Loading...
HomeMy WebLinkAbout20181638 Ver 4_More Info Requested_20250821Docusign Envelope ID: 188D78F2-F7D3-458F-BOFC-A2C7F877C374 JOSH STEIN Governor D. REID WILSON Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality September 21, 2025 DWR # 20181638 v4 Rockingham County Mountain Valley Pipeline, LLC Attn: Mr. Jeffrey Klinefelter 2200 Energy Drive Canonsburg, PA 15317 Delivered via email to: jeffrey.klinefelter@eqt.com Subject: REQUEST FOR ADDITIONAL INFORMATION MVP Southgate Project Dear Mr. Klinefelter: On August 12, 2025, the Division of Water Resources (Division) held a public hearing regarding your application requesting a 401 Individual Water Quality Certification from the Division for the subject project. The Division has conducted a review of oral and written public comments received thus far, and the project file, and has determined that additional information is necessary for the Hearing Officer to make a recommendation to the Division Director. Please respond to the following items by September 12, 2025: 1. The Division received a comment expressing concern over the potential for pollutants to be discharged to surface waters from the hydrostatic testing of the pipeline. Please provide any historical testing documentation or studies to address this concern. [15A NCAC 02H .0506(b)(3)] 2. The Division received numerous comments expressing concern over potential sedimentation and turbidity from the construction of the pipeline. In particular, the concerns note that most of the proposed stream crossings within the project limits are on unnamed tributaries that drain to the Dan River. As noted in the application, the Dan River supports multiple federal and state species of concern. The Division recognizes that the Division of Energy, Mineral and Land Resources (DEMLR) will review and approve the Sediment and Erosion Control Plan for the proposed project. Please identify any construction sequencing, or additional measures you will employ above the minimum requirements to address this concern. [15A NCAC 02H .0506(b)(3)] 3. The Division received numerous comments expressing concern over potential sedimentation and turbidity during construction of the pipeline when considered as a cumulative impact with other proposed pipeline construction projects within the same watersheds. In particular, the concerns note that most of the proposed stream crossings within the project limits are proposed to be impacted by the adjacent Transco SSEP project which appears to have a similar or overlapping D ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NQRTH CAROLIN4 NPran 10�i— —919.707.9000 Docusign Envelope ID: 188D78F2-F7D3-458F-BOFC-A2C7F877C374 MVP Southgate DWR# 20181638 v4 Request for Additional Information Page 2 of 2 proposed construction schedule. A secondary and cumulative analysis was provided with the application materials, however it is based on "post construction" long term impacts to the watershed and does not address the very specific concerns submitted to the Division regarding cumulative impacts during construction. Please provide a response to this concern. [15A NCAC 02H .0506(b)(3)] Please note that pursuant to 15A NCAC 02H .0503 the public comment period will remain open until September 12, 2025. The Division may require additional responses to public comments that are submitted by this deadline. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please ensure that the Division is immediately notified upon the USACE's decision regarding item #1 above. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Sue Homewood at 336-813-1863 or sue.homewood@deg.nc.gov if you have any questions or concerns. Sincerely, ESSigned by: ft p�G bass 980C5097D80E4E9_. Stephanie Goss, Supervisor 401 & Buffer Permitting Branch Electronic cc: Lori Ferry, Burns & McDonnell Christian King, Burns & McDonnell John Tessier, NextEra Energy Dicky Harmon, USACE Raleigh Regulatory Field Office Olivia Munzer, NCWRC DWR WSRO DWR 401 & Buffer Permitting Branch file Filename: 20181638 v4 MVP Southgate - Rockingham - IP-addinfo-hearing comments.docx D E Q� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLJNA oaa.rt�.rtAE'.=; � 919.707.9000