designation be recorded after all field survey steps have been completed. 3. (Field) The starting point in the field will be identified by the TRC surveyor, as described in Step #1. For streams with crossings, the longitudinal profiled survey should extend 50 linear feet Appendix A - Baseline Assessment Plan 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams upstream and 50 linear feet downstream of the proposed pipe and stream intersection. For streams that do not cross the proposed pipeline, the longitudinal profiled survey should begin at the upstream extend and extend 100 linear feet. Thalweg shots should be collected at a necessary frequency to depict breaks in bed topography. A corresponding water surface shot should also be collected directly above the thalweg shot or along the edge of the channel. Top of bank shots (both banks) should also be collected. Thalweg (deepest part of the channel), water surface and top of bank shots should all be collected in the downstream direction. While surveying the profile, the Burns & McDonnell geomorphologist should identify locations of a representative riffle and pool for Step #4. Longitudinal survey information should be stored in the TRC Surveyor's data collector. Note: The information from the longitudinal profile will be used to develop plan and profile views of the stream facets (riffle, run, pool, glide) as well as potential special aquatic sites, such as riffle - pool complexes. 4. (Field) At least one cross-section should be surveyed for streams that cross the pipeline, one along the pipeline alignment, and in one riffle and one pool. For streams that do not cross the pipeline, one cross -sections should be surveyed at a riffle and a pool. This will allow for stream classification, as needed, and will provide baseline channel dimensions. The method is summarized as follows: Survey the cross-section from left to right, as facing downstream. Start approximately five times the width of the channel (length) from the left top of bank. End the cross section on the right bank in the same manner. Identify floodplain ground shots, top banks, grade breaks in the channel to define major breaks in topography. A water surface and a thalweg shot should be collected as well. Cross-section survey information should be stored in the TRC Surveyor's data collector. 5. (Field) Pebble counts shall be completed for each surveyed stream within the defined 100 linear foot reach. Pebble counts characterize the channel and bed material present through a given study reach. A representative reach -wide pebble count is used to determine stream type, while an active riffle pebble count is used for hydraulic calculations. Because this baseline assessment is not being used for hydraulic calculations, a reach -wide, representative pebble count is being utilized for these surveys. Pebble count instructions are as follows: a. Pace the entire study reach (completed during steps #3 and #4); estimate and record pool lengths and riffle lengths. b. Calculate the percentage of the reach composed of pool and riffle bed features. C. Identify bankfull on both sides of the channel at the first cross-section (transect) location and determine the sampling interval (sample at equal increments across the entire channel). d. Begin the pebble count below bankfull. Do not include particles if the channel width is small (based on best professional judgement), as 20% of the samples (2 out of 10) may skew the particles that makeup the boundary of the channel. Unless conditions dictate otherwise, a 5% bank sample is taken (one sample every other transect). To avoid bias of selecting larger particles, the observer should look away from the channel bed and select the first particle touched by the tip of the index finger at the observers' toe. Appendix A - Baseline Assessment Plan 2-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams e. Measure the length of the particle's B-axis in millimeters. Each crew is supplied with a gravelometer to aid in the identification of the B-axis. Continue until 10 particles from 10 different cross -sections (transects) have been measured in proportion to the bed features of the reach. 6. (Field) Document stream reach conditions in addition to downstream and upstream conditions with photographs. See table (Table 3) for prescribed location and quantity of photographs, dependent upon stream width. 7. (Office) Upon completion of field survey, materials should be copied, and the originals should be placed in the project's main file. Photographs should be uploaded on to the server and identified. Information regarding longitudinal profile and cross -sections will be entered into CADD software and RiverMorph. A report should be developed including mapping that identifies each channel (stream) reach type and information supporting this designation, which may include photographs and measurements taken in the field. 8. (Office) The survey data collected will be summarized into the following metrics for comparison to performance standards in future monitoring events: a. Stream cross -sectional area. The survey data will be used to compute the area of each cross-section from the substrate surface to a plane that coincides with the lowest significant change in bank slope. This plane elevation will be utilized in all future monitoring events for each particular cross-section. b. Pool -to -pool spacing. Will be determined from the longitudinal survey. C. Max. pool depth. Will be determined from the cross -sectional survey. d. Average riffle slope. Will be determined from the longitudinal survey. e. Average reach slope. Will be determined from the longitudinal survey. f. Median particle size (D50). Will be determined by the results of the pebble count showing the D50 or median of the dataset. Please note that Mountain Valley's environmental inspection team will conduct a detailed inspection of every aquatic resource immediately prior to the start of construction. As part of those inspections, data collected from the pre -crossing longitudinal surveys, cross -sections, and photographs will be evaluated to determine if there has been a substantial shift in the streambed morphology at each of the crossings between the date the preliminary survey was conducted and the date of the crossing. Evaluations may include, but are not limited to, the assessment of potential changes to elevations in riffles and to top of riffle locations. In the event a substantial shift in streambed morphology is noted during a pre -construction inspection, the environmental inspection team will delay construction of the crossing until a revised longitudinal profile survey and cross section can be prepared. 2.1.2 Riffle -Pool Complex Identification Diagnostic features of Montgomery -Buffington channel types are shown in Table 1. This classification system is fundamental to identifying riffle -pool complexes. Appendix A - Baseline Assessment Plan 2-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams Table 1— Diagnostic Features of Montgomery -Buffington Channel Types Colluvial Cascade Bedrock Step:pool Plane -bed Pool:riffle Dune:ripple Typical bed Variable Boulder Rock Cobbleboulder Gravelcobble Gravel Sand material Bedform Vertically Laterally Variable Random Irregular Featureless Multilayered pattern oscillatory oscillatory Bedforms Sinuosity, (bars, bedforms Dominant Boundaries Bedforms pools) (dunes, Grains, Grains, roughness Grains banks (bed and (steps, pools), banks ripples, pp elements banks) grains, barks grains, bars) grains, sinuosity, banks banks Fluvial, Fluvial, Dominant Hillslope, hillslope, hillslope, Fluvial, Fluvial, bank Fluvial, sediment debris hillslope, bank Fluvial, sources flows debris debris failure, bank failure debris flows debris flows failure flows flows Lee and Sediment stoss storage Bed sides of Pockets Bedforms Overbank bedfor s bedforms bedforOverbs bedforms elements flow obstruction Typical Confined Confined Confined Confined Variable Unconfined Unconfined confinement Typical pool spacing Unknown <1 Variable 1 to 4 None 5 to 7 5 to 7 (channel widths) In addition to the longitudinal profile, the reach will be visually inspected for potential riffle:pool complexes that are consistent with the Montgomery and Buffington definition of this feature (Exhibit B, Figure 1, Photo D). Specifically, riffle:pool complexes are characterized by sinuous or meandering platforms that contain riffle, pools, and bars (Exhibit B, Figure 2(D) ) (Chartrand and Whiting, 2000). Leopold et al. (1964) defined pool:riffle complexes as undulating beds that have defined sequences of bars, pools, and riffles or predictable sequences of these stream units. Pools are topographical depressions within the channel, while bars are corresponding high points (Exhibit B, Figure 3(D)) (Montgomery and Buffington, 1997). In this channel type (self -formed pool:riffle channels), riffles will be spaced about every five to seven channel widths. The exception to this may be channels that have large amounts of woody debris. These channels have low to moderate gradients (See Exhibit B, Figure 4) and are typically unconfined Appendix A - Baseline Assessment Plan 2-4 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams and have a well -developed floodplain. Chartrand and Whiting (2000) reported a median slope for this channel type of 0.0060 and a range of 0.001 to 0.015, while Montgomery and Buffington (1997) found that streams with slopes less than 0.02 were generally composed of pool:riffle channel units (Exhibit B, Figure 4). The substrate in these types of channels may vary from sand to cobble, but gravel is the dominant substrate type. If noted as potentially present, these locations will be marked with GPS and within the longitudinal survey. Additional evaluations may be completed to determine if a complex is truly present. Photo documentation will also be completed. 2.1.3 Stream Vegetation Existing stream vegetation will be noted during initial field assessments of each proposed temporary impact and will be captured in the visual assessment documentation as further described in Section 2.1.5. 2.2 Streams — Resource Valuation Specific data -collection methodologies are outlined in the following Sections Please note that Mountain Valley has a limited ability to conduct activities outside of the LOD approved by the Federal Energy Regulatory Commission. Accordingly, field -data -collection activities will be limited to the specific LOD width for each crossing and require a modification from the standard reach lengths as outlined in the U.S. Environmental Protection Agency (USEPA) Rapid Bioassessment Protocol (RBP) Manual (100-meter reach for RBP/Benthic Macroinvertebrates) and applicable state guidance. The assessment reach will be limited to the 75-ft LOD or less, depending on the proposed impact type (pipeline crossing, temporary or permanent access road, additional temporary workspace, or anode bed). Depending on the crossing angle, stream meanders, and other factors, the actual length of the stream reach available for survey within the LOD may be more or less than 75 ft. Mountain Valley proposes to conduct preliminary assessment and survey activities of streams that are proposed to be temporarily impacted in the IP application presently pending before the USACE (Table 2, IP Application and provided in Exhibit E). If new or modified temporary impact locations are proposed, or previously proposed temporary impacts are slated to be avoided, the survey locations will be adjusted accordingly. Each proposed temporary stream crossing will be assessed and surveyed for parameters prior to the proposed temporary impact, unless doing so proves impracticable or unsafe. Impracticable conditions that may limit data collection would include a dry stream channel, which prevents the collection of benthic, field water quality, and several of the RBP assessment parameters. Adverse weather conditions and/or hazardous site access or stream access conditions due to existing conditions and/or precipitation could prevent crews from completing required sampling activities. Sampling will only be conducted if travel and site conditions are safe for the field crew(s) collecting the data. Safety assessments will be completed by field crews upon traveling to and arriving on -site. Please note that based on topography along the LOD, some sites along sections of the Project that have not been prepared for construction may require strenuous hikes with equipment that would prove unsafe due to steep hillsides and/or steep stream banks. Field crews are advised to not conduct sampling if access conditions to the crossings or stream crossing conditions are determined to be unsafe. Weather or flow conditions could potentially affect the total number of sampling events required to obtain the recommended data. In the event impracticable or unsafe conditions prevent the collection of any data, the crew will utilize data previously collected by Mountain Valley, if relevant data are available. Any data gaps resulting from impracticable or unsafe conditions will be noted in the final report. Appendix A - Baseline Assessment Plan 2-5 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams 2.2.1 Field Water Quality Water -quality data will be collected concurrently with the biological and physical data. Field water -quality parameters will include dissolved oxygen, specific conductivity, and pH. Field water -quality parameters will be collected both at the upstream edge of the pipeline LOD and the downstream edge of the pipeline LOD. Downstream edge LOD water -quality data will be collected. Stream flow (velocity and depth measurements) will also be documented at each crossing location, unless water flow is absent, is too low to obtain measurements, or presents high -flow (flooding) conditions that would endanger the survey crew or that would provide data indicative of high -flows rather than normal flows. USEPA Environmental Monitoring and Assessment Protocol (EMAP; Lazorchak et al., 1998) methods will be utilized for collecting stream -flow measurements. Prior to the site visit, meters will be calibrated per the manufacturers' specifications and calibration records will be retained. Probes will be inspected for potential wear, and membranes will be replaced, as necessary. Field data will be collected in an area with adequate depth and flow near mid -stream or in the thalweg. The data collected above will be summarized into the following metrics for comparison to performance standards in future monitoring events: 1. Dissolved oxygen 2. Specific conductivity 3. pH 2.2.2 Rapid Bioassessment Protocol (RBP) For consistency between Virginia and North Carolina, Mountain Valley will utilize the widely accepted USEPA RBP data collection forms provided in Exhibit C (Data Forms) for both RBP scoring and benthic macro i nverteb rate sampling. Habitat assessments will be completed as outlined in the USEPA RBP Manual (Barbour et al., 1999), with a modified reach length to be applied based on specific ROW crossing width. The USEPA's RBP stream physical characterization field sheets will be completed for each stream crossing. The results of the visual -based habitat assessment will be used to determine the quality of habitat for the overall aquatic community at each sampling location. Weather conditions prior to and during sample collection will also be noted. Sampling locations will be documented with Trimble GPS units or similar equipment, capable of sub -meter accuracy. Stream measurements and velocity data will be taken at a representative location within the sampling reach to calculate stream -flow data during each sampling event. These methods may also be found in Chapter 5 of the RBP Manual (Barbour, et al., 1999). Field forms are included in Exhibit C. Stream -velocity readings will also be recorded to calculate stream flow during each benthic macroi nve rteb rate sampling event. Please note that, for streams without stream flow, a modified RBP will be completed, and the HGM assessment will need to be completed (Refer to Section 2.1.6). The following categories related to stream flow are not recorded on the RBP form when the stream channel lacks flow: Epifaunal substrate/available cover, 2. Velocity/depth regime, 3. Channel flow status, and 4. Frequency of riffles/or bends. Appendix A - Baseline Assessment Plan 2-6 Last Updated March 10, 2026 Mountain Valley MVP Southgate Streams 2.2.3 Benthic Macroinvertebrates Mountain Valley will utilize methodologies outlined in the USEPA RBP manual, with a modified reach length to be applied based on the constraint of working within the site -specific LOD crossing widths. Single -habitat (kick net) samples will be collected. As per the methodology, samples will be collected using a rectangular dipnet (four -kick composite). Samples will be field sieved, composited, preserved, and returned to a third -party laboratory for processing. Samples will be hand-picked, and organisms will be identified to the family level (when possible) using appropriate taxonomic keys with a target of 200 organisms [200 (+/- 20 %) sub -sample]. Benthic macroinvertebrate samples will be collected and sent to a third -party laboratory for sorting, enumeration, and identification. Crews will collect photos (Refer to Table 3 for Photo Requirements) and complete appropriate field forms and documentation during sampling events. Field data will be entered into Excel workbooks and the data summarized. Summarized data will then be analyzed and presented in a report that discusses the findings of the assessment. Acceptable collection dates in Virginia are from September 1 to November 30 (fall monitoring period) or March 1 to May 31 (spring monitoring period), with a two -week buffer in Virginia between seasons to account for seasonal uncertainties and improve assessment performance provided that there are not excessively high or low flows. Ideal collection dates in North Carolina are from June 1 to September 30. A seasonal correction may be required for samples collected outside of the summer sampling season (i.e. October 1 through May 31). If stream conditions are unsafe or pose a hazard, samples will not be collected. Furthermore, streams should not be sampled after extended dry periods unless the wetted channel width is known. This helps avoid collection of misrepresentative stream condition data due to the lack of colonization in dry streambeds. Please note that if ephemeral and/or intermittent streams are dry and/or there are drought conditions, or if perennial streams are dry during site visits, available data will be collected and notations will be made in site notes documenting the on -site conditions and inability to collect certain data types (water quality and benthics). Samples should also not be collected after a high - flow event (48 hours after a scouring event). 2.2.4 Visual Assessment Documentation Photo documentation of existing conditions will be gathered using the guidance and nomenclature as specified in Table 3 below: Table 3 - Stream Photo Location Requirements Stream Type Photographs Virginia & North Carolina Streams Streams E DS VIEW- Downstream View of impact area inside LOD US VIEW- (Bankfull width <10') F Upstream View of impact area inside LOD ❑ RB CIL - Standing on Right Bank looking down pipe centerline (C/L) C LB CIL - Standing on Left Bank looking down pipe C/L E DS COND - Downstream conditions outside LOD Appendix A - Baseline Assessment Plan 2-7 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams Streams ❑ RB DS VIEW— Downstream View on Right Bank of impact area inside LOD (Bankfull width >10') ❑ LB DS VIEW— Downstream View on Left Bank of impact area inside LOD ❑ RB US VIEW— Upstream View on Right Bank of impact area inside LOD C' LB US VIEW— Upstream View on Left Bank of impact area inside LOD L RB CIL — Standing on Right Bank looking down pipe C/L ❑ LB CIL — Standing on Left Bank looking down pipe C/L ❑ DS COND — Downstream conditions outside LOD Streams L DS VIEW— Downstream View of impact area inside LOD (Within the ❑ US VIEW— Upstream View of impact area inside LOD LOD but not crossing pipe F DS COND — Downstream conditions outside LOD centerline) Access Road ❑ DS VIEW— Downstream View of impact area inside LOD US VIEW — Crossings ❑ Upstream View of impact area inside LOD ❑ CIL ACCESS-1 — Standing in Access Road looking towards impact ❑ CIL ACCESS-2 — Standing in Access Road looking towards impact DS COND — Downstream conditions outside LOD Virginia & North Carolina Streams All Streams US LOD US VIEW — Upstream Edge of LOD Upstream View US LOD DS VIEW — Upstream Edge of LOD Downstream View C LOD US VIEW — Center of LOD Upstream View C LOD DS VIEW — Center of LOD Downstream View DS LOD US VIEW — Downstream Edge of LOD Upstream View DS LOD DS VIEW — Downstream Edge of LOD Downstream View Appendix A - Baseline Assessment Plan 2-8 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams All Streams ❑ If riffle or pool complexes are present, additional photos will be collected illustrating upstream views (from downstream of riffle or pool) and downstream views (from upstream of riffle or pool). Table 4 illustrates the data -collection activities that will be conducted based on stream flow regime. Table 4 - Preliminary Data -Collection Activity Summary per Stream Flow Regime Type Stream -Flow Regime Ephemeral Intermittent Perennial Stream -Flow Stream -Flow Stream -Flow Field Water Quality Dependent Dependent Dependent Ephemeral Stream USM (Virginia Only) Assessment Form Stream Assessment Stream Assessment Form (Form 1) Form (Form 1) (Form 1a) Stream -Flow Stream -Flow Stream -Flow Dependent; Dependent; Modified Dependent; Modified RBP Modified Scoring Scoring Categories if Scoring Categories if No Flow Categories if No No Flow Flow Benthic Stream -Flow Stream -Flow Stream -Flow Macroinvertebrates Dependent Dependent Dependent Stream Assessment NC SAM N/A Stream Assessment Form Form Longitudinal Profiles Pool -to -pool spacing, Surveys and Cross N/A; restore to stable N/A; restore to max pool depth, average riffle slope, Sectionsa configuration stable configuration average reach slope, pebble count aAdditional surveys may be required prior to completing the crossings, in the event evaluations determine there have been substantial shifts in streambed morphology. Please refer to Section 2.1.7. 2.2.5 Virginia Unified Stream Methodology (Virginia Streams Only) VA Unified Stream Methodology (USM)For Virginia streams, the USM (USACE and VADEQ, 2007) will be utilized to assign a Reach Conditions Index (RCI) to each proposed temporary stream impact, to assess the type or severity of the temporary impact, to determine the compensation that would be required if the Appendix A - Baseline Assessment Plan 2-9 Mountain Valley Last Updated March 10, 2026 MVP Southgate Streams impacts were permanent, and to determine what types of and the amount of the various compensation practices that would satisfy the compensation requirement (if the impacts were permanent). Parameters to be assessed in intermittent and perennial streams are channel condition, riparian buffers, instream habitat/available cover, and channel alteration. Riparian buffer is the only parameter to be assessed in ephemeral streams. Condition indices will be determined utilizing the appropriate USM, forms and the RCI will be calculated for each stream crossing (see Exhibit D for examples of USM forms). 2.2.6 North Carolina Stream Assessment Method (North Carolina Streams Only) For temporarily impacted perennial and intermittent streams, the North Carolina Stream Assessment Method (NC SAM) will be used to evaluate the ecological function and condition of intermittent and perennial streams that are proposed to be temporarily impacted (see Exhibit D for examples of SAM forms). The NC SAM rates a stream's hydrology, water quality, and habitat functions. The NC SAM uses 25 specific field metrics to determine the level of function in perennial and intermittent streams. This method can assist in adjusting standard mitigation ratios based on condition of the stream (if impacts were permanent). NC SAM does not evaluate ephemeral streams, as they generally lack the biological, hydrological, and physical features characteristic of intermittent of perennial water conveyance; however, it does document their presence. Appendix A - Baseline Assessment Plan 2-10 Mountain Valley Last Updated March 10, 2026 MVP Southgate Quality Assurance/Quality Control (QA/QC) 3.0 Quality Assurance/Quality Control (QA/QC) Field equipment will be inspected and calibrated at least weekly, prior to field crew deployment per the manufacturers' specifications. A calibration log will be kept for each field water -quality meter utilized. Spare supplies, such as batteries/chargers, calibration fluid, tools, etc., will be carried by each field crew for emergency field repairs of equipment. A field notebook will be maintained to document conditions encountered while samples are collected, including field observations, photographs taken, samples collected, and deviations from the sampling protocol. Appropriate field forms, as mentioned in previous sections, will be completed as required in the field and copied/filed upon return to the office. Benthic sample containers and lids will be labeled in the field with sample location/ID, sample type (i.e., kicknet/D-net), field crew initials, date and time of sample, project number, and sample preservative. Chain -of -custody (COC) forms will be generated and maintained with the benthic samples. The COC forms will contain information including project identification, laboratory name, sampler's initials, method of sample shipment/transfer, sample numbers, date and time of sample collection, sample matrix, sample type (grab or composite), preservative used, analysis requested, turn -around time requested, date and time samples were relinquished, and signatures of the persons relinquishing and receiving samples. Benthic sample sorting, identification, and reporting will be conducted in accordance with the USEPA RBP. A third -party consultant will be contracted to perform the benthic sample sorting and identification. Manual data entry in spreadsheets and/or calculations performed will be subjected to a QA/QC review to ensure proper data transfer. Appendix A - Baseline Assessment Plan 3-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Data Analysis and Reporting Procedures 4.0 Data Analysis and Reporting Procedures The raw data in the form of field data forms, photographs, and laboratory bench sheets for benthic macro i nverteb rate identification will be provided to Mountain Valley by the field staff. Data will also be summarized in Excel spreadsheets for comparison and evaluation and for inclusion in a formal report to be provided to USACE, VDEQ, and NCDEQ. Appendix A - Baseline Assessment Plan 4-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate References 5.0 References Barbour, M.T., J. Gerritsen, and B.D. Snyder and J.B. Stribling (USEPA), 1999. Rapid Bioassessment Protocols for Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates and Fish, Second Edition. EPA 841-B-99-002. U.S. Environmental Protection Agency, Office of Water; Washington, D.C. Chartrand, S.M. and P.J. Whiting. 2000. Alluvial Architecture in Headwater Streams with Special Emphasis on Step -Pool Topography. Earth Surf. Process. Landforms. 25:583-600. Cowardin, L.M., Carter, V., Golet, F.C., and LaRoe, E.T. 1979. Classification of Wetlands and Deepwater Habitats of the United States. Technical Report FWS/OBS-79/31. U.S. Department of the Interior, Fish and Wildlife Service, Office of Biological Services, Washington, D.C. Modified for National Wetlands Inventory Mapping Convention. Gerritsen, J., J. Burton, M.T. Barbour. 2000. A stream condition index for West Virginia wadeable streams. Tetra Tech, Inc., Owning Mills, MD. Lazorchak, J.M., Klemm, D.J., and D.V. Peck (editors). 1998. Environmental Monitoring and Assessment Program -Surface Waters: Field Operations and Methods for Measuring the Ecological Condition of Wadeable Streams. EPA/620/R- 94/004F. U.S. Environmental Protection Agency, Washington, D.0 Leopold, L.B, Wolman, M.G., and J.P. Miller. 1964. Fluvial Processes in Geomorphology. Dover Publishing, Inc. New York. Montgomery, D.R. and J.M. Buffington. 1993. Channel Classification, Prediction of Channel Response, and Assessment of Channel Conditions. Washington State Department of Natural Resources Report TFW-SH 10-93-002. Montgomery, D.R. and J.M. Buffington. 1997. Channel -reach Morphology in Mountain Drainage Basins. Geological Society of America Bulletin. 109(5):596-611. Rosgen, D., H.L. Silvey, and D. Frantila. 2008. River Stability Field Guide. Wildland Hydrology. Summers, E.A., C.V. Noble, J.F. Berkowitz, and F.J. Spilker. 2017 (January). Operational Draft Regional Guidebook for the Functional Assessment of High Gradient Headwater Streams and Low - Gradient Perennial Streams in Appalachia. ERDC/EL TR-17-1. Wetlands Regulatory Assistance Program. U.S. Army Corps of Engineers, Washington, DC. United States Army Corps of Engineers. 2011. Implementation of the hydrogeomorphic approach and the interagency review team release the West Virginia stream and wetland valuation metric (Version 2.0) for application within the U. S. Army Corps of Engineers, Huntington and Pittsburgh Districts. Available at: https://ribits.ops.usace.army.mil/ords/f?p=107:150:2787804554456::NO::P150_DOCUM ENT_ID:64420 USACE and VADEQ, January 2007. Unified Stream Methodology for Use in Virginia. U.S. Army Corps of Engineers, Norfolk District and Virginia Department of Environmental Quality. 37 pp. WVDEP, 2018. Watershed Assessment Branch, 2018 Field Sampling Standard Operating Procedures. Division of Water and Waste Management, Watershed Assessment Branch, Charleston, WV. Appendix A - Baseline Assessment Plan 5-1 Mountain Valley Last Updated March 10, 2026 Exhibit A — Checklist for Field Equipment Last Updated March 10, 2026 EXHIBIT A — FIELD EQUIPMENT LIST Description Survey Instruments: • Laser Level Kit (each includes 2 sensors with brackets or Total Station) • Survey Rods (25 feet in 10t's and 100tns) • Tripods (aluminum) • Auto Levels (If Needed) • Narrow Blade Shovels (4-3/4 x 16) • Buckets with Bottoms • Sieve — 600 Micron • Water Buckets (for wet -sieving) • Long -Handled Sledge Hammers • 1/2 inch x 3 ft. Rebar (for cross -sections) • Sampling Jars • Wooden Stakes (3 feet long) Field Bags: • 300 ft. Measuring Tape (in 10ths & 100tns) • 100 ft. Measuring Tape (in 10ths & 100ths) • Small Sledge Hammer • Pocket Rod (in ft., I Oths & 100ths) • Rod Level • Metal Ruler (12 inch) • Line Level • Sand Gauge • Ballpoint Pens (for imprinting metal tags) • Permanent Markers • Rolls of Flagging Last Updated March 10, 2026 Exhibit B — Figures Last Updated March 10, 2026 EXHIBIT B - FIGURES �-; Fi(,•ure L. kiltivia I channel -reach morphologies: (A) cascade. (B) step pool: (C) plane bed: (D) pool riffle: (E) dune ripple, (F) colluvial (chan- nel in photo is l).5 m i� kle): and (G) forced pool riffle. Last Updated March 10, 2026 HL,ure 1. (C nndnaerl—ctt/Nion nn lariat Pn,•e 1. forming material generally is mobile only during relatively infrequent hydro- logic events (Whittaker, 1987a,19S7b: Grant et al., 19901, although Warbur- ton (1992) showed that step -forming clasts in steep proglacial channels may be mobile annually. Significant movement ofall grain sizes occurs duringex- treme floods, and step -pool morphology is reestablished during the falling limb of the hydrograph (Sawada et al., 1983: Whittaker, 1987b: Warbuton. 19921. luring more frequent discharges, finer material stored in pools travels as bedload over stable bed-fomung Blasts (.ashida et al., 1981, Whittaker, 1987a, 1987b. Ergenzinger and Schmidt, 1990,, Grant et al, 1990: Schmidt and Ergenzinger, 1992). In a series of tracer tests in a step -pool channel. Schmidt and Etgenzinger (1992) found that all ofthe tagged particles placed in pools mobilized during frequent, moderate discharges and were preferen- tially redeposited into pools. Transportofall the pool -filling material indicates that sediment transport ofnon—step4brminggrains is supply Ihnited. Bedload studies in step -pool channels demonstrate complex relations between dis- charge and sediment transport: transport rates are dependent on seasonal and stochastic sedanent inputs, flow magnitude and duration, and antecedent events (Nanson, 1974: Grilfalis, 1980: Ashida et al.. 1981: Sawada et al.. 1983, Whittaker, 1987a, 1987b, Warburton, 1992). Ashida et al (1981). for Last Updated March 10, 2026 0 M Figure L Schematic planform illustration of allusial channel mor- phoiogies at low flow: (A) cascade channel showing nearh continuous. highly turbulent flow around large grains; (B) step -pool channel showing sequential highly turbulent flow over steps and more tranquil flow through intervening pooh, (C) plane -bed channel showing single boulder protruding through otherwise uniform flow; (D) pool -riffle channel showing exposed bars, highly turbulent flow through riffles, and more tranquil flow through pools; and (E) dune -ripple channel showing dune and ripple forms as viewed through the flow. Last Updated March 10, 2026 0 D FlLure 3. Schematic Ionititudinal profiles of allu►ial channel mor- pholopies at low flow: (A) cascade: (B) step pool: (C) plane bed; (D) pool riffle; and (E) dune ripple. Last Updated March 10, 2026 Debris flows Initiation �w Scour — — — Deposition Large woody debris Largely immobile: mobile: traps sediment acts as sediment >.201.30>s>.10l.10>s>.031 .03>s>.Ol I .02>s>.001 I s>.001 Diffusion Debris flow Fluvial dominated I I dominated Source I Transport I Response Figure 4 Process domains of Montgomery and Buffington (1997) arranged along a longitudinal gradient (reproduced from Montgomery and Buffington 1997) Last Updated March 10, 2026 Exhibit C — Rapid Bioassessment Protocol and Field Forms Last Updated March 10, 2026 PHYSICAL CHARACTERIZATION/WATER QUALITY FIELD DATA SHEET (FRONT) STREAM NAME LOCATION STATION # RIVERMILE STREAM CLASS LAT LONG RIVER BASIN STORET# AGENCY INVESTIGATORS FORM COMPLETED BY DATE TIME nM rM REASON FOR SURVEY WEATHER CONDITIONS Now Past 24 hours ❑ storm (heavy rain) ❑ ❑ rain (steady rain) ❑ ❑ showers (intermittent) ❑ %❑ %cloud cover ❑ % ❑ clear/sunny ❑ Has there been a heavy rain in the last 7 days? ❑ Yes ❑ No Air Temperature ° C Other SITE LOCATION/MAP Draw a map of the site and indicate the areas sampled (or attach a photograph) STREAM Stream Subsystem Stream Type CHARACTERIZATION ❑ Perennial ❑ Intermittent ❑ Tidal ❑ Coldwater ❑ Warmwater Stream Origin Catchment Area kmZ ❑ Glacial ❑Spring -fed ❑ Non ❑ Mixture -glacial montane of origins ❑ Swamp and bog ❑ Other Rapid Bioassessment Protocols For Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates, and Fish, Second Edition - Form I A-5 Last Updated March 10, 2026 PHYSICAL CHARACTERIZATION/WATER QUALITY FIELD DATA SHEET (BACK) WATERSHED Predominant Surrounding Landuse Local Watershed NPS Pollution FEATURES ❑ Forest ❑ Commercial ❑ No evidence ❑ Some potential sources ❑ Field/Pasture ❑ Industrial ❑ Obvious sources ❑ Agricultural ❑ Other ❑ Residential Local Watershed Erosion ❑ None ❑ Moderate ❑ Heavy RIPARIAN Indicate the dominant type and record the dominant species present VEGETATION ❑ Trees ❑ Shrubs ❑ Grasses ❑ Herbaceous (18 meter buffer) dominant species present INSTREAM Estimated Reach Length m Canopy Cover FEATURES ❑ Partly open ❑ Partly shaded ❑ Shaded Estimated Stream Width m High Water Mark m Sampling Reach Area m2 Proportion of Reach Represented by Stream Area in km2 (m'x1000) km'` Morphology Types ❑ Riffle /o ❑ Run % Estimated Stream Depth m ❑ Pool Surface Velocity m/sec Channelized ❑ Yes ❑ No (at thalweg) Dam Present ❑Yes ❑ No LARGE WOODY LWD m2 DEBRIS Density of LWD m2/km2 (LWD/ reach area) AQUATIC Indicate the dominant type and record the dominant species present VEGETATION ❑ Rooted emergent ❑ Rooted submergent ❑ Rooted floating ❑ Free floating ❑ Floating Algae ❑ Attached Algae dominant species present Portion of the reach with aquatic vegetation % WATER QUALITY Temperature ° C Water Odors ❑ Normal/None ❑ Sewage Specific Conductance ❑ Petroleum ❑ Chemical ❑ Fishy ❑ Other Dissolved Oxygen Water Surface Oils pH ❑ Slick ❑ Sheen ❑ Globs ❑ Flecks ❑ None ❑ Other Turbidity Turbidity (if not measured) WQ Instrument Used ❑ Clear ❑ Slightly turbid ❑ Turbid ❑ Opaque ❑ Stained ❑ Other SEDIMENT/ Odors Deposits SUBSTRATE ❑ Normal ❑ Sewage ❑ Petroleum ❑Sludge ❑ Sawdust ❑ Paper fiber ❑ Sand ❑ Chemical ❑ Anaerobic ❑ None ❑ Relict shells ❑ Other ❑ Other Looking at stones which are not deeply embedded, Oils are the undersides black in color? ❑ Absent ❑ Slight ❑ Moderate ❑ Profuse ❑ Yes ❑ No INORGANIC SUBSTRATE COMPONENTS (should add up to 100%) ORGANIC SUBSTRATE COMPONENTS (does not necessarily add up to 100%) Substrate Type Diameter % Composition in Sampling Reach Substrate Type Characteristic % Composition in Sampling Area Bedrock Detritus sticks, wood, coarse plant materials (CPOM) Boulder > 256 mm (10") Cobble 64-256 mm (2.5"-10") Muck -Mud black, very fine organic (FPOM) Gravel 2-64 mm (0.1"-2.5") Sand 0.06-2mm (gritty) Marl grey, shell fragments Silt 0.004-0.06 mm Clay < 0.004 min (slick) A-6 Appendix A-1: Habitat Assessment and Physicochemical Characterization Field Data Sheets - Form I Last Updated March 10, 2026 BENTHIC MACROINVERTEBRATE FIELD DATA SHEET STREAM NAME LOCATION STATION # RIVERMILE STREAM CLASS LAT LONG RIVER BASIN STORET# AGENCY INVESTIGATORS LOT NUMBER FORM COMPLETED BY DATE TIME AM PM REASON FOR SURVEY HABITAT TYPES Indicate the percentage of each habitat type present ❑ Cobble % ❑ Snags % ❑ Vegetated Banks % ❑ Submerged Macrophytes % ❑ Other ( ❑ Sand % ) °/0 SAMPLE Gear used ❑ D-frame ❑ kick -net ❑ Other COLLECTION How were the samples collected? ❑ wading ❑ from bank ❑ from boat Indicate the number of jabs/kicks taken in each habitat type. ❑ Cobble ❑ Snags ❑ Vegetated Banks ❑ Sand ❑ Submerged Macrophytes ❑ Other ( ) GENERAL COMMENTS QUALITATIVE LISTING OF AQUATIC BIOTA Indicate estimated abundance: 0 = Absent/Not Observed, 1 = Rare, 2 = Common, 3= Abundant, 4 = Dominant Periphyton 0 1 2 3 4 Slimes 0 1 2 3 4 Filamentous Algae 0 1 2 3 4 Macroinvertebrates 0 1 2 3 4 Macrophytes 0 1 2 3 4 Fish 0 1 2 3 4 FIELD OBSERVATIONS OF MACROBENTHOS Indicate estimated abundance: 0 = Absent/Not Observed, 1 = Rare (1-3 organisms), 2 = Common (3-9 organisms), 3= Abundant (>10 organisms), 4 = Dominant (>50 organisms) Porifera 0 1 2 3 4 Anisoptera 0 1 2 3 4 Chironomidae 0 1 2 3 4 Hydrozoa 0 1 2 3 4 Zygoptera 0 1 2 3 4 Ephemeroptera 0 1 2 3 4 Platyhelminthes 0 1 2 3 4 Hemiptera 0 1 2 3 4 Trichoptera 0 1 2 3 4 Turbellaria 0 1 2 3 4 Coleoptera 0 1 2 3 4 Other 0 1 2 3 4 Hirudinea 0 1 2 3 4 Lepidoptera 0 1 2 3 4 Oligochaeta 0 1 2 3 4 Sialidae 0 1 2 3 4 Isopoda 0 1 2 3 4 Corydalidae 0 1 2 3 4 Amphipoda 0 1 2 3 4 Tipulidae 0 1 2 3 4 Decapoda 0 1 2 3 4 Empididae 0 1 2 3 4 Gastropoda 0 1 2 3 4 Simuliidae 0 1 2 3 4 Bivalvia 0 1 2 3 4 Tabinidae 0 1 2 3 4 Culcidae 0 1 2 3 4 Rapid Bioassessment Protocols For Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates, and Fish, Second Edition - Form I A-25 Last Updated March 10, 2026 HABITAT ASSESSMENT FIELD DATA SHEET —HIGH GRADIENT STREAMS (FRONT) STREAM NAME LOCATION STATION # RIVERMILE STREAM CLASS LAT LONG RIVER BASIN STORET# AGENCY INVESTIGATORS FORM COMPLETED BY DATE TIME AM PM REASON FOR SURVEY Habitat Condition Category Optimal Suboptimal Marginal Poor Parameter Greater than 70% of 40-70% mix of stable 20-40% mix of stable Less than 20% stable 1. Epifaunal substrate favorable for habitat; well -suited for habitat; habitat habitat; lack of habitat is Substrate/ epifaunal colonization and full colonization potential; availability less than obvious; substrate Available Cover fish cover; mix of snags, adequate habitat for desirable; substrate unstable or lacking. submerged logs, undercut maintenance of frequently disturbed or banks, cobble or other populations; presence of removed. stable habitat and at stage additional substrate in the to allow full colonization form of newfall, but not potential (i.e., logs/snags yet prepared for that are not new fall and colonization (may rate at not transient). high end of scale). 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE 5 Gravel, cobble, and Gravel, cobble, and Gravel, cobble, and Gravel, cobble, and 2. Embeddedness boulder particles are 0- boulder particles are 25- boulder particles are 50- boulder particles are more 25% surrounded by fine 50% surrounded by fine 75% surrounded by fine than 75% surrounded by sediment. Layering of sediment. sediment. fine sediment. cobble provides diversity of niche space. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE All four velocity/depth Only 3 of the 4 regimes Only 2 of the 4 habitat Dominated by 1 velocity/ 3. Velocity/Depth regimes present (slow- present (if fast -shallow is regimes present (if fast- depth regime (usually Regime deep, slow -shallow, fast- missing, score lower than shallow or slow -shallow slow -deep). w deep, fast -shallow). if missing other regimes). are missing, score low). L (Slow is < 0.3 m/s, deep is > 0.5 m.) SCORE 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Little or no enlargement Some new increase in bar Moderate deposition of Heavy deposits of fine 4. Sediment of islands or point bars formation, mostly from new gravel, sand or fine material, increased bar Deposition and less than 5% of the gravel, sand or fine sediment on old and new development; more than bottom affected by sediment; 5-30% of the bars; 30-50% of the 50% of the bottom sediment deposition. bottom affected; slight bottom affected; sediment changing frequently; deposition in pools. deposits at obstructions, pools almost absent due to constrictions, and bends; substantial sediment moderate deposition of deposition. pools prevalent. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE Water reaches base of Water fills >75% of the Water fills 25-75% of the Very little water in 5. Channel Flow both lower banks, and available channel; or available channel, and/or channel and mostly Status minimal amount of <25% of channel riffle substrates are mostly present as standing pools. channel substrate is substrate is exposed. exposed. exposed. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE Rapid Bioassessment Protocols For Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates, and Fish, Second Edition - Form 2 A-7 Last Updated March 10, 2026 HABITAT ASSESSMENT FIELD DATA SHEET —HIGH GRADIENT STREAMS (BACK) Habitat 6. Channel Alteration SCORE 7. Frequency of Riffles (or bends) a y 8. Bank Stability (score each bank) 0 Note: determine left or right side by facing downstream. SCORE (LB) a $ SCORE (RB) L S 9. Vegetative Protection (score Po I each bank) SCORE (LB) Channelization or dredging absent or minimal; stream with normal pattern. Some channelization present, usually in areas of bridge abutments; evidence of past channelization, i.e., dredging, (greater than past 20 yr) may be present, but recent channelization is not Channelization may be extensive; embankments or shoring structures present on both banks; and 40 to 80% of stream reach channelized and disrupted. Banks shored with gabion or cement; over 80% of the stream reach channelized and disrupted. Instream habitat greatly altered or removed entirely. 20 19 18 17 16 1 15 14 13 12 11 1 10 9 8 7 6 1 5 4 3 2 1 0 Occurrence of riffles Occurrence of riffles Occasional riffle or bend; Generally all flat water or relatively frequent; ratio infrequent; distance bottom contours provide shallow riffles; poor of distance between riffles between riffles divided by some habitat; distance habitat; distance between divided by width of the the width of the stream is between riffles divided by riffles divided by the stream <7:1 (generally 5 between 7 to 15. the width of the stream is width of the stream is a to 7); variety of habitat is between 15 to 25. ratio of >25. key. In streams where riffles are continuous, placement of boulders or other large, natural obstruction is important. 20 19 18 17 16 15 14 13 12 11 1 10 9 8 7 6 1 5 4 3 2 1 0 Banks stable; evidence of Moderately stable; Moderately unstable; 30- Unstable; many eroded erosion or bank failure infrequent, small areas of 60% of bank in reach has areas; 'raw" areas absent or minimal; little erosion mostly healed areas of erosion; high frequent along straight potential for future over. 5-30% of bank in erosion potential during sections and bends; problems. <5% of bank reach has areas of erosion. floods. obvious bank sloughing; affected. 60-100% of bank has erosional scars. Left Bank 10 9 Right Bank 10 9 More than 90% of the streambank surfaces and immediate riparian zone covered by native vegetation, including trees, understory shrubs, or nonwoody macrophytes; vegetative disruption through grazing or mowing minimal or not evident; almost all plants allowed to grow naturally. Left Bank 10 9 8 7 6 5 4 3 2 1 0 8 7 6 5 4 3 2 1 0 70-90% of the 50-70% of the Less than 50% of the streambank surfaces streambank surfaces streambank surfaces covered by native covered by vegetation; covered by vegetation; vegetation, but one class disruption obvious; disruption of streambank of plants is not well- patches of bare soil or vegetation is very high; represented; disruption closely cropped vegetation vegetation has been evident but not affecting common; less than one- removed to full plant growth potential half of the potential plant 5 centimeters or less in to any great extent; more stubble height remaining. average stubble height. than one-half of the potential plant stubble height remaining. 8 7 6 SCORE _ (RB) Right Bank 10 9 8 7 6 Width of riparian zone Width of riparian zone 10. Riparian >18 meters; human 12-18 meters; human Vegetative Zone activities (i.e., parking activities have impacted Width (score each lots, roadbeds, clear -cuts, zone only minimally. bank riparian zone) lawns, or crops) have not impacted zone. Left Bank 10 9 8 7 6 SCORE (LB) Right Bank 10 9 8 7 6 SCORE (RB) Total Score 5 4 3 5 4 3 Width of riparian zone 6- 12 meters; human activities have impacted zone a great deal. 2 1 0 2 1 0 Width of riparian zone <6 meters: little or no riparian vegetation due to human activities. 5 4 3 2 1 0 5 4 3 2 1 0 A-8 Appendix A-1: Habitat Assessment and Physicochemical Characterization Field Data Sheets - Form 2 Last Updated March 10, 2026 HABITAT ASSESSMENT FIELD DATA SHEET —LOW GRADIENT STREAMS (FRONT) STREAM NAME LOCATION STATION # RIVERMILE STREAM CLASS LAT LONG RIVER BASIN STORET# AGENCY INVESTIGATORS FORM COMPLETED BY DATE TIME AM PM REASON FOR SURVEY Habitat Condition Category Parameter Optimal Suboptimal Marginal Poor Greater than 50% of 30-50% mix of stable 10-30% mix of stable Less than 10% stable 1. Epifaunal substrate favorable for habitat; well -suited for habitat; habitat habitat; lack of habitat is Substrate/ epifaunal colonization and full colonization potential; availability less than obvious; substrate Available Cover fish cover; mix of snags, adequate habitat for desirable; substrate unstable or lacking. submerged logs, undercut maintenance of frequently disturbed or banks, cobble or other populations; presence of removed. stable habitat and at stage additional substrate in the to allow full colonization form of newfall, but not potential (i.e., logs/snags yet prepared for that are not new fall and colonization (may rate at not transient). high end of scale). 4 SCORE 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 L a Mixture of substrate Mixture of soft sand, mud, All mud or clay or sand Hard -pan clay or bedrock; a 2. Pool Substrate materials, with gravel and or clay; mud may be bottom; little or no root no root mat or vegetation. Characterization firm sand prevalent; root dominant; some root mats mat; no submerged 5 mats and submerged and submerged vegetation vegetation. n Q vegetation common. present. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 0 SCORE Even mix of large- Majority of pools large- Shallow pools much more Majority of pools small- 3. Pool Variability shallow, large -deep, deep; very few shallow. prevalent than deep pools. shallow or pools absent. small -shallow, small -deep L pools present 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE Little or no enlargement Some new increase in bar Moderate deposition of Heavy deposits of fine 4. Sediment of islands or point bars formation, mostly from new gravel, sand or fine material, increased bar Deposition and less than <20% of the gravel, sand or fine sediment on old and new development; more than bottom affected by sediment; 20-50% of the bars; 50-80% of the 80% of the bottom sediment deposition. bottom affected; slight bottom affected; sediment changing frequently; pools deposition in pools. deposits at obstructions, almost absent due to constrictions, and bends; substantial sediment moderate deposition of deposition. pools prevalent. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE Water reaches base of Water fills >75% of the Water fills 25-75% of the Very little water in 5. Channel Flow both lower banks, and available channel; or available channel, and/or channel and mostly Status minimal amount of <25% of channel substrate riffle substrates are mostly present as standing pools. channel substrate is is exposed. exposed. exposed. 120 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE Rapid Bioassessment Protocols For Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates, and Fish, Second Edition - Form 3 A-9 Last Updated March 10, 2026 HABITAT ASSESSMENT FIELD DATA SHEET —LOW GRADIENT STREAMS (BACK) Habitat Condition Category Parameter Optimal Subo timal Mar inal Poor 6. Channel Channelization or Some channelization Channelization may be Banks shored with gabion Alteration dredging absent or present, usually in areas of extensive; embankments or cement; over 80% of minimal; stream with bridge abutments; or shoring structures the stream reach normal pattern. evidence of past present on both banks; and channelized and disrupted. channelization, i.e., 40 to 80% of stream reach Instream habitat greatly dredging, (greater than channelized and disrupted. altered or removed past 20 yr) may be entirely. present, but recent channelization is not present. 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 SCORE The bends in the stream The bends in the stream The bends in the stream Channel straight; 7. Channel increase the stream length increase the stream length increase the stream length waterway has been Sinuosity 3 to 4 times longer than if 1 to 2 times longer than if 1 to 2 times longer than if channelized for a long it was in a straight line. it was in a straight line. it was in a straight line. distance. (Note - channel braiding is considered normal in a R coastal plains and other low-lying areas. This a parameter is not easily A rated in these areas.) y SCORE 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 a yBanks stable; evidence of Moderately stable; Moderately unstable; 30- Unstable; many eroded 8. Bank Stability erosion or bank failure infrequent, small areas of 60% of bank in reach has areas; "raw" areas o(score each bank) absent or minimal; little erosion mostly healed areas of erosion; high frequent along straight potential for future over. 5-30% of bank in erosion potential during sections and bends; problems. <5% of bank reach has areas of erosion. floods. obvious bank sloughing; affected. 60-100% of bank has erosional scars. SCORE (LB) Left Bank 10 9 8 7 6 5 4 3 2 1 0 a o SCORE (RB) Right Bank 10 9 8 7 6 5 4 3 2 1 0 y L E' More than 90% of the 70-90% of the streambank 50-70% of the streambank Less than 50% of the 8 9. Vegetative streambank surfaces and surfaces covered by native surfaces covered by streambank surfaces L Protection (score immediate riparian zone vegetation, but one class vegetation; disruption covered by vegetation; a each bank) covered by native of plants is not well- obvious; patches of bare disruption of streambank vegetation, including represented; disruption soil or closely cropped vegetation is very high; Note: determine left trees, understory shrubs, evident but not affecting vegetation common; less vegetation has been or right side by or nonwoody full plant growth potential than one-half of the removed to facing downstream. macrophytes; vegetative to any great extent; more potential plant stubble 5 centimeters or less in disruption through grazing than one-half of the height remaining. average stubble height. or mowing minimal or not potential plant stubble evident; almost all plants height remaining. allowed to grow naturally. Left Bank 10 9 8 7 6 5 4 3 2 1 0 SCORE _ (LB) SCORE _ (RB) Right Bank 10 9 8 7 6 5 4 3 2 1 0 Width of riparian zone Width of riparian zone 12- Width of riparian zone 6- Width of riparian zone <6 10. Riparian >18 meters; human 18 meters; human 12 meters; human meters: little or no Vegetative Zone activities (i.e., parking activities have impacted activities have impacted riparian vegetation due to Width (score each lots, roadbeds, clear -cuts, zone only minimally. zone a great deal. human activities. bank riparian zone) lawns, or crops) have not impacted zone. Left Bank 10 9 8 7 6 5 4 3 2 1 0 SCORE _ (LB) SCORE_ (RB) Right Bank 10 9 8 7 6 5 4 3 2 1 0 Total Score A-10 Appendix A-1: Habitat Assessment and Physicochemical Characterization Field Data Sheets -Form 3 Last Updated March 10, 2026 Exhibit D — Examples of Unified Stream Methodology & Stream Assessment Method Forms Last Updated March 10, 2026 Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or erennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date SAR # Class. length Factor Name(s) of Evaluators) Stream Name and Information 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Dvemidened/incised. vertical/lateral instability. Severe Slightly incised, few areas of active erosion or unprotected banks. Majority Poor. Banks more stable than Severe or Vertical) /lateral) stable. Like) to y y unstable. y incision, Flow contained within the Channel Very little incision or active erosion; 80- of banks are stable (60-80 % ). Poor due to lower bank slopes. widen further. Majority of both banks banks. Streambed below average Condition 100 % stable banks. Vegetative surface Vegetative protection or natural rock Erosion may be present on 40-60 % of are near vertical. Erosion present on 60 rooting depth, majority of banks protection or natural rock, prominent prominent (60-80%) AND/OR both banks. Vegetative protection on 40 g p 80%of banks. Vegetative protection g p vertical/undercut. Vegetative protection (80-100%). AND/OR Stable point Depositional features contribute to 60% of banks. Streambanks may present on 20-40% of banks, and is present on less than 20% of banks, is bars/bankfull benches are present. stability. The bankfull and low flow bevertical or undercut. AND/OR 40- insufficient to prevent erosion. AND/OR not preventing erosion. Obvious bank Access to their original Soodplain or channels are well defined. Stream likely 60% of stream is covered by sediment. 60-80% of the stream is covered by sloughing present. Erosionlraw banks fully developed wide bankfull benches. has access to bankfull benches, or Sediment may be temporary/transient, sediment. Sediment is on 80-100%. AND/OR Aggrading Mid -channel bars, and transverse bars newly developed Soodplains along contribute instability. Deposition that temporary/transient in nature, and channel. Greater than 80% of stream few. Transient sediment deposition portions of the reach. Transient contribute to stability, may be contributing to instability. AND/OR V- bed is covered by deposition, covers less than 10% of bottom. sediment covers 10-40% of the stream forming/present. AND/OR V-shaped shaped channels have vegetative contributing to instability. Multiple bottom. channels have vegetative protection on protection is present on > 40 % of the thread channels and/or subterranean > 40 % of the banks and depositional banks and stable sediment deposition is flow. CI features which contribute to stability. absent. Score 3 2.4 2 1.6 1 NOTES>> 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> Optimal Suboptimal Marginal Poor Low Marginal: High Poor: Lawns, High Suboptimal: Low suboptimal: High Marginal: Non -maintained, dense herbaceous mowed, and maintained areas, Low Poor: Riparian areas with tree stratum (dbh> Riparian areas with tree stratum (dbh> Non -maintained, vegetation, riparian nurseries; no -till Impervious 3 inches) present, 3 inches) present, dense herbaceous areas lacking shrub cropland; actively surfaces, mine Riparian p Tree stratum (dbh > 3 inches) present, with 30%to 60% with>30%tree vegetation with and tree stratum, grazed pasture, spoil lands, with > 60 % tree canopy cover and a tree canopy cover canopy cover and a either a shrub layer hay production, sparsely vegetated denuded surfaces, Buffers non -maintained understory. Wetlands or a tree layer (dbh ponds, open water. non -maintained row crops, active located within the riparian areas. and containing both herbaceous and maintained understory. Recent > 3 inches) If present, tree area, recently feed lots, trails, or shrub layers or a c(dense with <30% stratum (dbh >3 seeded and other comparable non -maintained veger vegetation). capresent, tree canopy cover. inches) present, stabilized, or other conditions. understory. with <30%tree comparable canopy cover with condition. maintained understory. High Low High Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you below. of % Riparian 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Riparian Area> Qo/ 0 Right Bank Score > CI= (Sum % RA * Scores*0.01)/2 %Riparian Area> 0% Rt Bank Cl> 0.00 C1 Left Bank Score> Lt Bank Cl > 0.00 0.00 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; undercut NOTES>> banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Instream Optimal Suboptimal Marginal Poor Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present in present in 30-50% of the reach and are present in 10-30% of the reach and are lacking or are unstable. Habitat Cover greater than 50% of the reach. adequate for maintenance of adequate for maintenance of elements are typically present in less populations. populations. than 10% of the reach. CI Score 1 1.5 1.2 0.9 0.5 Last Updated March 10, 2026 1 of Stream Impact Assessment For Project# Applicant Locality Cowardin Class. HUC 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of charm spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - o o reach o o re is disrupted by any is disrupted by any Less than 20% of 20d0% of the of the channel of the channel Channel the stream reach is stream reach is alterations listed in alterations listed in Alteration Channelization, dredging, alteration, or disrupted by any of disrupted by any of the parameter guidelines. If the parameter guidelines. If hardening absent. Stream has an the channel the channel stream has been stream has been unaltered pattern or has naturalized. alterations listed in alterations listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1.3 1.1 0.9 0.7 REACH CONDITION INDEX and STREAM CONDITION UNI NOTE: The Cl. and RCI should be rounded to 2 decimal places. The CR should be rounded to a whole number. INSERT PHOTOS: DESCRIBE PROPOSED IMPACT: RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) >> 0 CR=RCIXLFXIF Last Updated March 10, 2026 Ephemeral Stream Assessment Form (Form 1 a) Unified Stream Methodology for use in Virginia For use in ephemeral streams Cowardin ImpacUSAR Impact Project # Project Name Locality Class. HUC Date SAR # length Factor 1 Names of Evaluators Stream Name and Information 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Cate lory NOTES>> Optimal Suboptimal Marginal Poor Low Marginal: High Poor: Lawns, High Suboptimal: Low Suboptimal: High Marginal: Nan -maintained, dense herbaceous owed, and maintained areas, Low Poor: Riparian areas with Riparian areas with Nan -maintained, vegetation, riparian rseries: no -till Impervious tripah.nes um (tlbh > has,pariah um (tlbh > dense herbaceous areas lacking shmb cropland; actively surfaces, mine Riparian P Tree stratum (tlbh > 3 inches) present, 3 inches) present, with 30%to 60% 3 inches) present, with>30%tree vegetation with and tree stratum, grazetl pasture, spoil lands, with > 60%t �e canopy cover and an tree canopy cover canopy cover and a e0her ash b lays hay p oduction, sparsely vegetated denuded surfaces, Buffers aintained understo Wetlands on-m ry. and containing both maary, etl o layer ( r a tree la tlbh pan its, open water. m - aintainetl ow crops, active areas. herbaceous and understory. Recent > 3 inches) If present, tree a, recently aseeded feed Ids, trails, or shrub layers a a cutovar (dense present, with <30% stratum (tlbh >3 and other comparable —maintained! aintained vegetation). tree canopy cover. inches) present, stabilized, or other conditions. with <30%tree canopy cover I comparable condition. maintained understory. Er High Low High Low High I Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you below. of % Riparian 3. Enter the % Riparian Area and Scone for each riparian category in the blocks below. Blocks equal 100 Riparian A— 0 Right Bank score> a=(Sum%RA Scores-0.01y2 Le�Bank %Riparian A— 0% Rt Bank Cl> 0.00 CI S..> 7 Lt Bank CI> 0.00 0.00 REACH CONDITION INDEX and STREAM CONDITION UNITS FOR THIS REACH wore: me cis and RCI—.1d he you—ro2 d-n,ai pl--The cR—rld o---d m a whae THE REACH CONDITION INDEX (RCI)>> 0.00 DESCRIBE PROPOSED IMPACT: RCI= (Riparian CI)/2 COMPENSATION REQUIREMENT (CR) >> 0 CR=RCI XLFX IF Last Updated March 10, 2026 Stream Assessment Summary Form (Form 2) Unified Stream Methodology for use in Virginia Project # Applicant Date Evaluators HUC Locality Stream Name Reach ID Length of Impact (Lj (feet) Reach Condition Index (RCI) Impact Factor (IF) Compensation Requirement (CR) (LI x RCI x IF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total L, 0 Total CR 0 Note: Round all feet & CR's to the nearest whole number. Last Updated March 10, 2026 Compensation Crediting Form (Form 3) Unified Stream Methodology for use in Virginia Project # Project Name Locality Cowarclm Class. HUC Date Reach # Reach Length 100 Names of Evaluators Steam Name and Information Project Credits Restoration: Includes Priority 1, 2, and 3 restoration activities. Does not include buffer width. Credit per foot 0 List Reaches that will receive full Restoration: ITotal length of Full Restoration 7 Credits = Stream Length X 1.0 E n ha nceme nt With I nstream Stru ctu res: Addressing Stream bank Stability, Grade Control (Vanes, Weirs, Step -Pools), Constructed Riffles Credit per foot Discuss Length Affected by Instream Structures (justify length): Length Affected by Instream Structures 0.3 0 Credits = Stream Length X 0.3 Enhancement: Addressing Stream bank Stability, Entrenchment Ratios, Access to Flood plain Mitigation Categories Mechanical Bank Work Biological Bank Work Credit Per Length Pick One Per Length May Be Cumulative Per Length Activities Habitat Structures Create Bankfull Bench Lay Back Banks Bio-Remediation Techniques Stream Bank Plantings Credit per foot per bank 0.1 0.15 0.1 0.1 0.09 Right Bank Length 0 Credit> CREDITS Length 0 Rt Bank > 1 0.00 Credit Left Bank Credit> LtBank > 1 0.00 SUMofbanks E(Length X Credit) for all areas (banks done separately) 0 Riparian Areas: Assess the proposed 100 foot buffer on both banks based on the activity proposed. Enter the percentage of area and the credit below. (Widths of buffer above 1 00'will be determined below) Activities Buffer Re- establishment (removal ofinvasives) Buffer Planting -Heavy Buffer Planting -Light Preservation High y, Restoration, Enhancement Preservation Low Quality Buffer area not within preservation width CredRfor(r-100• 0.4 0.38 0.29 0.14 0.07 0 crednfor beyond 100• 0.2 0.19 0.15 0.07 0 Calculation of "Goal" riparian buffer for each side (SAR length times 100') »» 10,000 square feet WITHIN FIRST 100'- Mitigation Categories One vegetative community maintained Subtract 0.03 Ensure the sums of % Riparian Blocks Two vegetative communities maintained Subtract 0.06 equal 100 Area # 1 2 Sq, Footage Right Bank %Area 0% 0 % 0% 0% 0% 0% 0% Credit> Area # Sq, Footage CREDITS Lek Bank %Area 0% 0% 0% 0% 0% 0% 0% Rt Bank > 0.00 Credit Credit> Lt Bank > 0.00 0.00 L(% Area X CrediO for all areas (banks done separately) AVE of credit torbanks X len th of promject 0 Outside First 100' - Mitigation Categories One vegetative community maintained Subtract 0.03 1 Ensure the sums of % Riparian Blocks 100 00% CREDITS Two vegetative communities maintained Subtract 0.06 equal Area # Sq, Footage Right Bank % Area 0% 0 % 0% 0% 0% 0% Credit> Area # Sq, Footage Left Bank % Area 0%_ 0 0 0 1 0 0 0% Rt Bank > 0.00 Credit Credit> Ltlank > 0.00 0.00 0 E(%Area X Credit) for all areas (banks done separately) AVE of credit for banks X length of protect Adjustment Factors: These factors are applied as a multiplier to length of a reach for which they apply Record AF length /credit beneath the AF activity. Provide a narrative explanation of the applicable site conditions that warrant an adjustment and justify the AF credit chosen. Adjustment Factor Categories Activity Rare, Threatened, or Endangered Species or Communities Livestock Exclusion Watershed Preservation Credit 0.1-0.3 0.1-0.3 0.1-0.3 Stream Length Affected Credit> Credits> YLength X Credit) for all areas 0 Credits are cumulative and can apply to more than one reach. Each reach can have more than one Adjustment Factors Total Compensation Credit Provided by Project 0 Last Updated March 10, 2026 Compensation Summary Form (Form 4) Unified Stream Methodology for use in Virginia Project # Applicant Date Evaluators HUC Locality A Comp. Length (L,) Total Compensation Credit Stream Name p°'. (feet) (Total CC) (From Form 3) Totals 01==61 Note: Round all feet & CC's to the nearest whole number. Last Updated March 10, 2026 NC SAM FIELD ASSESSMENT FORM Accompanies Draft User Manual: March 2013 USACE AID #: NCDWQ # INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): 2. Date of evaluation: 3. Applicant/owner name: 4. Assessor name/organization: 5. County: 6. Nearest named water body 7. River basin: on USGS 7.5-minute quad: 8. Site coordinates (decimal degrees, at lower end of assessment reach): STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 10. Length of assessment reach evaluated (feet): 11. Channel depth from bed (in riffle, if present) to top of bank (feet): ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 13. Is assessment reach a swamp stream? ❑Yes ❑No 14. Feature type: ❑Perennial flow ❑Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑Mountains (M) ❑Piedmont (P) ❑Inner Coastal Plain (1) ❑Outer Coastal Plain (0) 16. Estimated geomorphic ` l valley shape (skip for ❑a El Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ❑Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mi) ❑Size 3 (0.5 to < 5 mi2) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ❑Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑l ❑11 ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWQ riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ❑Yes ❑No 1. Channel Water — assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction — assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ❑B Not A 3. Feature Pattern — assessment reach metric ❑A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not A 4. Feature Longitudinal Profile — assessment reach metric ❑A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not A 5. Signs of Active Instability — assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ❑A < 10% of channel unstable ❑B 10 to 25% of channel unstable ❑C > 25% of channel unstable vii Last Updated March 10, 2026 Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ❑B ❑B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ❑C ❑C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ❑B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) ❑1 Other: (explain in "Notes/Sketch" section) ❑J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ❑C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ❑No Is stream too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types — assessment reach metric 10a. ❑Yes ❑No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 11) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses ❑F 5% oysters or other natural hard bottoms W (including liverworts, lichens, and algal mats) � E ❑G Submerged aquatic vegetation ❑B Multiple sticks and/or leaf packs and/or emergent o ❑H Low -tide refugia (pools) vegetation y LC ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) � M ❑J 5% vertical bank along the marsh ❑D 5% undercut banks and/or root mats and/or roots ❑K Little or no habitat in banks extend to the normal wetted perimeter ❑E Little or no habitat 11. Bedform and Substrate —assessment reach metric 11a. ❑Yes ❑No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). (skip for Tidal Marsh Streams) ❑A Riffle -run section ❑B Pool -glide section ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ❑ ❑ ❑ ❑ ❑ Bedrock/saprolite ❑ ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ❑ ❑ ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ❑ ❑ ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ❑ ❑ ❑ Sand (.062 — 2 mm) ❑ ❑ ❑ ❑ ❑ Silt (< 0.062 mm) ❑ ❑ ❑ ❑ ❑ Detritus ❑ ❑ ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) viii Last Updated March 10, 2026 *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 12 Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ❑Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ❑Yes ❑No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ❑ ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles (including water pennies) ❑ ❑Caddisfly larvae (Trichoptera [T]) ❑ ❑Asian clam (Corbicula) ❑ ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans (true flies) ❑ ❑Mayfly larvae (Ephemeroptera [E]) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ❑Other fish ❑ ❑Salamanders/tadpoles ❑ ❑Snails ❑ ❑Stonefly larvae (Plecoptera [P]) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Unaltered or majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ❑N ❑N 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ❑A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction that passes some flow during low -flow periods affecting assessment reach (ex: beaver dam, bottom -release dam) ❑D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) ❑E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>> 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge ❑F None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ❑A Stream shading is appropriate for the stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent ix Last Updated March 10, 2026 19. Buffer Width — assessment area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ❑A ❑A ❑A ❑A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ❑B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ❑A ❑A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If no stressors, check here and skip to Metric 22: ❑No Stressors Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ❑A ❑A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ❑A ❑A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ❑A ❑A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity — assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ❑No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch: Last Updated March 10, 2026 Draft NC SAM Stream Rating Sheet Accompanies Draft User Manual: March 2013 Stream Site Name Stream Category Date of Assessment Assessor Name/Organization Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Function Class Rating Summary USACE/ NCDWQ All Streams Intermittent (1) Hydrology (2) Baseflow (2) Flood Flow (3) Streamside Area Attenuation (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Channel Stability (3) Tidal Marsh Stream Geomorphology (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration (1) Habitat (2) In -stream Habitat (3) Baseflow (3) Substrate (3) Stream Stability (3) In -stream Habitat (2) Streamside Habitat (3) Streamside Habitat (3) Thermoregulation (2) Tidal Marsh In -stream Habitat (3) Flow Restriction (3) Tidal Marsh Stream Stability (4) Tidal Marsh Channel Stability (4) Tidal Marsh Stream Geomorphology (3) Tidal Marsh In -stream Habitat (2) Intertidal Zone Overall A Last Updated March 10, 2026 Exhibit E — Tables 2 & 3, Stream and Wetland Impact Tables Last Updated March 10, 2026 Table 2 -Stream Impacts Individual Permit Application MVP Southgate Amendment Project Stream ID NHD Stream Name a/ County USACE District Latitude b/ Longitude b/ Flow Regime Water Type c/ Stream Designation d/ HUC 8 Impact Type e/ Temporary Impact (linear feet) Permanent Impact (linear feet) Temporary Impact Area (acres) f/ Permanent Impact Area (acres) f/ Temporary Fill (cubicyards)g/ Permanent Fill (cubicyards)h/ Figure S-A001 UNIT To White Oak Creek Pittsylvania Norfolk 36.734897 -79.440223 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 73 0.0156 251 CL-021;AR-023 S-A004 Little Cherrystone Creek Pittsylvania Norfolk 36.822913 -79.347519 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 99 0.0375 604 CL-002 S-A005 LINT to Little Cherrystone Creek Pittsylvania Norfolk 36.828977 -79.344565 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 91 - 0.0180 - 290 - CL-001, AR-003 S-A007 UNTto Cherrystone Creek Pittsylvania Norfolk 36.801823 -79.367316 Intermittent RPW Warmwater Fishery 03010105 Culvert Installation/Replacement - 26 - 0.0036 - 20 AR-012 S-A009 UNTto Cherrystone Creek Pittsylvania Norfolk 36.811606 -79.359388 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 99 - 0.0087 - 141 - CL-004; AR-008, 009 S-A012 UNTto Cherrystone Creek Pittsylvania Norfolk 36.814949 -79.355538 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 90 0.0092 148 CL-003, 004; AR-007 S-A013 UNT to Cherrystone Creek Pittsylvania Norfolk 36.816112 -79.353454 Ephemeral NRPW Warmwater Fishery 03010105 Timber Mat Crossing 24 0.0010 5 CL-003;AR-007 S-A017 UNTto Banister River Pittsylvania Norfolk 36.782808 -79.390591 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 79 0.0105 169 CL-010, 011 S-A018 UNTto Banister River Pittsylvania Norfolk 36.792090 -79.381212 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 79 0.0057 92 CL-008, 009; AR-013 S-A019 UNTto Banister River Pittsylvania Norfolk 36.787971 -79.384411 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 87 0.0156 251 CL-009 S-A021 White Oak Creek Pittsylvania Norfolk 36.773111 -79.399660 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 91 0.0511 825 CL-012, 013 S-A022 White Oak Creek Pittsylvania Norfolk 36.771795 -79.400506 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 77 0.0336 542 CL-013; AR-018 S-A024 UNTTo White Oak Creek Pittsylvania Norfolk 36.741561 -79.434055 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 126 0.0130 210 CL-019 S-A025 UNTTo White Oak Creek Pittsylvania Norfolk 36.746074 -79.429921 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 125 0.0098 157 CL-018, 019 S-A026 UNTTo White Oak Creek Pittsylvania Norfolk 36.753111 -79.423458 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 109 0.0167 270 CL-017 S-A027 UNTTo White Oak Creek Pittsylvania Norfolk 36.753276 -79.423227 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 106 0.0059 95 CL-017; AR-022 S-A028 UNTTo White Oak Creek Pittsylvania Norfolk 36.756964 -79.419623 Ephemeral NRPW Warmwater Fishery 03010105 Pipeline ROW 76 0.0105 169 CL-016 S-A029 UNTTo White Oak Creek Pittsylvania Norfolk 36.734731 -79.440384 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 77 0.0211 340 CL-021 S-A031 UNTTo White Oak Creek Pittsylvania Norfolk 36.729126 -79.445772 Perennial RPW Warmwater Fishery 03010105 Timber Mat Crossing 37 0.0056 27 CL-022 S-A032 UNTTo White Oak Creek Pittsylvania Norfolk 36.720680 -79.454690 Intermittent RPW Warmwater Fishery 03010105 Pipeline ROW 70 0.0049 79 CL-024 S-A033a UNTTo White Oak Creek Pittsylvania Norfolk 36.720526 -79.454921 Perennial RPW Warmwater Fishery 03010105 Pipeline ROW 182 0.0315 508 CL-024 S-A034 UNTTo White Oak Creek Pittsylvania Norfolk 36.719144 -79.457085 Ephemeral NRPW Warmwater Fishery 03010105 Pipeline ROW 106 0.0042 67 CL-024 S-A036 UNTto Sandy Creek Pittsylvania Norfolk 36.707787 -79.466956 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 306 0.0271 437 CL-026, 027; AR-028 S-A037 UNIT toSandy Creek Pittsylvania Norfolk 36.707919 -79.466839 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 25 0.0021 10 CL-026;AR-028 S-A038 UNIT toSandy Creek Pittsylvania Norfolk 36.707051 -79.466859 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW/ATWS 245 0.0130 210 CL-026, 027; AR-028 S-A040 UNIT toSandy Creek Pittsylvania Norfolk 36.704018 -79.470164 Ephemeral NRPW Warmwater Fishery 03010103 Timber Mat Crossing 147 0.0061 29 CL-027 S-A041 UNIT toSandy Creek Pittsylvania Norfolk 36.704062 -79.470350 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 84 0.0050 24 CL-027 S-A042 UNTto Sandy Creek Pittsylvania Norfolk 36.703928 -79.470519 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 153 0.0244 394 CL-027 S-A043 UNTto Sandy Creek Pittsylvania Norfolk 36.701629 -79.473438 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 93 0.0052 84 CL-028 S-A044 UNTto Sandy Creek Pittsylvania Norfolk 36.698524 -79.476499 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 77 0.0163 262 CL-028 S-A045 Sandy Creek Pittsylvania Norfolk 36.688829 -79.486181 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 82 0.0355 573 CL-030 S-A046 UNTto Sandy Creek Pittsylvania Norfolk 36.680562 -79.490125 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 109 0.0180 291 CL-032 S-A047 UNTto Sandy Creek Pittsylvania Norfolk 36.671924 -79.498955 Perennial RPW Warmwater Fishery 03010103 TemporaryAccess Road 25 0.0046 22 AR-031 S-A048 UNTto Sandy Creek Pittsylvania Norfolk 36.668159 -79.506549 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 77 0.0064 103 CL-035 S-A049 UNTto Sandy Creek Pittsylvania Norfolk 36.673416 -79.501654 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 82 0.0146 236 CL-034;AR-032 S-A050 UNTto Silver Creek Pittsylvania Norfolk 36.655379 -79.519215 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 82 0.0039 63 CL-037,038 S-A052 UNTto Silver Creek Pittsylvania Norfolk 36.653753 -79.520409 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 169 0.0152 246 CL-038 S-A053 UNTto Sandy River Pittsylvania Norfolk 36.636725 -79.528878 Intermittent RPW Warmwater Fishery 03010103 TemporaryAccess Road 53 0.0028 13 AR-033 S-A054 UNTto Silver Creek Pittsylvania Norfolk 36.651978 -79.522157 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 90 0.0070 114 CL-038 S-A055 UNTto Silver Creek Pittsylvania Norfolk 36.651865 -79.522220 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 106 0.0042 68 CL-038 S-A057 UNTto Sandy River Pittsylvania Norfolk 36.643891 -79.527377 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 93 - 0.0088 143 - CL-040 S-A065 UNTto Sandy River Pittsylvania Norfolk 36.638495 -79.531549 Ephemeral NRPW Warmwater Fishery 03010103 Culvert Installation/Replacement - 36 - 0.0020 - 6 AR-033, 034 S-A066 UNTTo White Oak Creek Pittsylvania Norfolk 36.76369 -79.412675 Ephemeral NRPW Warmwater Fishery 03010105 Timber Matt Crossing 11 - 0.0006 - 3 - CL-015;AR-020 S-A069 UNTTo White Oak Creek Pittsylvania Norfolk 36.755111 -79.424018 Intermittent RPW Warmwater Fishery 03010105 TemporaryAccess Road 13 0.0008 4 CL-017;AR-022 S-A070 UNTto Silver Creek Pittsylvania Norfolk 36.662088 -79.511259 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 80 0.0060 97 CL-036 S-A071 UNTto Sandy River Pittsylvania Norfolk 36.639740 -79.534245 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 88 0.0239 386 CL-041; AR-034 S-B023 LINT to Dan River Pittsylvania Norfolk 36.568006 -79.611830 Ephemeral NRPW Warmwater Fishery 03010103 Timber Mat Crossing 11 0.0005 2 CL-056 S-B026 LINT toTrotters Creek Pittsylvania Norfolk 36.584710 -79.598879 Intermittent RPW Warmwater Fishery 03010103 TemporaryAccess Road 26 0.0017 8 AR-044 S-B027 LINT toTrotters Creek Pittsylvania Norfolk 36.583901 -79.599466 Intermittent RPW Warmwater Fishery 03010103 TemporaryAccess Road 13 0.0013 6 AR-044 S-B028 LINT toTrotters Creek Pittsylvania Norfolk 36.583129 -79.600290 Ephemeral NRPW WarmwaterFishery 03010103 TemporaryAccess Road 25 0.0032 15 AR-044,045 S-B029 Trotters Creek Pittsylvania Norfolk 36.574685 -79.600110 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 76 0.0264 426 CL-054 S-B032 LINT toTrotters Creek Pittsylvania Norfolk 36.586822 -79.586916 Intermittent RPW WarmwaterFishery 03010103 Pipeline ROW 77 0.0034 55 CL-052 S-B033 LINT toTrotters Creek Pittsylvania Norfolk 36.585572 -79.588112 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 39 0.0034 55 CL-052 S-B038 LINT toTrotters Creek Pittsylvania Norfolk 36.582728 -79.592044 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 2 0.0001 1 CL-053 S-B039 LINT toTrotters Creek Pittsylvania Norfolk 36.580246 -79.594500 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW 84 0.0099 159 CL-053 S-B040 LINT toTrotters Creek Pittsylvania Norfolk 36.587479 -79.586301 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 81 0.0049 24 CL-052 S-B041 UNTto Trayner Branch Pittsylvania Norfolk 36.595875 -79.576954 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 53 0.0017 28 CL-050 S-B042 UNTtoTrayner Branch Pittsylvania Norfolk 36.595831 -79.577069 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 84 0.0049 80 CL-050 S-13044a UNTtoTrayner Branch Pittsylvania Norfolk 36.603259 -79.570412 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 61 0.0055 89 CL-048;AR-042 S-B045 UNT to Trayner Branch Pittsylvania Norfolk 36.605972 -79.568131 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 98 0.0086 138 CL-048;AR-040 S-B046 LINT to Pine Lake Pittsylvania Norfolk 36.613887 -79.562228 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 109 0.0120 194 CL-046 Page 1 of 2 Last Updated March 10, 2026 Table 2 -Stream Impacts Individual Permit Application MVP Southgate Amendment Project Stream ID NHD Stream Name a/ JL ANNEMN County USACE District Latitude b/ Longitude b/ Flow Regime Water Type c/ Stream Designation d/ HUC 8 Impact Type e/ Temporary Impact (linear feet) Permanent Impact (linear feet) Temporary Impact Area (acres) f/ Permanent Impact Area (acres) f/ Temporary Fill (cubicyards)g/ Permanent Fill (cubicyards)h/ Figure S-B051 UNIT to Dan River Pittsylvania Norfolk 36.545968 -79.628350 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 88 0.0113 183 CL-060 S-B052 UNTto Dan River Pittsylvania Norfolk 36.552527 -79.621795 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 83 0.0127 205 CL-059; AR-048 S-B054 UNTto Dan River Pittsylvania Norfolk 36.556374 -79.617919 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 78 0.0094 151 CL-058 S-B055 UNTto Dan River Pittsylvania Norfolk 36.55673 -79.616551 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 13 0.0004 2 CL-058 S-B056 UNTto Dan River Pittsylvania Norfolk 36.561424 -79.613324 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW 96 0.0040 64 CL-057 S-B059 UNTto Pine Lake Pittsylvania Norfolk 36.617481 -79.559870 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW 86 0.0058 94 CL-046 S-B060 UNTto Banister River Pittsylvania Norfolk 36.775387 -79.398532 Ephemeral NRPW Warmwater Fishery 03010105 Pipeline ROW 97 0.0068 109 CL-012 S-B061 UNT to Trotters Creek Pittsylvania Norfolk 36.575092 -79.599593 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW 72 0.0035 57 CL-054 S-13002 UNTto Dan River Rockingham Wilmington 36.493049 -79.678829 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW/TemporaryAccess Road 76 - 0.0102 - 164 - CL-071; AR-063 S-13006 UNT to Dan River Rockingham Wilmington 36.495022 -79.676080 Intermittent RPW Warmwater Fishery 03010103 Culvert Installation/Replacement - 21 - 0.0021 - 9 CL-071;AR-062 S-13007 UNTto Dan River Rockingham Wilmington 36.501472 -79.674974 Intermittent RPW Warmwater Fishery 03010103 Culvert Installation/Replacement - 31 - 0.0017 - 10 AR-061 S-13008 UNTto Dan River Rockingham Wilmington 36.502862 -79.670507 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 90 - 0.0118 - 190 - CL-069; AR-060 S-13009 UNTto Dan River Rockingham Wilmington 36.505393 -79.667501 Ephemeral NRPW Warmwater Fishery 03010103 Pipeline ROW 75 0.0057 92 CL-069 S-B010 UNIT toDan River Rockingham Wilmington 36.507750 -79.665780 Ephemeral NRPW Warmwater Fishery 03010103 Timber Mat Crossing 10 0.0006 3 CL-068;AR-057 S-13011 UNIT to Dan River Rockingham Wilmington 36.511354 -79.662130 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 74 0.0068 110 CL-067, 068 S-B013 UNIT to Dan River Rockingham Wilmington 36.517520 -79.657911 Intermittent RPW Warmwater Fishery 03010103 TemporaryAccess Road 5 0.0007 3 AR-055 S-B015 UNIT to Dan River Rockingham Wilmington 36.516199 -79.656929 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 89 0.0091 147 CL-066, 067; AR-055 S-13015a UNIT to Dan River Rockingham Wilmington 36.516197 -79.656872 Intermittent RPW Warmwater Fishery 03010103 Timber Mat Crossing 15 0.0009 4 CL-066, 067; AR-055 S-B016 UNIT toDan River Rockingham Wilmington 36.515501 -79.657546 Ephemeral NRPW Warmwater Fishery 03010103 Timber Mat Crossing 126 0.0048 23 CL-067;AR-055 S-B017 UNIT to Dan River Rockingham Wilmington 36.513214 -79.660053 Intermittent RPW Warmwater Fishery 03010103 Pipeline ROW 81 0.0044 71 CL-067; AR-055 S-F005 UNTto Cascade Creek Rockingham Wilmington 36.534513 -79.638991 Perennial RPW Warmwater Fishery 03010103 Pipeline ROW 79 0.0054 88 CL-063; AR-049 a/ For identified streams without an NHD (National Hydrography Dataset) name, the identified stream was given the name "Unidentified Tributary (UNT)" of the first named receiving waterbody. b/ Shown in decimal degrees. c/ RPW = Relatively Permanent Waters; NRPW = Non -Relatively Permanent Waters d/ Streams designated as warmwater fisheries in Virginia have time of year restrictions from April 15 through July 15. See Section 1.8.4 and Section 4.2.9 for more information. e/ Pipeline right-of-way (ROW) is based on streams that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on streams that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. f/ Temporary and permanent impacts include the area of streams that are within the limits of disturbance. g/ Temporary fill discharge into Waters of the U.S. (WOTUS); cubic yards rounded to the nearest whole number. Temporary fill volume includes a 10-foot depth of fill for streams crossed by the pipeline and a 3-foot depth of fill for streams not crossed by the pipeline. b/ Permanent fill discharge into WOTUS; cubic yards rounded to the nearest whole number. Permanent fill volume includes a depth of fill equal to the culvert diameter plus 0.5 foot. Page 2 of 2 Last Updated March 10, 2026 Table 3 - Wetland Impacts Individual Permit Application MVP Southgate Amendment Project WettandID County USACE District Latitude a/ IML Longitude a/ Cowardin Classb/ HUC-8 Impact Typec/ Temporary Impacts (acres)d/ Permanent Conversion Impacts (acres)e/ Permanent Fill Impacts (acres) Temporary Fill (cubic yards) f/ Permanent Fill (cubic yards) g/ Figure JAL W-A001 Pittsylvania Norfolk 36.820876 -79.349624 PEM 03010105 Timber Mat Travel Lane 0.0629 - - 305 - CL-002 W-A003a Pittsylvania Norfolk 36.823293 -79.347035 PFO 03010105 Pipeline ROW - 0.3771 - 6,084 - CL-002 W-A003b Pittsylvania Norfolk 36.823326 -79.347151 PEM 03010105 Pipeline ROW 0.0958 - - 1,546 - CL-002 W-A004 Pittsylvania Norfolk 36.827490 -79.344446 PFO 03010105 Pipeline ROW - 0.0392 - 632 - CL-OOI;AR-003 W-A005 Pittsylvania Norfolk 36.826061 -79.338719 PEM 03010105 Temporary Access Road 0.0252 - - 122 - AR-004, 006 W-A006 Pittsylvania Norfolk 36.825273 -79.344682 PFO 03010105 Timbe Mat Travel Lane/Maintenance Corridor/ Secondary Impact - 0.1043 - 205 - CL-OOI;AR-004 W-A007 Pittsylvania Norfolk 36.801930 -79.368135 PEM 03010105 Temporary Access Road 0.0658 - - 319 - CL-006;AR-012 W-A008 Pittsylvania Norfolk 36.801941 -79.368419 PEM 03010105 Temporary Access Road 0.0068 - - 33 - CL-OO6;AR-012 W-A009 Pittsylvania Norfolk 36.803103 -79.369149 PEM 03010105 Pipeline ROW 0.0364 - - 587 - CL-006;AR-012 W-AO10a Pittsylvania Norfolk 36.804950 -79.367094 PEM 03010105 Pipeline ROW 2.2928 - - 36,991 - CL-005, 006 W-A010b Pittsylvania Norfolk 36.806753 -79.364964 PFO 03010105 Pipeline ROW - 1.1924 - 19,238 - CL-005, 006 W-AO10c Pittsylvania Norfolk 36.805165 -79.366691 PSS 03010105 Pipeline ROW - 0.0362 - 585 - CL-006 W-A011 Pittsylvania Norfolk 36.808642 -79.362942 PEM 03010105 Timber Mat Travel Lane 0.0173 - - 84 - CL-OO5;AR-009 W-AO13a Pittsylvania Norfolk 36.810309 -79.360973 PEM 03010105 Pipeline ROW/ Temporary Access Road 1.0186 - - 4,930 - CL-04, 05; AR-009 W-A013b Pittsylvania Norfolk 36.810865 -79.360273 PSS 03010105 Pipeline ROW - 0.5312 - 8,569 - CL-04, 05; AR-009 W-A013c Pittsylvania Norfolk 36.811511 -79.359471 PFO 03010105 Pipeline ROW - 0.0718 - 1,158 - CL-04; AR-008, 009 W-A013d Pittsylvania Norfolk 36.810765 -79.360280 PFO 03010105 Pipeline ROW - 0.2150 - 3,469 - CL-04, 05; AR-009 W-A014a Pittsylvania Norfolk 36.816246 -79.354021 PFO 03010105 Pipeline ROW - 0.0087 - 140 - CL-03; AR-007 W-A017 Pittsylvania Norfolk 36.736489 -79.438789 PEM 03010105 Pipeline ROW 0.1795 - - 52 - CL-020, 021; AR-023 W-A019 Pittsylvania Norfolk 36.788037 -79.384399 PFO 03010105 Pipeline ROW - 0.0686 - 31 - CL-09 W-A020 Pittsylvania Norfolk 36.773189 -79.399640 PFO 03010105 Pipeline ROW - 0.0429 - 70 - CL-012, 013 W-A021 Pittsylvania Norfolk 36.772842 -79.399682 PFO 03010105 Pipeline ROW - 0.0613 - 47 - CL-012, 013 W-A022 Pittsylvania Norfolk 36.771512 -79.401621 PFO 03010105 Pipeline ROW/ATWS - 0.9950 - 4,816 - CL-013;AR-018 W-A023 Pittsylvania Norfolk 36.771852 -79.400313 PFO 03010105 Pipeline ROW - 0.1266 - 2,043 - CL-013;AR-018 W-A024 Pittsylvania Norfolk 36.766498 -79.400132 PSS 03010105 Temporary Access Road - 0.0540 - 262 - AR-016, 017 W-A025a Pittsylvania Norfolk 36.741628 -79.434083 PEM 03010105 Timber Mat Crossing 0.0108 - - 52 - CL-019 W-A025b Pittsylvania Norfolk 36.741515 -79.434065 PFO 3010105 Pipeline ROW - 0.0116 - 187 - CL-019 W-A026 Pittsylvania Norfolk 36.746177 -79.429973 PEM 03010105 Timber Mat Crossing 0.0063 - - 31 - CL-018, 019 W-A027 Pittsylvania Norfolk 36.753467 -79.423204 PEM 03010105 Timber Mat Crossing 0.0144 - - 70 - CL-017;AR-022 W-A028 Pittsylvania Norfolk 36.734611 -79.440496 PFO 03010105 Pipeline ROW - 0.0997 - 1,608 - CL-021;AR-023 W-A029a Pittsylvania Norfolk 36.735055 -79.440182 PEM 03010105 Pipeline ROW 0.0750 - - 1,210 - CL-021 W-A029b Pittsylvania Norfolk 36.734941 -79.440171 PFO 03010105 Pipeline ROW - 0.1693 - 2,731 - CL-021;AR-023 W-A030a Pittsylvania Norfolk 36.728941 -79.445945 PEM 03010105 Pipeline ROW 0.0953 - - 1,538 - CL-022 W-A030b Pittsylvania Norfolk 36.729069 -79.445688 PSS 03010105 Pipeline ROW - 0.0708 - 1,143 - CL-022 W-A031 Pittsylvania Norfolk 36.720653 -79.454680 PFO 03010105 Pipeline ROW - 0.2044 - 3,298 - CL-024;AR-026 W-A032 Pittsylvania Norfolk 36.757595 -79.419057 PEM 03010105 Timber Mat Crossing 0.0098 - - 47 - CL-016 W-A033 Pittsylvania Norfolk 36.720309 -79.455317 PFO 03010105 Pipeline ROW - 0.0831 - 1,341 - CL-024 W-A034 Pittsylvania Norfolk 36.719099 -79.457215 PFO 03010105 Pipeline ROW - 0.0253 - 409 - CL-024 W-A035 Pittsylvania Norfolk 36.719138 -79.457066 PSS 03010105 Pipeline ROW - 0.0044 - 71 - CL-024 W-A036 Pittsylvania Norfolk 36.707843 -79.466854 PSS 03010103 Timber Mat Crossing - 0.0278 - 134 - CL-026;AR-028 W-A037 Pittsylvania Norfolk 36.703959 -79.470234 PEM 03010103 Timber Mat Crossing 0.0033 - - 16 - CL-027 W-A038 Pittsylvania Norfolk 36.704175 -79.470157 PSS 03010103 Timber Mat Crossing - 0.0233 - 113 - CL-028 W-A039 Pittsylvania Norfolk 36.701610 -79.473394 PFO 03010103 Pipeline ROW - 0.0554 - 893 - CL-028 W-A040 Pittsylvania Norfolk 36.701714 -79.473466 PEM 03010103 Timber Mat Crossing 0.0159 - - 77 - CL-028 W-A041 Pittsylvania Norfolk 36.688824 -79.486112 PFO 03010103 Pipeline ROW - 0.0152 - 245 - CL-030 W-A042 Pittsylvania Norfolk 36.688884 -79.486260 PEM 03010103 Timber Mat Crossing 0.0008 - - 4 - CL-030 W-A043 Pittsylvania Norfolk 36.688825 -79.486238 PEM 03010103 Timber Mat Crossing 0.0013 - - 6 - CL-030 W-A044 Pittsylvania Norfolk 36.680665 -79.490026 PFO 03010103 Pipeline ROW - 0.1340 - 2,161 - CL-032 W-A045 Pittsylvania Norfolk 36.680303 -79.490273 PFO 03010103 Pipeline ROW 0.0840 - 1,355 - CL-032 Page 1 of 4 Last Updated March 10, 2026 Table 3 - Wetland Impacts Individual Permit Application MVP Southgate Amendment Project Wetland ID County USACE District Latitude a/ Longitude a/ Cowardin Classb/ HUC-8 Impact Type c/ Temporary Impacts (a d/ Permanent Conversion Impacts (acres)e/ Permanent Fill Impacts (acres) Temporary Fill (cubicyards)f/ Permanent Fill (cubicyards)g/ Figure W-A046 Pittsyivania Norfolk 36.671944 -79.498935 PEM 03010103 Temporary Access Road 0.0009 - - 5 - AR-031 W-A047 Pittsyivania Norfolk 36.671862 -79.498897 PEM 03010103 Temporary Access Road 0.0061 - - 30 - AR-031 W-A048 Pittsylvania Norfolk 36.668160 -79.506540 PEM 03010103 Pipeline ROW 0.0088 - - 142 - CL-035 W-A049a Pittsylvania Norfolk 36.673612 -79.501453 PFO 03010103 Pipeline ROW - 0.1117 - 1,802 - CL-034;AR-032 W-A049b Pittsylvania Norfolk 36.673619 -79.501599 PEM 03010103 Timber Mat Crossing 0.0181 - - 87 - CL-034;AR-032 W-A050 Pittsylvania Norfolk 36.803187 -79.368939 PEM 03010105 Timber Mat Crossing 0.0125 - - 61 - CL-06 W-A051 Pittsylvania Norfolk 36.651860 -79.522198 PEM 03010103 Pipeline ROW 0.0324 - - 523 - CL-038 W-A053 Pittsylvania Norfolk 36.803307 -79.368781 PEM 03010105 Timber Mat Crossing 0.0012 - - 6 - CL-06 W-A054 Pittsylvania Norfolk 36.644078 -79.527393 PEM 03010103 Pipeline ROW 0.0989 - - 1,596 - CL-039, 40 W-A063 Pittsylvania Norfolk 36.627974 -79.548082 PEM 03010103 Timber Mat Crossing 0.0007 - - 3 - CL-043;AR-038 W-A068 Pittsylvania Norfolk 36.768123 -79.408282 PEM 03010105 Pipeline ROW 0.0182 - - 293 - CL-014;AR-021 W-A069 Pittsylvania Norfolk 36.758036 -79.418399 PFO 03010105 Timber Mat Crossing - 0.0058 - 28 - CL-016 W-A070a Pittsylvania Norfolk 36.757744 -79.418935 PEM 03010105 Timber Mat Crossing 0.0238 - - 115 - CL-016 W-A070b Pittsylvania Norfolk 36.757852 -79.418825 PEM 03010105 Timber Mat Crossing 0.0082 - - 40 - CL-016 W-A070c Pittsylvania Norfolk 36.757703 -79.418798 PFO 03010105 Pipeline ROW - 0.0956 - 1,543 - CL-016 W-A071b Pittsylvania Norfolk 36.632551 -79.543389 PSS 03010103 Timber Mat Travel Lane/Maintenance Corridor - 0.0014 - 7 - CL-042 W-A072 Pittsylvania Norfolk 36.783390 -79.388961 PFO 03010105 Timber Mat Travel Lane/Maintenance Corridor - 0.0020 - 10 - CL-010 W-A073 Pittsylvania Norfolk 36.825590 -79.344701 PFO 03010105 Secondary Impact - 0.0054 - 0 - CL-001 W-A073a Pittsylvania Norfolk 36.774698 -79.399031 PEM 03010105 Pipeline ROW 0.2724 - - 4,395 - CL-012 W-A073b Pittsylvania Norfolk 36.775000 -79.398765 PFO 03010105 Pipeline ROW - 0.1908 - 3,078 - CL-012 W-A076 Pittsylvania Norfolk 36.657575 -79.517488 PEM 03010103 Timber Mat Crossing 0.0001 - - 1 - CL-037 W-A079 Pittsylvania Norfolk 36.815033 -79.355579 PEM 03010105 Timber Mat Crossing 0.0036 - - 17 - CL-03, 04; AR-007 W-A081 Pittsylvania Norfolk 36.698694 -79.476488 PEM 03010103 Timber Mat Crossing 0.0022 - - 11 - CL-028 W-13013a Pittsylvania Norfolk 36.541866 -79.632567 PEM 03010103 Timber Mat Crossing 0.0174 - - 84 - CL-061 W-130131b Pittsyivania Norfolk 36.541802 -79.632478 PFO 03010103 Pipeline ROW - 0.1438 - 2,320 - CL-061 W-B014 Pittsyivania Norfolk 36.544279 -79.629937 PFO 03010103 Timber Mat Travel Lane/Maintenance Corridor/ Secondary Impact _ 0.0404 - 107 - CL-061 W-B015 Pittsylvania Norfolk 36.552492 -79.621731 PFO 03010103 Timber Mat Crossing - 0.0043 - 21 - CL-058;AR-048 W-B016 Pittsylvania Norfolk 36.551078 -79.616184 PFO 03010103 Temporary Access Road - 0.2015 - 975 - AR-047 W-B017 Pittsylvania Norfolk 36.557813 -79.616489 PEM 03010103 Pipeline ROW 0.0602 - - 972 - CL-058 W-B019 Pittsylvania Norfolk 36.561926 -79.612988 PEM 03010103 Pipeline ROW 0.1125 - - 1,815 - CL-057 W-B020 Pittsylvania Norfolk 36.565514 -79.613474 PSS 03010103 Pipeline ROW - 0.1248 - 2,014 - CL-057 W-B021 Pittsylvania Norfolk 36.584726 -79.598867 PFO 03010103 Temporary Access Road - 0.0281 - 136 - AR-044 W-B022 Pittsylvania Norfolk 36.572367 -79.606150 PFO 03010103 Timber Mat Travel Lane/Maintenance Corridor/ Secondary Impact _ 0.0444 - 160 - CL-055 W-B023 Pittsyivania Norfolk 36.586795 -79.586963 PFO 03010103 Pipeline ROW/Secondarylmpact - 0.0348 - 547 - CL-052 W-B024 Pittsyivania Norfolk 36.585648 -79.588213 PEM 03010103 Timber Mat Crossing 0.0116 - - 56 - CL-052 W-B035 Pittsyivania Norfolk 36.582779 -79.591983 PFO 03010103 Timber Mat Crossing - 0.0015 - 7 - CL, 053 W-B036a Pittsylvania Norfolk 36.587510 -79.586176 PFO 03010103 Pipeline ROW/Secondary Impact - 0.0470 - 450 - CL-051, 052 W-130361b Pittsylvania Norfolk 36.587230 -79.586598 PEM 03010103 Timber Mat Crossing 0.0798 - - 386 - CL-051, 052 W-130371b Pittsylvania Norfolk 36.590298 -79.583194 PFO 03010103 Timber Mat Crossing - 0.0011 - 5 - CL-051 W-B038a Pittsylvania Norfolk 36.595989 -79.576949 PEM 03010103 Pipeline ROW 0.0758 - - 1,223 - CL-050;AR-043 W-130381b Pittsylvania Norfolk 36.595888 -79.576940 PFO 03010103 Pipeline ROW - 0.1034 - 1,668 - CL-050 W-B038c Pittsylvania Norfolk 36.595719 -79.577293 PEM 03010103 Timber Mat Crossing 0.0860 - - 416 - CL-050 W-130391b Pittsylvania Norfolk 36.598727 -79.574286 PFO 03010103 Timber Mat Travel Lane/MaintenanceCorridor/ Secondary Impact _ 0.0947 - 177 - CL-049 W-B041 Pittsylvania Norfolk 36.603225 -79.570394 PSS 03010103 Pipeline ROW - 0.0125 - 201 - CL-048;AR-042 W-13042a Pittsylvania Norfolk 36.606170 -79.568044 PEM 03010103 Timber Mat Crossing 0.0599 - - 290 - CL-048;AR-040 W-13042b Pittsylvania Norfoik 36.606032 -79.568002 PSS 03010103 Pipeline ROW - 0.0772 - 1,246 - CL-048;AR-040 W-B043 Pittsylvania Norfoik 36.613880 -79.562342 PFO 03010103 Pipeline ROW - 0.0441 - 712 - CL-046 W-B049 Pittsylvania Norfolk 36.566556 -79.612510 PFO 03010103 1 Timber Mat Travel Lane/Maintenance Corridor - 0.0170 - 82 - CL-056, 057 Page 2 of 4 Last Updated March 10, 2026 Table 3 - Wetland Impacts Individual Permit Application MVP Southgate Amendment Project Wetland ID County USACE District Latitude a/ Longitude a/ Cowardin Classb/ HUC-8 ImpactType c/ Temporary Impacts (a Permanent Conversion Impacts ( Per Permanent Fill Impacts(acres) Temporary Fill (cubic yards) f/ Permanent Fill (cubic yards) g/ Figure W-B050 Pittsylvania Norfolk 36.561401 -79.613187 PEM 03010103 Timber Mat Crossing 0.0040 - - 20 - CL-057 W-F002a Pittsylvania Norfolk 36.588715 -79.584987 PEM 03010103 Timber Mat Crossing 0.0055 - - 26 - CL-051 W-F0021b Pittsylvania Norfolk 36.588681 -79.584935 PFO 03010103 Timber Mat Crossing - 0.0175 - 85 - CL-051 W-G001a Pittsylvania Norfolk 36.551286 -79.614259 PEM 03010103 Temporary Access Road 0.0276 - - 134 - AR-047 W-G0021b Pittsylvania Norfolk 36.550963 -79.614042 PFO 03010103 Temporary Access Road - 0.0015 - 7 - AR-047 W-B001a Rockingham Wilmington 36.495303 -79.680073 PEM 03010103 ATWS 0.3582 - - 1,734 - CL-071; AR-062, 063 W-BOOlb Rockingham Wilmington 36.495493 -79.679431 PFO 03010103 ATWS - 0.0523 - 253 - CL-071;AR-062 W-B002a Rockingham Wilmington 36.493109 -79.679704 PFO 03010103 Pipeline ROW/ATWS - 0.3549 - 1,718 - CL-071;AR-063 W-13002b Rockingham Wilmington 36.492954 -79.678955 PFO 03010103 Pipeline ROW/ATWS/ Temporary Access Road _ 0.1730 - 838 - CL-071;AR-063 W-13002c Rockingham Wilmington 36.493510 -79.678670 PFO 03010103 Timber Mat Crossing - 0.0094 - 45 - CL-071;AR-063 W-13003 Rockingham Wilmington 36.494788 -79.677685 PFO 03010103 Timber Mat Travel Lane/Maintenance Corridor - 0.0399 - 193 - CL-071;AR-062 W-13004 Rockingham Wilmington 36.493601 -79.675951 PEM 03010103 ATWS 0.0232 - - 112 - CL-071;AR-063 W-13004a Rockingham Wilmington 36.493842 -79.675963 PSS 03010103 ATWS - 0.0403 - 195 - CL-071; AR-062,063 W-BOOS Rockingham Wilmington 36.500779 -79.672586 PFO 03010103 Pipeline ROW - 1.7856 - 28,807 - CL-069, 070; AR-060, 061 W-13008 Rockingham Wilmington 36.513224 -79.660014 PEM 03010103 Pipeline ROW 0.0101 - - 163 - CL-067 W-13009a Rockingham Wilmington 36.516424 -79.656693 PFO 03010103 Pipeline ROW - 0.1415 - 2,282 - CL-066,067; AR-055 W-B009b Rockingham Wilmington 36.516920 -79.656429 PEM 03010103 Pipeline ROW 0.0536 - - 865 - CL-066; AR-055 W-BO10 Rockingham Wilmington 36.519145 -79.654541 PEM 03010103 Pipeline ROW/Temporary Access Road 0.0999 - - 484 - AR-054 W-BO11 Rockingham Wilmington 36.538144 -79.636202 PEM 03010103 Pipeline ROW 0.0275 - - 444 - CL-062 W-BO12 Rockingham Wilmington 36.539856 -79.634416 PEM 03010103 Timber Mat Travel Lane 0.0315 - - 153 - CL-062 W-B013b Rockingham Wilmington 36.541802 -79.632478 PFO 03010103 Pipeline ROW - 0.0181 - 293 - CL-061 W-B027 Rockingham Wilmington 36.528102 -79.646154 PFO 03010103 Timber Mat Travel Lane/Maintenance Corridor - 0.0283 - 137 - CL-064 W-B028 Rockingham Wilmington 36.529211 -79.645000 PEM 03010103 Pipeline ROW 0.7960 - - 12,843 - CL-064; AR-050 W-B029 Rockingham Wilmington 36.530506 -79.642653 PEM 03010103 Timber Mat Crossing 0.0033 - - 16 - CL-063, 064; AR-050 W-13031a Rockingham Wilmington 36.530553 -79.643717 PEM 03010103 Pipeline ROW 0.2289 - - 3,693 - CL-063, 064; AR-050 W-6031b Rockingham Wilmington 36.530829 -79.643465 PSS 03010103 Pipeline ROW - 0.2696 - 4,350 - CL-063, 064; AR-050 W-B032 Rockingham Wilmington 36.534529 -79.638990 PEM 03010103 Pipeline ROW 0.1102 - - 1,777 - CL-063;AR-049 W-B051 Rockingham Wilmington 36.494693 -79.677771 PFO 03010103 Timber Mat Travel Lane/Maintenance Corridor - 0.0105 - 51 - CL-071; AR-062, 063 W-13052a Rockingham Wilmington 36.508360 -79.665160 PFO 03010103 Timber Mat Crossing - 0.0294 - 142 - CL-068;AR-057 W-6052b Rockingham Wilmington 36.508385 -79.665273 PEM 03010103 Pipeline ROW 0.0233 - - 376 - CL-068;AR-057 W-BO53 Rockingham Wilmington 36.525433 -79.648654 PEM 03010103 Pipeline ROW 0.0441 - - 711 - CL-065 W-B055 Rockingham Wilmington 36.493194 -79.678821 PEM 03010103 Timber Mat Crossing/ Temporary Access Road 0.0416 - - 201 - CL-071;AR-063 W-B056 Rockingham Wilmington 36.493824 -79.678444 PEM 03010103 Pipeline ROW 0.0391 - - 630 - CL-071; AR-062, 063 W-13056a Rockingham Wilmington 36.528530 -79.645701 PSS 03010103 Pipeline ROW - 0.0476 - 768 - CL-064 W-F003 Rockingham Wilmington 36.538306 -79.636126 PEM 03010103 Timber Mat Crossing 0.0089 - - 43 - CL-062 W-F004 Rockingham Wilmington 36.537522 -79.636888 PEM 03010103 Timber Mat Crossing 0.0096 - - 46 - CL-062 W-F005 Rockingham Wilmington 36.537389 -79.637028 PEM 03010103 Timber Mat Crossing 0.0023 - - 11 - CL-062 W-F006 Rockingham Wilmington 36.536551 -79.637457 PEM 03010103 Timber Mat Travel Lane 0.0101 - - 49 - W-F007 Rockingham Wilmington 36.536358 -79.637041 PEM 03010103 ATWS 0.0168 - - 81 - CL-062 W-F008 Rockingham Wilmington 36.525157 -79.648937 PEM 03010103 Timber Mat Crossing 0.0393 - - 190 - CL-065 W-F009 Rockingham Wilmington 36.520103 -79.654101 PEM 03010103 Pipeline ROW/ATWS/ Temporary Access Road 0.8132 - - 3,936 - CL-066;AR-054 W-FO10 Rockingham Wilmington 36.519681 -79.654757 PEM 03010103 Timber Mat Crossing/ATWS/ Temporary Access Road 0.1008 - - 488 - CL-066;AR-054 W-F011 Rockingham Wilmington 36.519424 -79.654546 PEM 03010103 Pipeline ROW 0.0339 - - 546 - CL-066;AR-054 W-F012 Rockingham Wilmington 36.519330 -79.654769 PEM 03010103 Pipeline ROW 0.0148 - - 239 - CL-066;AR-054 W-F013 Rockingham Wilmington 36.520754 -79.653245 PEM 03010103 Pipeline ROW 0.0260 - - 419 - CL-066;AR-054 W-F015 Rockingham Wilmington 36.533180 -79.642304 PEM 03010103 Temporary Access Road 0.0006 - - 3 CL-063; AR-049, 050 Page 3 of 4 Last Updated March 10, 2026 Table 3 - Wetland Impacts Individual Permit Application MVP Southgate Amendment Project Temporary Permanent Conversion USACE C n Permanent Fill Temporary Fill Permanent Fill Wetland ID County Latitude a/ Longitudea/J HUC-8 Impact Type c/ Impacts Impacts Figure District Casslass b/ Impacts (acres) (cubicyards)f/ (cubicyards)g/ (acres)d/ (acres)e/ W-G003 Rockingham Wilmington 36.499646 -79.673743 PEM 03010103 Pipeline ROW/ATWS/ 0.0242 - - 117 - CL-070; AR-061 Temporary Access Road PRM Activities: PRM-W-01 Franklin Norfolk 36.856595 -79.743641 PEM 03010101 Temporary Impacts - Grading 3.3978 - 0.0362 889 117 - Permanent Impacts - Ditch Plugs a/ Shown in decimal degrees. h/ PEM = Palustrine Emergent; PSS= Palustrine Scrub -Shrub; PFO = Palustrine Forested c/ Pipeline right-of-way (ROW) is based on wetlands that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on wetlands that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. ATWS = additional temporary workspace. d/ Construction of access roads will not result in impacts to tidal wetlands or wetlands adjacent to tidal waters. Temporary impacts include the area of PEM wetlands that are within the limits of disturbance; impact acreages are rounded to 4 decimal places. a/ Permanent conversion impacts include the area of PFO/PSS wetlands that are within the limits of disturbance. f/ Temporary fill discharge into Waters of the U.S.; cubic yards rounded to the nearest whole number. Temporary fill volume includes a 10-foot depth of fill for wetlands crossed by the pipeline and a 3-foot depth of fill for wetlands not crossed by the pipeline. Tempory fill volume for PRM activities includes a 2-foot depth of fill for grading of ditches within the wetland. .91 Permanent fill discharge into Waters of the U.S: cubic yards rounded to the nearest whole number. Permanent fill volume for PRM activities includes a 2-foot depth of fill for the plugging of ditches within the wetland. Page 4 of 4 Last Updated March 10, 2026 APPENDIX B - RESTORATION WORK PLAN Last Updated March 10, 2026 CONTENTS 1.0 Legal, Regulatory, and Permit Requirements............................................1-1 1.1 Pre -construction Compliance Training....................................................... 1-1 1.2 Responsibility for Compliance with Requirements ...................................... 1-1 1.3 Summary of Applicable Requirements....................................................... 1-1 2.0 Pre -Crossing Procedures..........................................................................2-1 2.1 Agency Notifications................................................................................... 2-1 2.2 Pre -Construction Inspection....................................................................... 2-1 2.3 Waterbody Crossing Plan........................................................................... 2-1 2.4 Pre -Crossing Field Meeting........................................................................ 2-2 3.0 Restoration Procedures.............................................................................3-1 3.1 Monitoring of Construction and Restoration Activities (All Activities).................................................................................................... 3-1 3.2 Restoration of Temporary Wetland Impacts (Trenches) ............................. 3-1 3.3 Restoration of Temporary Wetland Impacts (Timber Mats/Temporary Fill)................................................................................... 3-1 3.4 Restoration of Temporary Stream Impacts (Trenches) .............................. 3-2 3.5 Riffles, Pools, and Riffle -Pool Complexes (All Activities) ............................ 3-2 4.0 Post -Restoration Procedures....................................................................4-1 4.1 Post -Construction Inspection......................................................................4-1 4.2 Corrective Action (If Necessary)................................................................. 4-1 4.3 Subsequent Monitoring............................................................................... 4-1 Last Updated March 10, 2026 EXHIBITS Exhibit A Environmental Inspector Roles & Responsibilities Exhibit B Pre -construction Resource Crossing Checklist Exhibit C Example Waterbody Crossing Plan Exhibit D Post -Construction Resource Crossing Inspection Form Last Updated March 10, 2026 MVP Southgate Legal, Regulatory, and Permit Requirements The purpose of this Restoration Work Plan is to provide details on procedures used at jurisdictional aquatic resource crossings and for the restoration of temporary stream and wetland impacts resulting from the construction of the MVP Southgate Amendment Project (Project). The successful restoration of temporary stream and wetland impacts, as described below, is an important factor in ensuring the Project's Performance Standards will be met. 1.0 Legal, Regulatory, and Permit Requirements 1.1 Pre -construction Compliance Training Mountain Valley Pipeline, LLC (Mountain Valley) will conduct a resource -crossing training event, including specific training for sensitive waters,' for all field personnel before initiating any resource crossings. The training will document permitting requirements, agency notifications, best management practices for sensitive waters, restoration procedures, and monitoring commitments associated with the Project. Appropriate field personnel must have demonstrated experience with resource crossings, environmental controls, and environmental maintenance. New employees hired after the date of the planned pre - construction training will undergo the same training and be held to the same expectations. 1.2 Responsibility for Compliance with Requirements Mountain Valley has the following expectations of every person employed on the Project and participating in stream and wetland crossings and other activities that impact aquatic resources: • Know the legal, regulatory, and permit requirements applicable to their role in the Project. • Comply with all legal, regulatory, and permit requirements at all times, without exception. • Do not tolerate non-compliance by any other person employed on the Project. • Immediately report any instances of non-compliance and/or unauthorized impacts to aquatic resources to the Project's Environmental Inspectors. Every person employed on the Project has the authority and the duty to stop work if they witness any activities, conditions, or circumstances (1) that do not comply with any applicable legal, regulatory, or permit requirements or (2) which have or may cause an unauthorized impact to streams, wetlands, or other environmental resources. 1.3 Summary of Applicable Requirements Restoration of stream and wetland impacts falls within the jurisdiction of several federal and state agencies. For reference, the table below lists the sources of applicable requirements for activities in and around streams and wetlands. Note that stream and wetland construction practices and erosion and sediment control measures are not addressed in this Restoration Work Plan except to the extent they specifically pertain to restoration. 1 As used in this Restoration Work Plan, "sensitive waters" refers to streams with (1) relevant water quality impairments and (2) potential presence of threatened or endangered species addressed in the Project's Environmental Assessment. . Appendix B- Restoration Work Plan 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Legal, Regulatory, and Permit Requirements Document Agency IRelevant Activities Reference Location All Areas of Project 72025), rtificate Order (Dec. Relevant portions Environmental Federal Energy attached (Appendix ( pp Assessment (Oct. Regulatory . All activities C: Environmental 2025), FEIS (2020) Commission (FERC) Conditions) Wetland and . Inspections Waterbody • Stream & wetland Construction Trailer Construction and FERC crossings & Field Tablets Mitigation • Restoration (digital version) Procedures • Monitoring Upland Erosion Construction Trailer FERC Upland work near &Field Tablets Revegetation and streams & wetlands (digital version) Maintenance Plan Clean Water Act § • Stream & wetland 404/Rivers and U.S. Army Corps of crossings To be attached upon Harbors Act § 10 Engineers • Restoration issuance Permit (pending) • Monitoring Virginia Only • Inspections • Upland work near Standards and Virginia Department of streams & Construction Trailer Environmental wetlands & Field Tablets Specifications Quality (VDEQ) 0 Stream & wetland (digital version) crossings • Restoration • Inspections • Upland work near Erosion and streams & Construction Trailer Sediment Control VDEQ wetlands & Field Tablets Plans a Stream & wetland (digital version) crossings • Restoration Stormwater Inspections Construction Trailer Management Plans VDEQ 0 Restoration & Field Tablets • Monitoring (digital version) • Inspections Individual 401 Water VDEQ Stream & wetland Attached Quality Certification crossings • Restoration Appendix B- Restoration Work Plan 1-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Legal, Regulatory, and Permit Requirements Document Agency IRelevant Activities Reference Location North Carolina Only • Inspections Individual 401 Water Stream & wetland NCDEQ Attached Quality Certification crossings • Restoration • Inspections • Upland work near Erosion and streams & Construction Trailer Sediment Control NCDEQ wetlands & Field Tablets Plans a Stream & wetland (digital version) crossings • Restoration Inspections Construction Trailer Stormwater NC Restoration & Field Tablets Management Plans Counties/Municipalities • Monitoring (digital version) Appendix B- Restoration Work Plan 1-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Pre -Crossing Procedures 2.0 Pre -Crossing Procedures The process of ensuring the successful restoration of streams and wetlands begins prior to the initiation of the crossing. The following procedures must be followed to prepare for stream and wetland crossings. With regard to Mountain Valley's Environmental Inspector (EI), a list of responsibilities is provided in Exhibit A. 2.1 Agency Notifications Mountain Valley's El is responsible for verifying all necessary pre -crossing notifications have been provided to regulatory agencies. These notifications enable the agencies to exercise oversight of crossings. The required notifications include the following: Entire Project • FERC — All crossings via weekly construction schedule updates Virginia • VDEQ — 10-day construction notification • VMRC — All streams under VMRC jurisdiction North Carolina • NCDEQ/NCWRC — pre -construction meeting prior to impacts • NCDEQ — 30-day notification of drilling fluids/additives for HDD crossings • NCDEQ — 30-day notification for culvert installations • NCDEQ — prior to any discharges of hydrostatic test water 2.2 Pre -Construction Inspection Prior to commencing the crossing, the Project's El is required to complete the Preconstruction Resource Crossing Checklist (Exhibit B), which provides site -specific information and procedures to properly document pre -crossing conditions, ensure that the appropriate equipment and materials are on site, and ensure that everyone has reviewed procedures to successfully complete the crossing. The pre -crossing inspection includes a visual inspection to confirm that site conditions have not materially changed since the baseline conditions assessment was completed. If the El observes that conditions have changed, the crossing will not proceed until a new survey is completed to document the pre - crossing condition. 2.3 Waterbody Crossing Plan It is the responsibility of the contractor to develop a site -specific Waterbody Crossing Plan for each crossing prior to the initiation of the crossing. The plan is intended to provide practical instructions for the construction crew that will be conducting the crossing and restoration activity. An example is provided in Exhibit C. It will be developed in consideration of the following: • Weather, flow, and other relevant site conditions at the time of the crossing; • Impairment status; • Potential presence of threatened or endangered species; Appendix B- Restoration Work Plan 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Pre -Crossing Procedures • Pre -construction survey data, plan drawings, and/or other relevant information gathered through the Baseline Assessment, including the presence of any sensitive features (e.g., riffles and pools) that must be restored; and • Applicable regulatory and permit requirements. 2.4 Pre -Crossing Field Meeting An onsite pre -crossing field meeting will be held shortly (typically 24 to 48 hours) before commencing each stream or wetland crossing. The purpose of the pre -crossing field meeting is to ensure that all parties are in agreement about the plan and preparation for the crossing and restoration. The meeting will be attended by: • Chief Environmental Inspector or their designee; • Environmental Inspector; • Construction Manager or their designee; • Construction Foreman and Crew assigned to respective crossing; • Survey Crew Member; and • Others as appropriate (e.g., agency inspectors and/or staff). At the meeting, the parties will jointly review the following: • Relevant regulatory or permit requirements; • Suitability of the weather forecast, stream flow, and other site conditions for commencing the crossing; • Waterbody Crossing Plan prepared by the contractor; • Location of ordinary high water mark, setbacks, and vegetative buffers and, if necessary, refreshing flagging for same; • Selected locations for stockpiling of the top 12 inches of stream substrate or wetland topsoil separately from subsoils (where necessary for the activity); • Pre -construction Resource Crossing Checklist prepared by the El; • Equipment and materials on hand (e.g., pumps, dams, backup erosion and sediment controls) to verify that all are properly staged and operational; • Erosion and sediment controls at the crossing site to ensure that they are installed in accordance with the erosion and sediment control plans; • Additional stabilizing erosion -control devices such as extra mulch, erosion control blanketing, and/or tackifiers; • Sufficiency of the dewatering structure and discharge locations (where necessary for the activity); • Placement and suitability of the temporary equipment bridge (where necessary); • Inspection requirements— • Virginia: ■ Inspection frequency is once every four days for all streams; o North Carolina; ■ Inspection frequency is once every seven days for all streams; • Stabilization must begin immediately once the crossing is complete; • Task assignments and responsibilities for Construction Foreman and Crew; and • Stop -work authority and procedures during implementation of the crossing and restoration activities. The crossing will commence only if and when all parties attending the pre -crossing field meeting are in agreement as to the items in the list above. Appendix B- Restoration Work Plan 2-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Restoration Procedures 3.0 Restoration Procedures This section outlines restoration procedures to be implemented to restore impacts. Where a restoration activity is intended to facilitate the eventual attainment of one or more Performance Standards (PS), that is noted in the text with a bracketed reference (e.g., [PS 1.0.7]). 3.1 Monitoring of Construction and Restoration Activities (All Activities) Mountain Valley's Els will provide onsite monitoring for all construction and restoration activities in streams and wetlands as well as monitor instream conditions and compliance with relevant requirements. Their responsibilities include, among other things, identifying and promptly remedying any deviations from the field crossing and restoration plan and applicable regulatory requirements. Monitoring and oversight provided by the Els are expected to support the eventual attainment of each applicable Performance Standard. 3.2 Restoration of Temporary Wetland Impacts (Trenches) After the pipe is installed, the trench is backfilled with the native material that was removed during excavation [PS 1.0.3]. The upper 12 inches of topsoil that were segregated and stockpiled separately from the lower material will then be restored, de -compacted, and brought to match the pre -construction conditions [PS 1.0.1; 1.0.2; 1.0.3; 1.0.7; 1.0.8; 1.0.9]. Original surface hydrology will be re-established in wetlands by maintaining the existing overland flow patterns and surface contours of the surrounding areas [PS 1.0.7; 1.0.8]. Surface flow will not be directed away from the wetland. Trench breakers will be installed outside of the wetland limits to prevent subsurface drainage along the pipeline and to further support the development of hydric conditions [PS 1.0.7; 1.0.8]. Wetlands along the proposed pipeline are expected to exhibit varying degrees of saturation and water elevation, requiring a variety of plant species in order to be re-established. Wetlands will be temporarily seeded in accordance with the typical construction details and state -approved seed mixes [PS 1.0.5]. However, having segregated the upper 12 inches of topsoil will help support the natural restoration of the native seedbank [PS 1.0.1; 1.0.4; 1.0.5; 1.0.6]. Erosion and sediment control devices will be installed around the perimeter of the wetland until the area is stable with vegetation [PS 1.0.4; 1.0.6]. For all affected forested wetlands, restoration activities will be conducted in accordance with approved permit conditions and mitigation requirements, [PS 1.0.1; 1.0.4; 1.0.5; 1.0.6]. If saplings are required to be planted within the temporary right-of-way areas, this will be conducted in accordance with the approved erosion and sediment control plans, unless otherwise specified by applicable permit conditions. 3.3 Restoration of Temporary Wetland Impacts (Timber Mats/Temporary Fill) Wetland crossing structures, such as timber mats utilized to support equipment on the construction right- of-way, or other temporary fill material will be removed upon completion of construction. The timber mats will be lifted from and not pulled through the wetland further protecting the soils and native seedbank [PS 1.0.1; 1.0.2; 1.0.4; 1.0.6; 1.0.7]. The equipment used to remove the timber mats will work from upland areas or the existing timber mats — tracking out of the wetland until the mats are removed [PS 1.0.5; 1.0.9]. The area will then be de -compacted or scarified to support plant regrowth [PS 1.0.1; 1.0.2; 1.0.3; Appendix B- Restoration Work Plan 3-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Restoration Procedures 1.0.4; 1.0.6; 1.0.7; 1.0.8; 1.0.9]. Additional seeding measures, if necessary, will be considered as part of the Adaptive Management Plan. 3.4 Restoration of Temporary Stream Impacts (Trenches) To facilitate successful restoration of streams, the top 12 inches of the streambed substrate will be segregated and stockpiled separately from subsoils [PS 2.0.1; 2.0.3; 2.0.4; 2.0.5; 2.0.6; 2.0.7]. Work will proceed as quickly as practicable until the crossing is completed and the work area is restored. This practice ensures that the duration of temporary impacts to streams from pipeline installation work is minimized. Following pipe installation, the native subsoil material excavated from the trench will be used as backfill. Using the Baseline Assessment information, the stream will be installed to the pre -construction conditions using the cross -sectional and longitudinal profile information, with the segregated streambed substrate being replaced last [PS 2.0.1; 2.0.3; 2.0.4; 2.0.5; 2.0.6; 2.0.7]. Trench breakers of clay, earthen fill, sand -filled sacks (or other agency approved alternative) may be used to keep backfill from sloughing in toward the center of the stream and to prevent the pipeline bedding material from acting as a French drain [PS 2.0.1; 2.0.2; 2.0.3; 2.0.7]. The streambanks will be recontoured and stabilized [PS 2.0.2]. Once the El has verified that the trench has been successfully backfilled and the upper 12 inches of stream substrate and streambanks have been restored to preconstruction contours, the downstream diversion will be removed, followed by the upstream diversion, restoring the natural flow of the stream [PS 2.0.4]. Steam banks and riparian areas will be seeded with the approved mixes applied at the required rates [PS 2.0.2]. Restoration of the bank and riparian areas would begin following the pipeline installation and continue until the vegetation is successfully established [PS 2.0.2]. 3.5 Riffles, Pools, and Riffle -Pool Complexes (All Activities) Special attention must be paid to the restoration of any riffles, pools, and riffle -pool complexes. Where the Baseline Assessment determined that these features are present in the pre -crossing conditions, these data will be used to stabilize and/or restore the stream physical characteristics/morphology, including the pattern, profile, and dimensions, as close as practicable to the pre -crossing condition [PS 2.0.1; 2.0.3; 2.0.5; 2.0.6; 2.0.7]. This includes utilizing the preconstruction longitudinal profile to recreate riffle and pool sequences at slopes similar to those found pre -crossing data. The cross-section data collected as part of the baseline assessment will be utilized to restore dimensions in the impacted reaches. Appendix B- Restoration Work Plan 3-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Post -Restoration Procedures 4.0 Post -Restoration Procedures 4.1 Post -Construction Inspection The Els will conduct a post -construction inspection of each completed stream and wetland crossing to verify that the resource was appropriately restored. A state -specific Resource Crossing Inspection Form (Exhibit D) has been developed to standardize the inspection process. The form is completed in stages before, during, and after construction. During the post -construction inspection, the El must make a number of determinations, including the following. For trenching activities: • All welding, coating, and construction debris was removed from the crossing site; • The top 12 inches of stream substrate or wetland topsoil was replaced last, on top of the backfilled subsoil; and • Permanent trench breakers were installed in accordance with the approved plans. For all restoration activities (e.g., trenching, timber -mat removal): • All temporary and excess fill was removed from stream, wetland, and buffer areas; • All disturbed areas were restored to pre -construction contours, including the restoration of riffles and pools; • Streambanks, riparian areas, and/or wetland topsoils have been properly stabilized; and • The disturbed area has been seeded with the appropriate permanent seed mix. Once the area has been restored and all crossings (timber mats/temporary fills) have been removed, vehicular crossings of the resources are prohibited. Spanning of the resource is acceptable, provided additional fills are not located within the jurisdictional boundaries (i.e. ordinary high water mark). 4.2 Corrective Action (If Necessary) Any deficiencies observed by the El during the installation or restoration of the crossing or during the post -construction inspection will be documented and promptly communicated to the Construction Foreman. The El and Construction Foreman will consult on a plan to promptly remedy the deficiency and provide the plan to Mountain Valley for authorization. The corrective action will be undertaken immediately, or as soon as practicable (e.g., end of authorized work hours) if circumstances (e.g., weather conditions) prevent immediate correction. If the deficiency is attributable to human error or oversight, the El will ensure that appropriate action is taken to prevent recurrence, through field instruction, additional offsite training, or other measures deemed necessary by the El. 4.3 Subsequent Monitoring Subsequent topographical survey and monitoring will be completed in accordance with the Monitoring Plan. Appendix B- Restoration Work Plan 4-1 Mountain Valley Last Updated March 10, 2026 Exhibit A — Environmental Inspector Roles & Responsibilities Last Updated March 10, 2026 MVP Southgate Amendment Project Stream and Wetland Mitigation ��I'O Roles and Responsibilities: Environmental Inspector ��' Statement & Scope Mountain Valley Pipeline (MVP) expects every person employed on the Project and participating in stream and wetland crossings and other activities that impact aquatic resources to know the legal, regulatory and permit requirements; comply with all of these requirements at all times; do not tolerate non-compliance, and immediately report any instances of non-compliance. The purpose of this document is to summarize the assigned Roles and Responsibilities for Environmental Inspectors in regard to MVP Southgate Amendment Project Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework procedures. This document does not describe all the roles and responsibilities of the MVP Environmental Inspectors, but rather only those associated with Stream and Wetland Monitoring, Restoration, and Mitigation Framework. This summarized document does not replace or remove the requirement for employees associated with Stream and Wetland activities from reading and understanding the comprehensive "MVP Southgate Amendment Project Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework" procedure. Roles and Responsibilities Stream and Wetland: Baseline • No Responsibilities Stream and Wetland: Compliance Training • Section 2.4 (pg 2-2) — Attend Pre -Construction Compliance Training. Stream and Wetland: Pre -Construction • Section 2.1 (pg 2-1) — Verify all pre -crossing notifications provided to regulatory agencies. • Section 2.2 (pg 2-1) — Complete Pre -Construction Resource Crossing Checklist prior to commencing the crossing. • Section 2.3 (pg 2-1) — Confirm contractor developed a site -specific Waterbody Crossing Plan. • Section 2.4 (pg 2-2) — Schedule and hold an on site pre -construction field meeting (typically 24-48 hrs) before commencing a stream and wetland crossing. Stream and Wetland: Construction and Restoration Activities include: trenching, pipe installation, and backfilling. Environmental Inspector Section 3.1 (pg 3-1) — Onsite monitoring of construction and restoration activities through identification and remediation of deviations from construction and restoration plans and applicable requirements. Sections 3.2 through 3.5 (pgs 3-1 through 3-2) — Verify the streams and wetlands were restored accordingly, including but not limited to appropriate placement of upper 12-inches of stream substrate/wetland soils, pre -construction conditions using longitudinal profile and cross -sections have been restored; trench breakers appropriately installed; and stream banks stabilized. Verify the Restoration of Temporary Stream Impact trenches have been successfully backfilled, downstream diversions removed, upstream diversions removed, and the natural flow of the stream is restored. Stream and Wetland: Post -Construction Section 4.1 (pg 4-1) — Conduct post -construction inspection of each completed stream and wetland crossing. Stream and Wetland: Three -Year Monitoring • No Responsibilities Last Updated January 26, 2026 Exhibit B — Pre -Construction Resource Crossing Checklist Last Updated March 10, 2026 Pre -construction Resource Crossina Checklist Resource ID: Spread ID Anticipated Substrate: TOYR? Yes ❑ No ❑ Spread ID: Crossing Length: Station End: Other species of concern? T&E? Relocations? (Stream with Relevant Impairment: Yes El No El. List: Project Commitment Considerations? List: (Crossing Preparations: ❑ Anticipated crossing date: ❑ Weather Forecast: ❑ Streamflow conditions: ❑ Waterbody Crossing Plan developed, authorized, and reviewed with crew. ❑ Pre -construction Photos Onsite and Reviewed. ❑ Identify Primary Crew personnel. Tie -In Crew Foreman: Environmental Crew Foreman: Environmental Inspector: Date: Station Begin: ❑ Identify locations for resource streambed soils and subsoil stockpiles. ❑ Adequate materials/measures are in -place / on -site to prevent mixing of resource topsoil. ❑ Trench dewatering locations are identified and verified. ❑ Streambed scour BMPs to be implemented (typical detail ID): ❑ Pre -construction notifications submitted? Date: Crossing Materials and Equipment ❑ Spill Kits, adequate number and sizes ❑ Pumps for "pump around" ❑ Cofferdam materials? If so, what? ❑ Flume pipe(s)? If so, size and number? ❑ (1) Backup pump for every pump in use for "pump around," verified working, fueled, and ready. ❑ Secondary containment for pumps, light plants, generators etc. ❑ Hoses/clamps/floats. Correct size, length, and condition for immediate use. ❑ Intake Screens. ❑ Energy Dissipator material ❑ Intake Floats ❑ Turbidity Curtains ❑ Sandbags ❑ Ladders ❑ Plastic Sheeting ❑ Trench Dewatering Pump(s) ❑ Filter Bags (appropriately sized) Version 2.0 March 21, 2020 Last Updated March 10, 2026 ❑ Straw Bales ❑ Geotech Material ❑ Trench Breaker(s) ❑ Any drain tiles, or other pre-existing conditions? ❑ Silt Fence ❑ Compost Filter Sock ❑ Erosion Control Fabric ❑ Permanent and Temporary Seed Mix ❑Native Cobbles for CWF streambed restoration? Sourced onsite or imported? I hereby confirm that the above information is accurate to the best of my ability. Sign and Date: Tie-in Crew Foreman: Environmental Crew Foreman: Environmental Inspector: Version 2.0 March 21, 2020 Last Updated March 10, 2026 Exhibit C — Example Waterbody Crossing Plan Last Updated March 10, 2026 A LP / / DISCHARGE ENERGY ,,I/ DISSIPATOR \ (SANDBAGS, ETC.) \ \ \ PROPOSED CONSTRUCTION \ BASELINE f TIBER MATS - SEE J\ NOTE 3 W-Al1 a 0 40 80 SCALE IN FEET / WV-HA-077 / //////// / / / // / / /AIL/ S-A11a-BRAID-2 I DISCHARGE ENERGY \\ I DISSIPATOR �, 1148+80 S-A11a \ 040, u I S-A11a TIMBER MATS WATER PUMPS SIZE < 20' 2 20' 3" 6" QUANTITY 40 1 0 8 6 NOTE: 1. STATIONING IS BASED UPON IFC ALIGNMENT. 2. EXACT PIPELINE ALIGNMENT SUBJECT TO CHANGE, WITHIN THE EXTENTS OF THE PERMANENT EASEMENT, DEPENDING ON FIELD CONDITIONS. MVP WILL MAINTAIN ELEVATIONS AND MINIMUM DISTANCES FROM RESOURCES AS SHOWN. 3. TIMBER MAT, DAM, DEWATERING, WELL POINT AND SOIL STOCKPILE LOCATIONS SUBJECT TO CHANGE BASED ON FIELD CONDITIONS AT THE TIME OF CONSTRUCTION. 4. SOIL STOCKPILES NOT DRAWN TO SCALE. 5. SPOIL FROM CROSSING TO BE LOCATED MINIMUM 10' FROM BANK. 6. E&S CONTROLS NOT SHOWN FOR CLARITY; REFER TO STATE -SPECIFIC DETAILS FOR ECD INFORMATION. 0 ♦'� O / DAM (SANDBAGS, ETC.) /�/ I ////// , \ fri 60 l ' Ox00 z \ O O DAM (SANDBAGS, ETC.) S-A11a-BRAID-1 LEGEND ORDINARY HIGH WATER MARK DEWATERING SITE 0 WELL POINT PROPOSED LIMIT OF DISTURBANCE m FRAC TANK LOCATION ® SOIL STOCKPILE — — — — — — PROPOSED PERMANENT R.O.W. ® FUEL STORAGE ----------- CONSTRUCTION BASELINE EP LIGHT PLANT LOCATION PUMP -AROUND LINE DAM (SAND BAGS) encompass IT M o u n t a i n Valley DATE: 05/23/23 PROJECT NO.: 61538 DRAWN BY: JCV CHECKED BY: AMM MITIGATION FRAMEWORK PRECROSSING SITE DRAWINGS RESOURCE NAME: S-A11a & S-A11a-BRAID-2 LAT./LONG. = 39.33546,-80.522390 APPROVED BY: GMI SHEET: 1 OF 2 DRAWING NUMBER STATION = 1149+23 COUNTY / STATE: HARRISON COUNTY, WV ENCOMPASS SERVICES, LLC 1370 WASHINGTON PIKE, SUITE 308 A-BP-WV-HA-077-MF_REV0 BRIDGEVILLE, PA 15017 Last Updated March 10, 2026 S-A11a 12'OHWM 1080 1070 1060 1050 1040 1030 1020 NOTE: 1. MINIMUM 3' COVER BETWEEN STREAMBED AND TOP OF PIPELINE UNLESS OTHERWISE NOTED. 2. PROPOSED FILL WILL BE IN TRENCH AND WILL BE RESTORED TO PRE -CONSTRUCTION ELEVATIONS. S-Al1 a -BRAT D-2 6' OHWM 1080 1070 I I 1050 1040 1030 4' MIN. FOR 1020 1010 SCOUR MITIGATION 1010 1148+80 1149+20 1149+60 1150+00 PROPOSED 42" STEEL PIPE INSTALLED BY OPEN -CUT METHOD 0 40 80 SCALE IN FEET encom ss ENCOMPASS SERVICES, LLC 1370 WASHINGTON PIKE, SUITE 308 BRIDGEVILLE, PA 15017 1!7 Mountain Valley SOURCE NAME: S-Al1a & S-A11a-BRAID-2 T./LONG. = 39.33546,-80.522390 ATION = 1149+23 )UNTY / STATE: HARRISON COUNTY, WV DATE: 05/23/23 PROJECT NO.: 61538 DRAWN BY: JCV CHECKED BY: AMM APPROVED BY: GMI SHEET: 2 OF 2 DRAWING NUMBER A-BP-WV-HA-077-M F_REV0 Last Updated March 10, 2026 Exhibit D — Post -Construction Resource Crossing Inspection Form Last Updated March 10, 2026 WKI 'd4 RUTHGATE Resource ID: Milepost: Spread: RESOURCE CROSSING INSPECTION FORM Start Date: Station: Weather: Completed Date: Classification: Stream Depth: Item # Pre -Construction N/A YES NO 1. Resource Name: Stream: Pre -construction photos and survey taken (upstream, downstream, and crossing location) Date: ❑ ❑ ❑ Wetland: Pre -construction photos and survey taken at crossing location Date: ❑ ❑ ❑ 2 Resource Crossing Checklist Complete? ❑ ❑ ❑ 3 24-hour Variance Request Anticipated? ❑ ❑ ❑ If yes, FERC approval received? ❑ ❑ ❑ 4. Temporary equipment crossing to remain after resource crossing installation is complete? ❑ ❑ ❑ Is chemical storage, equipment maintenance, equipment storage, refueling equipment stored at least 100- feet from the stream or wetland? El El El5' 6. Stream crossings to be conducted during low -flow conditions, when possible ❑ ❑ ❑ Review local weather forecast for predicted storm events to occur with 72 hours of scheduled in -stream work? El El El7'a 7.b Are storm events forecast that have potential to impact in -stream work? (Specify in Notes) ❑ ❑ ❑ Notification submitted to potable water supply intakes within 3 miles downstream (where applicable)? Date notification submitted: El El El$' Notes: Item # Construction N/A YES NO 1 Are equipment mats or other suitable methods used to minimize soil compaction and disturbance in ❑ ❑ ❑ Wetlands? (FERC PROCEDURES) 2 a Was the top 1-foot of wetland soil or stream bed substrate segregated and stockpiled separate from ❑ ❑ ❑ trench spoils? 2 b For crossings that require blasting, wetland topsoil/stream bed substrate must be segregated PRIOR to ❑ ❑ ❑ drilling of bore holes. 3 Are spoil piles located a minimum of 10-feet from the resource boundary with use of a sediment barrier? ❑ ❑ ❑ (FERC PROCEDURES) 4. Were permanent trench breakers installed at the banks of stream channels? (IP and FERC PROCEDURES) ❑ ❑ ❑ 5 Is water discharged from work area through a properly sized dewatering structure into a well -vegetated or ❑ ❑ ❑ otherwise stable area? (IP and FERC PROCEDURES) Version 4.0 October 22, 2021 Last Updated March 10, 2026 Sheet 1 of 2 RESOURCE CROSSING pry, I� INSPECTION FORM 6. Is there adequate cover over the pipeline in accordance with DOT standards in 49 CFR 192.327and IP? Required Depth of Cover: ft. ❑ ❑ ❑ 7. Was scour mitigation installed per the "Vertical Scour and Lateral Channel Erosion Analysis" report? If so, what mitigation measures were installed? ❑ ❑ ❑ g Top of pipe elevation measurements at the stream crossing and HMZ (if appropriate) for scour analysis. Elevation: Are drilling/blasting/rock excavation done in accordance with the General Blasting Plan? (Sections 7.5 and 7.7) El El El9. Was excavated material backfilled in the proper order or if not utilized for backfill, removed and disposed of at an upland site? (IP) El El El10. Notes: Item # Restoration N/A YES NO Was in -stream work conducted as continuous activity to minimize crossing duration? 1' (FERC PROCEDURES, IP) El El El Was all welding and coating debris fully removed from waterbody crossing prior returning flow to the El El El2 waterbody? 3 Was the top 1-foot of stream substrate segregated during excavation of the stream utilized during ❑ ❑ ❑ restoration of the stream channel? (FERC PROCEDURES, IP) Were disturbed areas within riparian buffers restored to pre -construction contours? El El 4. (FERC PROCEDURES, IP) Is this stream slated to have bare root saplings installed following restoration? Sapling plantings will be El El El5 conducted outside of the crossing activity. Was segregated wetland soil utilized for restoration of the upper 1-foot of the trench? El El El 6. (FERC PROCEDURES) 7. Was streambank stabilization and ESC fabric applied immediately following construction and prior to re- ❑ ❑ ❑ establishing the flow regime? 8. Was permanent seed applied to riparian areas and unsaturated wetlands at time of restoration? ❑ ❑ ❑ g Was the proper seed mix and application rate utilized and seed tags saved? ❑ ❑ ❑ Do post -construction survey conditions meet pre -construction survey conditions in accordance with ❑ ❑ ❑ 10. USACE IP permit conditions? Was the resource crossing construction sequence adhered to as shown on the Approved ESC General ❑ ❑ ❑ 11. Details? Notes: This report was written by Print Name Signature Date Insert photo pages Version 4.0 October 22, 2021 Last Updated March 10, 2026 Sheet 2 of 2 APPENDIX C - PERFORMANCE STANDARDS Last Updated March 10, 2026 CONTENTS 1.0 Wetland Attributes.....................................................................................1-1 1.1 Cowardin Classification.............................................................................. 1-1 1.2 Area............................................................................................................1-1 1.3 Topographical Survey................................................................................. 1-2 1.4 Dominant Vegetation.................................................................................. 1-2 1.5 Invasive Species......................................................................................... 1-2 1.6 Native (Non -Invasive) Herbaceous Vegetation Coverage .......................... 1-2 1.7 Hydric Soils................................................................................................. 1-2 1.8 Hydrology Indicators................................................................................... 1-3 1.9 Bulk Density................................................................................................ 1-3 1.10 North Carolina Wetland Assessment Method ............................................. 1-3 2.0 Stream Attribute........................................................................................2-1 2.1 Stream Survey............................................................................................ 2-1 2.1.1 Cross -sectional Area...................................................................... 2-2 2.1.2 Pool -to -pool Spacing...................................................................... 2-2 2.1.3 Maximum Pool Depth..................................................................... 2-2 2.1.4 Average Riffle Slope....................................................................... 2-2 2.1.5 Average Reach Slope..................................................................... 2-2 2.1.6 Pebble Count..................................................................................2-2 2.2 Stream Vegetation...................................................................................... 2-2 2.2.1 Riparian Buffer................................................................................ 2-2 2.3 Stream Resource Valuation........................................................................ 2-3 2.3.1 Field Water Quality......................................................................... 2-3 2.3.1.1 Dissolved Oxygen.............................................................2-3 2.3.1.2 Specific Conductivity......................................................... 2-3 2.3.1.3 pH..................................................................................... 2-3 2.3.2 Rapid Bioassessment Protocol (RBP)............................................ 2-4 2.3.3 Benthic Macroinvertebrates............................................................ 2-4 2.3.4 Visual Assessment Documentation ................................................ 2-4 2.3.5 Virginia Unified Stream Methodology (USM).................................. 2-4 2.3.6 North Carolina Stream Assessment Method (SAM) ....................... 2-4 3.0 References................................................................................................3-1 Last Updated March 10, 2026 MVP Southgate Wetland Attributes This Appendix provides performance standards for the various metrics that will be monitored for wetlands and stream areas that are temporarily impacted by the construction of the MVP Southgate Amendment Project (Project) and then subsequently restored. Damage to the restoration areas by anthropogenic activities outside of the control of Mountain Valley Pipeline, LLC (Mountain Valley) and/or by wildlife species (such as deer or beaver) may require adjustment to the criteria for successful establishment of the resource. Likewise, upstream conditions beyond Mountain Valley's control may affect monitoring results within the restoration areas. It also must be understood that some areas would not meet these understory and groundcover standards simply due to natural but abnormal conditions, such as extreme weather events; therefore, a reasonable determination would be made as to whether failure to meet the relevant standards is a result of a natural occurrence or whether it is an unsuccessful revegetation effort. 1.0 Wetland Attributes' 1.1 Cowardin Classification The Cowardin Classification (Cowardin et al., 1979) for each impact area was determined during the delineation of each resource. Three wetland types—Palustrine Emergent (PEM), Palustrine Scrub -Shrub (PSS), and Palustrine Forest (PFO)—were identified. Conversion impacts to PSS and PFO will be mitigated through the purchase of credits and development of a Perm ittee-Responsible Mitigation (PRIM) site 2. The restoration goal is to restore each temporarily impacted wetland area to a condition such that it is on a trajectory to become, at maturity, a PEM (unless there is a specific restoration obligation in place that requires otherwise). Notwithstanding the defined performance standard is to achieve a PEM wetland, where possible, temporarily impacted wetlands that were previously PSS or PFO will be encouraged to return to that condition by leaving roots and stumps in the areas 15 feet outside pipeline, which allows existing vegetation to recover more rapidly. Where required, Mountain Valley may plant bare -root saplings and shrubs in impacted PFO in the temporary right-of-way (ROW). During the first monitoring event, a survival rate of approximately 300 stems per acre per planting area (75% of 400 stem per acre planting) will be targeted. During the second monitoring event, habitat assessments will be performed to determine whether the expected average survived. If not, the ratio of surviving stems to total stems planted will be calculated to determine the stem -survival rate. The actual survival rate will be used to determine the number of plantings necessary to achieve the desired average in the third monitoring event. 1.2 Area The restored wetland area shall be greater than or equal to the original wetland area established in the baseline assessment. 1 Performance standards are based on the 2018 Mitigation Banking Instrument Template developed by the Norfolk District of the U.S. Army Corps of Engineers (USACE) and the Virginia Department of Environmental Quality. 2 MVP Southgate Amendment Project's PRM site is permitted through the Project's 404/401 Water Quality Certification with all construction and restoration requirements documented through those authorizations. Therefore, the requirements of this Mitigation Framework are not directly applicable to the PRIM site. Appendix C- Performance Standards 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetland Attributes 1.3 Topographical Survey The restored wetland area elevations shall be restored as close as practicable to the pre -construction contours to maintain the original wetland hydrology. If hydrology indicators have not been identified at year 1 of annual monitoring, Mountain Valley will conduct a follow-up topographic survey. This survey shall use the same horizontal and vertical datums used by the original data. If point data from the original data are not available, to be able to compare topography to this level of precision post -construction to the original topographic survey, a combination of interpolation using surfaces constructed from counter interval data and survey data outside of the limits of disturbance may be needed to calibrate and compare each survey to each other. 1.4 Dominant Vegetation More than 50% of all dominant herbaceous plant species shall be facultative (FAC) or wetter (facultative wetland (FACW) or obligate wetland (OBL)). Wetland vegetation dominance is defined as a vegetation community where more than 50% of all dominant species are FAC or wetter using "routine delineation methods" as described in the 1987 Manual and Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (Version 2.0). 1.5 Invasive Species The restored wetlands area shall contain less than 5% aerial coverage of invasive species or be similar to the invasive species population density immediately adjacent to the resource crossing. The invasive species list for Virginia is available through the Virginia Department of Conservation and Recreation.' The invasive species list for North Carolina is maintained by the North Carolina Invasive Plant Council and the North Carolina Native Plant Society. 1.6 Native (Non -Invasive) Herbaceous Vegetation Coverage Native or non-invasive herbaceous plant coverage shall be at least 70% by the end of the first growing season and subsequent monitoring years thereafter unless shrub and/or canopy/crown coverage is at least 30%. 1.7 Hydric Soils For restored wetlands where wetland soils were previously sampled to a minimum depth of 12 inches, positive indicators of hydric soil formation (see Field Indicators of Hydric Soils in the United States, Version 8.2 (NRCS, 2018)4) must be present by the conclusion of the monitoring period post - construction within the first six inches for sandy (coarse -textured) soils and within the first 12 inches for silts, clays, and loams. Restored wetlands that had refusal at 12 inches or less should also exhibit hydric soil development by the conclusion of the monitoring period; however, as these locations can be seen as problematic, if hydric soil formation indicators are not identified visually, evaluation of wetland restoration should consider procedures found in Chapter 5 of the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (USACE, 2012). The following standards specific to the soil type must be achieved: (Required) For coarse -textured (sandy) surface soils, positive indicators of hydric soil formation must be demonstrated within six inches of the soil surface. ' NH invasivePlantList 2014.indd (virginia.gov). 4 Field Indicators of Hydric Soils in the United States has since been updated with Version 9.2 released on Sept. 30, 2025. Appendix C- Performance Standards 1-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetland Attributes (Required) For fine -textured soils (silts, clays, loams), positive indicators of hydric soil formation must be demonstrated within 12 inches of the soil surface. If the positive indicators of hydric soil formation identified above are not met, one of the following procedures may be considered to determine if hydric soils are present. • For all monitoring years after reaching the final grade, piezometers or shallow wells demonstrate free water within 12 inches of the surface for 14 consecutive days during the growing season. Redoximorphic features that must be present include, but are not limited to, redox concentrations, redox depletions, and reduced matrices. • Demonstrate that positive tests with reagent occur within 60% or more of a specific layer in at least two or three soil samples. A reaction to alpha-alphaDipyridyl reagent must occur within a 2- inch layer of the upper 4 inches in soil that is inundated but not saturated, a 2.5-inch layer of the upper 5 inches in sandy textured soils, and a 4-inch layer of the upper 12 inches in clayey soils. • A minimum of three of five "Indicator of Reduction in Soil" tubes must have 30% iron removed from a zone that is six inches or more thick. The zone of removal must begin within six inches of the soil surface for all soil textures. 1.8 Hydrology Indicators The wetland hydrology standard shall be met if an area is inundated (flooded or ponded) or the water table is <_12 inches below the soil surface for >_14 consecutive days during the growing season. This can be determined with piezometers or shallow wells that demonstrate free water within 12 inches of the surface for 14 consecutive days during the growing season. Alternatively, the standard may be met by observation of the following wetland hydrology indicators. For wetlands where primary hydrology indicators were observed or where two secondary hydrology indicators are present, the standard will be deemed satisfied if these indicators are present by the third full growing season after construction. Observations should be made during the growing season. Note that some locations may lack hydrology indicators during the latter half of the growing season or during drier than normal years. This should be considered when evaluating sites that appear to be lacking previous hydrologic indicators. The growing season will be determined in accordance with the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (USACE, 2012). Note that some locations may have been problematic prior to construction and evaluation of wetland restoration should consider procedures found in Chapter 5 of the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (USACE, 2012). 1.9 Bulk Density As stated in the Baseline Assessment, bulk density is assumed to not exceed root -growth restriction ranges and thus will not be measured during the baseline assessment. Bulk density may be measured during restoration if Mountain Valley determines it is necessary or as part of the adaptive management strategy. 1.10 North Carolina Wetland Assessment Method The North Carolina Wetland Assessment Method (NC WAM) was developed by the NCDEQ and the User Manual was prepared by the North Carolina Wetland Functional Assessment Team. Version 5, February 2016. Mountain Valley will use the NC WAM for assessing the success of restoration for wetlands in Appendix C- Performance Standards 1-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute North Carolina. NC WAM evaluates wetlands based on three major functions —hydrology, water quality, and habitat —and uses indicators of condition as a surrogate for directly measuring function. 2.0 Stream Attribute Restored channels will be evaluated to determine if the performance standards have been successfully achieved during the monitoring period. These standards, outlined in Sections 2.0.1 and 2.0.2 below, have been developed to demonstrate that these overall objectives have been achieved: Development and maintenance of a definable bed and bank. Restoration of temporarily impacted streams to configurations that are hydrologically equivalent to what was present prior to stream crossings. Development of the definable bed and bank will be evaluated utilizing visual observations and supported with physical survey data. A channel must be distinguishable upon visual inspection. This visually verifies the presence of stream channel which, in some instances, may not contain year-round flow. The most common way to describe and quantify channel form is dimension, pattern, and profile. A longitudinal profile of the restoration area will be generated and will include the thalweg, water surface, and lowest bank, where feasible. These data will be used to compare stream pattern to verify that, within the monitoring period, the longitudinal profile of the restored reach is similar to the pre -crossing configuration. The cross sections at benchmarked locations will be established over the approximate center line of the pipe. If beneficial in the restoration of the channel, cross sections may also be taken at riffles, runs, or pools or in a configuration that can determine the maintenance of the defined channel in the restoration reach and that can demonstrate re-establishment of bed and banks as well as the thalweg (in cross sections). The post -construction reach will have dimensions similar to pre -crossing configurations. Particle -size distribution and pebble -count data will be collected and utilized to determine change in substrate over time. Restoration reaches will be consistent with the pre -crossing form (will maintain D50 size class), as well as material present in upstream and downstream reaches (as applicable). To be deemed successful, the restored stream reaches must have similar dimension, pattern, and profile to pre -crossing conditions or be in a state of dynamic stability. This will be achieved by comparing the data collected pre- and post -crossing. Locations that deviate greater than the performance requirements described below will be addressed utilizing Mountain Valley's adaptive management plan provided in Appendix E: Maintenance & Adaptive Management Plan. 2.1 Stream Survey The following performance standards shall apply to streams.5 However, recognizing that these are natural streams that may be influenced by conditions in the watershed outside of the control of Mountain Valley, if the streams (post -crossing) fail to meet the performance standards, but it can be demonstrated that there are conditions in the watershed affecting the stability of the stream, these performance standards may be waived by the applicable agencies. Similarly, if it can be demonstrated that the stream is in a state of 5 Performance standards are based on the 2018 Mitigation Banking Instrument Template developed by the Norfolk District USACE and the Virginia Department of Environmental Quality. Appendix C- Performance Standards 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute "dynamic stability" (i.e., the stream is shifting due to natural conditions, but is stable), these performance standards may be waived by the applicable agencies. 2.1.1 Cross -sectional Area In the perennial streams, the stream cross -sectional area shall not increase or decrease by an amount greater than 25% of the baseline stream cross -sectional area, unless it is consistent with the upstream and/or downstream channel. In the ephemeral and intermittent streams, the cross -sectional area shall be restored to a stable configuration based on the preconstruction contours and site conditions. 2.1.2 Pool -to -pool Spacing The pool -to -pool spacing shall not increase or decrease by an amount greater than 25% of the baseline surveyed pool -to -pool spacing range when more than one pool exists in the subject reach. 2.1.3 Maximum Pool Depth In the perennial streams, the maximum pool depth shall not increase or decrease by an amount greater than 50% of the baseline surveyed pool depth (measured to bankfull elevation). In the ephemeral and intermittent streams, the maximum pool depth shall be restored to a stable configuration based on the preconstruction contours and site conditions. 2.1.4 Average Riffle Slope The average slope of the riffle shall not increase or decrease by an amount greater than one tenth (0.1) of the slope determined by the baseline longitudinal survey or 0.4%, whichever is greater (e.g., a 4% baseline slope can allow a post -construction riffle slope of +/- 0.4%, or a range from 3.6% to 4.4%; a 1 % baseline slope can allow a post -construction riffle slope of +/- 0.4%, or a range from 0.6% to 1.4%). 2.1.5 Average Reach Slope The average slope of the reach shall not increase or decrease by an amount greater than one tenth of the slope determined by the baseline longitudinal survey or 0.4%, whichever is greater. 2.1.6 Pebble Count A reach -wide, representative pebble count will be completed post -construction and during the subsequent monitoring periods. The performance metric will be to maintain the same category as the baseline conditions. 2.2 Stream Vegetation 2.2.1 Riparian Buffer Mountain Valley will stabilize and restore the riparian buffer adjacent to the stream crossings. Where proposed, a 75% survival rate at the areas having bare -root saplings planted will be required. An enhanced 80% survival rate at the areas having bareroot saplings planted will be required at impaired waters crossings. Herbaceous vegetation by native non/invasive species shall achieve 70% coverage unless canopy coverage reaches 30%. Herbaceous vegetation by native non/invasive species achieving 80% coverage will be required at impaired waters crossings unless canopy coverage reaches 30%. Appendix C- Performance Standards 2-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute In areas where pre -crossing conditions were such that they preclude successful restoration, these performance standards shall not apply. Such conditions may include, but are not limited to, active agricultural fields or areas not fenced for livestock exclusion that may be grazed or otherwise affected. The restored area shall contain less than 5% aerial coverage of invasive species or be similar to the invasive species population density immediately adjacent to the resource crossing. The invasive species list for Virginia is available through the Virginia Department of Conservation and Recreation.6 The list for the North Carolina is maintained by the NC Invasive Plant Council and the North Carolina Native Plant Society. 2.3 Stream Resource Valuation Recognizing that these are natural streams that may be influenced by conditions in the watershed outside of the control of Mountain Valley, if the streams fail to meet the performance standards post -crossing, but it can be demonstrated that there are conditions in the watershed affecting the water quality of the stream, these performance standards may be waived by the appropriate agencies. 2.3.1 Field Water Quality The following performance standards shall apply to streams, unless waived. 2.3.1.1 Dissolved Oxygen In Virginia, levels will meet the baseline conditions or the state water -quality standards established at 9VAC25-260-50, i.e., a minimum of 4.0 mg/I in Class III and Class IV waters, a minimum of 5.0 mg/I in Class V waters, and a minimum of 6.0 mg/I in Class VI waters. In North Carolina, dissolved oxygen levels will meet the applicable baseline conditions or the State surface water quality standards established at 15A NCAC 02B .0211, including a minimum instantaneous dissolved oxygen concentration of 4.0 mg/L and a minimum daily average concentration of 5.0 mg/L in non -trout waters, and a minimum dissolved oxygen concentration of 6.0 mg/L in waters classified for trout (Tr). 2.3.1.2 Specific Conductivity Virginia and North Carolina have not established state stand alone water -quality standards for specific conductivity. In addition to the uncertainty about appropriate effects thresholds for conductivity, conductivity levels vary naturally. Therefore, Mountain Valley has developed the following Performance Standard for specific conductivity: Specific conductivity should measure within a range of 0-1,500ps/cm, which is the typical range for freshwater resources in the Project's ecoregion. 2.3.1.3 pH In Virginia, levels will meet the baseline conditions or the state water -quality standards established at 9VAC25-260-50, i.e., 6.0 to 9.0 standard units for fresh surface waters in all Classes, unless lower or higher values are determined to be the result of natural conditions. In North Carolina, pH levels will meet baseline conditions or the State surface water quality standards established at 15A NCAC 02B .0211, requiring pH to be maintained within the range of 6.0 to 9.0 standard units for fresh surface waters, unless lower or higher values are determined to be the result of natural conditions. 6 NH invasivePlantList 2014.indd (virainia. Appendix C- Performance Standards 2-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute 2.3.2 Rapid Bioassessment Protocol (RBP) It is anticipated that there will be variability in the RBP scores as the resources are restored and become reestablished. The information collected from the first monitoring event will be compared to the second monitoring event to determine if RBP habitat scores are being maintained or improved. The information collected from the second monitoring event will be compared to the third monitoring event to determine if RBP habitat scores are being maintained or improved. As this information is collected and compared, Mountain Valley will continue to work with the agencies to determine if the streams are approaching a satisfactory restoration based on the application of best professional judgment and expertise. 2.3.3 Benthic Macroinvertebrates Post -construction surveys for benthic macro i nverte b rates will be conducted and compared to the pre - construction index. It is anticipated that there will be variability in these results. The information collected from the second monitoring event will be compared to the third monitoring event to determine if the scores are being maintained or improved. As this information is collected and compared, Mountain Valley will continue to work with the agencies to determine if the streams are approaching a satisfactory restoration based on the application of best professional judgment and expertise. 2.3.4 Visual Assessment Documentation While there is no specific performance standard for visual assessment documentation, this information will be utilized for visual comparisons throughout the post construction monitoring timeframe. 2.3.5 Virginia Unified Stream Methodology (USM) For Virginia streams, the USM (USACE and VDEQ, 2007) will be utilized to assign a Reach Condition Index (RCI) to each proposed temporary stream impact. Parameters to be assessed in intermittent and perennial streams are channel condition, riparian buffers, instream habitat/available cover, and channel alternation. Riparian buffer is the only parameter to be assessed in ephemeral streams. Condition indices will be determined utilizing the appropriate USM forms and the RCI will be calculated for each stream crossing. 2.3.6 North Carolina Stream Assessment Method (SAM) For North Carolina streams, the North Carolina Stream Assessment Method (NC SAM) will be used to evaluate the ecological function and condition of intermittent and perennial streams that are proposed to be temporarily impacted. The NC SAM rates a stream's hydrology, water quality, and habitat functions. The NC SAM uses 25 specific field metrics to determine the level of function in perennial and intermittent streams. This method can assist in adjusting standard mitigation ratios based on condition of the stream (if impacts were permanent). NC SAM does not evaluate ephemeral streams, as they generally lack the biological, hydrological, and physical features characteristic of intermittent or perennial water conveyance; however, it does document their presence. Appendix C- Performance Standards 2-4 Mountain Valley Last Updated March 10, 2026 MVP Southgate References 3.0 References Cowardin, L. M., Carter, V., Golet, F. C. & LaRoe, E. T. 1979. Classification of wetlands and deep water habitats of the United States. US Fish and Wildlife Service FWS/OBS 79/31. Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-87-1. United States Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. Environmental Laboratory. 2012. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (Version 2.0). Wetlands Regulatory Assistance Program ERDC/EL TR-12-9. United States Army Corps of Engineers, Research and Development Center, Vicksburg, Mississippi. United States Department of Agriculture, Natural Resources Conservation Service. 2018. Field indicators of hydric soils in the United States, Version 8.2. L.M. Vasilas, G.W. Hurt, and J.F. Berkowitz (eds.). In cooperation with the National Technical Committee for Hydric Soils. Appendix C- Performance Standards 3-1 Mountain Valley Last Updated March 10, 2026 APPENDIX D - MONITORING PLAN Last Updated March 10, 2026 CONTENTS INTRODUCTION...............................................................................................1-1 1.0 Wetland Monitoring...................................................................................1-2 1.1 Cowardin Classification.............................................................................. 1-2 1.2 Wetland Area.............................................................................................. 1-2 1.3 Topographical Survey................................................................................. 1-2 1.4 Dominant Vegetation..................................................................................1-2 1.5 Invasive Species Cover.............................................................................. 1-3 1.6 Native (Non -Invasive) Herbaceous Vegetation Cover ................................ 1-3 1.7 Hydric Soils................................................................................................. 1-3 1.8 Hydrology Indicators................................................................................... 1-3 1.9 Bulk Density................................................................................................ 1-3 1.10 Wetland —Resource Evaluation.................................................................. 1-3 1.10.1 Visual Assessment Documentation ................................................ 1-3 2.0 Stream Attribute Monitoring.......................................................................2-1 2.1 Stream Survey............................................................................................ 2-1 2.2 Stream Vegetation...................................................................................... 2-1 2.3 Stream Resource Valuation........................................................................ 2-1 2.3.1 Field Water Quality......................................................................... 2-1 2.3.2 Rapid Bioassessment Protocol (RBP)............................................ 2-1 2.3.3 Benthic Macroinvertebrates............................................................ 2-1 2.3.4 Visual Assessment Documentation ................................................ 2-1 2.3.5 Visual Assessment Documentation ................................................ 2-3 3.0 Quality Assurance/Quality Control(QA/QC)..............................................3-1 4.0 Data Analysis and Reporting Procedures..................................................4-1 5.0 References................................................................................................5-1 Last Updated March 10, 2026 MVP Southgate Wetland Monitoring Introduction Assessments and surveys will be conducted for the restored stream and restored wetland crossings in the MVP Southgate Amendment Project (Project) area. Restored stream and wetland assessments and surveys will be initiated within the year following restoration activities at each crossing. Monitoring activities, except for the as -built survey, will be completed during the growing season. For the purpose of wetland monitoring, the growing season will be approximated as the timeframe after the last frost in the spring and before the first frost in the fall unless more specific methods are utilized. If site -specific data are unavailable, other biological indicators for the growing season may be utilized, which may include emergence of herbaceous plants from the ground; appearance of new growth from vegetative crowns (e.g., in graminoids, bulbs, and corms); coleoptile/cotyledon emergence from seed; bud burst on woody plants (i.e., some green foliage is visible between spreading bud scales); emergence or elongation of leaves of woody plants; or emergence or opening of flowers. The end of the growing season may be indicated as when woody deciduous species lose their leaves and/or the last herbaceous plants cease flowering and their leaves become dry or brown, generally in the fall due to cold temperatures or reduced moisture availability. Monitoring will begin after completion of restoration activities. Annual monitoring will start during the growing season that commences after restoration completion (i.e., if the growing season starts March 15 and the restoration was completed June 30, the monitoring will start during the subsequent year's growing season). Longitudinal surveys of field conditions, cross-section analysis, and in -stream surveys will be completed if visual observations determine that the stream has not reached a state of dynamic stability for the first year of monitoring. Streams will be visually monitored for each subsequent monitoring period, unless conditions indicate additional surveys are required. If the relevant performance standards have been achieved for a site prior to the three-year commitment, Mountain Valley may request approval from the relevant regulatory agency overseeing the post - construction monitoring to discontinue monitoring of the resource. Confirmation in writing from Mountain Valley Pipeline, LLC (Mountain Valley and concurrence from the United States Army Corps of Engineers (USACE), Virginia Department of Environmental Quality (VADEQ), and North Carolina Department of Environmental Quality (NCDEQ) when Mountain Valley has satisfied the requirements of the restoration plan will end the monitoring period for this Project. Please note that Mountain Valley has a limited ability to conduct activities outside of the limits of disturbance (LOD) approved by the Federal Energy Regulatory Commission. Accordingly, field -data - collection activities will be limited to the specific LOD width for each crossing and require a modification from the standard reach lengths as outlined in the U.S. Environmental Protection Agency (USEPA) Rapid Bioassessment Protocol (RBP) Manual (100-meter reach for RBP/Benthic Macroinvertebrates) and applicable state guidance. The assessment reach will be limited to the 75-ft LOD or less, depending on the proposed impact type (pipeline crossing, temporary or permanent access road, additional temporary workspace, or anode bed). Depending on the crossing angle, stream meanders, and other factors, the actual length of the stream reach available for survey within the LOD may be more or less than 75 ft. Appendix D- Monitoring Plan 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetland Monitoring 1.0 Wetland Monitoring 1.1 Cowardin Classification Cowardin Classification (Cowardin et al., 1979) for each wetland will be determined using the Wetland Determination Data Form for that wetland. The delineator will record the existing Cowardin classification as well as the classification of the type of wetlands that the vegetation community suggests it is on a trajectory to achieve. 1.2 Wetland Area The wetland areas will be delineated utilizing the USACE 1987 Wetland Delineation Manual (Environmental Laboratory, 1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region Version 2.0 (USACE, 2012). The delineated wetlands will be survey -located for comparison to the pre -construction area. Photo documentation will occur during each sampling event. Specific photo locations are provided in Table 1. For wetland crossings or impacts, in addition to those listed in Table 1, the investigators will include various photographs of the restored wetland inside the LOD as well as conditions outside the LOD (based on size, shape, and total area of the restored wetlands). All photographs will be geo- referenced with GPS coordinates. Each crossing will include a photo location map indicating the specific location where photos were taken. Table 1: Wetland Photo Location Requirements Stream Type Photographs Virginia & North Carolina Wetlands All Wetlands and Uplands Photos of cardinal directions at the center of the wetland Photos of cardinal directions of each wetland sample pit. Photo of pit Photo of core sample. Virginia & North Carolina Wetlands All Wetlands WL-(#) — (#) photos of the impacted wetland area inside the LOD EX COND — (#) — (#) photos of the conditions edge of the LOD 1.3 Topographical Survey If surface water is present, water elevation should be documented in addition to the surface of the wetland soil in cross-section. Hard control points should be established for future reference. Contour intervals should be a minimum of six inches with 25-ft grids and spot shots indicated if ground survey work is conducted versus aerial or remote sensing. Wherever possible, survey -grade spot shots will be taken outside of the LOD to assist in calibrating the datum of the pre -construction topographic survey with this post -construction topographic survey. 1.4 Dominant Vegetation Dominant vegetation will be determined based on the methodology found in the USACE's Wetland Delineation Manual and recorded on the Wetland Determination Data Form for each wetland. Appendix D- Monitoring Plan 1-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetland Monitoring 1.5 Invasive Species Cover Invasive species cover will be recorded on the Wetland Determination Data Form for each wetland. The delineator will also note and identify all invasive plant species and their percent cover located within the wetland but outside the data plot, if any. 1.6 Native (Non -Invasive) Herbaceous Vegetation Cover Native herbaceous vegetation cover will be recorded on the Wetland Determination Data Form for each wetland. 1.7 Hydric Soils The presence of hydric soils will be determined based on the methodology found in the USACE's Wetland Delineation Manual and recorded on the Wetland Determination Data Form for each wetland. 1.8 Hydrology Indicators The presence of wetland hydrology indicators will be determined based on the methodology found in the USACE's Wetland Delineation Manual and recorded on the Wetland Determination Data Form for each wetland. 1.9 Bulk Density As stated in Baseline Assessment Plan, bulk density is assumed to not exceed root -growth restriction ranges and thus will not be measured during the baseline assessment. Bulk density may be measured during restoration if Mountain Valley determines it is necessary or as part of the adaptive management strategy. 1.10 Wetland —Resource Evaluation 1.10.1 Visual Assessment Documentation In Virginia, field photographs will be collected and used for visual comparison, following the same procedures as when conducting surveys. In North Carolina, the NC WAM field assessment will be completed after each monitoring event. For both scenarios, the collected data will then be used to compare to baseline and/or previous monitoring years, as applicable. Appendix D- Monitoring Plan 1-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute Monitoring 2.0 Stream Attribute Monitoring 2.1 Stream Survey Stream cross-section(s) and longitudinal profile will be completed for the first year only unless conditions indicate additional surveys are required. Pebble counts will be conducted in the same fashion as specified in the baseline assessment. The collected data will then be used to compare to baseline and/or previous monitoring years as applicable: a. Stream cross -sectional area (as required) b. Pool -to -pool spacing (as required) c. Maximum pool depth (as required) d. Average riffle slope (as required) e. Average reach slope (as required) f. Pebble counts 2.2 Stream Vegetation Riparian buffer vegetation will be assessed using a 50-foot-long, 5-foot-wide belt transect placed above the top of bank. All woody stems within the transect will be counted to determine if the stem density requirement has been met. Herbaceous coverage will be visually assessed using a randomly placed 1 m2 quadrat. Invasive species cover will be visually assessed within the riparian buffer to determine if the success criterion has been met. All observed invasive plant species and their approximate percent cover within the riparian area will be recorded. Adjacent invasive species population densities will also be considered. 2.3 Stream Resource Valuation 2.3.1 Field Water Quality Data for dissolved oxygen, specific conductivity, and pH will be collected in the field using in -field probes (YSI water quality meters or similar). This is a snapshot approach; continuous monitoring of these parameters will not be conducted. 2.3.2 Rapid Bioassessment Protocol (RBP) RPB data for each stream crossing will be collected using the same methodology stated in the Baseline Assessment Plan and scored to monitor restoration progress. 2.3.3 Benthic Macroinvertebrates Benthic macroinvertebrate data for each stream crossing will be collected and scored to monitor restoration progress. Benthic collections will be streamflow dependent and will follow the same guidelines for collection as in the Baseline Assessment Plan. 2.3.4 Visual Assessment Documentation Photo documentation will occur during each sampling event. Specific photo locations are provided in Table 2. For resource crossings or temporary impacts, in addition to those listed in Table 2, the monitoring staff should include various photographs of the restored wetland inside LOD as well as Appendix D- Monitoring Plan 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute Monitoring conditions outside the LOD (based on size, shape, and total area of the restored resource). Photographs will be geo-referenced with GPS coordinates. Table 2: Stream Photo Location Requirements Stream Type Photographs Virginia & North Carolina Streams Streams (Bankfull width <10') DS VIEW— Downstream View of impact area inside LOD US VIEW— Upstream View of impact area inside LOD RB CIL — Standing on Right Bank looking down pipe centerline LB CIL Standing on Left Bank looking down pipe C/L DS COND — Downstream conditions edge of LOD Streams (Bankfull width >10') RB DS VIEW— Downstream View on Right Bank of impact area inside LOD LB DS VIEW— Downstream View on Left Bank of impact area inside LOD RB US VIEW— Upstream View on Right Bank of impact area inside LOD LB US VIEW— Upstream View on Left Bank of impact area inside LOD RB CIL — Standing on Right Bank looking down pipe C/L LB CIL — Standing on Left Bank looking down pipe C/L DS COND — Downstream conditions edge of LOD Streams (Within the LOD but not crossing pipe centerline) DS VIEW— Downstream View of impact area inside LOD US VIEW— Upstream View of impact area inside LOD DS COND — Downstream conditions edge of LOD Access Road Crossings DS VIEW— Downstream View of impact area inside LOD US VIEW— Upstream View of impact area inside LOD CIL ACCESS-1 — Standing in Access Road looking towards impact CIL ACCESS-2 — Standing in Access Road looking towards impact DS COND — Downstream conditions edge of LOD Virginia & North Carolina Streams All Streams US LOD US VIEW— Upstream Edge of LOD Upstream View US LOD DS VIEW— Upstream Edge of LOD Downstream View C LOD US VIEW— Center of LOD Upstream View C LOD DS VIEW— Center of LOD Downstream View DS LOD US VIEW— Downstream Edge of LOD Upstream View DS LOD DS VIEW— Downstream Edge of LOD Downstream View CS LB UG 1 — Cross-section 1 Left Bank Upgradient View CS LB DG 1 — Cross-section 1 Left Bank Downgradient View CS RB UG 1 — Cross-section 1 Right Bank Downgradient View CS RB DG 1 — Cross-section 1 Right Bank Downgradient View Additional cross-section photos will be collected as needed, to document each cross-section in the sampling reach, if applicable. Appendix D- Monitoring Plan 2-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attribute Monitoring 2.3.5 Visual Assessment Documentation Relevant elements of the VA Unified Stream Methodology and the NC Stream Assessment Method forms are covered by applicable sections within this Monitoring Plan. Appendix D- Monitoring Plan 2-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate Quality Assurance/Quality Control (QA/QC) 3.0 Quality Assurance/Quality Control (QA/QC) Field equipment will be inspected and calibrated each day prior to field crew deployment per the manufacturers' specifications. A field notebook will be maintained to document conditions encountered while samples are collected, including field observations, photographs taken, samples collected, and deviations from the sampling protocol. Appropriate field forms, as mentioned in previous sections, will be completed as required in the field and copied/filed upon return to the office. Manual data entry in spreadsheets and/or calculations performed will be subjected to a QA/QC review to ensure proper data transfer. Appendix D- Monitoring Plan 3-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Data Analysis and Reporting Procedures 4.0 Data Analysis and Reporting Procedures Raw data in the form of field data forms from the stream surveys will be archived once relevant information has been transferred on to spreadsheets or other applicable programs. Wetland data sheets will be evaluated to determine the presence of hydric soils, hydrology, and vegetation. Wetland forms and photographs will then be filled out so that this information may be used in annual monitoring reports. Data will also be compared (annually) and evaluated to determine if performance standards are being met. To maintain clear communication with the agencies, Mountain Valley will submit annual monitoring reports to the applicable USACE district and relevant state agency, VDEQ or NCDEQ, that address the previous year's monitoring activities. Each annual report will include: • All data collected, including quarterly monitoring reports for impaired waters, for each restored stream and wetland site in accordance with the Monitoring Plan; • Circumstances (e.g., unusual or extreme weather conditions, land -use changes or other impacts upstream, damage by wildlife) that may be affecting the conditions of monitored streams and wetlands; • Any findings that warrant action under the Maintenance & Adaptive Management Plan and, if necessary, a corrective action plan based on those findings; and • Recommended determination of whether each monitored site has achieved the applicable performance standards or if additional monitoring is warranted. Appendix D- Monitoring Plan 4-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate References 5.0 References Cowardin, L. M., Carter, V., Golet, and deepwater habitats of FWS/OBS 79/31. F. C. & LaRoe, E. T. 1979. Classification of wetlands the United States. US Fish and Wildlife Service Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-87-1. United States Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. Environmental Laboratory. 2012. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (Version 2.0). Wetlands Regulatory Assistance Program ERDC/EL TR-12-9. United States Army Corps of Engineers, Research and Development Center, Vicksburg, Mississippi. Montgomery, D.R. and J.M. Buffington. 1993. Channel Classification, Prediction of Channel Response, and Assessment of Channel Conditions. Washington State Department of Natural Resources Report TFW-SH10-93-002. Montgomery, D.R. and J.M. Buffington. 1997. Channel -reach Morphology in Mountain Drainage Basins. Geological Society of America Bulletin. 109(5):596-611. Rosgen, D., H.L. Silvey, and D. Frantila. 2008. River Stability Field Guide. Wildland Hydrology. United States Department of Agriculture, Natural Resources Conservation Service. 2018. Field indicators of hydric soils in the United States, Version 8.2. L.M. Vasilas, G.W. Hurt, and J.F. Berkowitz (eds.). In cooperation with the National Technical Committee for Hydric Soils. Appendix D- Monitoring Plan 5-1 Mountain Valley Last Updated March 10, 2026 APPENDIX E - MAINTENANCE & ADAPTIVE MANAGEMENT PLAN Last Updated March 10, 2026 CONTENTS INTRODUCTION...............................................................................................1-1 1.0 Wetland Attributes.....................................................................................1-0 1.1 Cowardin Classification.............................................................................. 1-0 1.2 Wetland Area.............................................................................................. 1-0 1.3 Topographical Survey................................................................................. 1-0 1.4 Dominant Vegetation..................................................................................1-1 1.5 Invasive Species Cover.............................................................................. 1-1 1.6 Native (Non -Invasive) Herbaceous Vegetation Cover ................................ 1-1 1.7 Hydric Soils................................................................................................. 1-1 1.8 Hydrology Indicators................................................................................... 1-1 1.9 Bulk Density................................................................................................ 1-2 2.0 Stream Attributes......................................................................................2-1 2.1 Stream Survey............................................................................................ 2-2 2.2 Stream Vegetation...................................................................................... 2-2 2.2.1 Riparian Buffer................................................................................ 2-2 2.2.2 Invasive Species Cover..................................................................2-3 2.3 Stream Resource Valuation........................................................................ 2-3 2.3.1 Field Assessments.......................................................................... 2-3 3.0 Site Protection and Long -Term Management............................................3-1 4.0 References................................................................................................4-1 Last Updated March 10, 2026 MVP Southgate Wetland Attributes Introduction Mountain Valley Pipeline, LLC's (Mountain Valley's) Adaptive Management Plan (AMP) anticipates likely challenges associated with resource restoration and provides a menu of actions available to address those challenges. During the three years of post -restoration monitoring, Mountain Valley shall also be conducting maintenance as required for all related erosion and sediment control and stormwater management permits issued for the MVP Southgate Amendment Project (Project). All maintenance actions needed —such as invasive species controls, reseeding/replanting, or soil modifications —shall be implemented promptly, subject to growing -season restrictions and as weather conditions allow. Therefore, due to this overlap of maintenance and AMP practice implementation time frames, Mountain Valley has combined these two requirements into this document. The proposed restoration of the temporary impacts is the responsibility of Mountain Valley. Mountain Valley will maintain the restoration areas until full stabilization is documented. This includes routine inspection every four days in Virginia, every seven days in North Carolina, and after precipitation events that trigger inspection (as per Mountain Valley's stormwater construction permits for the Project), which is a requirement independent of the monitoring outlined in the Monitoring Plan. The inspections conducted in accordance with the Monitoring Plan will provide the data needed to determine when maintenance and adaptive management actions are needed. If necessary and feasible, corrective actions and any associated supplemental monitoring may extend beyond the three-year post - construction monitoring period. Mountain Valley can address any such requirements since it has inspection, monitoring, and maintenance requirements under its Federal Energy Regulatory Commission (FERC) approvals that continue through the operational life of this Project. Consistent with sound adaptive management principles, the suggested response actions outlined in this AMP may be revised, omitted, supplemented, or substituted when warranted by the circumstances. The baseline information collected including but not limited to the USM, NC SAM, and RBP may be used in developing adaptive management. Appendix E- Maintenance & Adaptive Management Plan 1-1 Last Updated March 10, 2026 Mountain Valley MVP Southgate Wetland Attributes 1.0 Wetland Attributes 1.1 Cowardin Classification If the Cowardin Classification performance standards identified in Appendix C are not achieved on or before year 3, then the following management procedures may be implemented: a. Check soil fertility, pH, organic matter percentage, and bulk density, and b. Correct any issues found in (a) and then seed and/or replant at the appropriate time of year; or c. If no issues are found in (a), then seed and/or replant at the appropriate time of year. d. If the vegetation performance standards are not met after three annual attempts, then, subject to approval of the appropriate permitting agencies (United States Corps of Engineers, Virginia Department of Environmental Quality, and/or North Carolina Department of Environmental Quality) for said impact area(s), Mountain Valley may purchase mitigation credits or make appropriate in -lieu -fee (ILF) contributions, using the assumption that such area was permanently impacted without taking credit for partially successful restoration. Mountain Valley will work with the agencies to appropriately stabilize the area (if necessary) prior to or concurrently with proposing to purchase mitigation credits or make an ILF contribution. 1.2 Wetland Area If the wetland -area performance standard identified in Appendix C is not met on or before year 3, then Mountain Valley will evaluate whether the area required to be a wetland is smaller than baseline due to incorrect grading or disposal of extra subsoil (displaced by the pipe installation) in the wetland area. If incorrect grading or disposal of extra subsoil is determined to be the cause, then, subject to approval of the appropriate permitting agencies, Mountain Valley will regrade and reseed/replant, purchase mitigation credits, and/or make appropriate ILF contributions, using the assumption such an area was permanently impacted without taking credit for partially successful restoration. The preferred response will be to regrade and reseed/replant the wetland. However, providing additional mitigation credits may be the appropriate response in certain conditions, which may include, for example, when previous attempts to regrade or reseed/replant were unsuccessful or when accessing the location with heavy grading equipment would likely result in more harm than potential beneficial. 1.3 Topographical Survey If the wetland has not been restored to its pre -construction area and function on or before year 3, then Mountain Valley will evaluate whether the topographical differences relative to baseline is due to incorrect grading or disposal of extra subsoil (displaced by the pipe installation) in the wetlands area. If that is the case, the area shall be regraded and reseeded/replanted subject to approval of the appropriate permitting agencies. If the contour standard is still not achieved after regrading, then, subject to approval of the appropriate permitting agencies for said impact area(s), Mountain Valley may purchase mitigation credits or make appropriate ILF, using the assumption that such area was permanently impacted. Appendix E- Maintenance & Adaptive Management Plan 1-0 Last Updated March 10, 2026 Mountain Valley MVP Southgate Wetland Attributes 1.4 Dominant Vegetation If the performance standard identified in Appendix C for dominant vegetation is not met on or before the end of the three-year monitoring period, the management procedures outlined in Section 1.1 above will be implemented. 1.5 Invasive Species Cover If the performance standard for invasive -species cover identified in Appendix C is not satisfied on or before the end of the three-year monitoring period, then invasive plant species shall be removed mechanically (i.e., hand weeding), or with herbicide applications if approved by all applicable regulatory agencies in compliance with 9VAC25-210-50. If requested by Mountain Valley, this performance metric may be re-evaluated by the permitting agencies for situations where adjacent land cover contains invasive species or factors outside of the control of Mountain Valley prevent this performance standard from being met. Mountain Valley may also request that the permitting agencies re-evaluate this performance metric to consider the ecological tradeoffs of controlling invasive cover to the potential benefit of species richness or other ecologically based measures that identify the benefits of not re -disturbing the area. 1.6 Native (Non -Invasive) Herbaceous Vegetation Cover If the performance standard for native (non-invasive) herbaceous vegetation coverage identified in Appendix C is not met on or before the end of the three-year monitoring period, the management procedures outlined in Section 1.1 above will be implemented. 1.7 Hydric Soils If the performance standard for hydric soils identified in Appendix C is not met on or before the end of the three-year monitoring period, then the hydrology and appropriate response actions will be evaluated as outlined in Section 1.0.8. If efforts to restore hydric soils are not successful, subject to approval of the appropriate permitting agencies for the impact area(s), Mountain Valley will purchase mitigation credits or make appropriate ILF contributions, using the assumption that such area was permanently impacted. 1.8 Hydrology Indicators If the performance standard for hydrology indicators identified in Appendix C is not met on or before the end of the three-year monitoring period, the first step will be to check the Palmer Drought Severity Index and the US Drought Monitor for the subject location to determine if the area is in a moderated drought (Palmer Index) or abnormally dry or drier (U.S. Drought Monitor) conditions. If there are such dry conditions, hydrology indicators of a wetlands are not likely to be present, at least for "drier end" wetlands areas, and no actions are necessary. If such conditions do not exist and wetland hydrology indicators are not identified on or before the end of the three-year monitoring period, then shallow groundwater wells or piezometers may be installed (U.S. Army Corps of Engineers, 2005) to determine if wetlands hydrology is present but not identifiable in the soil media due to the time lag of some soil chemistry parameters. Mountain Valley may also consider regrading or directing overland flow in the wetland area to improve hydrological conditions. This determination will be made prior to the installation of groundwater wells or piezometers and completed by a wetland professional. If the hydrology performance standard is not met during a normal, or drier -than - normal, growing season at least once during the three-year monitoring period, then Mountain Valley will evaluate whether additional monitoring is likely to demonstrate that the performance standard has been Appendix E- Maintenance & Adaptive Management Plan 1-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Wetland Attributes met. If efforts to restore hydrology indicators are not successful, subject to approval of the appropriate permitting agencies for said impact area(s), Mountain Valley will purchase mitigation credits or make appropriate ILF contributions, using the assumption that such area was permanently impacted. 1.9 Bulk Density If it is determined that soil density may be restricting root -growth conditions, and if standard decompaction practices (disking, plowing, cultivating, tilling, or incorporation of organic matter into the topsoil horizon ) have not sufficiently de -compacted the soil, then bulk density testing may be completed for the topsoil (upper 6 to 12 inches depending on soil profile). The upper 12 inches of the soil profile shall have a bulk density of less than the following levels so that root growth is not restricted, dependent on soil texture: Clayey: 91.7 pounds/cubic foot (Ibs/cf) or 1.47 grams/cubic centimeter (g/cm3 ) Silty: 103.0 Ibs/cf or 1.65 g/cm3 Sandy: 112.3 Ibs/cf or 1.80 g/cm3 The bulk density for textures in between these classes shall be linearly interpolated based on the in -situ soil texture percentages of these three soil particle size classes. The area may then be further de -compacted to meet these standards, or coordination with the agencies will be conducted to determine if mitigation banking or ILF contributions would be more appropriate, depending on site access and location. Appendix E- Maintenance & Adaptive Management Plan 1-2 Last Updated March 10, 2026 Mountain Valley MVP Southgate Stream Attributes 2.0 Stream Attributes The main areas of maintenance and adaptive management concern or focus are as follows: • Maintaining appropriate geomorphology, i.e., monitored stream dimension (cross section), bed material, and photo documentation. • Maintaining a stable channel. • Minimizing bank erosion. • Maintaining appropriate bedforms and particulates. • Establishing early riparian vegetation. • Controlling invasive species. The physical features of any natural channel, as well as restored channels, change periodically, and such changes do not always require maintenance. However, when these changes adversely affect the stability, structural integrity, and/or habitat quality within the channels, actions should be taken. Stream attributes may be assessed using visual inspections (observations), longitudinal profiles, or cross-section surveys. Note, as discussed, not all changes are considered detrimental (such changes occur in natural stream channels as well). For example, considerable reconfiguration of physical features may be allowed as long as they do not adversely affect conveyance, bank stability, structural integrity, or habitat quality. Channel Stability: If performance standards in Appendix C are not met on or before the end of the three-year monitoring period, Mountain Valley will evaluate implementation of the measures in this section. The key areas of concern are erosion of stream banks, aggradation of channel that could impair flood capacity or change channel stability, and aggradation of the overbank channel or damage to the floodplain. The process for addressing erosion problems will be highly proactive with visual observations or surveys, as well as ongoing monitoring as per the Project's Erosion and Sediment Control Plans in North Carolina and Standards and Specifications in Virginia. This will allow Mountain Valley to identify potential problems early so that low -tech vegetative methods can be employed to slow down erosion. If the problems become severe enough to warrant structural treatment, then a design process will be initiated (after contacting the appropriate resource agencies). The proposed restoration measures should be self -maintaining after an initial vegetation establishment period and should require little, if any, maintenance. However, additional action may need to be taken if the flood capacity of the channel is reduced (some type of infringement on the channel or in the floodplain) or if the geomorphic stability of the restored channel is compromised. These problems could occur due to excess sediment deposition, erosion, topographic changes, higher -than -expected channel roughness, or differences in the predicted channel dimensions and associated flow regime versus pre - construction data. Mountain Valley will undertake an evaluation of options in the unlikely event of such a channel failure or compromise. Changes that may be necessary if such events were to occur may include, but are not limited to, the following: • Removal of vegetation. • Modification of channel dimensions. • Addition of more structure. • Regrading of vegetative areas. Appendix E- Maintenance & Adaptive Management Plan 2-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attributes If appropriate, Mountain Valley may choose to assess ecological outcomes during the following monitoring events. Other measures may be undertaken if anticipated ecological benefits do not come to fruition, including increases or decreases in vegetative plantings, modification of instream habitat, or introduction of large woody debris. Riffle and Pool Features: After stream restoration, should the riffle and pool depth/dimensions within the LOD become unstable or depart from the baseline and performance parameters, adaptive management may become necessary. In watersheds with elevated sediment loads unrelated to the Project, pool features may require structures to maintain appropriate or acceptable dimensions. Similarly, constructed riffle may also be utilized to provide additional sediment transport, benthic macroinvertebrate habitat enhancement, and pool maintenance. Monitoring pool features (using the survey data) will be critical to determining the effectiveness of the restoration efforts and if adaptive management in the riffle and pool features will be necessary. 2.1 Stream Survey The data being collected with detailed stream surveys are to be analyzed utilizing the following six metrics and compared to their specific performance standards: • Stream Cross Section Area • Pool -to -Pool Spacing • Maximum Pool Depth • Average Riffle Slope • Average Reach Slope • Pebble Counts If the performance -standard specifications are not met for the above metrics and have not been waived via a "dynamic stability" determination, the following Maintenance and Adaptive Management Actions may be implemented: 1. If monitoring indicates that performance -standard issues are caused by upland erosion in adjacent right-of-way (ROW), correct the erosion and sediment control issue on the adjacent ROW and return the area to a stabilized condition. Following approval from the applicable permit agencies, Mountain Valley may re-establish the stream channel and banks. 2. Following approval from the applicable permit agencies, install stream stability structures such as rip rap, natural cross vein structures, or articulated matting. 3. Alternatively, subject to approval of the appropriate permitting agencies for the impact area(s), Mountain Valley may purchase mitigation credits or make appropriate ILF contributions, using the assumption that such area was permanently impacted. 2.2 Stream Vegetation 2.2.1 Riparian Buffer If the performance standards do not match those outlined in Appendix C then following adaptive strategies may be completed: 1. Check soil fertility, pH, organic matter percentage, and/or bulk density, and 2. Correct any issues found in (a) and then reseed and/or replant at the appropriate time of year; or 3. If no issues are found in (a), then seed and/or replant at the appropriate time of year. 4. If the vegetation performance standards fail to be met after three annual attempts, then Mountain Valley will coordinate with the agencies to determine if the riparian area is detrimental to the Appendix E- Maintenance & Adaptive Management Plan 2-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Stream Attributes resource restoration and if additional mitigation credits or appropriate ILF contributions are required. 2.2.2 Invasive Species Cover 1. If the performance standards identified in Appendix C for invasive -species cover are not satisfied on or before the end of the three-year monitoring period, then invasive species shall be removed mechanically (i.e., hand weeding) or with herbicide applications if approved by all applicable regulatory agencies. 2. If the invasive -species cover performance standard, as modified, is not met on or before year 3, then, subject to approval of the appropriate permitting agencies for the impact area(s), Mountain Valley may purchase mitigation credits or make appropriate ILF contributions. 2.3 Stream Resource Valuation 2.3.1 Field Assessments Sections 2.3.2 — 2.3.3 and 2.3.5 — 2.3.6 in Appendix C identify performance standards for the following parameters: • Rapid Bioassessment Protocol (RBP) • Benthic Macroinvertebrates • VA USM • NC SAM If monitoring shows a deviation from the performance standards for any of these parameters, Mountain Valley will consult with the permitting agencies regarding the probable cause of the deviations, if any. Causes not related to the Project may include, but are not limited to, watershed land -use changes, time of year, and precipitation amounts and patterns. Adaptive management actions may include (a) additional monitoring (to see if the changes are just temporal or caused by upstream conditions), (b) additional plantings, (c) adding woody debris, (d) implementing stream structural changes, (e) translocating benthic macro i nve rtebrates with HabiTubes, and/or (f) the purchase of additional credits or ILF contributions. Appendix E- Maintenance & Adaptive Management Plan 2-3 Last Updated March 10, 2026 Mountain Valley MVP Southgate Site Protection and Long -Term Management 3.0 Site Protection and Long -Term Management The restoration areas are located within the Project's ROW and construction access areas where future disturbance will be limited. Per FERC requirements, Mountain Valley is responsible for inspecting and maintaining the ROW for the operational life of the Project. Upon the completion of permit requirements, monitoring the restoration areas will fall under the monitoring program Mountain Valley utilizes for utility ROWs as required by its FERC certification. Furthermore, the restored stream channels are considered Waters of the U.S. and will, therefore, be protected from future disturbances in the form of pollutant discharges, channel alterations, or filling by existing laws and regulations limiting such impacts. Appendix E- Maintenance & Adaptive Management Plan 3-1 Last Updated March 10, 2026 Mountain Valley MVP Southgate References 4.0 References Compensatory Mitigation for Losses of Aquatic Resources; Final Rule (2008). Corps of Engineers 33 CFR Parts 325 and 332 Environmental Protection Agency 40 CFR Part 230, Federal Register Vol. 73, No. 70, Thursday, April 10, 2008, pp 19594- 19705. National Drought Mitigation Center, University of Nebraska -Lincoln. U.S. Drought Monitor. Available at: https://droughtmonitor.unl.edu/ National Oceanographic and Atmospheric Administration. Palmer Drought Index. Available at: https://www.ncdc.noaa.gov/temp-and-precip/drought/weekly- palmers/ U.S. Army Corps of Engineers, 2005. Technical Standard for Water -Table Monitoring of Potential Wetland Sites; publication ERDC TN-WRAP-05-2. Available at: https-//www.nrc.gov/docs/ML1327/ML13276AO40.pdf Appendix E- Maintenance & Adaptive Management Plan 3-1 Last Updated March 10, 2026 Mountain Valley APPENDIX F - SUPPLEMENTAL CREDIT DETERMINATION METHODOLOGY Last Updated March 10, 2026 CONTENTS 1.0 Introduction...............................................................................................1-1 2.0 Compensatory Mitigation Credit Requirements.........................................2-1 2.1 Virginia Methodology.................................................................................. 2-1 2.2 North Carolina Methodology....................................................................... 2-1 3.0 Mitigation for Permanent Impacts..............................................................3-1 3.1 Permanent Stream Impacts Associated with Access Road ........................ 3-1 3.2 Permanent Wetland Conversion Impacts ................................................... 3-1 3.3 Permanent Wetland Fill Impacts................................................................. 3-2 4.0 Supplemental Mitigation for Temporary Impacts.......................................4-1 4.1 Temporal Mitigation Credit Determination Methodology ............................. 4-1 4.2 Temporary Impacts Associated with Pipeline Crossings ............................ 4-1 4.3 Temporary Impacts Associated with the Placement of Temporary Fill............................................................................................................... 4-2 4.4 Proposed Supplemental Compensatory Mitigation ..................................... 4-3 5.0 References................................................................................................5-4 Last Updated March 10, 2026 EXHIBITS Exhibit A Proposed Temporal Mitigation Requirements for Streams and Wetlands Last Updated March 10, 2026 MVP Southgate Introduction 1.0 Introduction The purpose of this document is to provide a clear understanding on how aquatic resource temporary impacts mitigation in Virginia and North Carolina are being determined for the MVP Southgate Amendment Project (the Project). This Supplemental Credit Determination Methodology document (CDMD) is a companion to the Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework (Framework Document) which contains a compendium of the discussion contained herein. The methods utilized for credit determination of permanent impacts follow applicable regulations in Virginia and North Carolina; however, voluntary additional mitigation being provided by Mountain Valley for temporal loss during temporary impacts has been developed specifically for this project. Under Section 404 of the Clean Water Act, an applicant for a Department of the Army Permit must comply with provisions found in Section 404(b)(1) as well as other applicable regulations and statutes. Section 404(b)(1) guidelines require that applicants mitigate by avoiding and minimizing potential impacts to aquatic resources to the maximum extent practicable. In addition to Section 404(b)(1) guidelines, projects authorized by the United States Army Corps of Engineers (USACE) should be consistent with the mitigation rules found in 33 CFR Part 332 Compensatory Mitigation for Losses of Aquatic Resources (Mitigation Rule) (33 U.S.C. 401 et seq.: 33 U.S.C. 1344; and Pub. L. 108-136). The proposed approach to compensatory mitigation for unavoidable impacts outlined in this document has been developed to meet or exceed the above -mentioned regulations and guidance. Appendix F- Supplemental Credit Determination 1-1 Mountain Valley Methodology Last Updated March 10, 2026 MVP Southgate Compensatory Mitigation Credit Requirements 2.0 Compensatory Mitigation Credit Requirements In addition to complying with federal regulations, projects must comply with regulations that are often state specific. In Virginia, in the USACE Norfolk District, mitigation may take the form of options listed in 9 VAC 25-210-116 (C)(2)-(C)(3). This includes the use of mitigation banking (banking), in -lieu fee programs (ILF), and permittee-responsible mitigation. Mitigation amounts are determined using the Unified Stream Methodology (USM) (Streams) and compensation ratios (Wetlands). 2.1 Virginia Methodology The USM was developed by the USACE and the Virginia Department of Environmental Quality (VADEQ) to rapidly assess stream compensation requirements for permitted streams. The USM process assigns a Reach Condition Index to a stream reach, assesses the type or severity of impact and then can assist in determining the compensation that may be required. This method is used by both the USACE for Department of the Army authorizations and by the VADEQ's Virginia Water Protection Permit Program. II may be applied to projects where compensation is performed on -site, off -site, banking, and ILF. VADEQ has established "standard mitigation ratios" by regulation (9 VAC 210-80(C)). These ratios are generally recognized by the Norfolk District. The standard mitigation ratios are as follows: • 2:1 (2 acres compensation for each 1 acre of impact) for forested wetland impacts. • 1.5:1 for scrub -shrub wetland impacts. • 1:1 for emergent wetland impacts. • 1:1 for conversion impacts (ex. forested wetland converted to emergent wetland). • Project -specific ratios for other surface water impacts. Alternative ratios may be used for individual permits. 2.2 North Carolina Methodology In North Carolina, compensatory mitigation requirements are established pursuant to 15A NCAC 02H .0506(c), 15A NCAC 02H.1305(c), and DWR's Stream Mitigation Guidelines, which emphasize functional replacement using a credit —debit framework rather than fixed mitigation ratios. Mitigation requirements are determined based on the number of stream credits needed to offset calculated debits, taking into account stream classification (e.g., perennial, intermittent), existing condition, impact severity, and the proposed mitigation approach. General principles reflected in NC DWR guidance include: • Higher mitigation requirements for impacts to perennial and higher -functioning streams • Lower mitigation requirements for impacts to degraded or intermittent streams, where appropriate • Use of credit -based accounting rather than linear -foot or ratio -based mitigation • Case -specific mitigation requirements for non-standard, temporary, or complex impacts Final mitigation requirements are determined by NCDEQ DWR in coordination with the USACE Wilmington District and may vary based on project -specific conditions, watershed priorities, and the availability of approved mitigation options. Appendix F- Supplemental Credit Determination 2-1 Mountain Valley Methodology Last Updated March 10, 2026 MVP Southgate Mitigation for Permanent Impacts 3.0 Mitigation for Permanent Impacts Mountain Valley has provided mitigation for permanent impacts using banking programs in both Virginia and North Carolina, as well as by implementing the Snow Creek Permittee-Responsible Mitigation project in Virginia. A list of the permanently -impacted streams and wetlands and their associated mitigation may be found in Tables 15 and 16 of the IP Application. Mitigation purchases are listed in Tables 1 and 2, below. Mountain Valley has provided compensatory mitigation for all proposed permanent impacts in quantities that meet or exceed the applicable regulatory requirements. Accordingly, no additional compensatory mitigation is proposed in this CDMD for permanent impacts. Bills of Sale will be provided to the respective DEQ and USACE offices upon purchase. 3.1 Permanent Stream Impacts Associated with Access Road All of the proposed permanent stream impacts result from the installation, repair, or replacement of culverts associated with access roads. Properly -sized and countersunk culverts are necessary to maintain natural stream flow across access roads. Nevertheless, they are considered permanent impacts. The compensatory mitigation provided for these impacts is summarized in the following table. Table 1: Banking Credits Sourced for Permanent Stream Impacts Impacts (ft) Credits Required Frog Bottom Mitigation Bank Primary 162 145 North Carolina Division of Mitigation Services Primary 52 52 Total 114 97 3.2 Permanent Wetland Conversion Impacts All of the proposed permanent wetland impacts for the Project result from the conversion of Palustrine Forested (PFO) or Palustrine Scrub -Shrub (PSS) wetlands to Palustrine Emergent (PEM). Mountain Valley's ability to restore PFO and PSS wetlands to their preconstruction condition is limited by the need to maintain vegetation on the right-of-way (ROW) to allow inspections of the pipeline and to protect the pipe coating from damage by woody vegetation roots. Although vegetation maintenance will be limited to the extent necessary in wetlands, Mountain Valley has erred on the side of caution by deeming all conversion impacts to be permanent for the purpose of calculating compensatory mitigation. Nevertheless, conversion impacts will be restored to PEM wetlands so that there is no loss in wetland area resulting from these impacts. Additionally, most of the "permanent" conversion impacts are not expected to be permanent in fact. Except for actively -maintained areas of the ROW, these systems are expected to return to PSS and/or PFO conditions over time. The compensatory mitigation provided for wetland conversion impacts is summarized in the following table. Appendix F- Supplemental Credit Determination 3-1 Mountain Valley Methodology Last Updated March 10, 2026 MVP Southgate Mitigation for Permanent Impacts Table 2: Banking Credits Sourced for Wetland Conversion Impacts Impacts (acres) I Credits Required Beaverdam Mitigation Bank Primary 0.97 1 0.97 Copper Hill Mitigation Bank Primary 0.67 T 0.67 Snow Creek Permittee Responsible Mitigation Site Primary 4.75 1 4.75 North Carolina Division of Mitigation Services Primary 3.00 3.00 Total 9.39 9.39 3.3 Permanent Wetland Fill Impacts No permanent wetland impacts from the placement of fill are anticipated for the Project. Therefore, no compensatory mitigation for permanent wetland fill impacts is required for the Project. Appendix F- Supplemental Credit Determination 3-2 Mountain Valley Methodology Last Updated March 10, 2026 MVP Southgate Supplemental Mitigation for Temporary Impacts 4.0 Supplemental Mitigation for Temporary Impacts Temporary impacts occur when fill is placed in "Waters of the United States" that are then restored to similar preconstruction contours when construction is complete. These impacts do not result in changes in the bottom elevation of streams and wetlands; thus, are not considered a loss of aquatic resources. Therefore, compensatory mitigation for temporary impacts is typically provided by the restoration of the resources. To account of the temporary loss of use, Mountain Valley proposes to voluntarily mitigate for temporal impacts associated with stream and wetland crossings. This section discusses the methodology for calculating the quantity of supplemental compensatory mitigation credit to be provided to compensate for temporal mitigation. 4.1 Temporal Mitigation Credit Determination Methodology Compensatory mitigation for temporal impacts is not typically provided for actions regulated by the respective Corps districts, VADEQ, or NCDEQ. Nor do the Norfolk or Wilmington USACE Districts or respective state DEQ's have a standard approach to mitigating temporal losses. Mountain Valley originally developed a temporal loss compensation methodology for the Mountain Valley Pipeline Mainline project. To develop the methodology, Mountain Valley reviewed authorities from the relevant agencies, as well as approaches to temporal loss mitigation in other districts. The methodology was thoroughly reviewed and accepted by the relevant Corps districts (Norfolk, Huntington, and Pittsburgh) and state agencies (Virginia and West Virginia) responsible for the Mainline project. Mountain Valley intends to apply the same methodology to this Project. Mountain Valley proposes to provide supplemental compensatory mitigation for temporal loss at a standard rate of 3% per year for all temporary impacts. The same rate (3%) will be applied both to the duration of the construction impact and an assumed period of post -construction restoration. The assumed durations are explained in Sections 4.2 and 4.3. Mountain Valley has calculated the amount of supplemental compensatory mitigation to be provided with the modified 3% per year debit assumptions noted above in Virginia and North Carolina. The supplemental compensatory mitigation has been calculated by applying a 3% credit per year credit debit to the mitigation requirement that would be generated for a hypothetical permanent impact using the USM or stream area (streams) or wetland area in accordance with the following formula: Supplemental compensatory mitigation = 3% per year compensation rate times assumed duration of temporal loss times hypothetical mitigation requirement for a permanent impact to the resource. 4.2 Temporary Impacts Associated with Pipeline Crossings Streams and wetlands will be temporarily impacted by preparation of the ROW and excavation of the trench to all the installation of the pipeline. Once an aquatic resource crossing is commenced, it is completed as expeditiously as possible to minimize the duration of instream work. The impact location is restored immediately upon completion of the pipeline installation activity. For temporarily -impacted streams associated with pipeline crossings, the preexisting substrate and contours will be restored and stream flow (if flowing water present) will be returned. Elevated sediment and turbidity levels are expected to dissipate within several hours to a few days. To conservatively compensate for any lingering temporal loss following restoration of the stream crossing, Mountain Valley Appendix F- Supplemental Credit Determination Methodology 4-1 Mountain Valley Last Updated March 10, 2026 MVP Southgate Supplemental Mitigation for Temporary Impacts will include one year of compensatory mitigation from the date the stream is impacted, which will also include the de minimis duration of the instream work. For example, the supplemental mitigation obligation for a 100-linear feet stream temporarily impacted by a pipeline crossing would be determined as follows. First, Mountain Valley would determine the hypothetical compensation requirement for a permanent impact to this 100-foot stream segment using either the USM (VA) or NC DWR (NC) methodologies. For such impacts, Mountain Valley assumes the duration of temporal loss is 1 year, and that loss is mitigated at a rate of 3% per year. Accordingly, the compensatory mitigation commitment for this example impact would be 3% of the compensation that would be necessary if there was a permanent loss of the stream. For temporarily -impacted wetlands associated with pipeline crossings, the preexisting contours will be restored with the segregated wetland topsoil (except in the unexpected situation in which saturated or flooded conditions prevent topsoil segregation). Through a combination of the natural seedbank, seeding, and, where required, bare root sapling or shrub plantings, PEM wetland vegetation is expected to return within one full growing season. No additional compensatory mitigation is proposed for restoration of PSS or PFO vegetation because, as discussed in Section 3.2, compensatory mitigation has already been provided for those conversion impacts. To conservatively compensate for any lingering temporal loss following restoration of the wetland crossing, an additional two years of compensatory mitigation will be provided. For example, the supplemental mitigation obligation for a 0.10-acre PEM wetland temporarily impacted by a pipeline crossing would be determined as follows. First, Mountain Valley would determine the hypothetical compensation requirement for a permanent impact to this 0.10-acre wetland using either the standard mitigation ratio (VA) or NC DWR methodology (NC). For such impacts, Mountain Valley assumes the duration of temporal loss is 2 years, and that loss is mitigated at a rate of 3% per year. Accordingly, the compensatory mitigation commitment for this example impact would be 6% of the compensation that would be necessary for a permanent loss of the wetland. 4.3 Temporary Impacts Associated with the Placement of Temporary Fill Temporary fills may be placed in aquatic resources in several circumstances. The most common type of temporary fill is timber mat crossings. Timber mats that are used at stream crossings are often included because they are located below the ordinary high water mark and do not change or alter the stream bottom. Timber mats are used in wetlands, as required by FERC and recommended by other resource agencies, to reduce potential impacts to these resources from equipment passage. Timber mats may remain in place for an extended duration during the construction phase of the Project because they are necessary to maintain access to parts of the ROW for the purposes of construction, inspection, and maintenance of the Project's erosion and sediment controls. Other temporary fills may be necessary to construct and maintain temporary access roads and workspaces. When no longer needed for construction of the Project, temporary fills will be removed, and the affected resources will be restored to preconstruction conditions. To calculate the supplemental compensatory mitigation to be provided for temporary fill impacts, Mountain Valley has first calculated the anticipated duration of the fill. Although resources with temporary fills are expected to be restored quickly, Mountain Valley has applied the same assumed post -restoration period of temporal loss as for crossings. That is, an additional one year of compensatory mitigation will be provided for streams and two years for wetlands. Appendix F- Supplemental Credit Determination Methodology 4-2 Mountain Valley Last Updated March 10, 2026 MVP Southgate Supplemental Mitigation for Temporary Impacts For example, assume timber mats are placed in 0.10-acres of PEM wetland to allow for the passage of construction equipment. After 6 months, the timber mats are removed and the wetland is restored. Compensation for this temporal loss would be determined as follows. Similar to pipeline crossings, Mountain Valley would begin with the hypothetical compensation requirement for permanent loss of the 0.10-acre PEM using the applicable Virginia or North Carolina methodology. The duration of temporal loss would be the 6 months the timber mats were in place plus the assumed two-year period for the wetland to be fully restored after the timber mats are removed — or 3 years. Compensation would be provided at a rate of 3% per year times 3 years. Accordingly, the compensation for temporal loss in this example would be 9.0% (3%/year x 3 years) of the hypothetical compensatory mitigation requirement that would apply to a permanent loss of the wetland. 4.4 Proposed Supplemental Compensatory Mitigation Applying the methodology described above, Mountain Valley has calculated an additional compensatory mitigation commitment to be provided for each temporary impact in the IP application. Mountain Valley intends to provide this supplemental compensatory mitigation by purchasing credits and permittee responsible mitigation. Tables identifying the proposed supplemental mitigation for each impact are included in Exhibit A while Tables 3 and 4 below provide summaries of the total credits required and where the credits will be sourced. Bills of Sale will be provided to the respective DEQ and USACE offices upon purchase. Mountain Valley recognizes that the supplemental compensatory mitigation methodology relies on certain forward -looking assumptions, including the timely success of restoration activities. If the assumptions underlying this CDMD prove incorrect and the mitigation provided for temporal loss is inadequate as a result, Mountain Valley will address any additional compensatory mitigation needs in the conjunction with its implementation of Maintenance and Adaptive Management Plan. Table 3: Banking Credits Sourced for Temporary Stream Impacts Impacts (ft) Credits Required Beaverdam Mitigation Bank Primary 5,648 1 168 North Carolina Division of Mitigation Services Primary 720 22 Total 6,368 190 Table 4: Banking Credits Sourced for Temporary Wetland Impacts Impacts (acres) Credits Required Copper Hill Mitigation Bank Primary 5.08 0.32 North Carolina Division of Mitigation Services Primary 2.99 0.20 Total 8.07 0.52 Appendix F- Supplemental Credit Determination Methodology 4-3 Mountain Valley Last Updated March 10, 2026 MVP Southgate References 5.0 References Barbour, M.T., J. Gerritsen, B.D. Snyder, and J.B. Stribling. 1999. Rapid Bioassessment Protocols for Use in Streams and Wadeable Rivers: Periphyton, Benthic Macroinvertebrates and Fish, Second Edition. EPA 841-B-99-002. U.S. Environmental Protection Agency. Office of Water. Washington, D.C. Cowardin, L.M., Carter, V., Golet, F.C., and LaRoe, E.T. 1979. Classification of Wetlands and Deepwater Habitats of the United States. Technical Report FWS/OBS-79/31. U.S. Department of the Interior, Fish and Wildlife Service, Office of Biological Services, Washington, D.C. Modified for National Wetlands Inventory Mapping Convention. Gerritsen, J., J. Burton, and M.T. Barbour. 2000. A Stream Condition Index for West Virginia Wadeable Streams. Tetra Tech, Inc. Owing Mills, MD. Potesta & Associates, Inc., et al. Comprehensive Stream and Wetland Monitoring, Restoration and Mitigation Framework: Mountain Valley Pipeline Project. Prepared for Mountain Valley Pipeline, LLC, Project No. 0101-21-0244-005, 25 May 2023. Summers, E.A., C.V. Noble, J.F. Berkowitz, and F.J. Spilker. 2017 (January). Operational Draft Regional Guidebook for the Functional Assessment of High Gradient Headwater Streams and Low -Gradient Perennial Streams in Appalachia. ERDC/EL TR-17-1. Wetlands Regulatory Assistance Program. U.S. Army Corps of Engineers, Washington, DC. USACE and VADEQ, January 2007. Unified Stream Methodology for Use in Virginia. U.S. Army Corps of Engineers, Norfolk District and Virginia Department of Environmental Quality. 37 pp. USACE. 2011. The West Virginia Stream and Wetland Valuation Metric. http://www.Irh.usace.army.miI/Portals/38/docs/regulatory/West%2OVirginia% 20Stream%20and%2OWetland%2OValuation%2OMetric%201nstruction.pdf Appendix F- Supplemental Credit Determination Methodology 5-4 Mountain Valley Last Updated March 10, 2026 Exhibit A — Proposed Temporal Mitigation Requirements for Streams and Wetlands Last Updated March 10, 2026 Table F-1- Virginia Supplemental Wetland Mitigation Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework MVP Southgate Amendment Project Wetland ID County UDistrict Latitude a/ Longitude a/ Cowardin Class b/ HLIC-8 Impact Type c/ Temporary Impacts (acres) d/ Hypothetical Compensatory Mitigation Requirement e/ Compensation RateSACE (3%) f/ Assumed Duration of Temporal Loss (years) g/ Supplemental Compensatory Mitigation h/ W-AO01 Pittsylvania Norfolk 36.820876 -79.349624 PEM 03010105 Timber Mat Travel Lane 0.0629 0.0629 0.03 3 0.0057 W-A003b Pittsylvania Norfolk 36.823326 -79.347151 PEM 03010105 Pipeline ROW 0.0958 0.0958 0.03 2 0.0058 W-AO05 Pittsylvania Norfolk 36.826061 -79.338719 PEM 03010105 Temporary Access Road 0.0252 0.0252 0.03 3 0.0023 W-AO07 Pittsylvania Norfolk 36.801930 -79.368135 PEM 03010105 Temporary Access Road 0.0658 0.0658 0.03 3 0.0059 W-AO08 Pittsylvania Norfolk 36.801941 -79.368419 PEM 03010105 Temporary Access Road 0.0068 0.0068 0.03 3 0.0006 W-AO09 Pittsylvania Norfolk 36.803103 -79.369149 PEM 03010105 Pipeline ROW 0.0364 0.0364 0.03 2 0.0022 W-A010a Pittsylvania Norfolk 36.804950 -79.367094 PEM 03010105 Pipeline ROW 2.2928 2.2928 0.03 2 0.1376 W-A011 Pittsylvania Norfolk 36.808642 -79.362842 PEM 03010105 Timber Mat Travel Lane 0.0173 0.0173 0.03 3 0.0016 W-A013a Pittsylvania Norfolk 36.810309 -79.360973 PEM 03010105 Pipeline ROW/ Temporary Access Road 1.0186 1.0186 0.03 2 0.0611 W-AO17 Pittsylvania Norfolk 36.736489 -79.438789 PEM 03010105 Pipeline ROW 0.1795 0.1795 0.03 2 0.0108 W-A025a Pittsylvania Norfolk 36.741628 -79.434083 PEM 03010105 Timber Mat Crossing 0.0108 0.0108 0.03 3 0.0010 W-A026 Pittsylvania Norfolk 36.746177 -79.429973 PEM 03010105 Timber Mat Crossing 0.0063 0.0063 0.03 3 0.0006 W-A027 Pittsylvania Norfolk 36.753467 -79.423204 PEM 03010105 Timber Mat Crossing 0.0144 0.0144 0.03 3 0.0013 W-A029a Pittsylvania Norfolk 36.735055 -79.440182 PEM 03010105 Pipeline ROW 0.0750 0.0750 0.03 2 0.0045 W-A030a Pittsylvania Norfolk 36.728941 -79.445945 PEM 03010105 Pipeline ROW 0.0953 0.0953 0.03 2 0.0057 W-A032 Pittsylvania Norfolk 36.757595 -79.419057 PEM 03010105 Timber Mat Crossing 0.0098 0.0098 0.03 3 0.0009 W-A037 Pittsylvania Norfolk 36.703959 -79.470234 PEM 03010103 Timber Mat Crossing 0.0033 0.0033 0.03 3 0.0003 W-A040 Pittsylvania Norfolk 36.701714 -79.473466 PEM 03010103 Timber Mat Crossing 0.0159 0.0159 0.03 3 0.0014 W-A042 Pittsylvania Norfolk 36.688884 -79.486260 PEM 03010103 Timber Mat Crossing 0.0008 0.0008 0.03 3 0.0001 W-A043 Pittsylvania Norfolk 36.688825 -79.486238 PEM 03010103 Timber Mat Crossing 0.0013 0.0013 0.03 3 0.0001 W-A046 Pittsylvania Norfolk 36.671944 -79.498935 PEM 03010103 Temporary Access Road 0.0009 0.0009 0.03 3 0.0001 W-A047 Pittsylvania Norfolk 36.671862 -79.498897 PEM 03010103 Temporary Access Road 0.0061 0.0061 0.03 3 0.0006 W-A048 Pittsylvania Norfolk 36.668160 -79.506540 PEM 03010103 Pipeline ROW 0.0088 0.0088 0.03 2 0.0005 W-A049b Pittsylvania Norfolk 36.673619 -79.501599 PEM 03010103 Timber Mat Crossing 0.0181 0.0181 0.03 3 0.0016 W-A050 Pittsylvania Norfolk 36.803187 -79.368939 PEM 03010105 Timber Mat Crossing 0.0125 0.0125 0.03 3 0.0011 W-A051 Pittsylvania Norfolk 36.651860 -79.522198 PEM 03010103 Pipeline ROW 0.0324 0.0324 0.03 2 0.0019 W-A053 Pittsylvania Norfolk 36.803307 -79.368781 PEM 03010105 Timber Mat Crossing 0.0012 0.0012 0.03 3 0.0001 W-A054 Pittsylvania Norfolk 36.644078 -79.527393 PEM 03010103 Pipeline ROW 0.0989 0.0989 0.03 2 0.0059 W-A063 Pittsylvania Norfolk 36.627974 -79.548082 PEM 03010103 Timber Mat Crossing 0.0007 0.0007 0.03 3 0.0001 W-A068 Pittsylvania Norfolk 36.768123 -79.408282 PEM 03010105 Pipeline ROW 0.0182 0.0182 0.03 2 0.0011 W-A070a Pittsylvania Norfolk 36.757744 -79.418935 PEM 03010105 Timber Mat Crossing 0.0238 0.0238 0.03 3 0.0021 W-A070b Pittsylvania Norfolk 36.757852 -79.418825 PEM 03010105 Timber Mat Crossing 0.0082 0.0082 0.03 3 0.0007 W-A073a Pittsylvania Norfolk 36.774698 -79.399031 PEM 03010105 Pipeline ROW 0.2724 0.2724 0.03 2 0.0163 W-A076 Pittsylvania Norfolk 36.657575 -79.517488 PEM 03010103 Timber Mat Crossing 0.0001 0.0001 0.03 3 0.0000 W-A079 Pittsylvania Norfolk 36.815033 -79.355579 PEM 03010105 Timber Mat Crossing 0.0036 0.0036 0.03 3 0.0003 W-A081 Pittsylvania Norfolk 36.698694 -79.476488 PEM 03010103 Timber Mat Crossing 0.0022 0.0022 0.03 3 0.0002 W-B013a Pittsylvania Norfolk 36.541866 -79.632567 PEM 03010103 Timber Mat Crossing 0.0174 0.0174 0.03 3 0.0016 W-BO17 Pittsylvania Norfolk 36.557813 -79.616489 PEM 03010103 Pipeline ROW 0.0602 0.0602 0.03 2 0.0036 W-BO19 Pittsylvania Norfolk 36.561926 -79.612988 PEM 03010103 Pipeline ROW 0.1125 0.1125 0.03 2 0.0068 W-B024 Pittsylvania Norfolk 36.585648 -79.588213 PEM 03010103 Timber Mat Crossing 0.0116 0.0116 0.03 3 0.0010 W-B036b Pittsylvania Norfolk 36.587230 -79.586598 PEM 03010103 Timber Mat Crossing 0.0798 0.0798 0.03 3 0.0072 W-B038a Pittsylvania Norfolk 36.595989 -79.576949 PEM 03010103 Pipeline ROW 0.0758 0.0758 0.03 2 0.0046 W-B038c Pittsylvania Norfolk 36.595719 -79.577293 PEM 03010103 Timber Mat Crossing 0.0860 0.0860 0.03 3 0.0077 W-B042a Pittsylvania Norfolk 36.606170 -79.568044 PEM 03010103 Timber Mat Crossing 0.0599 0.0599 0.03 3 0.0054 W-B050 Pittsylvania Norfolk 36.561401 -79.613187 PEM 03010103 Timber Mat Crossing 0.0040 0.0040 0.03 3 0.0004 W-F002a Pittsylvania Norfolk 36.588715 -79.584987 PEM 03010103 Timber Mat Crossing 0.0055 0.0055 0.03 3 0.0005 W-G001a Pittsylvania j Norfolk 36.551286 -79.614259 PEM 03010103 Temporary Access Road 0.0276 0.0276 0.03 3 0.0025 Total: 0.3232 a/ Shown in decimal degrees. b/ PEM = Palustrine Emergent; PSS = Palustrine Scrub -Shrub; PFO = Palustrine Forested c/ Pipeline right-of-way (ROW) is based on wetlands that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on wetlands that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. ATWS = additional temporary workspace. d/ Construction of access roads will not result in impacts to tidal wetlands or wetlands adjacent to tidal waters. Temporary impacts include the area of PEM wetlands that are within the limits of disturbance; impact acreages are rounded to 4 decimal places. e/ The hypothetical compensatory mitigation requirement is determined for a hypothetical permanent impact to wetlands at a standard compensatory mitigation ratio of 1:1. f/ Mountain Valley proposes a standard rate of 3% per year for all temporary impacts which includes the duration of the construction impact and an assumed period of post -construction restoration. g/ Mountain Valley assumes the duration of temporal loss is 2 years for pipeline crossings and 3 years for the placement of temporary fill such as timber mats. h/ Supplemental compensatory mitigation = 3% per year compensation rate times assumed duration of temporal loss times hypothetical mitigation requirement for a permanent impact to the wetland. Last Updated March 10, 2026 Table F-2 - North Carolina Supplemental Wetland Mitigation Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework MVP Southgate Amendment Project Hypothetical Assumed Duration of Supplemental Temporary Impacts Compensatory Compensation RateSACE Wetland ID County UDistrict Latitude a/ Longitude a/ Cowardin Class b/ HLIC-8 Impact Type c/ Temporal Loss Compensatory (acres) d/ Mitigation (3%) f/ (years) g/ Mitigation h/ Requirement e/ W-B001a Rockingham Wilmington 36.495303 -79.680073 PEM 03010103 ATWS 0.3582 0.3582 0.03 3 0.0322 W-13004 Rockingham Wilmington 36.493601 -79.675951 PEM 03010103 ATWS 0.0232 0.0232 0.03 3 0.0021 W-B008 Rockingham Wilmington 36.513224 -79.660014 PEM 03010103 Pipeline ROW 0.0101 0.0101 0.03 2 0.0006 W-13009b Rockingham Wilmington 36.516920 -79.656429 PEM 03010103 Pipeline ROW 0.0536 0.0536 0.03 2 0.0032 W-BO10 Rockingham Wilmington 36.519145 -79.654541 PEM 03010103 Pipeline ROW/Temporary Access Road 0.0999 0.0999 0.03 2 0.0060 W-13011 Rockingham Wilmington 36.538144 -79.636202 PEM 03010103 Pipeline ROW 0.0275 0.0275 0.03 2 0.0017 W-BO12 Rockingham Wilmington 36.539856 -79.634416 PEM 03010103 Timber Mat Travel Lane 0.0315 0.0315 0.03 3 0.0028 W-B028 Rockingham Wilmington 36.529211 -79.645000 PEM 03010103 Pipeline ROW 0.7960 0.7960 0.03 2 0.0478 W-B029 Rockingham Wilmington 36.530506 -79.642653 PEM 03010103 Timber Mat Crossing 0.0033 0.0033 0.03 3 0.0003 W-13031a Rockingham Wilmington 36.530553 -79.643717 PEM 03010103 Pipeline ROW 0.2289 0.2289 0.03 2 0.0137 W-B032 Rockingham Wilmington 36.534529 -79.638990 PEM 03010103 Pipeline ROW 0.1102 0.1102 0.03 2 0.0066 W-13052b Rockingham Wilmington 36.508385 -79.665273 PEM 03010103 Pipeline ROW 0.0233 0.0233 0.03 2 0.0014 W-B053 Rockingham Wilmington 36.525433 -79.648654 PEM 03010103 Pipeline ROW 0.0441 0.0441 0.03 2 0.0026 Timber Mat Crossing/ W-B055 Rockingham Wilmington 36.493194 -79.678821 PEM 03010103 0.0416 0.0416 0.03 3 0.0037 Temporary Access Road W-BO56 Rockingham Wilmington 36.493824 -79.678444 PEM 03010103 Pipeline ROW 0.0391 0.0391 0.03 2 0.0023 W-F003 Rockingham Wilmington 36.538306 -79.636126 PEM 03010103 Timber Mat Crossing 0.0089 0.0089 0.03 3 0.0008 W-F004 Rockingham Wilmington 36.537522 -79.636888 PEM 03010103 Timber Mat Crossing 0.0096 0.0096 0.03 3 0.0009 W-F005 Rockingham Wilmington 36.537389 -79.637028 PEM 03010103 Timber Mat Crossing 0.0023 0.0023 0.03 3 0.0002 W-F006 Rockingham Wilmington 36.536551 -79.637457 PEM 03010103 Timber Mat Travel Lane 0.0101 0.0101 0.03 3 0.0009 W-F007 Rockingham Wilmington 36.536358 -79.637041 PEM 03010103 ATWS 0.0168 0.0168 0.03 3 0.0015 W-F008 Rockingham Wilmington 36.525157 -79.648937 PEM 03010103 Timber Mat Crossing 0.0393 0.0393 0.03 3 0.0035 Pipeline ROW/ATWS/ W-F009 Rockingham Wilmington 36.520103 -79.654101 PEM 03010103 0.8132 0.8132 0.03 2 0.0488 Temporary Access Road Timber Mat Crossing/ATWS/ W-FO10 Rockingham Wilmington 36.519681 -79.654757 PEM 03010103 0.1008 0.1008 0.03 3 0.0091 Temporary Access Road W-F011 Rockingham Wilmington 36.519424 -79.654546 PEM 03010103 Pipeline ROW 0.0339 0.0339 0.03 2 0.0020 W-FO12 Rockingham Wilmington 36.519330 -79.654769 PEM 03010103 Pipeline ROW 0.0148 0.0148 0.03 2 0.0009 W-FO13 Rockingham Wilmington 36.520754 -79.653245 PEM 03010103 Pipeline ROW 0.0260 0.0260 0.03 2 0.0016 W-FO15 Rockingham Wilmington 36.533180 -79.642304 PEM 03010103 Temporary Access Road 0.0006 0.0006 0.03 3 0.0001 Pipeline ROW/ATWS/ W-GO03 Rockingham Wilmington 36.499646 -79.673743 PEM 03010103 0.0242 0.0242 0.03 2 0.0015 Temporary Access Road Total: 0.1988 a/ Shown in decimal degrees. b/ PEM = Palustrine Emergent; PSS = Palustrine Scrub -Shrub; PFO = Palustrine Forested c/ Pipeline right-of-way (ROW) is based on wetlands that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on wetlands that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. ATWS = additional temporaryworkspace. d/ Construction of access roads will not result in impacts to tidal wetlands or wetlands adjacent to tidal waters. Temporary impacts include the area of PEM wetlands that are within the limits of disturbance; impact acreages are rounded to 4 decimal places. e/ The hypothetical compensatory mitigation requirement is determined for a hypothetical permanent impact to wetlands at a standard compensatory mitigation ratio of 1:1. f/ Mountain Valley proposes a standard rate of 3% per year for all temporary impacts which includes the duration of the construction impact and an assumed period of post -construction restoration. g/ Mountain Valley assumes the duration of temporal loss is 2 years for pipeline crossings and 3 years for the placement of temporary fill such as timber mats. h/ Supplemental compensatory mitigation = 3% per year compensation rate times assumed duration of temporal loss times hypothetical mitigation requirement for a permanent impact to the wetland. Last Updated March 10, 2026 Table F-3 - Virginia Supplemental Stream Mitigation Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework MVP Southgate Amendment Project Stream ID NHD Stream Name a/ County USACE District Latitude b/ Longitude b/ Flow Regime HUC 8 Impact Type c/ Temporary Impact (linear feet) d/ USM RCI e/ Hypothetical Compensatory Mitigation Requirement f/ Compensation Rate (3%) g/ Assumed Duration of Temporal Loss (years) h/ Supplemental Compensatory Mitigation i/ S-AO01 UNT To White Oak Creek Pittsylvania Norfolk 36.734897 -79.440223 Intermittent 03010105 Pipeline ROW 73 1.13 82 0.03 1 2 S-AO04 Little Cherrystone Creek Pittsylvania Norfolk 36.822913 -79.347519 Perennial 03010105 Pipeline ROW 99 1.08 107 0.03 1 3 S-AO05 UNT to Little Cherrystone Creek Pittsylvania Norfolk 36.828977 -79.344565 Perennial 03010105 Pipeline ROW 91 1.07 98 0.03 1 3 S-AO09 UNT to Cherrystone Creek Pittsylvania Norfolk 36.811606 -79.359388 Intermittent 03010105 Pipeline ROW 99 1.05 104 0.03 1 3 S-AO12 UNT to Cherrystone Creek Pittsylvania Norfolk 36.814949 -79.355538 Perennial 03010105 Pipeline ROW 90 1.10 100 0.03 1 3 S-AO13 UNT to Cherrystone Creek Pittsylvania Norfolk 36.816112 -79.353454 Ephemeral 03010105 Timber Mat Crossing 24 0.45 11 0.03 1 0 S-AO17 UNT to Banister River Pittsylvania Norfolk 36.782808 -79.390591 Intermittent 03010105 Pipeline ROW 79 1.01 80 0.03 1 2 S-AO18 UNT to Banister River Pittsylvania Norfolk 36.792090 -79.381212 Intermittent 03010105 Pipeline ROW 79 0.71 56 0.03 1 2 S-AO19 UNT to Banister River Pittsylvania Norfolk 36.787971 -79.384411 Perennial 03010105 Pipeline ROW 87 1.07 93 0.03 1 3 S-A021 White Oak Creek Pittsylvania Norfolk 36.773111 -79.399660 Perennial 03010105 Pipeline ROW 91 1.10 100 0.03 1 3 S-A022 White Oak Creek Pittsylvania Norfolk 36.771795 -79.400506 Perennial 03010105 Pipeline ROW 77 1.10 85 0.03 1 3 S-A024 UNTTo White Oak Creek Pittsylvania Norfolk 36.741561 -79.434055 Perennial 03010105 Pipeline ROW 126 0.80 100 0.03 1 3 S-A025 UNTTo White Oak Creek Pittsylvania Norfolk 36.746074 -79.429921 Intermittent 03010105 Pipeline ROW 125 1.28 161 0.03 1 5 S-A026 UNTTo White Oak Creek Pittsylvania Norfolk 36.753111 -79.423458 Perennial 03010105 Pipeline ROW 109 1.07 116 0.03 1 3 S-A027 UNT To White Oak Creek Pittsylvania Norfolk 36.753276 -79.423227 Perennial 03010105 Pipeline ROW 106 0.99 105 0.03 1 3 S-A028 UNT To White Oak Creek Pittsylvania Norfolk 36.756964 -79.419623 Ephemeral 03010105 Pipeline ROW 76 0.60 46 0.03 1 1 S-A029 UNT To White Oak Creek Pittsylvania Norfolk 36.734731 -79.440384 Perennial 03010105 Pipeline ROW 77 1.23 95 0.03 1 3 S-A031 UNT To White Oak Creek Pittsylvania Norfolk 36.729126 -79.445772 Perennial 03010105 Timber Mat Crossing 37 1.10 41 0.03 1 1 S-A032 UNT To White Oak Creek Pittsylvania Norfolk 36.720680 -79.454690 Intermittent 03010105 Pipeline ROW 70 1.12 79 0.03 1 2 S-A033a UNT To White Oak Creek Pittsylvania Norfolk 36.720526 -79.454921 Perennial 03010105 Pipeline ROW 182 1.12 204 0.03 1 6 S-A034 UNTTo White Oak Creek Pittsylvania Norfolk 36.719144 -79.457085 Ephemeral 03010105 Pipeline ROW 106 0.43 46 0.03 1 1 S-A036 UNT to Sandy Creek Pittsylvania Norfolk 36.707787 -79.466956 Intermittent 03010103 Pipeline ROW 306 1.26 385 0.03 1 12 S-A037 UNT to Sandy Creek Pittsylvania Norfolk 36.707919 -79.466839 Intermittent 03010103 Timber Mat Crossing 25 1.30 32 0.03 1 1 S-A038 UNT to Sandy Creek Pittsylvania Norfolk 36.707051 -79.466859 Ephemeral 03010103 Pipeline ROW/ATWS 245 0.60 147 0.03 1 4 S-A040 UNT to Sandy Creek Pittsylvania Norfolk 36.704018 -79.470164 Ephemeral 03010103 Timber Mat Crossing 147 0.60 88 0.03 1 3 S-A041 UNT to Sandy Creek Pittsylvania Norfolk 36.704062 -79.470350 Intermittent 03010103 Timber Mat Crossing 84 1.03 86 0.03 1 3 S-A042 UNT to Sandy Creek Pittsylvania Norfolk 36.703928 -79.470519 Perennial 03010103 Pipeline ROW 153 1.24 189 0.03 1 6 S-A043 UNT to Sandy Creek Pittsylvania Norfolk 36.701629 -79.473438 Perennial 03010103 Pipeline ROW 93 1.30 121 0.03 1 4 S-A044 UNT to Sandy Creek Pittsylvania Norfolk 36.698524 -79.476499 Perennial 03010103 Pipeline ROW 77 1.24 96 0.03 1 3 S-A045 Sandy Creek Pittsylvania Norfolk 36.688829 -79.486181 Perennial 03010103 Pipeline ROW 82 1.24 102 0.03 1 3 S-A046 UNT to Sandy Creek Pittsylvania Norfolk 36.680562 -79.490125 Perennial 03010103 Pipeline ROW 109 1.30 141 0.03 1 4 S-A047 UNT to Sandy Creek Pittsylvania Norfolk 36.671924 -79.498955 Perennial 03010103 Temporary Access Road 25 0.98 25 0.03 1 1 S-A048 UNT to Sandy Creek Pittsylvania Norfolk 36.668159 -79.506549 Intermittent 03010103 Pipeline ROW 77 0.99 77 0.03 1 2 S-A049 UNTto Sandy Creek Pittsylvania Norfolk 36.673416 -79.501654 Perennial 03010103 Pipeline ROW 82 1.09 89 0.03 1 3 S-A050 UNT to Silver Creek Pittsylvania Norfolk 36.655379 -79.519215 Intermittent 03010103 Pipeline ROW 82 1.04 86 0.03 1 3 S-A052 UNT to Silver Creek Pittsylvania Norfolk 36.653753 -79.520409 Perennial 03010103 Pipeline ROW 169 1.06 179 0.03 1 5 S-A053 UNT to Sandy River Pittsylvania Norfolk 36.636725 -79.528878 Intermittent 03010103 Temporary Access Road 53 1.32 70 0.03 1 2 S-A054 UNT to Silver Creek Pittsylvania Norfolk 36.651978 -79.522157 Perennial 03010103 Pipeline ROW 90 0.95 86 0.03 1 3 S-A055 UNT to Silver Creek Pittsylvania Norfolk 36.651865 -79.522220 Intermittent 03010103 Pipeline ROW 106 1.11 118 0.03 1 4 S-A057 UNT to Sandy River Pittsylvania Norfolk 36.643891 -79.527377 Intermittent 03010103 Pipeline ROW 93 1.22 114 0.03 1 3 S-A066 UNT To White Oak Creek Pittsylvania Norfolk 36.76369 -79.412675 Ephemeral 03010105 Timber Matt Crossing 11 0.38 4 0.03 1 0 S-A069 UNT To White Oak Creek Pittsylvania Norfolk 36.755111 -79.424018 Intermittent 03010105 Temporary Access Road 13 1.30 16 0.03 1 0 S-A070 UNT to Silver Creek Pittsylvania Norfolk 36.662088 -79.511259 Intermittent 03010103 Pipeline ROW 80 1.13 90 0.03 1 3 S-A071 UNT to Sandy River Pittsylvania Norfolk 36.639740 -79.534245 Perennial 03010103 Pipeline ROW 88 1.32 116 0.03 1 3 S-B023 UNT to Dan River Pittsylvania Norfolk 36.568006 -79.611830 Ephemeral 03010103 Timber Mat Crossing 11 0.52 6 0.03 1 0 S-B026 UNT to Trotters Creek Pittsylvania Norfolk 36.584710 -79.598879 Intermittent 03010103 Temporary Access Road 26 1.05 27 0.03 1 1 S-B027 UNTtoTrotters Creek Pittsylvania Norfolk 36.583901 -79.599466 Intermittent 03010103 Temporary Access Road 13 1.05 14 0.03 1 0 S-B028 U NT to Trotters Creek Pittsylvania Norfolk 36.583129 -79.600290 Ephemeral 03010103 Temporary Access Road 25 0.43 11 0.03 1 0 S-B029 Trotters Creek Pittsylvania Norfolk 36.574685 -79.600110 Perennial 03010103 Pipeline ROW 76 1.17 89 0.03 1 3 S-B032 U NT to Trotters Creek Pittsylvania Norfolk 36.586822 -79.586916 Intermittent 03010103 Pipeline ROW 77 0.90 69 0.03 1 2 S-B033 U NT to Trotters Creek Pittsylvania Norfolk 36.585572 -79.588112 Intermittent 03010103 Pipeline ROW 39 1.00 39 0.03 1 1 S-B038 UNT to Trotters Creek Pittsylvania Norfolk 36.582728 -79.592044 Intermittent 03010103 Timber Mat Crossing 2 1.20 3 0.03 1 0 S-B039 U NT to Trotters Creek Pittsylvania Norfolk 36.580246 -79.594500 Ephemeral 03010103 Pipeline ROW 84 0.60 50 0.03 1 2 S-B040 UNT to Trotters Creek Pittsylvania Norfolk 36.587479 -79.586301 Intermittent 03010103 Timber Mat Crossing 81 0.46 37 0.03 1 1 S-B041 UNT to Trayner Branch Pittsylvania Norfolk 36.595875 -79.576954 Intermittent 03010103 Pipeline ROW 53 1.15 61 0.03 1 2 S-B042 UNT to Trayner Branch Pittsylvania Norfolk 36.595831 -79.577069 Perennial 03010103 Pipeline ROW 84 1.04 87 0.03 1 3 S-13044a UNT to Trayner Branch Pittsylvania Norfolk 36.603259 -79.570412 Perennial 03010103 Pipeline ROW 61 1.01 61 0.03 1 2 S-B045 UNT to Trayner Branch Pittsylvania Norfolk 36.605972 -79.568131 Perennial 03010103 Pipeline ROW 98 1.04 102 0.03 1 3 S-B046 UNT to Pine Lake Pittsylvania Norfolk 36.613887 -79.562228 Perennial 03010103 Pipeline ROW 109 1.19 129 0.03 1 4 S-BO51 UNT to Dan River Pittsylvania Norfolk 36.545968 -79.628350 Perennial 03010103 Pipeline ROW 88 0.80 70 0.03 1 2 S-B052 UNT to Dan River Pittsylvania Norfolk 36.552527 -79.621795 Perennial 03010103 Pipeline ROW 83 1.27 105 0.03 1 3 S-B054 UNT to Dan River Pittsylvania Norfolk 36.556374 -79.617919 Perennial 03010103 Pipeline ROW 78 1.12 87 0.03 1 3 S-B055 UNT to Dan River Pittsylvania Norfolk 36.55673 -79.616551 Intermittent 03010103 Timber Mat Crossing 13 1.12 15 0.03 1 0 S-B056 UNT to Dan River Pittsylvania Norfolk 36.561424 -79.613324 Ephemeral 03010103 Pipeline ROW 96 0.35 34 0.03 1 1 S-BO59 UNT to Pine Lake Pittsylvania Norfolk 36.617481 -79.559870 Ephemeral 03010103 Pipeline ROW 86 0.45 39 0.03 1 1 S-B060 UNT to Banister River Pittsylvania Norfolk 36.775387 -79.398532 Ephemeral 03010105 Pipeline ROW 97 0.52 51 0.03 1 2 S-B061 UNT to Trotters Creek Pittsylvania Norfolk 36.575092 -79.599593 Ephemeral 03010103 Pipeline ROW 72 0.56 40 0.03 1 1 Total: 168 a/ For identified streams without an NHD (National Hydrography Dataset) name, the identified stream was given the name "Unidentified Tributary (UNT)" of the first named receiving waterbody. b/ Shown in decimal degrees. c/ Pipeline right-of-way (ROW) is based on streams that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on streams that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. d/ Temporary impacts include the area of streams that are within the limits of disturbance. e/ Unified Stream Methodology (USM) Reach Condition Index (RCI). f/ The hypothetical compensatory mitigation requirement is determined for a hypothetical permanent impact to streams. In Virginia, the hypothetical compensatory mitigation requirement was calculated by multiplying the USM RCI by the temporary impact length and Impact Factor (IF), with an assumed IF of 1.0. g/ Mountain Valley proposes a standard rate of 3% per year for all temporary impacts which includes the duration of the construction impact and an assumed period of post -construction restoration. h/ Mountain Valley assumes the duration of temporal loss is 1 year for temporary impacts to streams. i/ Supplemental compensatory mitigation = 3% per year compensation rate times assumed duration of temporal loss times hypothetical mitigation requirement for a permanent impact to the stream. Last Updated March 10, 2026 Table F-4 - North Carolina Supplemental Stream Mitigation Comprehensive Stream and Wetland Monitoring, Restoration, and Mitigation Framework MVP Southgate Amendment Project Hypothetical Assumed Duration of Supplemental Temporary Impact Compensatory Compensation RateSACE Stream ID NHD Stream Name a/ County UDistrict Latitude b/ Longitude b/ Flow Regime HUC 8 Impact Type c/ Temporal Loss (years) Compensatory (linear feet) d/ Mitigation (3%) f/ g/ Mitigation h/ Requirement e/ S-13002 UNTto Dan River Rockingham Wilmington 36.493049 -79.678829 Intermittent 03010103 Pipeline ROW/Temporary Access Road 76 76 0.03 1 2 S-13008 UNTto Dan River Rockingham Wilmington 36.502862 -79.670507 Intermittent 03010103 Pipeline ROW 90 90 0.03 1 3 S-13009 UNTto Dan River Rockingham Wilmington 36.505393 -79.667501 Ephemeral 03010103 Pipeline ROW 75 75 0.03 1 2 S-BO10 UNTto Dan River Rockingham Wilmington 36.507750 -79.665780 Ephemeral 03010103 Timber Mat Crossing 10 10 0.03 1 0 S-13011 UNTto Dan River Rockingham Wilmington 36.511354 -79.662130 Perennial 03010103 Pipeline ROW 74 74 0.03 1 2 S-BO13 UNTto Dan River Rockingham Wilmington 36.517520 -79.657911 Intermittent 03010103 Temporary Access Road 5 5 0.03 1 0 S-BO15 UNTto Dan River Rockingham Wilmington 36.516199 -79.656929 Perennial 03010103 Pipeline ROW 89 89 0.03 1 3 S-13015a UNTto Dan River Rockingham Wilmington 36.516197 -79.656872 Intermittent 03010103 Timber Mat Crossing 15 15 0.03 1 0 S-BO16 UNTto Dan River Rockingham Wilmington 36.515501 -79.657546 Ephemeral 03010103 Timber Mat Crossing 126 126 0.03 1 4 S-BO17 UNTto Dan River Rockingham Wilmington 36.513214 -79.660053 Intermittent 03010103 Pipeline ROW 81 81 0.03 1 2 S-F005 UNTto Cascade Creek Rockingham Wilmington 36.534513 -79.638991 Perennial 03010103 Pipeline ROW 79 79 0.03 1 2 Total: 22 a/ For identified streams without an NHD (National Hydrography Dataset) name, the identified stream was given the name "Unidentified Tributary (UNT)" of the first named receiving waterbody. b/ Shown in decimal degrees. c/ Pipeline right-of-way (ROW) is based on streams that cross the pipeline within the 75-foot-wide permanent and temporary easements. Timber mat crossings are based on streams that do not cross the pipeline within the 75-foot-wide permanent and temporary easements. d/ Temporary impacts include the area of streams that are within the limits of disturbance. e/ The hypothetical compensatory mitigation requirement is determined for a hypothetical permanent impact to streams. In North Carolina, the hypothetical compensatory mitigation requirement was calculated using a standard compensatory mitigation ratio of 1:1. f/ Mountain Valley proposes a standard rate of 3% per year for all temporary impacts which includes the duration of the construction impact and an assumed period of post -construction restoration. g/ Mountain Valley assumes the duration of temporal loss is 1 year for temporary impacts to streams. h/ Supplemental compensatory mitigation = 3% per year compensation rate times assumed duration of temporal loss times hypothetical mitigation requirement for a permanent impact to the stream. Last Updated March 10, 2026