Loading...
HomeMy WebLinkAboutNCC241826_NOT Closeout Document_20260203 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Wake Project: 2023 Water Main Replacements River basin: Neuse Person financially responsible:Town of Cary-Robert Hirt Project#: WAKE-2024-022 Address: P.O.Box 8005,Cary,NC 27512-8005 1. Project Location: Union St,King,St,etc,Cary Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one on site Title: Inspection report: Sent Report Date given/sent: December 05,2025 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://portal.deq.nc.gov/login.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: November 04,2025 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM CC: