Loading...
HomeMy WebLinkAboutNCC231982_Annual Fee NOD Letter (2025 Fee)_20250815 ye ro+ 44,4 JOSH STEIN I rj Governor D.REID WILSON .W Secretory WILLIAM E.TOBY VINSON.JR NORTH CAROLINA Director Env6nnnwntalQuality August 15, 2025 Brookstone Village, Phase One- Lots 71, 72, 89 &95-97 Attn: Christopher Cates Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. INV-009331 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 6/30/25 and was due on 07/30/25.The annual fee applies to the following construction site: Brookstone Village, Phase One- Lots 71, 72, 89 &95-97 Watercress Lane &Tulip Oak Drive McLauchlin Township, 28376 Hoke County Certificate of Coverage No. NCC231982 NC Reference No. NCG01-2019-2276 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (https://deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website (My AccessDEQ). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Tev Holloman at tev.holloman@deq.nc.gov. Sincerely, William E. Vinson,Jr., PE, CPESC, CPM Director Division of Energy, Mineral, and Land Resources 1 \ ii4 ( I I1 I,.t Ii. of liii.i i I . IE ry,t I .II 1 —•\ ���