HomeMy WebLinkAboutNCC243306_Annual Fee NOD Letter (2025 Fee) Email_20251116 Subject: Notice of Deficiency for NCC243306 To Recipients:
kevinshortridge@gmail.com;kevinshortridge@gmail.com;kevinshortridge@gmail.com; Date Sent: 2025-11-
16T00:29:10.7294542Z Sender: DoNotReply-DEQPermits@deq.nc.gov AttachmentCount: 1
November 15, 2025
JSJ Builders, Inc.
Attn: Kevin Shortridge
1135 Robeson Street Fayetteville, NC 28305-5527
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. INV-014832
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$127 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).
The annual fee was billed on 10/1/25 and was due on 10/31/25.The annual fee applies to the following construction site:
Abingdon S/D Lot 10
Abingdon Farms Drive O'Neals Twsp., NC 27576
Johnston County
Certificate of Coverage No. NCC243306
NC Reference No. NCG01-2024-3306
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions
on the NPDES Construction Program website (https://deq.nc.gov/NCG01). If the project was not closed out or sold prior
to the invoice due date, please pay the permit fee using the Stormwater ePayment website (My AccessDEQ).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential
civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or
concerns, please contact Tev Holloman at tev.holloman@deq.nc.gov.
Sincerely,
William E. Vinson,Jr., PE, CPESC, CPM
Director
Division of Energy, Mineral, and Land Resources