Loading...
HomeMy WebLinkAbout20181638 Ver 4_More Info Received_20250715r-9 Mountain Valley PIPELINE uc July 15, 2025 Sue Homewood 401 & Buffer Permitting Branch North Carolina Department of Environmental Quality Division of Water Resources 512 North Salisbury Street Raleigh, NC 27699 2200 Energy Drive I Canonsburg, PA 15317 833-MV-SOUTH I mail@mvpsouthgate.com www.mvpsouthgate.com RE: Response to North Carolina Department of Environmental Quality Request for Additional Information Mountain Valley Pipeline, LLC — MVP Southgate Amendment Project DWR #20181638 v4 Dear Ms. Homewood: Mountain Valley Pipeline, LLC (Mountain Valley) submits the enclosed responses to the North Carolina Department of Environmental Quality (DEQ), Division of Water Resources (Division) Request for Additional Information dated July 2, 2025 regarding the 401 Individual Water Quality Application for the MVP Southgate Amendment Project. Division Information Request No. 1: In order to document that the project has avoided and minimized impacts to surface waters, please provide justification for the impacts proposed to W-F009 for the Additional Temporary Work Space (ATWS) as it appears that the ATWS could be located on the opposite side of the ROW. [I5A NCAC 02H.0506(b)(1)J Mountain Valley Response to Information Request No. 1: The Additional Temporary Work Space (ATWS) located at W-F009 cannot be relocated to the opposite side of the ROW, as there are three existing pipelines at this location. Shifting the ATWS to this location is not practicable, as it would require construction activities for the proposed pipeline to take place over existing pipeline corridors, leading to additional technical and logistical challenges. Furthermore, the proposed impacts to W-F009 are temporary and will be restored to preconstruction conditions. Division Information Request No. 2: Provide the exact location for the proposed water withdrawal from the Dan River for use as hydrostatic test water. Sue Homewood July 15, 2025 Page 2 Mountain Valley Response to Information Request No. 2: The exact location of the water withdrawal from the Dan River has yet to be determined; however, Mountain Valley will coordinate with DEQ in selecting the location. Division Information Request No. 3: Please provide an Agent Authorization Form which authorizes Lorri Ferry of Burns & McDonnell to act as signatory authority with regards to the 401 Certification request. A example form may be found on our website at [15A NCAC 02H.0502(a)(11)jl Mountain Valley Response to Information Request No. 3: Agent authorization for Lori Ferry of Burns & McDonnell to act as signatory authority was provided in the submitted application within Attachment E — USACE Wilmington District ENG Form 4345. A copy of the Wilmington District ENG Form 4345 is included in Attachment 1 of this response. Division Information Request No. 4: Public Hearing - The Director has determined that it is in the public's interest to hold a public hearing to receive public comment and additional information on the proposed project. This hearing must be held prior to taking final action on your application. The Division is in the process of scheduling the public hearing and will forward the details by separate letter. [15A NCAC 02H .0503(f)] Mountain Valley Response to Information Request No. 4: Mountain Valley acknowledges the decision from DEQ to hold a public hearing to receive public comment and additional information regarding the Amendment Project. Mountain Valley has also included shapefiles of the proposed limits of disturbances, delineated aquatic resources, and proposed impacts within this response per the DEQ email request on July 8, 2025. Aquatic resource impacts have been modified at several locations since the submittal of the application to account for travel lanes/maintenance corridors through wetlands that are being crossed by a conventional bore. Revised impact figures (Attachment 2) and tables (Attachment 3) are included within this response to reflect the current proposed impacts. Please modify Mountain Valley's application accordingly. Regards, Jeffrey Klinefelter Mountain Valley Pipeline, LLC 1 https:Hedocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2488211&cr=1 Sue Homewood July 15, 2025 Page 3 Enclosures Attachment 1: USACE Wilmington District ENG FORM 4345 Attachment 2: Updated Figure B-2 (Wetland and Waterbody Impacts) Attachment 3: Updated Impact Tables Table B-1 (North Carolina Stream Impacts) Table B-2 (North Carolina Wetland Impacts) Table B-3 (North Carolina Stream Impact Summary) Table B-4 (North Carolina Wetland Impact Summary) cc: Christian King, Burns & McDonnell Engineering Company, Inc. Lori Ferry, Burns & McDonnell Engineering Company, Inc. John Tessier, NextEra Energy Dicky Harmon, USACE Raleigh Regulatory Field Office Olivia Munzer, NCWRC DWR WSRO DWR 401 & Buffer Permitting Branch file ATTACHMENT I USACE WILMINGTON DISTRICT ENG FORM 4345 U.S. Army Corps of Engineers (USACE) Farm Approved - APPLICATION FORDEPARTMENT of THE ARMY PERMIT OMB No. 0710-0003 For use of this form, see 33 F 1 The proponent agency i E W Expires: 1 The public reporting burden for this colt tlon of information, OMB Control Number 07101 0 , i estimated to averageI I hours per response including the time for r T iew g instructions, earthing exist -In data sources' gathering andmaintainingthe data needed, and completing and reviewing the collection of information, Send comments regarding the burden estimateor burden reduc Jonsuggestionsto the Department of Defense, Washington Headquarters Services, G h I , 1�x.ddA d-inform io - . . Respondents 1de1 Its should be aware that not*4thsta 1din any other provision of law, no person shall be subject to any penalty for failing to comply th a collec on of Information ation i1 It does not display acurrentlyvalid OMB control number. PLEASE DO NOT RETURN YOUR APPLICATION TO THE ABOVE EMAIL, PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403, Clean Dater Act, Section 404, 33 USC 1344. Manne Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413, regulatory Programs of the Corps of Engineers, Final Mule 33 CFR- . Principal Purpose- Information pro d d on this form vA II be used its evaluating the application for a permit. l outine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal farms. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a pert be issued One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this appl1caUon (see sarnpie drawings andlor instructions) and be submitted to theDistrict Engineer having Jurisdiction over the location of the proposed activity. application that is not completed in full 1I be returned. System of Record Notice ( ). The information received is entered into our permit tracking database and a BORN has been completed #A11 b) and may be accessed at the following I b It - htip;//d[)cld.d nse.gp /Pn'va /SORNslnd D D# 1d - RN- f l - Ie /Article/57Ol l$l l -ce_asp (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1 _ APPLICATION NO. _ FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) . APPLICANTS NAME 8. AUTHORIZED AGE NTPS NAME AN D TITLE (agent is not required) First - Jeffrey WIdle # List - Klinefelter Fiat - Dori Middle - Last - Ferry Company - Mountain Valley Pipeline, LLC Company - BMCD EGS, P.C. E-mail Address -jeffrey.kl*lnefelter@eqt.com E-mail Add ress - I m ferr @ bumsmcd.com . APPLICANTS TADDRESS, 9 AGENT'SADDRESS: Address- 2200 Energy Drive Address- 1431 Opus P1 City - Canonsburg State ! PA Zip - 15317 Country -USA City - Downers Grove State - I L Zip ! 60515 Country -USA 7. APPLI ANT* PHONE Nos_WAREA CODE 10 AGENTS PHONE -w/AREA DE a Residence b. Business c. F ax a. Re si de nce b. Business c. Fax - 7 -1 7331-218-3688 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, Lori Ferry to act in my behatf as my agent in the processing of this application and to furnish, upon request, u pplemen ta 1 1nforrr a o n in support of th i hl6*pit ppli cation. ' 2 7.5 /SYNO%T P Ll CANT DATA NAME, LOCATION, AND DESCRIPTION F PROJECT OR ACTIVITY 1_ PROJECT DAME R TITLE (see Instructions) MVP Southgate Amendment Project Individual Permit Applicafion 13. NAME OF 1 ATEF B DY, IF KNOWN (if applicable) 1_ PROJECT STREET AERIE (if applicable) See Table 1, Table 2 and Table 3 Address See Table 8 1. LOCATION of PROJECT Latitude: o See Sections 1. 1. Longitude: a ity Statip_ 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID See Table 8 Municipality See Table ecbon - Township - Range - EhIG FARM 4345, .1LIN 2024 PREVIOUS EDITIONS ARE OBSOLETE. page 1 of 3 I DITIl THE SITE ee Section 1.7 in the attached application 18. Mature of A t'N (Description of project, include all features) See Section I in the attached application 1 _ Project Purpose (Describe the reason or purse of the project} see instructions) See Section 2 in the attached application USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 0. Reason() for Discharge See Section 1.0 and 4.0 in the attached application 1. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards See Table 2 and Table . Surface Area in Acres of Wetlands or Other WatersWateTs Filled (see instructions) Acres See Table and Table or Linear~ Feet- See Table 2 and Table 3. Deschption of Avoidance. Minimization, and Compensation (sea instructions) See Section 24 Is Any Portion of the Work AlreadyComplete'? Yes No IF YES, DESCRIBE THE COMPLETED WORK See Section 1 ., Figure 2, Table 25 Addresses of Adjoining Property Owners} Lessees} Etc., Whose Property Adjoins the Wa te rood (ft more trtw can be entered here pieaw epoch a sWplmdnerKal first) a Address- See Table City _ State - zip - h ddrss- City - State - Zip - c. Address - City - State - zip - d Address - City - State - Zip - . Address - City - State - zip 26 List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Desonihed In This Application. AGENCY See Table TYPE APPROVALM IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED * Mould include but is not restricted to zoning, building, and flood plain permits . Application is hereby rude for permit or permits to authorize the work described in this application. l certify that this information in this application M complete and accurate. 1 further certify that J possess the authority to undertake the work described herein or am acUng as the duty authorized agent of the applicant. y 0, / ? 31,;2 &/,A76.5� SI IVAT OF APPLICANT FDAT SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duty authorized agent 'if the statement in black 11 has been filled out and signed 18 U.C. Section 1001 provides that, Whoever, in any manner within the Jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictbous or fraudulent statements or entry, shall be fired not more than $10,000 or imprisoned not more than five years or both ENG FORM 2024 Page of ATTACHMENT 2 UPDATED FIGURE B-2 (WETLAND AND WATERBODY IMPACTS) o TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARYACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGING AREA SURVEY AREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT PERENNIAL WETLAND IMPACT ® TEMPORARY L,__J CONVERSION ® SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM COUNTY BOUNDARY '`20 ° ° PROJECT: MVP Southgate Amendment Project Q STATE BOUNDARY Rockingham County, North Carolina ELEVATION - CONTOUR - ° ° 0 100 200 TITLE. INDEX I FIG B-2 58 ° ° FEET NC WETLAND AND WATERBODY IMPACT ELEVATION -CONTOUR - Canville 1:2,400 1" = 200' INTERMEDIATE zzo \J' PAGE: 1 CL-062 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE M V P EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI, CGIAR, USGS, ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF NORTH CAROLINA DOT, © OPENSTREETMAP, S O U T H G AT E MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, i. ssing PEM: 084 RIP Proposed Open Cut Temporary Impact (Ac): 0.1102, Temporary Fill (cu.yrd): 1777 I I , I \� `I \,I \•I \, \ I I I � j j � I I'I I I 1, v i //, i// i % I �' / I !_ _/'_l — 7 ---------,1 W-FO15 PEM \ Temporary Access Road <' I I / /` J r----- Temporary Impact (Ac): 0.0006, TemporaryFill (cu.yrd): 3 / S F005 l / -- - i f i �' / /->> j \ Crossing #: 084 i i / / / ' % / \--;\ , - I/ % / . ' -_ ----� TA - Perennial 072 _ c'— •\ - _ i J / l ( /' / \ J `\ \ Proposed Open Cut Temporary Impact (linear feet): 79, Temporary Impact Area (Ac): 0.0054, Temporary Fill (cu.yrd): 88 / — 311 W-B029 PEM Timber Mat Crossing Temporary Impact (Ac): 0.0033, Temporary Fill (cu.yrd): 16 W-F016 PSS _ ^ 1 No Impact Avoiding W-B03lb Crossing #: 085A PSS Proposed Open Cut Conversion Impact (Ac): 0.2696, Temporary Fill (cu.yrd): 4350 \I I\ 1 W-B03la Crossing #: 085A PEM Proposed Open Cut Temporary Impact (Ac): 0.2289, Temporary Fill (cu.yrd): 3693 a o o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY Ley) Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENTACCESS STREAM IMPACT o a 1�" ROAD __ ®SECONDARY IMPACT J CONVERSION ELEVATION - CONTOUR - 0 100 200 TITLE METER STATIONS . TEMPORARY INDEX FIG B-2 LIMITS OF PERMANENT ELEVATION -CONTOUR - 58 gnW CaFEET nville 1:2,400 1" = 200' NC WETLAND AND WATERBODY IMPACT CONTRACTOR YARD r--. CONSTRUCTION WETLAND TYPE INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT — — H-650 PIPELINE OPERATIONAL EPHEMERAL � zzo �l PAGE: 2 PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED CL-063 ROAD INTERMITTENT PALUSTRINE SCRUB- NOTES: BORE PITS 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 TEMPORARYACCESS 41& PERENNIAL SHRUB SIZE SHEET. ROAD LAYDOWN YARD I 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE M V P ®PALUSTRINE EXCEPT WHERE SHOWN STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI, CGIAR, USGS, ESRI COMMUNITY MAPS SURVEY AREA BOTTOM CONTRIBUTORS, STATE OF NORTH CAROLINA DOT, © OPENSTREETMAP, S O U T H G AT E MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, 1 \ W-13031f \ W-B031e PSS No Impact L_' Avoiding \ Avoiding J {, "BOO r W-B030t�' PSS C� \ ` \ No Impact 1 Avoiding � W-B030a PEM No Impact ��'' Avoiding W-1303ld ^- V PSS — — — — — —I No Impact W-FO16 Avoiding PSS W B031 g No Impact EE PEM Avoiding No Im act p Avoiding W-B031c PSS No Impact I I W-B029 Avoiding PEM — — — — — Timber Mat Crossing. — _ Temporary Impact Ac 0.0033, _ _ _ _ _ ll — _ _ — o _ _ : " r-7! BOO —� —, Temporary Fill (cu.yrd): 16 — — — — — — — — I I {------- — — — T W-B031a Crossing #: 085A W-1303lb PEM Proposed Open Cut Crossing #: 085A Temporary Impact (Ac): 0.2289, PSS Temporary Fill (cu.yrd): 3693 Proposed Open Cut Conversion Impact (Ac): 0.2696, Temporary Fill (cu.yrd): 4350 1L> W-B028 Crossing #: 085B, 085C, 086A PEM Proposed Open Cut Temporary Impact (Ac): 0.796, Temporary Fill (cu.yrd): 12843 W-B056a Crossing #: 086A PSS Proposed Open Cut Conversion Impact (Ac): 0.0476, Temporary Fill (cu.yrd): 768 W-B027 Crossing #: 086B PFO Timber Mat Travel Lane/Maintenance Corridor Temporary Impact (Ac): 0.0283, _, Temporary Fill (cu.yrd): 137 i W-13027a Crossing #: 086B PFO J S-B034 Crossing #: 087 Perennial Conventional Bore No Impact - Proposed Bore / No Impact Avoiding Crossing Perennial Conventional Bore No Impact - Proposed Bore S-B035 Crossing #: 087 Perennial Conventional Bore No Impact -Proposed Bore o o TENTH MILE POST MILE POST TEMPORARYACCESS ROAD STREAM FLOW DIRECTION WETLAND IMPACT ® TEMPORARY COUNTY BOUNDARY Q STATE BOUNDARY )220 ° ° 1 iG PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina Q — — MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H 650 PIPELINE PERMANENTACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF r--. CONSTRUCTION WORKSPACE OPERATIONAL — WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT PERENNIAL L_®SECONDARY IMPACT J CONVERSION WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB- SHRUB PALUSTRINE UNCONSOLIDATED ELEVATION - CONTOUR - INDEX ELEVATION -CONTOUR - INTERMEDIATE 9Ta 58 gnW Canville O \f 0 1:2,400 100 200 FEET 1" = 200' TITLE . FIG B-2 NC WETLAND AND WATERBODY IMPACT PAGE: 3 CL-064 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DATE JULY 2025 M V P SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, S O U T H G AT E All ( '' W-1`008 Crossing #: 087 Y6` PEM Perennial ,� Timber Mat Crossing Conventional Bore II / Temporary Impact (Ac): 0.0393, No Impact —Proposed Bore7° Temporary Fill (cu.yrd): 190 TA-RO-077 TA-RO-077A ( ,i • / l — — — — �o — — — — — — — — — — — — — — — — — — — — — — — — — —�— — — — — — — — — —�\ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — • — — — — — — It It W-B053 Crossing #: 087 PEM Proposed Open Cut TA-RO-075 S-B034 Temporary Impact (Ac): 0.0441, Crossing #: 087 Temporary Fill (cu.yrd): Ill Perennial Conventional Bore No Impact —Proposed Bore -4— I0000 o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENT ACCESS STREAM IMPACT CONVERSION ELEVATION - CONTOUR - � ROAD � 0 0 100 200 TITLE: METER STATIONS TEMPORARY INDEX SECONDARY IMPACT FIG B-2 CONTRACTOR YARD LIMITS OF � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville FEET 1:2,400 1" = 200' NC WETLAND AND WATERBODY IMPACT WORKSPACE STREAM TYPE PALUSTRINE EMERGENT INTERMEDIATE � �� PAGE: 4 — — H-650 PIPELINE OPERATIONAL EPHEMERAL PALUSTRINE FORESTED zzo CL-065 PERMANENTACCESS — WORKSPACE NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS DATE: JULY 2025 TEMPORARYACCESS ROAD PERENNIAL SHRUB LAYDOWN YARD I ®PALUSTRINE SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN M V P STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, W-FO13 Crossing #: 087B PEM Proposed Open Cut W-17011 Temporary Impact (Ac): 0.026, Crossing #: 088 Temporary Fill (cu.yrd): 419 PEM Proposed Open Cut Temporary Impact (Ac): 0.0339, Temporary Fill (cu.yrd): 546 W-FO10 PEM Timber Mat Crossing/ATWS/Temporary Access Road Temporary Impact (Ac): 0.1008, Temporary Fill (cu.yrd): 488 ■TA-RO-0750 W-F009 Crossing #: 087C PEM Proposed Open Cut/ATWS/Temporary Access Road Temporary Impact (Ac): 0.8132, Temporary Fill (cu.yrd): 3936 s' moo W-FO12 Crossing #: 088 -RO-077 PEM Proposed Open Cut Temporary Impact (Ac): 0.0148, \ Temporary Fill (cu.yrd): 239 W-B009a Crossing #: 090 PFO Proposed Open Cut Conversion Impact (Ac): 0.1415, Temporary Fill (cu.yrd): 2282 L S-B015a Crossing #: 090 Intermittent Timber Mat Crossing Temporary Impact (linear feet): 15, Temporary Impact Area (Ac): 0.0009, Temporary Fill (cu.yrd): 4 W-II001 PEM No Impact Avoiding W-B007 W-13009b PEM _ Crossing #: 089 No Impact C►. o 0 0 ► PEM Avoiding / Proposed Open Cut r Temporary Impact (Ac): 0.0536, _ Temporary Fill (cu.yrd): 865 S-BO15 Crossing #: 090 /- �. - --- Perennial Proposed Open Cut PA RO 000o oft —,Temporary Impact (linear feet): 89, LN 360O Interconnect -1 Temporary Impact Area (Ac): 0.0091, Temporary Fill (cu.yrd): 147 S-B016a Intermittent No Impact Avoiding r� --- I S-F006 —__ Ephemeral — _--__S%' — �, ,II TA-RO-076 j No Impact Avoiding W-13010 Crossing #: 088 S-B013 PEM -- Intermittentf Proposed Open Cut/Temporary Access Road Temporary Access Road Temporary Impact (linear feet): 5, TemporaryImpact > �/ Temporary Fill (cu.yrd): Temporary Impact Area (Ac): 0.0007, \ \ r. -------- / / Temporary Fill (cu.yrd): 3 I _ J i ('> o o TENTH MILE POST MILE POST TEMPORARYACCESS ROAD STREAM FLOW DIRECTION WETLAND IMPACT ® TEMPORARY COUNTY BOUNDARY Q STATE BOUNDARY )220 ° ° � fl1'vJ PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina Q — — MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H 650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD PERMANENTACCESS � ROAD LIMITS OF CONSTRUCTION WORKSPACE OPERATIONAL — WORKSPACE BORE PITS LAYDOWN YARD I ® STAGING AREA STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 41& PERENNIAL LJ CONVERSION � ®SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB- SHRUB PALUSTRINE UNCONSOLIDATED ELEVATION -CONTOUR - INDEX ELEVATION -CONTOUR - INTERMEDIATE o a 58 � � Canville z2o 0 1:2,400 �'00 100 200 FEET 1" = 200' rlrLe. FIG B-2 NC WETLAND AND WATERBODY IMPACT PAGE: 5 CL-066 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DATE JULY 2025 M V P 7 SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, S O U T H G AT E Crossing #: 091 Ephemeral Timber Mat Crossing Temporary Impact (linear feet): 126, Temporary Impact Area (AI 0.0048, \ \ Temporary Fill (cu.yrd): 23 \� J S-13015a Crossing #: 090 \\ I Intermittent W-13008 r I I Timber Mat Crossing Crossing #: 092 ' Temporary Impact (linear feet): 15, PEM I I �) Temporary Impact Area (Ac): 0.0009, ° Proposed Open Cut Temporary Fill (cu.yrd): 4 Temporary Impact (Ac): 0.0101, PEIOv101 Temporary Fill (cu.yrd): 163 No Impact Avoiding —--- ------------- -- --------------------------------��'` S-B016a �1 L ittent % ( < % / — � /'�-/ /ipactng S-BO15 Crossing #: 090 Perennial V Proposed Open Cut Temporary p Impact linear feet 89, / Temporary Impact Area (Ac): 0.0091, Temporary Fill (cu.yrd): 147 W-B009a e v Crossing #: 090 PFO W-B007 PEM No Impact Avoiding Proposed Open Cut �0076 Conversion Impact (Ac): 0. 1415, / / Temporary Fill (cu.yrd): 2282 - ——-� ---�- II IIII -- _ _ _ \ / c.t I A(A I - S-13011 Crossing #: 093 0' / 1 // - Perennial I I I I/ '� ° Proposed Open Cut Temporary Impact (linear feet): 74, Temporary Impact Area (Ac): 0.0068, Temporary Fill (cu.yrd): 110 r I \ \-\,��----a S-BO17 �`v ����VAA. \,A\V A,\,�1, Crossing #: 092\, \`�\\\,1x\ I Intermittent A `1 \A 1'I'I'I I l j l Proposed Open Cut Temporary Impact (linear feet): 81, Temporary Impact Area (Ac): 0.0044, Temporary Fill (cu.yrd): 71 ,1 o o TENTH MILE POST MILE POST TEMPORARYACCESS ROAD STREAM FLOW DIRECTION WETLAND IMPACT ® TEMPORARY COUNTY BOUNDARY Q STATE BOUNDARY )220 ' ice) PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina Q — — MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD PERMANENTACCESS ROAD LIMITS OF rI CONSTRUCTION WORKSPACE OPERATIONAL r — WORKSPACE BORE PITS LAYDOWN YARD / ® STAGINGAREA STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 41& PERENNIAL __ ®SECONDARY IMPACT J CONVERSION WETLAND TYPE � PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB- SHRUB PALUSTRINE UNCONSOLIDATED ELEVATION - CONTOUR - INDEX ELEVATION -CONTOUR - INTERMEDIATE ° ° 58 gnW Canville zzo - �l 0 1:2,400 100 200 FEET 1" = 200' TITLE . FIG B-2 NC WETLAND AND WATERBODY IMPACT PAGE: 6 CL-067 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DATE JULY 2025 M V P 7 r-ISURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, S O U T H G AT E - '\ I \\\\ if �_ -\ -_�I_ \�l /i. `/� /I , < /I- __ �-\ =�\ / '=\" �- _- �'l�=, .�� �—\\I ,_� \l /�/I�%�\ If ' \�\ �/ 1� I,-\:� !J�1 •/ . � -1/"�/�i \/-'1 \! %_ �;`_-_ \,��, _ - , /\\ -/1 ' \loW-B052a l' � � %i/ �- -�_S"\_ \\i�- -_ s,-lB/��// %I/",I`'I1/ �� -� \-`-�- /� ';/� -1,�l-�\- '',l- -1\\\\ =/ —_ o'- _-,\ -/\` --� /�- -•1,�✓ \-,� _ . Crossing #: 094 T �/\/,j//'--,� I/I / PFO----- -'- �'/\ .\l \1 \l'_ ,-' �-_ \1 --`(\`.I/�.Iv —I _`�-_ ��_/-I/ _\�\ \\\\ 1 Ephemeral \/("\\. �_ 1 _ \\�\fi/-- / -'- - I/ - —_Timber Mat Crossing \ `,-_ �II\—� /�\ \�� —I _�'/ _/ -- -/—/I// _-i—\`/ TimerMat rossing Crossing W BO06 Temporary Impact (linear10, )/ � fIe-et -� I � / I-_,l_ -\ - Conversion Im act (Ac) 0.0294;-�-, � / `�/l `l_/, -�\__\I --"\, �\ -\/%;i\v- `__/-_�/ ,'I —/ _`'l �-/�'/� `l -\ �- �- /\-/ -�--,\\I,_�� ///, 6 PFO Temporary Impact Area Ac): o 000-� _ - —Fill (cu.yrd): 142 /' _-\ I -� __—i --/`r' -L I' \1/%I '_/;\/'��� ,\\�-- ", No ImpactTemporary Temporary Fill (cu.yrd): 3 I� I -\` - /I 1/'l, "T'I�-_ _\/-=� _�/\ I\I \I/\ \// I,1III/I \\ \I-'\ II// L'-1 \!.\-,/ Avoiding \-__--' _ \--_/\ \\ `/I I, �\ \\`-� ` II - � '!- I - - ) II II I �II �/l \�-1,I-I \/I,'l �1 \J/- \/ ,\�-`�' \/- \,/-// I- \\ �-'/,'- -��-�. �_ \�-;-�_�I� \� \ \_"_\ \\ .�'� \\` - _ \ II/ 1I �` I�I \ -- ' ' I - -��- ` 1 I)I/' 1/ I % I,1 /,'l,_I \I- ''/ �--/I- II --� I�/I ,'I '�I;='' �.,--',_�- I 1 ,l-I �1�I �\��a-/��' I\=I=_1 �' v/./ -\ \/'-\I//\ -` -1 \/%- I,—•.\ -_\\\-. II/ I/ rI ,\- -`I\. \_/�/_ \/-/I l.w� \`\\ I/�/ I -\` /_- \ ( \LJ /% I%- '\ \—��'/ l ll, �1I1 , , I _�\ v l .%` , \\ \\\�I JI \-�i/ v1 \J\\I1 \--/ ;/—\' �\\ I/,\ _�\�- -- � � _________ __________ _\ -/ �/\i �` _ _____________ _/ �\\\ (— T_\/ I - - - - - - - - - - - - - -.7 / -'>i \I _- `// '_ _'/ -, � ` -\ f,�/,-� =� -�I—/ \ ` ------------------ T- - � `I \\`-\�\\v - } --,-- I,I �-I\ -- -\ �`\`�\ f11\"'"'W\ > ------- ` \ I- ! I/ \I_) ;r Ii -\-'` I/ -\_\-,_\\- I�/I/-` l.,'\ \ I j\\ / �II,\I I- - --�I '1I �. I / / I //I/ I-� 1 (�-� _-;l��/-� �/_-- l. l / I , I 1 ',V j /�'\�\- ,\ �/-�,�, \`- /-�_/-�_,--�/; //_ !viJ/�%--\/ ,�._ I(--II1\ I,=I l/-,// / ) lIJ / 1 '�//� I1�\ j-,//- l/ (%!% /'IJ ''% I C/ II\ I 1- Jill - /\- ' l�%� \ /'-�, /I/J/ /I -\`��/� J i I=\ �� -.\v_�� 1/`'_-' I/ II � I I Ills I I' I / _-\' \ �\ /✓" //_ ,\\ /%/// l VI/ ' A-- /\ vIIj V-\ 1//\ v ' w Bos2bL' Crossing #:094 /� :\' \\ / �I I� ,/ /-_ J-� '�'- III_/ I\\ -1 /II �`" \ , -� PE A I S-13011 , TA-KO-078 ✓v \��\1 ,\l I� '.ce'\ -'`'i ,\," _�_�\-1 I-/T —;"/''J/, —,,-1�J') / -/ Proposed Open Cu/ J Crossing #: 093 Temporary Impact Ac): 0.0233rIt/ ' -- '_\i'� \`�--, --l- 'I'I- -� ��/' �\`-�\ -/\ `,I1- !/;/' 1/ Perennial Temporary Fill (cu.yrd): 376 \ / \.� Open Cut ` \ \ /,/-/� /1 j//l/ /I l- I- I�� \\\\\ \\1,I r- ------"Proposed ' .�`- \J-\\\�\ V`I l;-/T\ \\ �_�/- J\ /�-�1--_ /` \I/\�1I,l1'-\ \ '-\_\�\\I_\ `\ \�•-_,- -I /vI \_/\ .,\�\ / ` �_\ // / Temporary Impact (linear feet): 74, 1 \�- \ \ � j \\\ \` \, -// 1 ,-�/ \-\--�� !��,/_\� \� Temporary Impact Area (Ac): 0.0068, / � / . \ Temporary Fill (cu.yrd): 110 < // `/' \\/i '\. // /, /'//,I'II/ ,/ \_ \,\-�� ,1\--_- ,\`I \;_�1-`/ \'I� /�--\(�/ // \\ `\\`i \\. - ,, \ .. //i--\ \ ;� !/l///I ��\\ //%;\/ ,' \II �I\- \�\ \\- -IIl—' // .- --�/- -' /- ,_�'r� _-/� -I \1\I-\,l1 -1 -����\ `- \. \�\- %,//\_l, /-I�/ \\�\`_I/- ////,/-I��!��\�-II ////1 /�\-,,/_\// \\I\/ / \ \�\ II - . /,\ ,, I`� L, I '�/�1 /I L /%% ; ;\ I I\ /� /' /- ` 1 lilt /)/ \1I�,TI =- \ - r III /'�- �1; /_ \- \\/-v- // \; .�/\\/ -,--\ ,I '— ._ _\\\,'- „, i/\'-\ �l-� `_-\� \ /-Ij� \- ./II \j_\_ ,/. l� %\/ /'/,%-I �- /l /l/�l j// II�'1_ 1) //j /// `/ /:-/ / / - - _� / -- \ �` \ , 1\��„_ �� I 1 / %I \ 1) % lI -/ = l - ,�_ �, - �1/ i_\.I \�_\-/- :\�-- �l,/�,I_/ _-��� \'I_� -- \` �,\-- �� �-_/_ \- �'�\/--� .\—\_- \_\�_ /—,/�1II'/l \\�--\-- �I _l �(/ /% ��/ \.�-^•�\--� I'1Q`� ,I/II1// /I/�/`/ \-II��1' _\/ I\V //-J-\ "I_ \� I/ '//'\/, �.- ,-\ , \ _ \ 1./ I��\\1 I/'� I 1 � i' \\ I/l, ' = \`- \ ` \ \ \ ,. ! 'A\ �_—I \�I , j��` '`�\\ -�I,-I -I\ '�_-\ I\r 1� \I./I� -_-� A' .I) j- �- v-�\ /\/1 I/_-y�//_-/; -_�_._I,�-' I,/\�l/ ir ;. \-I� //1 \�-�- �I 'l II �% Il/I' I/ /\i �/,I I I • -\ `, „ IN,1 I . _ I/_I I- I,,/ ,I / I o TENTH MILE POST TEMPORARYACCESS STREAM FLOW WETLAND IMPACT COUNTYBOUNDARY ROAD DIRECTION Z20 1G PROJECTMVP Southgate Amendment Project Rockingham County, North Carolina o MILE POST ® TEMPORARY STATE BOUNDARY PERMANENTACCESS STREAM IMPACT QMAIN LINE VALVE ROAD CONVERSION ELEVATION - CONTOUR - aw 0 100 200 TITLE: �\/_��\ �_ METER STATIONS TEMPORARY SECONDARY IMPACT INDEX LIMITS OF FEET I FIG B-2 PERMANENT ELEVATION -CONTOUR - CONTRACTOR YARD CONSTRUCTION WETLAND TYPE � 58 Danville 1:2,400 1=200'NC WETLAND AND WATERBODY IMPACT PAGE: 7 INTERMEDIATE H-650 PIPELINE WORKSPACE STREAM TYPE dPALUSTRINE EMERGENT zzo OPERATIONAL EPHEMERAL PERMANENTACCESS WORKSPACE PALUSTRINE FORESTED INTERMITTENT CL-068 NOTES: ROAD PALUSTRINE SCRUB BORE PITS - PERENNIAL SHRUB 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" SIZE SHEET. DATE: JULY 2025 ►� M V P TEMPORARY ACCESS ROAD LAYDOWN YARD I ® STAGINGAREA PALUSTRINE 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E SURVEY AREA BOTTOM GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, %/ �/ ---� /%� -,\ \ \ \ \\\` \\ \\ \\\\\ \\ \\ \\\\\ \ \ \'\ `�'�\, \, ` \ ' `,�-, ` \i U 1Iv 1 no `7 J�J J', n I I , _ \\. _ _ \\ \� \` \ \ \ . j Crossing #: 096 \ \ \ \`\ ` Intermittent Proposed Open Cut Temporary Impact (linear feet): 90, Temporary Impact Area Ac 0.0118, Temporary Fill (cu.yrd): 190 \\ `\ \ \\ \\\\ W-BOOS Crossing #: 097 AVA\ PFO .\11,1�\ \ \ Proposed Open en Cut Conversion Impact (Ac): 1.7856, < c /' \ \ Temporary Fill (cu.yrd): 28807 <--� _-, \\ \`\`\\\ \ -==------- / / % / % % 1 \ 1\ \\ \ II \1-------- ___--/ % \ Crossin #: 095 47 Ephemeral / ) Proposed Open Cut Temporary Impact (linear feet): 75,—"------_— /;�;�- /%ii I Temporary Impact Area (Ac):0.0057, Temporary Fill (cu.yrd): 92 \ , r / ///,/, �;� �- / / /) I I (\ ( �� / �� _ = \\ `\ \,� -� ✓ __;\\ \ \ �' i-_ �/ �, TA RO hQ —_/ / , / / / , ^_ � \ �� ��\\ � \'l-. L- Lev'`\--•�/ � --_ \\ \ \ \1 \ \ '� n /' / ^ I I \ \� --_ __ \ / \ I �' / \ \ \ !/' 1 I -�-� �,__� /_ '/"\' ` ` � ' (l \\ ` �--.� , \ , \ \ \\ , . � _ I / , i \ I �„ • /" III' / // / ; , \; \ ��� ___-_ \` ` \\'\, � _ ,----=�\ -�-��� ` ) I ��- \�\\\` o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY Z,0 ° ° 1 PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENTACCESS STREAM IMPACT � � ROAD j CONVERSION ELEVATION -CONTOUR - 0 100 200 rlrLe. TEMPORARY INDEX METER STATIONS LIMITS OF ®SECONDARY IMPACT FEET FIG B-2 CONTRACTOR YARD CONSTRUCTION <2 PERMANENT ELEVATION - CONTOUR - WETLAND TYPE ss ° ° Danville 1:2,400 1"=200' NC WETLAND AND WATERBODY IMPACT INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT PAGE: 8 — — H-650 PIPELINE OPERATIONAL EPHEMERAL PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED INTERMITTENT CL-069 NOTES: ROAD PALUSTRINE SCRUB- BORE PITS 41& PERENNIAL SHRUB 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" SIZE SHEET. DATE JULY 2025 7 M V P TEMPORARYACCESS ROAD LAYDOWN YARD I ® STAGING AREA PALUSTRINE UNCONSOLIDATED 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS , S O U T H G AT E W-BOOS Crossing #: 097 PFO Proposed Open Cut Conversion Impact (Ac): 1.7856, Temporary Fill (cu.yrd): 28807 -----1--------------- \ \` W-GO03 Crossing #: 097 \ PEM Proposed Open Cut/ATWS/Temporary Access Road Temporary Impact (Ac): 0.0242, Temporary Fill (cu.yrd): 117 —�..�-----C-----------`-----c----_ - � ---� 500 late J \--- o TENTH MILE POST 0 MILE POST 0 MAIN LINE VALVE METER STATIONS CONTRACTOR YARD — — H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEYAREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 410 PERENNIAL WETLAND IMPACT ® TEMPORARY L CONVERSION W SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM J COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE o.o nville zzo \ THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" 7E SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE 2EPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF )RTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, \RMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, , R0 S-BOOS Crossing #: 098 Perennial Conventional Bore No Impact — Proposed Bore PROJECT ■ Southgate AmendmentProject © Rockingham County,•Carolina I 100 200 FIG B-2 1:2,400 FEET 1 200' ! di, I I �.ysz �Ii•�.�.,:: r MVPr_�br�►�►ii s� ��sw71/ • 0 S-B006 Intermittent Culvert Installation/Replacement Permanent Impact (linear feet): 21, Permanent Impact Area (Ac): 0.0021, Permanent Fill (cu.yrd): 9 L W-B003 Crossing #: 098 PFO Timber Mat Travel Lane/Maintenance Corridor Conversion Impact (Ac): 0.0399, Temporary Fill (cu.vrd): 193 S-B004 Crossing #: 098 Ephemeral W-B004 PEM ATWS Temporary Impact (Ac): 0.0232, Temporary Fill (cu.yrd): 112 W-B056 Crossing #: 099 PEM Proposed Open Cut Temporary Impact (Ac): 0.0391, Temporary Fill (cu.vrd): 630 i Conventional Bore � i No Impact — Proposed Bore i W-B051 v Crossing #: 098 PFO Timber Mat Travel Lane/Maintenance Corridor Conversion Impact (Ac): 0.0105, Temporary Fill (cu.yrd): 51 0 o TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD W-BO04a PSS ATWS Conversion Impact (Ac): 0.0403, Temporary Fill (cu.yrd): 195 S-B001 Ephemeral No Impact W-B002c PFO Timber Mat Crossing Conversion Impact (Ac): 0.0094, Temporary Fill (cu.yrd): 45 JI U—> W-B002d PFO No Impact Avoiding �d S-B003 Crossing #: 098 Intermittent Conventional Bore No Impact — Proposed Bore W-BOOlb S-BOOS PFO Crossing #: 098 ATWS Perennial Conversion Impact (Ac): 0.0523, Conventional Bore Temporary Fill (cu.yrd): 253 No Impact — Proposed Bore TEMPORARYACCESS STREAM FLOW WETLAND IMPACT ROAD DIRECTION ® TEMPORARY PERMANENTACCESS STREAM IMPACT ROAD � ® TEMPORARY �J CONVERSION LIMITS OF SECONDARY IMPACT p CONSTRUCTION PERMANENT WETLAND TYPE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT OPERATIONAL EPHEMERAL PALUSTRINE FORESTED WORKSPACE INTERMITTENT BORE PITS PALUSTRINE SCRUB - PERENNIAL SHRUB ® LAYDOWN YARD I PALUSTRINE STAGING AREA UNCONSOLIDATED SURVEYAREA BOTTOM W-FO17 PEM No Impact COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE - TA-RO EPA: Dan River Interconnect 1 W-BOOIa ' PEM ATWS Temporary Impact (Ac): 0.3582, Temporary Fill (cu.vrd): 1734 W-BOSS PEM Timber Mat Crossing/Temporary Access Road Temporary Impact (Ac): 0.0416, Temporary Fill (cu.yrd): 201 t82A LIE -on a o W-FO17 PEM No Impact COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE - TA-RO EPA: Dan River Interconnect 1 W-BOOIa ' PEM ATWS Temporary Impact (Ac): 0.3582, Temporary Fill (cu.vrd): 1734 W-BOSS PEM Timber Mat Crossing/Temporary Access Road Temporary Impact (Ac): 0.0416, Temporary Fill (cu.yrd): 201 t82A LIE -on a o oa 0 100 m 58 Danville 1:2,400 FEET zzo \J' 0 0 DTES: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE {CEPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DRTH CAROLINA DOT, ©OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, ARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS , \ \ W-13002b Crossing #: 100 � PFO Proposed Open Cut/ATWS/Temporary Access Road Conversion Impact (Ac): 0.173, Temporary Fill (cu.yrd): 838 W-B002a Crossing #: 100, 101 PFO '- Proposed Open Cut/ATWS Conversion Impact (Ac): 0.3549, Temporary Fill (cu.yrd): 1718 Dan River Interconnect 2 rxan. PRoJEcr: MVP Southgate Amendment Project Rockingham County, North Carolina 200 TITLE. � FIG B-2 1"-200' NC WETLAND AND WATERBODY IMPACT PAGE: 10 CL-071 DATE. JULY 2025 MVP SOUTHGATE IMP 311 --7 Crossing #: 084 PEM Proposed Open Cut Temporary Impact (Ac): 0.1102, Tem orary Fill cu. rd . 1777 \�\S�L`- i I \ \ \ \ \ \ Crossing #: 084 �,\ \\ \\ 1 �\ J Perennial A V �. A\ /♦ / / / --� —�V _ Proposed Open Cut �` ( `—� \ \\\�. / ♦/ ♦ / ♦ / Temporary Impact (linear feet): 79, '� 1 �,A ��� Temporary Impact Area (Ac): 0.0054, / \ 1 \ \ I \ Temporary Fill cu. rd 88 ( )� I ( p Y Y _ v 1) v v ♦/ / I I �,�--- I `> ����� \ A�\\ I �1 I � � I � �� I ICI I I � � � � � ♦♦♦/ I I I I �/ /� /� _ / / -/ J' I III I I ' I �' �' \ \ ♦/ / l„ / /�j/ ,���-�/ lI � �j Il l � I I � �/ it ♦///♦/ � fi / /� (\II �I�, ��I III` � /! / /♦ I 1 1' \ TA-RO-072 ( �-> l I V A ��� v'�- / / ♦/ W-FO15 \ / / /♦ PEM ♦ \ ` \ Temporary Access Road / / /' Temporary Impact (Ac): 0.0006, i I, Temporary Fill (cu.yrd): 3 ICI � '� I 'il i / � ♦� V �A\ o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT o MILE POST ROAD DIRECTION ® TEMPORARY COUNTY BOUNDARY Q STATE BOUNDARY 220 N PROJECT: MVP Southgate Rockingham Amendment Project County, North Carolina MAIN LINE VALVE L 0 PERMANENTACCESS STREAM IMPACT ROAD CONVERSION � i ELEVATION - CONTOUR - O 0 1 200 TITLE: TEMPORARY METER STATIONS LIMITS OF SECONDARY IMPACT INDEX FEET FIG B-2 CONTRACTOR YARD � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville 1:2,400 1" = 200' NC WETLAND AND WATERBODY IMPACT PAGE: 11 INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT — — H-650 PIPELINE 22o OPERATIONAL EPHEMERAL PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED INTERMITTENT AR-049 NOTES: ROAD PALUSTRINE SCRUB- BORE PITS PERENNIAL SHRUB 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T SIZE SHEET. DATE: JULY 2025 M V P TEMPORARYACCESS ROAD LAYDOWN YARD I ®PALUSTRINE STAGING AREA UNCONSOLIDATED 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, S O U T H G AT E o TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARYACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGING AREA SURVEY AREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT PERENNIAL WETLAND IMPACT ® TEMPORARY L,__J CONVERSION ® SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM COUNTY BOUNDARY '`20 am PROJECT: MVP Southgate Amendment Project STATE BOUNDARY N Rockingham County, North Carolina ELEVATION - CONTOUR - aqa 0 1 200 TITLE. INDEX FIG B-2 58 0 o FEET NC WETLAND AND WATERBODY IMPACT ELEVATION -CONTOUR - Canville 1:2,400 1" = 200' INTERMEDIATE zzo PAGE: 12 AR-050 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE M V P EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, / � ✓�_' `III /„ <1 i TA-RO-075 077 / / / �\ ' I o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY H2O PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina 0 MAIN LINE VALVE � ROAD PERMANENTACCESS STREAM IMPACT � CONVERSION ELEVATION - CONTOUR -1@wTal 0 1 200 TITLE: METER STATIONS TEMPORARY � SECONDARY IMPACT � INDEX FIG B-2 CONTRACTOR YARD LIMITS OF CONSTRUCTION � PERMANENT WETLAND TYPE ELEVATION -CONTOUR - Danville 1:2,400 FEET 1200' " = NC WETLAND AND WATERBODY IMPACT WORKSPACE STREAM TYPE PALUSTRINE EMERGENTH-650 INTERMEDIATE PAGE: 13 PIPELINE PERMANENTACCESS OPERATIONAL — WORKSPACE EPHEMERAL PALUSTRINE FORESTED zzO AR-051 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS DATE: JULY 2025 TEMPORARYACCESS ROAD LAYDOWN YARD I ®PALUSTRINE 4q& PERENNIAL SHRUB SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN M V P STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, S O U T H G AT E o TENTH MILE POST o MILE POST 0 MAIN LINE VALVE METER STATIONS ❑ CONTRACTOR YARD — — H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEYAREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 410 PERENNIAL WETLAND IMPACT ® TEMPORARY L CONVERSION W SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM M COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE o.o nVille zzo THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE 2EPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF )RTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, \RMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, PROJECT: MVP Southgate Amendment Project N Rockingham County, North Carolina 0 1 200 TITLE: FIG B-2 FEET NC WETLAND AND WATERBODY IMPACT 'teaPAGE: 14 ♦ d� �i. :mob+�►�►ii si�rry��fw7w/Mvp ��iSOUTHGATI o TENTH MILE POST o MILE POST 0 MAIN LINE VALVE METER STATIONS CONTRACTOR YARD — — H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEYAREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 410 PERENNIAL WETLAND IMPACT ® TEMPORARY L CONVERSION W SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM 11 > I hw / /fl� It H . I I I III I,j, II,I ,III 1 I �I Illlj IIIII/II III lr�! / % i % � .�� it I''• �I�I I�I� I��I � �I� 11�� '1�'1 1, \ \� � I 1 �, I PA-RO-000 `11� it (� TA-RO-075 < TA-RO-076 j 1 / LN 3600 Interconnect i COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE o.o nville zzo THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" 7E SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE 2EPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF )RTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, \RMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, ProjectPROJECT MVP Southgate Amendment © Rockingham County,•Carolina FIG B-2 1:2,400 FENC WETLAND AND ET 1 200'WATERBODY IMPACT 'teaPAGE: 15 ♦ d� �i. • 53 Mvpr_�br�►�►ii s� ��sw7A/ ��iSOUTHGATE o TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARYACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGING AREA SURVEY AREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT PERENNIAL WETLAND IMPACT ® TEMPORARY L,__J CONVERSION ® SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM COUNTY BOUNDARY '`20 ° ° PROJECT: MVP Southgate Amendment Project Q STATE BOUNDARY N Rockingham County, North Carolina ELEVATION - CONTOUR - 0 1 200 TITLE. INDEX FIG B-2 58 0 o FEET NC WETLAND AND WATERBODY IMPACT ELEVATION -CONTOUR - Canville 1:2,400 1" = 200' INTERMEDIATE zzo mil_ PAGE: 16 AR-054 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE M V P EXCEPT WHERE SHOWN 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, LN 3600 Interconnect / 0 TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD I \ \\ IN I S-BO13 Intermittent Temporary Access Road Temporary Impact (linear feet): 5, _ \ Temporary Impact Area (Ac): 0.0007, Temporary Fill (cu.yrd): W-B007 PEM No Impact Avoiding _ -1 IX S-13015a Crossing #: 090 Intermittent Timber Mat Crossing Temporary Impact linear feet): 15, Temporary Impact Area (Ac):0.0009, \ �AV Temporary Fill (cu.yrd): 4 � / I I1 \IiI II' 1 I ;ICI S-BO16 Crossing #: 091 II Ephemeral Timber Mat Crossing Temporary Impact (linear feet): 126, Temporary Impact Area (Ac): 0.0048, Temporary Fill (cu.yrd): 2340 / TEMPORARYACCESS STREAM FLOW WETLAND IMPACT ROAD DIRECTION ® TEMPORARY PERMANENTACCESS STREAM IMPACT L�J CONVERSION ROAD � TEMPORARY ® SECONDARY IMPACT p LIMITS OF CONSTRUCTION PERMANENT WETLAND TYPE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT OPERATIONAL EPHEMERAL PALUSTRINE FORESTED WORKSPACE INTERMITTENT BORE PITS qqo PERENNIAL PALUSTRINE SCRUB- SHRUB ® LAYDOWN YARD I PALUSTRINE STAGING AREA UNCONSOLIDATED SURVEYAREA BOTTOM j `� S-13015 / / Crossing #: 090 � �\ ` ♦♦ � ♦ W-H001 - � \ \ �♦ ♦♦ PEM 1 '�- \ � ♦ � No Impact COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE ♦ ♦ Avoiding 1 / /'OP 0000 Perennial Proposed Open Cut Temporary Impact (linear feet): 89, Temporary Impact Area (Ac): 0.0091 Temporary Fill (cu.yrd): 147 zzo W-B009b Crossing #: 089 PEM Proposed Open Cut Temporary Impact (Ac): 0.0536, Temporary Fill (cu.yrd): 865 W-B009a Crossing #: 090 PFO Proposed Open Cut Conversion Impact (Ac): 0.1415, Temporary Fill (cu.yrd): 2282 S-B016a Intermittent No Impact Avoiding / <, 00 N 0 1 m FEET nville 1:2,400 THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE 2EPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF IRTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, 1RMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina 200 TITLE. FIG B-2 1°-200' NC WETLAND AND WATERBODY IMPACT PAGE: 17 AR-055 DATE. JULY 2025 MVP SOUTHGATE If ---------------- \ TA-RO-078 \ \ If11'I\1 I'I�I I ! \�<\ if \\ \� ��_ (.p ;�_� ,---�;�',� �, //� If /fit o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina 0 PERMANENTACCESS STREAM IMPACT MAIN LINE VALVE � ROAD CONVERSION ELEVATION - CONTOUR -O L` 0 1 200 TITLE: TEMPORARY METER STATIONS INDEX SECONDARY IMPACT FIG B-2 LIMITS OF CONTRACTOR YARD � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville FEET 1:2,400 1" = 200' NC WETLAND AND WATERBODY IMPACT WORKSPACE STREAM TYPE INTERMEDIATE PALUSTRINE EMERGENT PAGE: 18 — — H-650 PIPELINE OPERATIONAL EPHEMERAL PALUSTRINE FORESTED E03 AR-056 PERMANENTACCESS — WORKSPACE NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS DATE: JULY 2025 TEMPORARYACCESS PERENNIAL ROAD LAYDOWN YARD I ®PALUSTRINE SHRUB SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN M V P STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, W-13052b \ '\ /' / ' l / / --\- • ° _ �� ���'/ Crossing #: 094 PEM Proposed Open Cut ,Q• / l) / \ \ \ / - — - — / Temporary Impact (Ac): 0.0233> Temporary Fill (cu.yrd): 376 \ / / r / // ''// '/'/ \\`//'�/( \ �' /, < III \ ( �'� -� '\ �� ♦ % / �// / / �� l/ 1l IIII \_—' / , /, �--- /'/ ` I ), �, I i ' / \ \_ \ . \\ TA-RO-078 I I r I �\\`\ \\: \ '\-/ l I l 11 I, , I, ' /, /', ,//, I I \ \ \ -�_ _,- / % / // I ♦ � �,/ /�_ ��,/ W-13052a / /- ,, Crossing #: 094 \- PFO // \` I \ \\ \\ -\ \. - -- / I ` \, -� \ \ / /'/ / ♦ / ♦ W-B006 Timber Mat Crossing PFO �Conversion Impact (Ac)� 0.0294, No Impact Temporary Fill (cu.yrd): 142 !%i�;l�;lljl"j111 �1,1 lI v''/� //i�i''/ �ll' vvAwAA�A\�_— ��. A' 1 I I l i� �' /' /' ♦ / ♦ i� /,Avoiding—/ /�-�:--- �� I I \ ' I' 1\ 1"\\���\1; III j 'l'I' \�� ��_ i /,//// 1 \ l`�_ �_�\\ `-_ r � �� � I )/ /� � , � / I I (\\ \ I \ ♦ / ♦ �. \ `. � I �\,�' % /'-_-_-� - \\ �\�\\\\�\ l l�(\I\ < (\ I\1` <\<\<\< << � �, I I I I,1 111, I111 III / �//II \\ �\--_��' /i;/ I \ ` ��;>>\ `� j , / , , / 1 \ I\ \ \ \ \ \ I I ♦ / / ,.-^ '� ? \ , , \ / `\\\ \\\ \\ \\ \\\\ �\� ' � r 1 111'111�"IIII`(/((l\L\\ `_�� ) �% i/'/ (I \ \ \ \\ 1 I '-_ / l l I I , \ \ I I �'-- 9 ' I I \ \ \ \ \ \ \ \ \ \ \ I I \ \ \ /I II � �\\ _J\ I \ I I \\ \• \ \\ \I\ \ / / l ` \ I S-BO10 I I Ephemeral Timber Mat Crossing-�.- -__ \ / // �• �%/ ��/ �:� -�% — — /'-- —,� \\, / / \ \\\\ / / \ \,IIII' I/// I _—_ --=— � l _�\'\\ ,I \�� %%�%%/,� ��///' , C �• /' � �// /' '\ ' �'/�/ I"%'/'/%i/ �/ / /"/%/ ' %///_/ /��� //'-'�'� -�--,--—�-= _ \-��--- ^-,_; \ / //,_-^- ? \' \/`�l>, �'>' / / �,% / \�\�I �--IL--C-'--\-\� _\; �--�\\'� � . ♦ ♦ / / iY `/ \` -�\ w^�\. I /\\ / I/ I /�II %// , /�I l/ /1' , 1 III /'' ; Temporary Ipact(linear feet): 11/ /' Temporary Impact Area (Ac : 0006, \�\ \ Temporary Fill (cu.yrd): \�\ ---, -%, 3 \ \ \ \ \ \ _— \ \\-- 1 ��- - —-__ ` ;� ' ••\ 1\'\'�111, ,\���_ ,�///�� �/, // , �-. 1; � � ! � I f l ' � \, --�i--� � --' ._��_� /� __ / /, I � �/ /,/ , / , ( � _- —� � I ` \ I \\ \\\\\\\d\ `1`I 'I' I , I (,/11\ � \ / / / \ � /% /%(, 1 \ � ----____ --------- , _ f/// / 1 \ • \\ I \I `\\\ I 11 ` I III I I \�//' �1 \\ \\,\ / �l II / I\ \ \1 \ \ \� - --- � � ° ° o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z,0 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENTACCESS STREAM IMPACT � ROAD CONVERSION ELEVATION -CONTOUR - 0 1 200 rlrLe. TEMPORARY INDEX FIG B-2 METER STATIONS LIMITS OF ®SECONDARY IMPACT FEET CONTRACTOR YARD CONSTRUCTION <2 PERMANENT ELEVATION - CONTOUR - ss ° ° Danville 1:2,400 1"=200' NC WETLAND AND WATERBODY IMPACT WETLAND TYPE INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT H 650 PIPELINE PAGE: 19 OPERATIONAL EPHEMERAL zzo PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED ° ° AR-057 ROAD INTERMITTENT PALUSTRINE SCRUB- NOTES: BORE PITS 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 TEMPORARYACCESS PERENNIAL SHRUB SIZE SHEET. LAYDOWN YARD I 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE ROAD 7 M V P ® STAGINGAREA PALUSTRINE EXCEPT WHERE SHOWN UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF C SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS , / II' VAvv'�Av Vv ljj lllf III irr i'11l0it III 1'l/ IIII � �- If It I II,I 11,0 It Ill�n�/III \ \�\\ v,/ / > �, /� //� /X jjjll'Inll'l(f / Iv���` AvIf / /,// , // lei TA-RO-079A n\ :/%'�,/ / \ / I II IIII ,\\III\\\\\���`////// W,\\\\`\�'\` It / / / \ ,����\ .Ih �' IN \VA vv11`IAvl`V�,v v If 'HIV 1 N1l o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina 0 PERMANENTACCESS STREAM IMPACT MAIN LINE VALVE � ROAD CONVERSION ELEVATION -CONTOUR - aw 0 1 200 TITLE: TEMPORARY INDEX METER STATIONS LIMITS OF SECONDARY IMPACT � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville FEET 1:2,400 1" = 200' FIG B-2 NC WETLAND AND WATERBODY IMPACT CONTRACTOR YARD INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT PAGE: 20 — — H-650 PIPELINE OPERATIONAL EPHEMERAL PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED 220 AR-058 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T SIZE SHEET. ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS PERENNIAL SHRUB DATE: JULY 2025 M V P TEMPORARYACCESS ROAD LAYDOWN YARD I ®PALUSTRINE STAGING AREA 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, S O U T H G AT E \ \\\, \\I I\ I I�I�I t I / 1�� II�I�I� �III'III II TA-RO-080 if I'll I If I /PIl�Iil�lll o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina 0 MAIN LINE VALVE PERMANENTACCESS � ROAD STREAM IMPACT CONVERSION ELEVATION -CONTOUR - aw 0 1 200 TITLE: METER STATIONS LIMITS OF TEMPORARY SECONDARY IMPACT INDEX FEET FIG B-2 CONTRACTOR YARD � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville 1:2,400 1" = 200' NC WETLAND AND WATERBODY IMPACT PAGE: 21 INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT — — H-650 PIPELINE � 22o PERMANENTACCESS OPERATIONAL — WORKSPACE EPHEMERAL PALUSTRINE FORESTED AR-059 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T SIZE SHEET. ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS PERENNIAL SHRUB DATE: JULY 2025 ►� M V P TEMPORARYACCESS ROAD LAYDOWN YARD I ®PALUSTRINE STAGING AREA 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF ~ C SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, $ O U T H G AT E �— \\\,. \ I �� I\ i ' II IIII\ IIIII IIIII `�' (\ ,---� `:' �:/ ' ' �%� II // l l \ \\�__/ /�//,,/, ,��/i,/// r I- I � I, I I I II I i / I _ I I� ,�- i';/;, , /j , I 1,�11\ /II �� �I III II< - I I 1 % 1 I l II I \\ I, 1 I I// \ / /// 1 1AvvvVAI`vVAIIII A,II1 '1v\Vv VA. V`\ v`��� �_ TA-RO-079A <- I11 A11II1111 I III ,1 v, .v v` � II II,1111 IIII IIII\\\\ \\ l\ vvAv. /, ,//, j - ,__ �_> v IA` v / ♦ — _ /'' -_ \`\\ (I\ A I \/ ' --/ l IIII I 1111 J - � 1\ \� J /ll �ll j��l ���/ l I \\\ \\\ •\ \ I \ l i /�_� / 1 I I I 'I II � I I I � I I ' i � �� - __ _---/ ,----- ('/ � i __-----===__ _ _----___— ---/ --- �_/' `\\I 1 I I ,�--' �- /////'I I• `�___�-�%� �//j/// �/ j % =n (I'� I ' / � I � -----. / / j l/// 1/ Il �\\," i / �`\\_ --- i�✓:=-' _--��\ - _-_'__-'� �_��___-== _" — -- I I l' / I /' I _���% l ' I' I I I l / 1 \ \ \ `\ /' //, / /ll / l/ , "IL , 1 I \ / ,//- _ _/ / \i'\_ ./' /_ /--' r,C, t`, / / ♦\' J �'-��/ / -_ _ /' � '� S-Boos - _ ---- / Crossing Intermittent Proposed Open Cut Temporary Impact linear feet 90, Temporary Impact Area (Ac): 0.0118, / / F-'v Temporary Fill cu. rd : 190 TA-RO-079 TA RO 080 V Iv I �/ / IIII I !,V '-- ,� j ! ) I / V Vv�,% ) III w-Boos � //-\\ \�_�/- / / 1 � i 1 � i \\ �-✓r _-�,v,� / Crossing #: 097PFO Proposed Open Cut Conversion Impact (Ac): 1.7856, / / ♦ / , Temporary Fill (cu.yrd): 28807 a o o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z,0 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENTACCESS STREAM IMPACT o a � ROAD CONVERSION ELEVATION -CONTOUR - 0 1 200 rlrLe. TEMPORARY INDEX FIG B-2 METER STATIONS LIMITS OF ®SECONDARY IMPACT FEET NC WETLAND AND WATERBODY IMPACT CONTRACTOR YARD r--. CONSTRUCTION <2 WETLAND TYPE PERMANENT ELEVATION - CONTOUR - 58 gnW Danville 1:2,400 1" = 200' INTERMEDIATE WORKSPACE STREAM TYPE PALUSTRINE EMERGENT H 650 PIPELINE PAGE: 22 OPERATIONAL EPHEMERAL PERMANENTACCESS — WORKSPACE PALUSTRINE FORESTED AR-060 ROAD INTERMITTENT PALUSTRINE SCRUB- NOTES: BORE PITS 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" DATE JULY 2025 TEMPORARYACCESS PERENNIAL SHRUB SIZE SHEET. ROAD LAYDOWN YARD if2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE M V P ® STAGINGAREA PALUSTRINE EXCEPT WHERE SHOWN UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF C SURVEY AREA BOTTOM NORTH CAROLINA DOT, 0 OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NIPS, ;�\ IJ�:J RCN• - ��� / �/ � �/ � � / / �\��\\\\\�\\\\�\\\\1\\\,\1 /' /' �/ 0 ° S-13007 Intermittent Culvert Instal I ation/Replacement Permanent Impact linear feet 31, Permanent Impact Area Ac 0.0017, P ( ): / I Permanent Fill (cu.yrd): 10 40, _ l / TA-RO-080 / / W-BOOS Crossing #: 097 PFO Proposed Open Cut Conversion Impact (Ac): 1.7856, Temporary Fill (cu.yrd): 28807 / W-GO03 Crossing #: 097 PEM Proposed Open Cut/ATWS/Temporary Access Road Temporary Impact (Ac): 0.0242, Temporary Fill (cu.yrd): 117 o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY Z20 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina 0 MAIN LINE VALVE PERMANENTACCESS � ROAD STREAM IMPACT L i CONVERSION ELEVATION - CONTOUR - O 0 1 200 TITLE: METER STATIONS TEMPORARY INDEX SECONDARY IMPACT FIG B-2 CONTRACTOR YARD LIMITS OF � CONSTRUCTION PERMANENT WETLAND TYPE ELEVATION -CONTOUR - 58 a Danville 1:2,400 FEET 1" = 200' NC WETLAND AND WATERBODY IMPACT WORKSPACE INTERMEDIATE STREAM TYPE PALUSTRINE EMERGENT PAGE: 23 — — H-650 PIPELINE PERMANENTACCESS OPERATIONAL — WORKSPACE EPHEMERAL PALUSTRINE FORESTED 220 AR-061 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS DATE: JULY 2025 TEMPORARYACCESS ROAD LAYDOWN YARD I ®PALUSTRINE PERENNIAL SHRUB SIZE SHEET. 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN M V P STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, S O U T H G AT E 11 -- ^ 1M C"� 1 "' u, o TENTH MILE POST o MILE POST Q MAIN LINE VALVE METER STATIONS CONTRACTOR YARD H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD 00 h 1 W-BOOIb I'I I I 1 I PFO I'I j I ATWS Conversion Impact (Ac): 0.0523, Temporary Fill (cu.yrd): 253 �I �I I i I W-BOOla III I I PEM II I I I ATWS I I Temporary Impact (Ac): 0.3582, v Temporary Fill (cu.yrd): 1734 700 I I I ' III 1', I TEMPORARYACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEYAREA S-B001 Ephemeral No Impact Avoiding O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT PERENNIAL W-B051 Crossing #: 098 PFO Timber Mat Travel Lane/Maintenance Corridor \ Conversion Impact (Ac): 0.0105, Temporary Fill (cu.yrd): 51 WETLAND IMPACT ® TEMPORARY L,__J CONVERSION ® SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM W-BO02d PFO No Impact Avoiding COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE / S-Bo06 / Intermittent W-B003 Crossing #: 098/ , ff PFO / Timber Mat Travel Lane/Maintenance Corridor Conversion Impact (Ac): 0.0399, Temporary Fill (cu.yrd): 193 / S-B003 Crossing #: 098 / Intermittent Conventional Bore No Impact — Proposed W Crossing #: 099 PEM Proposed Open Cut Temporary Impact (Ac): 0.0391, Temporary Fill (cu.vrd): 630 o.a Culvert Installation/Replacement Permanent Impact (linear feet): 21, Permanent Impact Area (Ac): 0.0021, Permanent Fill (cu.yrd): 9 ' —� 0 /@Tbe Danville 1:2,400 zz0 \ ' DTES: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE {CEPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DRTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, ARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, N 1 7 FEET S-BOOS Crossing #: 098 Perennial Conventional Bore No Impact — Proposed Bore W-B004a PSS ATWS Conversion Impact (Ac): 0.0403, Temporary Fill (cu.yrd): 195 PROJECT: MVP Southgate Amendment Project Rockingham County, North Carolina 200 TITLE FIG B-2 1°-200' NC WETLAND AND WATERBODY IMPACT PAGE: 24 AR-062 DATE. JULY 2025 MVP SOUTHGATE � 00 800 WA W-FO17 S-13003 PEM Crossing #: 098 No Impact Intermittent W-BOOla Avoiding Conventional Bore PEM No Impact — Proposed Bore ATWS Temporary Impact (Ac): 0.3582, TA-RO-081 Temporary Fill (cu.yrd): 1734 , e W-B051 -_ Crossing #: 098 PFO Timber Mat Travel Lane/Maintenance Corridor 0,1 Conversion Impact (Ac): 0.0105, Temporary Fill (cu.yrd): 51 � I � TA-RO-080A W-B056 )t W-13002d Crossing #: 099 1 PFO PEM \ Proposed Open Cut No Impact � � Avoiding 1 Temporary Impact (Ac): 0.0391, Temporary Fill (cu.yrd): 630 W-13002c PFO Timber Mat Crossing \ \ ' Conversion Impact (Ac): 0.001 Temporary Fill (cu.yrd): 45 Dan River Interconnect 2 Dan River Interconnect 1 I t' ►� 1 II C � I MLU4 Q ` PA-RO-082A I I ` TA-RO-083 W-15002a PA-R1J-082 Crossing #: 100, 101 PFO �— Proposed Open Cut/ATWS 700 Conversion Impact (1*c): 0.3549, i Temporary Fill (cwyrd): 1718 / 1 i a I S-B001 PA-RO-082BI Ephemeral No Impact W-B004a PSS , , �' J I Avoiding \ ATWS — — — Conversion Impact (Ac): 0.0403, Temporary Fill (cu.yrd): 195 W-B002b Crossing #: 100 PFO Proposed Open Cut/ATWS/Temporary Access Road „ 1% Conversion Impact (Ac): 0.173, Temnorary Fill (cu.vrd): 838 a I S-B001 PA-RO-082BI Ephemeral No Impact W-B004a PSS , , �' J I Avoiding \ ATWS — — — Conversion Impact (Ac): 0.0403, Temporary Fill (cu.yrd): 195 W-B002b Crossing #: 100 PFO Proposed Open Cut/ATWS/Temporary Access Road „ 1% Conversion Impact (Ac): 0.173, Temnorary Fill (cu.vrd): 838 W-BO55 A@ IF PEM Timber Mat Crossing/Temporary Access Road W-B004 Temporary Impact (Ac): 0.0416, PEM Temporary Fill (cu.yrd): 201 ATWS Temporary Impact (Ac): 0.0232, Temporary Fill (cu.yrd): 112 S-B002 Crossing #: 0100 Intermittent Proposed Open Cut/Temporary Access Road e Temporary Impact (linear feet): 76, Temporary Impact Area (Ac): 0.0102, Temporary Fill (cu.yrd): 164 o TENTH MILE POST TEMPORARY ACCESS STREAM FLOW WETLAND IMPACT COUNTY BOUNDARY ° ° Z20/-'�111 PROJECT: MVP Southgate Amendment Project o MILE POST ROAD DIRECTION ® TEMPORARY Q STATE BOUNDARY N Rockingham County, North Carolina Q MAIN LINE VALVE PERMANENTACCESS � ROAD STREAM IMPACT L�J CONVERSION ELEVATION -CONTOUR - 0 1 200rlrLe.TEMPORARY METER STATIONS INDEX ®SECONDARY IMPACT FIG B-2 YARD LIMITS OF CONSTRUCTION PERMANENT ELEVATION -CONTOUR- WETLAND TYPE nville FEETCONTRACTOR 1:2,400 1"=200' NC WETLAND AND WATERBODY IMPACT INTERMEDIATE PAGE: 25 WORKSPACE STREAM TYPE PALUSTRINE EMERGENT H 650 PIPELINE O\f PERMANENTACCESS OPERATIONAL — WORKSPACE EPHEMERAL PALUSTRINE FORESTED AR-063 NOTES: 1: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ROAD INTERMITTENT PALUSTRINE SCRUB- BORE PITS DATE JULY 2025 TEMPORARYACCESS 41& PERENNIAL SHRUB SIZE SHEET. ROAD LAYDOWN YARD I ®PALUSTRINE 2: SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE EXCEPT WHERE SHOWN M V P STAGING AREA UNCONSOLIDATED 3: BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF SURVEY AREA BOTTOM NORTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, S O U T H G AT E GARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METI/NASA, USGS, EPA, NPS, o TENTH MILE POST o MILE POST 0 MAIN LINE VALVE METER STATIONS CONTRACTOR YARD — — H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEY AREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 410 PERENNIAL WETLAND IMPACT ® TEMPORARY CONVERSION SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE MR PROJECT: MVP Southgate Amendment Project N Rockingham County, North Carolina 0 1 200 TITLE: FIG B-2 nville 1:2,400 1200' FEET NC WETLAND AND WATERBODY IMPACT " = E03 THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X1T ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE 2EPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF )RTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, \RMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, PAGE: 26 CY-036 DATE: JULY 2025 I`1 MVP TSOUTHGATE o TENTH MILE POST 0 MILE POST 0 MAIN LINE VALVE METER STATIONS CONTRACTOR YARD — — H-650 PIPELINE PERMANENTACCESS ROAD TEMPORARYACCESS ROAD TEMPORARY ACCESS ROAD PERMANENTACCESS ROAD LIMITS OF p CONSTRUCTION WORKSPACE OPERATIONAL j WORKSPACE BORE PITS LAYDOWN YARD I ® STAGINGAREA SURVEYAREA O STREAM FLOW DIRECTION STREAM IMPACT TEMPORARY PERMANENT STREAM TYPE EPHEMERAL INTERMITTENT 410 PERENNIAL 0 r r� Lip 01 /.I 0 \ \ \ CY-OS _ TA-RO-082D \ I I I I, WETLAND IMPACT ® TEMPORARY L CONVERSION W SECONDARY IMPACT WETLAND TYPE PALUSTRINE EMERGENT PALUSTRINE FORESTED PALUSTRINE SCRUB - SHRUB PALUSTRINE UNCONSOLIDATED BOTTOM COUNTY BOUNDARY Q STATE BOUNDARY ELEVATION - CONTOUR - INDEX ELEVATION - CONTOUR - INTERMEDIATE o.o nville zzo � DTES: THIS FIGURE IS INTENDED TO BE VIEWED OR PRINTED IN COLOR ON 11"X17" ZE SHEET. SURVEY AREA IS EQUIVALENT TO LIMITS OF CONSTRUCTION WORKSPACE KCEPT WHERE SHOWN BASE MAP SERVICES: ESRI COMMUNITY MAPS CONTRIBUTORS, STATE OF DRTH CAROLINA DOT, © OPENSTREETMAP, MICROSOFT, ESRI, TOMTOM, ARMIN, SAFEGRAPH, GEOTECHNOLOGIES, INC, METIINASA, USGS, EPA, NPS, PROJECT• •.te Amendment Project © '• •County,•Carolina I II II 1:2,4 •• FEET 1 200'NC WETLAND AND • DY IMPACT PAGE: 27 I 1 will �` a r_�br�►�►ii s� ��sw71/Mvp ��iSOUTHGATE ATTACHMENT 3 UPDATED IMPACT TABLES Table B-1- North Carolina Stream Impacts Individual Permit Application MVP Southgate Amendment Project Stream ID NHD Stream Name a/ County USACE District Latitude b/ Longitude b/ Flow Regime Water Type c/ Stream Designation d/ HUC 8 Impact Type e/ Temporary Impact (linear feet) Permanent Impact (linearfeet) Temporary Impact Area (acres) f/ Permanent Impact Area (acres) f/ Temporary Fill (cubic yards) g/ Permanent Fill (cubic yards) h/ Figure S-13002 UNT to Dan River Rockingham Wilmington 36.493049 -79.678829 Intermittent RPW Warmwater Fishery 3010103 Pipeline ROW/Temporary Access Road 76 - 0.0102 - 164 - CL-071; AR-063 S-13006 UNT to Dan River Rockingham Wilmington 36.495022 -79.67608 Intermittent RPW Warmwater Fishery 3010103 Culvert Installation/ Replacement - 21 - 0.0021 - 9 CL-071; AR-062 S-13007 UNT to Dan River Rockingham Wilmington 36.501472 -79.674974 Intermittent RPW Warmwater Fishery 3010103 Culvert Installation/ Replacement - 31 - 0.0017 - 10 AR-061 S-BOOS UNT to Dan River Rockingham Wilmington 36.502862 -79.670507 Intermittent RPW Warmwater Fishery 3010103 Pipeline ROW 90 - 0.0118 - 190 - CL-069; AR-060 S-13009 UNT to Dan River Rockingham Wilmington 36.505393 -79.667501 Ephemeral NRPW Warmwater Fishery 3010103 Pipeline ROW 75 0.0057 92 CL-069 S-B010 UNT to Dan River Rockingham Wilmington 36.50775 -79.66578 Ephemeral NRPW Warmwater Fishery 3010103 Timber Mat Crossing 10 0.0006 3 CL-068; AR-057 S-13011 UNT to Dan River Rockingham Wilmington 36.511354 -79.66213 Perennial RPW Warmwater Fishery 3010103 Pipeline ROW 74 0.0068 110 CL-067, 068 S-B013 UNT to Dan River Rockingham Wilmington 36.51752 -79.657911 Intermittent RPW Warmwater Fishery 3010103 Temporary Access Road 5 0.0007 3 AR-055 S-B015 UNT to Dan River Rockingham Wilmington 36.516199 -79.656929 Perennial RPW Warmwater Fishery 3010103 Pipeline ROW 89 0.0091 147 CL-066, 067; AR-055 S-6015a UNTto Dan River Rockingham Wilmington 36.516197 -79.656872 Intermittent RPW Warmwater Fishery 3010103 Timber Mat Crossing 15 0.0009 4 CL-066, 067; AR-055 S-B016 UNT to Dan River Rockingham Wilmington 36.515501 -79.657546 Ephemeral NRPW Warmwater Fishery 3010103 Timber Mat Crossing 126 0.0048 23 CL-067; AR-055 S-B017 UNT to Dan River Rockingham Wilmington 36.513214 -79.660053 Intermittent RPW Warmwater Fishery 3010103 Pipeline ROW 81 0.0044 71 CL-067; AR-055 S-F005 INTto Cascade Cree Rockingham I Wilmington 36.534513 1 -79.638991 Perennial RPW I Warmwater Fishery 1 3010103 Pipeline ROW 79 0.0054 88 CL-063; AR-049 a/ For identified streams without an NHD (National Hydrography Dataset) name, the identified stream was given the name "Unidentified Tributary (UNT)" of the first named receiving waterbody. Table B-2 -North Carolina Wetland Impacts Individual Permit Application MVP Southgate Amendment Project Wetland ID County USACE District Latitude a/ Longitude a/ Cowardin Class b/ NC WAM Type c/ HUC-8 Impact Type d/ JL Temporary Impacts (acres) e/ Permanent Conversion Impacts (acres) f/ Temporary Fill (cubic yards)g/ Figure W-BOOla Rockingham Wilmington 36.495303 -79.680073 PEM Non -Tidal Freshwater Marsh 3010103 ATWS 0.3582 - 1,734 CL-071; AR-062, 063 W-13001b Rockingham Wilmington 36.495493 -79.679431 PFO Headwater Forest 3010103 ATWS - 0.0523 253 CL-071;AR-062 W-13002a Rockingham Wilmington 36.493109 -79.679704 PFO Headwater Forest 3010103 Pipeline ROW/ATWS 0.3549 1,718 CL-071; AR-063 W-13002b Rockingham Wilmington 36.492954 -79.678955 PFO Headwater Forest 3010103 Pipeline ROW/ATWS/ 0.173 838 CL-071; AR-063 W-13002c Rockingham Wilmington 36.49351 -79.67867 PFO Headwater Forest 3010103 Timber Mat Crossing 0.0094 45 CL-071; AR-063 W-13003 Rockingham Wilmington 36.494788 -79.677685 PFO Headwater Forest 3010103 Timber Mat Travel Lane/ Maintenance Corridor - 0.0399 193 CL-071; AR-062 W-13004 Rockingham Wilmington 36.493601 -79.675951 PEM Non -Tidal Freshwater Marsh 3010103 ATWS 0.0232 - 112 CL-071; AR-063 W-13004a Rockingham Wilmington 36.493842 -79.675963 PSS Floodplain Pool 3010103 ATWS - 0.0403 195 CL-071; AR-062, 063 W-13005 Rockingham Wilmington 36.500779 -79.672586 PFO Headwater Forest 3010103 Pipeline ROW - 1.7856 28,807 CL-069, 070; AR-060, 061 W-13008 Rockingham Wilmington 36.513224 -79.660014 PEM Floodplain Pool 3010103 Pipeline ROW 0.0101 - 163 CL-067 W-13009a Rockingham Wilmington 36.516424 -79.656693 PFO Headwater Forest 3010103 Pipeline ROW - 0.1415 2,282 CL-066, 067; AR-055 W-13009b Rockingham Wilmington 36.51692 -79.656429 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0536 - 865 CL-066; AR-055 W-B010 Rockingham Wilmington 36.519145 -79.654541 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW/Temporary Access Road 0.0999 484 AR-054 W-13011 Rockingham Wilmington 36.538144 -79.636202 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0275 444 CL-062 W-B012 Rockingham Wilmington 36.539856 -79.634416 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Travel Lane 0.0315 - 153 CL-062 W-13013b Rockingham Wilmington 36.541802 -79.632478 PFO Headwater Forest 3010103 Pipeline ROW - 0.0181 293 CL-061 W-B027 Rockingham Wilmington 36.528102 -79.646154 PFO Headwater Forest 3010103 Timber Mat Travel Lane/ Maintenance Corridor - 0.0283 137 CL-064 W-B028 Rockingham Wilmington 36.529211 -79.645 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.796 - 12,843 CL-064; AR-050 W-B029 Rockingham Wilmington 36.530506 -79.642653 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Crossing 0.0033 16 CL-063, 064; AR-050 W-13031a Rockingham Wilmington 36.530553 -79.643717 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.2289 - 3,693 CL-063, 064; AR-050 W-13031b Rockingham Wilmington 36.530829 -79.643465 PSS Floodplain Pool 3010103 Pipeline ROW - 0.2696 4,350 CL-063, 064; AR-050 W-B032 Rockingham Wilmington 36.534529 -79.63899 PEM Floodplain Pool 3010103 Pipeline ROW 0.1102 - 1,777 CL-063; AR-049 W-B051 Rockingham Wilmington 36.494693 -79.677771 PFO Headwater Forest 3010103 Timber Mat Travel Lane/ Maintenance Corridor - 0.0105 51 CL-071; AR-062, 063 W-13052a Rockingham Wilmington 36.50836 -79.66516 PFO Headwater Forest 3010103 Timber Mat Crossing - 0.0294 142 CL-068; AR-057 W-13052b Rockingham Wilmington 36.508385 -79.665273 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0233 - 376 CL-068; AR-057 W-B053 Rockingham Wilmington 36.525433 -79.648654 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0441 711 CL-065 W-B055 Rockingham Wilmington 36.493194 -79.678821 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Crossing 0.0416 201 CL-071; AR-063 W-B056 Rockingham Wilmington 36.493824 -79.678444 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0391 - 630 CL-071; AR-062, 063 W-13056a Rockingham Wilmington 36.52853 -79.645701 PSS Floodplain Pool 3010103 Pipeline ROW - 0.0476 768 CL-064 W-F003 Rockingham Wilmington 36.538306 -79.636126 PEM Floodplain Pool 3010103 Timber Mat Crossing 0.0089 - 43 CL-062 W-F004 Rockingham Wilmington 36.537522 -79.636888 PEM Floodplain Pool 3010103 Timber Mat Crossing 0.0096 46 CL-062 W-F005 Rockingham Wilmington 36.537389 -79.637028 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Crossing 0.0023 11 CL-062 W-F006 Rockingham Wilmington 36.536551 -79.637457 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Travel Lane 0.0101 49 W-F007 Rockingham Wilmington 36.536358 -79.637041 PEM Non -Tidal Freshwater Marsh 3010103 ATWS 0.0168 81 CL-062 Wilmington 36.525157 -79.648937 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Crossing 0.0393 190 CL-065 Rockingham Wilmington 36.520103 -79.654101 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW/ATWS 0.8132 3,936 CL-066;AR-054 LW-FOO8Rockingham Rockingham Wilmington 36.519681 79.654757 PEM Non -Tidal Freshwater Marsh 3010103 Timber Mat Crossing/ATWS 0.1008 488 CL-066; AR-054 Page 1 of 2 Table B-2 -North Carolina Wetland Impacts Individual Permit Application MVP Southgate Amendment Project Permanent Temporary Cowardin Conversion Temporary Fill Wetland ID County USACE District Latitude a/ Longitude a/ NC WAM Type c/ HUC-8 Impact Type d/ Impacts Figure Class b/ Impacts (cubic yards)g/ (acres) e/ (acres) f/ W-F011 Rockingham Wilmington 36.519424 -79.654546 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0339 546 CL-066; AR-054 W-FO12 Rockingham Wilmington 36.51933 -79.654769 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.0148 239 CL-066; AR-054 W-FO13 Rockingham Wilmington 36.520754 -79.653245 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW 0.026 419 CL-066; AR-054 W-FO15 Rockingham Wilmington I 36.53318 -79.642304 PEM Non -Tidal Freshwater Marsh 3010103 Temporary Access Road 0.0006 3 CL-063; AR-049, 050 W-GO03 Rockingham Wilmington 36.499646 -79.673743 PEM Non -Tidal Freshwater Marsh 3010103 Pipeline ROW/ATWS 0.0242 117 CL-070; AR-061 a/ Shown in decimal degrees. Page 2 of 2 Table B-3. North Carolina Stream Impacts Summary Individual Permit Application MVP Southgate Amendment Project USACE District Flow Regime Temporary Impact (linear feet) Temporary Impact Area (acres) Temporary Fill (cubic yards) Wilmington District Ephemeral 211 0.0111 118 Intermittent 267 0.0280 432 Perennial 242 0.0213 345 Wilmington District Total 720 0.0604 895 Table B-4. North Carolina Wetland Impacts Summary Individual Permit Application MVP Southgate Amendment Project USACE District Cowardin Class Temporary Impact (acres) Permanent Conversion Impact (acres) Temporary Fill (cubic yards) PEM 2.9910 0.0000 30,370 PSS 0.0000 0.3575 5,313 Wilmington District PFO 0.0000 2.6429 34,759 Wilmington District Total 2.9910 3.0004 70,442