Loading...
HomeMy WebLinkAboutNCC220507_NOT Closeout Document_20251203 (2) Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: Tarborough Ridge Subdivision River basin: Tar-Pamlico Person financially responsible:TRNC Development,LLC-Dan Tingen,Member Project#: FRANK-2022-019 Manager Address: 8411-121 Garvey Drive,Raleigh,NC 27616 1. Project Location: 3231 Tarboro Road,Youngsville Pictures: No 2. Weather and soil conditions: Sunny,Workable Conditions Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 26,2025 9. Corrective action needed: 10. Comments: Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:NPDES Construction Program I NC DEQ.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Noah Compton Others present: Date of inspection: September 25,2025 Time arriving on site: 11:00 AM Time leaving site: 1:15 AM CC: