September 21, 2025
DWR # 20181638 v4
Rockingham County
Mountain Valley Pipeline, LLC
Attn: Mr. Jeffrey Klinefelter
2200 Energy Drive
Canonsburg, PA 15317
Delivered via email to: jeffrey.klinefelter@eqt.com
Subject: REQUEST FOR ADDITIONAL INFORMATION
MVP Southgate Project
Dear Mr. Klinefelter:
On August 12, 2025, the Division of Water Resources (Division) held a public hearing regarding your
application requesting a 401 Individual Water Quality Certification from the Division for the subject
project. The Division has conducted a review of oral and written public comments received thus far, and
the project file, and has determined that additional information is necessary for the Hearing Officer to
make a recommendation to the Division Director. Please respond to the following items by September
12, 2025:
1. The Division received a comment expressing concern over the potential for pollutants to be
discharged to surface waters from the hydrostatic testing of the pipeline. Please provide any
historical testing documentation or studies to address this concern. [15A NCAC 02H .0506(b)(3)]
2. The Division received numerous comments expressing concern over potential sedimentation and
turbidity from the construction of the pipeline. In particular, the concerns note that most of the
proposed stream crossings within the project limits are on unnamed tributaries that drain to the
Dan River. As noted in the application, the Dan River supports multiple federal and state species of
concern. The Division recognizes that the Division of Energy, Mineral and Land Resources (DEMLR)
will review and approve the Sediment and Erosion Control Plan for the proposed project. Please
identify any construction sequencing, or additional measures you will employ above the minimum
requirements to address this concern. [15A NCAC 02H .0506(b)(3)]
3. The Division received numerous comments expressing concern over potential sedimentation and
turbidity during construction of the pipeline when considered as a cumulative impact with other
proposed pipeline construction projects within the same watersheds. In particular, the concerns
note that most of the proposed stream crossings within the project limits are proposed to be
impacted by the adjacent Transco SSEP project which appears to have a similar or overlapping
D ��� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
NQRTH CAROLIN4
NPran 10�i— —919.707.9000
Docusign Envelope ID: 188D78F2-F7D3-458F-BOFC-A2C7F877C374 MVP Southgate
DWR# 20181638 v4
Request for Additional Information
Page 2 of 2
proposed construction schedule. A secondary and cumulative analysis was provided with the
application materials, however it is based on "post construction" long term impacts to the
watershed and does not address the very specific concerns submitted to the Division regarding
cumulative impacts during construction. Please provide a response to this concern. [15A NCAC 02H
.0506(b)(3)]
Please note that pursuant to 15A NCAC 02H .0503 the public comment period will remain open until
September 12, 2025. The Division may require additional responses to public comments that are
submitted by this deadline.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested
information for the proper consideration of the application. Please ensure that the Division is
immediately notified upon the USACE's decision regarding item #1 above.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this
activity and any work done within waters of the state may be a violation of North Carolina General
Statutes and Administrative Code.
Please contact Sue Homewood at 336-813-1863 or sue.homewood@deg.nc.gov if you have any
questions or concerns.
Sincerely,
ESSigned by:
ft p�G bass
980C5097D80E4E9_.
Stephanie Goss, Supervisor
401 & Buffer Permitting Branch
Electronic cc: Lori Ferry, Burns & McDonnell
Christian King, Burns & McDonnell
John Tessier, NextEra Energy
Dicky Harmon, USACE Raleigh Regulatory Field Office
Olivia Munzer, NCWRC
DWR WSRO
DWR 401 & Buffer Permitting Branch file
Filename: 20181638 v4 MVP Southgate - Rockingham - IP-addinfo-hearing comments.docx
D E Q� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
NORTH CAROLJNA
oaa.rt�.rtAE'.=; � 919.707.9000