HomeMy WebLinkAbout[External] MVP Southgate: MVP Mainline Water Quality AssessmentHanko, Ryan E
From: Tessier, John <John.Tessier@nee.com>
Sent: Thursday, November 6, 2025 5:31 PM
To: Wooten, Samantha
Subject: [External] MVP Southgate: MVP Mainline Water Quality Assessment
Attachments: preprint_pipeline_sirmanuscript_02sept2025.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Samantha,
Following up on DEQ's inquiries respecting post -construction stream monitoring, I'm enclosing a report that
evaluates data from continuous water quality monitoring stations at 6 streams crossed by the Mountain Valley
Pipeline Mainline. Those stations were installed prior to construction as a joint undertaking by the US Geological
Service and the Virginia Department of Environmental Quality to monitor the project, and they sampled water prior
to, during, and following construction of the project. The report found that the project had no more than a minimal
and short-term effect on water quality.
Please let me know if you have any questions.
Thankyou,
Job, r
Environmental Services Manager
Environmental Services Department
NEX I era
EI�
NextEra Energy
700 Universe Blvd
Juno Beach, FL 33408
Office: 561-694-4131
John.tessier@nee.com
Join our team! We have exciting opportunities available on our environmental team:
NextEra Energy Careers I Home
Keyword: Environmental