Loading...
HomeMy WebLinkAboutNCC242640_Annual Fee NOD Letter (2025 Fee) Email_20250915 Subject: Notice of Deficiency for NCC242640 To Recipients: nuwan.wijesuriya@duke-energy.com;nuwan.wijesuriya@duke- energy.com;nuwan.wijesuriya@duke-energy.com; Date Sent: 2025-09-15T23:41:16.2198846Z Sender: DoNotReply- DEQPermits@deq.nc.gov AttachmentCount: 1 September 15, 2025 Duke Energy Progress, LLC. Attn: Nuwan Wijesuriya 410 South Wilmington Street Raleigh, NC 27601-1849 Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. INV-011845 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$127 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 8/1/25 and was due on 08/31/25.The annual fee applies to the following construction site: Camp Lejeune#1 230kV Substation Rebuild Holcomb Blvd Camp Lejeune Marine Corp Base, NC 28542 Onslow County Certificate of Coverage No. NCC242640 NC Reference No. NCG01-2024-2640 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (https://deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website (My AccessDEQ). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Tev Holloman at tev.holloman@deq.nc.gov. Sincerely, William E. Vinson,Jr., PE, CPESC, CPM Director Division of Energy, Mineral, and Land Resources