Loading...
HomeMy WebLinkAboutNCC233174_NOT Closeout Document_20260203 Public Works Department 801 SE Service Rd 4Southern Southern Pines, NC Phone: (910) 692-1983 PifleS CARRO L INA Fax: (910) 692-1085 23-1832 Soil and Sediment Control Closeout SITE ADDRESS: 11 MONTEITH PL PROJECT NAME: 11 Monteith To whom it may concern: A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project has been conducted. Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. All requirements of the plan have been met and properly completed. You are reminded of the requirement to maintain any permanent structures of this plan. Receipt of this letter is notification that the erosion control project plan is completed and is being removed from our active file. Any further development will require the submittal of a new plan for review and approval. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT must be submitted through your permit via the AccessDEQ Portal at https://www.deq.nc.gov/accessdeq. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. If I can be of further assistance, please contact the Public Works Office at 910-692-1983. Sincerely, Date: 05/20/2025 James Michel, PE, MBA Town Engineer/ Asst. Public Works Director