HomeMy WebLinkAboutNAO-2018-1574_SAW-2018-00887_FTO_Initial_Proffered_Permit SignedDEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
NORFOLK DISTRICT
FORT NORFOLK
803 FRONT STREET
NORFOLK VA 23510-101
March 20, 2026
Regulatory Program/Division
Jeffrey Klinefelter
Mountain Valley Pipeline, LLC
2200 Energy Drive
Canonsburg, PA 15317
Via Email: jeffrey.klinefelter@eqt.com
Dear Mr. Klinefelter:
This letter is in response to your request for a Department of the Army permit
received on April 11, 2025, and assigned the file number NAO-2018-1574, SAW-2018-
00887. Our regulations require you have an opportunity to review the terms and
conditions prior to final signature by the Department of the Army. Enclosed is an
unsigned Department of the Army permit instrument (permit) to construct components of
Mountain Valley Pipeline – Southgate Project Amendment (Project) under the
provisions of Section 404 of the Clean Water Act within the regulatory boundaries of the
Corps of Engineers Norfolk District and Corps of Engineers Wilmington District.
The Project involves the construction of 31.3 miles of 30-inch diameter natural gas
pipeline to transport natural gas from an interconnection point with the Mountain Valley
Pipeline in Pittsylvania County, Virginia to an interconnection point with the East
Tennessee Natural Gas, LLC system in Rockingham County, North Carolina, and then
to two new delivery points in Rockingham County, North Carolina. The overall Project
will result in the permanent discharge of dredged and/or fill material into 114 linear feet
(0.0093 acre) of streams and 0.0362 acre of palustrine emergent wetlands, the
temporary discharge of dredged and/or fill material into 6,368 linear feet (0.7827 acre)
of streams and 11.4713 acres of wetlands, and the permanent conversion of 9.3855
acres of forested and scrub-shrub wetlands to emergent wetlands.
The Project components within the Norfolk District regulatory boundary consist of the
construction of approximately 26.8 miles of pipeline and 10.8 miles of access roads.
Activities requiring Department of the Army authorization within the Norfolk District
regulatory boundary include the following:
• Permanent discharge of dredged and/or fill material into 62 linear feet (0.0055
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 5,648 linear feet (0.7224
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 5.0826 acres of wetlands
for pipeline installation and easement construction;
• Permanent conversion of 6.3850 acres of forested or scrub-shrub wetlands to
emergent wetlands for perpetual maintenance of the utility easement;
• Permanent discharge of dredged and/or fill material into 0.0362 acres of
wetlands for Permittee Responsible Mitigation Site construction; and
• Temporary discharge of dredged and/or fill material into 3.3978 acres of wetlands
for Permittee Responsible Mitigation Site construction.
The Project components within the Wilmington District regulatory boundary consist
of the construction of 4.6 miles pipeline and 4.5 miles of access roads. Activities
requiring Department of the Army authorization within the Wilmington District regulatory
boundary include the following:
• Permanent discharge of dredged and/or fill material into 52 linear feet (0.0038
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 720 linear feet (0.0603
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 2.9909 acres of wetlands
for pipeline installation and easement construction; and
• Permanent conversion of 3.0004 acres of forested or scrub-shrub wetlands to
emergent wetlands for perpetual maintenance of the utility easement.
Please review the document and carefully read the Special Conditions included in
Attached 3 of the permit. These were developed to apply specifically to your project.
Water Quality Certification was required prior to issuance of a permit. In accordance
with General Condition 5 of the permit, the Water Quality Certifications have been
attached to the Department of the Army permit.
Instructions for Accepting Terms and Conditions and Finalizing Your Permit:
In order to accept the terms and conditions of this initial proffered permit and receive a
valid Department of the Army permit, you must sign and return the permit and submit
payment of the permit fee. Upon receipt of your signed permit, the District Engineer or
his representative will then sign the permit. The Corps will add the permit expiration
date to the permit, the permit issuance date on the Notice of Department of the Army
Permit form and return the valid permit to you. It is important to note that the permit
is not valid until the District Engineer or his representative signs it. Please follow
the steps below:
a. Sign the signature page of the initial proffered permit (page 6 of 7). Your
signature, as permittee, indicates that as consideration for the issuance of this
permit, you voluntarily accept and agree to comply with all the terms and
conditions of this permit. In the case of corporations, acceptance must be by an
officer of that corporation authorized to sign on behalf of the corporation. Please
type or print the name and title of the person signing below the signature and the
date signed.
b. Return the entire permit, including all attachments, to the address listed in the
last paragraph of this letter or send via email to the Project Manager listed in the
last paragraph of this letter. If the file is greater than 20 MB, upload via DOD
SAFE (https://safe.apps.mil/).
c. Pay the permit fee (CFR 33 Part 325.1(f)) of $100 one of two ways: (1) Mail a
check or money order to the address listed in the last paragraph of this letter,
made payable to the Finance and Accounting Officer, Corps of Engineers, Norfolk
District, or (2) Pay online at pay.gov/public/form/start/996412796 (or go to pay.gov
and enter into the search box “DEPARTMENT OF THE ARMY PERMIT FEES” to
navigate to the payment input form). After paying online, submit a receipt along
with the signed permit, either by mail to the address listed in the last paragraph of
this letter, or via email to the Project Manager listed in the last paragraph of this
letter.
Instructions for Objecting to Permit Terms and Conditions: This letter contains
an initial proffered permit for your proposed project. If you object to certain terms and
conditions contained within the permit, you may request that the permit be modified.
Enclosed you will find a Notification of Administrative Appeal Options and Process fact
sheet and Request for Appeal (RFA) form. If you choose to object to certain terms and
conditions of the permit, you must follow the directions provided in Section 1, Part A and
submit the completed RFA form to the address listed in the last paragraph of this letter.
In order for an RFA to be accepted by the Corps, the Corps must determine that it is
complete, that it meets the criteria under 33 CFR Part 331.5, and that it has been
received by the District office within 60 days of the date of the RFA. Should you decide
to submit an RFA form, it must be received at the address listed in the last paragraph of
this letter by May 19, 2026.
It is not necessary to submit an RFA form to the District office if you do not object to
the decision in this letter.
If you have any questions concerning this correspondence, please contact Steven
VanderPloeg, project manager of the Norfolk District at 804-397-9836, by mail at the
above address, or by email at Steven.A.Vanderploeg@usace.army.mil. Please take a
moment to complete our customer satisfaction survey located at
https://regulatory.ops.usace.army.mil/customer-service-survey/.
Sincerely,
Kimberly-Prisco-Baggett, MBA, PMP
Chief Regulatory Division (Acting)
Norfolk District
Tommy Fennel
Chief Regulatory Division
Wilmington District
Enclosures
cc: Lori Ferry, BMCD EGS, P.C. (via lmferry@burnsmcd.com)
Samantha Wooten, North Carolina Division of Water Resources (via
Samantha.wooten@deq.nc.gov
Brenda Winn, Virginia Department of Environmental Quality (via
brenda.winn@deq.virginia.gov)
Todd Bowers, U.S. Environmental Protection Agency (via bowers.todd@epa.gov)
Kelly Williams, North Carolina Division of Mitigation Services (via
kelly.williams@deq.nc.gov)
Justin Curtis, AquaLaw PLC (via justin@aqualaw.com)
Cory Chalmers, EQT Corporation (via cory.chalmers@eqt.com)
ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 3
U.S. Army Corps of Engineers (USACE)
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS
AND REQUEST FOR APPEAL
For use of this form, see Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act of 1899, and
Section 103 of the Marine Protection, Research, and Sanctuaries Act; the proponent agency is CECW-COR.
Form Approved –
OMB No. 0710-0003
Expires 2027-10-31
DATA REQUIRED BY THE PRIVACY ACT OF 1974
Authority The authorities for requesting this information are Sections 9, 10, 13, and 14, Rivers and Harbors Act of March 3, 1899; Section
404, Clean Water Act; and Section 103 Marine Protection Research and Sanctuaries Act of 1972.
Principal Purpose This information serves as notification to affected parties regarding the USACE administrative appeal options and process, as well as
to facilitate requests for appeal of USACE decisions with which they disagree.
Routine Uses Routine uses will include: (a) To serve as notification to affected parties of the Corps administrative appeal options and process and to
facilitate requests for appeal of Corps decisions with which they disagree. (b) Records may be referred to the Department of Justice for
possible criminal prosecution. (c) Records may be referred to other Federal, State, and local agencies for evaluation and enforcement
purposes.
Disclosure Disclosure of this information is voluntary on your part. However, failure of individual to provide requested information could result in
inability to determine all pertinent information regarding a Department of the Army permit matter.
The Agency Disclosure Notice (ADN)
The Public reporting burden for this collection of information, 0710-0003, is estimated to average 1 hour per response, including time for reviewing
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at
whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no
person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PURPOSE: This form is used to facilitate the initiation of the administrative appeals process. The appeals process allows an affected party to pursue an
administrative appeal of certain Corps of Engineers decisions with which they disagree.
Upon release, this form will also be available on the Corps website https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/
Applicant: Jeffrey Klinefelter File Number: NAO-2018-1574, SAW-2018-00887 Date: 3/20/2026
Documents Attached (select all that apply): Form Reference Section:
☒ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
☐ PROFFERED PERMIT (Standard Permit or Letter of permission) B
☐ PERMIT DENIAL WITHOUT PREJUDICE C
☐ PERMIT DENIAL WITH PREJUDICE D
☐ APPROVED JURISDICTIONAL DETERMINATION E
☐ PRELIMINARY JURISDICTIONAL DETERMINATION F
SECTION I
The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at
https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/appeals/ or Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you
received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance
of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved
jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified
accordingly. You must complete Section II of this form and return the form to the district engineer. Upon receipt of your letter, the district engineer will
evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or
(c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district
engineer will send you a proffered permit for your reconsideration, as indicated in Section B below.
ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 3
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you
received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of
the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved
jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the
declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division
engineer. This form must be received by the division engineer within 60 days of the date of this notice.
C. PERMIT DENIAL WITHOUT PREJUDICE: Not appealable
You received a permit denial without prejudice because a required Federal, state, and/or local authorization and/or certification has been denied for
activities which also require a Department of the Army permit before final action has been taken on the Army permit application. The permit denial
without prejudice is not appealable. There is no prejudice to the right of the applicant to reinstate processing of the Army permit application if
subsequent approval is received from the appropriate Federal, state, and/or local agency on a previously denied authorization and/or certification.
D: PERMIT DENIAL WITH PREJUDICE: You may appeal the permit denial
You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending
the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice.
E: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information for reconsideration
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means
that you accept the approved JD in its entirety and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of
the date of this notice.
• RECONSIDERATION: You may request that the district engineer reconsider the approved JD by submitting new information or data to the district
engineer within 60 days of the date of this notice. The district will determine whether the information submitted qualifies as new information or data
that justifies reconsideration of the approved JD. A reconsideration request does not initiate the appeal process. You may submit a request for
appeal to the division engineer to preserve your appeal rights while the district is determining whether the submitted information qualifies for a
reconsideration.
F: PRELIMINARY JURISDICTIONAL DETERMINATION: Not appealable
You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an
approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further
consideration by the Corps to reevaluate the JD.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision you may contact: If you have questions regarding the appeal process, or to submit your
request for appeal, you may contact:
Name: Steven VanderPloeg Name: Andrew Dangler, Regulatory Appeals Review Officer
Street Address, City, State:
9100 Arboretum Parkway, Suite 235
Richmond, VA 23236
Street Address, City, State:
301 John Warren Avenue First Floor
Brooklyn, New York 11252-6700
Phone: 804-397-9836 Phone: 518-487-0215
Email: Steven.A.Vanderploeg@usace.army.mil Email: andrew.c.dangler@usace.army.mil
ENG FORM 6287, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 3
SECTION II – REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear
concise statements. Use additional pages as necessary. You may attach additional information to this form to clarify where your reasons or objections are
addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal
conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the
appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of
information that is already in the administrative record.
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct
investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the
opportunity to participate in all site investigations.
Email address of appellant and/or agent
Telephone number
Signature of appellant or agent Date
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
1
DEPARTMENT OF THE ARMY PERMIT
Permittee: Jeffrey Klinefelter
Mountain Valley Pipeline, LLC
2200 Energy Drive
Canonsburg, PA 15317
Permit No: NAO-2018-1574, SAW-2018-00887
Issuing Office: Norfolk
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee
or any future transferee. The term "this office" refers to the appropriate district or
division office of the U.S. Army Corps of Engineers (Corps) having jurisdiction over the
permitted activity or the appropriate official of that office acting under the authority of the
commanding officer. This Department of the Army permit was processed under the
authority of Executive Order (EO) 14156 declaring a national emergency under the
National Emergencies Act (50 U.S.C. 1621) based upon the finding that the United
States’ insufficient energy production, transportation, refining, and generation
constitutes an unusual and extraordinary threat to our Nation’s economy, national
security, and foreign policy.
You are authorized to perform work in accordance with the terms and conditions
specified below.
Project Description: The Mountain Valley Pipeline - South Gate Project (Project)
involves the construction of 31.3 miles of 30-inch diameter natural gas pipeline to
transport natural gas from an interconnection point with the Mountain Valley Pipeline in
Pittsylvania County, Virginia to an interconnection point with the East Tennessee
Natural Gas, LLC system in Rockingham County, North Carolina, and then to two new
delivery points in Rockingham County, North Carolina. The overall project will result in
the permanent discharge of dredged and/or fill material into 114 linear feet (0.0093
acre) of streams and 0.0362 acre of palustrine emergent wetlands, the temporary
discharge of dredged and/or fill material into 6,368 linear feet (0.7827 acre) of streams
and 11.4713 acres of wetlands, and the permanent conversion of 9.3855 acres of
forested and scrub-shrub wetlands to emergent wetlands.
The Project components within the Norfolk District regulatory boundary consist of the
construction of approximately 26.8 miles of pipeline and 10.8 miles of access roads.
Activities requiring Department of the Army authorization within the Norfolk District
regulatory boundary include the following:
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
2
• Permanent discharge of dredged and/or fill material into 62 linear feet (0.0055
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 5,648 linear feet (0.7224
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 5.0826 acres of wetlands
for pipeline installation and easement construction;
• Permanent conversion of 6.3850 acres of forested or scrub-shrub wetlands to
emergent wetlands for perpetual maintenance of the utility easement;
• Permanent discharge of dredged and/or fill material into 0.0362 acres of
wetlands for Permittee Responsible Mitigation Site construction; and
• Temporary discharge of dredged and/or fill material into 3.3978 acres of wetlands
for Permittee Responsible Mitigation Site construction.
The Project components within the Wilmington District regulatory boundary consist
of the construction of 4.6 miles pipeline and 4.5 miles of access roads. Activities
requiring Department of the Army authorization within the Wilmington District regulatory
boundary include the following:
• Permanent discharge of dredged and/or fill material into 52 linear feet (0.0038
acre) of streams for access road installation;
• Temporary discharge of dredged and/or fill material into 720 linear feet (0.0603
acre) of streams for pipeline installation and easement construction;
• Temporary discharge of dredged and/or fill material into 2.9909 acres of wetlands
for pipeline installation and easement construction; and
• Permanent conversion of 3.0004 acres of forested or scrub-shrub wetlands to
emergent wetlands for perpetual maintenance of the utility easement.
The work described above is to be completed in accordance with the 4 attachments
affixed at the end of this permit instrument.
Project Location: The Project area associated with the pipeline construction starts at
the proposed Lambert Interconnect in Pittsylvania County, Virginia (36.830743° N,
79.344083° W.), and ends at the proposed delivery interconnect points north of Dan
River Interconnect #1 and Dan River Interconnect #2 in Rockingham County, North
Carolina (36.493024°N, -79.681176°W). The permittee responsible mitigation site is
located in Franklin County, Virginia (36.85669°N, -79.743788°W).
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
3
Permit Conditions
General Conditions:
1. The time limit for completing the work authorized ends on December 31, 2031.
If you find that you need more time to complete the authorized activity, submit your
request for a time extension to this office for consideration at least one month before the
above date is reached.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this office, which
may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and State coordination
required to determine if the remains warrant a recovery effort or if the site is eligible for
listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature
and the mailing address of the new owner in the space provided and forward a copy of
the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to this
permit. For your convenience, a copy of the certifications is attached if it contains such
conditions (Attachment 3).
6. You must allow representatives from this office to inspect the authorized activity at
any time deemed necessary to ensure that it is being or has been accomplished in
accordance with the terms and conditions of your permit.
Special Conditions:
The special Conditions for this permit are included in Attachment 1 of the permit
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity
described above pursuant to:
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
4
( ) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344)
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413)
( ) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408)
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed
Federal projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not
assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted
or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this
permit is not contrary to the public interest was made in reliance on the information you
provided.
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
5
5. Reevaluation of Permit Decision: This office may reevaluate its decision on this
permit at any time the circumstances warrant. Circumstances that could require a
reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in
reaching the original public interest decision.
Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative order
requiring you comply with the terms and conditions of your permit and for the initiation of
legal action where appropriate. You will be required to pay for any corrective measures
ordered by this office, and if you fail to comply with such directive, this office may in
certain situations (such as those specified in 33 CFR 209.170) accomplish the
corrective measures by contract or otherwise and bill you for the cost.
6. Extensions: General Condition 1 establishes a time limit for the completion of the
activity authorized by this permit. Unless there are circumstances requiring either a
prompt completion of the authorized activity or a reevaluation of the public interest
decision, the Corps will normally give favorable consideration to a request for an
extension of this time limit.
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
6
Your signature below, as permittee, indicates that you accept and agree to comply with
the terms and conditions of this permit.
_______________________________________ ____________________
(PERMITTEE) (DATE)
This permit becomes effective when the Federal official, designated to act for the
Secretary of the Army, has signed below.
________________________ Date:
Sonny B. Avichal, PE
Colonel, U.S. Army
District Commander
Norfolk District
________________________ Date:
Brad A. Morgan, P.E
Colonel, U.S. Army
District Commander
Wilmington District
March 20, 2026
20 MAR 2026
03/20/2026
Jeffrey Klinefelter
Vice President, Operations
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
7
When the structures or work authorized by this permit are still in existence at the time
the property is transferred, the terms and conditions of this permit will continue to be
binding on the new owner(s) of the property. To validate the transfer of this permit and
the associated liabilities associated with compliance with its terms and conditions, have
the transferee sign and date below.
_______________________________________ ____________________
(TRANSFEREE-SIGNATURE) (DATE)
_______________________________________
(NAME-PRINTED)
_______________________________________
(ADDRESS)
______________________________________________________
(CITY, STATE, AND ZIP CODE)
ENG FORM 1721, Nov 86 (33 CFR 325 (Appendix A))
8
Attachments to Department of the Army
Permit Number NAO-2018-1574, SAW-2018-00887
1. PERMIT SPECIAL CONDITIONS (8 Pages)
2. PERMIT DRAWINGS:
a. Figure 3 – Detail Map (Sheets 1 - 137)
b. Snow Creek Wetland Mitigation Site, Final Design (Sheets G-001 – G-
603)
3. WATER QUALITY CERTIFICATION: Specific Conditions of the water quality
permit/certification in accordance with General Condition number 5 on page 3 of
this DA permit.
a. Commonwealth of Virigina Department of Environmental Quality (WQC #
25-0752), January 13, 2026 (32 Pages).
b. North Carolina Department of Environmental Quality Individual 401 Water
Quality Certification (WQC # 20181638 V4), November 12, 2025 (15
pages)
4. WILMINGTON DISTRICT COMPENSATORY MITIGATION RESPONSIBILITY
TRANSFER FORMS (2 Pages)