HomeMy WebLinkAboutNC0025437_EMC SOC WQ S24-002 NC0025437_20250730109 N Main Street P.0 Box 336 Rich Squarc, NC 27869 July 28, 2025 Town of Rich Square Raleigh Regional Supervisor Water Quality Regional Operation Section 1628 Mail Service Center Raleigh, NC 276990-1628 Re: SPECIAL ORDER BY CONSENT (SOC) EMC SOC WQ S24-002 Rich Square WWTP NPDES Permit NCO025437 Northampton County Dear Sir or Madam: Phone: 252-539-2315 Far: 252-539-3945 Website: richsquarenc.org JUL 3 0 M5 Attached please find the Town of Rich Square's Third Quarterly Report due July 30, 2025, as per the provisions of the Special Order of Consent (SOC) Schedule Table on Page 6 of said Order. Please advise if there are any questions or additional information required. Thank you for your attention to this matter. S'ncerelyy,, Victoria Newcombe Mayor Town of Rich Square Cc: Compliance & Expedited Unit NCDWR-NPDES Permitting Section 1617 Mail Center Raleigh, NC 27699-1617 109 N Main Street Town of Rich Square Phone: 252-539-2315 P.O Box 336 Fax: 252-539-3945 Rich Square, NC 27869 Website: richsquarenc.org July 28, 2025 Raleigh Regional Supervisor Water Quality Regional Operation Section 1628 Mail Service Center Raleigh, NC 276990-1628 Re: Town of Rich Square Third Quarterly Report SPECIAL ORDER BY CONSENT (SOC) EMC SOC WQ S24-002 Rich Square WWTP NPDES Permit NCO025437 Northampton County Dear Sir or Madam: JUL 3 0 2025 Since the last Quarterly Report dated April 25, 2025, the Town held a Progress Meeting on the Wastewater Treatment Plant (W WTP) Improvements. Please see the attached minutes of the meeting held on May 19, 2025. Richard Davis, Wastewater Specialist with North Caroline Rural Water Association (NCRWA) investigated and completed a Wastewater Treatment Plant Evaluation Report, dated May 30, 2025, as required under the terms of the SOC. A copy of the report is attached. With regards to the aerators at the W WTP, 1 and 2 are being replaced as one is inoperative and the other is failing. Aerator 7 is being replaced as the motor is broken. Aerator 5 is having some wiring repaired. The Rich Square Sewer Asset Inventory and Assessment project has begun to review and inventory the town's sewer system. A significant amount of inflow and infiltration is coming into the town's collection system. Several manholes have been identified in the ditch on Maggent Lane that have been significantly damaged by mowing equipment. These manholes are major inflow points and belong to Northampton County and were damaged by its mowing equipment. I am in communication with the County on this matter to insure they will make the needed repairs and avoid damage in the future. Raleigh Regional Supervisor July 28, 2025 Page 2 Attached are Waypoint Reports of Analysis from April 29 to June 12, 2025 for your review. Please advise if there are any questions or additional information required. Thank you for your attention to this matter. Sincerely, e L ng ORC Town of Rich Square Cc: Compliance & Expedited Unit NCDWR-NPDES Permitting Section 1617 Mail Center Raleigh, NC 27699-1617 ES ENGINEERING SERVICES, PA 1202 Benson Road Suite 200 P.O. Box 1849 Garner, NC 27529 Telephone: 919.662.7272 Fax: 919.662.7320 PROGRESS MEETING WWTP IMPROVEMENTS — Contract-2 TOWN OF RICH SQUARE, N.C. May 19, 2025 NCDEQ Project #SRP-W-ARP-0276 ES Project #202301-CA MINUTES OF MEETING ATTENDANCE LIST Name Representing Telephone Victoria Newcombe Town of Rich Square (910) 539-2315 Mayor of Present Christine Bass Town of Rich Square (910) 539-2315 Jeff Long Town of Rich Square (910) 539-2315 Public Works/WWTP mob: (252) 308-2984 Operator Kim Cole NCDEQ - DWI (252) 402-5796 of Present Bill Freed Enviro-Tech Unlimited (252) 564-7995 Site Superintendent I ontract-2 Chandler Price Engineering Services PA m: 919 608-7303 Brian Cox, P.E. Engineering Services, PA (919) 662-7272 Minutes of the meeting are as follows: 1. Bill Freed provided an update on the work completed and the status of the remaining work. 2. The bar screen, floating aerators and chemical feed equipment had startups and training last week. The setup of the deragging VFD units will be worked on today. The power cable for aerator #5 will be installed next week. The motor for aerator #7 is in route. 3. The group walked through the site to review the work and to identify additional improvements to the WWTP. 4. At the bar screen, the slide gate on the discharge end needs to be removed and stored. 5. The contractor needs to complete the heat trace and insulation of the bar screen wash water lines. The equipment warranty will begin when this is complete. 6. Jeff was satisfied with the installation and understands the operation and maintenance requirements for the bar screen and compactor equipment. 'A COMMITMENT TO EXCELLENCE" A Minutes of Progress Meeting May 19, 2025 Page 2 7. Aerator # 1 and #2 were not running. It was expected that they had rags that caused them to shut down. Bill will be working the deragging system at the end of the meeting. 8. Bill is communicating with the electrical engineer on the VFD installations in the motor control center and the site changes from the drawings. 9. The existing electrical service pull boxes, on the south side of lagoon, need to covered. Bill will provide a price to replace covers. 10. Aerators #3, 6 and 8 are installed in the lagoon and the startup training was completed last week. Jeff stated that he is satisfied with the installations and understands the operation and maintenance of the equipment. 11. Through conversations with the electrical engineer, Bill will raise the aerator power cable plugs. 12. The concrete outlet structure is serving as the normal outlet and the emergency outlet. The pond water level is operating at approximately 10" higher than normal. 13. The contractor will price cutting in a 60-degree v-notch 12" in the exist concrete wall to operate the pond level at normal pool elevation, with the emergency pool elevation being the top of wall. The grating in the box shall be replaced. 14. The contractor shall provide a price to move the two existing chemical tanks into the existing building, along with the connecting conduit piping and tubing to the chemical pumps. The electrical service for the lights and exhaust fan shall also be evaluated. 15. The chemical tank for hypochlorite was empty. Jeff discussed having the chemical delivered once a week in lieu of every two weeks. 16. Training for the chemical feed pumps was completed last week. Jeff stated that he is satisfied with the installations and understands the operation and maintenance of the equipment. He is currently working on the chemical feed adjustments needed with the changes in plant flow. 17. The junction box in the chemical feed panel needs a cover plate. 18. The blowers at the post aeration tank were operating. 19. Bill will submit a change order for the additional work noted above for the town to review. 20. The Contractor shall be solely responsible for maintaining a safe work environment for his crews and the public. The Contractor shall not allow alcohol, illegal drugs, or other unsafe practices at the work site. 21. The Contractor is totally responsible for the scheduling, directing, and performance of the project. Copies of these minutes will be distributed to all attendees. Please review the minutes and let me know if you have any comments. Sincerel Brian G. Cox, P.E. Engineering Services, P.A. cc: All Attendees 109 N Main Street Town of Rich Square Phone: 252-539-2315 P.O Box 336 Fax: 252-539-3945 Rich Square, NC 27869 Website: richsquarenc.org May 30, 2025 Attn: Vanessa Manuel, Assistant Regional Supervisor Water Resources Water Quality Regional Operations Section NPDES Program 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Ms. Manuel: JUL i n . Subject: SOC 90 Day Evaluation EMC SOC WQ 524-002 NPDES NC0025437 Town of Rich Square Northampton County The Town of Rich Square holds permit NPDES NC0025437 for the operation and maintenance of the town's wastewater treatment system. The town entered a Special Order by Consent (SOC) with the Environmental Management Commission on March 26, 2025, to address noncompliance issues associated with the noncompliance with permit limits. As required by the conditions of the SOC, the Town is submitting a required 90-day treatment unit investigation to provide the Department of Environmenta Quality and the Environmental Management Commission of an evaluation of improvements to the treatment facility. This information was formulated by the Wastewater Training & Technical Assistance division of the North Carolina Rural Water Association, with the assistance of representative Richard Davis, and is based on his visits to the facility, discussions with the staff and review of construction progress information and a review of laboratory data. • Solids Management Plan. Solids removal efforts were completed and measurements of sludge depths in the lagoon made with a total of 148 dry tons of solids removed. It is estimated that this effort resulted in the removal of 10-15% of the lagoon solids. Measurements of the remaining lagoon depths have been made, and priority is being determined for future sludge removal. The town is planning to review sources and methods for future sludge removal and instituting a preliminary program to address solids inventory and removal. • Headworks Improvements: Equipment identified as part of the headworks is nearing completion of installation and start-up and testing. Initial staff training has begun on the equipment currently installed and will follow-up with the implementation of standard operating procedures and related equipment maintenance service programs which will be based on manufacturers guidance. • Floating Aerators: Some aerators have been installed along with associated power cables. Initial start-up testing and training has been completed along with the operations staff involved in developing operations and maintenance procedures. Information obtained from the equipment maintenance documents is being utilized to develop a written planned program ensuring that documents maintenance history specific to each aerator are included to provide for longevity and service life of the aerators. Presently, additional on -site procedures to remove the accumulation of fibers the aerators, a major factor in service life of the aerators is being developed to improve short term reliability and operation of the floating aerators. • Chemical Feed Systems and Chemical Storage. Evaluation of chemical storage tank location is being considered along with plans to move two existing chemical tanks into existing structures to mitigate climate effects. Strategies for developing a more constant chemical purchase agreement are being evaluated to ensure continual chemical availability without degradation to chemical quality. Initial training for the use of the equipment has begun and operations staff are actively involved in adjusting chemical feed rates necessary for adequate treatment and disinfection with flow changes. The town will partner with the NC Rural Water Association for assistance and training in developing procedures to ensure a strategic plan is created to address concerns related to safety, spill containment and adequate chemical storage is attained on a continual basis. Conclusion, this 90-day evaluation has evidenced the positive outcomes of construction planning and operational activities needed to address deficiencies in the wastewater treatment facility. Further completion of the current contract will provide an expected improvement to treatment levels with a high level of confidence in meeting permitted performance. The town of Rich Square and its staff are dedicated to making progress and improving the performance of its wastewater treatment and protection of public health. If you have any questions regarding this evaluation, please contact Victoria Newcombe at 252- 539-2315 (o) or 252-518-1365 (c). Sincerely, te Victoria New&Me. yor Town of Rich Square July 2025 Town of Rich Square — Rich Square WWTP EMC SOC WQ S24-002 Table 1: Event Schedule Scheduled Activity Completion Date Date (due on or before) Completed Treatment Unit Investigation: Written report due No later than 90 days after SOC effective date May 30, 2025 Solids Management Plan: Written report due No later than 180 days after SOC effective date In Process Completion of Headworks, Floating Aerator and No later than 180 days after SOC Chemical Feed reference materials i effective date In Process Bid Date — Receipt of Bids from Contractors June 1, 2025 8/8/2024 Award Contract to Selected Contractor — Issue July 1, 2025 9/5/2024 Award Notice to Proceed (NTP) 1/16/2025 NTP Mobilize and Begin Construction and Operations Within 180 days of issuance of 1/27/2025 Notice to Proceed Mobilization Complete Headwork Improvements (bar screen, mechanical bar screen, and compactor), Targeted Sludge Removal from Lagoon, Floating Aerator No later than 360 days after SOC Improvements and Chemical Feed System effective date In Process Improvements ` Completed Contract -1 (Biosolids Removal) January 31, 2026 3/20/25 Construction and Operations Complete Contract-2 (WWTP Equipment January 21, 2026 In Process Replacement) Construction and Operations i Achieve compliance with NPDES final effluent May 1 2026 In Process limits • ���www►►►y, 114 Oakmont Drive, Greenville, NC 27858 Waypol■ ■LV Main 252.756.b208° Foxlnt 252 tical. coin ANALYTICALv+•WaypointanalyHoal.bom 00197 Town of Rich Square Jeff Long Project 197-Rich Square WW PO Box 336 Information Rich Square , NC 27869 Report Number: 25.154-0510 REPORT 0FANAL Y515 Report Date :06/lZ(2025- Received : 06/03/2025 Lab No : 86473 Matrix: Aqueous Sample ID : Influent Sampled: 6/3/2025 11:52 Test Results Units MOIL OF Date/Time By Analytical Analyzed Method Biochemical Oxygen Demand (5-day) 69 mg/L 40 1 06/03/25 11:57 )MMS 521OB-2016 Total Suspended Solids 24.5 mg/L 12,5 1 06/04/25 08:00 ANSI 2540D-2020 Lab No : 86474 Matrix: Aqueous Sample ID : Effluent - Sampled: 6/3/2025 11:37 Test Results Units MOL OF Date/Time By Analytical Analyzed Method Ammonia Nitrogen or0.02 mg/L 0.02 1 06/11/25 09:24 BLV 350.1 Biochemical Oxygen Demand (5-day) IMS mg/L 8.0 1 06/03/25 15:36 IMMS 5210B-2016 Fecal Coliform A000 b5 cfu/100mL 100 1 06/03/25 15:00 HMV 9222D-2015 Total Suspended Solids 39.0 mg/L 25.0 1 06/04/25 08:00 ANS1 2540D-2020 Qualifiers/ B Analyte detected in blank Definitions L Limit Exceeded OF Dilution Factor MQL Method Quantitation Limit Page 3 of 5 Waypo*1nit..4) ANALYTICAL 00197 Town of Rich Square 114 Oakmont Drive, Greenville, NC 27858 Main 252.756.6208 0 Fax 252.756.0633 www.waypolntanalytical.com Jeff Long Project 197 - Rich Square WW PO Box 336 Information Rich Square , NC 27869 Report Date: 06/01/2025 Report Number: 25-140-0504 REPORTOFANALYSIS Received: 05/20/2025 Lab No : 84565 Matrix: Aqueous Sample ID : Influent Sampled: 5/20/202510:40 Test Results Units MQL DF Date / Time By Analytical Analyzed Method Biochemical Oxygen Demand (5-day) 58 mg/L 40 1 05/21/2510:07 HMV 521OB-2016 Total Suspended Solids 49.3 mg/L 16.6 1 05/21/25 08:00 IMMS 254OD-2020 Lab No : 84566 Matrix: Aqueous Sample ID: Effluent Sampled: 5/20/202S 11:12 Test Results Units MQL DF Date / Time By Analytical Analyzed Method Ammonia Nitrogen .oW.02 mg/L 0.02 1 05/29/25 10:22 BLV 350.1 Biochemical Oxygen Demand (5-day) .60 mg/L 60 1 05/21/2510:29 HMV 521OB-2016 Fecal Coliform cfu/100mL 100 1 05/20/25 14:50 AAM 9222D-2015 Total Suspended Solids 7.5 mg/L 12.5 1 05 21/25 08:00 IMMS 254OD-2020 / Qualifiers/ DF Dilution Factor L Limit Exceeded Definitions MQL Method Quantitation Umit Page 2 of 4 • 114 Oakmont Drive, Greenville, NC 27858 wa g' nt Main 252.756.6208 ° Fax 252.756.0633 Y� www.w tntanal cal.com ANALYTICAL 00197 Town of Rich Square Jeff Long Project 197 - Rich Square WW PO Box 336 Information : Rich Square, NC 27869 Report Date: 06/29/2025 Report Number: 25-168-OSOS REPORTOFANALYMS Received : 06/17/2025 Lab No : 88645 Matra: Aqueous Sample ID : Influent Sampled: 6/17/2025 10:50 Test Results Units MQL DF Date / Time By Analytical Analyzed Method Biochemical Oxygen Demand (5-day) 29 mg/L 29 1 06/17/25 14:46. ANS1 5210E-2016 Total Suspended Solids 163 mg/L 62.5 1 06/18/25 09:00 BNC 2540D-2020 Lab No : 88646 Matrix: Aqueous Sample ID: Effluent Sampled: 6/17/202511:26 Test Results Units MQL DF Date / Time By Analytical Analyzed Method Ammonia Nitrogen A.04 mg/L 0.04 1 01/01/00 00:00 HMM 350.1 Biochemical Oxygen Demand (5-day) -09'6 mg/L 8.0 1 06/17/2514:46 ANS1 5210E-2016 Fecal Collform .. N C b5 cfu/100mL 100 1 06/17/25 14:55 AAM 9222D-2015 Total Suspended Solids /T43 mg/L 16.6 1 06/18/25 09:00 BNC 254OD-2020 Qualifiers/ B Analyte detected in blank Definitions L Umit Exceeded DF Dilution Factor MQL Method Quantitation Limit Page 3 of 5 w 114 Oakmont Drive, Greenville., NC 27858 Way-po,' nt ` Main 252.756.6208 ° Fax 252.756.0633 ANALYTICAL www.wayiQ � intarml cal.com 00197 Town of Rich Square Jeff Long Project 197 - Rich Square WW PO Box 336 Information : Rich Square , NC 27869 Report Date : 05/16/2025 Report Number: 25-126-0513 REPOR T OF A NA L YMS Received : 05/06/2025 Lab No : 82286 Matrix: Aqueous Sample ID : Influent Sampled: 5/6/2025 10:50 Test Results Units MOL DF Date / Time By Analytical Analyzed Method Biochemical Oxygen Demand (5-day) <2.0 mg/L 2.0 1 05/06/2511:19 IMMS 521OB-2016 Total Suspended Solids 70.0 mg/L 12.5 1 05/07/25 09:00 AAM 2540D-2020 Lab No : 82287 Matrix: Aqueous Sample ID : Effluent Sampled: 5/6/202511:15 Test Results Units MOL DF Date / Time By Analytical Analyzed Method Ammonia Nitrogen .S0,02 mg/L 0.02 1 05/07/25 13:02 BLV 350.1 Biochemical Oxygen Demand (5-day) .49 mg/L 8.0 1 05/06/25 15:44 IMMS 52108-2016 Fecal Coliform ,W6000 1b5 cfu/100ml. 100 1 05/06/25 15:44 AAM 9222D-2015 Nitrate+Nitrite-N I.M. 09 mg/L 0.04 2 05/12/25 11:36 MSK 353.2 Total Suspended Solids 1S.0 mg/L 25.0 1 05/07/25 09:00 AAM 254OD-2020 Total Kjeldahl Nitrogen $47 mg/L 0.50 1 05/15/2510:26 BLV EPA-351.2 Phosphorus OA--f5 mg/L 0.05 1 05/15/25 10:26 BLV 365.4 Qualifiers/ B Analyte detected In blank Definitions L Limit Exceeded DF Dilution Factor MQL Method Quantitatlon Umit Page 3 of 5