Loading...
HomeMy WebLinkAboutNC0025437_SOC_Report_20250730109 N Main Street Town of Rich Square Phone: 252-539-2315 P.O Box 336 Fax: 252-539-3945 Rich Square, NC 27869 Website: richsquarenc.org July 28, 2025 Raleigh Regional Supervisor Water Quality Regional Operation Section 1628 Mail Service Center Raleigh, NC 276990-1628 Re: SPECIAL ORDER BY CONSENT (SOC) EMC SOC WQ 524-002 Rich Square WWTP NPDES Permit NC0025437 Northampton County Dear Sir or Madam: RECEIVED JUL 3 0 2025 NCDEQ/DWR/NPDES Attached please find the Town of Rich Square's Third Quarterly Report due July 30, 2025, as per the provisions of the Special Order of Consent (SOC) Schedule Table on Page 6 of said Order. Please advise if there are any questions or additional information required. Thank you for your attention to this matter. S}ncerel%y, �,,� vll//�%tti' � Victoria Newcombe Mayor Town of Rich Square Cc: Compliance & Expedited Unit NCDWR-NPDES Permitting Section 1617 Mail Center Raleigh, NC 27699-1617 ,.: , 109 N Main Street P.O Box 336 Rich Square, NC 27869 July 28, 2025 Town of Rich Square Raleigh Regional Supervisor Water Quality Regional Operation Section 1628 Mail Service Center Raleigh, NC 276990-1628 Re: Town of Rich Square Third Quarterly Report SPECIAL, ORDER BY CONSENT (SOC) EMC SOC WQ S24-002 Rich Square WWTP NPDES Permit NCO025437 Northampton County Dear Sir or Madam: Phone: 252-539-2315 Fax: 252-539-3945 Website: richsquarenc.org Since the last Quarterly Report dated April 25, 2025, the Town held a Progress Meeting on the Wastewater Treatment Plant (WWTP) Improvements. Please see the attached minutes of the meeting held on May 19, 2025. Richard Davis, Wastewater Specialist with North Caroline Rural Water Association (NCRWA) investigated and completed a Wastewater Treatment Plant Evaluation Report, dated May 30, 2025, as required under the terms of the SOC. A copy of the report is attached. With regards to the aerators at the WWTP, 1 and 2 are being replaced as one is inoperative and the other is failing. Aerator 7 is being replaced as the motor is broken. Aerator 5 is having some wiring repaired. The Rich Square Sewer Asset Inventory and Assessment project has begun to review and inventory the town's sewer system. A significant amount of inflow and infiltration is coming into the town's collection system. Several manholes have been identified in the ditch on Maggettt Lane that have been significantly damaged by mowing equipment. These manholes are major inflow points and belong to Northampton County and were damaged by its mowing equipment. I am in communication with the County on this matter to insure they will make the needed repairs and avoid damage in the future. , Raleigh Regional Supervisor July 28, 2025 Page 2 Attached are Waypoint Reports of Analysis from April 29 to June 12, 2025 for your review. Please advise if there are any questions or additional information required. Thank you for your attention to this matter. Sincerely, e re L ng ORC Town of Rich Square Cc: Compliance & Expedited Unit NCDWR-NPDES Permitting Section 1617 Mail Center Raleigh, NC 27699-1617 rF—_'t ,1 ENGINEERING SERVICES, PA 1202 Benson Road Suite 200 P.O. Box 1849 Garner, NC 27529 Telephone: 919.662.7272 Fax: 919.662.7320 'A COMMITMENT TO EXCELLENCE" PROGRESS MEETING WWTP IMPROVEMENTS — Contract-2 TOWN OF RICH SQUARE, N.C. May 19, 2025 NCIDEQ Project #SRP-W-ARP-0276 ES Project #202301-CA MINUTES OF MEETING ATTENDANCE LIST Name Re resentin Telephone Victoria Newcombe Town of Rich Square (910) 539-2315 Mayor of Present Christine Bass Town of Rich Square (910) 539-2315 Jeff Long Town of Rich Square (910) 539-2315 Public Works/WWTP mob: (252) 308-2984 Operator Kim Cole NCDEQ - DWI (252) 402-5796 of Present Bill Freed Enviro-Tech Unlimited (252) 564-7995 Site Superintendent Contract-2 { Chandler Price Engineering Services, PA in: 919 608-7303 Brian Cox, P.E. Engineering Services, PA (919) 662-7272 Minutes of the meeting are as follows: 1. Bill Freed provided an update on the work completed and the status of the remaining work. 2. The bar screen, floating aerators and chemical feed equipment had startups and training last week. The setup of the deragging VFD units will be worked on today. The power cable for aerator #5 will be installed next week. The motor for aerator 97 is in route. 3. The group walked through the site to review the work and to identify additional improvements to the WWTP. 4. At the bar screen, the slide gate on the discharge end needs to be removed and stored. 5. The contractor needs to complete the heat trace and insulation of the bar screen wash water lines. The equipment warranty will begin when this is complete. 6. Jeff was satisfied with the installation and understands the operation and maintenance requirements for the bar screen and compactor equipment. Fy Minutes of Progress Meeting May 19, 2025 Page 2 7. Aerator 41 and #2 were not running. it was expected that they had rags that caused them to shut down. Bill will be working the deragging system at the end of the meeting. 8. Bill is communicating with the electrical engineer on the VFD installations in the motor control center and the site changes from the drawings. 9. The. existing electrical service pull boxes, on the south side of lagoon, need to covered. Bill will provide, a price to replace covers. 10. Aerators #3, 6 and 8 are installed in the lagoon and the startup training was completed last week. Jeff stated that he is satisfied with the installations and understands the operation and maintenance of the equipment. 11. Through conversations with the electrical engineer, Bill will raise the aerator power cable plugs. 12. The concrete outlet structure is serving as the normal outlet and the emergency outlet. The pond water level is operating at approximately 10" higher than normal. 13. The contractor will price cutting in a 60-degree v-notch 12" in the exist concrete wall to operate the pond level at normal pool elevation, with the emergency pool elevation being the top of wall. The grating in the box shall be replaced. 14. The contractor shall provide a price to move the two existing chemical tanks into the existing building, along with the connecting conduit piping and tubing to the chemical pumps. The electrical service for the lights and exhaust fan shall also be evaluated. 15. The chemical tank for hypochlorite was empty. Jeff discussed having the chemical delivered once a week in lieu of every two weeks. 16. Training for the chemical feed pumps was completed last week. Jeff stated that he is satisfied with the installations and understands the operation and maintenance of the equipment. He is currently working on the chemical feed adjustments needed with the changes in plant flow. 17. The junction box in the chemical feed panel needs a cover plate. 18. The blowers at the post aeration tank were operating. 19. Bill will submit a change order for the additional work noted above for the town to review. 20. The Contractor shall be solely responsible for maintaining a safe work environment for his crews and the public. The Contractor shall not allow alcohol, illegal drugs, or other unsafe practices at the work site. 21. The Contractor is totally responsible for the scheduling, directing, and performance of the project. Copies of these minutes will be distributed to all attendees. Please review the minutes and let me ]mow if you have any comments. Since I Brian G. Cox. P.E. Engineering Services, P.A. cc: All Attendees