HomeMy WebLinkAbout20181638 Ver 4_Approval Letter_20251112JOSH STEIN Governor D. REID WILSON .Secretory RICHARD E. ROGERS, JR. Director NORTH CAROLIINA Environmental Quality November 12, 2025 DWR #20181638 v4 Rockingham County Mountain Valley Pipeline, LLC Attn: Jeffrey Klinefelter 2200 Energy Drive Canonsburg, PA 15317 Delivered via email to: ieffrey.klinefelter@egt.corr� Subject: Approval of Individual 401 Water Quality Certification MVP Southgate Amendment Project USACE Action ID. No. SAW-2018-00887 (NAO-2018-1574; VMRC 25-0752) Location: 36.541344,-79.632803 Dear Jeffrey Klinefelter: Attached hereto is a copy of Certification No. WQC008395 issued to Jeffrey Klinefelter and Mountain Valley Pipeline, LLC, dated November 12, 2025. This approval is for the purpose and design described in your application. This Water Quality Certification does not relieve the Permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. Upon the presentation of proper credentials, the Division of Water Resources (Division) may inspect the property. This Water Quality Certification shall expire on the same day as the expiration date of the corresponding Section 404 Permit that is current at the time this Certification is issued. The conditions shall remain in effect for the life of the project, regardless of the expiration date of this Water Quality Certification. Non-compliance with or violation of the conditions herein set forth may result in revocation of this Water Quality Certification for the project and may also result in criminal and/or civil penalties. This approval and its conditions are final and binding unless contested [G.S. 143-215.5]. This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raletqh, North Carolina 27699-1617 awhrAKff . Q+" '.N� 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 2 of 14 Additional information regarding requirements for filing a Petition and Petition forms may be accessed at https:llwww.oah.nc.p,c .. or by calling the OAH Clerk's Office at (919) 431-3000. A party filing a Petition must serve a copy of the Petition on: Dan Hirschman, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 If the party filing the Petition is not the Permittee, then the party must also serve the recipient of the Certification in accordance with N.C.G.S. 1508-23(a). This letter completes the Division's review under Section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Samantha Wooten at (919) 707-3631 or samantha.wooten@deg.nc.go, if you have any questions or concerns. Sincerel Richard E. Rogers, Jr., Director Division of Water Resources Electronic cc: Lori Ferry, BMCD EGS, P.C. Dicky Harmon, USACE Raleigh Regulatory Field Office Olivia Munzer, NCWRC DWR 401 & Buffer Permitting Branch Electronic file Christopher A. Militscher, Chief, NEPA Section, Strategic Programs Office, USEPA, 61 Forsyth St SW, Atlanta GA 30303 Maria Clark, NEPA Section — Region 4, USEPA, 61 Forsyth St SW, Atlanta GA 30303 Filename: 20181638 v4 MVP Southgate — Rockingham — 401 IWQC.docx FM North Carolina Department of Environmental Quality I Division of Water Resources — 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 N�Onwir+anROUw r'..u—�AE�kaaarttal O.mh/ 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 3 of 14 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC008395 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500 and 15A NCAC 0213.0200, to Jeffrey Klinefelter and Mountain Valley Pipeline, LLC, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on May 30, 2025, with application fee received on June 5, 2025, and subsequent information on July 15, 2025, September 12, 2025, and October 28, 2025, and by Public Notice issued by the U. S. Army Corps of Engineers on April 30, 2025, and Public Notice issued by the Division on June 4, 2025, and within the Reasonable Period of Time pursuant to 40 CFR Part 121.6. The State of North Carolina certifies that this activity will comply with water quality requirements and the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b)] Type of Impact Amount Approved Amount Mitigation Permanent Approved Amount Required Temporary Perennial Streams S-13011: Pipeline ROW 0 linear feet 0 linear feet 74 linear feet 89 linear feet 0 credits 0 credits S-BO15: Pipeline ROW S-FO05: Pipeline ROW 0 linear feet 79 linear feet 0 credits Totals: 0 linear feet 242 linear feet 0 credits Intermittent Streams S-BO02: Pipeline ROW/ Temporary Access Road 0 linear feet 76 linear feet 0 credits S-BO06: Culvert Installation/Replacement 21 linear feet 0 linear feet 0 credits S-BO07: Culvert Installation/Replacement 31 linear feet 0 linear feet 0 credits S-BO08: Pipeline ROW 0 linear feet 90 linear feet 0 credits S-BO13: Temporary Access Road 0 linear feet 5 linear feet 0 credits S-13015a: Timber Mat Crossing 0 linear feet 15 linear feet 0 credits S-BO17: Pipeline ROW 0 linear feet 81 linear feet 0 credits Totals: 52 linear feet 267 linear feet 0 credits Ephemeral S-BO09: Pipeline ROW 0 linear feet 75 linear feet 0 credits S-13010: Timber Mat Crossing 0 linear feet 10 linear feet 0 credits S-BO16: Timber Mat Crossing 0 linear feet 126 linear feet 0 credits Totals: 0 linear feet 1 211 linear feet 0 credits �� North Carolina Department of Environmental Quality I Division of Water Resources D_ I E 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 UNA TM.Z\ /� 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 4 of 14 Type of Impact Amount Approved Permanent Conversion Amount Approved Temporary Mitigation Amount Required Riparian Wetlands W-6001a: Additional Temporary Workspace (ATWS) 0 acres 0.3582 acres 0 credits W-13001b: ATWS 0.0523 acres 0 acres 0 credits W-13002a: Pipeline ROW/ATWS 0.3549 acres 0 acres 0 credits W-13002b: Pipeline ROW/ATWS 0.173 acres 0 acres 0 credits W-13002c: Timber Mat Crossing 0.0094 acres 0 acres 0 credits W-BO03: Timber Mat Travel Lane/Maintenance Corridor _ 0.0399 acres 0 acres 0 credits W-BO04: ATWS 0 acres 0.0232 acres 0 credits W-13004a: ATWS 0.0403 acres 0 acres 0 credits W-BO05: Pipeline ROW 1.7856 acres 0 acres 0 credits W-BO08: Pipeline ROW 0 acres 0.0101 acres 0 credits W-6009a: Pipeline ROW 0.1415 acres 0 acres 0 credits W-6009b: Pipeline ROW 0 acres 0.0536 acres 0 credits W-6010: Pipeline ROW/Temporary Access Road 0 acres 0.0999 acres 0 acres 0.0275 acres 0 credits W-6011: Pipeline ROW 0 credits W-BO12: Timber Mat Travel Lane 0 acres 0.0315 acres 0 credits W-13013b: Pipeline ROW 0.0181 acres 0 acres 0 credits W-B027: Timber Mat Travel Lane/Maintenance Corridor 0.0283 acres 0 acres 0 credits W-B028: Pipeline ROW 0 acres 0.796 acres 0 credits W-B029: Timber Mat Crossing 0 acres 0.0033 acres 0 credits W-13031a: Pipeline ROW 0 acres 0.2289 acres 0 credits W-13031b: Pipeline ROW 0.2696 acres 0 acres 0 credits W-B032: Pipeline ROW W-B051: Timber Mat Travel Lane/Maintenance Corridor 0 acres 0.1102acres 0 credits 0.0105 acres 0 acres 0 credits W-13052a: Timber Mat Crossing 0.0294 acres 0 acres 0 credits W-13052b: Pipeline ROW 0 acres 0.0233 acres 0 credits W-B053 Pipeline ROW 0 acres 0.0441 acres 0 credits W-B055: Timber Mat Crossing 0 acres 0.0416 acres 0 credits W-BO56 Pipeline ROW 0 acres 0.0391 acres 0 credits W-6056a: Pipeline ROW 0.0476 acres 0 acres 0 credits W-FO03: Timber Mat Crossing 0 acres 0.0089 acres 0 credits W-FO04: Timber Mat Crossing 0 acres 0.0096 acres 0 credits W-FO05: Timber Mat Crossing 0 acres 0.0023 acres 0 credits W-FO06: Timber Mat Travel Lane 0 acres 0.0101 acres 0 credits W-FO07: ATWS 0 acres 0.0168 acres 0 credits e:.e0::f �� � North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NrRM cnao Hn 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 5 of 14 Type of Impact Amount Approved Permanent Conversion Amount Approved Temporary Mitigation Amount Required W-F008 Timber Mat Crossing 0 acres 0.0393 acres 0 credits W-FO09: Pipeline ROW/ATWS 0 acres 0.8132 acres 0 credits W-FO10: Timber Mat Crossing/AWTS 0 acres 0.1008 acres 0 credits W-F011: Pipeline ROW 0 acres 0.0339 acres 0 credits W-FO12: Pipeline ROW 0 acres 0.0148 acres 0 credits W-FO13 Pipeline ROW 0 acres 0.026 acres 0 credits W-FO15: Temporary Access Road 0 acres 0.0006 acres 0 credits W-GO03: Pipeline ROW/ATWS 0 acres 0.0242 acres 0 credits Totals: 3.0004 acres 2.991 acres 0 credits This approval requires you to follow the conditions listed in the Certification below. CONDITIONS OF CERTIFICATION [15A NCAC 02H .0507(c)]: 1. Mitigation must be provided for the proposed impacts as specified in the table below. The attached Compensatory Mitigation Responsibility Transfer Form (Form) for mitigation shall be completed and provided to the Division prior to any impacts occurring. If the Mitigation Provider specified on the attached Form(s) for the proposed impacts changes after issuance of this Certificate, then the Permittee shall request a revised Compensatory Mitigation Responsibility Transfer Form from the Division prior to conducting any impacts. Compensatory Mitigation River and Sub -basin Required __ Number Wetland Conversion 3.0004 acres (credits) F Roanoke/03010103 Citation: 15A NCAC 02H .0506(c), 15A NCAC 02H .0507(c) 2. The plans and specifications for this project are incorporated by reference as part of this Water Quality Certification. If you change your project, you must notify the Division, and you may be required to submit a new application package with the appropriate fee. If the property is sold, the Permittee shall provide the new owner must with a copy of this Water Quality Certification and all plans and specifications incorporated by reference. The Permittee may transfer this Water Quality Certification to the new owner by submitting a letter to the Division with the following statement: "At the time the property is transferred, the terms and conditions of this 401 Individual Water Quality Certification, including the responsibility to ensure compliance, are binding on the new owner(s) of the property." The letter shall be signed and dated by both the transferee and the new owner. Citation: 15A NCAC 02H .0507(d)(2) 4 Korth Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 TM Stem,_ 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 6 of 14 3. The Permittee shall secure an approved stormwater management plan (SMP) from Division of Energy, Mineral, and Land Resources (DEMLR) before any impacts authorized in this Certification occur. Citation: 15A NCAC 02H .0506(b)(2) and (3); 15A NCAC 02H .0507(c) 4. The Permittee shall schedule and conduct a pre -construction meeting with the construction contractors, MVP staff, the environmental inspector(s), DEMLR staff to review the conditions and requirements of the respective certifications and permits for clarity and understanding before any impacts authorized in this Certification occur. The NCWRC shall be invited to the pre -construction meeting. Citation: 15A NCAC 02H .0506, 15A NCAC 02H .0507(c) 5. The Permittee shall implement post -construction stormwater management measures in accordance with requirements from the FERC Upland Erosion Control, Revegetation, and Maintenance Plan and shall coordinate with DEMLR on Erosion and Sediment Control Plan Performance throughout construction activities. Citation: 15A NCAC 02H .0506(b)(2) and (3); 15A NCAC 02H .0507(c) 6. If the Permittee becomes aware of any inability to comply with any of the conditions of this Water Quality Certification, they must notify DWR Central Office within 24 hours (or the next business day if it is a weekend or holiday) from the time the Permittee becomes aware of the circumstances. The Permittee may be required to submit a new application package with appropriate fee to initiate modification of this authorization, and/or to conduct corrective actions as determined by the Division. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 7. The Permittee shall report to the DWR Central Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if it is a weekend or holiday) from the time the Permittee became aware of the non-compliance circumstances. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 8. The permittee shall comply with any moratoriums per the North Carolina Wildlife Resource Commission and/or the US Fish and Wildlife Service. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c), 15A NCAC 04B .0125 9. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the approved impacts (including temporary impacts). Citation: 15A NCAC 02H .0506; 15A NCAC 02H .0507(c) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 7 of 14 10. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North Carolina Department of Transportation Sediment and Erosion Control Manual. All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor -owned or leased borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCACO2B .0200, 15A NCAC 02B .0231 11. Sediment and erosion control measures shall not be installed in wetland or waters except within the footprint of temporary or permanent impacts otherwise authorized by this Certification. If placed within authorized impact areas, then placement of such measures shall not be conducted in a manner that results in dis-equilibrium of any wetlands, streambeds, or streambanks. Any silt fence installed within wetlands shall be removed from wetlands and the natural grade restored within two (2) months of the date that DEMLR has released the specific area within the project to ensure wetland standards are maintained upon completion of the project. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c), 15A NCAC 02B .0200; 15A NCAC 02B .0231 12. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 13. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping, and reporting requirements are required. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c); 15A NCAC 02B .0200, 15A NCAC 02B .0231 E::ANorth Carolina Department of Environmental Quality I Division of Water Resources Q�� 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NOR7ii 04RCJh1A � �" ya^T� r 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 8 of 14 14. The Permittee shall adhere to the following construction sequencing: a. All wetlands, streams, and surface waters, within 50 feet of the construction area on the project site shall be clearly marked prior to the beginning of clearing activities. b. Updated pre -construction conditions will be documented and photographed for all locations where stream channels that are parallel with the pipeline and proposed to be disturbed to ensure that restoration of the streams will be restored to their original conditions or a more stable and appropriately sized condition. No grubbing or grading will occur within 25 feet of a stream or within a wetland except for one traffic lane for construction equipment until construction activities that are necessary for pipe installation can occur continuously and expeditiously in order to minimize the length of disturbance to the waterbody. Trees will not be stumped within any wetlands except for within 15 feet of the trench. Roots and stumps will not be removed except in the areas of the pipe trench. 15. The Permittee shall provide a dedicated environmental inspector to oversee work and maintenance of erosion control measures within wetlands, streams and open waters until all areas within the watershed are permanently stabilized. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c), 15A NCAC 028.0200 16. The Permittee shall adhere to the Mountain Valley Pipeline Inadvertent Return Plan dated April 2025. Documentation of the composition and properties of drilling fluids and additives, including manufacturer's literature and Safety Data Sheets for each horizontal directional drilling crossing must be submitted to the Division no less than 30 calendar days prior to commencement of the particular crossing. If an inadvertent return enters a surface water, wetland or protected riparian buffer, the Permittee shall notify the DWR Central Office based on the location (after hours and on weekends call 800-858-0368). Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 17. The permittee shall collect and dispose of hydrostatic test water and any other wastewater associated with drilling/tunneling operations at an approved wastewater facility or dispose of the wastewater in compliance with 15A NCAC 2H .0106. Notification to the Division of Water Resources is required prior to any discharge. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c), 15A NCAC 02H .0106 18. The Permittee shall adhere to the following for Water Well Identification and Testing: a. Clearly mark the wellhead and surrounding area with silt fence/safety fence; b. Implement the FERC Upland Erosion Control, Revegetation, and Maintenance Plan and Procedures for stormwater-runoff control and control of petroleum and hazardous materials; c. Inform all affected landowners of the option for pre -construction and post -construction well water testing for private wells located within 150 feet of the construction workspace. Per the landowner's request, the permittee shall provide pre -construction and post -construction well water testing; North Carolina Department of Environmental Quality I Division of Water Resources ~ 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-i6: C.AROI.BdA /�� 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 9 of 14 If a well is impacted, MVP shall work with the landowner to remedy any impacts and shall provide a temporary water supply during any remediation work Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 19. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC Department of Transportation Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c); 15A NCAC 02B .0200 20. The Permittee shall adhere to the following for water withdrawal from the Dan River: a. Comply with the NC Water Withdrawal Registration procedures in GS 143-215.22H b. The intake shall be designed with an intake screen system such that: c. The temporary intake is suspended in an area greater than 5 feet in water depth (above functional substrates) d. The maximum intake velocity of 0.25 ft/sec through a mesh screen with openings not to exceed 1.0 millimeters. e. The system to clean the mesh screen is designed to minimize impacts to eggs, larvae, and juvenile species. f. The intake structure shall be marked in a manner that will reduce hazards to navigation. g. Water withdrawals shall not occur between May 15-July 31 to protect sensitive fish and mussels in the Dan River. A permanent instream infrastructure will not be installed. The maximum withdrawal amount shall not exceed 20% of the 7Q10 flow limit. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c), 15A NCAC 02B .0200 21. Culverts shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. The dimension, pattern, and profile of the stream above and below a pipe or culvert shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. If the width of the culvert is wider than the stream channel, the culvert shall include multiple boxes/pipes, baffles, benches and/or sills to maintain the natural width of the stream channel. If multiple culverts/pipes/barrels are used, low flows shall be accommodated in one culvert/pipe and additional culverts/pipes shall be installed such that they receive only flows above bankfull. Placement of culverts and other structures in streams shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low flow passage of water and aquatic life. If the culvert outlet is submerged within a pool or scour hole and designed to provide for aquatic passage, then culvert burial into the streambed is not required. North Carolina Department of Environme ' ' of Water Resources noam r FW Q ��dl� 512 North Salisbury Street 11617 Mail Ser `ce I . '11 ,.%,, North Carolina 27699-1617 1: LIM 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 10 of 14 For structures less than 72" in diameter/width, and topographic constraints indicate culvert slopes of greater than 2.5% culvert burial is not required, provided that all alternative options for flattening the slope have been investigated and aquatic life movement/connectivity has been provided when possible (e.g., rock ladders, cross -vanes, sills, baffles etc.). Notification, including supporting documentation to include a location map of the culvert, culvert profile drawings, and slope calculations, shall be provided to DWR thirty (30) calendar days prior to the installation of the culvert. When bedrock is present in culvert locations, culvert burial is not required, provided that there is sufficient documentation of the presence of bedrock. Notification, including supporting documentation such as a location map of the culvert, geotechnical reports, photographs, etc. shall be provided to DWR a minimum of thirty (30) calendar days prior to the installation of the culvert. If bedrock is discovered during construction, then DWR shall be notified by phone or email within 24 hours of discovery. Installation of culverts in wetlands shall ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. When roadways, causeways, or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges shall be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native woody vegetation and other soft stream bank stabilization techniques shall be used where practicable instead of rip -rap or other bank hardening methods. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 22. Application of fertilizer to establish native planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State, and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c), 15A NCAC 02B .0200, 15A NCAC 02B .0231 23. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c), 15A NCAC 02B .0200; 15A NCAC 02B .0231 24. All proposed and approved temporary fill and culverts shall be removed, and the impacted area shall be returned to natural conditions within sixty (60) calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile. All temporarily impacted sites shall be restored and stabilized with native vegetation. Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 M1Cfi7H C4F1QUV4 U� �� - 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 11 of 14 25. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams or wetlands shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this Certification. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 26. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All rip -rap shall be placed such that the original streambed elevation and streambank contours are restored and maintained and shall consist of clean rock or masonry material free of debris or toxic pollutants. Placement of rip -rap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area or be installed in a manner that precludes aquatic life passage. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 27. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to prevent movement by wave, current action, or stream flows, and shall consist of clean rock or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c), 15A NCAC 02B .0201 28. Mixing of topsoil and subsoils within wetlands shall be minimized to the greatest extent practical. During excavation, the soils shall be placed on fabric to minimize impacts whenever possible. Topsoil excavated from trenches should be piled separately from soils and backfilled into the trench only after the subsoils have been placed and compacted. a. The top 12 inches of streambed substrate will be segregated and stockpiled to prevent mixing with other materials and be used during restoration activities. b. In wetlands, the top 12 inches of topsoil (if unsaturated) will be removed from the ground surface, segregated, as appropriate, from subsoil, and replaced in the proper order during backfilling and final grading. If the topsoil is less than 12 inches, the actual depth of the topsoil will be removed, segregated, and backfilled. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 29. Stream restoration and streambank stabilization activities and wetland restoration activities shall be conducted in accordance with the MVP Southgate Amendment Project, Section 5.2.8 and 5.2.9, FERC Upland Erosion Control, Revegetation, and Maintenance Plan, and Wetland and Waterbody Construction and Mitigation Procedures. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) North Carolina Department of Environmental Quality f Division of Water Resources 512 North Salisbury Street 11617 Maif Service Center Raleigh, North Carolina 27699-1617 neRn+cnarn�u+ !!�� as 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 12 of 14 30. The Permittee shall narrow the construction Right -of -Way (ROW) to 75 feet within 50 feet of stream and wetland crossings. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 31. Upon restoration of temporary impacts to wetlands, all restored areas shall be monitored quarterly for at least three years with photo documentation kept and provided upon request. Wetland restoration shall be considered successful if all the following criteria are satisfied: a. the affected wetland satisfies the current federal definition for a wetland (i.e., soils, hydrology, and vegetation); b. vegetation is at least 70 percent of either: the cover documented for the wetland prior to construction, or at least 70 percent of the cover in adjacent wetland areas that were not disturbed by construction; c. stem density greater than or equal to 210 stems/acre and a minimum of 4 tree species as success criteria for forested wetlands; d. invasive species and noxious weeds are absent, unless they are abundant in adjacent areas that were not disturbed by construction. If monitoring of completed wetland crossings indicates modifications to the restoration procedures is necessary or additional wetland crossing locations require hardened stabilization, notification shall be provided to the Division prior to installation of hardened material at any location not identified by these procedures. Three years after construction is completed, the Permittee shall submit a report to the Division identifying the status of the wetland revegetation efforts, including example photo documentation, and documenting success as defined above. Wetland restoration monitoring may be extended by the Division if the restoration sites have not adequately recovered. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 32. Upon restoration of temporary impacts to streams all restored areas shall be monitored quarterly for at least three years with photo documentation kept and provided upon request. Stream restoration shall be considered successful if all of the following criteria are satisfied a. the stream channel is stable, and active erosion is not observed; b. riparian vegetation is at least 80 percent of either the cover documented for the wetland prior to construction, or at least 80 percent of the cover in adjacent riparian areas that were not disturbed by construction; c. invasive species and noxious weeds are absent, unless they are abundant in adjacent areas that were not disturbed by construction. If monitoring of completed stream crossings indicates modifications to these procedures is necessary or additional stream crossing locations require hardened stabilization, notification shall be provided to the Division prior to installation of hardened material at any location not identified by these procedures. Three years after construction is completed, the Permittee shall submit a report to the Division identifying the status of the riparian revegetation efforts and documenting success as defined North Carolina Department of Environmental Quality i Division of Water Resources e:50:0-f 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 276991617 NrYrtiH -RCU y 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 13 of 14 above. Stream restoration monitoring may be extended by the Division if the restoration sites have not adequately recovered. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 33. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c); 15A NCAC 02B .0200, 15A NCAC 02B .0231 34. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance and compaction. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0231 35. In accordance with 143-215.85(b), the Permittee shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. Citation: 15A NCAC 02H.0507(c), N. C. G.S 143-215.85(b) 36. The Permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. Citation: 15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) 37. The Permittee shall require its contractors and/or agents to comply with the terms and conditions of this Certification in the construction and maintenance of this project and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this Water Quality Certification. A copy of this Water Quality Certification shall be available at the project site during the construction and maintenance of this project. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 38. This Water Quality Certification neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Water Quality Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and does not create any prescriptive right or any right of priority regarding any usage of water. This Water Quality Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights North Carolina Department of Environmental Quality I Division of Water Resources E•/ 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 f r 919.707.9000 MVP Southgate Amendment Project DWR #20181638 v4 Individual Certification #WQC008395 Page 14 of 14 to water use. No consumptive user is deemed by virtue of this Water Quality Certification to possess any prescriptive or other right of priority with respect to any other consumptive user. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This Water Quality Certification shall expire on the same day as the expiration date of the corresponding Section 404 Permit that is current at the time this Certification is issued. The conditions shall remain in effect for the life of the project, regardless of the expiration date of this Water Quality Certification. This, the 12th day of November 2025 Richard E. Rogers, Jr., Director'/ Division of Water Resources / North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 M�hiaeAour� r ^`�^�•' �� 919.707.9000 JOSH STEIN Governor D. REID WILSON Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORM November 12, 2025 Permittee: Mountain Valley Pipeline, LLC DWR Project #20181638 v4 Project Name: MVP Southgate Amendment Project County: Rockingham The Division has received a Statement of Availability (SOA) from the NC Division of Mitigation Services (DMS) (Mitigation Provider) to satisfy the requirements set forth in 401 Individual Certification No. WQC008395 issued to Mountain Valley Pipeline, LLC, dated November 10, 2025 as provided in the table below. Compensatory Mitigation River and 8-digit HUC Number Riparian Wetlands 1 3.0004 acres (credits) Roanoke / 03010103 The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the Mitigation Provider has signed this form, it is the Permittee's responsibility to ensure that a signed copy of this form is submitted to DEQ.WR.401MRT@deg.nc.gov before conducting any of the authorized impacts. The Mitigation Provider verifies that the mitigation requirements (credits) shown above, have been released and are available at the identified bank site(s). By signing below, the Mitigation Provider is accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no more than 25 percent of the total mitigation required by Division can be met through preservation, unless requested and approved by the Division Director (15A NCAC 02H. 0506(c)(7)). Signature Authority Name (print): Signature: Date: NORTH CAROLINAD_ EQ:> oepammem a eammameami auw� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000