Loading...
HomeMy WebLinkAboutNAO-2018-1574_SAW-2018-00887_FTO_Initial_Proffered_Permit SignedDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS NORFOLK DISTRICT FORT NORFOLK 803 FRONT STREET NORFOLK VA 23510-101 March 20, 2026 Regulatory Program/Division Jeffrey Klinefelter Mountain Valley Pipeline, LLC 2200 Energy Drive Canonsburg, PA 15317 Via Email: jeffrey.klinefelter@eqt.com Dear Mr. Klinefelter: This letter is in response to your request for a Department of the Army permit received on April 11, 2025, and assigned the file number NAO-2018-1574, SAW-2018- 00887. Our regulations require you have an opportunity to review the terms and conditions prior to final signature by the Department of the Army. Enclosed is an unsigned Department of the Army permit instrument (permit) to construct components of Mountain Valley Pipeline – Southgate Project Amendment (Project) under the provisions of Section 404 of the Clean Water Act within the regulatory boundaries of the Corps of Engineers Norfolk District and Corps of Engineers Wilmington District. The Project involves the construction of 31.3 miles of 30-inch diameter natural gas pipeline to transport natural gas from an interconnection point with the Mountain Valley Pipeline in Pittsylvania County, Virginia to an interconnection point with the East Tennessee Natural Gas, LLC system in Rockingham County, North Carolina, and then to two new delivery points in Rockingham County, North Carolina. The overall Project will result in the permanent discharge of dredged and/or fill material into 114 linear feet (0.0093 acre) of streams and 0.0362 acre of palustrine emergent wetlands, the temporary discharge of dredged and/or fill material into 6,368 linear feet (0.7827 acre) of streams and 11.4713 acres of wetlands, and the permanent conversion of 9.3855 acres of forested and scrub-shrub wetlands to emergent wetlands. The Project components within the Norfolk District regulatory boundary consist of the construction of approximately 26.8 miles of pipeline and 10.8 miles of access roads. Activities requiring Department of the Army authorization within the Norfolk District regulatory boundary include the following: • Permanent discharge of dredged and/or fill material into 62 linear feet (0.0055 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 5,648 linear feet (0.7224 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 5.0826 acres of wetlands for pipeline installation and easement construction; • Permanent conversion of 6.3850 acres of forested or scrub-shrub wetlands to emergent wetlands for perpetual maintenance of the utility easement; • Permanent discharge of dredged and/or fill material into 0.0362 acres of wetlands for Permittee Responsible Mitigation Site construction; and • Temporary discharge of dredged and/or fill material into 3.3978 acres of wetlands for Permittee Responsible Mitigation Site construction. The Project components within the Wilmington District regulatory boundary consist of the construction of 4.6 miles pipeline and 4.5 miles of access roads. Activities requiring Department of the Army authorization within the Wilmington District regulatory boundary include the following: • Permanent discharge of dredged and/or fill material into 52 linear feet (0.0038 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 720 linear feet (0.0603 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 2.9909 acres of wetlands for pipeline installation and easement construction; and • Permanent conversion of 3.0004 acres of forested or scrub-shrub wetlands to emergent wetlands for perpetual maintenance of the utility easement. Please review the document and carefully read the Special Conditions included in Attached 3 of the permit. These were developed to apply specifically to your project. Water Quality Certification was required prior to issuance of a permit. In accordance with General Condition 5 of the permit, the Water Quality Certifications have been attached to the Department of the Army permit. Instructions for Accepting Terms and Conditions and Finalizing Your Permit: In order to accept the terms and conditions of this initial proffered permit and receive a valid Department of the Army permit, you must sign and return the permit and submit payment of the permit fee. Upon receipt of your signed permit, the District Engineer or his representative will then sign the permit. The Corps will add the permit expiration date to the permit, the permit issuance date on the Notice of Department of the Army Permit form and return the valid permit to you. It is important to note that the permit is not valid until the District Engineer or his representative signs it. Please follow the steps below: a. Sign the signature page of the initial proffered permit (page 6 of 7). Your signature, as permittee, indicates that as consideration for the issuance of this permit, you voluntarily accept and agree to comply with all the terms and conditions of this permit. In the case of corporations, acceptance must be by an officer of that corporation authorized to sign on behalf of the corporation. Please type or print the name and title of the person signing below the signature and the date signed. b. Return the entire permit, including all attachments, to the address listed in the last paragraph of this letter or send via email to the Project Manager listed in the last paragraph of this letter. If the file is greater than 20 MB, upload via DOD SAFE (https://safe.apps.mil/). c. Pay the permit fee (CFR 33 Part 325.1(f)) of $100 one of two ways: (1) Mail a check or money order to the address listed in the last paragraph of this letter, made payable to the Finance and Accounting Officer, Corps of Engineers, Norfolk District, or (2) Pay online at pay.gov/public/form/start/996412796 (or go to pay.gov and enter into the search box “DEPARTMENT OF THE ARMY PERMIT FEES” to navigate to the payment input form). After paying online, submit a receipt along with the signed permit, either by mail to the address listed in the last paragraph of this letter, or via email to the Project Manager listed in the last paragraph of this letter. Instructions for Objecting to Permit Terms and Conditions: This letter contains an initial proffered permit for your proposed project. If you object to certain terms and conditions contained within the permit, you may request that the permit be modified. Enclosed you will find a Notification of Administrative Appeal Options and Process fact sheet and Request for Appeal (RFA) form. If you choose to object to certain terms and conditions of the permit, you must follow the directions provided in Section 1, Part A and submit the completed RFA form to the address listed in the last paragraph of this letter. In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria under 33 CFR Part 331.5, and that it has been received by the District office within 60 days of the date of the RFA. Should you decide to submit an RFA form, it must be received at the address listed in the last paragraph of this letter by May 19, 2026. It is not necessary to submit an RFA form to the District office if you do not object to the decision in this letter. If you have any questions concerning this correspondence, please contact Steven VanderPloeg, project manager of the Norfolk District at 804-397-9836, by mail at the above address, or by email at Steven.A.Vanderploeg@usace.army.mil. Please take a moment to complete our customer satisfaction survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Sincerely, Kimberly-Prisco-Baggett, MBA, PMP Chief Regulatory Division (Acting) Norfolk District Tommy Fennel Chief Regulatory Division Wilmington District Enclosures cc: Lori Ferry, BMCD EGS, P.C. (via lmferry@burnsmcd.com) Samantha Wooten, North Carolina Division of Water Resources (via Samantha.wooten@deq.nc.gov Brenda Winn, Virginia Department of Environmental Quality (via brenda.winn@deq.virginia.gov) Todd Bowers, U.S. Environmental Protection Agency (via bowers.todd@epa.gov) Kelly Williams, North Carolina Division of Mitigation Services (via kelly.williams@deq.nc.gov) Justin Curtis, AquaLaw PLC (via justin@aqualaw.com) Cory Chalmers, EQT Corporation (via cory.chalmers@eqt.com) ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 3 U.S. Army Corps of Engineers (USACE) NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL For use of this form, see Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act of 1899, and Section 103 of the Marine Protection, Research, and Sanctuaries Act; the proponent agency is CECW-COR. Form Approved – OMB No. 0710-0003 Expires 2027-10-31 DATA REQUIRED BY THE PRIVACY ACT OF 1974 Authority The authorities for requesting this information are Sections 9, 10, 13, and 14, Rivers and Harbors Act of March 3, 1899; Section 404, Clean Water Act; and Section 103 Marine Protection Research and Sanctuaries Act of 1972. Principal Purpose This information serves as notification to affected parties regarding the USACE administrative appeal options and process, as well as to facilitate requests for appeal of USACE decisions with which they disagree. Routine Uses Routine uses will include: (a) To serve as notification to affected parties of the Corps administrative appeal options and process and to facilitate requests for appeal of Corps decisions with which they disagree. (b) Records may be referred to the Department of Justice for possible criminal prosecution. (c) Records may be referred to other Federal, State, and local agencies for evaluation and enforcement purposes. Disclosure Disclosure of this information is voluntary on your part. However, failure of individual to provide requested information could result in inability to determine all pertinent information regarding a Department of the Army permit matter. The Agency Disclosure Notice (ADN) The Public reporting burden for this collection of information, 0710-0003, is estimated to average 1 hour per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PURPOSE: This form is used to facilitate the initiation of the administrative appeals process. The appeals process allows an affected party to pursue an administrative appeal of certain Corps of Engineers decisions with which they disagree. Upon release, this form will also be available on the Corps website https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/ Applicant: Jeffrey Klinefelter File Number: NAO-2018-1574, SAW-2018-00887 Date: 3/20/2026 Documents Attached (select all that apply): Form Reference Section: ☒ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ☐ PROFFERED PERMIT (Standard Permit or Letter of permission) B ☐ PERMIT DENIAL WITHOUT PREJUDICE C ☐ PERMIT DENIAL WITH PREJUDICE D ☐ APPROVED JURISDICTIONAL DETERMINATION E ☐ PRELIMINARY JURISDICTIONAL DETERMINATION F SECTION I The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/appeals/ or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 3 B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C. PERMIT DENIAL WITHOUT PREJUDICE: Not appealable You received a permit denial without prejudice because a required Federal, state, and/or local authorization and/or certification has been denied for activities which also require a Department of the Army permit before final action has been taken on the Army permit application. The permit denial without prejudice is not appealable. There is no prejudice to the right of the applicant to reinstate processing of the Army permit application if subsequent approval is received from the appropriate Federal, state, and/or local agency on a previously denied authorization and/or certification. D: PERMIT DENIAL WITH PREJUDICE: You may appeal the permit denial You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information for reconsideration • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. • RECONSIDERATION: You may request that the district engineer reconsider the approved JD by submitting new information or data to the district engineer within 60 days of the date of this notice. The district will determine whether the information submitted qualifies as new information or data that justifies reconsideration of the approved JD. A reconsideration request does not initiate the appeal process. You may submit a request for appeal to the division engineer to preserve your appeal rights while the district is determining whether the submitted information qualifies for a reconsideration. F: PRELIMINARY JURISDICTIONAL DETERMINATION: Not appealable You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision you may contact: If you have questions regarding the appeal process, or to submit your request for appeal, you may contact: Name: Steven VanderPloeg Name: Andrew Dangler, Regulatory Appeals Review Officer Street Address, City, State: 9100 Arboretum Parkway, Suite 235 Richmond, VA 23236 Street Address, City, State: 301 John Warren Avenue First Floor Brooklyn, New York 11252-6700 Phone: 804-397-9836 Phone: 518-487-0215 Email: Steven.A.Vanderploeg@usace.army.mil Email: andrew.c.dangler@usace.army.mil ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 3 SECTION II – REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. Use additional pages as necessary. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the opportunity to participate in all site investigations. Email address of appellant and/or agent Telephone number Signature of appellant or agent Date ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 1 DEPARTMENT OF THE ARMY PERMIT Permittee: Jeffrey Klinefelter Mountain Valley Pipeline, LLC 2200 Energy Drive Canonsburg, PA 15317 Permit No: NAO-2018-1574, SAW-2018-00887 Issuing Office: Norfolk NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the U.S. Army Corps of Engineers (Corps) having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer. This Department of the Army permit was processed under the authority of Executive Order (EO) 14156 declaring a national emergency under the National Emergencies Act (50 U.S.C. 1621) based upon the finding that the United States’ insufficient energy production, transportation, refining, and generation constitutes an unusual and extraordinary threat to our Nation’s economy, national security, and foreign policy. You are authorized to perform work in accordance with the terms and conditions specified below. Project Description: The Mountain Valley Pipeline - South Gate Project (Project) involves the construction of 31.3 miles of 30-inch diameter natural gas pipeline to transport natural gas from an interconnection point with the Mountain Valley Pipeline in Pittsylvania County, Virginia to an interconnection point with the East Tennessee Natural Gas, LLC system in Rockingham County, North Carolina, and then to two new delivery points in Rockingham County, North Carolina. The overall project will result in the permanent discharge of dredged and/or fill material into 114 linear feet (0.0093 acre) of streams and 0.0362 acre of palustrine emergent wetlands, the temporary discharge of dredged and/or fill material into 6,368 linear feet (0.7827 acre) of streams and 11.4713 acres of wetlands, and the permanent conversion of 9.3855 acres of forested and scrub-shrub wetlands to emergent wetlands. The Project components within the Norfolk District regulatory boundary consist of the construction of approximately 26.8 miles of pipeline and 10.8 miles of access roads. Activities requiring Department of the Army authorization within the Norfolk District regulatory boundary include the following: ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 2 • Permanent discharge of dredged and/or fill material into 62 linear feet (0.0055 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 5,648 linear feet (0.7224 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 5.0826 acres of wetlands for pipeline installation and easement construction; • Permanent conversion of 6.3850 acres of forested or scrub-shrub wetlands to emergent wetlands for perpetual maintenance of the utility easement; • Permanent discharge of dredged and/or fill material into 0.0362 acres of wetlands for Permittee Responsible Mitigation Site construction; and • Temporary discharge of dredged and/or fill material into 3.3978 acres of wetlands for Permittee Responsible Mitigation Site construction. The Project components within the Wilmington District regulatory boundary consist of the construction of 4.6 miles pipeline and 4.5 miles of access roads. Activities requiring Department of the Army authorization within the Wilmington District regulatory boundary include the following: • Permanent discharge of dredged and/or fill material into 52 linear feet (0.0038 acre) of streams for access road installation; • Temporary discharge of dredged and/or fill material into 720 linear feet (0.0603 acre) of streams for pipeline installation and easement construction; • Temporary discharge of dredged and/or fill material into 2.9909 acres of wetlands for pipeline installation and easement construction; and • Permanent conversion of 3.0004 acres of forested or scrub-shrub wetlands to emergent wetlands for perpetual maintenance of the utility easement. The work described above is to be completed in accordance with the 4 attachments affixed at the end of this permit instrument. Project Location: The Project area associated with the pipeline construction starts at the proposed Lambert Interconnect in Pittsylvania County, Virginia (36.830743° N, 79.344083° W.), and ends at the proposed delivery interconnect points north of Dan River Interconnect #1 and Dan River Interconnect #2 in Rockingham County, North Carolina (36.493024°N, -79.681176°W). The permittee responsible mitigation site is located in Franklin County, Virginia (36.85669°N, -79.743788°W). ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 3 Permit Conditions General Conditions: 1. The time limit for completing the work authorized ends on December 31, 2031. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certifications is attached if it contains such conditions (Attachment 3). 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Special Conditions: The special Conditions for this permit are included in Attachment 1 of the permit Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 4 ( ) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) (X) Section 404 of the Clean Water Act (33 U.S.C. 1344) ( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413) ( ) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408) 2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 5 5. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions: General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit. ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 6 Your signature below, as permittee, indicates that you accept and agree to comply with the terms and conditions of this permit. _______________________________________ ____________________ (PERMITTEE) (DATE) This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below. ________________________ Date: Sonny B. Avichal, PE Colonel, U.S. Army District Commander Norfolk District ________________________ Date: Brad A. Morgan, P.E Colonel, U.S. Army District Commander Wilmington District March 20, 2026 20 MAR 2026 03/20/2026 Jeffrey Klinefelter Vice President, Operations ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 7 When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. _______________________________________ ____________________ (TRANSFEREE-SIGNATURE) (DATE) _______________________________________ (NAME-PRINTED) _______________________________________ (ADDRESS) ______________________________________________________ (CITY, STATE, AND ZIP CODE) ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A)) 8 Attachments to Department of the Army Permit Number NAO-2018-1574, SAW-2018-00887 1. PERMIT SPECIAL CONDITIONS (8 Pages) 2. PERMIT DRAWINGS: a. Figure 3 – Detail Map (Sheets 1 - 137) b. Snow Creek Wetland Mitigation Site, Final Design (Sheets G-001 – G- 603) 3. WATER QUALITY CERTIFICATION: Specific Conditions of the water quality permit/certification in accordance with General Condition number 5 on page 3 of this DA permit. a. Commonwealth of Virigina Department of Environmental Quality (WQC # 25-0752), January 13, 2026 (32 Pages). b. North Carolina Department of Environmental Quality Individual 401 Water Quality Certification (WQC # 20181638 V4), November 12, 2025 (15 pages) 4. WILMINGTON DISTRICT COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORMS (2 Pages)