HomeMy WebLinkAboutNCG021075_Application_20260609 RECEIVED
FORAGE CYU ONLY RECEIVED
NCCO2�'o � DE
iVl L_AI R
Assigned to: COO G JUN 0 9 2026
ARO FRO MRO RRO ARO WIRO WSRO
Division of Energy, Mineral, and Land Resources Land Quality SetV8ftWER
National Pollutant Discharge Elimination System
NCG020WO Notice of Intent
This General Permit covers STORMWATER AND/OR WASTEWATER DISCHARGES associated with activities under
SIC(Standard Industrial Classification)Code 14(Mineral Mining Industry)except for:peat mining,coal mining,
metal mining,oil and gas extraction, tourist gem mines, NCDOT borrow pits, in-stream sand mining, and
discharges from mining operations which are intermixed on site with stormwater from concrete operations. You
can find information on the DEMLRStormwater Program at deq.nc.gov/SW.
Directions: Print or type all entries on this application. Send the original,signed application with all required
items listed in Item(9)below to: NCDEMLR Stormwater Program,1612 MSC,Raleigh,INC 27699-1612. The
submission of this application does not guarantee coverage under the General Permit. Prior to coverage under
this General Permit a site inspection will be conducted.
1. Owner/Operator(to whom all permit correspondence will be mailed):
Name of legal organizational entity: Legally responsible person assigned in Item(10)below:
EVERETTS LOT CLEARING AND GRADING,INC. MARYANN EVERETT
Street address: City: State: Zip Code:
2402 Fred Everett Road KINSTON NC 28501
Telephone number: Email address:
252-522-5260 maryann@ecandg.com
Type of Ownership:
Government
❑County ❑Federal ❑Municipal ❑State
Non-government
IN Business(If ownership is business,a copy of NCSOS report must be included with this application)
❑Individual
2. Industrial Facility(facility being permitted):
Facility name: Facility environmental contact:
CABIN BRANCH MINE LYNN EVERETT
Street address: Cittyy State: Zip Code:
2611 FALLING CREEK RD KI-NSTON NC 28501
Parcel Identification Number(PIN) County:
37107-3596-02-8308 LENOIR
Telephone number: Email address:
252-522-5260 maryann@ecandg.com
Latitude of entrance: Longitude of entrance:
35.28 -77.69
4-digit SIC code: Facility is: Date operation is to begin or began:
1481 0 New ❑ Proposed August2026
❑ Existing
Types of minerals mined at this facility:
❑Gay ❑Feldspar Ore ❑ Lithium Ore ❑Phosphate tSoil 13 Construction Sand ❑Industrial Sand
❑Other:
Page 1 of 11
Is this a processing-only facility for materials mined elsewhere? Is this an inactive mine site?
❑Yes ❑Yes
IN No W No
Does total area of this mine site include ready-mixed concrete plant and/or asphalt plant areas?
❑Yes,and has separate NPDES stormwater permits(provide permit numbers):
O Yes,and does not have separate NPDES stormwater permits
IN No
Does this facility already have a valid Mining Permit from DEMLR's Land Quality Section?
❑Yes(please provide the Mining Permit Number)
IN No(please indicate the status of the Mining Permit application) I N REVIEW CURRENT
Are you applying for a discharge permit in the same location as a previously permitted mine?
❑Yes(please provide permit number and mine name)
C1 No
If the stormwater discharges to a municipal separate storm sewer system(MS4),name the operator of the MS4:
❑ N/A
3. Consultant(if applicable):
Name of consultant: Consulting firm:
J. BRANCH SMITH, PE DOGWOOD LD, PLLC
Street address: City: State Zip Code
205 SIERRA DR WILMINGTON NC 28409
Telephone number: Email address:
910-264-1071 dogwoodldp[Ic@gmait.com
4. Development Activities and Buffers
Mining operation will precede development activities at this site:
❑Yes
® No
Mine is located within one of the 20 Coastal Counties,and will it add more than 10,000 ft'of impervious surface:
❑Yes(to both)
❑ No,this mine is within one of the 20 Coastal Counties,but will not at more than 10,000 ft'of impervious surface
IN No,this mine is not within one of the 20 Coastal Counties
Mine is in the Neuse,Tar-Pamlico,or Catawba River Basins,OR in the Randleman or Jordan Water supply Watersheds?
®Yes(specify size of stream buffers) 50-FT BUFFER
❑ No
Mine site will include wastewater discharges from a ready-mix concrete batch plant?
❑Yes(please seek additional coverage under General Permit NCG140000:Ready-Mix Concrete)
® No
S. Mine Dewatering
Mine dewatering will occur at this site:
C�Yes ❑No(mark N/A for the rest of this section)
Mine dewatering from this facility will be discharged to:
2qSurface Waters and/or Wetlands
❑other(specify)
❑Mine will not discharge dewatering to Surface Waters and/or Wetlands;specify how dewatering will occur and where
water will be directed:
❑N/A
Page 2 of 11
Wetlands and/or Surface Waters are within 4W of the mine pit perimeter: 404/401 Certification permits required:
®Yes(specify distance) ❑Yes(briefly describe)
❑ No ® No
❑ N/A ❑ N/A
Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers?
❑Yes(please attach to this application) ® No SEE WETLAND CONSULTANT LETTER
6. Wastewater TreatmentN/A
Will this facility wash mined materials?
❑Yes 99 No
Will discharges of process wastewater treatment systems occur(including possible recycle system overflows)
❑Yes(please describe)
❑ No
Will this facility employ chemical additives to flocculate suspended solids?
❑Yes(specify name/manufacturer/quantity of daily use)
❑ No
Note:please visit:https://files.nc.gov/ncdea/Water+Quality/Environmental+Sciences/ATU/PAM8 30 18.pdf for list of
approved PAMS
Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that exceed the 10-yr,24-hr
rainfall event?
❑Yes(specify which systems)
❑ No
Are wastewater treatment facilities(including recycle systems)planned in the 100-year flood plain?
❑Yes ❑ No
Wastewater Treatment Alternative Review as required by 15A NCAC 2H.0105(c)(2)
Types of wastewater this mine site will discharge: Q Mine Dewatering ❑ Process Wastewater
Types of wastewater considered for this alternative review: ®Mine Dewatering ❑Process Wastewater
Are there existing sewer lines within a one-mile radius?
❑Yes
❑Wastewater treatment plant will accept wastewater
❑Is feasible to connect(explain)
❑Is not feasible to connect(explain)
❑Wastewater treatment plant will not accept wastewater(please attach letter documenting this)
IN No
Page 3 of 11
Are you already proposing a closed-loop recycle system(CLRS)that meets design requirements of 15A NCAC 2T.50000?
❑Yes,for dewatering
❑Yes,for process wastewater
❑Yes,for both
❑ No,this option is technologically feasible(explain)
❑ No,this option is not technologically feasible(explain)
❑ No,this option is otherwise feasible(explain)
❑No,this option is otherwise not feasible(explain)
What is the feasibility of building a CLRS compared to direct surface water discharge?
Surface or Subsurface Disposal System
❑A surface or subsurface disposal system is technologically feasible(explain)
❑A surface or subsurface disposal system is not technologically feasible(explain)
❑A surface or subsurface disposal system is otherwise feasible to implement(explain)
❑A surface of subsurface disposal system is not otherwise feasible to implement(explain)
What is the feasibility of employing a subsurface of surface discharge as compared to a direct discharge to surface waters?
Direct Discharge to surface waters is the most environmentally sound alternative to all reasonably cost-effective options
for the wastewaters being considered?
❑Yes
❑ No
If this review included all wastewater discharge types,would excluding some types make any of the above non-discharge
options feasible for some the wastewaters?
❑Yes
❑No
7. Outfalls(s)At least one outfall is required to be eligible for coverage.
3-4 digit identifier: Name of receiving water: Classification: El This water is impaired.
WDO-1 NEUSE RIVER C;NSW ❑This watershed has aTMDL.
Discharge from this outfall is from:
❑Stormwater IN Mine Dewatering ❑Process Wastewater
7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HOW,
ORW,Tr,WS-I,WS-II,WS-III,SA,or PNA):
Dischar a occurs from this outfall:
Only during a rainfall event ❑ Intermittently(indicate how often) ❑Continuously(indicate flow in CFS)
Latitude of outfall: Longitude of outfall:
35.29 1 -77.69
Brief description of the industrial activities that drain to this outfall:
no industrial
Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑ Yes ® No
If yes,how many gallons of new motor oil are used each month when averaged over the calendar year?
3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired.
N/A ❑This watershed has a TMDL
Page 4 of 11
Discharge from this outfall is from:
IN Stormwater ❑ Mine Dewatering ❑ Process Wastewater
7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW,
ORW,Tr,WS-I,WS-Il,WS-III,SA,or PNA):
Discharge occurs from this outfall:
❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑Continuously(indicate flow in CFS)
Latitude of outfall: Longitude of outfall:
Brief description of the industrial activities that drain to this outfall:
Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑Yes ❑ No
If yes,how many gallons of new motor oil are used each month when averaged over the calendar ear?
3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired.
❑This watershed has a TMDL
Discharge from this outfall is from:
❑Stormwater ❑ Mine Dewatering ❑Process Wastewater
7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HOW,
ORW,Tr,WS-I,WS-ll,WS-III,SA,or PNA):
Discharge occurs from this outfall:
❑Only during a rainfall event ❑ Intermittently(indicate how often) ❑Continuously(indicate flow in CFS)
Latitude of outfall: Longitude of outfall:
Brief description of the industrial activities that drain to this outfall:
Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑Yes ❑ No
If yes,how many gallons of new motor oil are used each month when averaged over the calendar year?
3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired.
❑This watershed has a TMDL.
Discharge from this outfall is from:
❑Stormwater ❑ Mine Dewatering ❑Process Wastewater
7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HOW,
ORW,Tr,WS-1,WS-II,WS-III,SA,or PNA):
Discharge occurs from this outfall:
❑Only during a rainfall event ❑ Intermittently(indicate how often) ❑Continuously(indicate flow in CFS)
Latitude of outfall: Longitude of outfall:
Brief description of the industrial activities that drain to this outfall:
Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑ Yes ❑ No
If yes,how many gallons of new motor oil are used each month when averaged over the calendar year?
3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired.
❑This watershed has a TMDL
Discharge from this outfall is from:
❑Stormwater ❑Mine Dewatering ❑Process Wastewater
7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HOW,
ORW,Tr,WS-1,WS-II,WS-III,SA,or PNA):
Discharge occurs from this outfall:
Page 5 of 11
❑Only during a rainfall event ❑ Intermittently(indicate how often) ❑Continuously(indicate flow in CFS)
Latitude of outfall: Longitude of outfall:
Brief description of the industrial activities that drain to this outfall:
Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑Yes ❑ No
If yes,how many gallons of new motor oil are used each month when averaged over the calendar year?
All outfalls must be listed and at least one outfall Is required.Additional outfalls may be added in the section
"Additional Outfalls"found on the last page of this N01.
S. Other Facility Conditions(check all that apply and explain accordingly):
❑This facility has other NPDES permits.If checked,list the permit numbers for all current NPDES permits:
❑This facility has Non-Discharge permits(e.g.recycle permit). If checked,list the permit numbers for all current Non-
Discharge permits:
W This facility uses best management practices or structural stormwater control measures.
If checked,briefly describe the practices/measures and show on site diagram:
SEE PLANS AND P&O PLAN
®This facility has a Stormwater Pollution Prevention Plan(SWPPP).
If checked,please list the date the SWPPP was implemented: 2026
❑This facility stores hazardous waste in the 100-year floodplain.
If checked,describe how the area is protected from flooding:
❑This facility is a(mark all that apply)
❑ Hazardous Waste Generation Facility
❑ Hazardous Waste Treatment Facility
❑Hazardous Waste Storage Facility
❑Hazardous Waste Disposal Facility
If checked,indicate:
Kilograms of waste generated each month: Type(s)of waste:
How material is stored: Where material is stored:
Number of waste shipments per year: Name of transport/disposal vendor:
Transport/disposal vendor EPA ID: Vendor address:
❑This facility is located on a Brownfield or Superfund site
If checked,briefly describe the site conditions:
❑ Facility provides appropriate secondary containment for bulk storage of liquid materials
If checked,briefly describe these measures:
❑Site has an active landfill within the mining permit boundary
If checked,please indicate type:
a) ❑ LCID(Land clearing and Inert Debris)
b) ❑other(specify)
Page 6 of 11
9. Required items(Application will be returned unless all of the following items have been included):
® Check for$120 made payable to NCDEQ
® Copy of most recent Annual Report to the NC Secretary of State(if applicable)
IN This completed application and any supporting documentation
❑Copy of the approved mining permit or indication of mining permit application status
❑Copy ofUS Army Corps—approved wetland delineation(if applicable) NA
Line drawing of the water flow through the facility or block flow diagram
VI Pictorial description of the nature of any sources of water and any collection and treatment measures
A site diagram showing,at a minimum,existing and proposed:
a) outline of drainage areas
b) surface waters
c) stormwater management structures
d) location of stormwater outfalls corresponding to the drainage areas
e) runoff conveyance features
f) areas where process materials are stored
g) impervious areas
h) site property lines
I�2 copies of large scale(24"x36"minimum)site plan showing:
!� a) topographical lines
b) all outfall locations
c) applicable buffers and delineated wetlands
d) receiving waters
e) 100-year flood plain(if applicable)
Copy of county map or USGs quad sheet with the location of the facility clearly marked
If mines site is in one of the 20 Coastal Counties(if applicable)
❑Applicant has check with the appropriate regional office to verify the need for a Coastal State Stormwater permit.
a) Indicate the Regional Office Contact:
❑ Detailed list of:
a) impervious surface areas and percentages
b) sub-drainage areas
c) total drainage area
If mine is dewatering and near wetlands,or may otherwise impact surface waters or groundwater
❑2 copies of large scale(24"x36"minimum)plans delineating areas on the listing acreage including:
a) wetlands
b) ditches
c) well-placements
d) pits
e) borrow areas
9 overburden storage
g) stormwater controls/BMPs
h) vehicle maintenance areas
i) settling basins
1) product process(such as screening,stockpiles,and waste piles)
k) total drainage area
1) impervious surface percentages(if state Stormwater programs apply)
m) applicable buffers
n) access and/or haul roads
❑Pump dewatering size and information on its specifications
Page 7 of 11
❑Well information(design,depths,maintenance)
❑ Physical monitoring for the wetland areas
❑Settling pond size information,if applicable
❑ Level spreader design,if applicable
❑ Details about dewatering method
❑Cone of influence calculations
❑ Description of measures to prevent erosion and flooding
❑ Description and information about 401/404 permits that have been obtained
❑Copy of US Army Corps of Engineers wetlands delineations or approved wetland delineation(if applicable)
❑ 1 have contacted my local regional office about a Pumping Operation and Monitoring(POM)plan
a) Regional Office Contact:
b) Date Contacted:
10.Applicant Certification:
North Carolina General Statute 143-215.6E(i)provides that: Any person who knowingly makes any false statement,
representation,or certification in any application,record,report,plan,or other document filed or required to be maintained
under this Article or a rule implementing this Article...shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law,I certify that:
am the person responsible for the permitted industrial activity,for satisfying the requirements of this permit,and for any
,-!c�ivil or criminal penalties incurred due to violations of this permit.
X�The information submitted in this NO1 is,to the best of my knowledge and belief,true,accurate,and complete based on
my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the
ormation.
El I will abide by all conditions of the NCG020000 permit.I understand that coverage under this permit will constitute the
� e It
It3rm
requirements for the discharge(s)and is enforceable in the same manner as an individual permit.
1 hereby request coverage under the
""N""CG020000 General Permit. -
Printed Name of Applicant: 4j�v�42AIA &me
Kr4 "
(gignature of Applicant) (Date Sig ed)
Mail the entire package to: DEMLR—Stormwater Program
Department of Environmental Quality
1612 Mail Service Center
Raleigh,NC 27699-1612
Page 8 of 11
} Falling Creek Mine 'c -' ✓ Legend
1 35289165° � � O Falling Creek Golf Course Z
-77.689400° Falling Creek Mine
ink( V
30
\ i
f
t JJJ /
.w.
w
w
1 )
u
COUISO
IC
f
f
_ t
1
�' �lir• tee - /
\TERRAIN
o! ENVIRONMENTAL
'CONSULTING
February 18, 2026
Dogwood LD, PLLC
205 Sierra Drive
Wilmington, NC 28409
Attention: Mr. Branch Smith, PE
Subject: Jurisdictional Delineation
Project No. 26-004-WS
Falling Creek Sand Mine
Kinston, NC
Dear Mr. Smith:
Terrain Environmental Consulting, PLLC (TEC) appreciates the opportunity to provide
you with this report for the jurisdictional delineation performed at the above referenced
project site. The results of our services are presented below.
PROJECT BACKGROUND
TEC was contracted by Dogwood LD to perform a jurisdictional delineation to identify
potential Waters of the US (WOTUS) including wetlands and streams. The overall
property is identified as Lenoir County PIN 3596-02-8308 totaling approximately 110
acres. It is our understanding that the property owner intends to construct a sand mine
on a portion the property on the southwest side of Falling Creek Road, and that our
delineation will be used to help determine the footprint of the sand mine.
A site plan prepared by Dogwood LD was provided to us which identified this portion
of the property as totaling approximately 80 acres and contains portions of an
agricultural field and undeveloped woodland along Cabin Branch and Falling Creek
(Figure 1).
METHODOLOGY
We reviewed the site for the presence of potential Waters of the US (WOTUS),
including jurisdictional wetland, non-jurisdictional wetland and streams using the U.S.
Army Corps of Engineers (USAGE) 1987 Wetland Delineation Manual and appropriate
Regional Supplement, 2023 WOTUS definition, USACE Regulatory Guidance Letter
05-05 Ordinary High Water Mark (OHWM) Identification, and North Carolina Division
of Water Resources (NCDWR) Stream ID Manual.
Wetland boundaries were marked with blue and white striped flagging and those flags
were located with non-survey grade, sub-meter accurate global positioning system
(GPS) equipment. Several GPS points were also taken along Cabin Branch and
Falling Creek to determine if the western and southern property boundaries shown on
PUMPING OPERATION & MONITORING PLAN
NPDES NCG02 DISCHARGE PERMIT
CABIN BRANCH SAND MINE
Lenoir County, North Carolina
Prepared for;
Everett's Lot Clearing and Grading, LLC
2402 Fred Everett Road
Kinston, NC 28504
Prepared by
Branch Smith, PE
DOGWOOD LD, PLLC
dogwoodLdpllc@gmaiL.com
(910) 264-1071
1 of 2
1 I
� 4
�y
T S60W tg M�
Hill Vlaw. r
r
1
3
Oakdale f, Slzsi
s_
i I
1
qa-
tI,d'S
v
Trinity Woods CI
70 La Grange a�ijeli 1. Sft. �,�.
I Pat Sand Hill
P
3 Hickory Hills ,
I �
Kinston
i
I. z Lemr '... Dupreeville:
i
f �
n Springs
ra'
t � ..
t
1 t
4TIrt0.5R IS(S EPA, kG5 15DA
Tulls Mill
2 Figure 1 -Site Vicinity
Falling Creek Sand Mine
}_. Falling Creek Road
Kinston, NC
0 5
Miles
C�)YStllnN
Terrain Environmental Consulting Project 26-004-WS February 18,2026
Falling Creek Sand Mine, Kinston, NC
The USACE has 30-days to determine the completeness of a NWP application and a
total of 45 to act once the application is deemed complete. A General WQC follows
the same review period as the corresponding NWP. NCDWR has 180-days to issue
an Individual WQC.
The project site is located in the Neuse River basin which has riparian buffer
protection rules that apply to any stream feature that appears approximately on a
county soil survey map, United States Geological Service (USGS)topographic map,
or other approved hydrography maps. Based on this, we expect the buffer rules to
apply to SA (Cabin Branch) and SB (Falling Creek). The riparian buffer extends 50
feet from the top of bank of such streams and development activities within the buffer
are limited. For mining activities, the following guidance is provided in 15A NCAC
02B.0714 (11)Table of Uses:
• Mining activities that are covered by the Mining Act are deemed allowable upon
authorization provided that new riparian buffers that meet the requirements of
Items (8)and (9) of this Rule are established adjacent to any relocated
channels. Item 8 details the two zones within the buffer and Item 9 pertains to
diffuse stormwater flow through the buffer;
• Mining activities that are not covered by the Mining Act OR where new riparian
buffers that meet the requirements of Items (8) and (9) of this Rule are not
established are deemed allowed with mitigation upon authorization; and
• Wastewater or mining dewatering wells with approved NPDES permit is
deemed allowable.
If encroachment into the 50-foot buffer of either SA or SB is proposed,then coordination
with NC Division of Water Resources for buffer protection permitting may be required.
CLOSING
We appreciate the opportunity to provide jurisdictional delineation services. If you
have any questions, please do not hesitate to contact me.
Sincerely,
Paul Masten, LSS, PWS
President/Owner
Attachments
Figure 1—Site Vicinity
Figure 2—Aquatic Resources
3
TW i• �'r
. e
s
h '
� L
� � t
a
a
Y ; 1
•
is
Pumping Plan N ra rative
Cabin Branch Mine will operate sand mining in accordance with the issued NC State Mining Permit.
Water is pumped from onsite pits to other onsite pits or either pumped directly into the dewatering
infiltration basin that is designed and constructed at the point of discharge. There is only one basin
for the entire mine permit and it is used intermittently throughout the year.
The pumping operations will consist of a 2,000 gpm mobile sump pump. Any dewatering
groundwater over 100,000 gaUday is required to maintain records with the NC Coastal Plain
Capacity Use Area monthly reporting in which this permit applies.
There are no residences within 500-ft of the property so no private wells will be affected. There are
wetlands downstream but the depth of the water will not be drawdown deep or permanently. The
intent of the dewatering basin to be used as a waterfowl impoundment. The discharge outlet is a
spillway shown per the plans that will surface dewater only during rainfall events and some
intermittent pumping.
The property is along Cabin Branch of Falling Creek off the Neuse River(C;Sw; NSW 27-77). Any
discharges that leave the settling basin flow in a non-erosive manner through rip-rap prior to entering
the existing wetlands and stream downstream.
Attachments
■ Pump Specifications
■ Plans for Dewatering—Mine Maps
2of2
i
J I
le m
Let's Solve Water
The Godwin CD100S Dri-Prime pump is a versatile,general purpose
dewatering pump designed for use in the industry's most challenging
construction,municipal,industrial and emergency response applications.
_ This rugged pump is ideally suited for tough dewatering jobs,and is the
reliable choice for rental solutions.
:i The CD100S is a member of the Godwin S Series of Smart pumps,
equipped with a new generation of Field Smart Technology(FST)for
remote monitoring and control.In addition to improved hydraulic
efficiency,greater fuel economy,and streamlined serviceability,the CD
impeller is interchangeable with a Flygt N Technology non-clog impeller,
providing the flexibility to tackle stringy,modern wastewater applications
with the same pump.
Specifications Features and benefits
�Succi4nc66ecuan c 4rnE1QDm}f(ane.;>
• Interchangeable impellers to Fully automatic priming from
tackle a full range of solids dry to 28 feet(8.5 meters).
4 Delivery connection 4 in(100 mm)flange handling applications.
�Maxcapacm# 1,079USGPbnt { Venturi priming requires no
m'lhr `M�„ µ <9 Field Smart Technology(FST) adjustment or control.
Max impeller diameter 10.0 in allows the user to monitor
---rP &control the pump from Available as open set or Sound
Maxsolfdshandltnc' 1 ut(45mM}�' ;,: Attenuated Enclosure.
t'�--� - , - + �.-• �» anywhere in the world.
Max operating temp 176 F (80 C) Standard build engine
Max vrbekm rass`urp -68`psp{4`7,6ai �-,: ' New compressor belt tensioner 3TNV88F(EPA Final Tier 4).
— -y- g�t - reduces time to change and
Max suction pressure 58 psi(4.0 bar) adjust belt to approximately 30 Other engine options available.
Irv_ar<Lcas, 3pres (rre t43(,}!(?,trbar7rN minutes. . Optional environmentally
Max operating spee. ....d 2200.. r.p.m... New sight glass and measuring friendly skid base contains all
.. ... .. .. ..
•Please contact our office for applications in excess of rrs•F(80 oQ. stick added to monitor level fluid spills.
t"Mar diameter pipes may be required for ma•Imum flows. and quality of mechanical seal
oil.
• Improved hydraulic design
reduces vibration,maximizes
efficiency and fuel economy.
godwin
a xylem brand
Godwin CD1O0S Dri-Prime Pump
PerFormance curve Suction lifttable 7800 rpm
Pump asrve is based on 0 ft dynamic suction lift. Performance data provided in tables is based on water tests at sea n
Flow(mamr) level and 68°F ambient.All information is approximate and for general
0 20 40 so 83 1W 120 140 160 tall x0u 2" 240 Zen 2eo
Iseguidanm only.Please contact the factory or office for lurtherdetalls. .A
130 22ro
s"
130 '. .aai isox { m TotalE r '[oral DeJiiM'rytf{2a4(Sot)
um�"
12. a*' suction
tto 1 35 1.3 ,26 .•i., ,39 H2 66, , F
Head g
n y
_ 00 (feet) iOutput{USGPM);,
so r4aor �- 1 2s E uw t.r•. .� . _ .a�-: _
i3O _ _ _ _L__ ! _ 10 623 574 509 427 328
eo -s,00 ',�� l i I I I xo
so - ss 15 1 623 558 476 377 1 262
40 _ 2
30 ' 3 4 10 20 591 525 443 344 230
za a �i l 11 -i ' i s 25 574 492 410 295 164
T
0 2s0 500 750 use 1250
Flmw(USGPM)
Open trailer
Fiji rapacity 30 U5 Ga1(114 i.rters)
Weight dry 1,930 lb(875 kg)
4Veightwet 2 750 tb 1�975 kg) t ''_� u4_k �
Dimensions L 102 in x W 54 in x H 70 in
(L 2,591 mm x W 1,372 mm x H 1,778 mm)
Informatlon provided above is based on NaYanmar 3TIJVBBF.
Sound attenuated enclosure
tofse( 23ft(7mlb_7db(A)
Fuel capacity 80 US Gal(303 Liters)'
Weight wet 3,250 lb(1,474 kg)
a Dj'rrierulotvs L$2 m x W 47{n* H 65 m '; ,. t � '
rry o-nfor
I(L2D63mxWi194mmxH1651mmj -.` ... z ...s
nfr. . ,. .......V: ........-:.
matlon provided above is based on the Venmar 3TNVBBF.
Driver Power Energy Use Emissions
Materials 1800 RPM Rating
Pump easmng �' Cast 7oit 85 EN 1561/EN � �1 YarlPnar 37NV88F� 24h}IP 1 01J5 Gal/hr'� EPA FxA M_,
2 Yanmar 3TNV88C 35 HP 1 2 US Gal/hr EPA FT4
Wearplates Cast Iron BS EN 1561/EN-
3 ^lanmar3TNV888pSA 36'HP 12,USGaIIhr' EPAIT4 J
��umpshaft t `' :� Carborr'stea)BS970 j1947 dt; 4 Caterpillar C1.5T 40 HP 1 5 US Gal/hr EPA IT4
(5leetoa In " 20HP
Impeller Cast Steel BS3100A5 Hardness Please comtaet the faeey or office for further details.A typical picture
to 200 HB Brinell of the pump is shown.All information is appmximare and for general guidance only.Consult the
factory for other driver opu.m.
Mechariicalsealfaces SIltcor,car6rdeVsSllicon
.. . . . . . . . . . . . . . . . . . . . . ::': . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
specifications and illuma[ions are subject to revision without notice.Xylem makes no
representation regarding the completeness or accuracy of this information and is not liable for
AI any direct or indirect damages arising from or relating to this information or its use.
®2019 Xylem.All rights reserved.Godwin is a trademark of xylem Dewatering Solutions,Inc.
Let's Solve Water tvwwaylem.com/godwin awhoily-ownedsub4dlary of Xylem Inc,