HomeMy WebLinkAboutpreprint_pipeline_sirmanuscript_02sept20251
Assessment of Natural Gas Pipeline Construction on
Stream Temperature and Turbidity in Southwestern
Virginia, 2017—25
By Brendan M. Foster, Carly M. Maas, and Alejandra L. Flota
This information product has been peer reviewed and approved for publication as a preprint by
the U.S. Geological Survey.
Any use of trade, firm, or product names is for descriptive purposes only and does not imply
endorsement by the U.S. Government.
Although this information product, for the most part, is in the public domain, it also may contain
copyrighted materials as noted in the text. Permission to reproduce copyrighted items must be
secured from the copyright owner.
2
Acknowledgments
The authors wish to thank the numerous U.S. Geological Survey (USGS) staff that have contributed to the
design, maintenance, and operation of this study since 2017. Technical reviews by Samuel Miller and
Spencer Tassone of the USGS strengthened the report and their comments are greatly appreciated.
Outline
Acknowledgments
Introduction
Description of Study Area
Overview of Pipeline Construction
Monitoring Site Selection
Purpose and Scope
Methods of Investigation
Monitoring Design
Real-time Alert Application
Statistical Analysis of Water Temperature and Turbidity
Continued Statistical Analysis of Water Temperature
Water Temperature Anomaly Detection
Continued Statistical Analysis of Turbidity
Stormflow Hysteresis
Spatial and Temporal Patterns of Water Temperature
Comparative Analysis of Upstream and Downstream Water Temperature Conditions
Detection of Water Temperature Anomalies
Discussion of Water Temperature Results
Short- and Long- Term Patterns of Turbidity
Turbidity Conditions and Comparison of Upstream versus Downstream Stations
Storm Hysteresis Patterns of Turbidity
Discussion of Turbidity Results
Utility of Real-Time Alert Application
Summary
References Cited
Appendix 1. Supporting Material for Turbidity Analysis
3
Figures
Figure 1. Map showing U.S. Geological Survey water-quality and gage height monitoring stations along
the Mountain Valley Pipeline (MVP) in southwestern Virginia. Stations names are defined in Table 1.
Figure 2. Maps showing aerial upstream and downstream monitoring locations compared to the
pipeline construction. A, Little Stony Creek; B, Sinking Creek; C, Roanoke River; D, Upper Bottom Creek;
E, Lower Bottom Creek; F. Blackwater River.
Figure 3. Time series of the hourly median water temperature. Vertical dashed lines indicate the during
crossing construction period. A. Time series of the upstream and downstream sites for each paired station,
B. Time series of the downstream – upstream and the identified temperature anomalies when seasonality
and long-term trends were removed.
Figure 4. Scatterplot of each paired station in the before, during, and after period. The 1-to-1 golden
dashed line represents when the upstream and downstream hourly median temperatures are equivalent. A.
Little Stony Creek; B. Sinking Creek; C. Roanoke River; D. Upper Bottom Creek, E. Lower Bottom Creek,
F. Blackwater River.
Figure 5. Scatterplot of the hourly median temperature difference of the anomalies and the duration, in
hours, of the anomalies in the before, during, and after period. A. Little Stony Creek; B. Sinking Creek; C.
Roanoke River; D. Upper Bottom Creek, E. Lower Bottom Creek, F. Blackwater River.
Figure 6. High-frequency turbidity and gage height time series at Lower Bottom Creek in the before
crossing, during crossing, and after crossing periods. A, Gage Height at Downstream Lower Bottom Creek;
B. Turbidity at the Upstream and downstream Lower Bottom Creek; C, Turbidity in the during crossing
period.
Figure 7. Hourly median turbidity at downstream station versus upstream station in the before, during,
and after period. The golden dashed line is a 1-to-1 line.
Figure 8. Histograms showing the baseflow turbidity differences between the upstream and the
downstream site in the before, during, and after crossing period compared to the frequency of observations.
A positive turbidity indicates the downstream turbidity was higher and a negative turbidity indicates the
upstream turbidity was higher.
Figure 9. Graph showing the relations of median hysteresis index to median slope of the upstream and
downstream site at all 6 crossing locations, A, Before Crossing; B, During Crossing; C, After Crossing. A
positive median hysteresis index indicates rapid delivery and negative is delayed delivery. Positive median
slope is transport-limited, and a negative median slope is supply limited.
Figure 1.1. High-frequency time series of the before crossing, during crossing, and after crossing
period. A, Little Stony Creek turbidity at the upstream and downstream site; B, Gage height at Little Stony
Creek downstream site; C, Sinking Creek turbidity at the upstream and downstream site; D, Gage height at
Sinking Creek upstream site.
Figure 1.2. High-frequency time series of the before crossing, during crossing, and after crossing
period. A, Roanoke River turbidity at the upstream and downstream site; B, Gage height at Roanoke River
Lafayette monitoring station upstream of upstream site; C, Upper Bottom Creek turbidity at the upstream
and downstream site; D, Gage height at Upper Bottom Creek downstream site.
Figure 1.3. High-frequency time series of the before crossing, during crossing, and after crossing
period. A, Lower Bottom Creek turbidity at the upstream and downstream site; B, Gage height at Lower
Bottom Creek in the downstream site; C, Blackwater River turbidity at the upstream and downstream site;
D, Gage height at Blackwater River downstream site.
4
Figure 1.4. Graphs of the hysteresis index and slope. A, Before Crossing at Upstream Sites; B, During
Crossing at Upstream Sites; C, After Crossing at Upstream sites; D, Before Crossing at Downstream Sites;
E, During Crossing at Downstream Sites; F, After Crossing at Downstream Sites.
TablesU.S. customary units to International System of Units
International System of Units to U.S. customary units
Table 1. Description of the 13 U.S. Geological Survey water quality monitoring stations.
Table 2. Description of the Mountain Valley Pipeline stream crossing methods and timeline in
southwestern, Virginia. The before period began at the start of monitoring and ended a day before the start
of construction, the during period began at the start of construction and ended at the end of construction,
and the after period began a day after the end of construction through the end of the monitoring. The
upstream and downstream distance from the ROW (ft) was calculated as the length along the stream.
Table 3. Description of the thresholds used for the real-time alert application. Baseline turbidity is the
maximum of the median turbidities across upstream and downstream gages through a 24-hour period.
Table 4. Characterization of the distribution of the high-frequency (5-minute interval) data of water
temperature at all sites throughout the before crossing, during crossing, and after crossing construction.
Table 5. Results of the bootstrapped hourly median differences between the upstream and
downstream time-matched paired turbidity observation during stormflow in the before, during, and after
crossing period. A negative median temperature, lower 99-percent confidence interval, and upper 99-
percent confidence interval indicates that the upstream site was warmer than the downstream site and a
positive temperature value indicates that the downstream site was warmer than the upstream.
Table 6. Descriptive statistics of turbidity for each site, station and period. Statistics were calculated using
the raw 5-minute interval data and include N, number of observations; Min, minimum value; Q1, first
quartile; Median, median value; Q3, third quartile; and Max, maximum value.
Table 7. Results of the bootstrapped median of hourly median differences between the upstream and
downstream time-matched paired turbidity observation in the before, during, and after crossing period.
Table 8. Summary of the number of flags from January 2018 to June 2025 by field parameter using
the real-time alert application.
Table 1.1. Number and percentage of values censored that were greater than 1000 FNU.
Table 1.2. Results of the percentage of absolute differences for each time-matched paired hourly
median turbidity measurements between the upstream and downstream for each site and period.
Conversion Factors
U.S. customary units to International System of Units
Multiply By To obtain
Length
inch (in.) 2.54 centimeter (cm)
inch (in.) 25.4 millimeter (mm)
foot (ft) 0.3048 meter (m)
mile (mi) 1.609 kilometer (km)
Area
section (640 acres or 1
square mile)
259.0 square hectometer (hm2)
square mile (mi2) 259.0 hectare (ha)
5
Multiply By To obtain
square mile (mi2) 2.590 square kilometer (km2)
Flow rate
inch per hour (in/h) 0.0254 meter per hour (m/h)
inch per year (in/yr) 25.4 millimeter per year (mm/yr)
mile per hour (mi/h) 1.609 kilometer per hour (km/h)
International System of Units to U.S. customary units
Multiply By To obtain
Length
centimeter (cm) 0.3937 inch (in.)
millimeter (mm) 0.03937 inch (in.)
meter (m) 3.281 foot (ft)
kilometer (km) 0.6214 mile (mi)
Area
square hectometer (hm2) 0.003861 section (640 acres or 1
square mile)
hectare (ha) 0.003861 square mile (mi2)
square kilometer (km2) 0.3861 square mile (mi2)
Flow rate
millimeter per year (mm/yr) 0.03937 inch per year (in/yr)
Temperature in degrees Celsius (°C) may be converted to degrees Fahrenheit (°F) as follows:
°F = (1.8 × °C) + 32.
Temperature in degrees Fahrenheit (°F) may be converted to degrees Celsius (°C) as follows:
°C = (°F – 32) / 1.8.
Datums
Vertical coordinate information is referenced to the North American Vertical Datum of 1988 (NAVD 88).
Horizontal coordinate information is referenced to the North American Datum of 1983 (NAD 83).
Elevation, as used in this report, refers to distance above the vertical datum.
6
Supplemental Information
Specific conductance is in microsiemens per centimeter at 25 degrees Celsius (µS/cm at 25 °C).
Turbidity is in Formazin Nephelometric Units (FNU)
Dissolved oxygen is in milligrams per liter
A water year is the 12-month period from October 1 through September 30 of the following year and is
designated by the calendar year in which it ends.
Abbreviations
CI confidence interval
DEQ Virginia Department of Environmental Quality
HI hysteresis index
LOESS locally estimated scatterplot smoothing
MVP Mountain Valley Pipeline
NHST null hypothesis statistical tests
Q1 first quartile
Q3 third quartile
ROW right-of-way
SC specific conductance
STL seasonal and trend decomposition using LOESS
TB turbidity
Transco Transcontinental Gas Pipe Line Company, LLC
USGS U.S. Geological Survey
WT water temperature
7
Abstract
The natural gas pipeline network in the United States is extensive and often intersects
streams and other sensitive habitats, yet there are limited case studies utilizing a comparative
upstream-downstream approach to evaluate potential short- and long-term effects of pipeline
stream crossing construction from pre-construction to post-site restoration. In 2017, the U.S.
Geological Survey, in cooperation with the Virginia Department of Environmental Quality
(DEQ), deployed real-time continuous stream monitoring stations upstream and downstream of
six proposed Mountain Valley Pipeline (MVP) stream crossings in southwestern Virginia. Water
temperature and turbidity data collected at the upstream and downstream sites were compared
across three periods – before crossing construction, during crossing construction, and after
crossing construction – to elucidate potential impacts from the stream crossing construction.
Additionally, the monitoring network was utilized to notify regulators of potentially anomalous
conditions throughout the entire monitoring period.
Results of this study indicate (1) at all six monitored streams, pipeline stream crossing
construction did not affect long-term or short-term upstream-to-downstream water temperature
conditions; (2) pipeline stream crossing construction did not affect long-term upstream-to-
downstream turbidity conditions in all six monitored streams. Some short-term anomalously
elevated turbidity conditions were observed and attributable to pipeline stream crossing
construction; however, the duration and magnitude were not sufficient to alter the long-term
turbidity regime of the streams in which they were observed; and (3) the application of the
monitoring network as a real-time alert system successfully alerted regulators to potentially
anomalous conditions.
8
Introduction
The natural gas pipeline network in the United States extends over three million miles,
reliably serving 78.5 million people and providing electric power generation, industrial
applications, residential needs, commercial activities, and transportation (U.S. Energy
Information Administration, 2024a; U.S. Energy Information Administration, 2024b). At of the
beginning of 2024, a total of 122,552 miles of pipeline were either under construction or in the
planning stages worldwide (Reed, 2024). During construction, pipelines can traverse sensitive
aquatic habitats critical to both wildlife and human activities, potentially jeopardizing the
ecosystem and resources affected by pipeline crossing operations (Castro and others, 2015).
Therefore, an in-depth understanding of the potential short- and long- term effects of pipeline
stream crossing construction—such as changes in water temperature regimes or sedimentation—
on streams, particularly those with sensitive habitats, ecosystems, and natural resources, is
imperative.
There are few studies which investigate the potential short- and long-term impacts of
pipeline construction on streams. Potential impacts include increases in turbidity and suspended
sediment, modification of stream habitat, and pollutants entering stream in the event of
equipment failures or spills and on a longer time scale can lead to stream channel incision and
lateral migration (Castro and others, 2015). Increased suspended sediment can impact biota
directly by reducing light required for photosynthesis, burying habitat, and transporting particle-
associated contaminates (Moyer and Hyer, 2009; Miller and others, 2023). During construction,
suspended sediment could enter the stream through exaction and backfilling trenches, erosion
from upland construction, and discharge of water from hydrostatic pipe testing or trench
dewatering (Moyer and Hyer, 2009). A case study on the Jewell Pipeline in the Appalachian
9
Mountains of Virginia monitored turbidity as a proxy for suspended sediment concentrations and
found small increases in turbidity during the construction (Moyer and Hyer, 2009). While there
is not currently any regulation on turbidity in Virginia, excess sediment is a common reason that
water bodies can be listed as impaired (Miller and others, 2023).
Water temperature (WT) is a key state variable that directly and indirectly influences
stream physical, chemical, and biological processes (Bonacina and others, 2023; van Hamel and
Brunner, 2024; Johnson and others, 2024; Leach and others, 2023). Some of these processes
include the solubility of dissolved oxygen, toxicity of chemicals, pH, the density of water,
organic matter degradation, microbial metabolic activity, and primary production (Bonacina and
others, 2023). In Virginia, there are regulations in place for water temperature in surface water
bodies (Virginia Administrative Code 9VAC25-260-50). Although water temperature is a vital
factor in stream health, few studies have examined potential changes in water temperature from
pipeline construction. Of the pipeline crossing studies that have considered water temperature, all
have provided evidence that water temperature was not affected by construction activities
(Gowdy and others, 1994; Houser and Pruess, 2009).
An over seven-year study conducted by the U.S. Geological Survey (USGS) in
cooperation with the Virginia Department of Environmental Quality (DEQ) was designed to
continuously monitor water-quality conditions at six Mountain Valley Pipeline (MVP) stream
crossings. This report analyzes the high-frequency water temperature and turbidity time series
before, during, and after the MVP stream crossing period. This analysis was conducted to
directly assess the magnitude and duration of potential changes, if any, in sediment and water
temperature conditions and determine if they were directly attributable to pipeline crossing
construction.
10
Figure 1. Map showing U.S. Geological Survey water-quality and gage height monitoring stations along
the Mountain Valley Pipeline (MVP) in southwestern Virginia. Stations names are defined in Table 1.
Description of Study Area
The MVP is a natural gas transmission pipeline which originates in northwestern West
Virginia and ends in south-central Virginia (Figure 1). The purpose of the pipeline is to connect
West Virginia’s Marcellus shale region near Wetzel County, West Virginia to the existing
Transcontinental Gas Pipe Line Company, LLC (Transco) gas transmission pipeline in
Pittsylvania County, Virginia (Parfomak and Vann, 2022). The 42-inch diameter pipeline spans
approximately 303 miles and crosses the Appalachian Mountains. The pipeline was initially
proposed in 2014 and construction began January 1, 2018 (Parfomak and Vann, 2024); however,
11
construction of the pipeline was suspended numerous times due to permitting issues in federal
court. Construction was completed on June 10, 2024, and the MVP was approved to begin
commercial service on June 11, 2024 (Parfomak and Vann, 2024).
The study sites are located in the Appalachian Basin and the Piedmont-Blue Ridge
Physiographic Provinces, with varying topography of areas with high slope and highly erodible
soils (Betcher and others, 2019; Lévesque and Dubé, 2007; New River Geographics, 2017; U.S.
Geological Survey, 2025a). The karst topography in this region is characterized by vast caves
and other subsurface water conduits and can pose an additional risk during construction activities
(Lévesque and Dubé, 2007; Zerga, 2024).
The climate within this region is subtropical, characterized by mild summers and winters,
with an annual average temperature of 14.2 degrees Celsius (°C) (Roanoke Weather Records,
2025). Roanoke, Virginia (located approximately in the middle of the study area) receives an
average annual rainfall of 42.8 inches and average snowfall of 14.7 in (Coats and Jackson, 2020;
Roanoke Weather Records, 2025). This study area is predominantly deciduous, coniferous, and
mixed forest, comprised of northern hardwood, cove hardwood, and mixed deciduous trees
(Turner and others, 2003; Virginia Department of Conservation and Recreation, 2021). Mature
trees in this region have an average height of 100 feet, providing dense canopy cover across the
mountain range (Coats and Jackson, 2020).
Overview of Pipeline Construction
MVP intersects approximately 139 streams and 61 wetlands across Virginia and West
Virginia, primarily in rural and previously undisturbed areas (Betcher and others, 2019;
Downstream Strategies and West Virginia Rivers, 2024). Various stream crossing methods were
12
utilized during the construction, which are summarized in this report as either trenched or
trenchless crossings. Stream crossing methods were selected based on the characteristics of the
landscape, including stream width, the steepness of the adjacent slopes, local geology, available
space for construction activities, and proximity to residential areas, roads, or environmental
resources (Tetra Tech, 2021).
The trenched crossing method used was a conventional dry-ditch open cut method (Tetra
Tech, 2021). Trenched crossing methods isolate the construction site by diverting streamflow to
dry or nearly dry conditions using a temporary coffer dam (Castro and others, 2015; Reid and
others, 2002). The workflow includes excavating the trench, installing the pipe in the trench, and
backfilling the trench. Trenched methods may disrupt sediment during installation and after
removal of the dam (Lévesque and Dubé, 2007; Reid and others, 2002).
Trenchless methods install the pipeline by drilling boreholes beneath the stream,
completing the installation without disturbing the surface or streambed (Castro and others, 2015;
New Jersey Department of Environmental Protection, 2021; Yan and others, 2018). The pipeline
is installed as an arc beneath the stream and can often be several feet below the streambed
(Castro and others, 2015). The suitable entry and exit locations for the pipeline may be identified
outside of the streambank margins (Castro and others, 2015). Entry and exit points are initially
drilled as a pilot hole by a drill rig, then drilling fluids are utilized to transport drill cuttings to the
surface, maintain the borehole stability, and cool the drill bit (Yan and others, 2018). Trenchless
methods for stream crossings can avoid the aquatic risks by boring outside the streambanks and
underneath the stream, which is particularly used in sensitive or urban areas (Castro and others,
2015). However, there are associated risks with this approach as well, including groundwater
infiltration and disruption of underground stream networks.
13
The pipeline requires both a temporary and permanent right of way (ROW) to
accommodate construction and maintenance vehicles, equipment, and material stockpiles (Tetra
Tech, 2021). In the upland areas, a 125-foot-wide construction ROW and 50-foot-wide
permanent ROW were constructed (Tetra Tech, 2021). Within 50 feet of an aquatic resource
crossing, the construction ROW narrows to 75 feet to preserve the riparian buffer (Tetra Tech,
2021).
After the sites were backfilled and hydrostatic tested, cleanup and restoration were
completed. These activities include restoring the grade cuts to pre-construction topography and
ground cover to regrow native plants, minimizing erosion, and stabilizing stream banks (Tetra
Tech, 2021).
Monitoring Site Selection
The USGS monitored six perennial streams in cooperation with the Virginia DEQ along
the MVP. These sites were selected based on the presence of threatened or endangered species,
proximity to- or designation as- Virginia Tier III waters (Exceptional State Waters), high
ecological integrity based on previous aquatic community, habitat and water quality surveys
conducted by DEQ, public water supplies, upland construction areas, site access, and suitable
water flow (Virginia Administrative Code 9VAC25-260-30). The monitoring sites varied in
watershed area, elevation, and proximity to the pipeline crossing construction (Figure 2; Table
1).
The three smallest watersheds, Little Stony Creek, upper Bottom Creek, and lower
Bottom Creek, all contain sections designated as Exceptional State Waters and are noted for wild
trout populations, diverse benthic macroinvertebrate communities, and high-quality in-stream
14
and riparian habitat conditions (Virginia Administrative Code 9VAC25-260-30; Burton and
Gerritsen, 2003; J. Hill, DEQ – Blue Ridge Regional Office, oral commun., 2017). This
designation identifies, maintains, and protects the waterbody from permanent or long-term
degradation (Virginia Administrative Code 9VAC25-260-30). Sinking Creek, the third largest
watershed, is distinguished by both the high benthic macroinvertebrate diversity and the karstic
geology. Upper Bottom Creek was crossed using trenched methods and Little Stony Creek,
lower Bottom Creek, and Sinking Creek were crossed using trenchless methods.
The two largest watersheds, Blackwater River and Roanoke River, are prominent western
Piedmont streams and are the water sources for Smith Mountain Lake, a reservoir used for
drinking water and recreation by thousands of residents and visitors each year. Although the
Blackwater River has a smaller watershed, it features two pipeline crossings within the study
area – one on the tributary, Maggodee Creek, upstream of the monitoring area and another
located between the two monitoring stations on the Blackwater River. Roanoke River serves as a
vital public water supply for the City of Roanoke, Roanoke County, and the City of Salem in
Virginia. Although the Roanoke River was crossed using trenchless methods and Blackwater
River was crossed using trenched methods, the pipeline at both locations was installed at a
minimum depth of six feet below the streambed (Tetra Tech, 2021).
15
Figure 2. Maps showing aerial upstream and downstream monitoring locations compared to the pipeline
construction. A, Little Stony Creek; B, Sinking Creek; C, Roanoke River; D, upper Bottom Creek; E, lower
Bottom Creek; F, Blackwater River. Stations names are defined in Table 1.
16
Table 1. Description of the 13 U.S. Geological Survey water quality monitoring stations (U.S. Geological
Survey, 2025b).
[Site numbers are shown on Figure 1. no. number; ID, identifier; USGS, U.S. Geological Survey;
*, Sites with gage height; ft, feet; mi2, square-miles]
Site
No. DEQ Site ID USGS
site number
USGS
site name
Abbreviated
site name Latitude Longitude Elevation
(ft)
Watershed
area
(mi2)
1 9-LRY002.87 03171597
Little Stony Creek Above
Archer Trail Near
Pembroke, VA
Little Stony
Creek upstream 37.343154 -80.619545 1,929 19.7
2 9-LRY002.87 0317159760
Little Stony Creek Below
Archer Trail Near
Pembroke, VA
Little Stony Creek
downstream* 37.339560 -80.624550 1,906 20.2
3 9-LRY002.39 0317154954
Sinking Creek Along
Route 604 Near
Newport, VA
Sinking Creek
upstream* 37.312663 -80.507729 1,876 65.2
4 9-SNK009.56 0317155123
Sinking Creek at Covered
Bridge Ln Near
Newport, VA
Sinking Creek
downstream 37.310988 -80.516938 1,811 66.2
5 9-SNK008.19 0205450393
Roanoke River Along
Route 626 at
Lafayette, VA
Roanoke River
upstream 37.234300 -80.199740 1,177 256
6 4AROA226.86 0205450495
Roanoke River Above
Route 11 at Lafayette,
VA
Roanoke River
downstream 37.234630 -80.193080 1,184 257
7 4AROA226.86 02054500 Roanoke River at
Lafayette, VA
Roanoke River gage
height* 37.236527 -80.2092089 1,174 254
8 4AROA226.64 0205373035
Bottom Creek Above
Tributary Near Bent
Mountain, VA
Upper Bottom Creek
upstream 37.187090 -80.151910 3,162 0.4
9 NA 0205373075
Bottom Creek Along
Route 612 Near Bent
Mountain, VA
Upper Bottom Creek
downstream* 37.191370 -80.144080 3,024 0.98
10 4ABTM012.47 0205373228
Bottom Creek Above
Confluence Near Bent
Mountain, VA
Lower Bottom Creek
upstream 37.173110 -80.135090 2,732 2.08
11 4ABTM011.94 0205373422
Bottom Creek Below
Poor Mountain Near
Bent Mountain, VA
Lower Bottom Creek
downstream* 37.164750 -80.141360 2,693 3.44
12 4ABTM010.26 0205696042
Blackwater River Above
Maple Branch Near
Redwood, VA
Blackwater River
upstream 37.052280 -79.826830 874 164
13 4ABTM009.25 0205696095
Blackwater River Below
Maple Branch Near
Redwood, VA
Blackwater River
downstream* 37.052317 -79.826867 915 165
17
Purpose and Scope
The purpose of this report is to assess whether water temperature and turbidity regimes
were affected by pipeline stream-crossing construction and to evaluate the utility of real-time
stream monitoring alert networks during pipeline construction. These objectives were addressed
through the following questions:
• Were there significant short-term or long-term anomalous water temperature or
turbidity conditions in relation to pipeline stream crossing construction?
• Can stream monitoring networks be used to identify compliance alerts throughout
pipeline construction?
The analysis herein is limited to answering the above-described questions specifically for
the six monitored streams reaches. Potential construction-related anomalous conditions outside
those specifically evaluated are possible but fall outside the scope of this report. Additionally, the
study design and analysis address potential reach-specific effects only – potential overall or
watershed-wide effects of pipeline construction are not evaluated from monitored data in this
report.
Methods of Investigation
The interpretations presented in this report are derived from time series of continuous
water-quality and water-level sensors placed upstream and downstream of natural gas pipeline
stream crossings. These data were analyzed to evaluate short- and long-term water-temperature
and turbidity conditions and the utility of this monitoring as a real-time alert application.
18
Monitoring Design
The continuous water-quality and water-level monitoring network for the MVP was
established at six pipeline stream crossings in 2017 (Figure 1). Each site had a paired monitoring
design, with stations upstream and downstream of the pipeline stream crossing. Watershed areas
spanned from less than 1 mi2 to 260 mi2 (Table 1). Paired monitoring stations were used to assess
downstream changes in water temperature and turbidity relative to the upstream conditions.
Water levels were measured at one station per site, except for the Roanoke River, where water
level measurements were taken at upstream USGS gage 02054500 (Table 1). Data were reported
in near real-time to support and inform the real-time alert application.
Data were analyzed to assess water temperature and turbidity conditions before, during,
and after pipeline crossing construction (Table 2). The “before” period includes all dates from
the establishment of the monitoring station up to the day prior to stream crossing construction
(2,123 to 2,289 days). Due to intermittent construction caused by permitting issues, activities not
associated with the stream crossing construction, such as tree clearing and ROW construction,
are included in the before period. The “during” period includes the pipeline stream crossing
construction and the immediate post-crossing restoration work (12 to 208 days). The “after”
period is at least one year post-stream crossing construction (366 to 595 days).
19
Table 2. Description of the Mountain Valley Pipeline stream crossing methods and timeline in
southwestern, Virginia. The before period began at the start of monitoring and ended a day before the start
of construction, the during period began at the start of construction and ended at the end of construction,
and the after period began a day after the end of construction through the end of the monitoring. The
upstream and downstream distances from the right-of-way (ROW) (in feet, ft) were calculated as the length
along the stream.
[ft, feet]
Stream
name
Crossing
method
Upstream
Distance
from
ROW (ft)
Downstream
Distance
from ROW
(ft)
Total distance
between
upstream and
downstream (ft)
Start of
Monitoring
Start of
Construction
End of
Construction
End of
monitoring
Construction period
(days)
Little
Stony
Creek
Trenchless 315 1,672 1,987 2017-08-
26 2023-12-11 2024-04-29 2025-04-
30 141
Sinking
Creek Trenchless 6,004 430 6,434 2017-11-
07 2023-11-02 2024-04-15 2025-04-
30 166
Roanoke
River Trenchless 576 438 1,014 2017-08-
23 2023-09-21 2024-04-15 2025-04-
30 208
Upper
Bottom
Creek
Trenched 227 2,536 2,763 2017-10-
31 2023-08-24 2023-09-13 2025-04-
30 21
Lower
Bottom
Creek
Trenchless 2,340 1,591 3,931 2017-10-
27 2023-11-02 2024-04-26 2025-04-
30 177
Blackwater
River Trenched 382 1,266 1,648 2017-11-
09 2024-02-15 2024-02-26 2025-04-
30 12
20
Continuous water-quality data were measured using YSI, Inc. (Yellow Springs, Ohio) 6-
series Multiparameter Water Quality Sondes at 5-minute intervals for water temperature, specific
conductance, pH, dissolved oxygen, and turbidity. Water temperature has a measurement
resolution of 0.01 °C and a measurement accuracy of plus or minus (±) 0.15 °C (YSI, 2012). The
measurement resolution for turbidity is 0.1 Formazin Nephelometric Units (FNU) with an
accuracy of ± 2% of a measurement or 0.3 FNU, whichever is greater. Water levels were also
measured at 5-minute intervals at six monitored pipeline crossings using a TE Connectivity
(Galway, Ireland) KSPI 500 transducer or OTT HydroMet (Kempten, Germany) PLS pressure
transducer. Peak stage verification was accomplished with additional water level measurements
with an Onset HOBO (Bourne, Massachusetts) water level data logger. This report focuses solely
on water temperature, turbidity, and water-level data for the entire period of record. All data
were collected, and quality assured in accordance with USGS Guidelines and standard
procedures (Wagner and others, 2006; Sauer and Turnipseed, 2010). Turbidity measurements
exceeding 1,000 FNU are outside the manufacturer’s stated measurement range and were
censored and treated as values greater than 1,000 FNU, impacting less than 0.15-percent of all
measurements (Table 1.1). This small amount of right-censored turbidity data was
inconsequential to the analytical methods used and described in the subsequent subsection of this
report and to the purpose of understanding potentially anomalously high upstream-to-
downstream differences. All data in this report are publicly available on the USGS Water Data
for the Nation (U.S. Geological Survey, 2025b).
Real-time Alert Application
The monitoring network was used by DEQ as a real-time alert tool for regulators of the
pipeline construction. From January of 2018 through April of 2025, water temperature, pH,
21
dissolved oxygen, turbidity, and specific conductance were evaluated in real-time using an
automated script for potential anomalous conditions. A flag (that is, an alert provided by the
automated data review system) occurred when water quality measurements were below the
minimum values or above maximum values set by the thresholds defined in Table 3.
A field visit could lead to four response categories by DEQ:
(1) No Action Required by DEQ,
(2) Field complaint reviewed, no additional DEQ actions required,
(3) Issues were noticed during the follow-up investigation into a pollution complaint, but
these were addressed in real time by the Responsible Party with no longer term actions needed,
and
(4) Further action was required.
22
Table 3. Description of the thresholds used for the real-time alert application. Baseline turbidity is the
maximum of the median turbidities across upstream and downstream U.S. Geological Survey (USGS) sites
during a 24-hour period. Refer to Table 1 for additional information about USGS sites.
[*, Cited from Virginia Administrative Code 9VAC25-260-50]
Field Parameter Flag Name Flag Definition
Water
Temperature
(WT)
Upstream maximum Number of upstream WT (°C) samples exceeding maximum temperature standards*
Downstream maximum Number of downstream WT (°C) samples exceeding maximum temperature standards*
Rise above natural Number of times the difference between the upstream and downstream WT rose above
natural temperature (1-3 °C depending on class*)
Dissolved
Oxygen (DO)
Upstream minimum Number of times upstream DO (mg/L) fell below the minimum DO standards*
Downstream minimum Number of times downstream DO (mg/L) fell below the minimum DO standards*
Upstream-downstream
difference Number of times the difference between upstream and downstream DO was > 1 mg/L
pH
Upstream Number of upstream pH samples that fell below or above the pH range standards*
Downstream Number of downstream pH samples that fell below or above the pH range standards*
Upstream-downstream
difference
Number of times the difference between upstream and downstream pH was outside the
normal range (between pH min and pH max)
Specific
Conductance
(SC)
Upstream maximum Number of upstream SC (µS/cm) samples exceeding maximum specific conductivity
designations developed for each USGS gage by regional biologists.
Downstream maximum Number of downstream SC (µS/cm) samples exceeding maximum specific conductivity
designations developed for each USGS gage by DEQ regional biologists.
Upstream-downstream
difference
Number of times the difference between upstream and downstream SC (µS/cm)
exceeded the difference threshold developed for each USGS gage by DEQ regional
biologists.
Upstream-downstream
percentage difference
Number of times the percent difference between upstream and downstream SC (µS/cm)
exceeded the percent difference threshold developed for each USGS gage by DEQ
regional biologists.
Turbidity (TB)
Upstream-downstream
exceedance
Number of 30-minute windows where downstream TB exceeded upstream by at least 6
FNU, for sites with a baseline TB ≤ 40 FNU.
Upstream-downstream
percentage
exceedance
Number of 30-minute windows where downstream TB was at least 15% higher than
upstream TB, for sites with a baseline TB > 40 FNU.
Upstream exceeds 99th
percentile
Number of 30-minute windows where upstream TB exceeded the site-specific 99th
percentile threshold, based on pre-2018 background data.
Downstream exceeds
99th percentile
Number of 30-minute windows where downstream TB exceeded the site-specific 99th
percentile threshold, based on pre-2018 background data.
23
Statistical Analysis of Water Temperature and Turbidity
Water temperature and turbidity were analyzed by graphical inspection, descriptive
statistics, analysis of magnitude and duration, and testing time-matched paired differences. At
each site and for each period, bootstrapped resampling and confidence intervals were computed
to test if the observed median of all time-matched paired differences between upstream and
downstream were significantly different from zero. Water temperature and turbidity were each
further analyzed by methods suited for each specific parameter in the following subsections.
The raw data were initially plotted over time for graphical inspection and used to
calculate the minimum, first quartile (Q1), median, third quartile (Q3), and maximum for each
site, station, and period.
An hourly median was computed to account for lag time between the downstream and
upstream stations. The downstream hourly median data were plotted against the upstream data
for visual inspection. The hourly median data were used to analyze magnitude and duration of
the time-matched paired differences to identify potential short- and long-term anomalous
conditions for both parameters. If there was not a complete concurrent pair, the difference was
not calculated, and the given date time was removed from analysis. The hourly values were not
calculated and removed from the analysis if there was less than 80-percent of the data in a given
hour.
The instrument’s uncertainty for water temperature is ± 0.15 °C, while turbidity
measurements have an uncertainty of ± 0.3 FNU or 2-percent, whichever is greater (YSI, 2012).
Differences calculations require accounting for the combined uncertainty from both the upstream
and downstream instruments and were computed as averages for each site, station, and period as
in JCGM (2020):
24
1
𝑚∑√(𝑟𝐷𝑅𝑖)2 +(𝑟𝑈𝑅𝑖)2𝑚
𝑖=1 (1)
where
𝑙 �ℎ𝑟 𝑟�𝑎 𝑙𝑟𝑙𝑎𝑎𝑟 𝑙𝑎 𝑙𝑎𝑟𝑎𝑟𝑟𝑎𝑟�ℎ𝑙𝑙𝑟
�ℎ �ℎ𝑟 𝑎𝑎𝑎� �ℎ𝑙𝑟𝑟𝑎𝑙𝑟𝑎𝑙𝑎𝑙𝑟𝑟 𝑙𝑎𝑟𝑎𝑟𝑟𝑎𝑟�ℎ𝑙𝑙
𝑟𝐷𝑅 , 𝑟𝑈𝑅 𝑎𝑟𝑎 𝑎𝑎𝑎� 𝑎𝑙𝑟𝑙𝑟𝑟𝑟𝑎𝑎𝑙 𝑎𝑙𝑎 𝑟𝑙𝑟𝑟𝑟𝑎𝑎𝑙 𝑟𝑟𝑎𝑟�ℎ𝑙𝑙 𝑙𝑎𝑟𝑎𝑟𝑟𝑎𝑟�ℎ𝑙𝑙,𝑟𝑎𝑟𝑙𝑎𝑎𝑟�ℎ𝑟𝑎𝑙𝑟
A bootstrapping of median differences approach was used to determine if the difference
between the hourly median time-matched paired observations between downstream and upstream
stations differed significantly from zero. A non-parametric bootstrapping of medians approach is
well-suited for large, non-normal, and asymmetric datasets (Johnston and Faulkner, 2021;
Mudelsee and Alkio, 2007), which do not meet the assumptions of other statistical test for
dependent samples. Additionally, Johnston and Faulkner (2021) found that the bootstrapping of
differenced medians resulted in less Type I error in comparison to rank-banked Mann-Whitney
Wilcoxon test, although the analysis tested two independent samples.
The bootstrapping of median differences test used in this analysis is a one-sample test
applied to the dependent sample of time-matched paired differences between the upstream and
downstream stations. The median of the observed distribution of differences is computed and
used as the test statistic and compared to 10,000 bootstrapped resampled distributions with
replacement. Recent studies have stressed that calculating p-values for classic null hypothesis
statistical tests (NHST) when testing large sample sizes are not useful or appropriate because the
tests are heavily influenced by and dependent on sample size (Lin and others, 2013; Krawczyk,
2015; Gómez-de-Mariscal and others, 2021). Alternatively, recent studies suggest evaluating
25
confidence intervals directly (Lin and others, 2013; Balkin and Lenz, 2021; Gómez-de-Mariscal
and others, 2021). Upper and lower 99-percent confidence intervals were calculated for each
station and period from 10,000 bootstrapped resampling, with replacement. The confidence
intervals were evaluated for the hourly median differences of time-matched pairs between the
downstream and upstream monitoring stations.
Results of the bootstrapping of median differences tests were evaluated as such:
If a test’s confidence interval overlaps zero, or the observed median of the time-
matched paired differences is less than or equal to the combined uncertainty from
instrument accuracy, then the observed median of the time-matched paired
differences does not differ significantly from zero;
If a test’s confidence interval does not overlap zero and the observed median of
the time-matched paired differences is greater than the combined uncertainty from
instrument accuracy, then the observed median of the time-matched paired
differences differs significantly from zero.
Bootstrapping of median differences tests were performed in R v4.4.2 (R Core Team,
2025). Bootstrapped resampling was completed using the base R function ‘replicate.’
26
Continued Statistical Analysis of Water Temperature
The water temperature data were used to perform anomaly detection analysis on the
hourly median differences between the upstream and the downstream gage sites. The duration
and magnitude of the anomalies were calculated to assess potential short-term or long-term
effects from pipeline stream crossing construction.
Water Temperature Anomaly Detection
Anomaly detection is used to determine significant or extreme measurements that differ
significantly from the datasets overall distribution and are rare in the dataset (Jamshidi and
others, 2022). Here, anomaly detection was used to elucidate changes from the hourly median
water temperature differences at each paired pipeline crossing site. The hourly median water
temperature measurement at the upstream site was subtracted from the concurrent downstream
water temperature (downstream hourly median – upstream hourly median).
Anomalies were detected by decomposing the hourly median difference timeseries to
eliminate the seasonality and the long-term, non-stationarity trend. The differenced time series
(downstream – upstream) was decomposed using the Seasonal and trend decomposition using
Locally Estimated Scatterplot Smoothing (LOESS) (STL), which separates the time series into
three components: seasonal, trend, and the remainder (Shikwambana and Kganyago, 2023). The
seasonal component represents the variation in the timeseries for a stated period, such as regular
monthly intervals, to capture predictable patterns in the time series (Dancho and Vaughan, 2018;
Shikwambana and Kganyago, 2023). The trend component reveals the long-term, low-frequency,
non-stationary trends in the time series (Shikwambana and Kganyago, 2023). The remainder
component represents the data remaining after removing the seasonal and the trend components
27
(Shikwambana and Kganyago, 2023). The STL method auto-calculated 24 days as the frequency
and between 716 to 735 days for the trend across all sites. The frequency indicates the total
number of days in a cycle within the dataset, and the trend is the period which can be aggregated
to visualize the data’s central tendency (Dancho and Vaughan, 2018).
Water temperature anomalies were detected using the generalized extreme studentized
deviate (GESD) which uses a Student’s t-test to remove outliers (Dancho and Vaughan, 2018).
The test statistic is compared to a critical value; when an outlier is identified and removed, the
test statistic is recalculated and updated (Dancho and Vaughan, 2018). All outliers are removed
once the test statistic falls below the critical value (Dancho and Vaughan, 2018). A positive
temperature anomaly indicates the downstream station is warmer than the upstream station and is
referred to as a “downstream-warmer” temperature anomaly. A negative temperature anomaly
indicates the upstream station is warmer than the downstream station as is referred to as an
“upstream-warmer” temperature anomaly. The duration and the magnitude were calculated on
each of the anomalies. The water temperature anomaly detection was performed in R-Studio
R4.4.2 using the package “anomalize” (Dancho and Vaughan, 2023).
Continued Statistical Analysis of Turbidity
Turbidity and gage height data were used to conduct a hysteresis analysis of the storms at
each site, station, and period. Storm hysteresis analyzes the temporal dynamics of peaks and
troughs between a storm’s hydrograph and a solute’s chemograph (Liu and others, 2021; Lloyd
and others, 2016a). This dynamic interplay between the hydrograph and chemograph are utilized
to create hysteresis loops; for which, hysteresis metrics like, a hysteresis index can be computed
to gain insights about biogeochemical and watershed processes, land use, anthropogenic changes,
and hydroclimatic conditions (Knapp and others, 2020; Burns and others, 2019).
28
Stormflow Hysteresis
Hysteresis loops are characterized by their direction and magnitude (Lloyd and others,
2016a). Clockwise loops indicate rapid delivery with the peak of the chemograph on the rising
limb of the hydrograph (Baker and Showers, 2019), while counter-clockwise loops indicate
delayed delivery, with the peak of the chemograph on the falling limb of the hydrograph (Fovet
and others, 2018).
A hysteresis index (HI) aids in the quantification of storm hysteresis by applying a
consistent, representative metric to summarize a storm’s hysteresis and was computed as (Lloyd
and others, 2016a):
𝐻𝐻= 𝑇𝑅𝐿_𝑚𝑚𝑟𝑚−𝑇𝐹𝐿_𝑚𝑚𝑟𝑚 (2)
where
𝑇𝑅𝐿_𝑙𝑙𝑟𝑙 is the normalized turbidity value on the rising limb of the
hydrograph
𝑇𝐹𝐿𝑙𝑙𝑟𝑙 is the normalized turbidity value on the falling limb of the hydrograph
Slopes indicate whether a storm event was enriching (chemograph graph was becoming
more positive) or diluting (chemograph was becoming more negative). A “slope” metric is often
evaluated (Waite and others, 2023; Musolff and others, 2021; Millar and others, 2022) along
with HIs, which characterizes the hysteresis loop as positive, negative, or no slope (i.e., slope =
0). For this analysis, the slope was estimated as the line of best fit using an ordinary least squares
linear regression between the natural logarithm of turbidity and natural logarithm of gage height.
The sign of the numerical value of the slope indicates whether the dominant condition of a storm
29
event was enriching, diluting, or if neither was dominant. The relation between HI and slope is
compared to better understand the types of hysteretic behaviors that occur when the
concentration of the parameter of interest is enriching or diluting, providing insights and
additional evidence about the proximity of sources and delivery dynamics.
High-frequency turbidity and gage height data were used to analyze hysteretic patterns at
each site. Typically, discharge is used in hysteresis analysis instead of gage height; however,
discharge data were not collected at most stations. Only the Roanoke River gage 02054500 had
both gage height and discharge data available. A preliminary hysteresis analysis was performed
for the upstream and downstream stations of the Roanoke River using both gage height and
discharge, and results showed agreement.
Hysteresis analysis was performed on all storm events where gage height and turbidity
data at both upstream and downstream stations were available and contained 10-percent or less
gaps in turbidity data. Prior to analysis, time series gaps were filled by linear interpolation. Each
individual storm’s hysteresis loop, hydrograph, and chemograph were inspected to evaluate if
interpolated data resulting from data gaps affected the hysteresis index value. Any storm
hysteresis loop where interpolated data changed the prevailing shape and magnitude of the loop
was removed from further analysis.
All analyses were performed in R v4.4.2 (R Core Team, 2025). Baseflow separation,
storm identification, peak identification, and rising and falling limb parsing was completed using
the “hydroEvents” package (Wasko and Guo, 2022).
30
Short- and Long-term Water Temperature Patterns
Quantifying the duration and magnitude of temperature anomalies in streams before,
during, and after pipeline crossing construction is pertinent to contextualizing the potential
impacts construction may cause on the aquatic ecosystem and water quality. Short-duration
thermal fluctuations can significantly stress aquatic species, potentially resulting in sublethal
impairments or mortality events under extreme conditions (Alfonso and others, 2021; Donaldson
and others, 2008; Johnson and others, 2024, Tassone and others, 2023). Longer-duration
warming temperatures could result in a variety of ecological consequences, such as a change to
the physiology, behavior, and phenology in individual species, the migration of biota to new
habitat, and potential trophic restructuring (Johnson and others, 2024). The toxicity of pollutants
such as ammonia, pesticides, and polyaromatic hydrocarbons may also increase with increasing
temperature (Berger and others, 2017; Erickson, 1985; Noyes and Lema, 2015; Verheyen and
others, 2022). Here, the magnitude and duration of water temperature anomalies were
investigated to assess the potential for short-term and long-term effects from the pipeline
crossing construction on the overall thermal regime.
Comparative Analysis of Upstream and Downstream Water Temperature Conditions
The upstream and downstream temperatures have a similar seasonal variation throughout
the study period, following the typical U.S. East Coast seasonal temperature regimes (Figure
3A). Across all paired sites, the hourly median temperatures ranged from -2 to 30.4 °C (Table 4).
January consistently had the coldest median temperatures at both the upstream and downstream
sites throughout the study. The warmest median temperatures occurred during July for all sites,
except for upper Bottom Creek, where peak median temperatures were recorded in August.
31
Figure 3. Time series of the hourly median water temperature. Vertical dashed lines indicate the during
crossing construction period. A, Time series of the upstream and downstream sites for each paired station,
B, Time series of the downstream – upstream and the identified temperature anomalies when seasonality
and long-term trends were removed.
32
The hourly median water temperature differences between the upstream and downstream
stations were used to visually observe thermal variations on both an interannual and seasonal
timescale for each of the six sites (Figure 3B). A negative hourly median temperature difference
indicates the upstream station had a higher hourly median temperature than the downstream
station. A positive hourly median temperature difference indicates that the downstream station
had a higher hourly median temperature than the upstream station.
Sinking Creek, upper Bottom Creek, and lower Bottom Creek demonstrated the most
pronounced seasonal variation throughout the monitoring period. However, upper and lower
Bottom Creek exhibited a different pattern than Sinking Creek. At the Bottom Creek sites, the
downstream station’s hourly median temperature had warmer temperatures than the upstream
station during the warmer, summer months (Figure 3B). In contrast, the upstream station had
higher hourly median temperatures than the downstream station in the warmer, summer months
(Figure 3B). Little Stony Creek, Roanoke River, and Blackwater River had less variation
seasonally and interannually in the hourly median temperature differences between upstream and
downstream.
To further explore these patterns, temperature differences were evaluated at all sites by
isolating the before, during, and after stream crossing construction periods. Within each site and
each period, the upstream and downstream station generally had similar temperatures (Figure 4,
Table 4), although there were site-specific differences. At Sinking Creek, there were higher
temperatures at the upstream station compared to the downstream station at warmer overall
temperatures in the before and after periods (Figure 4B). Upper and lower Bottom Creek showed
warmer downstream temperatures as the temperature increased during all three periods (Figure
4D, Figure 4E). In the during construction period, upper Bottom Creek notably diverged from
33
the 1-to-1 line (that is, the line where downstream temperature equivalent is to upstream
temperature) (Figure 4D), with a higher temperature at the downstream station compared to the
upstream station.
Figure 4. Scatterplot of each paired station in the before, during, and after period. The 1-to-1 golden
dashed line represents when the upstream and downstream hourly median temperatures are equivalent. A,
Little Stony Creek; B, Sinking Creek; C, Roanoke River; D, upper Bottom Creek, E, lower Bottom Creek, F,
Blackwater River.
34
Table 4. Characterization of the distribution of the high-frequency (5-minute interval) data of water
temperature at all sites throughout the before crossing, during crossing, and after crossing construction.
[°C, degrees Celsius; N, Sample Size; Min, Minimum; Q1, Quantile 1; Q3, Quantile 3; Max,
Maximum]
Upstream Downstream
°C °C
Location Period N Min Q1 Median Q3 Max N Min Q1 Median Q3 Max
Little Stony
Creek
Before 655,221 -0.1 5.7 10.7 16.3 22.2 628,727 -0.1 5.8 10.8 16.4 22.6
During 40,248 -2 3.5 5.3 8 15.3 40,229 0 3.7 5.6 8.2 15.7
After 105,604 -0.1 5.6 12 16.5 22.6 104,303 -0.1 5.8 12.3 16.7 23.1
Sinking
Creek
Before 619,843 -0.2 7.6 12.8 18.4 24.3 621,368 0.4 8 12.6 17.6 23.2
During 47,429 -0.1 5.2 7.1 9.6 16.3 47,420 0.7 5.9 7.6 9.9 16.2
After 106,305 -0.1 8.1 14.5 18.4 25.6 108,934 0.5 8.2 14 17.7 23.9
Roanoke
River
Before 615,825 -0.1 7.7 14 20.1 27.1 620,495 -0.1 7.8 13.7 19.9 27.5
During 54,409 1.9 6.2 9 12.6 19.6 59,124 -0.1 6 8.7 12.4 20
After 108,613 -0.1 8 15.4 19.9 27.9 109,518 -0.1 8.1 15.6 20.1 28.3
Upper
Bottom
Creek
Before 600,063 -0.1 6.7 10.3 14.3 19 601,436 -0.3 6.3 10.4 15 21
During 5,746 13.5 15.4 15.9 16.3 17.4 5,761 12.6 15.8 16.5 17 18.8
After 170,845 0.1 6 9.1 13.1 18.8 166,058 -0.1 5.4 8.9 13.3 20.7
Lower
Bottom
Creek
Before 631,013 0 6.2 11.5 16.7 23.7 617,947 -0.2 6.1 11.6 17 24.9
During 50,661 0 3.9 6.1 8.9 19.1 50,649 -0.1 3.7 5.9 8.8 20.4
After 105,474 -0.1 6.2 12.7 16.4 24.1 106,471 -0.2 6.1 12.7 16.6 26
Blackwater
River
Before 632,181 -0.1 7.2 13.9 21 28.3 636,464 -0.1 7.2 13.9 21.1 28.4
During 2,904 3.3 5.2 6.6 7.6 9.3 2,903 3.6 5.4 6.8 7.7 9.3
After 107,094 -0.2 8.8 14.7 20.7 30.2 109,034 -0.1 8.3 14.7 20.9 30.4
The finding that, in general, the upstream and downstream hourly water temperature
differences were similar was supported by the bootstrapping of median differences analysis of
the hourly median differences (Table 5). The observed median differences ranged from the
upstream warmer by 0.15 °C and the downstream warmer by 0.6 °C. Sixteen of the 18 tests had
hourly median differences less than the combined uncertainty from the instrumentation. Of these,
three tests also had confidence intervals that overlapped zero – lower Bottom Creek in the before
and after period and upper Bottom Creek in the after period. Sinking Creek and upper Bottom
Creek in the during period are the only two tests which may have significant results because the
35
observed median of differences is greater than the combined instruments uncertainty and the
confidence intervals do not overlap zero. For these two tests that yielded a significant result, the
maximum median of differences is less than 1°C when uncertainty is accounted for, ranging
from 0.24 to 0.66 °C at Sinking Creek and from 0.39 to 0.81 °C at Upper Bottom Creek in the
during period.
Table 5. Results of the bootstrapped hourly median differences between the upstream and
downstream time-matched paired water temperature differences the before, during, and after crossing
period. A negative median temperature, lower 99-percent confidence interval, and upper 99-percent
confidence interval indicates that the upstream site was warmer than the downstream site and a positive
temperature value indicates that the downstream site was warmer than the upstream.
[°C, degrees Celsius; N, Sample Size; CI, confidence interval; %, percent]
°C
Location Period N
Combined
uncertainty
from
instruments
Median of hourly
median
differences
Lower
99% CI
Upper 99%
CI
Range between upper
and lower 99% CI
Little Stony
Creek
Before 54,253 ±0.21 0.1 0.1 0.1 0
During 3,379 ±0.21 0.2 0.2 0.2 0
After 8,683 ±0.21 0.15 0.15 0.2 0.05
Sinking Creek
Before 51,981 ±0.21 -0.1 -0.1 -0.1 0
During 3,975 ±0.21 0.45 0.45 0.5 0.05
After 8,837 ±0.21 -0.15 -0.2 -0.1 0.1
Roanoke
River
Before 50,476 ±0.21 0.1 0.1 0.1 0
During 4,541 ±0.21 0.1 0.1 0.1 0
After 9,047 ±0.21 0.1 0.1 0.1 0
Upper Bottom
Creek
Before 50,192 ±0.21 0.2 0.2 0.2 0
During 501 ±0.21 0.6 0.5 0.6 0.1
After 13,798 ±0.21 0 -0.1 0 0.1
Lower
Bottom
Creek
Before 52,079 ±0.21 0 0 0 0
During 4,245 ±0.21 -0.1 -0.1 -0.1 0
After 8,786 ±0.21 0 0 0 0
Blackwater
River
Before 52,742 ±0.21 0.1 0.1 0.1 0
During 286 ±0.21 0.2 0.1 0.2 0.1
After 9,336 ±0.21 0.1 0.1 0.1 0
36
Detection of Water Temperature Anomalies
Across the six sites, 7,284 hourly median water temperature anomalies were detected out
of the 766,504 total hourly median differences, representing approximately 0.95-percent of the
data. Roanoke River, lower Bottom Creek, and Blackwater River had the highest percentage of
data that detected anomalies, at 1.72-percent (n = 2,171 of 126,450), 1.55-percent (n = 2,010 of
129322), and 1.45-percent of the data (n = 1,794 of 123682), respectively. Anomalies were
detected at Little Stony Creek in 0.89-percent of the data (n = 1,152 of 129,656). There were two
sites with less than 100 anomalies detected in the time series and consisting around 0.06-percent
of the data – at Sinking Creek (n = 80 of 128,984) and upper Bottom Creek (n = 76 of 128,410).
There were three types of anomalies detected: downstream-warmer, which accounted for
3,218 anomalies (44.2-percent), upstream-warmer, which accounted for 4,030 anomalies (55.3-
percent), and same-temperature anomalies, which accounted for 36 total anomalies (0.9-percent).
Throughout the study period, the median duration of all anomaly types was two hours and the
median temperature difference of 0.73 °C, in which the downstream station is warmer. This
report further investigates the magnitude and duration of downstream-warmer and upstream-
warmer anomalies.
Downstream-Warmer Anomalies
Downstream warmer anomalies accounted for 47-percent of all anomalies in the before
period (n = 1,219), 60-percent in the during period (n = 68), and 34-percent in the after period (n
= 322). The highest number of downstream-warmer anomalies occurred in the before period,
comprising 76-percent of all downstream-warmer anomalies (n = 1,219 pf 1,609), likely due to
the longer duration of the period. There were 68 and 322 total downstream-warmer anomalies in
37
the during and after period, respectively. There were downstream-warmer anomalies in the
during construction period at Little Stony Creek, Sinking Creek, the Roanoke River, and lower
Bottom Creek.
Downstream-warmer anomalies varied in their median magnitude for a given event
between 0.3 to 3.0 °C (Figure 5). The highest temperature difference occurred at lower Bottom
Creek in the before period, in which the downstream site was 3.0 °C higher than the upstream
site and lasted for six hours. The downstream-warmer anomalies had a duration less than a day,
ranging from 1 to 18 hours. Two of the longest duration events, both lasting 18 hours, occurred
at Little Stony Creek; one in the before period with a median temperature difference of 0.60 ±
0.21 °C and the second in the during period with a median temperature difference of 0.90 ± 0.21
°C.
Figure 5. Scatterplot of the hourly median temperature difference of the anomalies and the duration, in
hours, of the anomalies in the before, during, and after period. A, Little Stony Creek; B, Sinking Creek; C,
Roanoke River; D, Upper Bottom Creek, E, Lower Bottom Creek, F, Blackwater River.
38
Upstream-Warmer Anomalies
Most upstream-warmer anomalies were detected in the before period (n = 1,356 of the
2,575 or 52-percent), likely due to longer duration of the period. In the during period, there were
46 anomalies detected out of the 114 total anomalies detected in the during period, representing
40-percent. In the after period, upstream-warmer anomalies represent 613 of the total 953
anomalies in the after period, or 64-percent. There were upstream-warmer anomalies identified
only at Little Stony Creek and Lower Bottom Creek in the during crossing construction period.
The upstream-anomalies were most prevalent at Sinking Creek (n = 62 of 80 anomalies, or 78-
percent) followed by the Roanoke River (n = 1,626 of 2,172, or 75-percent) and lower Bottom
Creek (n = 1,020 of 2,010, or 51-percent).
During the study period, the median duration of all anomaly types was 2 hours and the
median temperature difference of 0.42 °C, in which the upstream station was warmer. The
upstream-warmer anomalies varied in their magnitude between 0.050 to 2.65 °C (Figure 5). The
highest temperature difference occurred at lower Bottom Creek in the before period, in which the
upstream site was 2.65 °C higher than the downstream site and persisted for 5 hours. The
longest-lasting upstream-warmer temperature anomaly persisted at Blackwater River for 134
hours, with a median temperature magnitude of 0.60 ± 0.21 °C.
Discussion of Water Temperature Results
At all monitored locations, the upstream and downstream site exhibited a similar thermal
behavior within each evaluated period. The differences between the paired sites were minimal,
with the range between the lower and upper 99-percent confidence intervals from 0 to 0.1 °C.
Twelve of 18 tests had a difference in the upper and lower 99-percent confidence intervals of 0
39
°C. The median of the hourly median differences was also small, between -0.15 to 0.6 °C for all
sites and periods. Of the 18 tests performed, only Sinking Creek in the during period and upper
Bottom Creek in the during period were statistically significant. At both sites in the during
period, the medians of hourly median differences exceeded the combined uncertainty of the
instrumentation, and the confidence interval did not include 0. Although these tests are
statistically significant, the range of the temperature differences at both sites is less than 1 °C,
with Sinking Creek at 0.24 – 0.66 °C and upper Bottom Creek from 0.39 – 0.81 °C.
To distinguish any potential differences between the upstream and downstream
temperatures, water temperature anomaly detection was utilized to remove the effects of
seasonality and long-term changes to detect potential anomalous events. There were both
downstream-warmer and upstream-warmer anomalies across all study sites; however, these
anomalies constituted approximated 1-percent of the total data collected. Most of the
downstream-warmer and upstream-warmer anomalies were identified in the before period due to
the length of the before period in comparison to the during and after. Sites that used the
trenchless construction crossing method detected downstream-warmer anomalies in the during
period, whereas the two sites using trenched crossing methods did not detect any anomalies;
however, this disparity is more closely linked to the duration of the crossing period than the
crossing technique itself. The trenched construction period lasted 12 days at Blackwater River
and 21 days at Upper Bottom Creek, while the trenchless crossing period had a duration between
141 to 208 days. Additionally, some of the sites displayed a notable seasonality that was
captured in the during period. For instance, at lower Bottom Creek and the Roanoke River, there
are downstream-warmer anomalies in the late-spring to early-summer months and upstream-
warmer anomalies.
40
Both the duration and magnitude of the downstream-warmer and upstream-warmer
anomalies were relatively short duration and low magnitudes. The median duration across all
anomaly types was 2 hours, with a median magnitude of 0.73 ± 0.21 °C, with the downstream at
a higher temperature than the upstream. Little Stony Creek, Roanoke River, lower Bottom Creek,
and Blackwater River displayed comparable ranges for upstream- and downstream-warmer
anomalies and demonstrate a consistent pattern across different periods. The duration and
magnitudes of the anomalies in the during crossing construction period aligned closely to those
of the before and after crossing construction period.
The median duration of both upstream-warmer and downstream-warmer were both 2
hours, indicating that in general, anomalies were not persisting over long durations in the
streams. The maximum duration of a downstream-warmer anomaly was less than 1 day, at 18
hours, and the duration of an upstream-warmer anomaly was 134 hours. While there are longer
duration anomalies, 61-percent of the upstream-warmer anomalies (n = 380 of 610) and
downstream-warmer anomalies (n = 441 of 722) are less than or equal to 2 hours in total
duration. About 90-percent of the data has a duration less than or equal to 4 hours, with 649 of
722 upstream-warmer anomalies (90-percent) and 539 of 610 downstream-warmer anomalies
(88-percent), suggesting that most of the anomalies are short in duration.
The median magnitude of the downstream-warmer anomalies was 0.74 °C, and the
median magnitude of the upstream-warmer anomalies was 0.43 °C. Some sites had a consistent
typical range in the upstream-warmer and downstream-warmer anomalies, such as Little Stony
Creek, lower Bottom Creek, and the Roanoke River (Figure 5). All the sites had similar
magnitudes of temperatures consistent throughout the before, during, and after period. Most of
these magnitudes between the upstream and downstream sites are small, with about 63-percent of
41
the downstream-warmer anomalies (n = 385 of 610) and 68-percent (n = 493 of 722) of the
upstream-warmer anomalies less than or equal to 1°C. 90-percent of the downstream-warmer
anomalies are less than or equal to 2 °C difference between upstream and downstream and an
even higher percentage, 97-percent (n = 702 of 722) of the upstream-warmer anomalies. Over the
7-year study period, the magnitude of the temperature anomalies was low; most detected
anomalies were within a 2 °C difference.
One criterion applied in the real-time alert application included flagging instances where
the temperature differences between upstream and downstream exceeded the natural temperature
variability threshold, defined as 1-3 °C depending on the stream class (Virginia Administrative
Code 9VAC25-260-50). None of the study sites recorded hourly temperature differences
exceeding 3 °C, indicating that the temperature anomalies generally remained within the
expected range for Virginia. There was only one temperature anomaly difference which had a
median temperature difference of exactly 3 °C. This occurred during the before period at lower
Bottom Creek from 05/23/2029 at 12:00 to 05/23/2017 at 17:00. However, the small number of
hourly median temperature anomalies with respect to the entire dataset, combined with the brief
duration and low magnitude of anomaly events, suggests that the crossing construction on the
pipeline had minimal impact on the thermal regime downstream.
The anomaly detection method used in the analysis removes the effect of long-term
trends in the water temperature but does not remove the effect of short-term changes in
temperatures. Temperature is a highly variable metric that is significantly influenced by air
temperature and environmental conditions, including channel geometry, water depth, tributary
confluences, groundwater seeps, stream discharge levels, and microhabitat characteristics
(Caissie, 2006; Siegel and Volk, 2019; Gendaszek and Appel, 2022; Mejia and others, 2020).
42
While air temperature was not directly measured in this study, stream water temperature
increases about 0.6 to 0.8 °C for every 1 °C increase in air temperature (Morrill and others,
2005). However, higher elevations or groundwater-dependent watersheds are less sensitive to
temperature changes (Siegel and Volk, 2019). For example, from direct field observation,
Sinking Creek has a groundwater input located downstream of the upstream monitoring location
amongst other known groundwater inputs within the watershed (Christensen and others, 2022).
The groundwater discharge cools the surface water in the summer (Gendaszek and Appel, 2022)
and results in the more upstream-warmer temperature anomalies, and the upstream site was
warmer in the summer months (Figure 3). The confluence of tributaries could potentially
influence temperature differences at the upstream or downstream site. At the Blackwater River,
there are two confluences from tributaries near the Blackwater River upstream site (Figure 2F)
which could potentially influence conditions observed at the upstream or downstream location.
The confluence upstream of the Blackwater River upstream site, Maggodee Creek, was also
crossed by the MVP. Maggodee Creek, which has a watershed area of 45.5 mi2 (U.S. Geological
Survey, 2019) was crossed using trenched methods and overlapped the construction on the
Blackwater River for 10 days.
Short- and Long- Term Patterns of Turbidity
Increased turbidity might degrade water quality, adversely affect lotic food webs, and
disrupt ecosystem function. Short-duration increases in turbidity have been associated with
decreased primary production, zooplankton, benthic habitat diversity, hyporheic exchange,
invertebrate abundance, and local fish populations (Henley and others, 2000; Huenemann and
others, 2012; Honious and others, 2022). Longer-duration turbidity increases have been shown to
43
exacerbate and prolong the potential effects that have been associated with short-term turbidity
increases (Henley and others, 2000). Here, the magnitude and duration of potential anomalous
turbidity conditions from pipeline crossing construction were investigated and compared to each
stream’s turbidity regime.
Turbidity Conditions and Comparison of Upstream versus Downstream Stations
Upstream median turbidity ranged from 0.5 to 7.2 FNU across all sites and periods, and
the downstream ranged from 0.6 to 8.3 FNU (Table 6). Higher turbidity at both upstream
downstream stations was typically associated with increased gage height throughout the study
period and lower turbidity at low gage height, as expected (Figure 6; Appendix 1.1-1.3). The
Blackwater River had the highest magnitude turbidity values across all summary statistics and
upper Bottom Creek had the lowest (Table 5). At all sites and during all periods, the minimum,
Q1, median, and Q3 are close together in magnitude compared to their maximums.
Little Stony Creek, Roanoke River, upper Bottom Creek, and Blackwater River displayed
general agreement in the time series data over the entire study period. Sinking Creek turbidity
peaks during storms were consistently higher at the upstream stations before the stream crossing
and in the during and after crossing periods were closer together. Lower Bottom Creek had
consistently higher turbidity at the downstream station compared to the upstream station over the
entire study period and anomalously high magnitude turbidity at the downstream station when
compared to the upstream station in the during crossing period.
44
Table 6. Descriptive statistics of turbidity (in Formazin Nephelometric Units, FNU) for each site, station and
period. Statistics were calculated using the raw 5-minute interval data and include N, number of
observations; Min, minimum value; Q1, first quartile; Median, median value; Q3, third quartile; and Max,
maximum value.
Upstream Downstream
FNU FNU
Location Period N Min Q1 Median Q3 Max N Min Q1 Median Q3 Max
Little Stony
Creek
Before 628,825 0 0.5 1.1 2 1,000 601,571 0 0.7 1.2 2.1 995
During 35,856 0 0.9 1.3 2.1 237 31,192 0.9 1.5 1.9 2.4 281
After 97,178 0 0.5 0.8 1.4 404 92,918 0 0.1 0.9 1.8 641
Sinking
Creek
Before 564,619 0 1.5 3.3 6 1,000 579,228 0 1.9 3.8 6.6 913
During 45,675 0 0.5 1.7 3.6 496 45,598 0 1 2 3.7 508
After 87,419 0 0.8 2 4.1 945 102,598 0 0.9 2.9 5.7 1,000
Roanoke
River
Before 590,320 0 1 2.1 4.6 1,000 589,319 0 1.1 2.2 4.6 1,000
During 53,900 0 0.9 1.4 2.5 620 58,135 0.2 1 1.5 2.6 562
After 105,034 0 0.6 1.8 4.6 897 102,500 0 0.8 1.8 4.6 847
Upper
Bottom
Creek
Before 581,135 0 0.2 0.6 1.1 783 588,343 0 0.2 0.6 1.2 700
During 5,969 0.1 0.9 1.2 1.6 120 5,970 1 1.8 2 2.4 64.5
After 142,844 0 0.1 0.5 1.3 321 157,568 0 0.2 0.8 2 325
Lower
Bottom
Creek
Before 614,258 0 0.7 1.3 2.2 1,000 578,988 0 2 2.9 4.7 945
During 45,716 0 0.5 0.9 2.2 111 48,422 0 1.8 3.1 6.1 797
After 94,690 0 0.6 1.3 2.8 735 100,170 0.3 1.2 2.1 3.4 789
Blackwater
River
Before 586,968 0 4.4 7.2 14.2 1,000 577,120 0.2 4.1 7.1 14.9 1,000
During 3,144 3.7 4.7 5.6 9.9 178 3,131 3.1 5.9 8.3 12.4 224
After 100,410 0.5 2.6 4.4 8.1 978 86,273 0 2.8 4.8 10.6 1,000
45
Figure 6. High-frequency turbidity and gage height time series at Lower Bottom Creek in the before
crossing, during crossing, and after crossing periods. A, Gage Height at Downstream Lower Bottom Creek
(0205373422); B, Turbidity at the Upstream (0205373228) and downstream (0205373422) Lower Bottom
Creek; C, Turbidity in the during crossing period. Refer to Table 1 for additional information about USGS
sites.
Differences between downstream and upstream stations of the hourly median turbidity
values show anomalous behavior in the during crossing period at lower Bottom Creek shown by
the red points ascending the y-axis without a matching signal of the same magnitude on the x-
axis (Figure 7). Most observations at lower Bottom Creek during the crossing appear to be left of
the 1-to-1 line, suggesting many more observations where the downstream station had a higher
46
magnitude than the upstream station. The Blackwater River has a similar signal with downstream
turbidity exceeding upstream turbidity in the during crossing period as did the Roanoke River in
the after crossing period. The other sites and periods generally are close to the 1-to-1 line or are
evenly distributed about it.
Figure 7. Hourly median turbidity at downstream station versus upstream station in the before, during,
and after period. The golden dashed line is a 1-to-1 line.
47
Of the 18 comparisons (six matched sites * three periods), 15 had time matched
differences of less than or equal to 5 FNU during 90-percent of the time series. The remaining
three comparisons had differences less than or equal to 5 FNU for 80-to-89-percent of the time
series (Appendix Table 1.2). Differences between upstream and downstream stations that were
greater than 100 FNU represented less than or equal to 0 to 0.8 percent of the time series across
all matched sites (Appendix Table 1.2).
Distributions of median hourly turbidity differences between stations show most of the
observations are close to zero at all sites and all periods (Figure 8). At Sinking Creek, the largest
magnitude differences occurred in the before crossing period with more total observations where
the upstream station had higher turbidity than the downstream station. The Roanoke River had
some larger magnitude differences in the after crossing period where the downstream station
measurements were higher than the upstream station that was attributable to the presence of the
pipeline ROW. At upper Bottom Creek, there were a small number of observations with larger
differences in the before crossing period where the downstream station measured higher than the
upstream station, and in the after crossing period a small number of larger differences where the
upstream station measured higher than the downstream station. At lower Bottom Creek, the
before and during crossing periods both showed a consistent signal of the downstream station
measuring higher turbidity than the upstream station, with slightly more observations and greater
magnitude observations occurring in the during crossing period. Most differences at lower
Bottom Creek were still close to zero. At Blackwater River, all periods showed most differences
close to zero, and a more normal distribution of values with roughly even amounts of
observations greater than and less than zero. At Little Stony Creek, most differences for all
periods were close to zero.
48
Figure 8. Histograms showing the baseflow turbidity differences between the upstream and the
downstream site in the before, during, and after crossing period compared to the frequency of observations.
A positive turbidity indicates the downstream turbidity was higher and a negative turbidity indicates the
upstream turbidity was higher.
49
The bootstrapped median differences confidence intervals tests resulted in 3 of the 18
tests confidence intervals overlapped zero, suggesting strong evidence that the median does not
differ significantly from zero. Nine additional tests (12 total tests) resulted in observed medians
of the time-match paired differences lower than the amount of uncertainty from instrument
accuracy, suggesting that these tests did not differ significantly from zero (Table 7). The six
remaining tests overcame uncertainty from instrument accuracy and had confidence intervals that
did not overlap zero, included Little Stony Creek during crossing, upper Bottom Creek during
crossing, lower Bottom Creek before during and after crossing, and Blackwater River during
crossing, suggesting that the median of the time-matched paired differences differed significantly
from zero for these tests. When the uncertainty from instrument accuracy is accounted for in the
six tests that yielded a significant difference, only two tests had a median of the differences that
was reliably over 1 FNU, the before and during crossing periods at lower Bottom Creek which
ranged from 1.19 to 2.11 FNU and 1.42 to 2.38 FNU, respectively. These two tests at lower
Bottom Creek represent the largest magnitude upstream-to-downstream differences but are small
in any practical meaning, were present in the before crossing period, and had the smallest
observed median of upstream-to-downstream differences in the after crossing period.
50
Table 7. Results of the bootstrapped median of hourly median differences between the upstream and
downstream time-matched paired turbidity observation in the before, during, and after crossing period.
[FNU, Formazin nephelometric unit; N, sample size; %, percent; CI, confidence interval]
FNU
Location Period N
Combined
uncertainty
from
instruments
Median of
hourly median
differences
Lower
99% CI
Upper
99% CI
Range between
upper and lower
99% CI
Little Stony
Creek
Before 50,713 ±0.44 0.2 0.2 0.2 0
During 2,571 ±0.44 0.7 0.7 0.75 0.05
After 7,419 ±0.44 -0.1 -0.1 0 0.1
Sinking
Creek
Before 45,402 ±0.51 0.3 0.3 0.35 0.05
During 3,705 ±0.48 0.25 0.2 0.3 0.1
After 7,189 ±0.48 0.3 0.3 0.35 0.05
Roanoke
River
Before 46,785 ±0.57 0.1 0.1 0.1 0
During 4,405 ±0.48 0.05 0 0.1 0.1
After 8,321 ±0.56 0.3 0.3 0.3 0
Upper
Bottom
Creek
Before 48,057 ±0.43 0.05 0.05 0.1 0.05
During 501 ±0.43 0.9 0.85 1 0.15
After 11,350 ±0.43 0.4 0.4 0.4 0
Lower
Bottom
Creek
Before 48,918 ±0.46 1.65 1.6 1.65 0.05
During 3,804 ±0.48 1.9 1.8 2.05 0.25
After 7,789 ±0.48 0.85 0.8 0.9 0.1
Blackwater
River
Before 45,624 ±0.90 0.25 0.25 0.3 0.05
During 286 ±0.49 1.3 1.15 1.5 0.35
After 7,323 ±0.64 -0.1 -0.1 0 0.1
Storm Hysteresis Patterns of Turbidity
At all stations and for all periods, the median hysteresis index (HI) and median slope
were both positive, indicating turbidity tend to increase during storm events compared to ambient
conditions and peaked on the rising limb of the hydrograph (Figure 9). A similar pattern was
observed for all individual storm events at each station and across all periods, which is consistent
with other stream turbidity hysteresis studies (Figure 1.4; Lloyd and others 2016b; Waite and
others, 2023). Over the entire study period and at both upstream and downstream stations,
positive HI was observed 182 times at Little Stony Creek, 137 times at Sinking Creek, 59 times
51
at Roanoke River, 98 times at upper Bottom Creek, 193 times at lower Bottom Creek, and 109
times at Blackwater River. Negative HI was observed 2 times at Little Stony Creek, 18 times at
Sinking Creek, 37 times at Roanoke River, 0 times at upper Bottom Creek, 2 times at Lower
Bottom Creek, and 36 times at Blackwater River; however, many HI values were close to zero,
indicating no hysteresis. A threshold of -0.05 to 0.05 HI was used following Waite and others
(2023) as a threshold to demonstrate hysteresis or not. No hysteresis was observed 12 times at
Little Stony Creek, 25 times at Sinking Creek, 27 times at Roanoke River, 2 times at upper
Bottom Creek, 13 times at lower Bottom Creek, and 47 times at Blackwater River.
Figure 9. Graph showing the relations of median hysteresis index to median slope of the upstream and
downstream site at all 6 crossing locations, A, Before Crossing; B, During Crossing; C, After Crossing. A
positive median hysteresis index indicates rapid delivery and negative is delayed delivery. Positive median
slope is transport-limited, and a negative median slope is supply limited.
52
Discussion of Turbidity Results
Turbidity analyses were conducted to evaluate whether pipeline stream crossing
construction resulted in increased turbidity conditions during the crossing period relative to the
turbidity regime measured using high-frequency data from sensors over the 7-year study period.
Turbidity is a parameter of interest and importance due to its strong and well-established relation
to suspended sediment concentration (Porter, 2025; Miller and others, 2023; Rügner and others,
2013; Stubblefield and others, 2007). Sedimentation has been associated with pipeline
construction from crossings streams in previous studies (Moyer and Hyer, 2009; Lévesque and
Dubé, 2007) and sedimentation has been shown to adversely affect in-stream biota and
ecological functions (Henley and others, 2000; Wilber and Clarke, 2001). Measuring turbidity at
a high frequency provided additional information about the short-term anomalous events
observed. From US EPA (2003), of the 29 states that had a threshold for turbidity, 10 FNU was
the most common threshold. Fifteen states set thresholds based on comparison to background
conditions, 12 have absolute turbidity thresholds, and 2 use a combination of both, with most
states having stricter thresholds for streams that support colder water aquatic communities. All
observed median upstream-to-downstream differences in this study were less than established
thresholds for turbidity for all states that have a statute for turbidity except for one state whose
threshold is 0 FNU above background conditions.
Results from the analysis of the high-frequency turbidity data at all six stream crossing
sites did not show evidence of long-term, persistent effects from pipeline crossing construction.
Short-term, anomalously high turbidity conditions during stream crossing observed in this study
were not of magnitude or duration sufficient to produce an upstream-to-downstream difference in
median turbidity higher than established states thresholds or those needed to alter ecological
53
function. Across all sites, no significant difference in turbidity was observed between the before
and after construction periods, which is consistent with similar studies in the region (Moyer and
Hyer, 2009).
Storm turbidity hysteresis exhibited positive HI and positive slopes, indicating that most
storms peak on the rising limb of hydrographs, which is consistent with similar studies (Waite
and others, 2023; Lloyd and others, 2016a, Lloyd and others, 2016b; Fovet and others, 2018).
The positive HI indicate rapid flushing from a proximal source. The results of the hysteresis
analysis; however, generally show consistency between upstream and downstream stations at all
sites and periods. The storm hysteresis patterns add to the body of evidence that no persistent
changes in turbidity were identified.
Previous studies of pipeline stream crossings have primarily focused on comparing
pipeline stream crossing methods at a single downstream station and have monitored suspended
sediment concentration and total suspended solids (Lévesque and Dubé, 2007; Reid and others,
2002). However, these studies often have low sample collection frequency, are collected for a
relatively short duration (less than 1 year), or do not monitor multiple crossings in the same
study. However, Moyer and Hyer (2009) collected high-frequency turbidity data before, during,
and after two pipeline stream crossings, which used two different crossing methods. Moyer and
Hyer (2009) provided evidence that the trenchless crossing method had little effect on turbidity
conditions; however, the largest magnitude anomalous turbidity observation observed in this
study occurred at lower Bottom Creek, which was crossed using a trenchless crossing method.
This might suggest that other potential factors might be driving these short-term anomalous
conditions, such as ROW construction, failed sediment traps, high soil erosivity, or natural
watershed processes like bank erosion. The median differences in Moyer and Hyer (2009) and in
54
the present report both generally showed low median turbidity differences between upstream and
downstream stations across streams and periods.
Utility of Real-Time Alert Application
Out of the total 44,256,853 measurements from the USGS monitoring stations, a total of
137,263 (0.3-percent) flags were identified using the USGS real-time data when the parameter
values exceeded parameter-specific water quality standards or thresholds (Table 8).
Table 8. Summary of the number of flags from January 2018 to June 2025 by field parameter using the
real-time alert application.
[*, one flag indicates a 30-minute window of exceedance]
Field Parameter Flag Name Total count per
flag
Total count per
field parameter
Water Temperature (WT)
Upstream maximum 21,677 52,399
Downstream maximum 19,995
Rise above natural 10,727
Dissolved Oxygen (DO)
Upstream minimum 6,741 20,073
Downstream minimum 9,032
Upstream-downstream difference 4,300
pH
Upstream 19,725 42,179
Downstream 5,298
Upstream-downstream difference 17,156
Specific Conductance (SC)
Upstream maximum 77 283
Downstream maximum 49
Upstream-downstream difference 3
Upstream-downstream percentage difference 154
Turbidity (TB)*
Upstream-downstream exceedance* 5,700* 22,329*
Upstream-downstream percentage exceedance* 4,602*
Upstream exceeds 99th percentile* 8,055*
Downstream exceeds 99th percentile* 3,972*
Alerts could be caused by a flag from the real-time alert system, self-reported by MVP,
or a reported field complaint. There were 464 total alerts produced from the real-time alert
55
application from January 2018 to June 2025 among all six crossing sites. Out of the 464 alert
notices, 253 (55-percent) resulted in a compliance action and 211 (45-percent) resulted no
compliance issues.
Application of the real-time alert system provided timely information about stream
conditions, to regulators, installers, and the public, which can contribute to minimizing potential
short- and long-term effects and improving regulatory agencies responses (Storey and others,
2011). Most of the real-time alerts resulted in compliance issues found on site, which likely
would not have been identified without the alert system. Overall, the real-time alert system was
beneficial for addressing and resolving compliance issues in a timely manner.
Summary
Construction of the nationwide natural gas pipeline network in the United States required
crossing streams, rivers, and other waterbodies which are sources of drinking water and support
sensitive aquatic biota and habitat. Stream crossings using both trenched or trenchless methods
has the potential to alter the short-term or long-term water quality downstream. An excess of
suspended sediments or warming water temperatures may reduce the water quality, degrade
aesthetics, and impact the aquatic biota and habitat. The U.S. Geological Survey began a
continuous monitoring program in 2017 to study the water quality changes from pre-construction
background conditions through a year after the post-restoration of six sites upstream and
downstream of construction. This report (1) presents the site-water temperature and turbidity
data from all three monitored periods; (2) describes the potential for short- and long-term effects
of pipeline crossing construction on varying sized watersheds; and (3) explains the results from
56
statistical testing of water temperature and turbidity; (4) identifies and explains water
temperature anomaly testing; and (5) analyzes and explains storm hysteretic behavior.
The water temperature at all sites site ranged from -2 to 30.4 °C, with maximum
temperatures in July and August and minimum temperatures in the January. The bootstrapped
statistical tests of the median between the differences in water temperature upstream and water
temperature downstream of pipeline crossings indicated that only Sinking Creek and upper
Bottom Creek in the during period were statistically significant. At all sites, the bootstrapped
upper and lower 99-percent confidence intervals were between 0 and 0.1 °C, which is less than
the combined uncertainty of the instruments. Hourly median difference water temperature
anomalies were used to identify differences in the time series with the removal of seasonal and
long-term trends. Anomalies were identified in 0.95-percent of the data across all the sites (n =
7,284 of 766,504). All the downstream-warmer anomalies were less than or equal to 18 hours,
with most of the events lasting 2 hours or less in duration (61-percent) for both upstream- and
downstream-warmer anomalies. Most of the differences in the anomalies were small between
upstream and downstream, with 63-percent of the downstream-warmer and 68-percent of the
upstream warmer less than or equal to 1 °C. In general, the thermal regime between upstream
and downstream was characterized by low frequency, short duration, and low magnitude
anomalies consistently throughout the monitoring period, suggesting that changes in
temperatures could not be solely attributed to pipeline crossing construction.
The turbidity at all sites ranged from 0 to greater than 1000 FNU and, in general, showed
increasing turbidity with increased water-level. Bootstrapped statistical tests of the median
between the differences in turbidity upstream and turbidity downstream of pipeline crossings
indicated that there was no significant difference between the turbidity upstream and turbidity
57
downstream of the crossing. An evaluation of the median hysteresis index compared to median
slope at each site suggests there was not a change in the timing of sediment delivery or rate of
delivery during storms between the before and after periods. All sites and periods which were
investigated had a positive median hysteresis index and a positive median slope. All sites were
analyzed for hysteresis in the before and after period; Sinking Creek and lower Bottom Creek
were the only streams analyzed in the during period due to a lack of storms captured at the other
sites. A positive median slope indicated solute enrichment during a storm which is limited by the
connectivity or transport capacity of the flow and a positive hysteresis index indicates that most
of the sediment was moved on the rising limb of the hydrograph and there was a rapid flush of a
proximal source. If there was excess sediment from pipeline construction, the median hysteresis
index might have a change in HI, either more positive or negative, or had higher magnitude
slopes. Some of the sites hysteresis index values were close to zero which could mean there was
no hysteresis.
The real-time alert system was utilized by Virginia DEQ to identify potential compliance
issues at all six crossings for water temperature, specific conductance, pH, dissolved oxygen, and
turbidity. The alert flags were defined to identify measurements or differences between upstream
and downstream measurements that fell below a minimum standard, exceeded a maximum
standard, or exceeded a site-specific threshold. The alert system began in January of 2018. There
was an alert 0.3-percent of the entire monitoring period and 464 total alert notices. An alert
notice resulted in a site visit 81-percent of the time, a count of 374. When there was a notice, a
compliance issue occurred 253 times, or 55-percent of the total times. The real-time alert system
quickly identified and fixed compliance issues during pipeline construction. The use of a real-
time alert system could minimize potential short- and long-term effects of pipeline construction.
58
There was no observed relation between crossing method (that is, trenched or trenchless)
and in-stream turbidity or water temperature. Upper Bottom Creek and Blackwater River were
crossed using trenched methods, and lower Bottom Creek, Sinking Creek, Little Stony Creek,
and the Roanoke River were crossed using trenchless methods. There were no statistical
differences in the median of turbidity differences or changes in the hysteretic behavior due to
crossing method. There also were not consistent anomalies in the during crossing or after
crossing period that could be attributed to crossing methodology that could not be attributed to
short duration. The only effect that crossing method showed was the trenched sites had a shorter
crossing period and therefore did not capture as much hydrologic variation as the before or after
periods.
Findings from this multi-year study provide evidence that the pipeline crossing
construction did not strongly affect water temperature or turbidity. The upstream-downstream
comparative study observed some short-term anomalous water temperature and turbidity
conditions but suggested overall water temperature and turbidity regimes over the entire
monitoring period remained consistent. The synthesis of findings on six streams in mountainous
southwestern Virginia did not suggest the pipeline construction significantly changed overall
water temperature and turbidity regimes at the monitored locations. There is abundant utility for
deploying real-time continuous monitors for construction. Regulatory agencies or other groups
can utilize the real-time monitors to identify potential compliance issues immediately and work
to investigate them and resolve any potential issues quickly. The real-time alert application for
this study identified 464 number of potential compliance issues that were investigated by
Virginia DEQ, of which 253 (55-percent) were successfully identified leading to an action.
59
References Cited
Alfonso, S., Gesto, M., and Sadoul, B., 2021, Temperature increase and its effects on fish stress
physiology in the context of global warming: Journal of Fish Biology, v. 98, no. 6, p. 1496–
1508, accessed July 30, 2025, at https://doi.org/10.1111/jfb.14599.
Baker, E.B., Showers, W.J., 2019, Hysteresis analysis of nitrate dynamics in the Neuse River,
NC, Science of the Total Environment, v. 652, p. 889 – 899, accessed July 21, 2025, at
https://doi.org/10.1016/j.scitotenv.2018.10.254.
Balkin, R.S., Lenz, S., 2021, Contemporary Issues in Reporting Statistical, Practical, and Clinical
Significance in Counseling Research, Journal of Counseling and Development, v. 99, p. 227-
237, accessed August 18, 2025, at https://doi.org/10.1002/jcad.12370.
Berger, E., Haase, P., Kuemmerlen, M., Leps, M., Schäfer, R.B., and Sundermann, A., 2017,
Water quality variables and pollution sources shaping stream macroinvertebrate communities:
Science of The Total Environment, v. 587–588, p. 1–10, accessed July 30, 2025, at
https://doi.org/10.1016/j.scitotenv.2017.02.031.
Betcher, M., Hanna, A., Hansen, E., and Hirschman, D., 2019, Pipeline Impacts to Water
Quality, 39 pp., accessed July 3, 2025, at https://www.tu.org/wp-
content/uploads/2019/10/Pipeline-Water-Quality-Impacts-FINAL-8-21-2019.pdf.
Bonacina, L., Fasano, F., Mezzanotte, V., and Fornaroli, R., 2023, Effects of water temperature
on freshwater macroinvertebrates: a systematic review: Biological Reviews, v. 98, no. 1, p.
191–221, accessed July 30, 2025, at https://doi.org/10.1111/brv.12903.
Burns, D.A., Pellerin, B.A., Miller, M.P., Capel, P.D., Tesoriero, A.J., Duncan, J.M., 2019,
Monitoring the riverine pulse: Applying high-frequency nitrate data to advance integrative
60
understanding of biogeochemical and hydrological processes, WIREs Water, v. 6, no. 4, p. 13–
48, https://doi.org/10.1002/wat2.1348.
Burton, J., Gerritsen, J., 2003, A Stream Condition Index for Virginia Non-Coastal Streams:
Tetra Tech, Inc: 163 pp., accessed August 13, 2025, at
https://www.deq.virginia.gov/home/showpublisheddocument/4317/637461491373170000.
Caissie, D., 2006, The thermal regime of rivers: a review: Freshwater Biology, v. 51, no. 8, p.
1389–1406, accessed July 21, 2025, at https://doi.org/10.1111/j.1365-2427.2006.01597.x.
Castro, J.M., MacDonald, A., Lynch, E., and Thorne, C.R., 2015, Risk-based Approach to
Designing and Reviewing Pipeline Stream Crossings to Minimize Impacts to Aquatic Habitats
and Species: River Research and Applications, v. 31, no. 6, p. 767–783, accessed June 27,
2025, at https://doi.org/10.1002/rra.2770.
Christensen, N. D., Czuba, J. A., Triantafillou, S., Copenheaver, C. A., Peterson, J. A., Hession,
W. C., 2022, Establishment and persistence of trees growing in the channel of an intermittent
stream in a temperate, karst environment. Water Resources Research, v. 58, no.,
e2021WR031528, 19 p., accessed August 23, 2025, at
https://doi.org/10.1029/2021WR031528.
Coats, W.A., and Jackson, C.R., 2020, Riparian canopy openings on mountain streams:
Landscape controls upon temperature increases within openings and cooling downstream:
Hydrological Processes, v. 34, no. 8, p. 1966–1980, accessed July 3, 2025, at
https://doi.org/10.1002/hyp.13706.
Dancho, M., and Vaughan, D., 2018, anomalize: Tidy Anomaly Detection: The R Foundation,
accessed July 8, 2025, at https://doi.org/10.32614/cran.package.anomalize.
61
Dancho M, Vaughan D (2023). _anomalize: Tidy Anomaly Detection_. R package version 0.3.0,
<https://CRAN.R-project.org/package=anomalize>.
Donaldson, M.R., Cooke, S.J., Patterson, D.A., and Macdonald, J.S., 2008, Cold shock and fish:
Journal of Fish Biology, v. 73, no. 7, p. 1491–1530, accessed July 30, 2025, at
https://doi.org/10.1111/j.1095-8649.2008.02061.x.
Downstream Strategies and West Virginia Rivers, 2024, Mountain Valley Pipeline Stream and
Wetland Crossings: Review of Inspection Report, 15 pp., accessed July 4, 2025, at
https://wvrivers.org/wp-content/uploads/2024/11/MVP-November-2024-Audit-Report.pdf.
Erickson, R.J., 1985, An evaluation of mathematical models for the effects of pH and
temperature on ammonia toxicity to aquatic organisms: Water Research, v. 19, no. 8, p. 1047–
1058, accessed July 30, 2025, at https://doi.org/10.1016/0043-1354(85)90375-6.
Fovet, O., Humbert, G., Dupas, R., Gascuel-Odoux, C., Gruau, G., Jaffrezic, A., Thelusma, G.,
Faucheux, M., Gilliet, N., Harmon, Y., Grimaldi, C., 2018, Seasonal variability of stream
water quality response to storm events captured using high-frequency and multi-parameter
data. Journal of Hydrology, v. 559, p. 282–293, accessed July 11, 2025, at
https://doi.org/10.1016/j.jhydrol.2018.02.040.
Gendaszek, A.S., and Appel, M., 2022, Thermal heterogeneity and cold-water anomalies within
the lower Yakima River, Yakima and Benton Counties, Washington: U.S. Geological Survey
2021–5140, accessed July 28, 2025, at Scientific Investigations Report, at
https://doi.org/10.3133/sir20215140.
Gómez-de-Mariscal, E., Guerrero, V., Sneider, A, Jayatilaka, H., Phillip, J., Wirtz, D., Muñoz-
Barrutia, A., 2021, Use of the p-values as a size-dependent function to address practical
62
differences when analyzing large datasets, c. 11, no. 20942, 15 p., accessed August 15, 2025,
at https://doi.org/10.1038/s41598-021-00199-5.
Gowdy, M.J., Smits, M.P., Wilkey, P.L., and Miller, S.F., 1994, Data summary report on short-
term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County,
Idaho: PGT-PG&E Pipeline Expansion Project: Argonne National Lab., IL (United States)
ANL/ESD/TM--67, accessed July 29, 2025, at https://doi.org/10.2172/10161518.
Henley, W. F., Patterson, M. A., Neves, R. J., & Lemly, A. D., 2000, Effects of Sedimentation
and Turbidity on Lotic Food Webs: A Concise Review for Natural Resource Managers.
Reviews in Fisheries Science, v. 8, no. 2, p. 125–139, accessed August 17, 2025 at
https://doi.org/10.1080/10641260091129198.
Honious, S. A., S., Hale, R. L., Guilinger, J. J., Crosby, B. T., & Baxter Colden, V., 2022,
Turbidity structures the controls of ecosystem metabolism and associated metabolic process
domains along a 75-km segment of a semiarid stream. Ecosystems, v. 25, no. 2, p. 422-440,
accessed August 17, 2025 at, https://doi.org/10.1007/s10021-021-00661-5.
Houser, D.L., and Pruess, H., 2009, The effects of construction on water quality: a case study of
the culverting of Abram Creek: Environmental Monitoring and Assessment, v. 155, no. 1, p.
431–442, accessed July 22, 2025, at https://doi.org/10.1007/s10661-008-0445-9.
Huenemann, T. W., Dibble, E. D., & Fleming, J. P., 2012, Influence of Turbidity on the Foraging
of Largemouth Bass. Transactions of the American Fisheries Society, v. 141, no. 1, p. 107–
111, accessed August 17, 2025, at https://doi.org/10.1080/00028487.2011.651554.
Jamshidi, E.J., Yusup, Y., Kayode, J.S., and Kamaruddin, M.A., 2022, Detecting outliers in a
univariate time series dataset using unsupervised combined statistical methods: A case study
63
on surface water temperature: Ecological Informatics, v. 69, p. 101672, accessed July 17,
2025, at https://doi.org/10.1016/j.ecoinf.2022.101672.
The Joint Committee for Guides in Metrology (JCGM), 2020, Guide to the expression of
uncertainty in measurement — Part 6: Developing and using measurement models, accessed
August 17, 2025, at
https://www.bipm.org/documents/20126/2071204/JCGM_GUM_6_2020.pdf/d4e77d99-3870
0908-ff37-c1b6a230a337.
Johnson, M.F., Albertson, L.K., Algar, A.C., Dugdale, S.J., Edwards, P., England, J., Gibbins,
C., Kazama, S., Komori, D., MacColl, A.D.C., Scholl, E.A., Wilby, R.L., de Oliveira Roque,
F., and Wood, P.J., 2024, Rising water temperature in rivers: Ecological impacts and future
resilience: WIREs Water, v. 11, no. 4, p. e1724, accessed July 30, 2025, at
https://doi.org/10.1002/wat2.1724.
Johnston, M.G., Faulkner, C., 2021, A bootstrap approach is a superior statistical method for the
comparison of non-normal data with differing variance, The New Phytologist, v. 230, no. 1, p.
23–26, accessed July 21 2025, at https://www.jstor.org/stable/10.2307/27001227.
Knapp, J. L., von Freyberg, J., Studer, B., Kiewiet, L., Kirchner, J., 2020, Concentration-
discharge relationships vary among hydrological events, reflecting differences in event
characteristics, Hydrology and Earth System Sciences Discussions, v. 24, no. 5, p. 1–27,
accessed August 1, 2025, at https://doi.org/10.5194/hess-2019-684.
Krawczyk, M., 2015, The Search for Significance: A Few Peculiarities in the Distribution of P
Values in Experimental Psychology Literature, PLoS ONE, v. 10, no. 6, e0127872 p.,
accessed August 14, 2025, at https://doi.org/10.1371/journal.pone.0127872.
64
Leach, J.A., Kelleher, C., Kurylyk, B.L., Moore, R.D., and Neilson, B.T., 2023, A primer on
stream temperature processes: WIREs Water, v. 10, no. 4, p. e1643, accessed July 30, 2025, at
https://doi.org/10.1002/wat2.1643.
Lévesque, L.M., and Dubé, M.G., 2007, Review of the effects of in-stream pipeline crossing
construction on aquatic ecosystems and examination of Canadian methodologies for impact
assessment: Environmental Monitoring and Assessment, v. 132, no. 1, p. 395–409, accessed
July 27, 2025, at https://doi.org/10.1007/s10661-006-9542-9.
Lin, M.,, Lucas, H.C. jr., Shmueli, G., 2013, Too Big to Fail: Large Samples and the p-Value
Problem, Information Systems Research, p. 1-12, accessed August 14, 2025, at
http://dx.doi.org/10.1287/isre.2013.0480.
Liu, W., Birgand, F., Tian, S., Chen, C., 2021, Event-scale hysteresis metrics to reveal processes
and mechanisms controlling constituent export from watersheds: A review, Water Research, v.
200, no. 117254, p. 1–13, accessed June 11, 2025, at
https://doi.org/10.1016/j.watres.2021.117254.
Lloyd, C. E. M. and Freer, J. E. and Johnes, P. J. and Collins, A. L., 2016a, Technical Note:
Testing an improved index for analyzing storm discharge--concentration hysteresis, Hydrology
and Earth System Sciences, v. 20, no. 2, p. 625–632, accessed June 10, 2025, at
https://doi.org/10.5194/hess-20-625-2016.
Lloyd, C. E. M., Freer, J. E., Johnes, P. J., Collines, A. L., 2016b, Using hysteresis analysis of
high-resolution water quality monitoring data, including uncertainty, to infer controls on
nutrient and sediment transfer in catchments, Science of the Total Environment, v. 543, no. A,
p. 388–404, accessed July 21, 2025, at http://dx.doi.org/10.1016/j.scitotenv.2015.11.028.
65
Mejia, F.H., Torgersen, C.E., Berntsen, E.K., Maroney, J.R., Connor, J.M., Fullerton, A.H.,
Ebersole, J.L., and Lorang, M.S., 2020, Longitudinal, Lateral, Vertical, and Temporal Thermal
Heterogeneity in a Large Impounded River: Implications for Cold-Water Refuges: Remote
Sensing, v. 12, no. 9, p. 1386, accessed July 31, 2025, at https://doi.org/10.3390/rs12091386.
Millar, D., Buda, A., Duncan, J., Kennedy, C., 2022, An open-source automated workflow to
delineate storm events and evaluate concentration-discharge relationships, Hydrol. Process., v.
36, no. 1, p. 1–12, accessed June 10, 2025, at https://doi.org/10.1002/hyp.14456.
Miller, S. A., Webber, J. S., Jastram, J. D., Aguilar, M. F., 2023, Using high-frequency
monitoring data to quantify city-wide suspended-sediment load and evaluate TMDL goals.
Environmental Monitoring and Assessment, v. 195, no. 11, p. 1–21,
https://doi.org/10.1007/s10661-023-11905-3.
Morrill, J.C., Bales, R.C., and Conklin, M.H., 2005, Estimating Stream Temperature from Air
Temperature: Implications for Future Water Quality: Journal of Environmental Engineering, v.
131, no. 1, p. 139–146, accessed on August 17, 2025, at https://doi.org/10.1061/(ASCE)0733-
9372(2005)131:1(139).
Moyer, D.L., and Hyer, K.E., 2009, Continuous turbidity monitoring in the Indian Creek
watershed, Tazewell County, Virginia, 2006–08: U.S. Geological Survey Scientific
Investigations Report 2009–5085, 42 p.
Mudelsee, M., Alkio, M., 2007, Quantifying effects in two-sample environmental experiments
using bootstrap confidence intervals, Environmental Modelling and Software, v. 22, no. 1, p.
84–96, accessed August 1, 2025, at https://doi.org/10.1016/j.envsoft.2005.12.001.
Musolff, A., Zhan, Q., Dupas, R., Minaudo, C., Fleckenstein, J. H., Rode, M., Dehaspe, J.,
Rinke, K., 2021, Spatial and temporal variability in concentration discharge relationships at the
66
event scale. Water Resources Research, v. 57, no. e2020WR029442, p. 1–21, accessed, June
10, 2025, at https://doi.org/10.1029/2020WR029442.
New Jersey Department Of Environmental Protection, 2021, Horizontal Directional Drilling, 25
pp., accessed June 27, 2025.
New River Geographics, LLC, 2017, Mountain Valley Pipeline - A Comprehensive Story Map:
accessed August 8, 2025, at https://data-nrgeo.opendata.arcgis.com/apps/mountain-valley-
pipeline-a-comprehensive-story-map/explore.
Noyes, P.D., and Lema, S.C., 2015, Forecasting the impacts of chemical pollution and climate
change interactions on the health of wildlife: Current Zoology, v. 61, no. 4, p. 669–689,
accessed July 30, 2025, at https://doi.org/10.1093/czoolo/61.4.669.
Parfomak, P.W., and Vann, A., 2022, Mountain Valley Pipeline: Permitting Issues:
Congressional Research Service IN12032, 3 pp., accessed June 24, 2025, at
https://www.congress.gov/crs_external_products/IN/PDF/IN12032/IN12032.1.pdf.
Parfomak, P.W., and Vann, A., 2024, Mountain Valley Pipeline: Past the Finish Line, 3 pp.,
accessed June 24, 2025, at
https://www.congress.gov/crs_external_products/IN/PDF/IN12032/IN12032.14.pdf.
Porter, A., 2025, Spatiotemporal patterns in urban nutrient and suspended sediment loads and
stream response to watershed management implementation, Environmental Monitoring and
assessment, v. 197, no. 497, p. 1-26, accessed August 3, 2025, at
https://doi.org/10.1007/s10661-025-13917-7.
R Core Team, 2025, R—A language and environment for statistical computing. R Foundation for
Statistical Computing software release, accessed June 2, 2025, at https://www.R-project.org/.
67
Reed, M., 2024, North America 2024 Pipeline Construction Outlook: New LNG Terminals Lead
Call for More Pipelines: Underground Infrastructure, v. 79, accessed August 14, 2025, at,
https://undergroundinfrastructure.com/magazine/2024/february-2024-vol-79-no-
2/features/north-america-2024-pipeline-construction-outlook-new-lng-terminals-lead-call-for-
more-pipelines.
Reid, S.M., Stoklosar, S., Metikosh, S., and Evans, J., 2002, Effectiveness of Isolated Pipeline
Crossing Techniques to Mitigate Sediment Impacts on Brook Trout Streams: Water Quality
Research Journal, v. 37, no. 2, p. 473–488, accessed June 27, 2025, at
https://doi.org/10.2166/wqrj.2002.031.
Roanoke Weather Records, 2025, accessed August 8, 2025 at
https://www.extremeweatherwatch.com/cities/roanoke.
Rügner, H., Schwientek, M., Beckingham, B., Kuch, B., Grathwohl, P., 2013, Turbidity as a
proxy for total suspended solids (TSS) and particle facilitated pollutant transport in
catchments, Environmental Earth Sciences, v. 69, p. 373 – 380, accessed August 4, 2025, at
https://doi.org/10.1007/s12665-013-2307-1.
Sauer, V.B., and Turnipseed, D.P., 2010, Stage measurement at gaging stations: U.S. Geological
Survey Techniques and Methods book 3, chap. A7, 45 p.
Shikwambana, L., and Kganyago, M., 2023, Seasonal Comparison of the Wildfire Emissions in
Southern African Region during the Strong ENSO Events of 2010/11 and 2015/16 Using
Trend Analysis and Anomaly Detection: Remote Sensing, v. 15, no. 4, p. 1073, accessed July
08, 2025, at https://doi.org/10.3390/rs15041073.
68
Siegel, J.E., and Volk, C.J., 2019, Accurate spatiotemporal predictions of daily stream
temperature from statistical models accounting for interactions between climate and landscape:
PeerJ, v. 7, accessed on August 17, 2025, at https://doi.org/10.7717/peerj.7892.
Storey, M.V., van der Gaag, B., and Burns, B.P., 2011, Advances in on-line drinking water
quality monitoring and early warning systems: Water Research, v. 45, no. 2, p. 741–747,
accessed August 02, 2025, at https://doi.org/10.1016/j.watres.2010.08.049.
Stubblefield, A.P., Reuter, J.E., Dahlgren, R.A., Goldman, C.R., 2007, Use of turbidometry to
characterize suspended sediment and phosphorus fluxes in the Lake Tahoe basin, California,
USA, Hydrological Processes, v. 21, no. 3, p. 281–291, accessed August 1, 2025, at
https://doi.org/10.1002/hyp.6234.
Tassone, S.J., Besterman, A.F., Buelo, C.D., Ha, D.T., Walter, J.A., and Pace, M.L., 2023,
Increasing heatwave frequency in streams and rivers of the United States: Limnology and
Oceanography Letters, v. 8, no. 2, p. 295–304, accessed on August 17, 2025, at
https://doi.org/10.1002/lol2.10284.
Tetra Tech, 2021, Mountain Valley Pipeline Project Individual Permit Application: USACE
Individual Permit Application, 107 pp., accessed June 24, 2025, at
https://www.mountainvalleypipeline.info/wp-content/uploads/2021/03/aa_Individual-Permit-
Application-Text-and-Tables_PUBLIC.pdf.
Turner, M.G., Pearson, S.M., Bolstad, P., and Wear, D.N., 2003, Effects of land-cover change on
spatial pattern of forest communities in the Southern Appalachian Mountains (USA):
Landscape Ecology, v. 18, no. 5, p. 449–464, accessed July 3, 2025, at
https://doi.org/10.1023/A:1026033116193.
69
U.S. Energy Information Administration, 2024a, Natural gas explained: Natural gas pipelines,
accessed August 14, 2025 at https://www.eia.gov/energyexplained/natural-gas/natural-gas-
pipelines.php.
U.S. Energy Information Administration, 2024b, Natural gas explained: Use of natural gas,
accessed August 14, 2025 at https://www.eia.gov/energyexplained/natural-gas/natural-gas-
pipelines.php.
U.S. Energy Information Administration, 2025, Virginia: State Profile and Energy Estimates:
accessed July 2, 2025, at https://www.eia.gov/state/?sid=VA#tabs-5.
U.S. Environmental Protection Agency, 2003, Developing water quality criteria for suspended
and bedded sediments (SABS): Potential Approaches, DRAFT, accessed August 18, 2025 , at
https://assessments.epa.gov/risk/document/&deid=164423#downloads.
U.S. Geological Survey, 2019, The StreamStats program, online at
https://streamstats.usgs.gov/ss/, accessed on June 10, 2025.
U.S. Geological Survey, 2025a, National Geologic Map Database, accessed August 18, 2025, at
https://ngmdb.usgs.gov/Geolex/stratres/provinces.
U.S. Geological Survey, 2025b, USGS water data for the Nation: U.S. Geological Survey
National Water Information System database, accessed June 2025 at
http://dx.doi.org/10.5066/F7P55KJN.
van Hamel, A., and Brunner, M.I., 2024, Trends and Drivers of Water Temperature Extremes in
Mountain Rivers: Water Resources Research, v. 60, no. 10, p. e2024WR037518, accessed July
8, 2025, at https://doi.org/10.1029/2024WR037518.
70
Verheyen, J., Delnat, V., and Theys, C., 2022, Daily temperature fluctuations can magnify the
toxicity of pesticides: Current Opinion in Insect Science, v. 51, p. 100919, accessed July 30,
2025, at https://doi.org/10.1016/j.cois.2022.100919.
Virginia Administrative Code. 9VAC25-260-50. Numerical criteria for dissolved oxygen, pH,
and maximum temperature. Title 9, Agency 25, Chapter 250, Section 50. Accessed August 5,
2025, available at:
https://law.lis.virginia.gov/admincode/title9/agency25/chapter260/section50/.
Virginia Administrative Code. 9VAC25-260-30. Antidegradation policy. Title 9, Agency 25,
Chapter 260, Section 30. Accessed August 13, 2025, at
https://law.lis.virginia.gov/admincode/title9/agency25/chapter260/section30/.
Virginia Department of Conservation and Recreation, 2021, The Natural Communities of
Virginia Classification of Ecological Groups and Community Types, accessed August 13,
2025, at /www.dcr.virginia.gov/natural-heritage/natural-communities/ncta1
Wagner, R.J., Boulger, R.W., Jr., Oblinger, C.J., and Smith, B.A., 2006, Guidelines and standard
procedures for continuous water-quality monitors—Station operation, record computation, and
data reporting: U.S. Geological Survey Techniques and Methods 1–D3, 51 p. + 8 attachments;
accessed April 10, 2006, at http://pubs.water.usgs.gov/tm1d3.
Waite, T., Jankowski, K. J., Bruesewitz, D. A., Van Appledorn, M., Johnston, M., Houser, J. N.,
Baumann, D., A., Bennie, B., 2023, River geomorphology affects biogeochemical responses to
hydrologic events in a large river ecosystem. Water Resources Research, v. 59, no.
e2022WR033662, p. 1–20, accessed July 1, 2025, at https://doi.org/10.1029/2022WR033662.
71
Wasko, C., Guo, D., 2022, Understanding event runoff coefficient variability across Australia
using the hydroEvents R package. Hydrol. Process., v. 36, no.4, p. 1–14, accessed June 2,
2025, at https://doi.org/10.1002/hyp.14563.
Wilber, D.H., Clarke, D.G., 2001, Biological Effects of Suspended Sediments: A Review of
Suspended Sediment Impacts on Fish and Shellfish with Relation to Dredging Activities in
Estuaries, North American Journal of Fisheries Management, v. 21, p. 855-875 accessed
August 18, 2025, at https://doi.org/10.1577/1548-8675(2001)021<0855:BEOSSA>2.0.CO;2.
Yan, X., Ariaratnam, S.T., Dong, S., and Zeng, C., 2018, Horizontal directional drilling: State-
of-the-art review of theory and applications: Tunnelling and Underground Space Technology,
v. 72, p. 162–173, accessed July 30, 2025, at https://doi.org/10.1016/j.tust.2017.10.005.
YSI, 2012, 6-series multiparameter water quality sondes: Yellow Springs Incorporated, 379 p,
accessed August 13, 2025, at ysi.com/file library/documents/manuals/069300-ysi-6-series-
manual-revj.pdf.
Zerga, B., 2024, Karst topography: Formation, processes, characteristics, landforms, degradation
and restoration: A systematic review: Watershed Ecology and the Environment, v. 6, p. 252–
269, accessed July 3, 2025, at https://doi.org/10.1016/j.wsee.2024.10.003.
72
Appendix 1. Supporting Material for Turbidity Analysis
This section is used to provide supplemental information for turbidity analysis and
results.
Table 1.1. Number and percentage (%) of values censored that were greater than 1000 Formazin
Nephelometric Units (FNU; U.S. Geological Survey, 2025b).
Paired Site Name U.S. Geological
Survey Site
Number
Number of 5-min
data points
greater than
1000 FNU
Total number of
5-min turbidity
data points
collected
Percentage
(%)
Little Stony Creek upstream 03171597 9 761,913 0.001
Little Stony Creek downstream 0317159760 235 725,683 0.032
Sinking Creek upstream 0317154954 0 697,630 0.000
Sinking Creek downstream 0317155123 6 727,344 0.001
Roanoke River upstream 0205450393 34 749,359 0.005
Roanoke River downstream 0205450495 294 750,045 0.039
Upper Bottom Creek upstream 0205373035 0 729,865 0.000
Upper Bottom Creek downstream 0205373075 0 750,858 0.000
Lower Bottom Creek upstream 0205373228 1 754,568 0.000
Lower Bottom Creek downstream 0205373422 0 727,498 0.000
Blackwater River upstream 0205696042 893 690,453 0.129
Blackwater River downstream 0205696095 942 666,465 0.141
73
Figure 1.1. High-frequency time series of the before crossing, during crossing, and after crossing period.
A, Little Stony Creek turbidity at the upstream and downstream site; B, Gage height at Little Stony Creek
downstream site; C, Sinking Creek turbidity (in Formazin Nephelometric Units, FNU) at the upstream and
downstream site; D, gage height at Sinking Creek upstream site.
74
Figure 1.2. High-frequency time series of the before crossing, during crossing, and after crossing period.
A, Roanoke River turbidity (in Formazin Nephelometric Units, FNU) at the upstream and downstream site;
B, gage height at Roanoke River Lafayette monitoring station upstream of upstream site; C, upper Bottom
Creek turbidity at the upstream and downstream site; D, gage height at upper Bottom Creek downstream
site.
75
Figure 1.3. High-frequency time series of the before crossing, during crossing, and after crossing period.
A, lower Bottom Creek turbidity (in Formazin Nephelometric Units, FNU) at the upstream and downstream
site; B, gage height at lower Bottom Creek in the downstream site; C, Blackwater River turbidity at the
upstream and downstream site; D, gage height at Blackwater River downstream site.
76
Table 1.2. Results of the percentage of absolute differences for each time-matched paired hourly median
turbidity measurements between the upstream and downstream for each site and period.
Percent of absolute differences less than or equal to
Location Period N 1 FNU 2 FNU 5 FNU 10 FNU 25 FNU
Percent
absolute
differences
greater than 100
FNU
Little
Stony
Creek
Before 50,713 91.2 97.6 99.3 99.7 99.9 0
During 2,571 61.0 96.8 98.9 99.7 99.9 0
After 7,419 89.5 98.1 99.5 99.7 99.9 0
Sinking
Creek
Before 45,402 67.1 87.5 96.0 98.0 99.2 0
During 3,705 71.0 86.7 96.7 98.6 99.5 0
After 7,189 77.2 93.0 97.6 98.4 99.2 0.1
Roanoke
River
Before 46,785 75.9 88.7 95.5 97.6 99.1 0
During 4,405 86.6 95.0 98.1 99.2 99.9 0
After 8,321 78.9 90.3 95.2 97.2 99.2 0.1
Upper
Bottom
Creek
Before 48,057 91.9 98.0 99.3 99.7 99.9 0
During 501 57.9 93.6 96.8 98.2 99.6 0
After 11,350 77.5 94.9 99.0 99.6 99.9 0
Lower
Bottom
Creek
Before 48,918 28.7 61.5 90.1 96.0 98.6 0.2
During 3,804 31.3 51.7 79.7 89.1 95.5 0.4
After 7,789 52.8 78.0 91.8 95.4 98.3 0.1
Blackwater
River
Before 45,624 53.5 74.2 85.7 90.8 95.0 0.8
During 286 31.8 64.7 89.2 93.7 97.2 0
After 7,323 62.3 78.8 90.4 95.2 97.5 0.2
77
Figure 1.4. Graphs of the hysteresis index and slope. A, before crossing at upstream Sites; B, during
crossing at upstream sites; C, after crossing at upstream sites; D, before crossing at downstream sites; E,
during crossing at downstream Sites; F, after crossing at downstream sites.