Loading...
HomeMy WebLinkAboutMVP Southgate-Rockingham- Hearing officers report MEMORANDUM To: Richard Rogers Director, Division of Water Resources From: Michael Hall, Regional Supervisor, Raleigh Regional Office Date: November 7, 2025 Subject: Hearing Officer’s Report and Recommendations MVP Southgate Project Individual 401 Water Quality Certification Rockingham County I served as the Hearing Officer for a Public Hearing held at the Eden City Hall Council Chamber, in Eden, North Carolina (NC) on August 12, 2025. The public hearing was held under the authority of Title 15A of the North Carolina Administrative Code (NCAC), section 02H, subsection .0503. The purpose of this public hearing was to receive comments on the Division of Water Resources’ (DWR) 401 Water Quality Certification (401 WQC) application submitted by Mountain Valley Pipeline LLC (MVP). A 401 WQC is needed to construct a proposed natural gas pipeline through Rockingham County. In addition to listening to oral comments at the public hearing, the Division of Water Resources staff has reviewed written comments received prior, during , and after the public comment period. In preparation of this report, I have considered all the public comments, the public record, the relevant rule sets, the application for the project and consulted with DWR staff conducting the review of this project. The report has been prepared using the following outline: I. History / Background II. Public Hearing Summary III. Comments and Responses IV. Recommendations V. Summary I. History / Background On May 30, 2025, MVP submitted an application for a 401 WQC. MVP is proposing to construct and operate a natural gas transmission pipeline system from interconnection point in Pittsylvania County, Virginia to the proposed delivery interconnect points, Dan River Interconnect #1 and Dan River Interconnect #2 approximately 5.2 miles into Rockingham County NC. MVP’s application proposes to temporarily impact 720 linear feet of streams and 2.99 acres of jurisdictional wetlands during the construction phase. 3.00 acres of forested wetlands are proposed to be permanently converted to herbaceous wetlands for permanent maintenance corridors. The proposed impacts would result in a loss of 52 linear feet of intermittent streams but would not result in a permanent loss of wetlands or perennial streams. Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 2 Date Action July 2, 2025 Req. for Add Info (1) July 15, 2025 Add. Info Received (1) August 21, 2025 Req. for Add Info (2) September 12, 2025 Add. Info Received (2) The revised impact table provided by the applicant on July 15, 2025, reflects the final proposed impacts for review: Type of Impact Proposed Permanent Impact Amount Proposed Temporary Impact Amount Mitigation Amount Required Perennial Streams 0 linear feet 242 linear feet 0 credits Intermittent Streams 52 linear feet 267 linear feet 0 credits Ephemeral Streams 0 linear feet 211 linear feet 0 credits Riparian Wetlands 3.0004 acres of conversion 2.991 acres 0 credits The Division’s rule mitigation framework requires mitigation for the loss of resources or use above a certain impact threshold. The project does not trigger compensatory mitigation for the proposed permanent stream impacts since they are below the rule threshold of 300 liner feet of permanent stream loss. The temporary stream, temporary wetland, and permanent wetland conversion impacts do not require compensatory mitigation according to 15A NCAC 02H .0506. Even though not required, MVP proposes to mitigate 52 linear feet of permanent stream impacts and 3.0004 acres wetland conversion impacts in North Carolina through North Carolina Division of Mitigation Services (NC DMS) In-Lieu Fee Program. Under the authority of Title 15A NCAC 02H .0503, DWR accepted public comments on the application from July 11, 2025, until September 12, 2025. The public comment period included the public hearing as described below. In accordance with Title 15A NCAC 02H .0503, notice of the public hearing and availability of the application for the 401 WQC was posted on the DWR’s website and sent by email to the WQC email Listserv on July 11, 2025. II. Public Hearing A public hearing was held on August 12, 2025. The public hearing was held in order for DWR to receive public comment and additional information relevant to DWR’s review of the 401 WQC application submitted by MVP. Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 3 Sixty people attended the public hearing. As the hearing officer, I provided opening remarks and Sue Homewood, DWR staff member, presented background information on the 401 WQC process and the proposed application. Twenty-six attendees spoke at the hearing to provide comments. Speakers were given three minutes for presentations. The list of attendees and speakers is included in the attendance lists. The audio recording of the public hearing, including all oral comments provided at the hearing, is available online. DWR also received 2,409 written comments during the public comment period associated with the public hearing process. Some comments were submitted on behalf of multiple entities. A summary of the oral and written comments, along with detailed responses that have a direct impact on the certification decision , are included below in Section III. III. Comments and Responses The following is a summary of the comments received during the public hearing and the public comment period. Because the comments received were numerous and similar in nature, it was possible to identify generalized areas of concern which are addressed in this report. The discussion below is intended to summarize and address substantive comments received. Comments received are included in the DWR’s file which is accessible electronically. Comment: Multiple comments were in favor of the proposed project. Specific comments stated: • There is a growing need for domestically sourced, affordable, and reliable energy; • The pipeline construction will create well-paying jobs and support long- term economic growth for local communities; • MVP is committed to building the project safely and responsibly ; • MVP is committed to mitigating for unavoidable impacts ; and • MVP has provided/is providing support for local community resources . Response: The Director evaluates a 401 WQC application based on six criteria including a no practical alternatives analysis, minimization of adverse impacts to surface waters, an analysis of the degradation of ground waters or surface waters, a cumulative impacts an alysis, protection of downstream water quality through stormwater control measures, and replacement of existing uses through mitigation. Some of these comments raise considerations outside the criteria upon which the Director must evaluate the application under 15A NCAC 02H .0506. Comment: Many of the comments received related to the health and safety of adjacent communities. Comments relayed specific concerns that: • The project will impact the health and safety of the environment with no provided uplift to the surrounding community; • The project will impact recreational activities in surrounding communities; • The project targets vulnerable communities; and • MVP should test all wells surrounding the pipeline. Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 4 Response: The Director evaluates a 401 WQC application based on six criteria including a no practical alternatives analysis, minimization of adverse impacts to surface waters, an analysis of the degradation of ground waters or surface waters, a cumulative impacts analysis, protection of downstream water quality through stormwater control measures, and replacement of existing uses through mitigation. These comments raise considerations outside the criteria upon which the Director must evaluate the application under 15A NCAC 02H .0506. MVP has agreed to identify all private wells within the construction limits of disturbance to avoid impacts from construction activities and equipment. If requested by the landowner, pre-and post-construction testing for all private wells within 150 feet of the construction limits of disturbance will be conducted. The applicant stated there are no municipal or public water supplies within 150 feet of the limits of disturbance. Comment: Many comments requested that DEQ deny the proposed project for the same reasons it denied MVP Southgate, a prior 401 WQC application for a similar work. Response: The previous denial of the MVP Southgate project was based on the fact that the project was dependent upon the completion of the MVP Mainline project for which several necessary federal permits had been suspended and in litigation and the Federal Energy Regulatory Commission had issued a stop - work order, therefore the uncertainty of t he MVP Mainline project posed a critical risk to the purpose of the MVP Southgate Project. The circumstances are now different. Section 324 of the Federal Fiscal Responsibility Act of 2023, Public Law 118-5 mandated that the Secretary of the Army issue all permits or verifications necessary to complete the Mountain Valley Pipeline which would support the MVP Southgate connectivity issues. The level of uncertainty that prompted the earlier denial is no longer present. Comment: Many of the comments received were related to the justification and/or need for the project. Comments relayed specific concerns that: • The project is overbuilding gas infrastructure, that energy demand is being inflated/exaggerated; • The project is unnecessary; • The project is not the least cost option for customers ; and • The size of the T-15 and MVP Southgate pipeline are larger than needed. Response: While we understand the concerns expressed by the commenters, the comment is outside the evaluation criteria established in state law for the review of 401 WQCs including the North Carolina Administrative Code and the review provisions set forth for energy transmission projects such as this one set forth in NCGHS 143-214.1A. Comment: Many of the comments received were related to the impacts of construction activities on streams. Specific comments were that: Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 5 • Open cut/dry ditch methodology does not protect streams and wetlands during construction; • Open cut/dry ditch methodology does not meet the requirement for avoidance and minimization; • The proposed activity will not comply with state water quality standards (designated uses, numeric criteria, narrative criteria, and state’s antidegradation policy); • Construction activities will cause high turbidity, sediment, and erosion; • Current erosion control standards/methods are not sufficient in times when there are significant storm events which are more common nowadays; • Excessive sediment and other pollutants will be released pre/post- construction; • The project has potential to impact a drinking water supply ; • The pipeline is a safety risk given recent regional flooding/storm events; and • Aquatic species will be impacted in North Carolina. Response: The application has been thoroughly reviewed in accordance with 15A NCAC 02H .0506(b)(1) to ensure that the applicant has documented avoidance and minimization to ensure water quality standards are protected. The applicant has proposed various techniques of protecting water quality during construction such as trenchless crossing methods for larger streams and where sensitive species are present; isolation of the work area from the flowing stream during pipeline installation for medium and small sized streams; all areas will be dewatered during construction and immediately restored upon completion. The open cut/dry-ditch methodology is proposed for 21 stream and wetland crossings. This methodology combines traditional trench construction techniques with Erosion and Sediment Control Best Management Practices (BMPs). These diversion structures (cofferdams, flume pipe, and dam -and- pump) will be temporary and only implemented during pipeline construction activities. The open-cut/dry-ditch method isolates all construction activities from the associated waterbody. MVP stated that once grubbing and grading has been completed, they will proceed continuously and as quickly as practicable until the crossing is completed and the work area is restored. Additionally, MVP stated that the US Fish and Wildlife Service has indicated the presence of federally endangered Roanoke Logperch and critical habitat for the Atlantic Pigtoe and the Green Floater in the Dan River and Cascade Creek and MVP avoid instream impacts to these resources. MVP has agreed to follow this recommendation and will be using conventional boring to avoid and minimize any potential impacts to the federally listed species within these project areas. MVP will be required to secure an approved Erosion Control Plan prior to construction; and commit to construction activities (i.e. during periods of low Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 6 flow) at stream and wetland locations to minimize impacts at streams and wetlands. The applicant evaluated each potential crossing method using site- specific information and provided a Crossing Method Determination Summary for each proposed crossing over a waterbody . The construction corridor has been narrowed to 75 feet within 50 feet of an aquatic resource crossing to preserve riparian vegetation. Additionally, the applicant has committed to having a dedicated environmental inspector present during all instream construction activities. Pipeline safety during flood events is not within DWR’s regulatory authority except to the extent it may impact water quality. DWR maintains authority to address compliance concerns through the conditions included in 401 WQCs and DWR’s statutory authority to protect water quality though surface water standards in 15A NCAC 02B .0200. DWR maintains authority to address compliance concerns through the conditions included in 401 WQCs and DWR’s statutory authority to protect water quality though surface water and wetland standards in 15A NCAC 02B .0200. The project drains to a portion of the Dan River in NC that is classified as Class C waters. DWR believes that the comments stating the project will impact downstream water supplies may be related to Virginia’s classifications that protect waters for use as a drinking water source. Pursuant to the Clean Water Act, each state develops classifications for their own streams, however state classification staff are routinely in communication with adjacent states. DWR is not aware of any concerns from Virginia that the Class C classification for the above-mentioned NC portion of the Dan River at this location is inappropriate. DWR did not receive any comments from any state or local agency with concerns for an existing water supply system. In addition, the Clean Water Act provides for a formal process for EPA to review all Individual 401 certifications for potential to impact a neighboring jurisdiction. MVP will implement the Federal Energy Regulatory Commission (FERC) Upland Erosion Control, Revegetation, and Maintenance Plan, the Wetland and Waterbody Construction and Mitigation Procedures, and a project- specific Erosion and Sediment Control Plan (ESCP) that complies with NC regulations. NCDEQ Division of Energy and Mineral Resources (DEMLR) must approve the ESCP. Compliance with the Erosion and Sediment Control Plan is enforced by DEMLR. DWR will protect water quality through the conditions included in the 401 WQC and DWR’s statutory authority to enforce the water quality standards codified in 15A NCAC 02B. The applicant is committed to implementing the controls outlined in the NC Erosion and Sediment Control Planning and Design suitable for High Quality Water (HQW) even though the Amendment Project does not cross through a High Quality Water Zone . The applicant coordinated with the United States Fish and Wildlife Service (USFWS) to review any federally listed species within the project area(s). In North Carolina, USFWS indicated that Roanoke Logperch (RLP) is present within Cascade Creek and Dan River, and that critical habitat has been Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 7 designated for Atlantic pigtoe and critical habitat has been proposed for Green Floater within the Dan River. The Dan River and Cascade Creek crossings are using conventional boring to avoid and minimize any potential impacts to the federally listed species within the project area. Comment: Many of the comments received were related to the cumulative impacts of construction activities on streams. Specific comments were that: • DWR should consider the cumulative impact of construction within multiple streams draining to the same waterbody; • DWR should consider cumulative impacts for both the MVP and proposed Transco SSEP which will impact the same streams and wetlands on a similar schedule; • DWR should require monitoring of all streams and wetlands before, during and after construction to prove water quality standards are not exceeded; • MVP cannot provide adequate mitigation for the proposed impacts ; and • Proposed impacts to the Dan River should be considered in light of previous impacts from the 2014 Duke Energy Dan River coal ash incident. Response: MVP submitted an indirect and cumulative impact assessment in accordance with the DWR Cumulative Impact Policy. The assessment is specific to the potential for the proposed project to stimulate additional growth within a watershed rather than address cumulative impacts during construction. The application has been thoroughly reviewed to ensure that water quality standards are protected. The applicant has proposed various techniques of protecting water quality during construction, such as trenchless crossing methods, isolation of the work are a during installation, securing an approved Erosion Control Plan prior to construction and specific timing of construction activities at stream and wetland locations. Post- construction monitoring will be required by condition in the 401 WQC. MVP will implement construction scheduling coordination with Transco SSEP, implement erosion and sediment controls (ESC), and employ adaptive management strategies, if needed.. DWR requires mitigation for permanent perennial stream impacts over 300 linear feet and permanent wetland impacts over 0.10 acres. DWR does not require mitigation for temporary impacts, permanent no-loss impacts, wetland conversion, intermittent stream impacts, and open water impacts. MVP is proposing to mitigate all proposed permanent stream impacts and wetland conversions within North Carolina through NC Division of Mitigation Services. Comment: Some comments received were related to compliance if the application were to be approved. Specifically, that: Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 8 • MVP has a history of environmental non-compliance with state and federal water quality laws, specifically with construction of the MVP Mainline Project; and • DEQ lacks resources/staff to ensure the project stays in compliance. Response: The applicant has indicated that a dedicated environmental inspector will be present during all in-stream construction activities. The Amendment Project construction must comply with the Stormwater Design Manual, which follows the Minimum Design Criteria outlined in the NC Stormwater Rules and Regulations. While we understand the concerns expressed by the commenters, the Division maintains a strong enforcement program for all issued authorizations. MVP will be required to schedule and conduct a pre- construction meeting to understand condition compliance and shall report any non-compliance activities, including but not limited to sediment impacts to streams and wetlands, to DWR Central Office. If MVP becomes aware of any inability to comply with any of the conditions of the 401 Water Quality Certification, they must notify DWR Central Office within 24 hour s. The plan, titled: Best Drilling Practices, Mountain Valley Pipeline Inadvertent Return Plan (April 2025), provides prescriptive responses to protect water quality if an inadvertent release were to occur Comment: Concern that the proposed project plans to withdraw water from the Dan River to conduct pipeline testing and whether there would be substances of concern in the water prior to discharge back into local streams. Response: The hydrostatic testing of the pipeline will be utilized to test new or clean and certified polychlorinated biphenyl (PCB)-free pipes. MVP will adhere to the sampling and monitoring requirements of representative N C National Pollutant Discharge Elimination System individual permits. Before any discharge of test water to surface waters, MVP must receive a discharge permit authorizing such discharge. Comment: Concern that application materials are not specific enough for each impact location. Response: The applicant has provided construction plans which describe in detail all steps and measures to be employed to protect downstream water quality during trenching activities. All open cut crossings will be dewatered during pipe placement and immediately restored upon completion. DWR staff are satisfied with the level of detail provided within the application materials as well as additional information that has been provided . Comment: A vast majority of the comments were related to concerns that new pipelines will contribute to worsening climate change. Commenters requested NC to seek/use more renewable energy sources. Response: While we understand the concerns expressed by the commenters, the comment is outside the evaluation criteria established in state law for the Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 9 review of 401 WQCs including the North Carolina Administrative Code and the review provisions set forth for energy transmission projects such as this one set forth in NCGS 143-214.1A. Comment: Some comments were related to concerns of an increase in electric utility rates for residential customers being supplied by MVP. Commenters requested NC to seek/use more renewable energy sources Response: While we understand the concerns expressed by the commenters, the comment is outside the evaluation criteria established in state law for the review of 401 WQCs including the North Carolina Administrative Code and the review provisions set forth for energy transmission projects such as this one set forth in NCGHS 143-214.1A. Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 10 IV. Recommendations Based on the review of public comments, the application and additional information, the North Carolina General Statutes and Administrative Code, and discussions with DWR staff, I offer the following comments and recommendations on the criteria for issuance of a 401 WQC pursuant to 15A NCAC 02H .0506(b): (1) “Has avoided and minimized impacts to surface waters and wetlands to ensure any remaining surface waters or wetlands, and any surface waters or wetlands downstream, continue to support existing uses during and after project completion;” MVP has designed the proposed project such that it minimizes impacts to surface waters and wetlands to a practical extent. Crossings of the Dan River and Cascade Creek will be conducted using trenchless methods to avoid sensitive aquatic ecosystems. The proposed temporary impacts are consistent with other linear projects constructed throughout the state. The project design demonstrated minimization by proposing a narrower construction corridor when crossing wetlands and streams. Temporary impacts to stream and wetland areas will be restored to the original contours and revegetated with native plants in accordance with the temporary stream and wetland restoration plan. Upon successful completion of the restoration and monitoring activities, the stream and wetland impact areas will continue to support existing uses of hydrology, vegetation, and aquatic and wildlife habitat. The applicant has committed to several best management practices to avoid and minimize impacts to streams and wetlands. These include: • Demarcation of wetland boundaries with flagging and signs prior to start of construction; • Use of temporary work bridges, matting and pads to reduce the risk of soil compaction ; • Backfilling of trenches using native material to prevent soil contamination and to accelerate revegetation; • Reducing the width of the Right of Way (ROW) to 75-ft; • Establishment of a 50-ft buffer within the ROW which grubbing or belowground vegetation removal will not occur until the commencement of pipeline construction; • Installation of trench breakers or plugs at the boundaries of wetlands to prevent draining of wetlands; • Use of an energy dissipation/sediment filtration device prior to discharging to waterbodies during pump-out activities in work areas; • Use of trenchless methods such as conventional boring or horizontal directional drill (HDD) for Dan River and Cascade Creek; • Use of additional erosion control measures and schedules beyond the minimum required by the NC Erosion & Sediment Control Planning and Design Manual; and • Coordination with resource agencies such as the USFWS and the North Carolina Wildlife Resource Commission (NCWRC) to identify sensitive species, survey locations, and time of year restrictions. Recommendation: Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 11 The applicant has sufficiently demonstrated that impacts to surface waters and wetlands are required due to spatial considerations, natural features and the purpose of the project. The 401 WQC should require: 1) Monitoring of temporary impact areas in accordance with the proposed restoration and monitoring plan; and 2) Continued coordination with resource agencies and adherence to survey requests and time of year restrictions; and 3) Pre-construction meeting with construction contractors, MVP staff, DWR staff, DEMLR staff, and any other required agencies to review conditions prior to any impact occurring; and 4) The Permittee has agreed to adhere to the following for water withdrawal from the Dan River: i. Comply with the NC Water Withdrawal Registration procedures in GS 143-215.22H ii. The intake shall be designed with an intake screen system such that: 1. The temporary intake is suspended in an area greater than 5 feet in water depth (above functional substrates) 2. The maximum intake velocity of 0.25 ft/sec through a mesh screen with openings not to exceed 1.0 millimeters. 3. The system to clean the mesh screen is designed to minimize impacts to eggs, larvae, and juvenile species. iii. The intake structure shall be marked in a manner that will reduce hazards to navigation. iv. Water withdrawals shall not occur between May 15-July 31 to protect sensitive fish and mussels in the Dan River. v. Permanent instream infrastructure shall not be installed without approval. vi. Maintain minimum pass-by flows (<10% of instantaneous riverflow). (2) “Would not cause or contribute to a violation of water quality standards ;” The main risk to surface and groundwater from the project will be during construction. These risks include sedimentation and turbidity in surface waters , breaches of drilling fluids during HDD, and spills of petroleum products and hydraulic fluids from fueling and equipment maintenance. The applicant has committed to working in the dry for all stream crossings. Proper erosion and sedimentation control measures will be required for the entire project in accordance with an Erosion and Sediment Control Plan Approval from DEMLR. All temporary fill placed in surface waters related to construction of the pipeline will be removed once Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 12 installation of the pipeline is completed at the crossing . The stream banks and wetlands will be restored to the original contours and revegetated with a native seed mix to prevent erosion. Monitoring of the temporarily impacted areas will be required. Operation of the pipeline is not expected to have adverse effects on surface waters and groundwater. The applicant has committed to deploying reinforced or enhanced ESCs, temporary sediment basins, and rapid stabilization techniques to address concerns regarding potential sedimentation and turbidity during construction of the pipeline. Recommendation: The project is not expected to violate water quality standards if the certification is issued and if the conditions in the 401 WQC are fully complied with by the applicant (or its successor). The 401 WQC should also be contingent on the issuance of a n Erosion and Sediment Control Plan Approval issued by DEMLR. The 401 should also require compliance with proposed construction sequences, including voluntary measures provided by the applicant to prevent additional impacts, and measures to ensure water quality protection during construction. (3) ”Would result in secondary or cumulative impacts that cause or contribute to, or will cause or contribute to, a violation of water quality standards ;” The proposed project will consist of temporary impacts from the installation of the pipeline. There is the potential for sedimentation and temporary disturbance of aquatic and riparian habitat during construction. The impacts will be reduced through avoidance and minimization efforts, erosion and sedimentation control and stormwater best management practices (BMPs), and spill prevention, control, and countermeasure practices. In accordance with DWR’s 401 WQC Cumulative Impact Policy, the applicant completed a qualitative analysis and concluded that there was no potential for secondary growth as a result of the proposed project other than from short term temporary (construction) impacts. The applicant stated they will coordinate with Transco SSEP project team on construction activities to reduce simultaneous activities along with implementing enhanced erosion and sediment controls, creating a contingency plan and adaptive management plan, and coordinating with the DWR on construction progress. Recommendation: In accordance with DWR’s 401 WQC Cumulative Impact Policy the project is not expected to result in cumulative impacts that violate water quality standards, if the conditions in the 401 WQC are fully implemented by the applicant (or its successor). (4) “Provides for replacement of existing uses through mitigation;” DWR requires mitigation [15A NCAC 02H .0506(h)] at a minimum of a 1:1 ratio for loss of existing functions within perennial streams where impacts total above 300 linear feet and at a minimum of a 1:1 ratio for loss of existing functions within wetland impacts where impacts are equal to or greater than 0.10 acre. The project does not propose any permanent stream impacts that will result in permanent loss. All permanent impacts to Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29 13 wetland will be for conversion from forested wetland to herbaceous wetland which will not constitute a loss of function and therefore will not require mitigation by DWR. The applicant has committed to mitigate for all proposed permanent stream impacts and wetland conversion impacts in North Carolina through NC DMS. Recommendation: No mitigation is required for stream or wetland impacts as a result of the proposed project. The 401 WQC should be conditioned to include language requiring mitigation should the project change or otherwise result in additional permanent impacts that exceed mitigation thresholds. V. Summary Public comments received during the public hearings and public notice comment period focused on several major areas, including the degradation of water quality, project justification, concerns for human health, sedimentation and erosion control, the permitting process, and ground and surface water supply protection. Due to the number of public comments, many of which expressed concerns on the same issues, each comment is not addressed individually. Rather, the comments were categorized into major subject areas where responses and recommendations could be presented in a coherent manner. Only comments that have direct relevance to the 401 WQC decisions have been addressed in the recommendations (Section IV). As stated above, a thorough review of public comments received, and the project record has been conducted and evaluated in context of pertinent statutes and regulations governing the review of 401 WQC applications. Based on this information, it is my recommendation that the 401 WQC be issued and subject to the conditions included in the recommendations in Section IV. It is further recommended that DWR include any additional conditions necessary to ensure that the project will meet state water quality standards. Docusign Envelope ID: 6F51064A-49C1-4B1A-B673-633E2B6D6C29