HomeMy WebLinkAboutNCC241826_NOT Closeout Document_20260203 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200
County: Wake Project: 2023 Water Main Replacements River basin: Neuse
Person financially responsible:Town of Cary-Robert Hirt Project#: WAKE-2024-022
Address: P.O.Box 8005,Cary,NC 27512-8005
1. Project Location: Union St,King,St,etc,Cary
Pictures: No
2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): no one on site Title:
Inspection report: Sent Report Date given/sent: December 05,2025
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:https://portal.deq.nc.gov/login.Please note that
this correspondence must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present:
Date of inspection: November 04,2025 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM
CC: