HomeMy WebLinkAboutNCDEQ_AddInfoRequest2-Letter Response 09.12.2025September 12, 2025
Samantha Wooten
401 & Buffer Permitting Branch
North Carolina Department of Environmental Quality
Division of Water Resources
512 North Salisbury Street
Raleigh, NC 27699
RE: Response to North Carolina Department of Environmental Quality
Request for Additional Information
Mountain Valley Pipeline, LLC – MVP Southgate Amendment Project
DWR #20181638 v4
Dear Ms. Wooten:
Mountain Valley Pipeline, LLC (Mountain Valley) submits the enclosed responses to the North
Carolina Department of Environmental Quality (DEQ), Division of Water Resources (Division)
Request for Additional Information dated 21 August 2025 regarding the Individual Water Quality
Certification Application for the MVP Southgate Amendment Project.
Division Information Request No. 1:
The Division received a comment expressing concern over the potential for pollutants to be
discharged to surface waters from the hydrostatic testing of the pipeline. Please provide any
historical testing documentation or studies to address this concern. [15A NCAC 02H .0506(b)(3)]
Mountain Valley Response to Information Request No. 1:
Hydrostatic test water will be utilized to test only new or cleaned and certified PCB-free pipe. If
chemical methods are used to clean pipes, chemical-laden water would be collected and disposed
of at an approved waste facility. Mountain Valley will adhere with the sampling and monitoring
requirements of representative North Carolina NPDES individual permits that include provisions
addressing hydrostatic test water discharges. This includes sampling the water for Total Petroleum
Hydrocarbons, Oil and Grease, Total Organic Carbon, Total Suspended Solids, pH, Turbidity, and
Total Residual Chlorine prior to discharge. If Mountain Valley utilizes an approved waste facilty
for disposal of hydrostatic test water, it will adhere to the sampling requirements imposed by that
facility.
To minimize environmental impacts during hydrostatic testing of pipeline segments, discharge water
will be managed to avoid direct release into surface waterbodies. All dewatering activities associated
with hydrostatic water will occur through the use of a dewatering structure which will be constructed
in a stabilized, well vegetated area, away from waterbodies and wetlands, and sized according to the
intended use. Discharge activities will be carefully monitored to prevent erosion and flows into any
waterbody. If a surface water discharge is unavoidable, Mountain Valley will apply for a discharge
permit prior to discharging hydrostatic test water.
The test water will be collected and routed to upland areas with sufficient infiltration capacity,
utilizing temporary containment structures and energy dissipation devices to prevent erosion.
Discharge will occur over vegetated surfaces to promote natural filtration, and sediment control
measures such as silt fences and straw wattles will be installed as needed.
Division Information Request No. 2:
The Division received numerous comments expressing concern over potential sedimentation and
turbidity from the construction of the pipeline. In particular, the concerns note that most of the
proposed stream crossings within the project limits are on unnamed tributaries that drain to the Dan
River. As noted in the application, the Dan River supports multiple federal and state species of
concern. The Division recognizes that the Division of Energy, Mineral and Land Resources
(DEMLR) will review and approve the Sediment and Erosion Control Plan for the proposed project.
Please identify any construction sequencing, or additional measures you will employ above the
minimum requirements to address this concern. [15A NCAC 02H .0506(b)(3)]
Mountain Valley Response to Information Request No. 2:
In addition to implementing the controls outlined in the North Carolina Erosion and Sediment
Control Planning and Design Manual, other sequencing and construction methods will be applied to
further protect aquatic resources.
For every waterbody, a buffer will be added to both sides of each crossing to ensure that any
transitional area is also treated as an environmentally sensitive area. Buffers will extend 50 feet
where possible, or as far as topographic conditions permit, along the right-of-way from where the
trench centerline enters the waterbody.
Also, to minimize impacts to waterbody crossings, they will be treated as separate construction
entities, except during clearing activities, and efforts will be made to cross these areas during low
flow conditions. Once grubbing and grading starts at a waterbody crossing, it will be actively
conducted for consecutive days until the crossing is completed and the work area restored.
And finally, both the Dan River and Cascade Creek mainstems will be crossed using trenchless
construction methods to avoid impacts to protected species.
Division Information Request No. 3:
The Division received numerous comments expressing concern over potential sedimentation and
turbidity during construction of the pipeline when considered as a cumulative impact with other
proposed pipeline construction projects within the same watersheds. In particular, the concerns
note that most of the proposed stream crossings within the project limits are proposed to be impacted
by the adjacent Transco SSEP project which appears to have a similar or overlapping proposed
construction schedule. A secondary and cumulative analysis was provided with the application
materials, however it is based on “post construction” long term impacts to the watershed and does
not address the very specific concerns submitted to the Division regarding cumulative impacts
during construction. Please provide a response to this concern. [15A NCAC 02H .0506(b)(3)]
Mountain Valley Response to Information Request No. 3:
The “overlapping” construction schedules for the Amendment Project and SSEP do not present a
material risk of cumulative impacts to streams crossed by both projects. The dry ditch, open cut
crossing method is a mature practice. Instream impacts from the use of this crossing method are
generally limited in both duration and area.1 The primary effects associated with temporary
instream work—increases in suspended particulates and turbidity levels—generally dissipate
within one to four days. Suspended particulate and turbidity levels in the water column attenuate
not only with time but also with distance. Elevated suspended particulate and turbidity levels in
the water column tend to approach background levels within a few hundred feet downstream of a
crossing.
To create the potential for additive, synergistic, antagonistic, or other cumulative effects on water
quality in a stream crossed by both projects, the parties’ respective crossings would have to be
completed roughly contemporaneously (within the span of a few days) and at locations no more
than a few hundred stream-feet apart. That scenario is highly unlikely. First, many of the projects’
crossings of common streams are much farther apart. Second, the instream work for an open cut
crossing typically lasts from 1 to 7 days, and these crossings will be installed over the course of
approximately one year. Even if the overall construction schedules align, it is very unlikely that
the Amendment Project and SSEP will happen to cross the same stream at the same time.
In the unlikely event that Amendment Project and SSEP commence open cut crossings of a single
stream at the same time, the magnitude of the potentially “cumulative” short-term effect on water
quality will be minimal. The increase in turbidity levels downstream from an open cut crossing are
“small and considered to be minimal compared to increased turbidity associated with natural runoff
events.”2 Given that the increase in turbidity levels downstream from a single open cut crossing
would be less than the increase that would be expected from a natural runoff event, and given the
wide range of storm intensities that cause runoff events, it is reasonable to conclude that the
additive effect of two open cut crossings would not be produce turbidity levels that are outside the
wide range of natural variability. Furthermore, the projects’ respective crossing points are never
less than 70 feet apart, meaning that the magnitude of turbidity increases from the upstream
crossing would be attenuated to some degree before they could combine with increases from the
downstream crossing. Lastly, it is important to bear in mind that even the “worst-case” conditions
resulting from simultaneous crossings of the same stream would return to normal within one to
four days.
Nevertheless, Mountain Valley is coordinating with Transco to minimize the potential for
cumulative impacts and other issues during construction. Mountain Valley will implement the
following measures for this purpose:
1. Construction Scheduling Coordination
Mountain Valley is actively coordinating with the Transco SSEP project team to coordinate
and stagger construction activities within shared workspaces. Where practicable, Mountain
Valley and Transco may utilize the same crew to perform certain work activities for both
projects in areas that utilize the same workspaces. This approach is intended to minimize
simultaneous earth-disturbing activities in close proximity, thereby reducing the potential
for compounded sedimentation and turbidity impacts to aquatic resources.
1Refer to Sections 4.4.13 and 5.1.13 of Mountain Valley’s Joint Permit Application and the sources cited therein.
2 FERC, 2020 FEIS at 4-92.
2. Enhanced Erosion and Sediment Controls (ESCs)
In addition to the measures outlined in the Question #2 response, Mountain Valley will
deploy enhanced ESCs at stream crossings and sensitive areas, including:
a. Reinforced or enhanced ESCs, where appropriate. For example, super silt fence or
triple-stack compost filter sock;
b. Temporary sediment basins;
c. Rapid stabilization techniques (e.g., hydroseeding, erosion control blankets). These
measures will be maintained and monitored throughout construction to ensure
effectiveness.
3. Contingency Planning and Adaptive Management
Mountain Valley will be prepared to deploy supplemental ESC measures and implement
temporary work stoppages if cumulative impacts are observed. Adaptive management
strategies will be employed based on field conditions.
4. Agency Coordination and Reporting
Mountain Valley will provide regular updates to the Division on construction progress and
ESC performance. This will include documentation of coordination efforts with the
Transco SSEP project to demonstrate proactive management of cumulative impacts.
We are committed to minimizing environmental impacts during construction and ensuring that
cumulative effects are effectively managed through coordination, monitoring, and adaptive
mitigation strategies.
***
Mountain Valley appreciates the opportunity to provide this additional information and looks
forward to continuing to work with DEQ regarding the Project.
Sincerely,
Jeffrey Klinefelter
Mountain Valley Pipeline, LLC
cc: Dicky Harmon, USACE Raleigh Regulatory Field Office
Olivia Munzer, NCWRC
DWR WSRO
DWR 401 & Buffer Permitting Branch File
John Tessier, Mountain Valley Pipeline, LLC
Cory Chalmers, Mountain Valley Pipeline, LLC
Lori Ferry, Burns & McDonnell Engineering Company, Inc.
Christian King, Burns & McDonnell Engineering Company, Inc.