Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20181638 Ver 4_Attachment G_Cumulative-Impact_20250619
ATTACHMENT G - CUMULATIVE IMPACTS ANALYSIS MOUNTAIN VALLEY PIPELINE, LLC MVP SOUTHGATE AMENDMENT PROJECT CUMULATIVE IMPACT ANALYSIS APRIL 2025 MVP Southgate Amendment Project Cumulative Impact Analysis CONTENTS 1.0 Introduction.............................................................................................1-1 2.0 Data Acquisition Methodology...............................................................2-1 3.0 Data Source Summary Information.......................................................3-1 4.0 Project Impacts.......................................................................................4-1 5.0 Watershed Impacts.................................................................................5-1 5.1 Shockoe Creek — Banister River................................................................ 5-3 5.2 Cherrystone Creek..................................................................................... 5-8 5.3 White Oak Creek — Banister River............................................................ 5-13 5.4 Sandy Creek — Dan River......................................................................... 5-18 5.5 Lower Sandy River................................................................................... 5-23 5.6 Cascade Creek......................................................................................... 5-28 5.7 Trotter's Creek — Dan River...................................................................... 5-33 5.8 Town Creek — Dan River.......................................................................... 5-38 6.0 Conclusions.............................................................................................6-1 FIGURES Figure 1: Cumulative Overview Map.......................................................................... 2-3 Figure 2: Watershed Boundary Overview.................................................................. 5-2 Figure 3: Shockoe Creek — Banister River Watershed NHD and NWI Map .............. 5-5 Figure 4: Shockoe Creek — Banister River Watershed NLCD Land Cover Map......................................................................................................... 5-7 Figure 5: Cherrystone Creek Watershed NHD and NWI Map ................................. 5-10 Figure 6: Cherrystone Creek Watershed NLCD Land Cover Map ........................... 5-12 Figure 7: White Oak Creek — Banister River Watershed NHD and NWI Map.......... 5-15 Figure 8: White Oak Creek — Banister River Watershed NLCD Land Cover Map....................................................................................................... 5-17 Figure 9: Sandy Creek — Dan River Watershed NHD and NWI Map ....................... 5-20 Figure 10: Sandy Creek — Dan River Watershed NLCD Land Cover Map ............ 5-22 Figure 11: Lower Sandy River Watershed NHD and NWI Map ............................. 5-25 Figure 12: Lower Sandy River Watershed NLCD Land Cover Map ....................... 5-27 Figure 13: Cascade Creek Watershed NHD and NWI Map ................................... 5-30 MVP Southgate Amendment Project Cumulative Impact Analysis Figure 14: Cascade Creek NLCD Land Cover Map .............................................. 5-32 Figure 15: Trotter's Creek — Dan River Watershed NHD and NWI Map ................ 5-35 Figure 16: Trotter's Creek — Dan River Watershed NLCD Land Cover Map ......... 5-37 Figure 17: Town Creek Watershed NHD and NWI Map ........................................ 5-40 Figure 18: Town Creek — Dan River Watershed NLCD Land Cover Map .............. 5-42 TABLES Table 1: HUC-12 Watersheds within the Amendment Project Area ......................... 5-1 Table 2: Projects and Impact Summary within the Shockoe Creek — Banister River Watershed....................................................................... 5-4 Table 3: Land Cover within the Shockoe Creek — Banister River Watershed .......... 5-6 Table 4: Projects and Impact Summary within the Cherrystone Creek Watershed.............................................................................................. 5-9 Table 5: Land Cover within the Cherrystone Creek Watershed ............................. 5-11 Table 6: Projects and Impact Summary within the White Oak Creek — Banister River Watershed..................................................................... 5-14 Table 7: Land Cover within the White Oak Creek — Banister River Watershed............................................................................................ 5-16 Table 8: Projects and Impact Summary within the Sandy Creek — Dan RiverWatershed................................................................................... 5-19 Table 9: Land Cover within the Sandy Creek — Dan River Watershed ................... 5-21 Table 10: Projects and Impact Summary within the Lower Sandy River Watershed............................................................................................ 5-24 Table 11: Land Cover within the Lower Sandy River Watershed ............................. 5-26 Table 12: Projects and Impact Summary within the Cascade Creek Watershed............................................................................................ 5-29 Table 13: Land Cover Conversion within the Cascade Creek Watershed ................ 5-31 Table 14: Projects and Impact Summary within the Trotter's Creek — Dan RiverWatershed................................................................................... 5-34 Table 15: Land Cover within the Trotter's Creek — Dan River Watershed ................ 5-36 Table 16: Projects and Impact Summary within the Town -Creek — Dan River Watershed............................................................................................ 5-39 Table 17: Land Cover within the Town Creek — Dan River Watershed .................... 5-41 Table 18: Summary of Past, Present, and Planned Projects in the Amendment Project's HUC-12 Watersheds ........................................... 6-2 Table 19: Summary of Wetland Conversion within each Watershed .......................... 6-3 MVP Southgate Amendment Project Cumulative Impact Analysis ATTACHMENTS Attachment A Agency Call Logs Attachment B FOIA Requests and Responses Attachment C Cumulative Impacts Analysis Database Attachment D VA DEQ Projects Attachment E NC DEQ Projects Attachment F USACE Norfolk District Projects Attachment G USACE Wilmington District Projects MVP Southgate Amendment Project Cumulative Impact Analysis List of Abbreviations Abbreviation Term/Phrase/Name Amendment Project MVP Southgate Amendment Project CIA Cumulative Impacts Analysis DEMLR Division of Energy, Mineral, and Land Resources FERC Federal Energy Regulatory Commission FOIA Freedom of Information Act HDD horizontal directional drill HUC-12 12-digit Hydrological Unit Code IP Individual Permit LOD limits of disturbance Mountain Valley Mountain Valley Pipeline, LLC NC DEQ North Carolina Department of Environmental Quality NCDOT North Carolina Department of Transportation NCFS North Carolina Forest Service NHD National Hydrography Dataset NCLD National Land Cover Database NPDES National Pollution Discharge Elimination System NWI ROW U.S. National Wetlands Inventory right-of-way United States USACE U.S. Army Corps of Engineers USFWS U.S. Fish and Wildlife Service USGS U.S. Geological Survey VA DEQ Virginia Department of Environmental Quality VADOE Virginia Department of Energy VADOF Virginia Department of Forestry Virginia Department of Transportation Virginia Pollutant Discharge Elimination System Waters of the U.S. Water Quality Certification VDOT VPDES WOTUS WQC MVP Southgate Amendment Project Cumulative Impact Analysis Introduction 1.0 Introduction Mountain Valley Pipeline, LLC (Mountain Valley) is seeking an Individual Permit (IP) from the U.S. Army Corps of Engineers (USACE), Norfolk and Wilmington Districts, for the MVP Southgate Amendment Project (Amendment Project), which includes the construction of a 31.3 mile -long and 30-inch diameter natural gas pipeline. In support of the application, Mountain Valley has developed this Cumulative Impacts Analysis (CIA) to evaluate and describe the past, present, and planned projects within the 12- digit Hydrological Unit Code (HUC-12) watersheds associated with the Amendment Project. A comprehensive description of the Amendment Project can be found in the Amendment Project IP Application narrative, of which this document is included as an Appendix. This CIA provides a comprehensive look at the cumulative impacts, on a HUC-12 watershed level, of the temporary and permanent impacts associated with the Amendment Project and the past, present, and planned projects to aquatic resources (i.e., streams and wetlands) and land use. HUC-12 watersheds provide the appropriate scope for evaluating potential cumulative impacts to the aquatic ecosystem from the Amendment Project and other known or probable activities. In contrast, HUC-6 or HUC-8 watersheds cover much larger, more regional areas, making it difficult to meaningfully evaluate cumulative impacts as intended in the 404(b)(1) Guidelines. Projects that applied to federal, state, and local agencies or were active by December 1, 2022, were included in this analysis, along with planned projects that had not submitted documentation but that regulatory agencies were aware of or that were searchable via public news sources. 1-1 Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Data Acquisition Methodology Cumulative Impact Analysis 2.0 Data Acquisition Methodology Permitting information and other data were requested from numerous local, state, and federal agencies, including the Virginia Department of Environmental Quality (VA DEQ), Virginia Department of Energy (VADOE), VADOE Gas and Oil Information System, Virginia Department of Forestry (VADOF), Virginia Department of Transportation (VDOT), North Carolina Department of Environmental Quality (NC DEQ), NC DEQ Division of Energy, Mineral, and Land Resources (DEMLR), North Carolina Department of Transportation (NCDOT), North Carolina Forest Service (NCFS), USACE Norfolk and Wilmington Districts, county planning departments, and county floodplain coordinators. Calls to agencies were recorded in Call Logs, which are provided in Attachment A. Public resources, including the Virginia Regulatory Town Hall website, the VA DEQ Virginia Pollutant Discharge Elimination System (VPDES) Public Notice website, and the Virginia Permit Transparency and Permitting Enhancement and Evaluation Platform were mined for permit information within Pittsylvania County. Mountain Valley then submitted Freedom of Information Act (FOIA) requests to and/or contacted directly county and regional planning agencies located in Pittsylvania County, Virginia, and Rockingham County, North Carolina. Copies of these FOIA requests, along with documentation of agency response, when provided, are included in Attachment B. Additionally, internet searches were conducted to identify large development projects that were announced as upcoming in the region. The information was then summarized and grouped into several categories to identify the activities occurring within each United States (U.S.) Geological Survey (USGS) Watershed Boundary Dataset HUC-12 watershed. Mountain Valley categorized the data into nine categories based on authorizations, activities, and permitting status: Utility Lines, Residential Developments, Commercial/Industrial Developments, Transportation projects, additional Mining projects (beyond those identified in the commercial/industrial development category), additional Oil and Gas Well Developments (beyond those identified in the Commercial/Industrial Developments category), Forestry projects, other non -construction projects with National Pollution Discharge Elimination System (NPDES)/VPDES permits, and Planned projects. On request, the above agencies provided links to online databases and spatial frameworks that allowed the download of electronic copies of documents and information pertaining to projects within the relevant HUC-12 watersheds. In some cases, searching the online databases did not provide project information beyond projects obtained through these requests. Online searches were reviewed for relevance to the selected project categories and excluded if not relevant or if outside of the HUC-12 boundaries. Occasionally, multiple permits may have been obtained from multiple agencies for the same project, representing phases of an overall project. As a conservative measure, each permit from each phase remains in the database and is included in watershed project totals. Limits of disturbance (LOD) acreage, total stream and wetland impact acreages, and linear footage of stream impacts from each permit, if available, were included for analysis. Total stream and wetland impact acreages and linear footage of stream impacts for the LOD of the Amendment Project were calculated from wetland delineations completed by Mountain Valley's consultant. This CIA considers both impacts occurring within the temporary and permanent project easement to Waters of the U.S. (WOTUS) in acreage totals. Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Cumulative Impact Analysis Data Acquisition Methodology Additional data sources were used to identify the baseline stream and wetland resources within each HUC-12 watershed, including the USGS National Hydrography Dataset (NHD) and the U.S. Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI).' z The NHD represents the water drainage network of the United States with features such as rivers, streams, canals, lakes, ponds, coastlines, dams, and stream gages. NHD is updated and maintained through partnerships with states and other collaborative bodies. The digital format NWI maps were developed by USFWS in collaboration with the USGS Water Resource Division. The NWI maps are prepared primarily by stereoscopic analysis of high -altitude aerial photographs to produce reconnaissance -level information on the location, type, and size of wetland habitats. In accordance with the Cowardin System, all wetlands are identified based on vegetation, visible hydrology, and geography. According to the USFWS, the aerial photographs reflect conditions during the year and season they were taken; however, there is a margin of error inherent in the use of aerial photographs to delineate wetlands. Therefore, wetland boundaries established through the interpretation of aerial photographs may be revised based on a detailed ground survey and historical analysis of an individual site. It is, therefore, important to note that the NHD and NWI datasets used were not field -validated outside of the Amendment Project LOD, and our analysis may, therefore, potentially overestimate or underestimate aquatic resources within the HUC-12 watersheds. The NWI dataset was used to represent the total amount of aquatic resources within each HUC-12 watershed and for calculating the relative impacts of the Amendment Project and past, present, and planned projects. Finally, the USGS National Land Cover Database (NLCD) was used to obtain and summarize the land cover types within each watershed.3 The NLCD is a comprehensive resource that provides detailed information on land cover across the United States. This database is generated annually through a collaborative effort with the Multi -Resolution Land Characteristics Consortium. Landsat satellites first capture images of the Earth's surface at a 30-meter resolution. The spectral signatures of the land cover within these images are then classified into 16 distinct classes. Classification errors can occur due to the similarities in spectral signatures of different land cover types, and underrepresentation of wetland areas smaller than 30 meters may occur. NLCD data were downloaded, and acreages were summarized by land use type for each of the HUC-12 watersheds as well as for the Amendment Project LOD. All relevant data were aggregated and placed into ArcGIS and Google Earth to confirm project locations within the HUC-12 watersheds (Figure 1). A master spreadsheet of these projects and impact information was generated, along with LOD and impacts associated with each type of project, when available (Attachment C). The narrative language, summary tables, and mapping provided herein were developed using the compiled information. 1 NHD. 2024. National Hydrography Dataset: NHDFlowline. Available at: https://www.usgs.gov/national- hydrography/national-hydrography-dataset. Accessed December 2024. Z NWI. 2024. Wetlands Data Layer. Available at: https://www.fws.gov/program/national-wetlands- inventory/wetlands-data. Accessed December 2024. 3 NLCD. 2024. Annual NLCD (2023) for the Conterminous United States. October 2024. Available at: https://www.usgs.gov/media/images/annual-nlcd-2023-conterminous-united-states. Accessed December 2024. 2-2 Mountain Valley Pipeline, LLC L• - "! fit•' , � ��,�or 1 '4 ►I �1��agar • ti ` MVP Southgate Amendment Project Data Source Summary Information Cumulative Impact Analysis 3.0 Data Source Summary Information This section provides a description of the project categories, including the agencies from which the information for each category was requested. Note that the specific authorizations varied based on the regulatory requirements of the state in which each project occurred. Information obtained from the agencies was used to summarize and describe the total LOD acreages. Permanent and temporary stream and wetland impact acreages and linear footage of stream impacts were calculated using wetland delineation data from Mountain Valley's consultant. At the time of this writing, Mountain Valley has not received project information from NC DEQ DEMLR and Rockingham County, North Carolina. Pittsylvania County declined the FOIA request; however, Mountain Valley is continuing to coordinate with Pittsylvania County to obtain relevant project information within the county. The Utility Line projects category is limited to oil/gas pipelines, sanitary sewer lines, water lines, electric lines, communication lines, and potable water lines (based on available data) that required and received at least one of the following authorizations, as applicable to each project's location: a USACE Section 404 permit, VA DEQ Section 401 Water Quality Certification (WQC), VA DEQ Construction General VPDES permit, NC DEQ Section 401 WQC, NC DEQ NPDES Wastewater permit, and NC DEQ Construction Stormwater Certification of Coverage (Attachments D—G). Please note that LOD and/or aquatic resource impacts were not available for all projects identified. Residential Development projects include residential development construction (based on available data) that required and received at least one of the following authorizations, as applicable to each project's location: USACE Section 404 permit, VA DEQ Section 401 WQC, VA DEQ Construction General VPDES permit, NC DEQ Section 401 WQC, and NC DEQ Construction Stormwater Certification of Coverage (Attachments D—G). Please note that LOD and/or aquatic resource impacts were not available for all projects identified. Commercial/Industrial projects include all commercial and or industrial projects (mining, oil and gas development, manufacturing, solar developments, etc., based on available data) that required and received at least one of the following authorizations, as applicable to each project's location: USACE Section 404 permit, VA DEQ Section 401 WQC, VA DEQ Construction General VPDES permit, NC DEQ Section 401 WQC, NC DEQ NPDES Wastewater Permit, and NC DEQ Construction Stormwater Certification of Coverage (Attachments D—G). Please note that LOD and/or aquatic resource impacts were not available for all projects identified. Transportation projects include VDOT and NCDOT projects (based on available data) that required and have received at least one of the following authorizations, as applicable to each project's location: USACE Section 404 permit, VA DEQ Section 401 WQC, VA DEQ Construction General VPDES permit, NC DEQ Section 401 WQC, and NC DEQ Construction Stormwater Certification of Coverage (Attachments D—G). Please note that LOD and/or aquatic resource impacts were not available for all projects identified. Forestry projects include timbering operations licensed by the VADOF or NCFS (Attachments D—G). LOD acreage is equal to the total disturbance acreage. No aquatic impacts were reported for this category for the Amendment Project HUC-12 watersheds. Mining projects include surface mines, underground mines, mining haul roads, preparation plants, loadouts, and mine reclamation actions previously authorized by the VA DEQ or NC DEQ that were not Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Cumulative Impact Analysis Data Source Summary Information included under the Commercial/Industrial category due to lack of corresponding USACE Section 404, VA DEQ Section 401 WQC, VA DEQ Construction General VPDES authorizations, NC DEQ Section 401 WQC, NC DEQ NPDES Wastewater Permit, and/or NC DEQ Construction Stormwater Certification of Coverage. No past, present, or planned projects in this category were identified within the Amendment Project HUC-12 watersheds. Oil and Gas Well Development projects include those that required and have received conventional and non -conventional well permit authorizations from the VADOE Gas and Oil Information Program or the NC DEQ DEMLR and that were not included under the Commercial/Industrial category due to lack of corresponding USACE Section 404, VA DEQ Section 401 WQC, VA DEQ Construction General VPDES authorizations, NC DEQ Section 401 WQC, NC DEQ NPDES Wastewater Permit, and/or NC DEQ Construction Stormwater Certification of Coverage. No past, present, or planned projects in this category were identified within the Amendment Project HUC-12 watersheds. Other NPDES/VPDES projects include those projects that required and have received VA DEQ/NC DEQ Individual or Industrial/General authorizations and that were not included under other categories previously listed (i.e., Utility Line, Residential Development, Commercial/Industrial, Transportation) and did not require or receive a corresponding USACE Section 404, VA DEQ Section 401 WQC, and/or NC DEQ Section 401 WQC. These include general non -construction stormwater authorizations, home aeration unit seals, general sewage authorizations, individual Publicly Owned Treatment Works authorizations, industrial authorizations, etc. (Attachments D—G). Planned projects include those with pending modifications of existing permits from or new permit applications to the USACE, VDOT, NC DEQ, NCDOT, and/or water sewer authorities; those separately identified by federal, state, and regulatory agencies; and/or those listed by Pittsylvania County and Rockingham County planning/development offices. VADOE, VA DEQ, VADOF, NC DEQ, and NCFS did not include planned projects with the information they provided or made available. Please note that LOD and/or aquatic resource impacts were not available for all projects identified. 3-2 Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Cumulative Impact Analysis Project Impacts 4.0 Project Impacts Stream crossings for the Amendment Project will not involve the permanent alteration of streambeds or the placement of any permanent structure within WOTUS that will impede or alter stream flow. Pipeline construction through regulated waters will be accomplished using conventional dry -ditch open - cut or trenchless methods. Where the dry -ditch method is employed, flowing water will be diverted around the crossing through the installation of a dam -and -pump or flume, with the specific water diversion method to be decided during construction by the construction supervisor and/or the Mountain Valley representative based on conditions at the time of the crossing. Where trenchless methods are employed, the pipe will be installed with specialized equipment that bores or tunnels under aquatic resources using either conventional bore or horizontal directional drill (HDD). Mountain Valley will implement the Federal Energy Regulatory Commission (FERC) Upland Erosion Control, Revegetation, and Maintenance Plano and Wetland and Waterbody Construction and Mitigation Procedures5 and its project -specific Erosion and Sediment Control Plan that complies with state -specific regulations to minimize impacts during construction. Cleanup and restoration will commence as soon as practicable following the completion of backfilling and testing. Cleanup and restoration activities include restoring grade cuts to pre -construction contours, with stockpiled topsoil re -spread and decompacted. Disturbed areas will be seeded with a regional native seed mix, fertilized, and mulched to restore ground cover, minimize erosion, and stabilize stream banks for their natural reversion toward their previous state. Stream banks and beds will be restored as described in the plan and procedures referenced above for surface water and groundwater flow, and mulch, jute thatching, or bonded -fiber blankets will be installed on the stream banks. While most Amendment Project impacts will be temporary, some amount of wetland -type conversion will occur where it is necessary to convert palustrine forested (PFO) wetland and palustrine scrub -shrub (PSS) wetland to palustrine emergent (PEM) wetland to allow for right-of-way (ROW) access. Wetlands within the construction corridor that will not be crossed by the pipeline will be avoided where practicable and demarcated with signage and erosion and sediment controls (or other visible barriers). Where avoidance is not practicable, timber mats will be installed to minimize impacts from compaction and ground disturbance. Once construction is complete, the timber mats will be removed as soon as practicable, and the affected areas will be de -compacted and returned to pre -construction elevations to the extent practicable. 4 FERC. 2013a. Wetland and Waterbody Construction and Mitigation Procedures. Washington, DC: Office of Energy Projects, May 2013. 5 FERC. 2013b. Upland Erosion Control, Revegetation, and Maintenance Plan. Washington, DC: Office of Energy Projects, May 2013. Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts 5.0 Watershed Impacts The Amendment Project extends 31.3 miles across eight HUC-12 watersheds, including two states and counties: Pittsylvania, Virginia, and Rockingham, North Carolina (Table 1; Figure 2). This section summarizes, per HUC-12 watershed, the estimated total streams, wetlands, and land cover, the number of past, present, and planned projects per category and their impacts, and the Amendment Project impacts. Amendment Project impacts are presented as linear feet and acreage of streams, acreage of wetlands, and acreage of land cover within the Amendment Project LOD, which is comprised of (1) the operations footprint that represents the permanent easement of the Amendment Project, including the aboveground facilities, access roads, and groundbeds; and (2) the temporary construction footprint that includes pipeline installation and may also indicate temporary construction work areas, including access roads and laydown areas. Note that the LOD may overstate the Amendment Project's impact area as it is unlikely that ground -disturbing activities will occur within the entirety of the defined Amendment Project LOD. For example, existing access roads will occasionally be used for movement within the Amendment Project area. As the methodology for reporting impacts from other projects is unknown, this CIA calculated other project impacts by combining available reported temporary and permanent impacts. Therefore, total aquatic impacts across the watershed were determined through the combination of the Amendment Project's LOD and the permanent and temporary impacts of other projects within the watershed. Land cover conversion for the Amendment Project was calculated using NLCD land cover data from each watershed and within the Amendment Project LOD. The change in LOD acreage is the difference between existing land cover types and the assumed post -construction land cover types. The land cover categories of Open Water, Developed High Intensity, Developed Medium Intensity, Developed Low Intensity, and Developed Open Space are not expected to be changed by construction. All Woody Wetland land cover will be converted to Emergent Herbaceous Wetland land cover. All remaining land cover types will be converted to Grassland/Herbaceous. Table HUC-12 Watersheds within the Amendment Project Area HUC-12 12-Digit Watershed Watershed Designation County Pittsylvania County State Acreage 18,810 Shockoe Creek — 30101050203 Virginia Banister River Cherrystone Creek 30101050104 Pittsylvania County Virginia 29,141 White Oak Creek— 30101050103 Pittsylvania County Virginia 23,135 Banister River Sandy Creek— Dan 30101030907 Pittsylvania County Virginia 20,677 River Lower Sandy River 30101031003 Pittsylvania County Virginia 34,722 Cascade Creek 30101030902 Rockingham County North Carolina 27,013 Pittsylvania County Virginia Trotter's Creek — 30101030903 Rockingham County North Carolina 27,799 Dan River Pittsylvania County Virginia Town Creek — Dan River 30101030901 Rockingham County North Carolina 22,531 Mountain Valley Pipeline, LLC r zv if y 7� '�'• r k' T .. � a� m .*, a ,y,�a"�: � m� • ��' i Y ir. r U � 0 Rio LP o a� NZ Ir- IL � • 0 � c C � • I m ' E w a) LL I I ' ` MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts It is important to note that while a permanent operations easement will be established, it will not result in permanent impacts to streams. Once a crossing is completed, it will be restored as closely as possible to the base condition as described in Section 4. Acreages of stream impacts were calculated from wetland delineation boundaries. Non -regulated streams and streams that will be avoided using boring methods were not included in calculated stream impacts. As mentioned above, there will be some amount of conversion of PFO and PSS wetlands to PEM wetlands. To estimate the acreages of these conversions, the NLCD Woody Wetland land cover (which accounts for PFO and PSS wetlands) was quantified within the Amendment Project LOD and assumed to be permanently converted to the NLCD Emergent Herbaceous Wetland land cover. 5.1 Shockoe Creek — Banister River The Amendment Project occupies 3.2 acres within the Shockoe Creek — Banister River HUC-12 watershed. Wetland delineation data indicate that there are no anticipated impacts to aquatic resources within this watershed from the Amendment Project (Table 2; Figure 3). Past and present projects identified in the Shockoe Creek — Banister River watershed include four Utility Line projects and one Forestry project. No Planned projects were identified within the watershed. The total known disturbed acreage for the past and present projects, including the Amendment Project, is approximately 33.2 acres, which is approximately 0.2 percent of the watershed total acreage. There are no known impacts to aquatic resources (as available and identified) in the Shockoe Creek — Banister River watershed for the past and present projects, including the Amendment Project (Table 2). The NLCD data show land cover in the Shockoe Creek — Banister River watershed is predominantly Deciduous Forest, representing 27 percent of the watershed (Table 3; Figure 4). Other common land cover categories include Pasture/Hay (20 percent), Evergreen Forest (15 percent), Mixed Forest (13 percent), Grassland/Herbaceous (7 percent), and Shrub/Scrub (7 percent). The Amendment Project LOD consists predominantly of Developed Open Space (38.7 percent), Pasture/ Hay (25.8 percent), and Developed High Intensity (19.4 percent). Land cover conversion within the Amendment Project LOD will include 0.8 acre of Pasture/Hay and 0.1 acre of Deciduous Forest to Grassland/Herbaceous (Table 3). No permanent conversion of Woody Wetland will occur within the Shockoe Creek — Banister River watershed as a result of the Amendment Project. 5-3 Mountain Valley Pipeline, LLC ) §%_ coCL \ 2 \ co Cl) �u \ w _ 00 = 0 e 2W 04 \ \ �\} \ ( 0\ �� \ §] |E a. 2\ [5 a. 0 § ®{ /\ a. 7 §/ / \ ! , , , , , , , , , Q a) ° k� \\ §£ )0 LO 2 \ 0 LL /\ -j ƒ Q , , , , $ § \ \ > \\ »\ » 0 0 0 0 0 0 0 w] E _ _ \\ § -_ m \ \ 00 E § / ƒ -00L _ § ; -a)20 k # k \E) m \ E \ / a § 0- 0 270 - - - - } \ } 0 ) } \ k k \ ) ) ) \ ) £ § § - — - ice`• � •�� � li:. _ • �atr i� 46* J MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 3: Land Cover within the Shockoe Creek - Banister River Watershed Post- Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Pasture/Hay 3,715 20% 0.8 25.8% 3,714.2 -0.02 Deciduous Forest 5,130 27% 0.2 3.2% 5,129.8 -0.003 Barren Land 0 0% 0.0 0.0% 0.0 0.0 Cultivated Crops 716 4% 0.2 6.5% 716.0 0.0 Developed High 1 0% 0.6 19.4% 1.0 0.0 Intensity Developed Low 173 o 1 /0 0.0 0 0./0 0 173.0 0.0 Intensity Developed 12 0% 0.0 0.0% 12.0 0.0 Medium Intensity Developed Open 849 5% 1.2 38.7% 849.0 0.0 Space Emergent Herbaceous 4 0% 0.0 0.0% 4.0 0.0 Wetland Evergreen Forest 2,899 15% 0.0 0.0% 2,899.0 0.0 Mixed Forest 2,466 13% 0.2 6.5% 2,466.0 0.0 Open Water 29 0% 0.0 0.0% 29.0 0.0 Shrub/Scrub 1,285 7% 0.0 0.0% 1,285.0 0.0 Woody Wetland 221 1 % 0.0 0.0% 221.0 0.0 Grassland/ 1,309 7% 0.0 0.0% 1,309.9 0.07 Herbaceous 5-6 Mountain Valley Pipeline, LLC A-4 11 MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts 5.2 Cherrystone Creek The Amendment Project occupies 80.0 acres within the Cherrystone Creek HUC-12 watershed. Based on wetland delineation data within the LOD, the Amendment Project will result in approximately 6.5 acres of impact to wetlands and 0.08 acre of streams (410.3 linear feet), including 2.5 acres of wetland within the 20.1-acre permanent operations footprint (Table 4; Figure 5). Past and present projects identified in the Cherrystone Creek watershed include four Utility Line projects, one Residential Development project, four Commercial/Industrial projects, and one Forestry project. Two Planned projects were identified within the watershed. The total known disturbed acreage for the past, present, and planned projects, including the Amendment Project, is approximately 278.1 acres, which is approximately 1.0 percent of the watershed. The total impacts to aquatic resources (as available and identified) in the Cherrystone Creek watershed for the past and present projects, including the Amendment Project, are approximately 7.8 acres. These impacts to aquatic resources represent approximately 1.4 percent of aquatic resources within the watershed. The NLCD data show that land cover in the Cherrystone Creek watershed is predominantly Pasture/Hay, representing 34 percent of the watershed (Table 5; Figure 6). Other common land cover categories include Deciduous Forest (22 percent), Evergreen Forest (10 percent), Mixed Forest (10 percent), and Developed Open Space (7 percent). The Amendment Project LOD primarily encompasses Pasture/Hay (42.6 percent), Deciduous Forest (15.9 percent), and Developed Low Intensity (11.3 percent). Land cover conversion to Grassland/ Herbaceous within the Amendment Project LOD will include 34.1 acres of Pasture/Hay (0.3 percent of watershed Pasture/Hay), 3.9 acres of Shrub/Scrub (0.3 percent of watershed Shrub/Shrub), 12.7 acres of Deciduous Forest (0.2 percent of watershed Deciduous Forest), 4.0 acres of Mixed Forest (0.1 percent of watershed Mixed Forest), and 2.9 acres of Evergreen Forest (0.1 percent of watershed Evergreen Forest). Up to 0.8 acre of Woody Wetland (0.7 percent of watershed Woody Wetland) may be permanently converted to Emergent Herbaceous Wetland as a result of the Amendment Project (Table 5). 5-8 Mountain Valley Pipeline, LLC / §%_ co� _ L �u \ )� e % ! 22 & CL �\} \ � \ / ( , , , , , , , ,00 § \ » e ) ) _ _ ff ! k] |E ci CiC\l- / & k , , , , , , , , E Cl), Cl)Lo \\ \0 k]Lo, ° ° , , , , , , , [5 )/ ) ) � 0 2 a. k j §co a = \ \ f o , , , , , , , , )) \ ƒ r-- ;p v -2 a. 0 a $ �\ E 2 f = �0j kL CL 7? — §{ o \ t ƒ , , , , , , , . 2 > § /LL R \ 0 Q , 2 , J , , , \ / \ \ \ { ) ))§% u !:¢ // » It 0 0 0 0 � )\2E a) CL >M w- \w — ( E § 22 —_ m §/){E[ ƒ / \ / ELo _ m :/\ ) a)o \ ! 2 ! E 5 f 20200 _ [ _ \ ) \ k k \ ) ) ) \) m } m G } � £ § § T t s .t fil.10 &-el �; �►'* Lei► *ffir 4 t -.— - J MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 5: Land Cover within the Cherrystone Creek Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Woody Wetland 123 <1 % 0.8 1.0% 122.2 -0.7 Pasture/Hay 9,846 34% 34.1 42.6% 9,811.9 -0.3 Shrub/Scrub 1,234 4% 3.9 4.9% 1,230.1 -0.3 Deciduous Forest 6,286 22% 12.7 15.9% 6,273.3 -0.2 Mixed Forest 2,883 10% 4.0 5.0% 2,879.0 -0.1 Evergreen Forest 2,884 10% 2.9 3.6% 2,881.1 -0.1 Barren Land 4 <1 % 0.0 0.0% 4.0 0.0 Cultivated Crops 1,065 4% 0.0 0.0% 1,065.0 0.0 Developed High 61 <1% 3.8 4.8% 61.0 0.0 Intensity Developed Low 852 o 3 /0 9.0 0 11./0 3 852.0 0.0 Intensity Developed 229 1 % 3.9 4.9% 229.0 0.0 Medium Intensity Developed Open 2,018 7% 3.7 4.6% 2,018.0 0.0 Space Open Water 192 1 % 0.2 0.3% 192.0 0.0 Grassland/ 1,461 5% 1.0 1.3% 1,518.6 3.9 Herbaceous Emergent Herbaceous 2 <1 % 0.0 0.0% 2.8 40 Wetland 5-11 Mountain Valley Pipeline, LLC Ys I It 4, Ow, 0 . ro Zt- MVP Southgate Amendment Project Watershed Impacts Cumulative Impact Analysis 5.3 White Oak Creek — Banister River The Amendment Project occupies 130.8 acres within the White Oak Creek — Banister River HUC-12 watershed and, based on wetland delineation data, will result in impacts up to 3.3 acres of wetlands and 0.3 acre of streams (1,674.7 linear feet), including 2.4 acres of wetlands within a 48.1-acre permanent operations footprint (Table 6; Figure 7). Past and present projects identified in the White Oak Creek — Banister River watershed include four Utility Line projects, eight Commercial/Industrial projects, one Transportation project, and one Other NPDES/VPDES project. No Planned projects were identified. The total known disturbed acreage for the past and present projects, including the Amendment Project, is approximately 248.5 acres, which is approximately 1.1 percent of the watershed. The total impacts to aquatic resources (as available and identified) in the White Oak Creek — Banister River watershed for the past and present projects, including the Amendment Project, are approximately 5.1 acres. These impacts to aquatic resources represent approximately 0.9 percent of aquatic resources within the watershed. The NLCD shows land cover in the White Oak Creek — Banister River watershed is predominantly Pasture/Hay (28 percent) and Deciduous Forest (27 percent) (Table 7; Figure 8). Other common land cover includes Mixed Forest (10 percent), Cultivated Crops (8 percent), Evergreen Forest (8 percent), and Developed Open Space (5 percent). The Amendment Project encompasses primarily Pasture/Hay (37.9 percent), Deciduous Forest (21.2 percent), and Mixed Forest (12.1 percent). Land cover conversion to Grassland/Herbaceous within the Amendment Project LOD will include 49.6 acres of Pasture/Hay (0.8 percent of watershed Pasture/Hay), 27.7 acres of Deciduous Forest (0.4 percent of watershed Deciduous Forest), 15.8 acres of Mixed Forest (0.7 percent of watershed Mixed Forest), 12.4 acres of Evergreen Forest (0.6 percent of watershed Evergreen Forest), and 10.9 acres of Cultivated Crops (0.6 percent of watershed Cultivated Crops). Up to 0.6 acre of Woody Wetland (0.3 percent of watershed Woody Wetland) may be permanently converted to Emergent Herbaceous Wetland as a result of the Amendment Project (Table 7). 5-13 Mountain Valley Pipeline, LLC / §%_co Cl) co It � �u e Lo \ w e L 2 ! 22 & 04 Cl) Cl) �\} \ \ (k , , , , , , , , ® ° -E_ §\ w CIF ! _ Jf m |E - a\ § , , , , , , , , , _ \� \ �Lo a) , , , , , , , , _ [k- a (Yi o - 2? ) $ , , , , , , , , � o Cl) U) a. k § § a = � E 2 £ o , , , , , , , , % / 2 \ A k a-8 CL_ w Qp v v /\ a. _ \ k k k ) ( r0 ~ ° \§ CL |f � )) G\ t » a) tLL , \�o� § , , , , , , , , 08 � { - ))§% / / 'Ito = o 0 0 o CL \ / \ \ \ �a:o ._ a) CL >M c? - F § 22 I - - m § 0 / � \ /Lo ) \ \ \ I _ - _ §/) §o!§5f ) )\) g . �727)9 - - § - - } \ } ) } \ kk \ ) G MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 7: Land Cover within the White Oak Creek - Banister River Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Pasture/Hay 6,438 28% 49.6 37.9% 6,388.4 -0.8 Mixed Forest 2,406 10% 15.8 12.1% 2,390.2 -0.7 Evergreen Forest 1,940 8% 12.4 9.5% 1,927.6 -0.6 Cultivated Crops 1,808 8% 10.9 8.3% 1,797.1 -0.6 Deciduous Forest 6,200 27% 27.7 21.2% 6,172.3 -0.4 Woody Wetland 194 1 % 0.6 0.5% 193.4 -0.3 Shrub/Scrub 964 4% 2.7 2.1% 961.3 -0.3 Barren Land 62 <1 % 0.0 0.0% 62.0 0.0 Developed High 85 <1% 0.0 0.0% 85.0 0.0 Intensity Developed Low 560 o 2 /0 2.7 0 2./0 1 560.0 0.0 Intensity Developed 206 1 % 0.4 0.3% 206.0 0.0 Medium Intensity Developed Open 1,242 5% 7.1 5.4% 1,242.0 0.0 Space Open Water 80 <1 % 0.0 0.0% 80.0 0.0 Grassland/ 950 4% 0.9 0.7% 1,069.1 12.5 Herbaceous Emergent Herbaceous 1 <1 % 0.0 0.0% 1.6 60.0 Wetland 5-16 Mountain Valley Pipeline, LLC _;ILI 1 9 Y a� > -o L N N N N O C •� r a Q 00 f3 f4 L O N Y �(n E a)O yJ IL_0 > U Z E► E Q0 0 a) LO r ..-�-. i% 0 cc LO r 0 LO O o 0 0 U U p_ O � o � S U S `m c') a . m� t_ in 0 = U w 1�1111 m Y T c Y U � c m U 3 m0 g = O o LL L d d � O O J O N 0 O O N N m x oomow _ 1111 M N O (6 (/! O (6 C C m o a o 0> coO J U O O (� N M N N U) N N a> N 0 0 0 OL�ZI 1 MVP Southgate Amendment Project Watershed Impacts Cumulative Impact Analysis 5.4 Sandy Creek — Dan River The Amendment Project occupies 68.5 acres within the Sandy Creek — Dan River HUC-12 watershed and, based on wetland delineation data, will result in impacts to 0.5 acre of wetland and 0.2 acre of streams (1,505.1 linear feet of streams), including 0.5 acre of wetland within a 25.5-acre permanent operations footprint (Table 8; Figure 9). Past and present projects identified in the Sandy Creek — Dan River watershed include four Utility Line projects and one Transportation project. No planned projects were identified. The total known disturbed acreage for the past and present projects, including the Amendment Project, is approximately 127.1 acres, approximately 0.6 percent of the watershed. The total impacts to aquatic resources (as available and identified) in the Sandy Creek — Dan River watershed for the past and present projects, including the Amendment Project, are approximately 1.0 acre. These impacts to aquatic resources represent approximately 0.6 percent of aquatic resources within the watershed. The NLCD data show land cover in the Sandy Creek — Dan River watershed is predominantly Deciduous Forest, representing 30 percent of the watershed (Table 9; Figure 10). Other common land cover categories include Pasture/Hay (23 percent), Developed Open Space (11 percent), Mixed Forest (11 percent), and Evergreen Forest (10 percent). The Amendment Project encompasses primarily Deciduous Forest (27.4 percent), Pasture/Hay (22.2 percent), and Evergreen Forest (21.0 percent). Land cover conversion to Grassland/Herbaceous within the Amendment Project LOD will include 3.7 acres of Shrub/Scrub (0.6 percent of watershed Shrub/Scrub), 18.8 acres of watershed Deciduous Forest (0.3 percent of Deciduous Forest), 15.2 acres of Pasture/Hay (0.3 percent of watershed Pasture/Hay),14.4 acres of Evergreen Forest (0.7 percent of watershed Evergreen Forest), 6.6 acres of Cultivated Crops (1.4 percent of watershed Cultivated Crops), and 4.5 acres of Mixed Forest (0.2 percent of watershed Mixed Forest). No Woody Wetland will be converted within the Sandy Creek — Dan River watershed as a result of the Amendment Project (Table 9). 5-18 Mountain Valley Pipeline, LLC ) §%_ } �u \ E Cq ]W \ \ \} \ \ ( , , , , , , , ,co §\ ) _ |; 17 / { § k Cl) Cl) j} / k ]Lo C,4, , , , , , , , _ ) ; Q/ : E W ° ° k § § a = § 0 k J _ , , , , , , , , , Q / 2 \ } k e—CL— £ |E ; _ a. \ k § 9 ( , , , , , , , , p `/ \) ° ° — ) CL §I -® \ } LO , , , , , , , , § ! ƒ2 L6 � / \��� \ _ Z \ 7 \ 7 , , , , , , , , � = r — \)/y �CL\ ») » o o 0 0 0 0 0 W\/& c z ®/ !Iƒg=\ !2\\\ § 20 w — m § 0 \ \ /_/�\E )_ \ \ ° /\§j2 � CL \ k °` E [ C — z _ E727)» \ ) j j _ \ \ ) — } G kk £ § § MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 9: Land Cover within the Sandy Creek - Dan River Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Cultivated Crops 485 2% 6.6 9.6% 478.4 -1.4 Evergreen Forest 2,015 10% 14.4 21.0% 2,000.6 -0.7 Shrub/Scrub 592 3% 3.7 5.4% 588.3 -0.6 Pasture/Hay 4,756 23% 15.2 22.2% 4,740.8 -0.3 Deciduous Forest 6,306 30% 18.8 27.4% 6,287.2 -0.3 Mixed Forest 2,171 11% 4.5 6.6% 2,166.5 -0.2 Barren Land 0 0% 0.0 0.0% 0.0 0.0 Developed High 175 1% 0.0 0.0% 175.0 0.0 Intensity Developed Low 1,314 o 6/0 0.5 0 0./0 6 1,314.0 0.0 Intensity Developed 384 2% 0.1 0.1 % 384.0 0.0 Medium Intensity Developed Open 2,244 11% 2.3 3.5% 2,244.0 0.0 Space Open Water 44 <1 % 0.0 0.0% 44.0 0.0 Woody Wetland 8 <1 % 0.0 0.0% 8.0 0.0 Emergent Herbaceous 0 0% 0.0 0.0% 3.7 >0.0 Wetland Grassland/ 181 1 % 2.4 3.5% 244.2 34.9 Herbaceous 5-21 Mountain Valley Pipeline, LLC ss �. ;f • "r a.•r�' MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts 5.5 Lower Sandy River The Amendment Project occupies 75.1 acres within the Lower Sandy River HUC-12 watershed and, based on wetland delineation data, will result in 0.2 acre of impact to wetlands and 0.1 acre of impact to streams (969.0 linear feet), including 0.02 acre of wetland within a 28.3-acre permanent operations footprint (Table 10; Figure 11). Past and present projects identified in the Lower Sandy River watershed include four Utility Line projects and five Transportation projects. No Planned projects were identified in the watershed. The total known disturbed acreage for the past and present projects, including the Amendment Project, is 323.9 acres, which is approximately 0.9 percent of the watershed. The total impacts to aquatic resources (as available and identified) in the Lower Sandy River watershed for the past and present projects, including the Amendment Project, are approximately 0.5 acre. These impacts to aquatic resources represent approximately 0.3 percent of aquatic resources within the watershed. The NLCD data show land cover in the Lower Sandy River watershed is predominantly Deciduous Forest, representing 31 percent of the watershed (Table 11; Figure 12). Other common land cover categories include Pasture/Hay (25 percent), Mixed Forest (13 percent), Evergreen Forest (9 percent), Developed Open Space (8 percent), and Developed Low Intensity (4 percent). The Amendment Project LOD encompasses primarily Pasture/Hay (54.7 percent), Deciduous Forest (11.2 percent), and Mixed Forest (10.3 percent). Land cover conversion to Grassland/Herbaceous within the Amendment Project LOD will include 41.0 acres of Pasture/Hay (0.5 percent of watershed Pasture/ Hay), 8.4 acres of Deciduous Forest (0.1 percent of watershed Deciduous Forest), 7.7 acres of Mixed Forest (0.2 percent of watershed Mixed Forest), 6.8 acres of Cultivated Crops (3.1 percent of watershed Cultivated Crops), and 1.1 aces of Evergreen Forest (0.3 percent of watershed Evergreen Forest) land cover in the watershed. No Woody Wetland land cover will be converted within the Lower Sandy watershed as a result of the Amendment Project (Table 11). 5-23 Mountain Valley Pipeline, LLC ) §%_ co } �u } ]\ 22 & 04 \ \ �\} \ \ cq ( k , , , , , , , , 0)Cl)— ( §\ w _LD ! _ Jf §] |E - § , , , , , , , , , 16 a\ � \� �\ a) o 0 0 _ [a � 22 \ \ � C) ;/ § n = �a § ( § J § 2 = £ = o k /\ £ {/ Cl) �- ; p , , , , , , , , , \ / v _ a.10 \ E §_ § k ) \ , , , , , , , , / L6 � �Lo 0LL /§ CL ,{ — §f a) k 17 , , , , , , , 00 / 7 \ Cl), L # LL CL 'o /\E00 , , , , , , , )\7\ - - C !)§% ![/ /\ » o o e o 0 0 0 0\ E j§ Z !«\\\ — (2`r42 § �/22 — m I § r \ /\\k®� )_ \ \ \ z ` _ ° )oa)0 ) Z )!) _ \ § w ± z 2 i 27)7} \ } } \ \ ) )�)\)\) } G ) kk MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 11: Land Cover within the Lower Sandy River Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Cultivated Crops 221 1 % 6.8 9.1 % 214.2 -3.1 Pasture/Hay 8,835 25% 41.0 54.7% 8,794.0 -0.5 Mixed Forest 4,381 13% 7.7 10.3% 4,373.3 -0.2 Shrub/Scrub 1,111 3% 1.9 2.5% 1,109.1 -0.2 Deciduous Forest 10,781 31% 8.4 11.2% 10,772.6 -0.1 Evergreen Forest 3,250 9% 1.1 1.5% 3,248.9 -0.3 Barren Land 0 0% 0.0 0.0% 0.0 0.0 Developed High 153 <1% 0.0 0.0% 153.0 0.0 Intensity Developed Low 1,546 o 4 /0 1.0 0 1./0 3 1,546.0 0.0 Intensity Developed 310 1 % 0.4 0.5% 310.0 0.0 Medium Intensity Developed Open 2,888 8% 5.3 7.0% 2,888.0 0.0 Space Open Water 81 <1 % 0.0 0.0% 81.0 0.0 Woody Wetland 4 <1 % 0.0 0.0% 4.0 0.0 Emergent Herbaceous 0 0% 0.0 0.0% 1.9 0.0 Wetland Grassland/ 1,161 3% 1.5 2.0% 1,227.9 5.8 Herbaceous 5-26 Mountain Valley Pipeline, LLC A W6 AFjW X amp MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts 5.6 Cascade Creek The Amendment Project occupies 47.9 acres within the Cascade Creek HUC-12 watershed and, based on wetland delineation data, will result in 2.8 acres of wetland impacts and 0.006 acre of impact to streams (437.6 linear feet), including 0.4 acre of wetland within a 12.8-acre permanent operations easement (Table 12; Figure 13). Past and present projects identified in the Cascade Creek watershed include seven Utility Line projects, ten Commercial/Industrial projects, three Transportation projects, and one Forestry project. No Planned projects were identified in the watershed. The total known disturbed acreage for the past and present projects, including the Amendment Project, is approximately 251.1 acres, approximately 0.9 percent of the watershed. The total impacts to aquatic resources (as available and identified) in the Cascade Creek watershed for the past and present projects, including the Amendment Project, are approximately 3.1 acres. These impacts to aquatic resources represent approximately 2.1 percent of aquatic resources within the watershed. The NCLD data show land cover in the Cascade Creek Watershed is predominantly Deciduous Forest, representing 31 percent of the watershed (Table 13; Figure 14). Other common land cover categories include Evergreen Forest (19 percent), Pasture/Hay (18 percent), Mixed Forest (10 percent), and Developed Open Space (6 percent). The Amendment Project LOD encompasses primarily Pasture/Hay (51.8 percent), Developed High Intensity (12.7 percent), and Deciduous Forest (6.7 percent). Land cover conversion to Grassland Herbaceous within the Amendment Project LOD will include 24.8 acres of Pasture/Hay (0.5 percent of watershed Pasture/Hay), 3.2 acres of Deciduous Forest (0.04 percent of watershed Deciduous Forest), 2.5 acres of Evergreen Forest (0.05 percent of watershed Evergreen Forest), 1.1 acres of Cultivated Crops (3.3 percent of watershed Cultivated Crops), and 0.7 acre of Mixed Forest (0.03 percent of watershed Mixed Forest; Table 13). No permanent conversion of Woody Wetland will occur within the Cascade Creek watershed as a result of the Amendment Project. 5-28 Mountain Valley Pipeline, LLC ) §|_ co LO co U) \ \ w ƒ 2 ! �ww & \ \ \} \ \ — - m-( , , , , , , , LO k\ ƒ� ° ~ E : 2s 2 ® m |E _ £ f & k , �C\l , , , , , , , Lo � \C a) � C o , , , , , , , , n £k] a\ )) / / ) 7 0 0 , , , , , , , , / \ �k k j § a = 0 \ \ f w o , , , , , , , , , § )\ \ w , ;p -2 �� /\ \ )2 a $ C\ E 2 , , , , [ } § f � Cl) v � � kL 0j 7? — 2E o t ƒ , , , , , , , , § > § \ ƒ2 \0�, of g` .l), , , , , t CIt v � 04 cc, ))§% ![/ \\ »\ w o Cl)0 0 0 0 2 a § 04 a. 2\))§] — (e`r\/ § �/22 I — m § r \ /\0 )_ \ \ \ - -Fz° ` =�`E 0 ) Z \ \ � )!))o=§—� ± z 2 i 27)7} _ § } \ } 0 ) } \ kk \ ) )�)\)\) Y 4 JA *k; � " . • s. _ � s •r� •t ~ � � -� � §.'„� _ -� L , j jai: � � ``it' r' 7� � ;'• � � � it ^ ;z�, . � 'L'� . ,�} ��� • l j { •�,, `.,,� ?s�•,t+,. _ IL Jis qr iw, --r i r4er, ley OA i ao ���...� �• 1��� .Ap �.c .a.'��:'i ' 1 f - �I /l /4i"y.�.[--> •i t Y 4i �,g�`A p -. u t',K- A>yy MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 13: Land Cover Conversion within the Cascade Creek Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Cultivated Crops 33 <1% 1.1 2.3% 31.9 -3.3 Pasture/Hay 4,791 18% 24.8 51.8% 4,766.2 -0.5 Evergreen Forest 5,050 19% 2.5 5.2% 5,047.5 -0.05 Deciduous Forest 8,408 31% 3.2 6.7% 8,404.8 -0.04 Mixed Forest 2,748 10% 0.7 1.5% 2,747.3 -0.03 Barren Land 129 <1 % 0.0 0.0% 129.0 0.0 Developed High 200 1% 6.1 12.7% 200.0 0.0 Intensity Developed Low 841 o 3 /0 4.1 0 8./0 6 841.0 0.0 Intensity Developed 291 1 % 2.6 5.4% 291.0 0.0 Medium Intensity Developed Open 1,683 6% 2.8 5.8% 1,683.0 0.0 Space Emergent Herbaceous 1 <1 % 0.0 0.0% 1.0 0.0 Wetland Open Water 65 <1 % 0.0 0.0% 65.0 0.0 Shrub/Scrub 1,266 5% 0.0 0.0% 1,266.0 0.0 Woody Wetland 49 <1 % 0.0 0.0% 49.0 0.0 Grassland/ 1,459 5% 0.0 0.0% 1,491.3 2.2 Herbaceous 5-31 Mountain Valley Pipeline, LLC Y 4 *k; � " . • s. _ � s •r� •t ~ � � -� � §.'„� _ -� L , j jai: ��` "�► 7.:; •yy�"f,�„� tea. ':'3+ � f_ ,gyp �i>: � •, '• ` �, ' '�, .:� � �- r� � - --ice r j, 1 �� = � : �• i ,'; ram. JA 0. flnf� - 4 ..IV Iwo�► 7 } - �' •> r CIF js allI 4 +a II, R .,•.. SSS+ r _ 1J Yl ..� �� � .1 .. � • `r „� ,. � „f � ram-' •��.p, -.roc, vo Jv 66 - i• r j'�� i�,, MVP Southgate Amendment Project Watershed Impacts Cumulative Impact Analysis 5.7 Trotter's Creek — Dan River The Amendment Project occupies 103.2 acres within the Trotter's Creek — Dan River HUC-12 watershed and, based on wetland delineation data, will result in 1.9 acres of impacts to wetlands and 0.1 acre of streams (1,215.7 linear feet), including 1.1 acres of wetland within a 39.4-acre permanent operations easement (Table 14; Figure 15). Past and present projects identified in the Trotter's Creek — Dan River watershed include five Utility Line projects, five Commercial/Industrial projects, four Transportation projects, three Forestry projects, and one Other NPDES/VPDES project. Two Planned projects were identified, totaling 0.4 acre of permanent wetland impacts and 1,285 linear feet of stream. The total known disturbed acreage for the past, present, and planned projects, including the Amendment Project, is approximately 547.2 acres, or approximately 2.0 percent of the watershed. The total impacts to aquatic resources, as available and identified, in the Trotter's Creek — Dan River watershed for the past, present, and planned projects, including the Amendment Project, are approximately 12.4 acres. These impacts to aquatic resources represent approximately 3.0 percent of aquatic resources within the watershed. The NLCD data show land cover in the Trotter's Creek — Dan River watershed is predominantly Deciduous Forest, representing 29 percent of the watershed (Table 15; Figure 16). Other common land cover categories include Evergreen Forest (17 percent), Pasture/Hay (15 percent), Mixed Forest (13 percent), and Grassland/Herbaceous (7 percent). The Amendment Project's LOD encompasses primarily Mixed Forest (25.2 percent), Evergreen Forest (21.5 percent), and Grassland/Herbaceous (19.8 percent). Land cover conversion to Grassland/ Herbaceous within the Amendment Project LOD will include 26.0 acres of Mixed Forest (0.7 percent of watershed Mixed Forest), 22.2 acres of Evergreen Forest (0.5 percent of watershed Evergreen Forest), 12.5 acres of Pasture/Hay (0.3 percent of watershed Pasture/Hay), and 16.7 acres of Deciduous Forest (0.2 percent of watershed Deciduous Forest). No Woody Wetland will be converted within the Trotter's Creek — Dan River watershed as a result of the Amendment Project (Table 15). 5-33 Mountain Valley Pipeline, LLC / §%_ 17 co� � _ })� % ! 22 & 04 CL } \ \ CL �\ m \ / ( , , , , , , , §\ z z Cl) LD w ~ > ! z �\ tM |E16 / f Qp , C\l_ , , f , , , , 2 �)\ \/ 0 / Z [ m , ,LO, , , , , � _ \\ \\ \ u \ \ / © , , , , , A §) o w � o 0 f a. 2 = c ( \0 / (2 ) [ f o , , , , , , , , / 2 \ \\ Cl) ` w E ;p v \) _ a. 'a / 10 \ E §_ § k ) \ , , , , , , , , / C\la �\§ a) 0 CL ,{ §f § k 7 \ l) #� Cl)Cco 2}§] E /\s - $\ , , , - a - Cl), -Lo!)§% It)\${ ![/ /\ e o e It Cl)o o Cj \ E j§ Z a. !e¢gea !«\\\ - ( E -w 4w § �/22 - m I § r � \ /LO0- )_ \ \ \ z ` _ ) Z )!))o=§-� _ \ § \ ± z 2 i 27)7} \ } } \ \ ) )�)\)\) } G ) kk MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 15: Land Cover within the Trotter's Creek - Dan River Watershed Post Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Mixed Forest 3,621 13% 26.0 25.2% 3,595.0 -0.7 Evergreen Forest 4,683 17% 22.2 21.5% 4,660.8 -0.5 Pasture/Hay 4,279 15% 12.5 12.1% 4,266.5 -0.3 Deciduous Forest 8,075 29% 16.7 16.2% 8,058.3 -0.2 Shrub/Scrub 1,482 5% 0.9 0.9% 1,481.1 -0.1 Barren Land 2 <1 % 0.0 0.0% 2.0 0.0 Cultivated Crops 891 3% 0.0 0.0% 891.0 0.0 Developed High 9 o <1 /0 0.0 0 0./0 0 9.0 0.0 Intensity Developed Low 613 o 2 /0 0.9 0 0./0 9 613.0 0.0 Intensity Developed 63 <1 % 0.0 0.0% 63.0 0.0 Medium Intensity Developed Open 1,518 5% 3.6 3.4% 1,518.0 0.0 Space Open Water 331 1 % 0.0 0.0% 331.0 0.0 Woody Wetland 319 1 % 0.0 0.0% 319.0 0.0 Grassland/ 1,914 7% 20.4 19.8% 1,991.4 4.0 Herbaceous Emergent Herbaceous 1 <1 % 0.0 0.0% 1.9 90.0 Wetland 5-36 Mountain Valley Pipeline, LLC L U N � 7 O N y o cl)ENU � C u z EE N L < v O L 1- C7 LO MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts 5.8 Town Creek — Dan River The Amendment Project LOD occupies 56.7 acres within the Town Creek — Dan River HUC-12 watershed and, based on wetland delineation data, will result in 3.2 acres of impacts to wetlands and 0.06 acre of impacts to streams (663.4 linear feet), including approximately 2.6 acres of wetland within a 16.4-acre permanent operations easement (Table 16; Figure 17). Past and present projects identified in the Town Creek — Dan River watershed include six Utility Line projects, three Commercial/Industrial projects, four Transportation projects, one other NPDES/VPDES project, and one Planned project, totaling 51.7 acres of disturbance and 0.3 acre to aquatic resources. The total known disturbed acreage for the past, present, and planned projects, including the Amendment Project, is approximately 183.4 acres, which is approximately 0.8 percent of the watershed. The total impacts to aquatic resources, as available and identified, in the Town Creek — Dan River watershed for the past, present, and planned projects, including the Amendment Project, are approximately 3.9 acres. These impacts to aquatic resources represent approximately 1.2 percent of aquatic resources within the watershed. The NLCD data show land cover in the Town Creek — Dan River watershed is predominantly Deciduous Forest, representing 39 percent of the watershed (Table 17; Figure 18). Other common land cover categories include Pasture/Hay (15 percent), Developed Open Space (11 percent), Mixed Forest (11 percent), and Evergreen Forest (8 percent). The Amendment Project LOD encompasses primarily Pasture/Hay (53.4 percent), Evergreen Forest (12.3 percent), and Deciduous Forest (9.5 percent). Land cover conversion to Grassland/Herbaceous within the Amendment Project LOD will include 30.3 acres of Pasture/Hay (0.9 percent of watershed Pasture/Hay), 7 acres of Evergreen Forest (0.4 percent watershed Evergreen Forest), 5.4 acres of Deciduous Forest (0.1 percent of watershed Deciduous Forest), 3.7 acres of Mixed Forest (0.2 percent of watershed Mixed Forest), and 1.8 acres of Cultivated Crops (0.6 percent of watershed Cultivated Crops). Up to 1.2 acres of Woody Wetland in the permanent operations easement may be permanently converted to Emergent Herbaceous Wetland, representing approximately 1.6 percent of the Woody Wetland land cover within the Town Creek — Dan River watershed as a result of the Amendment Project (Table 17). 5-38 Mountain Valley Pipeline, LLC ) §%_ co \ } CL �u m n } cm ! 22 & 04 x\} \ \ \ \ ( k 0.k , , , , , , , , § - = _ ) _ «§ |; _ / E § ƒ , , , , , , , , , _ �\ � _ \\ , ] C,4 a coLo7 a\\ k /\ \ ° , , , , , , , , §) � 0 � _ / a\ k § a e = § [[ k £ / ] w CL— £ |E -E v JR x / \ E §_ § k ) \ / r r �/§ 0 CL ,{ — §f k 2 f , , , , , , , , a ° /� \§\ ;0 / , , , , , , a) $ e e m m e = a) ![/ / w = 0 Cl) It 0 0 0 — \ E j§ Z !«\\\ — (2`r42 / -/22 — m ) �E0 /_ _ � \ /\/k®� )_ \ \ CL � `a) w ` _ ° )o)0 ) Z )!) a ±z 2 i 2 7)7} \ } } \kk\ ) )�)\)\) } G ) £ § § MVP Southgate Amendment Project Cumulative Impact Analysis Watershed Impacts Table 17: Land Cover within the Town Creek - Dan River Watershed Post- Conversion Existing Land Existing Land Land Cover LOD LOD Construction of Overall Cover Category Cover Acreage Percentage Acreage Percentage HUC-12 Watershed Acreage Cover (%) Woody Wetland 74 <1 % 1.2 2.1 % 72.8 -1.6 Pasture/Hay 3,344 15% 30.3 53.4% 3,313.7 -0.9 Cultivated Crops 312 1% 1.8 3.2% 310.2 -0.6 Evergreen Forest 1,819 8% 7.0 12.3% 1,812.0 -0.4 Mixed Forest 2,443 11% 3.7 6.5% 2,439.3 -0.2 Deciduous Forest 8,880 39% 5.4 9.5% 8,874.6 -0.1 Barren Land 3 <1 % 0.0 0.0% 3.0 0.0 Developed High 172 1% 0.0 0.0% 172.0 0.0 Intensity Open Water 264 1% 0.0 0.0% 264.0 0.0 Developed 384 2% 0.1 0.2% 384.0 0.0 Medium Intensity Shrub/Scrub 712 3% 0.0 0.0% 712.0 0.0 Developed Low 1,224 o 5 /0 2.4 0 4./0 2 1,224.0 0.0 Intensity Developed Open 2,367 11% 4.8 8.5% 2,367.0 0.0 Space Grassland/ 530 2% 0.0 0.0% 578.2 9.1 Herbaceous Emergent Herbaceous 2 <1 % 0.0 0.0% 3.2 60.0 Wetland 541 Mountain Valley Pipeline, LLC MVP Southgate Amendment Project Cumulative Impact Analysis Conclusions 6.0 Conclusions This CIA evaluated impacts to aquatic resources and NLCD land cover within the Amendment Project's HUC-12 watersheds. Based on the information generated for this analysis, the Amendment Project will have minor impacts in each HUC-12 watershed. This Amendment Project will not involve permanent impacts to streams, and temporary impacts are primarily associated with timber mat crossings or temporary construction within the pipeline ROW. The Amendment Project will involve a minor amount of permanent conversion of Palustrine Forested and Palustrine Shrub/Scrub wetlands to Palustrine Emergent wetlands, as well as temporary impacts to wetlands. A total of 101 past, present, and planned projects, in addition to the Amendment Project, have been identified across the eight HUC-12 watersheds crossed by the Amendment Project. As several projects exist in multiple watersheds, only 71 unique projects were identified and included in the database in Attachment C. The Amendment Project will disturb 565.4 acres across the eight HUC-12 watersheds, or 0.3 percent of the total area (Table 18). Combined with all past, present, and planned projects identified, the total disturbance is approximately 1,967.1 acres or 1.0 percent of the total area. The Amendment Project impacts 19.2 acres of aquatic resources within the eight HUC-12 watersheds, or 0.7 percent of the 2,609 acres within the HUC-12 watershed. The cumulative aquatic impacts of all past, present, and planned projects within the HUC-12 watersheds, including the Amendment Project, are 33.7 acres, or 1.: percent of the total within the HUC-12 watersheds. Land cover analysis of the Amendment Project impacts within each HUC-12 watershed indicates minimal land cover conversion. Within the Amendment Project LOD, 451.8 acres will be converted to Grassland/Herbaceous, an increase of 0.22 percent across the eight HUC-12 watersheds, primarily from Pasture/Hay (208.3 acres), Deciduous Forest (93.0 acres), and Evergreen Forest (62.5 acres). Across the eight HUC-12 watersheds, up to 15.7 acres may be converted from Shrub/Scrub (13.1 acres) and Woody Wetland (2.6 acres) to Emergent Herbaceous Wetland, or 0.2 percent of the 9,649 acres of total wetland land cover (Table 19). 6-1 Mountain Valley Pipeline, LLC Yi U ` N _ N Q y U O O 'o E a�A w c J A m v m A N ik O a` 0 fn N N N d W W U L p O > O U ik O Z a a N C A W U E N N U y O =y a A w O > p ik y p N W O O A a m c c y O W ik 'O o 0 0 0 0 0 0 0 0 a` N O O y U W � O � N U ik O a` c O a N C F y w U ik 'O a` N v a� y c .N .O O V M V (O V W 0. N M y E U U O W ik O a` O V of O O LL� M M C W w U A J A o ¢ w A N > N p 4 C N � y N 6 o w N m v aver sA _ 7 N w U O W v v v v v r u� co ro � L N N .N C O U O Q y N m a- m v 3 0 7 d` of rn M o V r r N M >> N N U U of � m > L U U = U U> 3� UU 3p io~ m m U m m m n o o0 F o o Z MVP Southgate Amendment Project Cumulative Impact Analysis Conclusions Table 19: Summary of Wetland Conversion within each Watershed HUC-12 Watershed HUC-12 Wetland* Acreage Woody Wetland to beConverted (acres) Wetland Conversion within Watershed Shockoe Creek — Banister River 1,316 0 0.00 Cherrystone Creek 1,359 0.8 -0.70 White Oak Creek — Banister River 1,115 0 0.00 Sandy Creek — Dan River 600 0 0.00 Lower Sandy River 1,510 0 0.00 Cascade Creek 788 1.2 -1.60 Trotter's Creek — Dan River 1,802 0 0.00 Town Creek — Dan River 1,159 0.6 -0.30 Watershed Totals 9,649 2.6 0.027 (*) sum of Woody Wetland and Emergent Herbaceous Wetland land cover categories 6-3 Mountain Valley Pipeline, LLC ATTACHMENT A - AGENCY CALL LOGS M MVP SOUTHGATE TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Sam Weaver CONVERSATION WITH: AGENCY: North Carolina Department of Environmental Quality EMAIL ADDRESS: PHONE NUMBER: 336-776-9800 SUBJECT: Information request for Projects in HUC-12 watersheds associated with MVP Southgate Projects DATE AND TIME: November 11, 2024 15:40 SUMMARY OF CONVERSATION: SW: We are pulling together a Cumulative Impacts Analysis for and Individual Permit Application for a pipeline project that runs through Rockingham County. For this CIA, we need information on Projects in three watershed; Cascade Creek, Trotters Creek- Dan River, and Sandy Creek — Dan River. I am calling to request information on Projects that have received state Section 401 Water Quality Certifications, Construction Stormwater General National Pollutant Discharge Elimination System Permits, or NCDEQ Construction Stormwater Certification of Coverage within these watersheds. I would be happy to send the watershed boundaries and Project information in an email if that would be useful. If there area nay publicly available resources, I am happy to consult those as well if you can point me to them. We have a pretty quick turnaround on this, so any help is greatly appreciated. NCDEQ — transfers call to Paul Williams, Winston-Salem regional office. SW- Hi Paul, I have questions about fmding information regarding authorizations within some watershed in Rockingham County. Left a message asking for help with the CIA. Paul calls back at 12:45.1-le says he doesn't have access to the data and refers to a deputy secretary for public affairs. Sharon Martin. Phone # 919-707-8670 email (faster) sharon.martin@deq.nc.gov =MVP TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Sam Weaver CONVERSATION WITH: Beth Taylor, FOIA Coordinator AGENCY: Virginia Department of Environmental Quality EMAIL ADDRESS: PHONE NUMBER: 530-759-6582 SUBJECT: Information requests for Projects in HUC-12 watersheds associated with MVP Southgate Projects DATE AND TIME: November 12, 2024 10:20 SUMMARY OF CONVERSATION: SW: Mentioned an email that was sent yesterday, wondering if there as been any update and whether Beth is the correct person to ask for this information. BT: Beth confirmed receipt of email, says it was forwarded for processing, and Natalie Womack is the central processor. Her contact is 804-774-1224 (phone) natalie.wolmack(a�deq.virginia.gov (email) SW: Do you have an estimate of how long it will take to process that request? BT: No, but Natalie should be able to help out with that. =MVP TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Sam Weaver CONVERSATION WITH: AGENCY: N.0 Forest Service Rockingham County Office EMAIL ADDRESS: PHONE NUMBER: 336-634-3021 SUBJECT: Information request for Projects in HUC-12 watersheds associated with MVP Southgate Projects DATE AND TIME: November 12, 2024 15:20 SUMMARY OF CONVERSATION: SW: We are pulling together a Cumulative Impacts Analysis for a Individual permit Application for a pipeline project that runs through Rockingham County. For this CIA, we need information on Projects in three HUC-12 watersheds; Cascade Creek, Trotters Creek- Dan River, and Sandy Creek — Dan River. I am calling to request information on current or planned licensed Timbering operations within these watersheds. I would be happy to send the watershed boundaries and Project information in an email if that would be useful. If there are any publicly available resources, I am happy to consult those as well if you can point me to them. We have a pretty quick turnaround on this, so any help is greatly appreciated. NCFS: SW: Do you have an estimate of how long it will take to process that request? NCFS: Zach Jones, county ranger for... ZachM.Jones( NCAGR.gov Nancy Black wood called from NCDEQ on 11/13/2024. NCDEQ doesn't know of any active logging jobs in any of those HIC-12s. Bur unlike Virginia, loggers and contractors don't have mandatory notification law. Doesn't mean for sure, but to her knowledge, there are no logging operations occurring in the NC portions of those watersheds. =MVP TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Sam Weaver CONVERSATION WITH: VDOF AGENCY: Virginia Department of Forestry- Forest Management Program EMAIL ADDRESS: PHONE NUMBER: 434-220-9138, then 434-731-8116 SUBJECT: Information Request for Projects in HUC-12 watersheds associated with the MVP Southgate Projects DATE AND TIME: November 12, 2024 15:20 SUMMARY OF CONVERSATION: SW: Hello, I am calling to request information on current or planned licensed Timbering operations within seven HUC-12 watersheds in Pittsylvania and Dansville Counties. • Trotters Creek- Dan River-030101030903 • Lower Sandy River- 030101031003 • Sandy Creek- Dan River- 030101030907 • White Oak Creek — Banister River-030101050103 • Cherrystone Creek — 030101050104 • Shockoe Creek -Banister River- 030101050203 • Cascade Creek — 030101030902 I would be happy to send the watershed boundaries and Project information in an email if that would be useful. If there are any publicly available resources, I am happy to consult those as well if you can point me to them. We have a pretty quick turnaround on this, so any help is greatly appreciated! BT: - SW: Do you have an estimate of how long it would take to process that request? Drew: The information is probably not available to the public. A FOIA request could make it happen. They have a mandatory notification law. There is no notification until three days before and after. There is no way to predict that. What Dre could do is figure out the number of active logging jobs. SW: Could you figure out acreage? Drew: They call in an acreage when the notify. They could get a ballpark on acreage. Spreadsheet with all active projects in Pittsylvania County. Wouldn't be separated by watershed. SW: Offers to send the watershed Drew: Says he'll talk to a water quality specialist and figure out whether it's in the watershed. Guessing 150-200 jobs a year, slower the last couple of years. (email) Drew. arnn(a�dof.viginia.gov. =MVP TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Jeff Van Spankeren CONVERSATION WITH: AGENCY: USACE Norfolk Office Regulatory Office EMAIL ADDRESS: PHONE NUMBER: 336-634-3021 SUBJECT: Information request for Projects in HUC-12 Watersheds associated with MVP Southgate Projects DATE AND TIME: November 19, 2025 15:15 SUMMARY OF CONVERSATION: Initial Call — sent to voicemail JV: Hi, my name is Jeff Van Spankeren, we are pulling together a Cumulative Impacts Analysis for an Individual Permit Application for a pipeline project that runs through Rockingham County. For this CIA, we need information on Projects in three HUC-12 watersheds; Cascade Creek, Trotter's Creek -Dan River, and Sandy Creek -Dan River. I would be happy to send the watershed boundaries and Project information in an email if that would be useful. If there are any publicly available resources, I am happy to consult those as well if you can point me to them. We have a pretty quick turnaround on this, so any help is greatly appreciated. =MVP TELEPHONE /PERSONAL CONVERSATION REPORT PROJECT NAME: MVP Southgate Pipeline Project MVP TEAM CALLER: Jeff Van Spankeren CONVERSATION WITH: AGENCY: USACE Norfolk Office Regulatory Office EMAIL ADDRESS: PHONE NUMBER: 336-634-3021 SUBJECT: Information request for Projects in HUC-12 Watersheds associated with MVP Southgate Projects DATE AND TIME: November 19, 2025 15:15 SUMMARY OF CONVERSATION: Initial Call — sent to voicemail JV: Hi, my name is Jeff Van Spankeren, we are pulling together a Cumulative Impacts Analysis for an Individual Permit Application for a pipeline project that runs through Rockingham County. For this CIA, we need information on Projects in three HUC-12 watersheds; Cascade Creek, Trotter's Creek -Dan River, and Sandy Creek -Dan River. I would be happy to send the watershed boundaries and Project information in an email if that would be useful. If there are any publicly available resources, I am happy to consult those as well if you can point me to them. We have a pretty quick turnaround on this, so any help is greatly appreciated. ATTACHMENT B - FOIA REQUESTS AND RESPONSES N BURNS *KMSDONNELL. November 25, 2024 Derek Southern FOIA Officer Rockingham County 371 North Caroline Highway 65 Reidsville, NC 27320 RE: FOIA Request - Rockingham County Dear Mr. Southern, Pursuant to the Freedom of Information Act (FOIA), I am writing to request access to records maintained by Rockingham County related to permits and plans for residential and commercial projects within the county. Specifically, I am requesting copies of: 4 Any permits and plans for new construction, renovation, or significant alterations for residential properties to take place between September 1, 2022, and 2030. 4 Any permits and plans for new construction, renovation, or significant alterations for commercial properties to take place between September 1, 2022, and 2030. If there are any fees associated with fulfilling this request, please inform us in advance of processing, and we will be happy to provide payment as required. If any of the requested records are deemed exempt from disclosure, please provide a written explanation of the specific exemptions claimed. Additionally, if any records are not available, please provide a description of the nature of the records and any reasons for their unavailability. Please send the requested records electronically via email. Please call at (872) 204-4581 or email at amzenone(a)burnsmcd.com, should you need any further information to process this request. Sincerely, Burns & McDonnell i Aubree Zenone Aquatic Studies Project Manager 872-204-4581 amzenone@burnsmcd.com 200 West Adams Street, Suite 2700 1 Chicago, IL 60606 1 burnsmcd.com BURNS MCDQNNELL, November 25, 2024 Stephenie Adams FOIA Officer Pittsylvania County 1 Center Street Chatham, VA 24531 RE: FOIA Request - Pittsylvania County Dear Ms. Adams, Pursuant to the Freedom of Information Act (FOIA), I am writing to request access to records maintained by Pittsylvania County related to permits and plans for residential and commercial projects within the county. Specifically, I am requesting copies of: 4 Any permits and plans for new construction, renovation, or significant alterations for residential properties to take place between September 1, 2022, and 2030. 4 Any permits and plans for new construction, renovation, or significant alterations for commercial properties to take place between September 1, 2022, and 2030. If there are any fees associated with fulfilling this request, please inform us in advance of processing, and we will be happy to provide payment as required. If any of the requested records are deemed exempt from disclosure, please provide a written explanation of the specific exemptions claimed. Additionally, if any records are not available, please provide a description of the nature of the records and any reasons for their unavailability. Please send the requested records electronically via email. Please call at (872) 204-4581 or email at amzenone(a)burnsmcd.com, should you need any further information to process this request. Sincerely, Burns & McDonnell Aubree Zenone Aquatic Studies Project Manager 872-204-4581 amzenone@burnsmcd.com 200 West Adams Street, Suite 2700 1 Chicago, IL 60606 1 burnsmcd.com =�~! , — COUidMVIRGINI,A November 27, 2024 VIA EMAIL [amzenone(a-)burnsmcd.com] Aubree Zenone Burns & McDonnell 200 West Adams Street, Suite 2700 Chicago, Illinois 60606 Re: Virginia FOIA Request Response Dear Ms. Zenone: VA. FOIA OFFICER P.O. Box 426 • 1 Center Street Chatham, Virginia 24531 Phone (434) 432-7720 Pittsylvania County, Virginia ("County"), is in receipt of your November 26, 2024, email requesting records deemed to have been made in accordance with the Virginia Freedom of Information Act ("VA FOIA"); (Virginia Code §§ 2.2-3700 et seq.). This is a timely and legal response to your VA FOIA request. In said VA FOIA request, you requested the following: "Any permits and plans for new construction, renovation, or significant alterations for residential properties to take place between September 1, 2022 and 2030. Any permits and plans for new construction, renovation, or significant alterations for commercial properties to take place between September 1, 2022 and 2030." Respectfully, as you are from Illinois, the County will not produce said records, because VA FOIA provides rights to have access to public meetings and to inspect and copy public documents only to Virginia citizens and any non-resident representative of a newspaper, radio station, or television station that is circulated in or broadcasts in Virginia. See Virginia Code §§ 2.2-3700(B) and-3704(A). Please contact me if you have any questions about anything contained herein. Sinc rely yours, AStephe ie Adams VA FOIA Officer Legal Assistant to County Attorney BUSINESS SAVVY. PEOPLE FRIENDLY. Stephenie Adams stephenie.adams@pittgov.org ATTACHMENT C -CUMULATIVE IMPACTS ANALYSIS DATABASE zI Limo 0 0 0 0 0 0 w � _ Z.� c Z � 0 �3= 0 0 a r ^ N> D r ^ n> tElr ^ rv> `w-.Q a r ^ rv> D r ^ R> D r ^ n> a r ^ rv> 11 -Wa m .3 o _ `°_ U `°_ U 098 `°_ U `a_ U 18 18 a Z m j E & E j E Hai Hair Hair `a ti> `awn ti `H d.9 `H d.9 Eti 3 x w m - crcgn - a 0 q Z a q Z a q Z a q Z a q Z a � Z a q Z a 6 Mal Mal Mal Mal Mal TU' To! TU' in! 2 E 3= J LL a 3yatia 3 y a ti a 3 v a 8 a 3 y a ti a 3 y a ti a 3 y a ti a 3 y a ti a e e 3 3 OW 3 E E - `- E - `- E - `- E - `- E - `- E c e c e c E c e c e c o c e EFEx EFEx E rEY E rEY E rEY EFEx EFEx E o Q Q Q Q Q Q Q U Q U Q U Q Q A E _ E _ E mi c 3 c 3 c 3 c 3 c 3 c 3 c 3 E `w Y 3 E a K ry K 5 aIS E F r r mw w w w w w w w r r r z� F33A w � _ Z.� c E � Z � n E a 0 o o� �3= ma '°a wa �rc Mrc orc orc arc va G w a Grc Y o„o„ Y a G 3 eo r qo 3 m 0m� 3 eo F eo F eo F m 3 m 3 m 3 m 3 m 3 m M u u adY a Em � �❑ J Ea' -a K� E m' __ - e w a 3 'Ea o � E 4U `a a E qE a 2 - �❑ '3 w a� w � rn ~ � a_ a � E V? Z a 3` n E c- 3 e Y a IT �. Q N1O QU m U Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > Q > v rn .W L Ea v ml d c ry a w a O c c � a n e K m ry d Q o a E � a a o �❑ w E .. % w ti - � e 3 � Q o c 1O o a `a U 3 LL> - m - - - - - SIT E E SIT E SIT E E E E E 3 E 3 E 3 E 3 E 3 E 3 E 3 E 3 E 3 E 3 E - - EE W E W E W a W a W a W a W a W y E y E y E y E y E y E y E y E y E y E m F F F F p p F U h U h U h U h U h U h U h U U a o U a 0 U a 0 U a 0 U a 0 U a 0 U a 0 U a 0 U a 0 U a 0 z� F33A. . . . . . . . . . . . . . . . . . w � _ Z.� c E � Z � n E a c a E a J w 0 . o. sit�= y a`a a`a a`a a`a a `a a`a a`a e o oy m�'- 0 0 0 0 0 0 0 it 0 � xm E rii E e lb - 3 K ti E - a 2 22 E "' E 3 E a K a c a aO iq - r y o F a E n> m > K Ep O a m 3 a a E eoEl `a ti� O a x U - - dY - - - 3 y ti E All e❑ 3 z e 2 a N r - ~O m ? o ~O m r p F a j ti u e o - U E E E E E E E E E E E o_ a '-• __ p o� = e� e� o� e� m a � o � a � a � a � a � a � a � a � = p 3 3 3 3 3 3 3 3 3 3 3 E� 3 E� 3 E� 3 E� 3 E� 3 E� 3 E € € € € € 3 3 3 3 3 3 yE yE yE yE yE yE yE yE yE yE yE yE yE yE yE yE yE �E � � �E m Oa 0 Q pa 0 Q pa 0 Q pa 0 Q pa 0 Q pa 0 Q pa 0 Q pa 0 Q pa 0 Q pmo 0 Q mo 0 Q a mo 0 Q a mo 0 Q a mo 0 Q a mo 0 Q p 0 mo Q o0mo Q MOE p p Z MOEE p p Z aE Q p p Z Qa p p Z p p Z U U U U U U ƒ||# |!|® a !!| mE" . . . . . . . . . . . . !!ate e|# a | /! /re m m m m m }� { En \ \ \ \/ \ /\ \ Z Z ATTACHMENT D - VA DEQ PROJECTS a o� a` w c a `w L W R � Q W V O) O) O) V V V V V V V O) V V V V V V V V V V V V V V V V V V V V V 9I N O O O O N O N O N O N O N O N O N O O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r W W V O O O) V V V V CO V V V V V V V V V V V V V V V V V V V W N O N O N O O N 0 N 0 0 N 0 N 0 0 0 O N O N O N O N O O O O N O N O N O N O N O N O N O N O 0 N O 0 N O N O N O 00 (O (O (O V (O 0\ \ M M M V O O O CO m CO m m M N V V (O M M '0 O Ln Ln Ln N N � \ M fR.1 CO M M Ln I� (O CO V V CO V V Ln V Ln V V Ln V Lo I� Lo Q Q Q C O C O Y Y o � o U O O o a) a) a) Q O O a3 a) U t/) C Q a a C N LL LL u) E a) U) o LL LL a) C O a) C C C O C C T O .• O V1 O C C > C O C O a) a) C O O O O> .O (6 (6 d 9 fJ Y Y Y Y N N C N 'U (6 (6 .� ` O a) ?i U a) (6 (6 (6 (6 C C O >, a3 9 .0 U .0 O .0 ` Y 9 O E O a) O O O f/) T - ` f/1 N C O U _T —_ _T —_ _T —_ O O T - a) T - a) C a) C O M .� >i O (n a) Z U O (6 a) C '� o u, a) CD a) (7 E Q w a a) u) -o a E (7 (7 0 a) E o 9 E O a C a C U B T T O .. C C C O T ) T T a O E S O T Q O U a) a) O in a) a) (� a5 . (� _ a) a) W a C (� Q C U O W W W W y W O y a � T U o o C - U U o p T LOL o o F Q Q o M V M V M V M M M M M M V V M N N M M M M N M M V V N M N M M M N O O) O O N O O O O O m O O O m O m O O O O O O O O m O O O m O m O 0 O) 0 O) 0 O 0 0 0 O O) O O) O O) O O N O O M O o O o O o O o O o O o O M M O M O M O M O LO O S O S O M O M O M O M O M O LO O M O M O O o O o O o O M O M O M O LO O LO O LO V O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O o o 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O —o --o 0 o o o O O O O O O M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O S a) T O (6 OO m C .2) d d N O O LL WC a m C m J O C m Z N '� a) E a) a) _ > t/) (6 LO V N O M > a) m O E O Z X W O J d W d O d C to a) a) f/) 9 W a) Ul In a) Ul a) d -O X W -O jp E .o U .W a) ` o a) _ U Q C O C .. O — C a) a) > W In a) ` N a) (D C� a) (D `� 9 -O O .0 (6 (6 L X W (n I� O r O a) L �p a) L a) O C �. O t� E T Q a) a) a) C E o O a) M W O L U m L T Y d > Y Y M M d .0 d (n Y a) J O U > Ul C Q a) o in d' O a C d d L a) U (6 W co V 0 Ln p W a) a) a3 C O a) a) �O m > (6 (n a c a) a)� C d Ul �a O N a) a) E °��° +U-' §� O 2 O �� 0 0 u) O a =Uco C z o Q ow E0 = E In a) — E o () a) Q m �- Q m Q E � a) — L O S o O co > a O a O a'S O _ O o Y O d' > (6 ` S VI > a) Y (n U a) a) N Q Q Q E M O C a U m _O N o m U ~ m m m a °( 0 0 0 m Q o W > o m O to U = z O a O_ O) r O m M N N (O V LO I� O) (O M I� O) N LO LO LO (O CO N (O O M M M O V o) N (D V V N I� N I� N CO r Ln V N IT N V O o (O O V V V CO LO I� O O O N M o V o I� I� E o o > > m o Y J z 0 a a a 0� � � o 0 o to � � �� � � 0 o O O 0 0 o O O o 0 0 0 0 0 0 0 0 0 0 o 0 o O o a � � � � � CieIr � Cie � � � � � � � � � � � � � � z- Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q > > > > > > > > > > > > > > > > > > > > > > > > > > > > a a a a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a a u Eo o E E E E E E E E E E E E E E E E E E E E E E E E E E a a a a a a a a a a a a a a a a a a a a a a) a a a a a a a s a a ml o w E m C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 a 0 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W IL o Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > _T > U O R a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) a) U > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > •� U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U � Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q R U a o� a` w c a `w L W R � Q W 9� O) O V O V O V O V O O) O O) O V O V O V O V O O) O O) O O) O O) O O) O O) O O) O O) O V O V O V O V O O) O V O V O V O O) O O) O r r r r r r r r r r r r r r r r r r r r r r r r r r r r r W W U O N O) O N M V CO O) N O r M M V V (O CO CO CO p) CO CO O) � W N O NO O 0 0 N O N O N O O O 0 NO N O N O N O N O N O N O N O O O O O O ON O O O 0 a QN N N N N O 0 W W C N .0M 0 0 O m Ln M .0 .0N W 0) 7- (O .0 U W r m o m m O M Lo Lo o) M V Ln Q M Q a a Oo C pj C o o C O T ' a) a) In E - o a Q T O O O' (n E a) O o o U) a) � Q O 9 t/) O d o O d Q a) (n T C c Q E Q E Y a'S U) a>) ° ° a'�75 o '� a) '� a) '� 75 (D= O O _T VI O d' d' O O O o a p a a) p u) a) C E a a a s o a E E o Q U a) C O C O C C C (`T6 C C T a) Q C C C a) .0 U (6 E - f/) D u) 2 2 E O O in U S O >, Q > u) U T .O .O T Z D Q Q N V M O O oM O N O m O O M O m O M O M O O M O M O O M O M O m O M O M O m O M O M O m O M O M O m O M O M O O) O co O V O O LO O V O O LO O N O O) O co O M O O) O co O M O O LO O V O O LO O M O N O LO O M O O) O co O M O O) O co O M O O) O co O M O O co O M O O LO O M O O co O O O O O O O O O O O O O O O O O O O O O O O O 2 O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O O co O W O C a a a C R _ > 0] -p m C 0] -p (n CO Q (n (6 Y u) _ > a) m Z = �' u �' u m a o X m a a ° a o m a) ° o W •� ' a) p in f/) a) L `- a) w O Y C U a) O Y C U a) a) a f/) a) W f/) a) a) a U5 a) a) C- a) a) (� f/) 9 a C .- cC W U) E C w ` a) Q C a) a) a) Ul a) Ul W p W O U a d a) a) 0] L E E (6 a p) a) C p) a a p) a) a) L a) u) T d C .� Q a) p a a) f/) a) a) L a) �p 0] L (6 a O) CO N Q C O O a) a ` d a) o > C O c p u) p Q p N a) �p a) N — E .Y u)� O u) O u E O o C C Q —_ E 3 o (O O O E O E .0 �' � C 'p) C '� S E a) O u) -p u) a O C O a) L a) m Q '(p S E a) O u) u) > a) 2) _ ` O Q ` S o cC O O C E 2 a5 C m S Q o- u) > a) Y m cC W a � tz tz � o m o o o m a m m > u) `w M V O O 0 W 0 m (D N N N CO (D N O) co N N LO O o d' V J m J m J O d' o H O d' Y Z O a-m O O O N Y J J Z O O O O O O O O O O O O O O O O O O O O O a D� Z Q Q Q Q Q Q Q Q Q Q Q Q Q Q > > > > >>> > > > > > > > > > > > > > > > R w o u, o o o u, O a � a)' C 0 a p a p a p o C O C O C O C O C O C O C O C O C O C O C O a a a a a a a a a a •� C U O C E w � =o +• Y Y � w Ul � Ul � Ul � Ul � Ul � Ul � Ul � Ul � Ul � Ul � Ul '"' d o a O- a O- a O- a O- a O- a O- a O- a O- a O- a O- a O- y o o o 0 0 o 0 0 0 0 0 0 0 0 0 ml o 0 0 0 0 C C3 CJ CJ C C C C C a a a a a a a a a a a CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ R W W W W W W W W W W W W W W W W W W W W W W W W a Q Q Q o o o 0 o Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q > > > > > > > > > > > > > > > > > > > > > > > > > U U U U U C O > C O C O T T T T T T T T T T T T T T T T T T T T T T T T T T U y) 'U Q U Q U Q O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S O S R Q Q U a s� a` w c a `w L W R � Q W 91 O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) V O) V O) O) O) V O) O) o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W w O O N N N N W N O N O N O N O N O N O O N O N O N O N O N O N O N O N O N O O O N O N O N O O O O O O O O O N O N O 00 O CO Q Q O Q O Q Q O Q O N Q Q Q M Q Q N N 0) Q m M N QMM N O Q° > R o n °° ° °O M V LM Lo LCO L LO LO (O O U Q Q � Q (6 C C T ° Y O O O C C O ' a a In . = In ° Q(6 o U) 0 LL LL a) C m °- (� °- (� O O a) O C C N a) O m p a a E E ° V1 O C C O O C _ _ C C O y O y O a) (6 (6 2 (6 C CO C T 9 'U ` U CO 'U (6 (6 (6 Y Y Y Y C U 'U N =' C C ° >i U (6 (6 >i C� .> o O in ° ° >, _ O Q O Q '- (6 o ''-� - ° ° t/1 m .� (n _ E N ° in E O Q O Q f/1 ° ° a in ° a u) E d ° C a "' f/) C f/) C u) O O O E = (6 E N T 9 E f/) f/) a C a a C 9 C E V C T (6 (6 N ` ` W a C C U >i Q t/1 a) U (6 (6 �' �' (6 (6 .0 C OU (6 .0 U (6 > E E - (6 E y o z T W W W U O m R-O Z C U U a a 0 o u) O u) C >` LL T LL Z - w - mg Q Q 5 l �> �Q V O V O V O N O N O M O M O M O M O N O M O N O M O V O V O N O M O N O M O M O M O M O M O N O V O M O M O V O M O M Y N m m m m m m m m o) o) S N o) O o) N m o) O N O o O o O o O M O M O M O M O M O o O M O M O M O o O o O LO O M O M O M O LO O L° O L° O M M O M O LO O LO O M O LO O M Q V O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Q O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 E O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M ?� E .0 d (6 N X � w U a O U w C LL y6 N yp w O CQ` CO CO � O 'C C J (6 U (n N - (6 EO - m (6 L - Z > t/1 (6 Ln V N M N m C O .0 . C m N� U m a (6 a ° co ° o ° m X -° E �°-� ° - o W o °� ° °� ° ° u) wT L W u) O O L L (6 N C ° O E T Q CO LO _ j 9 ` N U .m Q - N N O w O _ - N O w T Q O C f.1 in (6 cC (6 d > M o) M o) W d .0 d O Y N ° °- N w C a (6 L L- C C L Q O. E Q O (n (6 > Y V N I� u) _ (6 C J U N CO > > C Lp O f/1 p C C O d >' O O d W m m (6 (6 C (6 U _ o O O M_ CO M M LO CO O Co CO O _ > O S C H u) Q �_ C (6 ) U N (n N O (n u) (n O (n (n E (n -° C� CO o ° Q ° E 0 °- E Q E T (q E ° E U -° a O C C= O _ .- .- C O a) C O d' o �`% U = .> O ° (6 - L L m Q E N O u) (6 E N O (n (6 j C ` O o ° O X = _ m m x° y x° _ ° L ° p m (n (6 Q °� O m O a W 3: Q S S Q O Q E - M C ° L N = = (6 N C N N H H u) m (6 > a) m (6 C a N U H T'C N Y _ _ a w a U m m m O ° (6 L m >' Q O L C Q > > () I � O = z a > m m a ° N CO CO V LO I� O) CO M I� O) N LO LO L° co O O V CO CO ° U w N I� N O LO V CO I� I� 0 V N V N T O o O O V m T V Co LO - O O � O N M o V co - - O V O N N O O r O O V r A E z o o a o a 0 C7 0 0 O � O � O � O to o 0 to 0 to 0 � 0 o � 0 � 0 � 0 � 0 m 0 LL 0 0 Y 0 Lo 0 Y o o � a ll� ll� E ° Z Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q co ° > > > > > > > > > > > > > > > > > > > > > > > > > > z Y a a a u a a a a a a a a a a a a a a a a a a s a a ... .. . . > N N (6 U E E E E E E E E E E E E E E E E E E E E E E C C y N N N N N N N N N N N N N N N N N N N N N E E E E E E E E Lp Lp o° 9 a a a a a a a a a a a a a a a a a a a a- a a a C o N m� E o C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 a 0 0 C7 °6 0 R W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W C IL > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > N Q U) m m 0 O E E O N Q U O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O LLB R > > U �I 91 ATTACHMENT E - NC DEQ PROJECTS M w Ln w I- O O I- 19t O N O— — M U) M N N M N N N a N L a N 3 c0 — U N U U U U U U U cB N O O O O O O O O O O M M O O I-- I-- 00 O M 0 0 0 0 O O O O N co E z .E Ci 0 C) /�y i C 2 f a' i p J d N Co Co > co N O O c Co co > m T) O a O 0 2co N c N N 2 a�w000Din�- U J J U U U C c0 U U U � O C C C E C C C c c c y c cU .� Cj In c c� a Cl EE—a)tEEEc Cl E yUU 0 0 0 0 UUU 0 0 •0 t a Y Y a U U U L> •L m •L m N •i ,[ U •L m •L m •L m 0 •8 — O O — — — 2 2 c 2 2 2 r O C C cB CU C C C aa2 CLIL>U d Z E d 0 0 0 O 1` O O O 1` N NC DEQ - NCO003468 Permit NC0003468 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Carolinas, LLC is hereby authorized to discharge wastewater from a facility located at the Dan River Combined Cycle Station 864 South Edgewood Road Eden, NC Rockingham County to receiving waters designated as the Dan River in the Roanoke River Basin in accordance with effluent limitations, monitoring requirements, and other applicable conditions set forth in Parts I, II, and III hereof. This permit shall become effective November 1, 2022. This permit and authorization to discharge shall expire at midnight on October 31, 2027. Signed this day September 23, 2022. Richard E. Rogers, Jr., Director Division of Water Resources By Authority of the Environmental Management Commission Page 1 of 9 Permit NC0003468 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Duke Energy Carolinas, LLC is hereby authorized to: 1. Continue to discharge the following: • Outfall 001: cooling tower blowdown from the combined cycle unit, intake screen backwash, and plant collection sumps (low volume wastes); • Internal Outfall 001A (discharges to Outfall 001): wastes from the filtered water plant including miscellaneous wash down water and laboratory wastes (low volume wastes); 2. Discharge from said treatment works at the location specified on the attached map into the Dan River (Outfall 001), classified C waters in the Roanoke River Basin. Page 2 of 9 Permit NC0003468 Part I A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Outfall 001) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the permittee is authorized to discharge intake screen backwash, cooling tower blowdown, and plant collections sumps through Outfall 001. Such discharges shall be limited and monitored by the permittee as specified below: EFFLUENT CHARACTERISTICS LIMITS MONITORING REQUIREMENTS Monthly Average Daily Maximum Measurement Frequency Sample Type Sample Location' Flow, MGD Daily Pump Logs Effluent Temperature 37.2 °C Weekly Grab Effluent Temperature 32.0 °C 2 Weekly Grab Downstream Total Suspended Solids 30.0 mg/L 100.0 mg/L 2/Month Grab Effluent Oil and Grease 15.0 mg/L 20.0 mg/L 2/Month Grab Effluent pH 6.0 <_ pH <_ 9.0 2/Month Grab Effluent Total Residual Chlorine a 28.0 µg/ L j 2/Month Grab I Effluent Notes: 1. Sample locations: Downstream - downstream approximately 85 ft.; Effluent - at point downstream of combined wastewaters from the combined cycle turbine unit. 2. See Special Condition A. (6.) Temperature Mixing Zone. 3. Total Residual Chlorine (TRC) compliance is required only if chlorine or chlorine derivative is added to the cooling water. The Division shall consider all effluent TRC values reported below 50 µg/L to be in compliance with the permit. However, the permittee shall continue to record and submit all values reported by a North Carolina certified laboratory (including field certified), even if these values fall below 50 µg/L. The permittee shall obtain authorization from the Division of Water Resources prior to using any biocide in the cooling water; see condition A. (5.). There shall be no discharge of floating solids or foam visible in other than trace amounts. Page 3 of 9 Permit NC0003468 A. (2.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Outfall 001A) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the permittee is authorized to discharge wastewater from the filtered water plant including wash down water and laboratory wastes (low volume waste sources) through Internal Outfall OOlA. Such discharges shall be limited and monitored2 by the permittee as specified below: EFFLUENT CHARACTERISTICS LIMITS MONITORING REQUIREMENTS Monthly Average Daily Average Measurement Frequency Sample Type Sample Location' Total Suspended Solids 30.0 mg/L 100.0 mg/L 2/Month Grab Effluent Oil & Grease 15.0 mg/L 20.0 mg/L 2/Month Grab Effluent Notes: 1. Effluent sample location shall be at point downstream of the oil separator and prior to mixing with Outfall 001. Should no flow occur during a given month, the words "no flow" should be clearly written on the front of the DMR. All samples shall be a representative discharge. There shall be no discharge of floating solids or foam visible in other than trace amounts. Page 4 of 9 Permit NC0003468 A. (3.) TOXICITY RE -OPENER CONDITION [15A NCAC 02B .0200 et seq.] This permit shall be modified, or revoked and reissued, to incorporate additional toxicity limitations and monitoring requirements in the event that toxicity testing or other studies conducted on the effluent or receiving stream indicate that detrimental effects may be expected in the receiving stream as a result of this discharge. A. (4.) SPECIAL CONDITIONS [NCGS 143-215.3 (a) (2) and NCGS 143-215.66] The following special conditions are applicable to all outfalls regulated by this permit: a) There shall be no discharge of polychlorinated biphenyl compounds such as those once commonly used for transformer fluid. b) Nothing contained in this permit shall be construed as a waiver by the permittee of any right to a hearing it may have pursuant to State or Federal laws or regulations. c) Discharge of any waste resulting from the combustion of toxic or hazardous waste to any waste stream which ultimately discharges to waters of the United States is prohibited, unless specifically authorized in this permit. d) The permittee shall report all visible discharges of floating materials (such as an oil slick) to the Director when submitting DMRs. e) "Upset," means an exceptional incident in which there is an unintentional and temporary non-compliance with technology -based effluent limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or improper operations. fl All flows shall be reported on monthly DMRs. Should no flow occur during a given month, the words "no flow" should be clearly written on the front of the DMR. g) EPA methods 200.7 or 200.8 (or the most current versions) shall be used for analyses of all metals except for total mercury. h) All effluent samples for all external outfalls shall be taken at the most accessible location after the final treatment but prior to discharge to waters of the U.S. (40 CFR 122.416)). i) The term low volume waste sources means wastewater from all sources except those for which specific limitations are otherwise established in this part (40 CFR 423.11 (b)). j) The term chemical metal cleaning waste means any wastewater resulting from cleaning any metal process equipment with chemical compounds, including, but not limited to, boiler tube cleaning (40 CFR 423.11 (c)). k) The term metal cleaning waste means any wastewater resulting from cleaning [with or without chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube cleaning, boiler fireside cleaning, and air preheater cleaning (40 CFR 423.11 (d)). 1) For all outfalls where the flow measurement is to be "estimated" the estimate can be done by using calibrated V-notch weir, stop -watch and graduated cylinder, or other method approved by the Division. m) The concentration of asbestos in any wastewater shall not exceed 7 million fibers per liter. A. (5.) BIOCIDE CONDITION [NCGS 143-215.1] The permittee shall not use any biocides except those approved in conjunction with the permit application. The permittee shall notify the Director in writing not later than ninety (90) days prior to instituting use of any additional biocide used in cooling systems which may be toxic to aquatic life other than those previously reported to the Division of Water Resources. Such notification shall include completion of Biocide Worksheet Form 101 and a map locating the discharge point and Page 5 of 9 Permit NC0003468 receiving stream. Completion of Biocide Worksheet Form 101 is not necessary for those outfalls containing toxicity testing. Division approval is not necessary for the introduction of new biocides into outfalls currently tested for whole effluent toxicity. A. (6.) TEMPERAURE MIXING ZONE [NCGS 143-215.1] a) The temperature mixing zone is defined as the area extending from outfall 001 to approximately 143 feet below the discharge. The discharge shall not result in acute toxicity to aquatic life, prevent free passage of aquatic organisms around the mixing zone, result in offensive conditions, produce undesirable aquatic life or result in a dominance of nuisance species outside of the assigned mixing zone; or endanger the public health or welfare. b) The temperature standard of 32°C (89.6°F) and the maximum temperature increase above natural temperature of 2.8°C (5.04°F) shall be met at the end of the mixing zone. The natural water temperature shall be the temperature measured at the upstream sampling location. The increase in temperature is defined as the difference in temperature between the upstream and downstream sampling locations. c) The results of all temperature monitoring shall be reported in the monthly DMRs. When possible, instream monitoring for temperature shall be performed during times the facility is operating at full loading. d) After 12 months of temperature data are collected the permittee shall submit a report to the Division to verify the Cormix model predictions. The report shall include field verification of assumptions used in the model and a summary of temperature data for effluent, upstream and downstream and shall be submitted to: Division of Water Resources WQ Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 fl This permit may be reopened to implement alternative temperature limits or requirements based on the results of the data collected. A. (7.) CLEAN WATER ACT SECTION 316(B) [40 CFR 125.95] Based on evaluation of the 316(b) study reports, the Department concludes that the existing configuration at this facility represents BTA for meeting the impingement and entrainment requirements of the Rule. The permittee shall continue to comply with the Cooling Water Intake Structure Rule per 40 CFR 125.95. Nothing in this permit authorizes take for the purposes of a facility's compliance with the Endangered Species Act. A. (8.) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS [G. S. 143-215.1(b)] Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. Page 6 of 9 Permit NC0003468 NOTE: This special condition supplements or supersedes the following sections within Part II of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) • Section D. (6.) • Section E. (5.) Reporting Records Retention Monitoring Reports 1. Reporting Requirements [Supersedes Section D. (2.) and Section E. (5.) (a)] The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report (eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross -Media Electronic Reporting Regulation (CROMERR), permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing, signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NC DENR / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1. 1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. See "How to Request a Waiver from Electronic Reporting" section below. Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Starting on December 21, 2025, the permittee must electronically report the following compliance monitoring data and reports, when applicable: • Sewer Overflow/Bypass Event Reports; • Pretreatment Program Annual Reports; and • Clean Water Act (CWA) Section 316(b) Annual Reports. The permittee may seek an electronic reporting waiver from the Division (see "How to Request a Waiver from Electronic Reporting" section below). 2. Electronic Submissions In accordance with 40 CFR 122.41(1)(9), the permittee must identify the initial recipient at the time of each electronic submission. The permittee should use the EPA's website resources to identify the initial recipient for the electronic submission. Page 7 of 9 Permit NC0003468 Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity (EPA or the state authorized by EPA to implement the NPDES program) that is the designated entity for receiving electronic NPDES data [see 40 CFR 127.2(b)]. EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each type of electronic submission and for each state. Instructions on how to access and use the appropriate electronic reporting tool will be available as well. Information on EPA's NPDES Electronic Reporting Rule is found at: http://www2.epa.gov/compliance/final-national- pollutant-dis charge-elimination-system-npdes-electronic-reporting-rule. Electronic submissions must start by the dates listed in the "Reporting Requirements" section above. 3. How to Request a Waiver from Electronic Reporting The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to the Division. Requests for temporary electronic reporting waivers must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data and reports. The duration of a temporary waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring data and reports shall be submitted electronically to the Division unless the permittee re -applies for and is granted a new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers are not transferrable. Only permittees with an approved reporting waiver request may submit monitoring data and reports on paper to the Division for the period that the approved reporting waiver request is effective. Information on eDMR and the application for a temporary electronic reporting waiver are found on the following web page: http://deg.nc.gov/about/divisions/water-resources/edmr 4. Signatory Requirements [Supplements Section B. (11.1 (b) and Supersedes Section B. (11.1 All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II, Section B. (11.) (a) or by a duly authorized representative of that person as described in Part II, Section B. (11.)(b). A person, and not a position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account, please visit the following web page: http://deg.nc.gov/about/divisions/water-resources/edmr Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: '7 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, Page 8 of 9 Permit NC0003468 and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 5. Records Retention [Supplements Section D. (6.11 The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time [40 CFR 122.41]. A. (9.) COMPLIANCE BOUNDARY [ 15A NCAC 02L.0107] The compliance boundary for the disposal system shall be specified in accordance with 15A NCAC 02L .0107(a) or (b) dependent upon the date permitted. An exceedance of groundwater standards at or beyond the compliance boundary is subject to remediation action according to 15A NCAC 02L .0106(c), (d), or (e) as well as enforcement actions in accordance with North Carolina General Statute 143-215.6A through 143-215.6C. The compliance boundary map for this facility is incorporated herein and attached hereto as attachment. Page 9 of 9 NC DEQ - NC0001643 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHAM E. ROGERS, JR. Director Mr. John Mendenhall City Manager City of Eden PO Box 70 Eden, NC 27289-0070 Dear Mr. Mendenhall, NORTH CAROLINA Environmental Quality 2/8/2023 Subject: Issuance of NPDES Permit NC0001643 New Street WWTP Grade 11 Biological Water Treatment Facility [15A NCAC 08G .0302] Rockingham County Division personnel have reviewed and approved your application for renewal of the subject permit. Accordingly, we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This final permit includes no major changes from the draft permit sent to you on September 19, 2022. This newly issued permit differs from the previous permit in the following ways: The facility description on the supplement to cover page was updated to include 12-digit HUC. Section A. (3.) was updated to be consistent with current federal requirements for electronic reporting • Monitoring for Copper has been removed from the permitted effluent limits and monitoring requirements, as this parameter did not demonstrate reasonable potential to exceed applicable water quality standards. • The previous version of this permit required both influent and effluent monitoring of BOD and TSS to ensure 85% removal of these parameters. At the regional office's recommendation, this requirement has been removed. New Street WWTP is a 100% Domestic WWTP. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. Please note that this permit is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the permit. This permit does not affect the legal North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTHCAROLINA 919.707.9000 Uepa i eM of E vlmnmenfal pual\ /' DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 requirements to obtain any other Federal, State, or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Emily Richards at emily.richardskncdenr. gov. Sincerely, EDocuSigned by: 'Z. 8328B44CEKB4A1... Richard E. Rogers, Jr. Director cc: NPDES files ec: Winston-Salem Regional Office D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CAROLINA 919.707.9000 Deparlmem of EnvlronmenU1 Dual DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Eden is hereby authorized to discharge wastewater from a facility located at the New Street WWTP 572 S New Street Eden Rockingham County to receiving waters designated as the Dan River in subbasin 03-02-03 of the Roanoke River basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective April 1, 2023 This permit and authorization to discharge shall expire at midnight on April 30, 2027. Signed this day February 8, 2023 DDocuSigned by: 8328B44CEKB4A1 Richard E. Rogers, Jr. Director, Division of Water Resources By Authority of the Environmental Management Commission Page 1 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked, and as of this issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. City of Eden is hereby authorized to: 1. Continue to operate an existing 0.500 MGD wastewater treatment system that includes the following components: ➢ Dual influent lift pumps ➢ Lint screen ➢ Aeration basin ➢ Dual clarifiers ➢ Chlorine contact chamber ➢ Post aeration chamber ➢ Sludge lagoon This facility is located at the New Street WWTP (572 S New St, Eden) in Rockingham County. 2. Discharge from said treatment works at the location specified on the attached map into the Dan River, currently classified C waters in hydrologic unit 030101030901 of the Roanoke River Basin. Page 2 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 Part I A. (1) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS Grade II Biological WPCS [15A NCAC 08G .0302] [15A NCAC 02B.0400 et seq., 02B.0500 et seq.] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge non -contact cooling water, boiler blowdown and domestic wastewater from outfall 001. Such discharges shall be limited and monitored' by the Permittee as specified below: PARAMETER [PCS Code] Limits Monitoring Requirements Monthly Average Daily Maximum Measurement -Freauency Sample Type Sample Location Flow [500501 0.5 MGD Continuous Recording Effluent BOD, 5-day 20°C C0310 30.0 mg/L 45.0 mg/L Weekly Composite Effluent Total Suspended Solids C0530 30.0 mg/L 45.0 mg/L Weekly Composite Effluent NH3 as N [C0610] Weekly Composite Effluent Total Nitrogen [C0600] NO2+NO3+TKN Quarterly Composite Effluent Total Phosphorus C0665 Quarterly Composite Effluent Dissolved Oxygen 00300 Weekly Grab Effluent Fecal Coliform(geometric mean 316161 Weekly Grab Effluent pH [00400] > 6.0 and < 9.0 standard units Weekly Grab Effluent Total Residual Chlorine2 50060 28 is /L Weekly Grab Effluent Temperature (°C) [00010] T Weekly Grab Effluent Footnotes: 1. The permittee shall submit discharge monitoring reports electronically using the Division's eDMR system [see A. (3)]. 2. TRC limit and monitoring requirements apply only if chlorine is added for disinfection. The Permittee shall report all effluent TRC values reported by a NC -certified laboratory [including field -certified]. Effluent values < 50 µg/L will be treated as zero for compliance purposes. There shall be no discharge of floating solids or visible foam in other than trace amounts. A. (2) RESTART OF PLANT OPERATIONS [15A NCAC 02B.0400 et seq., 02B.0500 et seq.] In the event that a change in use of the facility is anticipated, and such change will cause the treatment system to receive and treat wastewater other than domestic in nature. the Permittee shall submit a request for permit modification including the following documentation at least 180 days prior to the start of operations: 1. If manufacturing or other activities are resumed at the site, a description of the manufacturing processes or activities, products, and expected annual production. 2. Flow diagram indicating process and wastewater flow volumes. 3. Proposed treatment and characteristics of the wastewater to be discharged. 4. Description of any planned expansions or upgrades to the treatment facilities. 5. Engineering Alternatives Analysis of wastewater disposal alternatives including a flow justification, the connection to an existing municipal waste treatment facility and non -discharge alternatives. 6. If the facility is sold a name ownership change form and required documentation shall be submitted to the Division. Page 3 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 A. (5) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS [NCGS 143-215.1 (b)] Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. NOTE: This special condition supplements or supersedes the following sections within Part II of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) Reporting • Section D. (6.) Records Retention • Section E. (5.) Monitoring Reports 1. Reporting Requirements [Supersedes Section D. (2.) and Section E. (5.) (a)1 The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report (eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. The eDMR system may be accessed at: https://deq.nc. gov/about/divisions/water-resources/edmr. If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1. 1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the following address: NC DEQ / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 See "How to Request a Waiver from Electronic Reporting" section below. Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Starting on December 21, 2025, the permittee must electronically report the following compliance monitoring data and reports, when applicable: Sewer Overflow/Bypass Event Reports; Pretreatment Program Annual Reports; and Clean Water Act (CWA) Section 316(b) Annual Reports. The permittee may seek an electronic reporting waiver from the Division (see "How to Request a Waiver from Electronic Reporting" section below). 2. Electronic Submissions Page 4 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 In accordance with 40 CFR 122.41(1)(9), the permittee must identify the initial recipient at the time of each electronic submission. The permittee should use the EPA's website resources to identify the initial recipient for the electronic submission. Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity (EPA or the state authorized by EPA to implement the NPDES program) that is the designated entity for receiving electronic NPDES data [see 40 CFR 127.2(b)]. EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each type of electronic submission and for each state. Instructions on how to access and use the appropriate electronic reporting tool will be available as well. Information on EPA's NPDES Electronic Reporting Rule is found at: htlps://www.federalre isg ter.gov/documents/2015/10/22/2015-24954/national-pollutant-discharge-elimination- system-npdes-electronic-reporting-rule Electronic submissions must start by the dates listed in the "Reporting Requirements" section above. 3. How to Request a Waiver from Electronic Reporting The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to the Division. Requests for temporary electronic reporting waivers must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data and reports. The duration of a temporary waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring data and reports shall be submitted electronically to the Division unless the permittee re -applies for and is granted a new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers are not transferrable. Only permittees with an approved reporting waiver request may submit monitoring data and reports on paper to the Division for the period that the approved reporting waiver request is effective. Information on eDMR and the application for a temporary electronic reporting waiver are found on the following web page: htto://dea.nc. gov/about/divisions/water-resources/edmr 4. Signatory Requirements [Supplements Section B. (11.) (b) and Supersedes Section B. (11.) (d)1 All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II, Section B. (11.)(a) or by a duly authorized representative of that person as described in Part II, Section B. (11.)(b). A person, and not a position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account, please visit the following web page: http://deq.nc.gov/about/divisions/water-resources/edmr Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.221. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: 7 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my Page 5 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 Permit NC0001643 knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " 5. Records Retention [Supplements Section D. (6.)] The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time [40 CFR 122.41 ]. Page 6 of 6 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 5+ k I'll h�' J::1 `View ., I n r fi ' y nanny Hag'' , y P a T .Rax ',, ". :..' ! .l'�_ _yam'• - - R� .1a! • �3 cIRPG � -. I e.� ii r-Li. per E1lE=''" —� f L" •. r f . I � 'is*,'. t ,• I 41�Gestdi,:�h.,-;� t. 9• '�' �� R' � i i IM M .]csv -:t: if t+ 5I. Club C , ° w ` war a _}sxl C4Iii cn r5t f r Pa astral W Ponds r 1 SHwyg9 l j.. a f +. . '> ^i I O utfa11001 J. I aslt °�4 , NC0001643 — New Street WWTP Latitude: 36° 29' 34" Sub -Basin: 03-02-03 Longitude: 79° 42' 13" County: Rockingham USGS Quad: Southeast Eden, N.C. Stream Class: C Hydrologic Unit: 03010103 Receiving Stream: Dan River Facility Location DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 1 of 18 PART II STANDARD CONDITIONS FOR NPDES PERMITS Section A. Definitions 2/Month Samples are collected twice per month with at least ten calendar days between sampling events. These samples shall be representative of the wastewater discharged during the sample period. 3/Week Samples are collected three times per week on three separate calendar days. These samples shall be representative of the wastewater discharged during the sample period. Act or "the Act" The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. Annual Average The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In the case of fecal coliform, the geometric mean of such discharges. Arithmetic Mean The summation of the individual values divided by the number of individual values. Bypass The known diversion of waste streams from any portion of a treatment facility including the collection system, which is not a designed or established or operating mode for the facility. Calendar Day The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any consecutive 24-hour period that reasonably represents the calendar day may be used for sampling. Calendar Week The period from Sunday through the following Saturday. Calendar Quarter One of the following distinct periods: January through March, April through June, July through September, and October through December. Composite Sample A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 mL in such a manner as to result in a total sample representative of the wastewater discharge during the sample period. The Director may designate the most appropriate method (specific number and size of aliquots necessary, the time interval between grab samples, etc.) on a case -by -case basis. Samples may be collected manually or automatically. Composite samples may be obtained by the following methods: (1) Continuous: a single, continuous sample collected over a 24-hour period proportional to the rate of flow. (2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour period of discharge and combined proportional to the rate of flow measured at the time of individual sample collection, or (3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period with the time intervals between samples determined by a preset number of gallons passing the sampling point. Flow measurement between sample intervals shall be determined by use of a flow recorder and totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the expected total daily flow at the treatment system, or Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 2 of 18 (4) Constant time/constant volume: a series of grab samples of equal volume collected over a 24-hour period at a constant time interval. Use of this method requires prior approval by the Director. This method may only be used in situations where effluent flow rates vary less than 15 percent. The following restrictions also apply: ➢ Influent and effluent grab samples shall be of equal size and of no less than 100 milliliters ➢ Influent samples shall not be collected more than once per hour. ➢ Permittees with wastewater treatment systems whose detention time < 24 hours shall collect effluent grab samples at intervals of no greater than 20 minutes apart during any 24-hour period. ➢ Permittees with wastewater treatment systems whose detention time exceeds 24 hours shall collect effluent grab samples at least every six hours; there must be a minimum of four samples during a 24-hour sampling period. Continuous flow measurement Flow monitoring that occurs without interruption throughout the operating hours of the facility. Flow shall be monitored continually except for the infrequent times when there may be no flow or for infrequent maintenance activities on the flow device. Daily Discharge The discharge of a pollutant measured during a calendar day or any 24-hour period that reasonably represents the calendar day for purposes of sampling. For pollutants measured in units of mass, the "daily discharge" is calculated as the total mass of the pollutant discharged over the day. For pollutants expressed in other units of measurement, the "daily discharge" is calculated as the average measurement of the pollutant over the day. (40 CFR 122.2; see also "Composite Sample," above.) Daily Maximum The highest "daily discharge" during the calendar month. Daily Sampling Parameters requiring daily sampling shall be sampled 5 out of every 7 days per week unless otherwise specified in the permit. Sampling shall be conducted on weekdays except where holidays or other disruptions of normal operations prevent weekday sampling. If sampling is required for all seven days of the week for any permit parameter(s), that requirement will be so noted on the Effluent Limitations and Monitoring Page(s). DWR or "the Division" The Division of Water Resources, Department of Environmental Quality. Effluent Wastewater discharged following all treatment processes from a water pollution control facility or other point source whether treated or untreated. EMC The North Carolina Environmental Management Commission EPA The United States Environmental Protection Agency Facility Closure Cessation of all activities that require coverage under this NPDES permit. Completion of facility closure will allow this permit to be rescinded. Geometric Mean The Nth root of the product of the individual values where N = the number of individual values. For purposes of calculating the geometric mean, values of "0" (or "< [detection level]") shall be considered = 1. Grab Sample Individual samples of at least 100 mL collected over a period of time not exceeding 15 minutes. Grab samples can be collected manually. Grab samples must be representative of the discharge (or the receiving stream, for instream samples). Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 3 of 18 Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the CWA. Instantaneous flow measurement The flow measured during the minimum time required for the flow measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period. Monthly Average (concentration limit) The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of fecal coliform or other bacterial parameters or indicators, the geometric mean of such discharges. Permit Issuing Authority The Director of the Division of Water Resources. Quarterly Average (concentration limit) The arithmetic mean of all samples taken over a calendar quarter. Severe prope damage Substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage excludes economic loss caused by delays in production. Toxic Pollutant: Any pollutant listed as toxic under Section 307(a)(1) of the CWA. Upset An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance with permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. Weekly Average (concentration limit) The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of fecal coliform or other bacterial parameters or indicators, the geometric mean of such discharges. Section B. General Conditions 1. Duty to Comply The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the CWA and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit renewal application [40 CFR 122.41]. a. The Permittee shall comply with effluent standards or prohibitions established under section 307(a) of the CWA for toxic pollutants and with standards for sewage sludge use or disposal established under section 405(d) of the CWA within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been modified to incorporate the requirement. b. The CWA provides that any person who violates section[s] 301, 302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any such sections in a permit issued under section 402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(b)(8) of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation. [33 USC 1319(d) and 40 CFR 122.41(a)(2)] c. The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308, 318, or 405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 4 of 18 imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment of not more than 2 years, or both. [33 USC 1319(c)(1) and 40 CFR 122.41(a)(2)] d. Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both. [33 USC 1319(c)(2) and 40 CFR 122.41(a)(2)] e. Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more than 30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction of violating the imminent danger provision, be subject to a fine of not more than $1,000,000 and can be fined up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41(a)(2)] f. Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [North Carolina General Statutes § 143-215.6A] g. Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $37,500. Penalties for Class II violations are not to exceed $16,000 per day for each day during which the violation continues, with the maximum amount of any Class II penalty not to exceed $177,500. [33 USC 1319(g)(2) and 40 CFR 122.41(a)(3)] 2. Duty to Mitigate The Permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in violation of this permit with a reasonable likelihood of adversely affecting human health or the environment [40 CFR 122.41(d)]. Civil and Criminal Liability Except as provided in permit conditions on 'Bypassing" (Part H.C.4), "Upsets" (Part II.C.5) and "Power Failures" (Part II.C.7), nothing in this permit shall be construed to relieve the Permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6 or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the Permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. 4. Oil and Hazardous Substance Liability Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, or penalties to which the Permittee is or may be subject to under NCGS 143- 215.75 et seq. or Section 311 of the Federal Act, 33 USG 1321. Furthermore, the Permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. 5. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations [40 CFR 122.41(g)]. 6. Onshore or Offshore Construction This permit does not authorize or approve the construction of any onshore or offshore physical structures or facilities or the undertaking of any work in any navigable waters. Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 5 of 18 7. Severability The provisions of this permit are severable. If any provision of this permit, or the application of any provision of this permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby [NCGS 15013-23]. 8. Duty to Provide Information The Permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. The Permittee shall also furnish to the Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41(h)]. 9. Duty to Reapply If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the Permittee must apply for and obtain a new permit [40 CFR 122.41(b)]. 10. Expiration of Permit The Permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date unless permission for a later date has been granted by the Director. (The Director shall not grant permission for applications to be submitted later than the expiration date of the existing permit.) [40 CFR 122.21(d)] Any Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will subject the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq. 11. Signator_y Requirements All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and certified [40 CFR 122.41(k)]. a. All permit applications shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official [40 CFR 122.22]. b. All reports required by the permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a. above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.22] Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 6 of 18 c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative [40 CFR 122.22] d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " 12. Permit Actions This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the Permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any permit condition [40 CFR 122.41(f)]. 13. Permit Modification, Revocation and Reissuance, or Termination The issuance of this permit does not prohibit the permit issuing authority from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 02H .0100; and North Carolina General Statute 143.215.1 et. al. 14. Annual Administering and Compliance Monitoring Fee Requirements The Permittee must pay the annual administering and compliance monitoring fee within thirty days after being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 02H .0105(b)(2) may cause this Division to initiate action to revoke the permit. Section C. Operation and Maintenance of Pollution Controls 1. Certified Operator Owners of classified water pollution control systems must designate operators, certified by the Water Pollution Control System Operators Certification Commission (WPCSOCC), of the appropriate type and grade for the system, and, for each classification must [T15A NCAC 08G .0201]: a. designate one Operator In Responsible Charge (ORC) who possesses a valid certificate of the type and grade at least equivalent to the type and grade of the system; b. designate one or more Back-up Operator(s) in Responsible Charge (Back-up ORCs) who possesses a valid certificate of the type of the system and no more than one grade less than the grade of the system, with the exception of no backup operator in responsible charge is required for systems whose minimum visitation requirements are twice per year; and c. submit a signed completed "Water Pollution Control System Operator Designation Form" to the Commission (or to the local health department for owners of subsurface systems) countersigned by the designated certified operators, designating the Operator in Responsible Charge (ORC) and the Back-up Operator in Responsible Charge (Back-up ORC): (1) 60 calendar days prior to wastewater or residuals being introduced into a new system; or (2) within 120 calendar days following: ➢ receiving notification of a change in the classification of the system requiring the designation of a new Operator in Responsible Charge (ORC) and Back-up Operator in Responsible Charge (Back-up ORC) of the proper type and grade; or ➢ a vacancy in the position of Operator in Responsible Charge (ORC) or Back-up Operator in Responsible Charge (Back-up ORC). Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 7 of 18 (3) within seven calendar days of vacancies in both ORC and Back-up ORC positions replacing or designating at least one of the responsibilities. The ORC of each Class I facility (or the Back-up ORC, when acting as surrogate for the ORC) must: ➢ Visit the facility as often as is necessary to insure proper operation of the treatment system; the treatment facility must be visited at least weekly ➢ Comply with all other conditions of 15A NCAC 08G .0204. The ORC of each Class II, III and IV facility (or the Back-up ORC, when acting as surrogate for the ORC) must: ➢ Visit the facility as often as is necessary to insure proper operation of the treatment system; the treatment facility must be visited at least five days per week, excluding holidays ➢ Properly manage and document daily operation and maintenance of the facility ➢ Comply with all other conditions of 15A NCAC 08G .0204. 2. Proper Operation and Maintenance The Permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the Permittee to install and operate backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the permit [40 CFR 122.41(e)]. NOTE: Properly and officially designated operators are fully responsible for all proper operation and maintenance of the facility, and all documentation required thereof, whether acting as a contract operator [subcontractor] or a member of the Permittee's staff. 3. Need to Halt or Reduce not a Defense It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41(c)]. 4. Bypassing of Treatment Facilities a. Bypass not exceeding limitations [40 CFR 122.41(m)(2)] The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Paragraphs b. and c. of this section. b. Notice [40 CFR 122.41(m)(3)] (1) Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and effect of the bypass. (2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in Part II.E.6. (24-hour notice). c. Prohibition of Bypass (1) Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take enforcement action against a Permittee for bypass, unless: (A) Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; (B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and (C) The Permittee submitted notices as required under Paragraph b. of this section. (2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take enforcement action against a Permittee for a bypass as provided in any current or future system -wide collection system permit associated with the treatment facility. Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 8 of 18 (3) The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects, if the Permit Issuing Authority determines that it will meet the three conditions listed above in Paragraph c. (1) of this section. 5. Upsets a. Effect of an upset [40 CFR 122.41(n)(2)]: An upset constitutes an affirmative defense to an action brought for noncompliance with such technology based permit effluent limitations if the requirements of paragraph b. of this condition are met. No determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is final administrative action subject to judicial review. b. Conditions necessary for a demonstration of upset: Any Permittee who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: (1) An upset occurred and that the Permittee can identify the cause(s) of the upset; (2) The Permittee facility was at the time being properly operated; and (3) The Permittee submitted notice of the upset as required in Part II.E.6.(b) of this permit. (4) The Permittee complied with any remedial measures required under Part ILB.2. of this permit. c. Burden of proof [40 CFR 122.41(n)(4)]: The Permittee seeking to establish the occurrence of an upset has the burden of proof in any enforcement proceeding. 6. Removed Substances Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters shall be utilized/disposed of in accordance with NCGS 143-215.1 and in a manner such as to prevent any pollutant from such materials from entering waters of the State or navigable waters of the United States except as permitted by the Commission. The Permittee shall comply with all applicable state and Federal regulations governing the disposal of sewage sludge, including 40 CFR 503, Standards for the Use and Disposal of Sewage Sludge; 40 CFR Part 258, Criteria For Municipal Solid Waste Landfills; and 15A NCAC Subchapter 2T, Waste Not Discharged To Surface Waters. The Permittee shall notify the Permit Issuing Authority of any significant change in its sludge use or disposal practices. 7. Power Failures The Permittee is responsible for maintaining adequate safeguards (as required by 15A NCAC 02H .0124) to prevent the discharge of untreated or inadequately treated wastes during electrical power failures either by means of alternate power sources, standby generators or retention of inadequately treated effluent. Section D. Monitoring and Records 1. Representative Sampling Samples collected and measurements taken, as required herein, shall be representative of the permitted discharge. Samples collected at a frequency less than daily shall be taken on a day and time that is representative of the discharge for the period the sample represents. All samples shall be taken at the monitoring points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted by any other wastestream, body of water, or substance. Monitoring points shall not be changed without notification to and the approval of the Permit Issuing Authority [40 CFR 122.410)]. 2. Reporting Monitoring results obtained during the previous month(s) shall be summarized for each month and reported on a monthly Discharge Monitoring Report (DMR) Form (MR 1, 1. 1, 2, 3) or alternative forms approved by the Director, postmarked no later than the last calendar day of the month following the completed reporting period. The first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Duplicate signed copies of these, and all other reports required herein, shall be submitted to the following address: Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 9 of 18 NC DEQ / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Flow Measurements Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device. Devices selected shall be capable of measuring flows with a maximum deviation of less than 10% from the true discharge rates throughout the range of expected discharge volumes. Flow measurement devices shall be accurately calibrated at a minimum of once per year and maintained to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device. The Director shall approve the flow measurement device and monitoring location prior to installation. Once -through condenser cooling water flow monitored by pump logs, or pump hour meters as specified in Part I of this permit and based on the manufacturer's pump curves shall not be subject to this requirement. 4. Test Procedures Laboratories used for sample analysis must be certified by the Division. Permittees should contact the Division's Laboratory Certification Section (919 733-3908) or visit https:Hdeq.nc.gov/about/divisions/water-resources/water- resources-data/water-sciences-home-page/laboratory-certification-branch for information regarding laboratory certifications. Facilities whose personnel are conducting testing of field -certified parameters only must hold the appropriate field parameter laboratory certifications. Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to NCGS 143-215.63 et. seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the CWA (as amended), and 40 CFR 136; or in the case of sludge use or disposal, approved under 40 CFR 136, unless otherwise specified in 40 CFR 503, unless other test procedures have been specified in this permit [40 CFR 122.41]. To meet the intent of the monitoring required by this permit, all test procedures must produce minimum detection and reporting levels that are below the permit discharge requirements and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are determined capable of achieving minimum detection and reporting levels below permit discharge requirements, then the most sensitive (method with the lowest possible detection and reporting level) approved method must be used. Penalties for Tampering The CWA provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both [40 CFR 122.41]. 6. Records Retention Except for records of monitoring information required by this permit related to the Permittee's sewage sludge use and disposal activities, which shall be retained for a period of at least five years (or longer as required by 40 CFR 503), the Permittee shall retain records of all monitoring information, including: ➢ all calibration and maintenance records ➢ all original strip chart recordings for continuous monitoring instrumentation ➢ copies of all reports required by this permit ➢ copies of all data used to complete the application for this permit Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 10 of 18 These records or copies shall be maintained for a period of at least 3 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time [40 CFR 122.41]. 7. Recording Results For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record the following information [40 CFR 122.41]: a. The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; c. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 8. Inspection and Entry The Permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), upon the presentation of credentials and other documents as may be required by law, to; a. Enter, at reasonable times, upon the Permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the CWA, any substances or parameters at any location [40 CFR 122.41(i)]. Section E Reporting Requirements 1. Change in Discharge All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge of any pollutant identified in this permit more frequently than or at a level in excess of that authorized shall constitute a violation of the permit. 2. Planned Changes The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility [40 CFR 122.41(1)]. Notice is required only when: a. The alteration or addition to a permitted facility may meet one of the criteria for new sources at 40 CFR 122.29(b); or b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR 122.42(a)(1); or c. The alteration or addition results in a significant change in the Permittee's sludge use or disposal practices, and such alteration, addition or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit application process or not reported pursuant to an approved land application plan. 3. Anticipated Noncompliance The Permittee shall give advance notice to the Director of any planned changes to the permitted facility or other activities that might result in noncompliance with the permit [40 CFR 122.41(1)(2)]. 4. Transfers This permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61. The Director may condition approval in accordance with NCGS 143-215.1, in Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 11 of 18 particular NCGS 143-215.1(b)(4)b.2., and may require modification or revocation and reissuance of the permit, or a minor modification, to identify the new permittee and incorporate such other requirements as may be necessary under the CWA [40 CFR 122.41(1)(3), 122.61 ] or state statute. 5. Monitoring Reports Monitoring results shall be reported at the intervals specified elsewhere in this permit [40 CFR 122.41(1)(4)]. a. Monitoring results must be reported on a Discharge Monitoring Report (DMR) (See Part II.D.2) or forms provided by the Director for reporting results of monitoring of sludge use or disposal practices. b. If the Permittee monitors any pollutant more frequently than required by this permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this permit or other appropriate instrument governing the discharge, the results of such monitoring shall be included in the calculation and reporting of the data submitted on the DMR. 6. Twenty-four Hour Reporting a. The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens public health or the environment. Any information shall be provided orally within 24 hours from the time the Permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the Permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its cause; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance [40 CFR 122.41(1)(6)]. b. The Director may waive the written report on a case -by -case basis for reports under this section if the oral report has been received within 24 hours. c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 858-0368 or (919) 733-3300. 7. Other Noncompliance The Permittee shall report all instances of noncompliance not reported under Part II.E.5 and 6. of this permit at the time monitoring reports are submitted. The reports shall contain the information listed in Part II.E.6. of this permit [40 CFR 122.41(1)(7)]. 8. Other Information Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit such facts or information [40 CFR 122.41(1)(8)]. 9. Noncompliance Notification The Permittee shall report by telephone to either the central office or the appropriate regional office of the Division as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any occurrence at the water pollution control facility which results in the discharge of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a sludge digester; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report within 5 days following first knowledge of the occurrence. Also see reporting requirements for municipalities in Part IV.C.2.c. of this permit. 10. Availabilityports Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 12 of 18 of the Division. As required by the Act, effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143- 215.1(b)(2) or in Section 309 of the Federal Act. 11. Penalties for Falsification of Reports The CWA provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $25,000 per violation, or by imprisonment for not more than two years per violation, or by both [40 CFR 122.41]. 12. Annual Performance Reports Permittees who own or operate facilities that primarily collect or treat municipal or domestic wastewater and have an average annual flow greater than 200,000 gallons per day shall provide an annual report to the Permit Issuing Authority and to the users/customers served by the Permtttee (NCGS 143-215.1C). The report shall summarize the performance of the collection or treatment system, as well as the extent to which the facility was compliant with applicable Federal or State laws, regulations and rules pertaining to water quality. The report shall be provided no later than sixty days after the end of the calendar or fiscal year, depending upon which annual period is used for evaluation. The report shall be sent to: NC DEQ / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 13 of 18 PART III OTHER REQUIREMENTS Section A. Construction a. The Permittee shall not commence construction of wastewater treatment facilities, nor add to the plant's treatment capacity, nor change the treatment process(es) utilized at the treatment plant unless (1) the Division has issued an Authorization to Construct (AtC) permit or (2) the Permittee is exempted from such AtC permit requirements under Item b. of this Section. b. In accordance with NCGS 143-215.1(a5) [SL 2011-394], no permit shall be required to enter into a contract for the construction, installation, or alteration of any treatment work or disposal system or to construct, install, or alter any treatment works or disposal system within the State when the system's or work's principle function is to conduct, treat, equalize, neutralize, stabilize, recycle, or dispose of industrial waste or sewage from an industrial facility and the discharge of the industrial waste or sewage is authorized under a permit issued for the discharge of the industrial waste or sewage into the waters of the State. Notwithstanding the above, the permit issued for the discharge may be modified if required by federal regulation. c. Issuance of an AtC will not occur until Final Plans and Specifications for the proposed construction have been submitted by the Permittee and approved by the Division. Section B. Groundwater Monitoring The Permittee shall, upon written notice from the Director, conduct groundwater monitoring as may be required to determine the compliance of this NPDES permitted facility with the current groundwater standards. Section C. Changes in Discharges of Toxic Substances The Permittee shall notify the Permit Issuing Authority as soon as it knows or has reason to believe (40 CFR 122.42): a. That any activity has occurred or will occur which would result in the discharge, on a routine or frequent basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels"; (1) One hundred micrograms per liter (100 µg/L); (2) Two hundred micrograms per liter (200 µg/L) for acrolein and acrylonitrile; five hundred micrograms per liter (500 µg/L) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/L) for antimony; (3) Five times the maximum concentration value reported for that pollutant in the permit application. b. That any activity has occurred or will occur which would result in any discharge, on a non -routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels"; (1) Five hundred micrograms per liter (500 µg/L,); (2) One milligram per liter (1 mg/L) for antimony; (3) Ten times the maximum concentration value reported for that pollutant in the permit application. Section D. Facility Closure Requirements The Permittee must notify the Division at least 90 days prior to the closure of any wastewater treatment system covered by this permit. The Division may require specific measures during deactivation of the system to prevent adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit continue at the permitted facility. Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 14 of 18 PART IV SPECIAL CONDITIONS FOR MUNICIPAL FACILITIES Section A. Definitions In addition to the definitions in Part II of this permit, the following definitions apply to municipal facilities: Indirect Discharge or Industrial User Any non -domestic source that discharges wastewater containing pollutants into a POTW regulated under section 307(b), (c) or (d) of the CWA. [40 CFR 403.3 (i) and 0) and 15A NCAC 02H .0903(b)(11)] Interference Inhibition or disruption of the POTW treatment processes; operations; or its sludge process, use, or disposal which causes or contributes to a violation of any requirement of the Permittee's (or any satellite POTW's if different from the Permittee) NPDES, collection system, or non -discharge permit or prevents sewage sludge use or disposal in compliance with specified applicable State and Federal statutes, regulations, or permits. [I 5A NCAC 02H .0903(b)(14)] Pass Through A discharge which exits the POTW into waters of the State in quantities or concentrations which, alone or with discharges from other sources, causes a violation, including an increase in the magnitude or duration of a violation, of the Permittee's (or any satellite POTW's, if different from the Permittee) NPDES, collection system, or non -discharge permit. [15A NCAC 02H .0903(b)(23)] Publicly Owned Treatment Works (POTW) A treatment works as defined by Section 212 of the CWA, which is owned by a State or local government organization. This definition includes any devices and systems used in the storage, treatment, recycling and reclamation of municipal sewage or industrial wastes of a liquid nature. It also includes the collection system, as defined in 15A NCAC 2T .0402, only if it conveys wastewater to a POTW treatment plant. The term also means the local government organization, or municipality, as defined in section 502(4) of the CWA, which has jurisdiction over indirect discharges to and the discharges from such a treatment works. In this context, the organization may be the owner of the POTW treatment plant or the owner of the collection system into which an indirect discharger discharges. This second type of POTW may be referred to as a "satellite POTW organization." [15A NCAC 02H .0903(b)(26)] "Significant Industrial User" or "SIU" An Industrial User that discharges wastewater into a publicly owned treatment works and that [15A NCAC 02H .0903(b)(33)]: 1. Discharges an average of 25,000 gallons per day or more of process wastewater to the POTW (excluding sanitary, noncontact cooling and boiler blowdown wastewaters); or 2. Contributes process wastewater which makes up five percent or more of the NPDES or non -discharge permitted flow limit or organic capacity of the POTW treatment plant. In this context, organic capacity refers to BOD, TSS and ammonia; or 3. Is subject to categorical standards under 40 CFR Part 403.6 and 40 CFR Parts 405-471; or 4. Is designated as such by the Permittee on the basis that the Industrial User has a reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement, or the POTW's effluent limitations and conditions in its NPDES or non -discharge permit, or to limit the POTW's sludge disposal options; 5. Subject to approval under 15A NCAC 02H .0907(b), the Permittee may determine that an Industrial User meeting the criteria in paragraphs 1 or 2 of this definition above has no reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement, the POTW's effluent limitations and conditions in its NPDES or non -discharge permit, or to limit the POTW's sludge disposal options, and thus is not a Significant Industrial User (SIU); or 6. Subject to approval under 15A NCAC 02H .0907(b), the Permittee may determine that an Industrial User meeting the criteria in paragraph 3 of this definition above meets the requirements of 40 CFR Part 403.3(v)(2) and thus is a non -significant categorical Industrial User. Section B. Publicly Owned Treatment Works (POTWs) Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 15 of 18 All POTWs must provide adequate notice to the Director of the following [40 CFR 122.42(b)]: 1. Any new introduction of pollutants into the POTW from an indirect discharger, regardless of the means of transport, which would be subject to section 301 or 306 of CWA if it were directly discharging those pollutants; and 2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger as influent to that POTW at the time of issuance of the permit. 3. For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of effluent introduced into the POTW, and (2) any anticipated impact that may result from the change of the quantity or quality of effluent to be discharged from the POTW. Section C. Municipal Control of Pollutants from Industrial Users. 1. Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from Industrial Users discharging to the POTW may be present in the Permittee's discharge. At such time as sufficient information becomes available to establish limitations for such pollutants, this permit may be revised to specify effluent limitations for any or all of such other pollutants in accordance with best practicable technology or water quality standards. 2. Prohibited Discharges a. The Permittee shall develop and enforce their Pretreatment Program to implement the prohibition against the introduction of pollutants or discharges into the waste treatment system or waste collection system which cause or contribute to Pass Through or Interference as defined in 15A NCAC 02H .0900 and 40 CFR 403. [40 CFR 403.5(a)(1)] b. The Permittee shall develop and enforce their Pretreatment Program to implement the prohibitions against the introduction of the following wastes in the waste treatment or waste collection system [40 CFR 403.5(b)]: (1) Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to, wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.21; (2) Pollutants which cause corrosive structural damage to the POTW, but in no case discharges with pH lower than 5.0, unless the works is specifically designed to accommodate such discharges; (3) Solid or viscous pollutants in amounts which cause obstruction to the flow in the POTW resulting in Interference; (4) Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow rate and/or pollutant concentration which will cause Interference with the POTW; (5) Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C (1047) unless the Division, upon request of the POTW, approves alternate temperature limits; (6) Petroleum oil, non -biodegradable cutting oil, or products of mineral oil origin in amounts that will cause Interference or Pass Through; (7) Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause acute worker health and safety problems; or (8) Any trucked or hauled pollutants, except at discharge points designated by the POTW. c. The Permittee shall investigate the source of all discharges into the POTW, including slug loads and other unusual discharges, which have the potential to adversely impact the Permittee's Pretreatment Program and/or the operation of the POTW. The Permittee shall report such discharges into the POTW to the Director or the appropriate Regional Office. Any information shall be provided orally within 24 hours from the time the Permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the Permittee becomes aware of the circumstances. The written submission shall contain a description of the discharge; the investigation into possible sources; the period of the discharge, including exact dates and times; if the discharge has not ceased, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance, Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 16 of 18 3. With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the Permittee to supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to ensure compliance by the Permittee with all applicable effluent limitations. Such actions by the Permittee may be necessary regarding some or all of the industries discharging to the municipal system. 4. The Permittee shall require any Industrial User (IU) discharging to the POTW to meet Federal Pretreatment Standards developed under Section 307(b) of the Act as amended (which includes categorical standards and specific local limits, best management practices and narrative requirements). Prior to accepting wastewater from any Significant Industrial User (SIU), the Permittee shall either develop and submit to the Division a new Pretreatment Program or, as necessary, a modification of an existing Pretreatment Program, for approval as required under section D below as well as 15A NCAC 02H .0907(a) and (b). [40 CFR 122.440)(2)] 5. This permit shall be modified, or alternatively, revoked and reissued, to incorporate or modify an approved POTW Pretreatment Program or to include a compliance schedule for the development of a POTW Pretreatment Program as required under Section 402 (b)(8) of the CWA and implementing regulations or by the requirements of the approved State pretreatment program, as appropriate. Section D. Pretreatment Programs Under authority of sections 307 (b) and (c) and 402(b)(8) of the CWA and implementing regulations 40 CFR 403, North Carolina General Statute 143-215.3(14) and implementing regulations 15A NCAC 02H .0900, and in accordance with the approved pretreatment program, all provisions and regulations contained and referenced in the pretreatment program submittal are an enforceable part of this permit. [40 CFR 122.440)(2)] The Permittee shall operate its approved pretreatment program in accordance with Section 402(b)(8) of the CWA, 40 CFR 403, 15A NCAC 02H .0900, and the legal authorities, policies, procedures, and financial provisions contained in its pretreatment program submission and Division approved modifications thereof. Such operation shall include but is not limited to the implementation of the following conditions and requirements. Terms not defined in Part II or Part IV of this permit are as defined in 15A NCAC 02H .0903 and 40 CFR 403.3. 1. Sewer Use Ordinance (SUO) The Permittee shall maintain adequate legal authority to implement its approved pretreatment program. [I 5A NCAC 02H .0903(b)(32), .0905 and .0906(b)(1); 40 CFR 403.8(f)(1) and 403.9(b)(1) and (2)] 2. Industrial Waste Survey (IWS) The Permittee shall implement an IWS consisting of the survey of users of the POTW collection system or treatment plant, as required by 40 CFR 403.8(f)(2)(i-iii) and 15A NCAC 02H .0905 [also 40 CFR 122.440)(1)], including identification of all Industrial Users that may have an impact on the POTW and the character and amount of pollutants contributed to the POTW by these Industrial Users and identification of those Industrial Users meeting the definition of SIU. Where the Permittee accepts wastewater from one or more satellite POTWs, the IWS for the Permittee shall address all satellite POTW services areas, unless the pretreatment program in those satellite service areas is administered by a separate Permittee with an approved Pretreatment Program. The Permittee shall submit a summary of its IWS activities to the Division at least once every five years, and as required by the Division. The IWS submission shall include a summary of any investigations conducted under paragraph C.2.c. of this Part. [15A NCAC 02H .0903(b)(13), .0905 and .0906(b)(2); 40 CFR 403.8(f)(2) and 403.9] 3. Monitoring Plan The Permittee shall implement a Division -approved Monitoring Plan for the collection of facility specific data to be used in a wastewater treatment plant Headworks Analysis (HWA) for the development of specific pretreatment local limits. Effluent data from the Plan shall be reported on the DMRs (as required by Parts II.D and II.E.5.). [15A NCAC 02H .0903(b)(16), .0906(b)(3) and .0905] 4. Headworks Analysis (HWA) and Local Limits The Permittee shall obtain Division approval of a HWA at least once every five years, and as required by the Division. Within 180 days of the effective date of this permit (or any subsequent permit modification) the Permittee shall submit to the Division a written technical evaluation of the need to revise local limits (i.e., an updated HWA or documentation of why one is not needed) [40 CFR 122.44]. The Permittee shall develop, in accordance with 40 CFR 403.5(c) and 15A NCAC 02H .0909, specific Local Limits to implement the prohibitions listed in 40 CFR 403.5(a) and (b) and 15A NCAC 02H .0909. Pursuant to 40 CFR 403.5, local limits are Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 17 of 18 enforceable Pretreatment Standards as defined by 40 CFR 403.3(1). [15A NCAC 02H .0903(b)(10), .0905, and .0906(b)(4)] Industrial User Pretreatment Permits (IUP) & Allocation Tables In accordance with NCGS 143-215.1, the Permittee shall issue to all Significant Industrial Users, permits for operation of pretreatment equipment and discharge to the Permittee's collection system or treatment works. These permits shall contain limitations, sampling protocols, reporting requirements, appropriate standard and special conditions, and compliance schedules as necessary for the installation of treatment and control technologies to assure that their wastewater discharge will meet all applicable pretreatment standards and requirements. The Permittee shall maintain a current Allocation Table (AT) which summarizes the results of the HWA and the limits from all IUPs. Permitted IUP loadings for each parameter cannot exceed the treatment capacity of the POTW as determined by the HWA. [15A NCAC 02H .0906(b)(6), .0909, .0916, and .0917; 40 CFR 403.5, 403.8(f)(1)(iii); NCGS 143-215.67(a)] 6. Authorization to Construct (AtQ The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable Industrial Users for the construction or modification of any pretreatment facility. Prior to the issuance of an AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to comply with all Industrial User Pretreatment Permit (IUP) limitations. [15A NCAC 02H .0906(b)(7) and .0905; NCGS 143- 215.1(a)(8)] 7. POTW Inspection & Monitoring of their IUs The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division approved pretreatment program in order to determine, independent of information supplied by Industrial Users, compliance with applicable pretreatment standards. [15A NCAC 02H .0908(e); 40 CFR 403.8(f)(2)(v)] The Permittee must: a. Inspect all Significant Industrial Users (SIUs) at least once per calendar year; b. Sample all Significant Industrial Users (SIUs) at least once per calendar year for all SIU permit -limited parameters including flow except as allowed under 15A NCAC .0908(e); and c. At least once per year, document an evaluation of any non -significant categorical Industrial User for compliance with the requirements in 40 CFR 403.3(v)(2), and either continue or revoke the designation as non- significant. 8. IU Self Monitoringand nd Reporting The Permittee shall require all Industrial Users to comply with the applicable monitoring and reporting requirements outlined in the Division -approved pretreatment program, the industry's pretreatment permit, or in 15A NCAC 02H .0908. [15A NCAC 02H .0906(b)(5) and .0905; 40 CFR 403.8(f)(1)(v) and (2)(iii); 40 CFR 122.440)(2) and 40 CFR 403.12] 9. Enforcement Response Plan (ERP) The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards promulgated pursuant to section 307(b) and (c) of the CWA (40 CFR 405 et. seq.), prohibitive discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 02H .0909, specific local limitations, and other pretreatment requirements. All remedies, enforcement actions and other, shall be consistent with the Enforcement Response Plan (ERP) approved by the Division. [15A NCAC 02H .0903(b)(7), .0906(b)(8) and .0905; 40 CFR 403.8(f)(5)] 10. Pretreatment Annual Reports (PAR) The Permittee shall report to the Division in accordance with 15A NCAC 02H .0908. In lieu of submitting annual reports, Modified Pretreatment Programs developed under 15A NCAC 02H .0904 (b) may be required to submit a partial annual report or to meet with Division personnel periodically to discuss enforcement of pretreatment requirements and other pretreatment implementation issues. For all other active pretreatment programs, the Permittee shall submit two copies of a Pretreatment Annual Report (PAR) describing its pretreatment activities over the previous calendar year to the Division at the following address: Version 1110912011.2 DocuSign Envelope ID: 13A5271C-3E31-4EB4-81ED-646B06361AC6 NPDES Permit Standard Conditions Page 18 of 18 NC DEQ / Division of Water Resources / Water Quality Permitting Section Pretreatment, Emergency Response, and Collection Systems (PERCS) Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 These reports shall be submitted by March 1 of each year and shall contain the following: a. Narrative A narrative summary detailing actions taken, or proposed, by the Permittee to correct significant non- compliance and to ensure compliance with pretreatment requirements; b. Pretreatment Program Summary (PPS) A pretreatment program summary (PPS) on forms or in a format provided by the Division; c. Significant Non -Compliance Report (SNCR) A list of Industrial Users (IUs) in significant noncompliance (SNC) with pretreatment requirements, and the nature of the violations on forms or in a format provided by the Division; d. Industrial Data Summary Forms (IDSF) Monitoring data from samples collected by both the POTW and the Significant Industrial Users (SIUs). These analytical results must be reported on Industrial Data Summary Forms (IDSF) or on other forms or in a format provided by the Division; e. Other Information Copies of the POTW's allocation table, new or modified enforcement compliance schedules, public notice of IUs in SNC, a summary of data or other information related to significant noncompliance determinations for IUs that are not considered SIUs, and any other information, upon request, which in the opinion of the Director is needed to determine compliance with the pretreatment implementation requirements of this permit; 11. Public Notice The Permittee shall publish annually a list of Industrial Users (IUs) that were in significant noncompliance (SNC) as defined in the Permittee's Division -approved Sewer Use Ordinance with applicable pretreatment requirements and standards during the previous twelve month period. This list shall be published within four months of the applicable twelve-month period. [15A NCAC 02H .0903(b)(34), .0908(b)(5) and .0905 and 40 CFR 403.8(f)(2)(viii)] 12. Record Keeping The Permittee shall retain for a minimum of three years records of monitoring activities and results, along with support information including general records, water quality records, and records of industrial impact on the POTW and shall retain all other Pretreatment Program records as required by 15A NCAC 02H .0908(f). [ 15A NCAC 02H .0908(f); 40 CFR 403.12(o)] 13. Pretreatment Program Resources The Permittee shall maintain adequate funding and qualified personnel to accomplish the objectives of its approved pretreatment program. and retain a written description of those current levels of inspection. [I 5A NCAC 02H .0906(b)(9) and (10) and .0905; 40 CFR 403.8(t)(3), 403.9(b)(3)] 14. Modification to Pretreatment ProjZrams Modifications to the approved pretreatment program including but not limited to local limits modifications, POTW monitoring of their Significant Industrial Users (SIUs), and Monitoring Plan modifications, shall be considered a permit modification and shall be governed by 40 CFR 403.18, 15 NCAC 02H .0114 and 15A NCAC 02H .0907. Version 1110912011.2 ATTACHMENT F - USACE NORFOLK DISTRICT PROJECTS Norfolk District Files Berry Hill Connector - Permit #24-4024 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Virginia Department of Transportation INTER -AGENCY COORDINATION MEETING Joint Permit Application DEQ COE VMRC I. VDOT PROJECT INFORMATION Route: 311 UPC#: 119164 VDOT Project Number: 0311-071-835, C501, D648,USGS Quadrangle: Brosville D649, P101, R201 City/County: Pittsylvania VDOT City/County Code: 071 Contract Type: State Project Charge: UPC 119164; 7xx activity Planned Ad Date: 05/13/2025 Designer: Cox, Amanda J Project Number(Assoc)(UPC): 00311-071-26412732, 00311-071-26584286 II. TYPE OF SCOPING/COORDINATION: Permit Coordination Permits Required: COE Individual; VDEQ Individual VWPP III. VDOT CONTACTS Permit Coordinator District Environmental Manager VDOT (Applicant) (VDOT District Contact) (Authorized Agent) Name: Frank W Scearce Name: Kevin R Bradley Name: Vincent A Mayberry Address: US Highway 29 Address: 4219 Campbell Avenue Address: 4219 Campbell Avenue Chatham, VA 24531 Lynchburg, VA 24501 Lynchburg, VA 24501 Phone #: (540) 576-4515 Phone #: (434) 856-8288 Phone #: (434) 856-8289 IV. PERMITTED ACTIVITY The project involves reconfiguring Berry Hill Rd as an extension of the Berry Hill Rd Connector (UPC 115493) by widening the road from existing 2 lanes to a proposed 4-lane; for approx. 2.3 mi from the intersection of the new Connector Road to Oak Hill Rd. adjacent the Southern Va Mega Site at Berry Hill. The project also proposes improvements at Rte. 31 I/Oak Hill Rd intersection. The existing water main will be relocated within the new r/w. TOTAL IMPACTS: Total permanent wetland impacts are 10060 sf (0.231 ac) of forested wetland, 3985 sf (0.091 ac) of scrub -shrub wetland and 1804 sf (0.041 ac) emergent wetland. Total temporary wetland impacts are 1521 sf (0.035 ac) of scrub -shrub wetland. The total permanent stream impacts are 1285 if (16903 sf, 0.388 ac) and total temporary stream impacts (non -erodible cofferdams) are 335 if (7076 sf, 0.162 ac). Total stream excavation is 290 If (6629 sf, 737 cy) permanent fill is 1285 if (16903 sf, 1357 cy); temporary fill (non -erodible cofferdams) is 335 If (7076 sf). V. ENVIRONMENTAL ASSESSMENT(Avoidance and Impacts are described in greater detail in section VI and VIL) Present Impacts Present Impacts Yes * Yes Yes Federal Threatened/Endangered Species Water of the U.S State Threatened/Endangered Species Yes * Wetlands Yes Yes Anadromous fish No No Riffle Pool Complexes No No Trout No No Other Special Aquatic Sites No No Shellfish No No 100 Year Floodplain Yes No Public Water Supply No No Historic/Archeological Resources Yes Yes Scenic Rivers No No Air Quality Nonattainment Area No No Navigable Waters No No Tidal Waters/Wetlands: No No Open Water > 1.0 Acre No No *Please refer to the T&E Report for T&E Species Impacts IACM Coordination Form 7/1/2017 Page 1 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI. SUMMARY OF DETAILED ENVIRONMENTAL IMPACT INFORMATION This project has multiple jurisdictional crossings. General. Latitude: 36°33'16" Longitude: 79°35'54" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 495.13- 504.54 MLW elevation (feet): N/A Area (feetZ) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 6629 0 0 16903 0 15849 7076 0 1521 737 01 0 1357 01 0 01 01 0 0 0 0 0 0 0 0 0 0 MECHANICAL MECHANICAL IACM Coordination Form 7/1/2017 Page 2 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Stream Information: Stream Name(s): Trotters Creek, Tributary to Trotters Creek, Trotters Creek (downstream), McGuff Creek (upstream), McGuff Creek (downstream) Pool/Riffle/Flat ratio: See Ind Crossing Data Substrate: See Ind Crossing Data OHWM Indicator(s): See Ind Crossing Data Drainage Area (milesZ): See Ind Crossing Data Average Depth (feet): See Ind Crossing Data Average Width (feet): See Ind Crossing Data DWR Classification: Other (N/A) Cowardin Classification: R3UB, R4S13 DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 560 Intermittent- 230 Ephemeral- 495 Riffle/Pool- 0 Conceptual Stream Mitization: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream N/A/ 03010101, 03010103 905 $392,364.00 Bank Mitigation Bank -Credit N/A 03010102, Purchase 03010103, 03010105 Graham & David Graham and David N/A/ 03010101, 03010101 324 $29,891.50 Mitigation Bank Mitigation Bank - Credit N/A 030010102, Purchase 03010103, 03010105 Roanoke River Mitigation Roanoke River Mitigation 36°48'37.9"/ 03010101, 03010103 84 $8,196.72 Bank Bank - Credit Purchase 79053'41.5" 03010103, 03010104, 03010105 IACM Coordination Form 7/1/2017 Page 3 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PEM, PFO, PSS Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - 36054'00"/ 03010101, 03010105 19848 $29,573.52 Credit Purchase 79012'00" 03010102; 03010103, 03010104, 03010105 VDOT Dick Cross VDOT Dick Cross Site 36036'53.49"/ 03010106, 03010106 12649.5 $0.00 Mitigation Site 78016'17.42" 03010102 Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal IACM Coordination Form 7/1/2017 Page 4 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VIL PROJECT NARRATIVE: Project purpose, need, and description: The Project involves reconfiguring Berry Hill Rd as an extension of the Berry Hill Road Connector (Project #6311-071-454, C501; UPC #115493; Permit #20-4068) by widening Segment C of the road from the existing 2- lanes to a proposed 4-lane Rural Collector Road system (GS-3) to match the design of the Berry Hill Connector Road currently under construction. The anticipated completion of the Connector Road is Fall/2024. The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. A 2009 traffic study and 2018 supplement to the original study indicates that existing US Route 311 is not sufficient to accommodate traffic from the adjacent Industrial and Economic Development Area (IED) (Southern Virginia Mega Site at Berry Hill). The IED is currently under development on 3,528 acres in southwestern Pittsylvania County and will be a major regional employment center. The Berry Hill Connector Road and Extension transportation projects support not only the IED site, but also separate parcels that include Dominion's Solar Site (125MW) and future housing development sites. As a 4-lane facility, US Route 311 will act as the new... See Attachment A. Proposed construction schedule: The project is proposed to be advertised in May 2025. Construction should begin in the fall of 2025 and is anticipated to take approximately 2 years to complete. Tree removal may be undertaken before full project construction begins. Project impacts (include a description of all impacts, permanent and temporary): The project involves reconfiguring Berry Hill Rd as an extension of the Berry Hill Rd Connector (UPC 115493) by widening the road from existing 2 lanes to a proposed 4-lane; for approx. 2.3 mi from the intersection of the new Connector Road to Oak Hill Rd. adjacent the Southern Va Mega Site at Berry Hill. The project also proposes improvements at Rte. 311/Oak Hill Rd intersection. The existing water main will be relocated within new r/w. TOTAL IMPACTS: Total permanent wetland impacts are 10060 sf (0.231 ac) of forested wetland, 3985 sf (0.0.091 ac) of scrub -shrub wetland and 1804 sf (0.041 ac) emergent wetland. Total temporary wetland impacts are 1521 sf (0.035 ac) of scrub -shrub wetland. The total permanent stream impacts are 1285 if (16903 sf, 0.388 ac) and total temporary stream impacts (non -erodible cofferdams) are 335 if (7076 sf, 0.162 ac). Total stream excavation is 2901f (6629 sf, 737 cy) permanent fill is 1285 if (16903 sf, 1357 cy); temporary fill (non -erodible cofferdams) is 335 if (7076 sf). (Temporary fill in cubic yards is not provided due to the multiple phasing of the culvert installations and the varying cofferdam configurations that will be required to... See Attachment A. T&E Species (See Attachment G for additional documentation): Based upon review of federal databases including IPaC, federal T&E species have a potential to occur in the project area. Northern long-eared bat (FE): "This species only needs to be considered if the project includes wind turbine operations.' ; Tri-colored bat (FPE): Apply the pup season Time of Year Restriction for the purposes of tree cutting from 5/15-7/31; Green Floater (FPT, ST), Atlantic Pigtoe (FT,ST), JSM (FE, SE): Habitat Assessment completed and submitted to DWR, fmding consistent with historical results, no TOYR recommended. Project located outside the 0.5 mile buffer for Atlantic Pigtoe Critical Habitat. Approximately 29 acres of tree removal is required for this project. See Attachment G for additional T&E information. Cultural Resources (See Attachment E for additional documentation): VDOT Effect Determination: ADVERSE EFFECT. DHR concurred an Adverse Effect to the Berry Hill Archaeological District on 11-30-23. Final Effect Determination: ADVERSE EFFECT. DHR Concurrence Date: 11/30/2023. See Attachment E for additional Cultural Resources information. 1ACM Coordination Form 7/1/2017 Page 5 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VIII. PROJECT MITIGATION: Project mitigation efforts including AVOIDANCE, MINIMIZATION, AND COMPENSATION. Avoidance: Design efforts have been utilized to use the smallest practicable horizontal and vertical roadway footprint to avoid and minimize the impact to wetlands and streams by using the steepest and practicable roadway grades, curves and fill slopes. The new travel lane will be located parallel the north... See Attachment A. Minimization: The project design minimizes new disturbance by utilizing the existing Rte 311 Berry Hill Road corridor and locating the new travel lane parallel the exiting roadway. All new jurisdictional culverts will be countersunk and aligned to minimize channel tie-in lengths. Existing box culverts at... See Attachment A. Compensation (include functional assessment when applicable; see Attachment M for additional documentation): Wetland impacts will be compensated for using credits from the Banister Bend Wetland Bank Advance Credit Purchase and the VDOT Dick Cross Mitigation Site, and stream impacts requiring compensation will utilize the Callaway Stream Mitigation Bank Advance Credit Purchase, the Graham and David Stream Mitigation Bank Advance Credit Purchase, and the Roanoke River Stream Mitigation Bank Advance Credit Purchase. Wetland... See Attachment A. 1ACM Coordination Form 7/1/2017 Page 6 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: IX. EROSION AND SEDIMENT CONTROLS: An erosion and sediment control plan will be prepared and implemented in compliance with the Erosion and Sediment Control Law, the Erosion and Sediment Control Regulations, and the annual erosion and sediment control standards and specifications approved by the Department of Conservation and Recreation. X. STORMWATER MANAGEMENT STATEMENT: Design of this project will be in compliance with the Stormwater Management Act, the Stormwater Management Regulations, and the annual stormwater management standards, and specifications approved by the Department of Conservation and Recreation. XI. MATERIALS ASSESSMENT: All fill material shall be clean and free of contaminants in toxic concentrations or amounts in accordance with all applicable laws and regulations. XII. FEMA STATEMENT: The design of this project will be in compliance with all applicable FEMA-approved state or local floodplain management requirements. XIII. DREDGE MATERIAL MANAGEMENT PLAN: All dredge material will be removed to an approved, contained, upland location. The disposal area will be of sufficient size and capacity to properly contain the dredge material, to allow for adequate dewatering and settling out of sediment, and to prevent overtopping. The disposal area will be properly stabilized prior to placement of dredge material. XIV. NEPA DOCUMENTATION: Not Required Document type: Date: "VDOT is in receipt of the concurrence from the Virginia SHPO regarding conclusion of Section 106 (inclusive of any tribal requirements), the USFWS regarding conclusion of Section 7 consultation and NMFS regarding conclusion of Essential Fish Habitat consultation. We trust the evidenced conclusion of these federally authorized agencies with jurisdiction over these resources is sufficient for the USACE's acceptance of this coordination and indicates that consultation is complete." 1ACM Coordination Form 7/1/2017 Page 7 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: XV. CERTIFICATION (for SPGP/VWPP only; see Attachment IT): "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Applicant Signature: Name of person signing above: (print or type) Title: Authorized Agent Signature: Name of person signing above: (print or type) Title: Date: Date: 1ACM Coordination Form 7/1/2017 Page 8 of 9 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: XVI. ATTACHMENTS (Include all that apply): [ X ] Narratives Continuation (See Attachment A) [ X ] Project Maps [Vicinity, Topo, and FEMA Maps] [ X ] Multi -crossings summary table [ X ] Detailed Environmental Impact Information Sheet [ X ] Permit Sketches (Plan views, section views including temporary and permanent impacts) [ X ] Hydraulic Commentary [ X ] Cultural Resources Information [ X ] Section 408 Documentation [ X ] Threatened and Endangered Species Information (including VDOT T&E Report) [ X ] Alternatives Analysis [ X ] Wetland Delineation Documents [ X ] Compensatory Mitigation [ X ] Photographs [ X ] USM Stream Assessment Form [ X ] UPC_#119164_fmal response_to_COE_IACM comments [ X ] UPC_#119164_final response_to_EPA IACM_comments [ X ] UPC _#119164_-_fmal response_ to_DEQ_IACM_comments_ [ X ] 0311-071-835_C501_E&S Merged [ X ] 0311-071-835,_C501;_E&S Merged —continued [ X ] UPC_#119164_property_owners [ X ] Jurisdictional Determination Form [ X ] Signed Certification Statement [ ] SPGP Check List IACM Coordination Form 7/1/2017 Page 9 of 9 Attachment A Narratives Continuation A - CONTINUATION: Project purpose, need, and description: Primary route serving Eden, NC. which has their own IED sites and is also an employment base for the Danville, VA. area. The project also proposes intersection improvement to the Rte. 311/ Oak Hill intersection. The proposed intersection improvement will include a 50-foot and 80-foot intersection radii and an approximate 50-foot storage and a 50-foot taper. These improvements will facilitate larger vehicles accelerating and merging onto westbound US Route 311 which will help accommodate freight traffic. Project impacts: continually by-pass flow through the existing culverts.) The temporary cofferdam used to isolate the new third parallel box culvert will be installed in a manner that does not result in fill into the pre -construction OHW channel beyond the Permanant Stream Impacts shown on the Crossing Sketch. This cofferdam may be required to be in place for greater than one year. See Attachment C for additional project impact information. Avoidance: side of the exiting Berry Hill Road to avoid impacts to significant known cultural resources located adjacent the south side of the existing roadway. Minimization: Trotters Creek and McGuff Creek will be extended instead of full replacement shortening the duration of stream diversion and reducing the channel excavation footprint. The project design allows for stream diversions or pumping operations to be used during construction to allow all instream activities (culvert construction, inlet/outlet protection installation, etc.) to take place behind non -erodible cofferdams. Temporary wetland impact areas and stream impact areas will be restored to their preconstruction contours and profile with permanent vegetation established in wetlands and stream banks. Construction staging areas and locations of soil borrow/disposal areas will be in upland locations outside of wetlands, streams and their floodplains. In addition, stream/wetland areas adjacent to the project area that are not to be impacted shall be delineated and protected during construction with protective fencing/demarcation for wetlands. Potential impacts from sedimentation during construction will be minimized through the design, implementation and maintenance of erosion and sediment control measures following the Virginia Erosion and Sediment Control Handbook (VESCH). These measures may include, but are not limited to: silt fence installation, temporary sediment traps and basins, and temporary and permanent seeding. In addition, construction of the project shall adhere to VDOT's Road and Bridge Specifications and Best Management Practices. The following shall be adhered to during construction: Open Burning (9 VAC 5-130 et seq.); Fugitive dust & emission control (9 VAC 5-50-60 et seq.). Compensation: credits acquired from the VDOT Dick Cross Site were assessed an additional 3:1 compensation requirement. The project will provide 24715.5 sf (0.57 acres) for forested impact and 5978 sf (0.137 acres) for scrub -shrub impacts and 1804 sf (0.041 acres) of emergent impacts for a total of 32497.5 wetland credits. The project stream impacts were assessed using the USM (see Attachment K) and the project will provide 1313 stream credits. Attachment B Project Maps Vicinity, Topo, and FEMA Maps \ � \ E ƒ §� \ƒ 451 . 2\ ic) »%ƒ \/\ (\� e�? }/� ¥7@= I\Oco >I Cl) aka 0 E E E o $§$ 3 v - eeE E - \j§ v EEmoo 0. _ e � 0 z A`®aR Declination _ Project Name: Rte 311 Berry Hill Connector Road Extension Project Number: UPC 119164; 0311-071-835, C501, D648, D649, P101, R201 N N ��Stream Name: Trotters Creek, McGuff Creek, �County: Pittsylvania �"Community: Berry Hill Topo Location Map s9.5 Judy Byrd' Note: Secondary Route 863 has been reclassified as Primary Route 311 a+n _ G N 0.84° E 1f r�.� l �� J 1 ti- ✓ ``"�`w ` J` �f I v MN 8.79' W FF _ 564 J Il - I fj 7� ^�� End Project JJf , f 1_ �. —�IF df 07IF Begin Project , 11 (C) Copyright 2016, Trimble Navigation �imitad, OpenStreetMap contributors SCALE 1:24000 Map Name: BROSVILLE Print Date: 09/27/23 0 1000 2000 3000 4000 5000 Scale: 1 inch = 2,000 ft. Feet Map Center: 0360 33' 45.6458" N, 0790 34' 50.428E Horizontal Datum: NAD27 R L L £ v zk I cam] a1 0 a LL Y rl �p p N N s m ❑ c '^ a� u W O p c O = N d C L h O W N c m 0 ❑ LL « N L V L N 3 c rt m rt O� 16 LL U Q J Q P. =a pw (n¢ w a d N ¢ Wn LL W Q Q W V a� a� wLU � r r Vail r� O d= d R N i £ n 16 H 1 o m c E m i z a o E m oar d m N _ ❑ L L o m 0 a Rpc y3R E�=a ea occ5,Ep w 6 t N , - 2 O.L. 'a G b TE Y T Y w _.0 a1 a E E m a aE o W d m«" W 08 too � IaY6 0 O ,LO, 2a s m� V C Y ] N •� a Rai m �w 216 N N- N Q O N w R C= = E O❑ m O O O 2 7M N y= 0W d a C •� a3 } Ol N t 8 a 4 E 4 n U o3�E`01 8 aa�� 16 ❑ ram-yob=�oR� NM£?N yJ E'Eac 2atwo d Rcmc cz W Z O a R V❑ E y m m« LL C L .- m Z 0 L 41 N E❑ m Q p V N a T G a) Q a d T 16 w N U m ❑ ❑ -` a V L a: a N �p C m C 0 d £ m a E ° o a' Z~£ E d= a m i6 CL :be0 0 r EQ, Ee'n N N d bOL m _ W m � d LL c S T C p 0 N ❑ =` ac S1 w LL C p- ti N u cp.+ N C a LL Y ri p a N N 0 Q a m❑ W Ip Oa O O 'a m 2 ❑ O 3 C N @ a m 0 ❑ L N L w m r c Y b0 ��..I a� E rt Q IY O TN O a 16 w QJ Q do In U. a O � w l] Q U. Q J p m as aA w r�l w ❑ V) LL Lim co N M 0 0 H m C- 0 co Z 61 � a N m L m a N c m m a p R = O V1 a si i j m R � C El C W L ❑ � W d d 3 M. d U C 61 N m c_ y 7 di 0 R y F 0 N O R W L H m f0 ❑ } ❑ c y N N ILL O z � N to a1 d W Q L J yy p [p N 1pN U O 0 O p C. i a U U� fd U W � m # ` 2v O w O N v"= d R £Q 1 o 0 E 6H z a o E m d m I a r o: C c w wa c m a m 0 N a ti p y a fu rti ❑ R Q y d ` N A C m ❑ A. E p co £ o o�a .0 m�'cv u a mom. m �, n+ E o a n 16 0 R a 5�-. N p Ti O a ri m 2 nm o�i C m N MbF1 N a N C C d a N a M. O O O 2 7 y= 0 W 0 Q E O d 4 U m'oc 3�c rG w 3�£�a an�m o 0 E m c `m nqx y p m 0 m 5 W V O V! w a L z a E p R y a Q Z Q„ y T a N❑ L d y u n Q,4 N❑ T �0 Q O d0 Q w N U £ m ❑ �• n G� `o a� Ti ~ mC £ m = n m i6 a�� um r �� Ede u� men P p H m 't. L H N d 4 i 0 LO UY L M °O U o U TTI- U M � O Y O U o L ~ 0- m L E E E Z Z Z E U U E E O O E O O 0-0-cgUU C O U Attachment C Multiple Crossing Impact Tables and Permit Sketches w N d o a A Vl 00 �o N N �o N �o 00 �c Vl 00 en�O C Vl N V N M N en en N r O r O r r r _O O M V1 M V'1 M V'1 M V'1 M V1 M Vl M V1 M t M _r V _O V _M V V _N It M M M M en M M en en en M M M en en en en M M M O O O O O O O O O O O = O 00 N Ncq R N N N Oa by O U = CL 0 p O w 3 3 3 3 B o A cC 'C M i p E c'dC r� •Q ; a, a •Q � CIO to � U o W W Q Q � '� � •� � � � a � � • � x N N �° N � •° � .� 0 ." � � .0 •O 9 - o 0 N Rr N .❑� .00 �N -� .,0, 0. 'O U d a ca z 0 N M O b-0 by by by by bA by ari Oq by bA v u O O O O O O O O c o O O .� U U U U U U U U U U U � I o N_ V N V t M en M ll- N V V en en en NO =J O Vl rl O V O Vl M F�1 .y Q � O � CL w0 O uen Q a U R _ O � SO 1 � M "' C. cq O b�A rn N • O rn ,o z � N O O to a W a 7- bOp I bOp u u t M H i d F4 O O O O O N Vl In �O N N Cl M O 00 00 O M N l� H bD O A W y � rn N M x H u V ^ 00 � �4 u G M d F4 H O O O O O }' r5 d 4.1 00 01 Vl M O V N O\ N O\ O O O x r H v N N M z .y O U � W by by by by bA by by by by by by by Q O O O O O O O O O O O O O u u U U U u u u U U U IM O U H z z z z z z z z z z z z z 0 0 0 0 0 0 0 0 0 0 0 0 0 z z z z z z z z z z z z z bD C O d N N N N N N N N N N N N N O O O O O O O O O O O O O o z z z z z z z z z z z z z z a 0 U L+ O O O O O O O O O O O O O O � "a 'a 'a 'a 'a "� 'a 'a 'a 'a 'a 'a 'a d O Ci z H O ea i.i U �.. N M V Vl �O l'- 00 00 O\ N_ A _C _ by by by by bA by by by by by bA by by O O O O O O O O O O O O O U U U U U U U U U U U U IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 1 General. Latitude: 36A°33'16" Longitude: 79A°35'54" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 1463 0 0 1521 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles2): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PSS Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 1463 01 0 0 1463 0 0 0 0 0 0 0 0 0 0 0 1521 0 0 0 1521 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 2194.5 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal VDOT Project UPC 119164 Berry Hill Connector Extension Cowardin Classification & Stream Impacts Per VDOT Crossing VDOT Crossing Stream Impacts Permanent & Temporary Cowardin Classification Permanent Stream Impact Linear Ft. Temporary Stream Impact Linear Ft. Permanent Stream Impact (Sq. Ft.) Temporary Stream Impact (Sq. Ft.) Crossing 6 WOUS R31J13 64 84 1367 2126 Crossing 7 WOUS R31J13 76 191 1036 3955 Crossing 8 WOUS R Ephemeral 280 0 2366 0 Crossing 8 WOUS RA1 Ephemeral 32 25 249 151 Crossing 8a Ephemeral 183 0 2686 0 Crossing 10 WOUS 1331.113 90 35 1827 844 Crossing 11 WOUS 1131,113 330 0 5195 0 Crossing 11 WOUS R4S13 230 0 1 2177 1 0 Total Impacts 1285 335 1 16903 1 7076 SHEET BERRY HILL ROAD PROJ. 0311-071-835 UPC: 119164 OVERALL PLAN VIEW INDEX OF SHEETS DESCRIPTION 1 OVERALL PLAN VIEW & IN 2 CROSSING 1 PLAN VIEW 3 CROSSING 2 PLAN VIEW 4 CROSSING 3 PLAN VIEW 5 CROSSING 4 PLAN VIEW 6 CROSSING 5 PLAN VIEW 7 CROSSING 6 PLAN VIEW 8 CROSSING 7 PLAN VIEW 9 CROSSING 6 & 7 PROFILE 10 CROSSING 6 & 7 CROSS 11 CROSSING 8 PLAN VIEW 12 CROSSING 8a PLAN VIEW 13 CROSSING 8b PROFILE VI 14 CROSSING 9 PLAN VIEW 15 CROSSING 10 PLAN VIEW 16 CROSSING 11 PLAN VIEW 17 CROSSING 10 & 11 PROFII 18 CROSSING 10 & 11 CROSc 19 CROSSING 12 PLAN VIEW 20 PERMIT GENERAL NOTES SKETCHES ARE TO BE USED ENVIRONMENTAL IMPACTS PROPOSED SOLELY FOR SECURING WATER IN: PITTSYLVANIA COUNTY, VA QUALITY PERMITS AND ARE NOT PROJECT NO: 0311-071-835 TO BE USED FOR CONTRACT QUANTITY ESTIMATES UPC N0: 119164 SCALE = 1" = 1500' SHEET: 1 OF 20 DATE: 7/29/2024 REV. BERRY HILL ROAD (ROUTE 311) CROSSING: 1 PLAN VIEW I / F j G 1 ' Prop. 16" Water Line 11 1, Impact #1-2 Prop. R/W LOD AJD Wetland Zone EA ,y Temporary PSS Impacts 'y ,. 1,521 Sq. ft (0.035 acres) Limits of Construction - -- 1 Berry Hiii Rd (RTE 391 F FC Limits of Construction Impact#1-1 -------_-. AJD Wetland Zone EA Permanent PSS Impact _ -` ` — • - 1,463 Sq. ft (0.034 acres) PROP. EC-1 CLASS 1 LEGEND - RIPRAP Q LIMITS OF PERMANENTL2 PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS I EXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY EASEMENT LINE STREAM IMPACTS LIMITS TEMPORARY FORESTED WETLANDS TEMPORARY WETLANDIMPACTS 7 EASEMENT LINE SCRUB SHRUB WETLANDS �I EXISTING WATERS_Denotes Construction Limits in Cuts —•••—W,QLI. OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PSS TEMP = 1521 SF (0.035 ACRES) CROSSING: 1 IN: PITTSYLVANIA COUNTY, VA PSS PERM = 1463 SF (0.034 ACRES) LATITUDE: 36.554722 LONGITUDE:-79.598611 PROJECT N0: 0311-071-835 UPC NO: 119164 SCALE APPLICATION BY: VDOT 0 50 100' SHEET: 2 OF 20 DATE: 7/29/2024 REV. Af �,. lam... - _- 'i ._.... � ��• �'' ,��� ,';`• . :srr i .�,�. `�;; _ � •:�.,•;-.�s�:., . fir. 41 • - - - _. •tip . #.. ..� !'�. - T.�i .� ��;i. ��S �� n 44 - - � �� -�. _ .. �i : ;afar • ' f �. .. %I i r f( r _ 43 a � IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 2 General. Latitude: 36A°33'20" Longitude: 79A°35'44" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 2356 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles2): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: reference AJD NAO-2021-00423-VDP Cowardin Classification(s): PFO Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 0 0 2356 0 2356 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 2050.5 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 VDOT Dick Cross Mitigation VDOT Dick Cross Site 36A°36'53.49"/ 03010106, 03010102 03010106 1 5016 $0.00 Site 78A° 16' 17.42" Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 2 PLAN VIEW (*PSS changed to PFO per DEQ site visit 7-24-2024) Impact #2-2 vV� AJD Wetland Zone EP Permanent Conversion PFO* Impacts \ 989 Sq. ft (0.023 acres) x Impact #2-1 X--- AJD Wetland Zone EP , ---/ ti Permanent PFO* Impact 1,367 Sq. ft (0.031 acres) \\\\ Prop. RIW LOD C C \\ Prop. 16" Water Line , - - Limits of Construction Berry Limits of Construction— — — — — — — — — — PROP. EC-1 CLASS 1 W(1U LEGEND _ RIPRAP � LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS EXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY y EASEMENT LINE STREAM IMPACTS LIMITS TEMPORARY FORESTED WETLANDS \ TEMPORARY l� EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS EXISTING WATERS —•••— yy p•(/• EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PFO* PERM CONV. = 989 SF CROSSING: 2 IN: PITTSYLVANIA COUNTY, VA (0.023 ACRES) LATITUDE: 36.555556 PFO* PERM = 1367 SF (0.031 ACRES) LONGITUDE:-79.595833 PROJECT N0: 0311-071-835 UPC N0: 119164 SCALE APPLICATION BY: VDOT 0 50 100' SHEET: 3 OF 20 DATE: 7/29/2024 REV. h r Tj - ■ Y•' r - V lily 4-n_. _'„J.ir.7�• y r'!T A.-� . �I �r /- A:;Y1R;Nt +,' ,�SrR�_ r�.�i►1' y r_'i L�Li„ry �'-•�� �.r w=rs'+�%':.•"•-•'� -7e_ _ 'any �__ �' �}.� �:• �,�r �. �.e gj �• :4 �� -• � _ - '� r`� _ - � f 'fir .. S ,fig _ �.1 • _ %. Y ^' �.�"" ',�'' lf. f•r' �:TrF�1r t. .� i.f,a':: �•r _-:may' •�� � v '--� _ T '�� r ":.,•�,., - .;�~,:« .!: 7Rer�'%-. � � y - ::, ��� 1 � -i7•-' � Y � of fi� �v F , ~ ,,� • • _' ,IN �r r ' .�, .tom "r , �•„ � _ � �s,. ,� IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 3 General. Latitude: 36A°33'25" Longitude: 79A°35'39" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet') Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 1401 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles'): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PSS Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 1401 01 0 0 1401 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 1191 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 VDOT Dick Cross Mitigation VDOT Dick Cross Site 36A°36'53.49"/ 03010106, 03010102 03010106 1 910.5 $0.00 Site 78A° 16' 17.42" Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 3 PLAN VIEW Impact #3-2 AJD Wetland Zone EP� Permanent Conversion PSS Impacts 607 Sq. ft (0.014 acres) Impact 43-1 AJD Wetland Zone EP Permanent PSS Impact 794 Sq. ft (0.018 acres)���� Prop. R/W LOD Prop. 16" Water Line — — — - — — — - — - Berry Hi//Rd. (RTE311) ~ - - - - - - - - - -� - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - rop. Perm. Slope & Drainage Easement J Limits of Construction PROP. EC-1 CLASS 1 LEGEND _ RIPRAP LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS I IEXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY 'K 1 EASEMENT LINE STREAM IMPACTS D LIMITS TEMPORARY FORESTED WETLANDS TEMPORARY EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS EXISTING WATERS —•••— yy p,(/, l� EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PSS PERM CONV. = 607 SF CROSSING: 3 IN: PITTSYLVANIA COUNTY, VA (0.014 ACRES) PSS PERM = 794 SF (0.018 ACRES) LATITUDE: 36.557222 LONGITUDE:-79.594167 PROJECT N10311-071-835 UPC N0: 119164 SCALE APPLICATION BY: VDOT 0 50 100' SHEET: 4 OF 20 DATE: 7/29/2024 REV. IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 4 General. Latitude: 36A°33'29" Longitude: 79A°35'35" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 3923 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles2): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PFO Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 0 0 3923 0 3923 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 6702 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 VDOT Dick Cross Mitigation VDOT Dick Cross Site 36A°36'53.49"/ 03010106, 03010102 03010106 1 1716 $0.00 Site 78A° 16' 17.42" Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 4 PLAN VIEW 74p°°,p°° °°°°°°°°° °°°°°° °° ° °°°°° ° ° 000°oo o° Impact#4-2 °°°,p7° °°p° ° °°V°°°°°°V°°°°° AJD Wetland Zone DW i�vvv x o o o°*o o° � o o°�o o° -7 o o° °° Permanent Conversion °°°°°°° ° °° PFO Impacts ° � o o° ° o °��° 0 ° 572 Sq. ft (0.013 acres) F Prap. RIW LOD .�F --- - ° �°------------ fPr-op. 16" Water Line F � ° Limits of . _ ___---- --- --. Berry Hi//Rd. (RTE311) ~ ------------------ ------------------ Impact #4-1 AJD Wetland Zone DW Permanent PFO Impacts 3,351 Sq. ft (0.077 acres) Limits of Construction Prop. �-wm. �fo,ue & drainage Easemwit PROP. EC-1 CLASS 1 LEGEND _ RIPRAP ° LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS EXISTING WETLANDS PERMANENT ------ LIMITS OF TEMPORARY EASEMENT LINE STREAM IMPACTS D LIMITS OF TEMPORARY FORESTED WETLANDS TEMPORARY EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS l� EXISTING WATERS —•••— yy p•(/• EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PFO PERM CONV. = 572 SF CROSSING: 4 IN: PITTSYLVANIA COUNTY, VA (0.013 ACRES) LATITUDE: 36.558333 PROJECT N0: 0311-071-835 PFO PERM = 3351 SF (0.077 ACRES) LONGITUDE:-79.593333 UPC N0: 119164 SCALE APPLICATION BY: VDOT 0 50 100' SHEET: 5 OF 20 DATE: 7/29/2024 REV. IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 5 General. Latitude: 36A°33'38" Longitude: 79A°35'26" FEMA FIRM number: 51143C0615E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 1929 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles2): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PFO Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 0 0 1929 0 1929 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 3394 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 VDOT Dick Cross Mitigation VDOT Dick Cross Site 36A°36'53.49"/ 03010106, 03010102 03010106 1 696 $0.00 Site 78A° 16' 17.42" Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal Impact #5-2 AJD Wetland Zone DQ Permanent Conversion PFO Impacts 232 Sq. ft (0.005 acres) ti BERRY HILL ROAD (ROUTE 311) CROSSING: 5 PLAN VIEW I �o�oo�oo�o VV o�ooVoo oo� 000000000000 Vo 0o�000 oo o0 V 0 0 0 0 0 0 0 0 00 00 0 �oo�oo oo� 0 0 0 0 0 0 0 D O D O V�-voo-V oho 000000000 � V oo 00 0 - Prop. 16" Water Line Berry Hi//Rd. (RTE31I) Limits of Construction 0 o X � °o o Prop. R/W LOD ,� 7 ° ° ° Limits of Construction t-- -------------- Impact #5-1 AJD Wetland Zone DQ Permanent PFO Impacts 1,697 Sq. ft (0.039 acres) PROP. EC-1 CLASS 1 LEGEND _ RIPRAP LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS PROP. RIGHT OF WAY STREAM IMPACTS _ EXISTING WETLANDS 1 PERMANENT — - — - — - LIMITS OF TEMPORARY EASEMENT LINE STREAM IMPACTS —WLD FORESTED WETLANDS TEMPORARY LIMITS TEMPORARY EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS l� EC- EXISTING WATERS —•••— yy p•(/• _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PFO PERM CONV. = 232 SF CROSSING: 5 IN: PITTSYLVANIA COUNTY, VA (0.005 ACRES) LATITUDE: 36.560833 PROJECT N0: 0311-071-835 PFO PERM = 1697 SF (0.039 ACRES) LONGITUDE:-79.590833 UPC N0: 119164 SCALE APPLICATION BY: VDOT SHEET: 6 OF 20 DATE: 7/29/2024 0 50 100' REV. r � .fit •i ' s,:•' �...�� opor ���• � ��,.�"��'�' ----- fir. :, - -- .. � .. � 'i ���-. «q x" •:� -.L ... .-fir .. -�: �-.a:. ,. �_+p'- c; - � .- .. � -.- � �'�� �� '1••->�y.':✓... -- � - , .fir � �.,� ._:.,��::,',-5.•-��;. -- 'r � . [':`-ti.. _ �ti t-�` _.��-� � - '_,LYE-Y �. ��=•'�'�' rr�,,.�y.� `.l _�.._-Y1•- ` AIL •�^', 1 �-i ��tit,i�':�rs..�.,,,;. ��I�' L=�v� _ - v ems. � '-�• .. �e � .y. - �Sr^r ': 7if;:y�F3�.ka,.-`•,.:. ' - ��i. � ,•s.��-' ' _ _ :; •.•!*v�.7e-�" � - - �,'y .'Yd� - _ '"'i fir•._ � �h� ■ 5, - _•..'.� , �:^°r -a ��•.-;, Ail, IF r, - y6^1L dq7�. `.; r i'�� . ::t. • L r�� as;'�L��cy., -'[ - r _ -r• �A��r_ _ Aj-• fr �'•� � . �n � \ �^ 1 � _ �: r -. 4t � �,�. %'-w'�:'r`sa'�.. ?�� `�'i..•^ '� ',]'" Mir- -f �# — Imo. •- ��_ �. ,f, tt�� # ,� - ' 'i� ' .r ,:�:, � . . VRAM TLL- 070 10, ram►"' •� �>���: '-^,-��JT - *.�'f! _ r .. '��� � •� ' .`i. ��- , -' - .�r - y,.>(�., ir- }4. :5<r'� IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 6 General. Latitude: 36A°33'52" Longitude: 79A°35'02" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 495.13 MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Stream Information: Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 1367 0 0 1367 0 1132 2126 0 0 152 0 0 152 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL I MECHANICAL Stream Name(s): Trotters Creek (downstream) Drainage Area (miles2): 6.04 Pool/Riffle flat ratio: 20/30/50 Average Depth (feet): 1 Substrate: silt, sand, cobble, bedrock Average Width (feet): 22 OHWM Indicator(s): Clear, natural line impressed on the bank; Bed and banks; Scour DWR Classification: Other (N/A) Cowardin Classification: R3UB DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 64 Intermittent- 0 Ephemeral- 0 Riffle/Pool- 0 Conceptual Stream Mitization: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 55 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PFO Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 0 0 1132 0 1132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment VDOT Dick Cross Mitigation Site VDOT Dick Cross Site 36.9653.49"/ 78A° 16' 17.42" 03010106, 03010102 03010106 3396 $0.00 Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 6 PLAN VIEW I Existing Box Culvert-•••� Boxes 1 & 2 tA � 3 I t— See General Notes, Sheet 17 of 17, for additional details (Dewatering Operations, Countersinking, Choke Stone, Low Flow Channel, etc.) New Box Culvert Box 3 _ Limits of J Construction Limits of 480 Tons Ra 1 Class 1 Rip p Impact #6-1 AJD Wetland Zone BT Perm. Conv. PFO Impacts 293 Sq. ft (0.007 acres) Prop. Perm Drainage Easement LOD Impact #6-2 AJD Wetland Zone BU Perm. Conv. PFO Impacts 839 Sq. Ft. (0.019 acres) Impact #6-3 AJD Wetland Zone WOUS-B(R3) Permanent Stream Impacts 64 Ln. Ft. (1367 Sq. Ft.)(0.031 acres) Impact #64 AJD Wetland Zone WOUS-B(R3) Temporary Stream Impacts 84 Ln. Ft. (2126 Sq. Ft.)(0.049 acres) PROP. EC-1 CLASS 1 LEGEND RIPRAP LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS EXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY EASEMENT LINE wn STREAM IMPACTS LIMITS TEMPORARY FORESTED WETLANDS D TEMPORARY l� EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS EXISTING WATERS —•••— yy p•(/• EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY PFO TEMP = 1132 SF (0.026 ACRES) R3 STREAM PERM = 64 ft (1367 SF) (0.031 ACRES) R3 STREAM TEMP = 84 ft (2126 SF) (0.049 ACRES) Excavtion: 1367 SF; 152 CY Permanent Fill: 1367 SF; 152 CY ENVIRONMENTAL IMPACTS CROSSING: 6 LATITUDE: 36.564722 LONGITUDE:-79.583889 SCALE 0 50' 160, PROPOSED IN: PITTSYLVANIA COUNTY, VA PROJECT NO: 0311-071-835 UPC NO: 119164 APPLICATION BY: VDOT SHEET: 7 OF 20 DATE: 7/29/2024 REV. Fes. .. .. -.._ _ -. - ,. `ir ,..�..• � I.1 :.'Y y r�� i• . . is .4. JV tea+. - �� Cr'-Cr.S� 4 T...•Y .��. I W. - ,�� �, • tail pt .. ;. IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 7 General. Latitude: 36A°33'56" Longitude: 79A°35'02" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 495.13 MLW elevation (feet): N/A Area (feet') Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Stream Information: Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 1036 0 0 1036 0 0 3955 0 0 115 0 0 165 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL I MECHANICAL Stream Name(s): Trotters Creek Drainage Area (miles'): 6.04 Pool/Riffle flat ratio: 20/30/50 Average Depth (feet): 1 Substrate: silt, sand, cobble, bedrock Average Width (feet): 25 OHWM Indicator(s): Clear, natural line impressed on the bank; Bed and banks; Scour DWR Classification: Other (N/A) Cowardin Classification: R3UB, R4SB DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 76 Intermittent- 0 Ephemeral- 0 Riffle/Pool- 0 Conceptual Stream Mitization: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 87 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: N/A Species identified: Cowardin Classification(s): Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 7 PLAN VIEW Impact #7-3 AJD Wetland Zone WOUS R (R4) Temporary Stream Impacts 39 Ln. Ft. (168 Sq.Ft.)(0.004 acres) (Intermittent stream channel to be restored to original grade.) a� See General Notes, Sheet 17 of 17, for additional details (Dewatering Operations, Countersinking, Choke Stone, Low Flow Channel, etc.) Impact #7-1 AJD Wetland Zone WOUS B (R3) Temporary Stream Impacts 152 Ln. Ft. 3787 Sq.Ft.)0.087 acres) Impact #7-2 L AJD Wetland Zone WOUS B (R3) R Permanent Stream Impacts Prop. Perm. ❑rains 76 Ln. Ft. (1036 Sq.Ft.)(0.024 acres) � ���•'� Easement LO❑ x— • i Box Culvert Extension Boxes 1 & 2 Cofferdam to be in Prop. R/W LOD place for more that Prop. 16" Water Line 12 months —"— Limits Construction — — — — -- of ------------------ PROP. EC-1 CLASS 1 LEGEND _ RIPRAP LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ STREAM IMPACTS EXISTING WETLANDS LIMITS OF TEMPORARY PROP. RIGHT OF WAY PERMANENT — - — - — - EASEMENT LINE STREAM IMPACTS D FORESTED WETLANDS TEMPORARY LIMITS OF TEMPORARY WETLAND IMPACTS l� EASEMENT LINE SCRUB SHRUB WETLANDS EXISTING WATERS —•••— yy p•(/• EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED R3 STREAM PERM = 76 FT (1036 SF) CROSSING: 7 IN: PITTSYLVANIA COUNTY, VA (0.024 ACRES) LATITUDE: 36.565556 PROJECT N0: 0311-071-835 R3 STREAM TEMP = 152 FT (3787 SF) LONGITUDE:-79.583889 (0.087 ACRES) UPC NO: 119164 R4 STREAM TEMP = 39 FT (168 SF) SCALE APPLICATION BY: VDOT (0.004 ACRES) Excavtion: 1036 SF; 115 CY Permanent Fill: 1036 165 0 50 100 SHEET: 8 OF 20 DATE: 7/29/2024 SF; CY REV. z O O�U m W J>� W J W W = J m U ry mu� m m m W W m O m a. iE' m' z ��•b086'90 , l 0,031� L-AA3 01S'l ; Sb9-Q lZ'E6b tea, a� �m S, I I I �m a� a� I °' a� I W I a M ' xool Ln ll I 0 I I C) oa�e xX No 02 o� a)76 -az o� a, cuy9 K ' a m z Lb'E6ti ' 00 0+D '0.0 38L MA d 1S 6 � I 98b9-0; m- ' m I i6 z Q Lf) H > Q �(n � ~ Z 0c) � J Z O Q (2) Q U > w Q w M J Q Q O It m Z � 0 0 J O Z LLJ V) vOQ L' ' O w Z U_ a- --;. J O O U d of cj:� a- a- d Z d = Q C. 0 I Ln w o O > o � J 0 U w U U-) O n O ry n 00 n 0Y w a U Z C/) 0 �o a� w � J U w Z O v N O N N ti W Q 0 O N L.� O m W W S Q o N Q H > N_ W W Q 00 L Z 0 Q > O Q Z W Q O w q \ �Q p U Qom > O p Z CN Cl:C) � O O Q0� o� > w LLJ �O~UO O LLJ ZU Q�= o o� O O U d W w N of a� a- d d Z a_Q S (n m a w z m � W C, X WO m O W CD Un Q dl ow_� 0 w = 0' U � J 0 z w Q moa �mz w Ln —UW � O �w Q _w W� o o �W xw� W o ~ 0 WU � � z z 0 N 0 = Q oa /wOw W ry 0 (-) � CD ��/'� < O V/ _ > �a � J 0 �m oQ o 0 W Wcz o > m W U Q z am ozQ W N N a zW C,o� mL� U� m z O a z oW oCD LU �o oQ w m� 0 m W 0 m w� z� M T X o � o � m 0 I.' 4 Ph Ilk cu (,4 E ti m E Q) co " C) U) Q) 0 0 0 �F�'k%�. ,may:;•+. ., `� ` ...1 :.? � .. ••'/;'�„ _c ,, r � _ „/ j•• —. '• `�• ''�•"i ,, • t ` .. �� - r�� ~ �- rY' _ i r , .ter L'� � # , 'ti,:= � r . f�•� 'i�+j , �;' lY,•''_ _ ,ter=1l� ;f r- x ��... 1 rr .� fir. - 4• `'r' `Y. r -]'` r" . AI Ile jmr • A-. r t� d". IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 8 General. Latitude: 36A°33'56" Longitude: 79A°34'58" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 497.5 MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Stream Information: Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 2615 0 0 151 0 0 0 0 0 24 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL Stream Name(s): Tributary to Trotters Creek Drainage Area (miles2): 0.01 Pool/Riffle flat ratio: 20/0/80 Average Depth (feet): 0.25 Substrate: organic, riprap-lined channel Average Width (feet): 8.5 OHWM Indicator(s): Clear, natural line impressed on the bank; Leaf litter disturbed or washed away DWR Classification: Other (N/A) Cowardin Classification: DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent- 0 Ephemeral- 312 Riffle/Pool- 0 Conceptual Stream Mitization: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 226 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: N/A Species identified: Cowardin Classification(s): Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 8 PLAN VIEW *(R4) changed to Ephemeral per DEQ site visit 7-24-2024 See General Notes, Sheet 17 of 17, for additional details (Dewatering Operations, Countersinking, Choke Stone, Low Flow Channel, etc.) Pre,P. Perm Prop. R/W LOD .. Impact #8-2 0raloarre Fasement- AJD Wetland Zone WOUS RA1 Ephemeral* Permanent Stream Impacts Temp. Easement LOD 32 Ln. Ft. (249 Sq.Ft.)(0.006 acres) Impact #8-3 AJD Wetland Zone WOUS RA1 Ephemeral* Limits of 8 Tons Temporary Stream Impacts RC-1 Class 1 Rip 25 Ln. Ft. (151�Sq.Ft.)(0.003 acres) �r�r) Preq. Perrn. Limits of Construction { �1�cf�arr Fment Impact #8-1 AJD Wetland Zone WOUS R Ephemeral* y Permanent Stream Impacts 526 _ ' t 280 ft (2366 Sq.Ft)(0.054 acres) ,y Prop. 16"er Line •�-WAS. `•�' ;;� N, �y�. 00 w + • Berry Hill Rd. (RTE 311) PROP. EC-1 CLASS 1 RIPRAP LEGEND _ LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT STREAM IMPACTS LIMITS OF TEMPORARY WETLAND IMPACTS _ PROP. RIGHT OF WAY EXISTING WETLANDS PERMANENT — - — - — - EASEMENT LINE STREAM IMPACTS D FORESTED WETLANDS TEMPORARY LIMITS OF TEMPORARY WETLAND IMPACTS l� EASEMENT LINE EXISTING WATERS —•••— yy p•(/• SCRUB SHRUB WETLANDS EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED Ephemeral* STREAM PERM = 312 FT CROSSING: 8 IN: PITTSYLVANIA COUNTY, VA (2615 SF) (0.060 ACRES) LATITUDE: 36.565556 PROJECT N0: 0311-071-835 * Ephemeral STREAM TEMP = 25 FT LONGITUDE:-79.583055 UPC N0: 119164 (151 SF) (0.003 ACRES) SCALE APPLICATION BY: VDOT Excavtion: None Permanent Fill: 26.15 24 ISHEET:11 0 50 100, OF 20 DATE: 7/29/2024 SF; CY REV. 520 515 510 505 500 BERRYHILL ROAD PROFILE VIEW 8-15 24'' CULVERT 0 w ry T, N ,. w o0 w 0 C� --^ rn ,Proposed � — o �n I- o Cn + Grae . cn r` U w o • O NLO 0 � �I ua H M r n + (..) (N CO Q � 4 Co C/ ass /// Re , 9' d o % O, • 0 Existina LO` Satura trea tubed ��OHW497.5 0+00 0+25 New Culvert to be counter sunk 3" below Natural Streambed. itural Streambed ENVIRONMENTAL IMPACTS SCALE = NTS 'ROPOSED N: PITTSYLVANIA COUNTY, VA 'ROJECT NO:0311-071-835 JPC NO: 119164 %PPLICATION BY: VDOT HEET 13 OF 20 DATE:7/29/2024 Aw , :�' fa . _ �`,. �.' -'f .. ' ram• ' 1 - it 'r7a .1\-ti r it Ay _ '� •�f _ •� 5'.!t-r'�." y.• - cif `��4'± _ ,�{f• - �• �'.:'+ +• r � . 5; JA � .ram, �,,;�. ■J', �� '► �,_ �r�•� � s !,� . Pik , ,i. "� ' - _ '� \ i� ,l.t•� -} i-1'' • ,+ i'►i, . . if y (j k. � •' •.;•��' 1p''.ti V ` �j .�-r,4Y '�^,' �I1���1 17 Fig, -', � • _ �i yr• r � , .� _ �_ NIC i C a cu cn 1. +' F j �• CO O U) -041 f^,d . •'r . �V ■■■777 L CU -- s IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 8a General. Latitude: 36A°33'56" Longitude: 79A°34'55" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 498.2 MLW elevation (feet): N/A Area (feet') Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 2686 0 0 0 0 0 0 0 0 25 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: Stream Name(s): Tributary to Trotters Creek Drainage Area (miles'): 0.01 Pool/Riffle flat ratio: 20/0/80 Average Depth (feet): 0.25 Substrate: organic Average Width (feet): 14 OHWM Indicator(s): Leaf litter disturbed or washed away DWR Classification: Other (N/A) Cowardin Classification: DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent- 0 Ephemeral- 183 Riffle/Pool- 0 Conceptual Stream Mitization: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 157 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: N/A Species identified: Cowardin Classification(s): Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING:8a PLAN VIEW I *(R4) changed to Ephemeral per DEQ site vist 7-24-2024 Prop. R/W LOD C-1 CLASS 1 R PRAP p LIMITS OF PERMANENT — STREAM IMPACTS I LIMITS OF TEMPORARY STREAM IMPACTS LIMITS OF TEMPORARY WETLAND IMPACTS EXISTING WATERS —•••—yyp,(/, OF THE U.S. LIMITS OF PERMANENT; WETLAND CONVERSION Impact #8a-1 AJD Wetland Zone EPH Ephemeral* Permanent Stream Impacts 183 Ln. Ft. (2686 Sq.Ft.)(0.062 acres) �IJ kn Prop. 16" Water Line -------------------- LEGEND - LIMITS OF PERMANENT WETLAND IMPACTS EXISTING WETLANDS FORESTED WETLANDS D SCRUB SHRUB WETLANDS EMERGENT WETLANDS IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS Ephemeral* STREAM PERM = 183 FT CROSSING: 8a (2686 SF) (0.062 ACRES) LATITUDE: 36.565556 LONGITUDE:-79.582222 Excavtion: None Permanent Fill: 2686 SF; 25 CY SCALE 0 50' 160, PROP.COFFERDAM PROP. RIGHT OF WAY PERMANENT — - — - — - EASEMENT LINE TEMPORARY EASEMENT LINE — Denotes Construction Limits in Cuts C — Denotes Construction Limits in Fills PROPOSED IN: PITTSYLVANIA COUNTY, VA PROJECT NO: 0311-071-835 UPC NO: 119164 APPLICATION BY: VDOT SHEET:12 OF 20 DATE: 7/29/2024 REV. JPf • ' i. �'rl, ie' '� � - • • � � ` �• p err f . � � � IR { ��,,,� • � 1Mlo— �� • ,•T!Y 1y'• Ay' •i �,�� f I} � � "'! ' `yyf ',��q4r, `• . 1• ..:� -.1• { G�, n'yypp'r, ' �L.ti�. ge Ti �r:Z�j- �� _ �'�' a `'�:.i. � �h�. lii�, i�r;r�:.��1,,w.},Lr"�� L j��'' �j,� ■ i • .s"-'�, .-� _"�"4 F^$�M�► r _ _ _ .'f� .���►_ 4 .r.• .f�ipc.; �•r,. y�' i ,r �ti �.. '�:�:. '� e . .• /A'T ,M1Y',-r� — _ .•ti,'•'ifly i� `}.•.A :� is r• ,�'i ! 'x+ r'r f `-r 'N 1.• +'��y`'s�.rl. _� cr= .per 'L. �;�_ r:_�ti. �s� � r. • � .�- �r�. '�.:: . � • y}� ! f� ~ 'k" - ,>' i .Y Y �."6 •ram +iL _�. •.Al{" �•-. -" tires, _s"ti'y _ T;,I`' •�, • , �•�*`tT * , _ r� -f i _ - f 10 1' i .li+ •. tL.; t � y :� IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 9 General. Latitude: 36k34'08" Longitude: 79A°34'36" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet') Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 1804 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles'): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PEM Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 1804 01 0 0 0 0 1804 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 1804 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 9 PLAN VIEW I Prop. Perm. Drainage Easement LOD Impact #9-1 AJD Wetland Zone MT Permanent PEM Impacts 1,804MSq. ft (0.041 acres) " 1 ti Prop. RM L OD 1 Limits of Con�n- C-1 CLASS 1 R OP. LIMITS OF PERMANENT STREAM IMPACTS II LIMITS OF TEMPORARY wn STREAM IMPACTS LIMITS OF TEMPORARY WETLAND IMPACTS EXISTING WATERS —•••—yyp,(/, OF THE U.S. LIMITS OF PERMANENT; WETLAND CONVERSION -- 311) Berry H Rd. ..(RTE- - - - - _-- r— r�r LEGEND LIMITS OF PERMANENT WETLAND IMPACTS EXISTING WETLANDS FORESTED WETLANDS D SCRUB SHRUB WETLANDS EMERGENT WETLANDS IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PEM PERM = 1804 SF (0.041 ACRES) CROSSING: 9 LATITUDE: 36.568889 LONGITUDE:-79.576667 SCALE 0 50' 160, K (Prop. 16" Water Line PROP.COFFERDAM PROP. RIGHT OF WAY PERMANENT — - — - — - EASEMENT LINE TEMPORARY EASEMENT LINE — Denotes Construction Limits in Cuts C — Denotes Construction Limits in Fills PROPOSED IN: PITTSYLVANIA COUNTY, VA PROJECT NO: 0311-071-835 UPC NO: 119164 APPLICATION BY: VDOT SHEET:14 OF 20 DATE: 7/29/2024 REV. - - �,�'. .ram_ - - _ lu ,1 •` r �i�6 �'4r � x ■ y s 't-• sw•. � - IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 10 General. Latitude: 36A°34'10" Longitude: 79A°34'23" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 504.54 MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Stream Information: Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 1827 0 0 1827 0 0 844 0 0 203 0 0 203 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL I MECHANICAL Stream Name(s): McGuff Creek (downstream) Drainage Area (miles2): 6.14 Pool/Riffle flat ratio: 60/20/20 Average Depth (feet): 2 Substrate: silt, sand, cobble, boulder, bedrock Average Width (feet): 20 OHWM Indicator(s): Clear, natural line impressed on the bank; Destruction of terrestrial vegetation; Scour; Vegetation matted down, bent, or absent DWR Classification: Other (N/A) Cowardin Classification: R3UB DEQ Classification: III. Non -tidal (Coastal & Piedmont) Section #: 2 Special Standards: Linear Feet of Permanent Stream Impacts: Perennial- 90 Intermittent- 0 Ephemeral- 0 Riffle/Pool- 0 Conceptual Stream Mitikation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 79 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: N/A Species identified: Cowardin Classification(s): Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 10 PLAN VIEW Berry Hill Rd. (RTE 311) New Box CZ X Box 3Limits of Construction � —�JD --_-_-_-_- Existinq Box Culverts Boxes 1 & 2 Impact #10-1 AJD Wetland Zone WOUS A (R3) Permanent Stream Impacts 1 MCGuffC 90 Ln. Ft. (1827 SgFt.)(0.042 acres) reek 656 Tons EC-1, Class 1 Rip Rap L Prop. Perm. Drainage Easement LOD See General Notes, Sheet 17 of 17, for additional details (Dewatering Operations, Countersinking, Choke Stone, Low Flow Channel, etc.) a,nr~ poem. Drainage Easement Impact #10-2 AJD Wetland Zone WOUS A (R3) Temporary Stream Impacts 35 Ln. Ft. (844 SgFt.)(0.019 Acres) PROP. EC-1 CLASS 1 LEGEND _ RIPRAP LIMITS OF PERMANENT PROP. COFFERDAM LIMITS OF PERMANENT WETLAND IMPACTS _ PROP. RIGHT OF WAY STREAM IMPACTS I EXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY EASEMENT LINE wn STREAM IMPACTS D LIMITS TEMPORARY FORESTED WETLANDS TEMPORARY EASEMENT LINE WETLAND IMPACTS SCRUB SHRUB WETLANDS l� EXISTING WATERS —•••— yy p•(/• EC- _ Denotes Construction Limits in Cuts OF THE U.S. EMERGENT WETLANDS C _Denotes Construction Limits in Fills LIMITS OF PERMANENT WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED R3 STREAM PERM = 90 FT CROSSING: 10 IN: PITTSYLVANIA COUNTY, VA (1827 SF) (0.042 ACRES) LATITUDE: 36.569722 PROJECT NO: 0311-071-835 R3 STREAM TEMP = 35 FT LONGITUDE:-79.573056 UPC N0: 119164 (844 SF) (0.019 ACRES) SCALE APPLICATION BY: VDOT Excavtian: 1827 SF; 203 CY Permanent Fill: 1827 SF; 203 CY 0 50 100 SHEET:15 OF 20 DATE: 7/29/2024 REV. OOOFPP� 7 J 41 oo" M4- t.7 � — r ;w t� �4 • gal.:. ^s',. n -'+; .'r, i _p .....a��..^"HIV jaw F!KK'.+' � 1 /'.. � r '•fir - dims kF.s'' _ - ..' ` srµ +w j•�k{,c •y :_Y - gyp} �� • , � �� � ..� V !4 _�= - . � '�-f � �� � � "�' "'� ; � ..',•gyp"� � 't .f _�� +� fir.. ,•+ 4Y; •�....� 4 F 6 Y0 . IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 11 General. Latitude: 36A°34'12" Longitude: 79A°34'24" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): 504.54 MLW elevation (feet): N/A Area (feet') Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Stream Information: Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 2399 0 0 7372 0 720 0 0 0 267 0 0 788 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL I MECHANICAL Stream Name(s): McGuff Creek (upstream) Drainage Area (miles'): 6.14 Pool/Riffle flat ratio: 60/10/30 Average Depth (feet): 2 Substrate: silt, sand, cobble, boulder, bedrock Average Width (feet): 18 OHWM Indicator(s): Clear, natural line impressed on the bank; Bed and banks; Destruction of terrestrial vegetation; Scour DWR Classification: Other (N/A) DEQ Classification: III. Non -tidal (Coastal & Piedmont) Linear Feet of Permanent Stream Impacts: Perennial- 330 Intermittent- 230 Conceptual Stream Mitization: Cowardin Classification: R3UB, R4SB Section #: 2 Special Standards: Ephemeral- 0 Riffle/Pool- 0 Strategies Name Site Name Lat/Long GSA HUC Debit Payment Callaway Stream Mitigation Callaway Stream Mitigation N/A/ 03010101, 03010103 301 $392,364.00 Bank Bank -Credit Purchase N/A 03010102, 03010103,03010105 Graham & David Mitigation Graham and David N/A/ 03010101, 03010101 324 $29,891.50 Bank Mitigation Bank - Credit N/A 030010102, Purchase 03010103,03010105 Roanoke River Mitigation Roanoke River Mitigation 36A048'37.9"/ 03010101, 03010103 84 $8,196.72 Bank Bank - Credit Purchase 79A053'41.5" 03010103, 03010104,03010105 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Reference AJD NAO 2010 00423 Cowardin Classification(s): PFO Primary Secondary Temporary Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal 0 01 0 0 720 0 720 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Conceptual Wetland Mitigation: Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank - Credit 36A°54'00"/ 03010101, 03010105 830 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 VDOT Dick Cross Mitigation VDOT Dick Cross Site 36A°36'53.49"/ 03010106, 03010102 03010106 1 915 $0.00 Site 78A° 16' 17.42" Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts L.F S.F Non -Tidal Tidal Non -Tidal Tidal l BERRY HILL ROAD ROUTE 311) CROSSING: 11 PLAN VIEW New Box Culvert Box 3 V Impact #11-1 AJD Wetland Zone WOUS A (R3) Permanent Stream Impacts 330 ft (5195 Sq.ft)(0.119 acres) See General Notes, Sheet 17 of 17, for additional details (Dewatering Box Culvert Extension Operations, Countersinking, Choke Boxes 1 & 2 Stone, Low Flow Channel, etc.) Prop. Perm. Slope & Impact #11-2 Drainage Easement LOD AJD Wetland Zone WOUS AA (R4) Permanent Stream Impacts 230 Ln. Ft ( 2177 Sq.ft)(0.050 acres) 205 r Prop. RIW LOD _-,Prop. 16"Water Line !1 1h NN i, C-1 CLASS 1 R PRAP p LIMITS OF PERMANENT — STREAM IMPACTS II LIMITS OF TEMPORARY wn STREAM IMPACTS LIMITS OF TEMPORARY WETLAND IMPACTS EXISTING WATERS —•••—yyp,(/, OF THE U.S. LIMITS OF PERMANENT; WETLAND CONVERSION IMPACT AREA SUMMARY PFO PERM = 415 SF (0.010 ACRES) PFO PERM CONV. = 305 SF (0.007 ACRES) R3 STREAM PERM = 330 LN. FT (5195 SF) (0.119 ACRES) R4 STREAM PERM = 230 LN. FT (2177 SF)(0.050 ACRES) Excavtion: 2399 SF; 267 CY Permanent Fill: 7372 SF; 788 CY Limits of Construction Impact 411-3 AJD Wetland Zone AZ Permanent PFO Impacts 415 Sq. ft (0.010 acres) LEGEND LIMITS OF PERMANENT WETLAND IMPACTS EXISTING WETLANDS FORESTED WETLANDS D SCRUB SHRUB WETLANDS EMERGENT WETLANDS ENVIRONMENTAL IMPACTS CROSSING: 11 LATITUDE: 36.570000 LONGITUDE:-79.573611 SCALE 0 50' 160, Impact #11-4 AJD Wetland Zone AZ Permanent Conversion PFO Impacts 305 Sq. ft (0.007 acres PROR COFFERDAM PROP. RIGHT OF WAY PERMANENT — - — - — - EASEMENT LINE TEMPORARY EASEMENT LINE — Denotes Construction Limits in Cuts C — Denotes Construction Limits in Fills PROPOSED IN: PITTSYLVANIA COUNTY, VA PROJECT NO: 0311-071-835 UPC NO: 119164 APPLICATION BY: VDOT SHEET:16 OF 20 DATE: 7/29/2024 REV. z o � z 3:n, m W U �> WWI�I I �Jw _�W LL >- O U m n I, W 11_ m D CD '4103b L'M3 'pl'S 4 9 3� O fa O > Q - - O I >� G J po �00� co o a W r r r o A�� U b0'zOS �,- ------;--;- a,b32i 'L-M3 'ais l' I b9- On F— Z W J Q U I I cn Q� U = w CD Lw wl JCD a__ Q:�x z =Q CD U� zo w J O 0 v N O N N ti W Q 0 O N L� O n W LLJ S L v Q N O o H > N W Q rn o0 L Z O C:: �z � � O Q II U > CL zW w Q� o Q W �o J Q ZU Z CDIt m >O�Z N Cr_zm U (hLf) mJZ�O O o� > w W � p�w0U 00 Qua mom Q�� oQ OW OUd W z�� of a W d d Z d m Q S (n � LQ m� � m QO W z JO g Uz O =m v m U W oz ZW Cn Q X N o U� CIZ Q O _ z (� v W z I °del z116 C)� W �� V W Q Q � W m ��a OU C� W n w i o� ��w w _� =UW =LC) 0 � �Y U CD ��U J � c� � z�z I— ��L o z z cn �m UCH Z Q O z LQm �� z o _ O o W° ma Ua Uz CD C/) Q z �m �LU oz z_ > o w mzm� O I W W I WW U� OQ J �— O W a LLI m O LQ om ozQ N Wa mL 0 � z CD U) m a O O a o CD �� Cv z 0, oW II 0 �o oW � p� aQ W cc, --it du x o o m 0 N 0 �, 0 m � w z� M a o 0 A - f �t� Oo ?' ff�-- WIMV how IN. lot, G 6 - &-� . y ;; _40 + j� MT I ILI oi Iq `+• �� ^.tea '�Yy AY. �Y'�' .{• � f i. 1 9C, yy .• �ba. �` 1 r: }r � � - .fie•. _. -/.:. ji �. .. ,y r. '•- � 1, .. � i r•.i' . - .C``{.p' .+ - '��� i - i ice., i e .t� �.•� +i ..lY- 11 Ll NA ��, O'M C — ,Ir. ^ kit" f -Extending Existing Culverts 791 yt[l. �"r �.. � �• �+�. n. r `R1T � �' '/ -+ .. '[ fp'^- -' - s1 . �• t��� �Tlri a .L: •ti 'i �V� t�. �-. .fir w` y' rl '�. `+� % _ y.l� �r -ri w ',�T1• - + �� ! 1".-...... nL . i r•1..+a �� .�,s�,y�7f }}"+.fir . f - . 7'_� r _1 a�'RO - •, r _ �. _ i a' '7`�'vita _ _ 4 rrryyy]]]��i ���``` ' �' �I c�^'n ►�i� � ie� � + r y' ��",�F �' � : �E,':. _ - •ter -..� IL N. Mier -.New Culvert Crossing 1116 _ R, , gWOUS R3 Impact # 11-1 Proposed channel alignment (nts) �' ; }r '��_+ ", r '� `VW r.'f+-ice •r-= �K' r= ii r�l r ir. ,'x `° i3 {: v LU ref �f�•+. ' y j 14 cu co j CO C L ;?J•1' iJR..r���ej� ic„ ^ r '�` ;� ffn O � cu r' + > 4 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VI (cont). DETAILED ENVIRONMENTAL IMPACT INFORMATION Crossing Name: Crossing: 12 General. Latitude: 36A°34'23" Longitude: 79A°33'47" FEMA FIRM number: 51143C0605E Nearest Community: Berry Hill Surrounding Land Use: Industrial/mfg., Forest Basin: Roanoke River Basin Sub -basin: 4A. Roanoke River Sub -basin Hydrologic Unit Code: 03010103 Engineering data for impacts to Waters of the US: OHW elevation (feet): N/A MLW elevation (feet): N/A Area (feet) Quantity (yd3) below OHW Quantity (yd3) below MLW Construction Method Dredging/Excavation Filling (Permanent): Filling (Temporary): Streams Open Water Wetlands Streams Open Water Wetlands Streams Open Water Wetlands 0 0 0 0 0 1121 0 0 0 0 0 0 0 0 0 0 0 0 01 01 01 01 01 01 01 01 0 MECHANICAL Stream Information: N/A Stream Name(s): Pool/Riffle flat ratio: Substrate: OHWM Indicator(s): DWR Classification: DEQ Classification: Linear Feet of Permanent Stream Impacts: Perennial- 0 Intermittent - Conceptual Stream Mitigation: None Proposed Drainage Area (miles2): Average Depth (feet): Average Width (feet): Cowardin Classification: Section #: Special Standards: 0 Ephemeral- 0 Riffle/Pool- 0 IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: Wetland Information: Species identified: Pinus taeda; Pinus virginina; Liquidambar styraciflua; Dichanthelium scoparium; Panicum virgatum; Cowardin Classification(s): PSS Amount Disturbed(area -feet') Emergent Scrub/Shrub Forested Totals Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Non -Tidal Tidal Strategies Name Site Name Lat/Long GSA HUC Debit Payment Banister Bend Bank Banister Bend Bank -Credit 36A°54'00"/ 03010101, 03010105 1682 $29,573.52 Purchase 79A°12'00" 03010102; 03010103, 03010104,03010105 Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F Other Natural Resource Information: N/A Cowardin Classification(s): Amount of Impacts Permanent Temporary Conceptual Other Mitigation: None Proposed L.F L.F S.F Non -Tidal Tidal Non -Tidal Tidal BERRY HILL ROAD (ROUTE 311) CROSSING: 12 PLAN VIEW Previous Impact Permit #: NAO 20-4068 Permanent PFO Impacts 9,773 Sq. ft (0.224 acres) Impact #12-1 Previous Impact Permanent PSS Impacts Permit #: NAO 20-4068 1,121 Sq. ft (0.026 acres) Temporary PFO Impacts 1,330 Sq. ft (0.031 acres) Previous Impact Permit #: NAO 20-4068 Permanent PSS Impacts 3,932 Sq. ft (0.090 / acres) r r r r - - - - - - - - - - - - - - - f - - - - - - - - - - - -- - - ----------- — ---- o� o oo� Limits of Construction o00000 r �ioo�oo 00 .o00(�3��1�0 / 000�00�00 o 000000 000 o� o�oo�oo 00 000000000000 Previous Impact o V 0 0 V Permit #: NAO 20-4068 7 V V v Temporary PSS Impacts 321 Sq. ft (0.007 acres) PROP. EC-1 CLASS 1 RIPRAP LEGEND _ LIMITS OF PERMANENT PROP. COFFERDAM _ LIMITS OF PERMANENT WETLAND IMPACTS PROP. RIGHT OF WAY YVL_ STREAM IMPACTS EXISTING WETLANDS PERMANENT — - — - — - LIMITS OF TEMPORARY STREAM IMPACTS y EASEMENT LINE —WLD LIMITS TEMPORARY FORESTED WETLANDS TEMPORARY EASEMENT LINE WETLAND IMPACTS EXISTING WATERS —•••— yy p•(/• SCRUB SHRUB WETLANDS l� EC- _ Denotes Construction Limits in Cuts OF THE U.S. LIMITS OF PERMANENT EMERGENT WETLANDS C _Denotes Construction Limits in Fills WETLAND CONVERSION IMPACT AREA SUMMARY ENVIRONMENTAL IMPACTS PROPOSED PSS PERM = 1121 SF (0.026 ACRES) CROSSING: 12 IN: PITTSYLVANIA COUNTY, VA LATITUDE: 36.573333 PROJECT NO: 0311-071-835 LONGITUDE:-79.563056 UPC NO: 119164 SCALE APPLICATION BY: VDOT 0 50 100' SHEET:19 OF 20 DATE: 7/29/2024 REV. r Ukk Q t 70 co 00 CD co CD O Q �+ _ _ .�T�'•, t.a��.'--�._{Fw�r; � } ate--. � P. o CL ow !wr C� ,`" i^►(-yam.- t �� ''�1'•���. �1'R� '�'i• �. 47 is '� '�.. :\�r'1.'�.,�.•i m a_. �' _ • �=..,i; , rt tip., U � f "Y. I r x' •� Cu C cu BERRY HILL ROAD PROJ. 0311-071-835 UPC: 119164 PERMIT GENERAL NOTES I Dewatering operations: All work in'urisdictional channels shall take place in -the -dry behind non-erodiblJe cofferdams. Cofferdams will be installed with stream diversions and/or pumping operations. Full time pump -around operations may be required. Countersinking: All pipes and culverts placed in streams will be countersunk at both the inlet and outlet ends. Pipes that are 24 inches or less in diameter shall be countersunk 3 inches below the natural stream bottom and pipes that are greater than 24 inches in diameter shall be countersunk 6 inches below the natural stream bottom. An single pipes or culverts with bottoms shall be depressed (countersunk) below the natural streambed at both the inlet and outlet of the structure. In sets of multiple pipes or culverts with bottoms at least one pipe or culvert shall be depressed (countersunk) at both the inlet and outlet to convey low flows. Existing culvert extensions will be installed along their current grade elevations. Choke Stone: Choke stone shall be included at all jurisdictional culvert locations where riprap inlet/outlet protection is installed. Use of the choke stone with the inlet/outlet protection shall establish flow on top of the riprap within 15 days of completing culvert installation. Low Flow Channel: A low flow channel shall be constructed to concentrate flow at the inlet and outlet ends of culverts. The low flow channel dimensions shall mimic (approximately) the channel dimensions upstream and downstream of the culvert location. For multi -barrel culverts, the inlet/outlet protection shall be used to delineate the low flow barrel. SKETCHES ARE TO BE USED ENVIRONMENTAL IMPACTS SOLELY FOR SECURING WATER QUALITY PERMITS AND ARE NOT TO BE USED FOR CONTRACT QUANTITY ESTIMATES PROPOSED IN: PITTSYLVANIA COUNTY, VA PROJECT NO: 0311-071-835 UPC NO: 119164 SHEET: 20 OF 20 DATE: 7/29/2024 REV. Attachment D Hydraulic Commentary LD-293 (3-14-19) Page 1 of 2 VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN LOCATION HYDRAULIC STUDY 7w7r 119164 State Project Number 0311-071-835, C-501 Pittsylvania County Route 311 McGuff Creek Project Type I Roadway Improvement Description of proposed Roadway widening by adding two additional lanes and a grassed raised median. actions within the Base The existing double 10'x10' box culvert will be extended and a third 8'x10' box Flood Plain culvert will be constructed in parallel to accommodate the road widening. Drainage Area 6.14 sq. mi. Roadway Classification Minor Arterial Design Storm 25-year Panel Number Zone* BFE Floodway Notation Encroachment 51143CO60SE A N/A NA N/A Click to choose an item. * Only note if in a Zone A, AE, V, or VE area Proposed widening and additional box culvert installation will satisfy the allowable Engineers Assessment base flood increase requirement of no more than 1.0' (Zone A floodplain with no mapped floodway.) Conclusion Further study required None To Personal Information It Completed By Nikhil Deshpande, P.E. With Rinker Design Associates, P.C. Phone 703-334-9306 1 Email I ndeshpande@rdacivil.com LD-293 Page 2 of 2 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 ��'ALTH Op 0 ���c NIKHIL V. DESHPANDE Lic. No. 045430 �410NAL V, Rinker Design Associates, P.0 Virginia Beach, Virginia Hydraulic Engineer Responsible for all Pages LD-293 (3-14-19) Page 1 of 2 VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN LOCATION HYDRAULIC STUDY 7w7r 119164 State Project Number 0311-071-835, C-501 Pittsylvania County Route 311 Trotters Creek Project Type I Roadway Improvement Description of proposed Roadway widening by adding two additional lanes and a grassed raised median. actions within the Base The existing double 8'x10' box culvert will be extended and a third 10'x10' box Flood Plain culvert will be constructed in parallel to accommodate the road widening. Drainage Area 6.04 sq. mi. Roadway Classification Minor Arterial Design Storm 25-year Panel Number Zone* BFE Floodway Notation Encroachment 51143CO60SE A N/A NA N/A Click to choose an item. * Only note if in a Zone A, AE, V, or VE area Proposed widening and additional box culvert installation will satisfy the allowable Engineers Assessment base flood increase requirement of no more than 1.0' (Zone A floodplain with no mapped floodway.) Conclusion Further study required None To Personal Information It Completed By Nikhil Deshpande, P.E. With Rinker Design Associates, P.C. Phone 703-334-9306 1 Email I ndeshpande@rdacivil.com LD-293 Page 2 of 2 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 D op NIKHIDESHPLic. No. ��sI�NA Rinker Design Associates, P.C. Virginia Beach, Virginia Hydraulic Engineer Responsible for all Pages LD-294 (3-14-19) Page 1 of 3 VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DESIGN HYDRAULIC STUDY . - UPC 119164 State Project Number 0311-071-835, C-501 City/County Pittsylvania County Route 311 Waterbody McGuff Creek Description of Means and Methods used in the detailed analysis Historical Flood Data Utilized USGS Stream Stats for hydrologic data. A detailed Hydrologic and Hydraulic Analysis (H&HA) using HEC-RAS was performed. Within the limits of the analysis, field surveyed cross sections and lidar data was added to create the existing conditions model. The proposed roadway improvements were added to the existing conditions model to create the proposed conditions model. The water surface elevations were compared to ensure the increase in the 100-yr water surface elevation was not greater than 1 foot. ZM, Design and Survey File Location Project Wise Study Conclusion Roadway widening by adding two additional lanes and a grassed raised median. The existing double 10'x10' box culvert will be extended and a third 8'x10' box culvert will be constructed in parallel to accommodate the road widening. The project is within a FEMA floodplain with a Zone A designation. A detailed hydrologic and hydraulic analysis (H&HA) using HEC-RAS was performed to evaluate the impacts to the floodplain. Based on the results of the analysis, the proposed widening and additional box culvert installation will satisfy the allowable base flood increase requirement of no more than 1.0' (Zone A floodplain with no mapped floodway.) Please refer to the H&HA for additional information. Additional Actions Required I None Supporting Computer Files: (Please Note relevant plans or scenarios in more complex analyses) Project Wise LD-294 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 Data included in the report ❑ Alternatives Evaluation (New Construction only) ® Culvert Structure Summary ❑ Bridge Structure Summary ® Other Encroachment ® Existing and Proposed Flood elevations at the VDOT ROW Page 2 of 3 ® Existing and Proposed Base Flood Elevation throughout the analysis reach ❑ FEMA Data Comparison and Discussion ® I Causeways were not considered this analysis Causeways will be employed ❑ (describe and report impacts on base flow) An erosion and sediment control plan will be prepared and implemented in compliance with Virginia Erosion and Sediment Control Law and Regulations, and VDOT's Annual Erosion and Sediment Control Standards and Specifications approved by the Department of Environmental Quality. This analysis is only applicable to the structures and approaches described. Any changes in these conditions may invalidate this analysis and should be reviewed by the Hydraulics Staff. Completed By Nikhil Deshpande, P.E. With Rinker Design Associates Phone 703-334-9306 Email ndeshpande@rdacivil.com LD-294 Page 3 of 3 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 Rinker Design Associates, LLC Virginia Beach, Virginia Hydraulic Engineer Responsible for all Pages LD-294 (3-14-19) Page 1 of 3 VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DESIGN HYDRAULIC STUDY . I . eldli -141011, 771 UPC 119164 State Project Number 0311-071-835, C-501 City/County Pittsylvania County Route 311 Waterbody Trotters Creek Description of Means and Methods used in the detailed analysis Utilized USGS Stream Stats for hydrologic data. A detailed Hydrologic and Hydraulic Analysis (H&HA) using HEC-RAS was performed. Within the limits of the analysis, field surveyed cross sections and lidar data was added to create the existing conditions model. The proposed roadway improvements were added to the existing conditions model to create the proposed conditions model. The water surface elevations were compared to ensure the increase in the 100-yr water surface elevation was not greater than 1 foot. Historical Flood Data I NA Design and Survey File Locations I Project Wise Roadway widening by adding two additional lanes and a grassed raised median. The existing double 8'x10' box culvert will be extended and a third 10'x10' box culvert will be constructed in parallel to accommodate the road widening. The project is within a FEMA floodplain with a Zone A designation. Study Conclusion A detailed hydrologic and hydraulic analysis (H&HA) using HEC-RAS was performed to evaluate the impacts to the floodplain. Based on the results of the analysis, the proposed widening and additional box culvert installation will satisfy the allowable base flood increase requirement of no more than 1.0' (Zone A floodplain with no mapped floodway.) Please refer to the H&HA for additional information. Additional Actions Required None Supporting Computer Files: (Please Note relevant III plans or scenarios in more complex analyses) Project Wise LD-294 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 Data included in the report ❑ Alternatives Evaluation (New Construction only) ® Culvert Structure Summary ❑ Bridge Structure Summary ® Other Encroachment ® Existing and Proposed Flood elevations at the VDOT ROW Page 2 of 3 ® Existing and Proposed Base Flood Elevation throughout the analysis reach ❑ FEMA Data Comparison and Discussion ® I Causeways were not considered this analysis Causeways will be employed ❑ (describe and report impacts on base flow) An erosion and sediment control plan will be prepared and implemented in compliance with Virginia Erosion and Sediment Control Law and Regulations, and VDOT's Annual Erosion and Sediment Control Standards and Specifications approved by the Department of Environmental Quality. This analysis is only applicable to the structures and approaches described. Any changes in these conditions may invalidate this analysis and should be reviewed by the Hydraulics Staff. Completed By Nikhil Deshpande, P.E. With Rinker Design Associates Phone 703-334-9306 1 Email ndeshpande@rdacivil.com LD-294 Page 3 of 3 (3-14-19) UPC 119164 State Project Number 0311-071-835, C-501 Rinker Design Associates, LLC. Virginia Beach, Virginia Hydraulic Engineer Responsible for all Pages Attachment E Cultural Resources Information IACM DATE: 07/09/2024 VDOT PROJECT #: 0311-071-835, C501, D648, D649, P101, R201 PERMIT #: 24-4024 PRE-APP#: VDOT Cultural Resources Summary Documentation for Interagency Permit Application Project Number: 0311-071-835 UPC: 119164 Project Name: Berry Hill Connector Road Extension; Pittsylvania County VDHR File No. 2022-0219 Funding Source: Federal District: Lynchburg Primary Jurisdiction: Pittsylvania Cultural Resources Manager: Lichtenberger, Randy M Report Generated: 09/10/2024 The following determinations have been made by VDOT Cultural Resources staff for this VDOT project as a whole in consultation with the State Historic Preservation Officer in Virginia (Director of Virginia Department of Historic Resources) in conformance with the requirements of Section 106 of the National Historic Preservation Act (54 U.S.C. 306108) and its implementing regulations, 36 CFR Part 800. The Area of Potential Effects (APE) for the USACOE's undertaking subject to Section 106 may be smaller than the APE defined for the project as a whole. Designated Lead Federal Agency for Section 106: USACE Does the project have the potential to affect historic properties, should they be present? Yes Description of Area of Potential Effects (APE): Are there previously recorded architectural resources within the APE? Notes: Date: Are there previously recorded archaeological resources within the APE? Notes: Date: Are historic properties present in the Area of Potential Effects? Yes Historic Property The National Rejg6ister's Seven As ects of Integrity Effect on Property Location Design Setting Materials Workman- ship Feeling Association Alter Diminish Alter Diminish Alter Diminish Alter Diminish Alter Diminish Alter Diminish Alter Diminish 44PY0627 N NA Y Y Y Y Y Y Y Y Y Y N NA ADVERSE EFFECT Explanation of Effect Determination: DHR concurred an Adverse Effect to the Berry Hill Archaeological District on 11-30- 23. DHR concurred on 6-27-24 that the Corps permitted action will have an adverse effect to 44PY0627, ❑ Determination of No Effect made and reported to the SHPO in accordance with Stipulation II.A of the Programmatic Agreement among the Federal Highway Administration, the U.S. Army Corps of Engineers, Norfolk District, the Tennessee Valley Authority, the Advisory Council on Historic Preservation, the Virginia State Historic Preservation Officer, and the Virginia Department of Transportation Regarding Transportation Undertakings Subject to Section 106 of the National Historic Preservation Act of 1966 (executed August 2, 2016). Effect Determination (non-"Stip.H.A"): ADVERSE EFFECT VDHR Concurrence Date: 06/28/2024 If Adverse Effect, MOA Execution Date: COMMONWEALTH of VIRCjINIA DEPARTMENT OF TRANSPORTATION 731 Harrison Ave. SALEM, VA 24153-0560 STEPHEN C. BRICH, P.E. COMMISSIONER November 1, 2023 Julie V. Langan, Director ATTN: Ms. Sam Henderson, Office of Review and Compliance Virginia Department of Historic Resources 2801 Kensington Avenue Richmond, Virginia 23221 Subject: Determination of Effect for Berry Hill Connector Extension; VDOT Project # 0311-071-835, P101; UPC #119164 (VDHR File #2022-0219) Dear Ms. Langan: The Virginia Department of Transportation (VDOT) is proposing construction of a four - lane extension of the Berry Hill Road Connector Extension for approximately 2.3 miles from the intersection of the Connector Road, currently under construction, to just past the Oak Hill Road intersection along existing Route 311 in Pittsylvania County, VA. The purpose of this letter is to provide your department and other consulting parties the opportunity to comment on VDOT's determination of effect to historic properties. The Virginia Department of Historic Resources (VDHR) concurred by signature on July 5, 2023 that architectural resources #071-0026, -5321, 5322, -5334, -5336, -5472, -5473 were not eligible for the National Register of Historic Places (NRHP) but do contribute to a potentially eligible Berry Hill Archaeological District (44PY0627) and that architectural resources #071-5306 and -5316 were not individually eligible and do not contribute to the District. VDHR also concurred that archaeological site 44PY0675 is not eligible for the NRHP and does not contribute to the District and sites 44PY0676, -0677, -0678, -0679 are not considered individually eligible but do contribute to the District. Also, that sites 44PY0333, -0381, -0382, -0393, -0440 are contributing to the District. WE KEEP VIRGINIA MOVING Ms. J. Langan November 1, 2023 Page Two Effect At the time of the survey, the project was still in the planning process and the plans for the project had not been finalized to the extent that the criteria of adverse effect could be applied to the identified historic property within the area of potential effect (APE). Those plans have now reached a stage where VDOT can apply the criteria of adverse effect to historic properties within the project's APE in accordance with 36 CFR800.5(a). The regulations implementing Section 106 of the National Historic Preservation Act define an effect as an "alteration to the characteristics of a historic property qualifying it for inclusion in or eligibility for the National Register" [36CFR800.16(i)]. The effect is adverse when the alteration of a qualifying characteristic occurs in a "manner that would diminish the integrity of the property's location, design, setting, materials, workmanship, feeling, or association" [36 CFR800.5(a)]. The proposed project is a four -lane extension of the Berry Hill Road Connector for approximately 2.3 miles west from the intersection of the Connector Road, currently under construction, to just past the Oak Hill Road intersection along existing Route 311. The roadway would be four 12-foot-wide lanes with 6-foot-wide shoulders and a 16-foot grassed, raised median. The proposed roadway shifts the centerline of the current Route 311 north by 21 feet. The area within the proposed right-of-way is either vegetated or paved as driveways into parcels under development. Table 1 lists the resources that are individually eligible or contribute to a potentially eligible Berry Hill Archaeological District, whether the construction of the proposed roadway would impact the resource, and VDOT's recommendation of the type of Section 106 effect the project may have. Attached is a map with the cultural resources overlaid on the plan sheets for the proposed project. Table 1. Effect to Historic Resources Resource # Resource Type NRHP Construction Effect Determination Impact Determination 44PY0333 Farmstead Potentially Partially within Adverse Effect eligible and limits of to part of the site Contributing to construction the District 44PY0381 Farmstead, Lithic Not Eligible but Partially within Adverse Effect Scatter Contributing to limits of to part of the site the District construction 44PY0382 Dwelling Not Eligible but Partially within Adverse Effect Contributing to limits of to part of the site the District construction 44PY0393 Domestic and Not Eligible but No impact No Effect Lithic Scatter Contributing to the District 44PY0440 Oak Hill Eligible and Minor amounts of No Adverse Plantation Contributing to ROW/Easement Effect the District Ms. J. Langan November 1, 2023 Page Three 44PY0627 Berry Hill Potentially Partially within Adverse Effect Archaeological eligible limits of to part of the District construction District 44PY0676 Road Trace Not Eligible but Partially within Adverse Effect Contributing to limits of to part of the site the District construction 44PY0677 Domestic Scatter Not Eligible but Minor amounts of Adverse Effect Contributing to ROW/Easement to part of the site the District 44PY0678 Road Trace Not Eligible but Partially within Adverse Effect Contributing to limits of to part of the site the District construction 44PY0679 Road Trace Not Eligible but Within limits of Adverse Effect Contributing to construction the District 071-0026 Oak Hill Delisted from Minor amounts of No Adverse Plantation the NRHP but ROW/Easement Effect Contributing to the District 071-5321 Tenant Farm Not Eligible but Minor amounts of No Adverse Contributing to ROW/Easement Effect the District 071-5322 Tobacco Barn Not Eligible but No impact No Effect Contributing to the District 071-5334 Bridge Abutments Not Eligible but No impact No Effect Contributing to the District 071-5336 Tenant House Not Eligible but House just outside Adverse Effect Contributing to of limits of to viewshed of the District construction house 071-5473 Hairston Farm Not Eligible but Minor Amounts of No Adverse Contributing to ROW/Easements Effect the District The proposed project would require approximately 35 acres of right-of-way, drainage and utility easement, plus 1.44 acres of temporary easement for entrance reconstruction from within the potentially eligible Berry Hill Archaeological District (44PY0627.) The VDOT has determined that the project would have an adverse effect on the District and seven of its contributing resources. These include three short segments of the former Berry Hill Road and several domestic sites dating from the Post Bellum Period. The remaining archaeological site (44PY0393) located within the study area would not be impacted. The three segments of the former Berry Hill Road (sites 44PY0676, 44PY0678 and 44PY0679), while contributing to the Berry Hill Archaeological District, have been WE KEEP VIRGINIA MOVING Ms. J. Langan November 1, 2023 Page Four mapped and photographed in detail as part of the Phase I Archaeological Survey of the project's study area. The VDHR concurred by letter dated July 5, 2023 that the research potential of these sites has been exhausted by recordation and agreed that no further work on these sites is warranted. Four additional sites contributing to the Berry Hill Archaeological District (44PY0333, 44PY0381, 44PY0382 and 44PY0677) would be adversely affected by construction activities. These consist of low to moderate density domestic artifact scatters associated with suspected tenant farmer sites occupied by formerly enslaved people from the Oak Hill and Berry Hill plantations. Approximately half of sites 44PY0333, 44PY0381 and 44PY0382 are located within the project footprint while approximately ten percent of Site 44PY0677 would be impacted. The proposed project would adversely affect the viewshed of the Tenant House (071- 5336), a contributing architectural resource to the District. The proposed project shifts the edge of pavement north toward the house by approximately 57 feet and clears all vegetation and trees from the front of the parcel exposing the house completely to the view of the roadway. The proposed project would require approximately 0.20 acre of permanent drainage easement and approximately one acre for a utility easement from within the individually eligible Oak Hill Plantation (44PY0440, 071-0026). These areas are either currently ditched, mowed, or vegetated with scrub brush. The proposed right-of-way/easement has been archaeologically surveyed and contains no resources. A thick buffer of vegetation would remain between buildings/ruins and the widened roadway so that the viewshed would not be affected. Therefore, there would be no adverse effect to the Oak Hill Plantation (44PY0440, 071-0026). The remaining architectural resources would either not be impacted (071-5322, 071- 5334) or would not be adversely affected due to the relatively minor amounts of ROW/easement required from within their boundaries (071-5321, 071-5473). Minimization Measures Since the proposed project is a continuation of the 4-lane Berry Hill Road Connector currently under construction, the project was originally proposed to widen equally to both sides of the existing alignment of Route 311. This would have required approximately seven acres of right-of-way and easements, including relocation of utilities and tree cutting, from within the individually eligible Oak Hill Plantation (44PY0440, 071-0026). In order to reduce impacts to this eligible resource, the alignment was shifted to the north away from the Plantation so that no right of way is required and only 1.2 acres of permanent easement is required. The Plantation is within the Berry Hill Archaeological District. The shift to the north would cause additional impacts to contributing archaeological sites, none of which are individually eligible. Consulting Parties The following consulting parties previously indicated their interest in participating in the Section 106 process: Pittsylvania Historical Society, Danville Historical Society, Preservation Virginia, Danville Research Center for African American History and Ms. J. Langan November 1, 2023 Page Five Culture, Will Hairston, Cedric Hairston, Elizabeth Moore and Tom Klatka from VDHR, and the Delaware Nation. The VDOT consultant's report, Archaeological Survey for the Berry Hill Connector Road Extension, Pittsylvania County, Virginia, was sent to consulting parties on May 25, 2023, as well as a pdf of a roll plot map showing the historic resources and the preliminary proposed right-of-way overlaid on an aerial. The Delaware Nation responded they concurred with the findings and had no further concerns. No responses were received from any of the other consulting parties in regard to the report. This letter, as copied to the consulting parties, serves to document the adverse effect of the proposed project on resources eligible or potentially eligible for the NRHP, or contributing to a potentially eligible Berry Hill Archaeological District. VDOT will work with your department and the consulting parties identified above to mitigate effects to the Berry Hill Archaeological District (44PY0627) and its contributing resources, and to document these agreed -upon measures in a Memorandum of Agreement (MOA). The VDOT invites you to concur with the above determination of effect for this proposed undertaking. Please indicate your concurrence with these recommendations by completing the signature block below within 30 days of receipt of this letter. Thank you for your assistance on this project. If you have any questions about this proposed project, please contact me at (540) 524-8655. Sincerely, Jana Bean VDOT Architectural Historian Cultural Resources — Western Region Attachments cc: Brian Denson, USACE Elizabeth Moore, VDHR Tom Klatka, VDHR William Guerrant, Pittsylvania Historical Society Gus Dyer, Danville Historical Society Lisa Winn Bryan, Preservation Virginia Karice Luck-Brimmer, Danville Research Center for African American History and Culture Will Hairston Cedric Hairston Ms. J. Langan November 1, 2023 Page Six ■■ i i i i F F F F w i i i i i F F F F F F i i i i i F F F F l i i i i i i i i r i i i i i i i i i l r r r F r i i i i i i w F w F i i i i i i w The Virginia Department of Historic Resources concurs with the Virginia Department of Transportation's recommendations below regarding VDOT Project # 0311-071-835, P 101; UPC # 119164 (VDHR File #2022-0219), that: The project will have an adverse effect upon the Berry Hill Archaeological District (44PY0627) and its contributing resources (44PY0333, -0381, -0382, - 0676, -0677, -0678, 0679 and 071-5336). Ms. d e t Langan Director, Virginia Department of Historic Resources Virginia State Historic Preservation Officer r r 3a z - 3 Date WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRCjINIA DEPARTMENT OF TRANSPORTATION 731 Harrison Ave. SALEM, VA 24153-0560 STEPHEN C. BRICH, P.E. COMMISSIONER May 24, 2023 Julie V. Langan, Director ATTN: Ms. Sam Henderson, Office of Review and Compliance Virginia Department of Historic Resources 2801 Kensington Avenue Richmond, Virginia 23221 Route: Berry Hill Connector Extension Project No.: 0311-071-835, P101 UPC No.: 119164 County: Pittsylvania Funding: State Permits: To Be Determined DHR File No.: 2022-0219 Dear Ms. Langan: The Virginia Department of Transportation (VDOT) is proposing construction of a four - lane extension of the Berry Hill Road Connector Extension for approximately 2.3 miles from the intersection of the Connector Road, currently under construction, to just past the Oak Hill Road intersection along existing Route 311 in Pittsylvania County, VA. The purpose of this letter is to provide your department and other consulting parties the opportunity to comment on the results of VDOT's efforts to identify historic properties in the area of the project. WE KEEP VIRGINIA MOVING Ms. J. Langan May 24, 2023 Page Two Identification Archaeological Survey VDOT's consultant, New South Associates, Inc. (NSA), has completed an archaeological survey of the study area. The results are provided in the attached report (1 hardcopy & 1 flash drive) entitled, Archaeological Survey for the Berry Hill Connector Road Extension Pittsylvania County, Virginia, by Maureen Meyers. NSA identified five newly recorded sites (44PY0675-0679, inclusive), three previously recorded sites (44PY0333, 44PY0381 and 44PY0382), and two archaeological locations within the archaeological study area. The three previously recorded sites were avoided during the present survey but were tested up to their previously drawn boundaries. Site 44PY0333 is recommended as potentially eligible individually and as a contributing resource to the Berry Hill Archaeological District. Sites 44PY0381 and 44PY0382 were found by DHR to be not individually eligible but are recommended as contributing to the Berry Hill Archaeological District. NSA recommends Site 44PY0675 is not eligible individually or as a contributing element to the Berry Hill Archaeological District. Sites 44PY0676, 44PY0678 and 44PY0679, segments of the original Berry Hill Road, are recommended not individually eligible but do contribute to the Berry Hill Archaeological District. Site 44PY0677 is recommended not individually eligible but does contribute to the Berry Hill Archaeological District. The two archaeological locations are by definition not eligible for the NRHP. VDOT concurs with NSA's recommendations. VDOT has further determined that the three short segments of old Berry Hill Road, while contributing to the archaeological district under Criterion D, lack further research potential, having been recorded and photographed for the present survey. Architectural Survey There were nine previously identified and no newly identified architectural resources located within the project's study area (see Table 1). Oak Hill Plantation (#071-0026) was previously delisted from the NRHP but is currently under nomination as contributing to the Oak Hill Archaeological District. As shown in Table 1, seven of the nine architectural resources are not individually eligible but contribute to the Berry Hill Archeological District. VCRIS documentation for those resources that have not been updated in the past five years is included. Attached is a map titled Berry Hill Cultural Resources that shows the locations of the previously surveyed and newly surveyed archaeological and architectural resources overlaid on an aerial map for your reference. Additionally, VDOT had previously contacted DHR and consulting parties via email on March 1, 2023 concerning tree cutting activity for the Geotech boring study to be conducted this summer. Attached is a map of the geotech boring sites titled Berry Hill Boring Access Plan overlaid on the preliminary plans for the project. No additional trees will be cut but ground disturbance in the form of ground leveling for access in several places and two- to four -inch borings generally up to 35-feet in depth will be required. Ms. J. Langan May 24, 2023 Page Three Table 1. Previously Identified Resources Resource Resource Type Previous VDOT # Determination Recommendation 44 PY0333 Farmstead Potentially Potentially Eligible eligible and contributing to potential Berry Hill Archaeological District 44 PY0381 Farmstead, Not Eligible Contributing to Lithic Scatter potential Berry Hill Archaeological District 44 PY0382 Dwelling Not Eligible Contributing to potential Berry Hill Archaeological District 44 PY0393 Domestic and Not Eligible Contributing to Lithic Scatter potential Berry Hill Archaeological District 44 PY0440 Oak Hill Eligible Contributing to Plantation potential Berry Hill Archaeological District 44 PY0627 Berry Hill Potentially Potentially Archaeological eligible Eligible District 071-0026 Oak Hill Delisted from Contributing to Plantation the NRHP potential Berry Hill Archaeological District 071-5306 Oak Hill Non Not Eligible; Non Caretakers contributing to contributing to House Oak Hill Oak Hill or Berry Hill Archaeological District 071-5316 Demolished Not Eligible Not Eligible; Non House contributing to Oak Hill or Berry Hill Archaeological District 071-5321 Tenant Farm Not Evaluated Contributing to potential Berry Hill Archaeological District Ms. J. Langan May 24 2023 Page Four Resource Resource Type Previous VDOT # Determination Recommendation 071-5322 Tobacco Barn Potentially Contributing to eligible potential Berry Hill Archaeological District 071-5334 Bridge Not Evaluated Contributing to Abutments potential Berry Hill Archaeological District 071-5336 Tenant House Potentially Contributing to eligible potential Berry Hill Archaeological District 071-5472 House Not eligible Contributing to potential Berry Hill Archaeological District 071-5473 Hairston Farm Not Eligible Contributing to potential Berry Hill Archaeological District Table 2. Newly Identified Resources Resource # Map # Resource Type VDOT Recommendation 44PY0675 FS1 Bricks Not Eligible, Non- contributing 44PY0676 FS3 Road Trace Contributing to potential Berry Hill Archaeological District 44PY0677 FS5 Domestic Scatter Contributing to potential Berry Hill Archaeological District 44PY0678 FS6 Road Trace Contributing to potential Berry Hill Archaeological District 44PY0679 FS7 Road Trace Contributing to potential Berry Hill Archaeological District Ms. J. Langan May 24, 2023 Page Five The VDOT invites your department to concur with the above determinations regarding the eligibility of identified properties. Please indicate your concurrence with these recommendations by completing the signature block below within 30 days of receipt of this letter. Thank you for your assistance on this project. If you have any questions about this proposed project, please contact me at (540) 524-8655. Sincerely, Jana Bean VDOT Architectural Historian Cultural Resources — Western Region Attachments cc: Brian Denson, USACE Elizabeth Moore, VDHR Tom Klatka, VDHR Tim Roberts, VDHR Ms. J. Langan May 24, 2023 Page Six The Virginia Department of Historic Resources concurs with the Virginia Department of Transportation's recommendations below regarding VDOT Project # 0311-071-835, P101; UPC #119164 (VDHR File #2022-0219), that: 1) Architectural resources #071-0026, -5321, -5322, -5334, -5336, -5472, -5473 are recommended not individually eligible under Criteria A, B, or C but contribute to a potentially eligible Berry Hill Archaeological District; 2) Architectural resources #071-5306 and 071-5316 are recommended not individually eligible under Criteria A, B, or C and do not contribute to a potentially eligible Berry Hill Archaeological District; 3) Newly identified archaeological Site 44PY0675, is not eligible for the NRHP individually or as a contributing element to the Berry Hill Archaeological District (44PY0627) under Criterion D; Criteria A - C are not considered applicable and no further work is warranted. 4) Newly identified Sites 44PY0676, 44PY0678 and 44PY0679 are not individually eligible for the NRHP under Criterion D; Criteria A — C are not considered applicable. The sites are contributing elements to the Berry Hill Archaeological District (44PY0627); however, the research potential of these sites has been exhausted through recordation and no further work is warranted. 5) Newly identified Site 44PY0677 is not individually eligible for the NRHP under Criterion D; Criteria A — C are not considered applicable. The site is a contributing element to the Berry Hill Archaeological District (44PY0627). 4�-- Fie— Ms. JuEie V. gan Director, Virginia Department of Historic Resources Virginia State Historic Preservation Officer -715/ZOz3 Date MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA RECITALS WHEREAS, the Virginia Department of Transportation (VDOT) proposes to construct the Berry Hill Connector Road Extension in Pittsylvania County, Virginia (VDOT Project No. 0311-071-835, C501, D648, D649, P 101, R201, UPC 119164; DHR File No. 2022-0219) (see Attachment A, Project location map), by widening the existing two (2) lanes to a four (4)-lane Rural Collector Road system for approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Road, hereinafter referred to as the Project; and WHEREAS, the Project is solely funded through state construction funds without any involvement from the Federal Highway Administration, making it subject to review under the State Environmental Review Process (SERF) and the terms of the Programmatic Agreement Between the Virginia Departments of Transportation and Historic Resources Concerning Interagency Project Coordination executed January 13, 1999 (hereafter"1999 State PA"); and WHEREAS, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 USC §§ 401 and 403) and Section 404 of the Clean Water Act of 1973 (33 USC § 1344), a Department of the Army permit will be required from the U.S. Army Corps of Engineers, Norfolk District (USACE); and WHEREAS, the issuance of a USACE permit for the Project is a distinct federal action subject to Section 106 of the National Historic Preservation Act of 1966 (54 USC § 306108) and therefore is not subject to this Memorandum of Agreement (Agreement) between VDOT and the Department of Historic Resources (DHR); and WHEREAS, VDOT, in consultation with DHR, has determined pursuant to the 1999 State PA and in accordance with 36 CFR § 800.4(a)(1), that the Area of Potential Effects (Attachment B) for the Project, as generally depicted on Attachment B, shall be defined as the construction limits of the Project, plus areas within or adjacent to the construction limits, that may be directly impacted by construction or indirectly impacted through auditory, visual or traffic pattern changes, etc. resulting from the Project; and WHEREAS, consistent with Stipulation 8 of the 1999 State PA, VDOT, in consultation with DHR and other consulting parties, has completed the identification of historic properties within the Project's APE based on a 2023 architectural reconnaissance survey by VDOT cultural resources staff and the Archaeological Survey far the Berry Hill Connector Road Extension Pittsylvanto County, Virginia, by Maureen Meyers (2023), which were provided to DHR for their review and comment on May 24, 2023; and WHEREAS, pursuant to Stipulation 7.b. and 7.c. of the 1999 State PA, VDOT, in consultation with DHR and other consulting parties, has determined that the Berry Hill Archaeological District (District) (DHR Inventory No. 44PY00627) is potentially eligible for listing in the National Register of Historic Places (NRHP) and that archaeological sites DHR Inventory No. 44PY0333, -0381, - 0382, -0393, -0440, 0676, -0677, -0678, -0679 and architectural resources DHR Inventory Nos. 071- 0026,-5321,-5322, MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY. VIRGINIA -5334, -5336, -5472, -5473 are contributing to the District, and this determination was concurred with by DHR on July 5, 2023; and WHEREAS, pursuant to Stipulation 7.d. of the 1999 State PA, VDOT, in consultation with DHR and other consulting parties, has determined that the Project will constitute an adverse effect on the District as a whole and specifically to its contributing resources sites 44PY0333, 44PY0381, 44PY0382, 44PY0676, 44PY0677, 44PY0678, 44PY0679 and architectural property 071-5336. and this determination was concurred with by DHR on November 30, 2023; and WHEREAS, due to public interest and the potential for the Project to affect historic properties, VDOT invited Preservation Virginia, the Pittsylvania Historical Society, the Danville Historical Society, and the Danville Research Center for African American History and Culture to participate in this consultation and to concur with this Agreement; and WHEREAS, due to their demonstrated interest in the Project, VDOT invited certain individual stakeholders, Will Hairston and Cedric Hairston, to participate in this consultation and to concur with this Agreement; and WHEREAS, VDOT also invited the Danville-Pittsylvania Regional Industrial Facility Authority, Pittsylvania County, the Town of Danville, the Danville Museum of Fine Arts and History, Dean Hairston, and Ed Hairston the opportunity to participate in consultation but received no response from these parties; and WHEREAS, hereinafter in this Agreement, Preservation Virginia, Pittsylvania Historical Society, Danville Historical Society, Danville Research Center for African American History and Culture, Will Hairston, and Cedric Hairston shall be referred to collectively as the "Consulting Parties"; and WHEREAS, members of the public were provided an opportunity to comment on the Project on June 21, 2018, during a Danville-Pittsylvania Metropolitan Planning Organization Citizen Input Meeting and no comments specific to the historic properties were received; VDOT also posted a willingness to hold a Public Hearing on February 21, 2023, and no responses were received; NOW, THEREFORE, VDOT and DHR (each a Signatory and collectively, the Signatories) agree that the Project shall be implemented in accordance with the following stipulations in order to take into account the effects of the Project on historic properties. STIPULATIONS VDOT shall ensure that the following measures are carried out: I. Cultural Land Use Study A. VDOT shall complete a cultural land use study of the former Hairston plantations in Pinsylvania and Henry Counties, Virginia: Beaver Creek, Hordsville, Leatherwood, Camp Branch, Chatmoss, Magna Vista, Shawnee, Marrowbone, Windsor, Berry Hill, Oak Hill. The study will include mapping of the plantations' boundaries in the Ante- and Post-Bellum Eras, an analysis of the movement of the formerly enslaved populations in the Reconstruction Era and beyond, and the role of sharecropping and tenant farming in that movement with specific MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA nEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA reference, if possible, to known archaeological sites in the Berry Hill Archaeological District. The study will explore the rote of formerly enslaved persons from the Hairston plantatkins in the history of local towns and cities, including the community of Cascade and the City of Danville. B. VDOT shall prcparc web -ready content interpreting the results of the cultural land use study to be hosted online by the Danville Museum of Fine Arts and History. C. VDOT shall develop the cultural land use study and web content in consultation with DHR and Consulting Parties. VDOT shall provide draft copies of the study and draft copies of the web content to DHR and Consulting Parties for review and comment subject to the terms of Stipulation III.B, below. D. VDOT shall ensure that the cultural land use study and web content are completed and available for public use within one (1) year of completion of construction of the Project. The cost of the cultural land use study and web content development shall not exceed $70,000. E. Within one (1) month of finalizing the cultural land use study and web -ready content, VDOT shall provide one (1) hardcopy and one (1) electronic copy of the cultural land use report and one (1) electronic copy of the web -ready content to DHR, and one (1) copy of the cultural land use report in a format of their choosing and one (1) electronic copy of the web -ready content to Consulting Parties. F. Within one (1) month of completion of the final deliverables in Stipulation I.A and B above, whichever is later, VDOT shall provide DHR written confirmation that the terms of said stipulations have been fulfilled. If. Professional Qualifications All archaeological and architectural documentation carried out pursuant to this Agreement shall be conducted by or under the direct supervision of an individual or individuals who meet, at a minimum, the Secretary of the Interior's Professional Qualifications Standards (48 FR 44738-9, September 29, 1983) in the appropriate discipline. 111. Preparation and Review of Documents A. All technical materials prepared pursuant to this Agreement shall be consistent with the federal standards titled Archaeology and Historic Preservation: Secretary of the Interior's Standards and Guidelines (48 FR 44716-44742, September 29, 1983) and with DHR's Guidelines for Conducting Historic Resources Survey in Virginia (rev. 2417), or subsequent revisions or replacements to these documents. B. DHR and the Consulting Parties to this Agreement agree to provide comments to VDOT on all technical materials and other documentation arising from this Agreement within thirty (30) calendar days of receipt. If no comments are received from DHR or a Consulting Party within this review period, the VDOT may assume that the non -responsive party has no comment. VDOT shal I ensure that all comments received within the thirty (30) calendar -day review period are addressed in the final documentation. MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT of HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY BILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA IV. Post Review Discoveries A. In the event that previously unidentified potential historic properties are discovered within the APE or if unanticipated effects on historic properties occur during project construction, VDOT shall immediately halt all construction work in the area of the resource and, for the discovery of any archaeological resource, in surrounding areas where additional subsurface remains can reasonably be expected to occur and be impacted by project construction. Construction work in all other areas of the project may continue. B. VDOT shall notify DHR within two (2) working days of any discovery pursuant to Stipulation W.A. If the discovery includes potential prc-contact or historic Indian properties, VDOT shall also notify the appropriate federal and/or state recognized Indian Tribe(s) that may attach cultural and religious significance to the property within two (2) working days of such discovery. C. VDOT shall ensure that an archaeologist or architectural historian qualified pursuant to Stipulation I1, above, will investigate the work site and the discovered property, and shall forward an assessment of the NRHP eligibility of the resource and proposed treatment actions to resolve adverse effects to DHR and appropriate federal and/or recognized Tribe(s), if applicable. The DHR and appropriate federal and/or recognized Tribe(s), if applicable, shall respond within five (5) working days of receipt of the assessment of NRHP eligibility of the resources and/or the proposed treatment plan to resolve adverse effects. VDOT shall take into account the comments received from DHR and appropriate federal and/or recognized Indian Tribe(s), if applicable, regarding the NRHP eligibility of the resources and/or the proposed treatment plan to resolve adverse effects, when developing and implementing a plan of action. D. VDOT shall ensure that construction work within the area of the discovery does not proceed until appropriate treatment measures are developed and implemented, or the determination is made that the resource is not eligible for listing in the NRHP. V. Treatment of Human Remains A. VDOT shall treat human remains and associated funerary objects encountered during the Project in a manner consistent with the Advisory Council on Historic Preservation's Policy Statement Regarding Burial Sites, Human Remains and Funerary Objects (updated, March 1, 2023) and the Virginia Antiquities Act (Va. Code § 10.1-2302 erseq_) and its implementing regulation (17 VAC 5-20-10 et seq. . 13. If any human remains and associated funerary objects encountered are likely to be of Native American origin, VDOT, with the assistance of DHR, shall determine the treatment of Native American human remains and associated funerary objects in consultation with the appropriate federal and/or state recognized Indian Tribe(s), C. VDOT shall make a reasonable effort to ensure that the general public is excluded from viewing and photographing human remains and associated funerary objects. The signatories to this PA shall not release to the press or general public photographs of any human remains, gravesites or funerary objects unless otherwise required by law, including the Virginia Freedom of Information Act (Va. Code § 2.2-3700 et seq.). MEMORANDUM OF AGREEME%T BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY. VIRGINIA VI. Dispute Resolution A. Should a any party to this Agreement object in writing to a Signatory regarding any action carried out or proposed pursuant to this Agreement, VDOT shall consult with the objecting party to resolve the objection. B. If the objection is raised by a Consulting Party, VDOT shall take the objection into consideration and respond to the objecting party in writing, with copy to DHR, within thirty (30) days after initiating such consultation regarding how it intends to address the objection. C. If the objection is raised by DHR and if, after initiating such consultation, either VDOT or DHR finds that further consultation at the staff level will not resolve the objection, VDOT's Commissioner of Highways and the DHR's Director will consult to resolve the objection prior to the VDOT making a final decision on how to proceed with resolving the objection. D. If VDOT's Commissioner of Highways and DHR's Director cannot resolve the objection within thirty (30) calendar days, the Secretaries of Transportation and Natural and Historic Resources will consult to resolve the objection prior to the VDOT making a final decision on how to proceed with resolving the objection. E. If the Secretaries of Transportation and Natural and Historic Resources cannot resolve the objection within thirty (30) calendar days, VDOT shall forward all documentation relevant to the objection, including a proposed response to the objection, to the Secretary of the Administration for comment.The Secretary of the Administration must respond within thirty (30) calendar days. F. VDOT shall take into account any recommendations or comments provided by the Secretary of Administration with reference to the subject of the objection when making a final decision on how to proceed with resolving the objection. Those responsibilities or actions not associated with the objection remain unchanged and may proceed. G. Should a member of the pub] is raise an objection pertaining to a proposed action or the implementation of the measures stipulated in this Agreement, the signatory receiving the objection shall notify the other signatories to this Agreement in writing of the objection. VDOT and DHR shall consult, regarding the objection prior to responding to the objection. VII. Amendments and Termination A. Either Signatory to this Agreement may propose in writing that the Agreement be amended, whereupon VDOT and DHR shall consult to consider such an amendment. B. If VDOT and DHR agree such an amendment to this Agreement is necessary, they shall consult to develop an amendment. C. Any amendment to this Agreement shall become effective upon the date of the last signature of a Signatory. D. if VDOT decides it will not proceed with the Project, VDOT may so notify DHR and the MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVAIIA COUNTY, VIRGINIA Consulting Parties and this Agreement shall then become null and void. E. in the event that this Agreement is terminated or rendered null and void, VDOT shall submit to DHR a technical report on the results of any architectural studies conducted prior to and including the date of termination and shall ensure that any associated historic documentation or photos collected by VDOT are submitted to DHR. V i ll. Duration This Agreement shall be effective upon the date of the last signature by a Signatory and continue in full force and effect for five (5) years. At any time in the six (6)-month period prior to such date, VDOT may request that the Signatories consider an extension of this Agreement. No extension or modification shall be effective unless all Signatories have agreed with it in writing. IX. Execution This Agreement may be executed in counterparts, with a separate page for each Signatory. VDOT shall ensure that DHR is provided a copy of the fully executed Agreement. Execution of this Agreement by VDOT and DHR and implementation of its terms, evidence that the VDOT has taken into account the effect of the Project on historic properties pursuant to the requirements of SERF and the 1999 State PA. MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN F(TTSYLVANIA COUNTY, VIRGIN IA DEPARTMENT OF HISTORIC RESOURCES By: QL, Date: v� Julie V. Langan, Director Department of Historic Resources MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COL NTV, VIRGINIA SIGNATORY: VIRGINIA DEPARTMENT OF TRANSPORTATION Christopher J Swanson 2024.05.07 09:47:07-04'00' By: -- -- — - - Date: Chris Swanson, PE Environmental Division Director MEMORANDUM OF AGREEMENIT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF TH9 BERRY HILL CONNECTOR ROAD EXTENSION IN PiTTSYLVANIA COUNTY, VIRGINIA CONCURRING PARTY: PRESERVATION VIRGINIA By: —.._ Elizabeth KOstelny, Chief Executive Officer Date: MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSIONIN PITTSYLVANIA COUNTY, VIRGI,NIA CONCURRING PARTY: DANVILLE RESEARCH CENTER FOR AFRICAN AMERICAN HISTORY AND CULTURE [m Dr. Karice Luck-Brimmer Date: 10 MEMORANDUM OF AGREEMENT BETWEENTHE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCURRING PARTY: PITTSYLVANIA HISTORICAL SOCIETY M. William Guerrant Date: MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCURRING PARTY: DANVILLE HISTORICAL SOCIETY m Gus Dyer Date: 12 MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION; REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COL NTY, VIRGINIA CONCURRING PARTY: Wigal►:.LillElio By: Will Hairston Date: l3 MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OF THE BERRY BILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA � llialIII.7.I Wei Ml " CEDRIC HAIRSTON m. Cedric Hairston Date: 14 MEMORANDUM OF AGREEMENT BETWEEN THE DEPARTMENT OF HISTORIC RESOURCES AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION REGARDING CONSTRUCTION OFTHE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA 16 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA RECITALS WHEREAS, the Virginia Department of Transportation (VDOT) proposes to construct solely through state construction funds the Berry Hill Connector Road Extension in Pittsylvania County, Virginia (VDOT Project No. 0311-071-835, C501, D648, D649, P101, R201, UPC 119164; Department of Historic Resources (DHR) File No. 2022-0219) as generally depicted in Attachment A and hereinafter referred to as the Project; and WHEREAS, VDOT previously consulted with DHR on the state -funded portion of the Project pursuant to State Environmental Review Process and the terms of the Programmatic Agreement Between the Virginia Departments of Transportation and Historic Resources Concerning Interagency Project Coordination executed January 13, 1999; and WHEREAS, VDOT determined, and DHR concurred in a letter November 30, 2023, the state -funded portion of the Project will have an adverse effect on the Berry Hill Archaeological District (DHR Inventory No. 44PY00627), a property eligible for listing in the Virginia Landmarks Register, and entered into the state -level Memorandum ofAgreement Between the Department of Historic Resources and the Virginia Department of Transportation Regarding Construction of the Berry Hill Connector Road Extension in Pittsylvania County, Virginia (Project State -Level MOA) executed on May 9, 2024; and WHEREAS, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 USC § 401 and 403) and Section 404 of the Clean Water Act of 1973 (33 USC § 1344), a Department of the Army permit likely will be required from the U.S. Army Corps of Engineers, Norfolk District (USACE); and WHEREAS, USACE has determined that the issuance of an USACE permit for this Project is an undertaking, as defined in 36 CFR § 800.16(y); and WHEREAS, USACE has authorized VDOT to conduct Section 106 consultation with the Director of DHR, who serves as the the State Historic Preservation Officer (SHPO), pursuant to Va. Code § 10.1- 2201, for the Project on its behalf, including the initiation of the Section 106 process, identification of historic properties, and assessment and resolution of adverse effects, pursuant to Stipulation II.B of the Programmatic Agreement among the Federal Highway Administration, the U.S. Army Corps of Engineers, Norfolk District, the Tennessee Valley Authority, the Advisory Council on Historic Preservation, the Virginia State Historic Preservation Office and the Virginia Department of Transportation Regarding Transportation Undertakings Subject to Section 106 of the National Historic Preservation Act of 1966 (August 2, 2016) (hereinafter "2016 Federal PA"); and WHEREAS, VDOT, in consultation with USACE, SHPO and other consulting parties, has determined that the Area of Potential Effects (APE) for the Project, in accordance with 36 CFR § 800.4(a)(1), and Stipulation II.B. Le of the 2016 Federal PA, is defined as permit areas containing construction impacts to USACE-defined jurisdictional areas plus any areas that would be disturbed in order to access USACE- MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA regulated action, as generally depicted in Attachment B. In addition, any upland areas excavated for material used in the jurisdictional areas; and WHEREAS, VDOT, in consultation with the SHPO and other consulting parties, has completed the identification of historic properties within the Project's APE based on a 2023 architectural reconnaissance survey by VDOT cultural resources staff and the archaeological survey Archaeological Survey for the Berry Hill Connector Road Extension Pittsylvania County, Virginia, by Maureen Meyers (2023) conveyed to the SHPO for their files on May 24, 2023 and concurred with by the SHPO on July 5, 2023; and WHEREAS, the Berry Hill Archaeological District (District) (DHR Inventory No. 44PY0627) is potentially eligible for listing on the National Register of Historic Places (NRHP), and that archaeological sites DHR Inventory No. 44PY0333, -0381, -0382, -0393, -0440, -0676, -0677, -0678, -0679 and architectural resources DHR Inventory Nos. 071-0026, -5321, -5322, -5334, -5336, -5472, -5473 are contributing to the District; and WHEREAS, VDOT, on behalf of the USACE and in consultation with the SHPO and other consulting parties, has determined that the issuance of an USACE permit for this Project will constitute an adverse effect on the District due to construction impacts to the District and its contributing resource, archaeological site 44PY0381, and USACE, by way of VDOT, has consulted with the SHPO and other consulting parties in accordance with Stipulation ILBA.c of the 2016 Federal PA to resolve the adverse effect; and WHEREAS, VDOT looks to supplement the Cultural Landscape Study it has committed to complete in Stipulation I of the Project State -Level MOA as mitigation for the adverse effect on the District as a whole and specifically to its contributing resources sites 44PY0333, 44PY0381, 44PY0382, 44PY0676, 44PY0677, 44PY0678, 44PY0679, and architectural property 071-5336; and WHEREAS, pursuant to Stipulation II.B.4.c.ii of the 2016 Federal PA and on behalf of USACE, VDOT has notified the Advisory Council on Historic Preservation (ACHP) of the adverse effect of the Project by letter dated December 4, 2023, and the ACHP has chosen not to participate in consultation; and WHEREAS, VDOT has participated in this consultation pursuant to the terms of the 2016 Federal PA and will be a Signatory to this Memorandum of Agreement (Agreement) in accordance with Stipulation II.B.4.c.vi of the 2016 Federal PA; and WHEREAS, pursuant to Stipulation II.B.2.a of the 2016 Federal PA, the Pittsylvania Historical Society and the Danville Historical Society have participated in this consultation and, pursuant to Stipulation II.B.4.c.vii of the 2016 Federal PA and on behalf of USACE, VDOT has invited the Pittsylvania Historical Society and the Danville Historical Society to concur in this Agreement; and WHEREAS, pursuant to Stipulation II.B.2.a of the 2016 Federal PA, certain individual stakeholders, Will Hairston and Cedric Hairston, have participated in this consultation and, pursuant to Stipulation II.B.4.c.vii of the 2016 Federal PA and on behalf of USACE, VDOT has invited those stakeholders to concur in this Agreement; and MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA WHEREAS, pursuant to Stipulation II.B.2.a of the 2016 Federal PA, Preservation Virginia has participated in this consultation and, pursuant to Stipulation II.B.4.c.vii of the 2016 Federal PA and on behalf of USACE, VDOT has invited Preservation Virginia to concur in this Agreement; and WHEREAS, pursuant to Stipulation II.B.2.a of the 2016 Federal PA, Danville Research Center for African American History and Culture has participated in this consultation and, pursuant to Stipulation II.B.4.c.vii of the 2016 Federal PA and on behalf of USACE, VDOT has invited Danville Research Center for African American History and Culture to concur in this Agreement; and WHEREAS, pursuant to Stipulation II.B.2.a of the 2016 Federal PA and on behalf of USACE, VDOT has provided the Danville-Pittsylvania Regional Industrial Facility Authority, Pittsylvania County, the Town of Danville, the Danville Museum of Fine Arts and History, Dean Hairston, and Ed Hariston the opportunity to participate in consultation and received no response from this party; and WHEREAS, hereinafter in this Agreement, Pittsylvania Historical Society, Danville Historical Society, Preservation Virginia, Danville Research Center for African American History and Culture, Will Hairston, and Cedric Hairston shall be referred to collectively as the "Consulting Parties"; and WHEREAS, pursuant to Stipulation II.B.2.b of the 2016 Federal PA, the Danville-Pittsylvania Metropolitan Planning Organization has provided the public an opportunity to comment on the Project on June 21, 2018, in a Citizen Input Meeting and no comments specific to the historic properties was received; also, VDOT posted a willingness to hold a Public Hearing on February 21, 2023 and no responses were received. NOW, THEREFORE, USACE, the SHPO, and VDOT (hereinafter referred to collectively as the "Signatories") agree that the issuance of an USACE permit for the Project shall be implemented in accordance with the following stipulations in order to take into account the effects of the Project on historic properties. STIPULATIONS USACE shall ensure that the following measures are carried out: I. Building Recordation of Contributing Property, DHR Inventory No. 071-5336 A. As part of the cultural landscape study identified in Stipulation I of the Project State -Level MOA, VDOT shall complete an Intensive Level Survey Form for #071-5336 and enter the information into the SHPO's Virginia Cultural Resources Information System (VCRIS). This will include written descriptions and exterior/interior photographic documentation completed according to SHPO's Guidelines for Conducting Historic Resources Survey in Virginia (rev. 2017), or subsequent revisions or replacements to these documents. B. The VDOT shall provide the Corps, SHPO and the Consulting Parties with the Intensive Level Survey Form for review and acceptance within one (1) year of completion of construction of the Project. The SHPO and Consulting Parties shall provide the VDOT with a response on the documentation pursuant to Stipulation III. B, below. MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA C. Within one (1) month of completion of the final deliverables in Stipulation I.A and B above, the VDOT shall provide the Signatories written confirmation that the terms of the stipulation have been fulfilled. II. Professional Qualifications All archaeological and architectural documentation carried out pursuant to this Agreement shall be conducted by or under the direct supervision of an individual or individuals who meet, at a minimum, the Secretary of the Interior's Professional Qualifications Standards (48 FR 44738-9, September 29, 1983) in the appropriate discipline. III. Preparation and Review of Documents A. All technical materials prepared pursuant to this Agreement shall be consistent with the federal standards titled Archaeology and Historic Preservation: Secretary of the Interior's Standards and Guidelines (48 FR 44716-44742, September 29, 1983) and with the SHPO's Guidelines for Conducting Historic Resources Survey in Virginia (rev. 2017), or subsequent revisions or replacements to these documents. B. The SHPO and the Consulting Parties to this Agreement agree to provide comments to VDOT on all technical materials and other documentation arising from this Agreement within thirty (30) calendar days of receipt. If no comments are received from the SHPO or a Consulting Party within this review period, VDOT may assume that the non -responsive party has no comment. VDOT shall ensure that all comments received within the thirty (30) calendar -day review period are addressed in the final documentation. IV. Post Review Discoveries VDOT shall address post review discoveries of historic properties in accordance with the provisions of Stipulation V (Attachment B: Post Review Discoveries) in the 2016 Federal PA. V. Treatment of Human Remains VDOT shall address and treat human remains encountered on the Project in accordance with the provisions of Stipulation VII (Attachment C: Human Remains) of the 2016 Federal PA. VI. Dispute Resolution A. Objection by a Party to this Agreement 1.Should any Signatory or Consulting Party to this Agreement object in writing to USACE or VDOT regarding any plans provided for review pursuant to this Agreement or should any Signatory or Consulting Party to this Agreement object in writing to USACE or VDOT regarding the manner in which measures stipulated in this Agreement are being implemented, USACE shall first consult with the objecting party to resolve the objection. If USACE determines that the objection cannot be resolved through such consultation, USACE shall then consult with all Signatories to this Agreement to resolve the objection. If USACE then determines that the objection cannot be resolved through consultation, USACE shall forward 4 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA all documentation relevant to the objection to ACHP, including USACE's proposed response to the objection. Within thirty (30) calendar days after receipt of all pertinent documentation, ACHP shall exercise one (1) of the following options: (a) Advise USACE that ACHP concurs in USACE's proposed response to the objection, whereupon USACE will respond to the objection accordingly; or (b) Provide USACE with recommendations, which USACE shall take into account in reaching a final decision regarding its response to the objection; or (c) Notify USACE that the objection will be referred for comment pursuant to 36 CFR § 800.7(a)(4) and proceed to refer the objection and comment. USACE shall take the resulting comment into account in accordance with 36 CFR § 800.7(c)(4). 2.Should ACHP not exercise one (1) of the above options within thirty (30) calendar days after receipt of all pertinent documentation, USACE may assume ACHP's concurrence in its proposed response to the objection. 3. USACE shall take into account any ACHP recommendation or comment provided in accordance with this stipulation with reference only to the subject of the objection; USACE's responsibility to carry out all actions under this Agreement that are not the subject(s) of the objection shall remain unchanged. B. Objection from Public At any time during implementation of the measures stipulated in this Agreement, should a member of the public object to USACE or VDOT regarding the manner in which the measures stipulated in this Agreement are being implemented, USACE or VDOT shall notify the Signatories to this Agreement and consult with the objector to resolve the objection. The Signatories may request that USACE or VDOT notify the Consulting Parties to this Agreement about the objection as well. VII. Amendments and Termination A. Any Signatory to this Agreement may propose to USACE that the Agreement be amended, whereupon USACE shall consult with the other Signatories to consider such an amendment. 36 CFR § 800.6(c)(7) shall govern the execution of any such amendment. Any Signatory to this Agreement may terminate it in accordance with the provisions of 36 CFR § 800.6(c)(8). B. If USACE and VDOT decide they will not proceed with the Project, they may so notify the Signatories and then this Agreement shall become null and void. C. In the event that this Agreement is terminated or rendered null and void, VDOT shall submit to the SHPO a technical report on the results of any architectural studies conducted prior to and including the date of termination and shall ensure that any associated historic documentation or photos collected by VDOT are submitted to the SHPO. D. In the event of termination, USACE shall either execute a memorandum of agreement with the MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA Signatories under Stipulation II.13.4.c of the 2016 Federal PA or request the comments of the ACHP under 36 CFR § 800.7(a). VIII. Duration This Agreement shall continue in full force and effect for five (5) years after the date of the last signature of a Signatory. At any time in the six (6)-month period prior to such date, VDOT may request that the Signatories consider an extension of this Agreement. No extension or modification shall be effective unless all Signatories have agreed with it in writing. IX. Execution This Agreement may be executed in counterparts, with a separate page for each Signatory. USACE shall ensure that each Signatory is provided a copy of the fully executed Agreement. Execution of this Agreement by USACE, the SHPO, and VDOT and its submission to the ACHP in accordance with 36 CFR § 800.6(b)(1)(iv) shall, pursuant to 36 CFR § 800.6(c), be considered to be an Agreement with the ACHP for the purposes of Section 110(1) of the NHPA. Execution and submission of this Agreement, and implementation of its terms, evidence that USACE has afforded the ACHP an opportunity to comment on the proposed Project and its effect on historic properties, and that USACE has taken into account the effect of the Project on historic properties. 6 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA SIGNATORY: U.S. ARMY CORPS OF ENGINEERS By: Date: 09/04/2024 Kimberly Prisco-B gett, MBA Chief, Special Projects Virginia Regulatory Section USACE, Norfolk District MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA SIGNATORY: VIRGINIA STATE HISTORIC PRESERVATION OFFICER By: Julie V. Langan, Director Department of Historic Resources Date: 9/6/2024 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA SIGNATORY: VIRGINIA DEPARTMENT OF TRANSPORTATION By: _ Chris Swanson, PE Environmental Division Director Date: 08/21 /2024 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: PRESERVATION VIRGINIA Date: Unknown 10 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: DANVILLE RESEARCH CENTER FOR AFRICAN AMERICAN HISTORY AND CULTURE Date: Dr. Karice Luck-Brimmer 11 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: PITTSYLVANIA HISTORICAL SOCIETY Date: William Guerrant 12 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: DANVILLE HISTORICAL SOCIETY By: Gus Dyer Date: 13 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: WILL HAIRSTON By: Will Hairston Date: 14 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA CONCUR: CEDRIC HAIRSTON Date: Cedric Hairston 15 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA Attachment A: Project location map. 16 MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES CORPS OF ENGINEERS, NORFOLK DISTRICT, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, REGARDING CONSTRUCTION OF THE BERRY HILL CONNECTOR ROAD EXTENSION IN PITTSYLVANIA COUNTY, VIRGINIA Attachment B: Area of Potential Effects. 17 °a Sroaviile 1 5� ri �v ro a7i I ��a sak�' V � peAoowao cV �oA Archaeological Surve,. g Y Bae for the Berry Hill Connector �. Road Extension', — / Perkins (j Pittsylvania County, Virginia f' DOT Project No.0311-071-835, P101 ■ UPC:119164 ■ VDHR File No: 2022-0219 poll Ricr.t' sRe�' �FiS f �.New South Assi 1 Dn„ Rirr[ Intentionally left blank Archaeological Survey for the Berry Hill Connector Road Extension Pittsylvania County, Virginia Contract: 0311-071-835, P101 VDOT ProjectNo. 0311-071-835, P101 UPC: 119164 VDHR File No: 2022-0219 Report submitted to: RK&K • 700 East Pratt Street suite soo• Baltimore, MD 21202 Report prepared by: New South Associates • 6150 East Ponce de Leon Avenue • Stone Mountain, Georgia 30083 Alm. f.z4r Maureen Meyers, PHD, RPA — Principal Investigator Maureen Meyers, PHD, RPA — Archaeologist and Co -Author Faith Meader, MA — Historian and Co -Author Patty McMahon, MA, RPA, -Archaeologist and Co -Author James Stewart, MA, RPA — Archaeologist and Co -Author May 2, 2023 • Revised Draft Report New South Associates Technical Report 4453 Intentionally left blank ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA ABSTRACT New South Associates, Inc. (NSA) completed an archaeological survey for the Berry Hill Connector Road Extension project in Pittsylvania County, Virginia. The proposed project will include reconfiguring a 2.74-mile section of Berry Hill Road from a 2-lane to a 4-lane road. The survey followed procedures defined by VDOT Governance Document: Expectations and Standard Products for Cultural Resource Surveys and the guidelines of the Virginia Department of Historic Resources (VDHR). The Area of Potential Effects (APE) for this project is an Environmental Study Area (ESA) that includes a 2.74-mile-long corridor along Berry Hill Road. The corridor is approximately 122 meters (400 feet) wide with minor variations, for a total area of approximately 144 acres. The APE is centered on the existing Berry Hill Road except at the far northeast end. The archaeological survey included the entire APE except for the portions within the current boundaries of Sites 44PY333, 44PY381, and 44PY382. Survey included pedestrian walkover and systematic shovel testing at 50-foot (15.24-meter) intervals. Three previously identified archaeological sites are located in the APE: 44PY333, 44PY381 and 44PY382. All three have late nineteenth and early twentieth century components. Site 44PY333 is considered potentially eligible for listing under Criterion D of the NRHP, and avoidance or Phase 11 testing is recommended. Sites 44PY381 and 44PY382 are recommended not eligible for individual listing on the NRHP but are contributing elements to the Berry Hill Archaeological District. Five historic sites and two isolated finds (IFs) were identified during the survey. Site 44PY675 is a small pile of bricks located on the surface; surrounding shovel tests did not contain any artifacts and this site is recommended as not eligible for listing on the NRHP individually and is not a contributing element to the Berry Hill Archaeological District. Sites 44PY676, 44PY678, and 44PY679 are all segments of the original Berry Hill Road. These sites are identified based on landscape features. No artifacts were recovered on the surface or from subsurface testing at these sites. NSA recommends that Sites 44PY676, 44PY678, and 44PY679 are not eligible for listing on the NRHP individually but are contributing elements to the Berry Hill Archaeological District. Site 44PY677 is a historic late nineteenth to early twentieth-century scatter of household refuse. The site lacks integrity and is recommended not eligible for listing on the NRHP individually but is a contributing element to the Berry Hill Archaeological District. IF-1 and IF-2 are metavolcanic flakes recovered from the southwestern portion of the APE. Isolated finds, by definition, are not eligible for listing on the NRHP. Intentionally left blank ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR lll ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA TABLE OF CONTENTS ABSTRACT..................................................................................................................................... i TABLEOF CONTENTS............................................................................................................... iii LISTOF FIGURES........................................................................................................................ v LISTOF TABLES......................................................................................................................... vi I. INTRODUCTION...................................................................................................................... 1 II. ENVIRONMENTAL CONTEXT............................................................................................. 3 Physiographyand Geomorphology............................................................................................ 3 BedrockGeology........................................................................................................................ 3 Hydrology................................................................................................................................... 3 Soils............................................................................................................................................ 4 Climateand Ecology................................................................................................................... 7 III. CULTURAL CONTEXT.......................................................................................................... 9 PrecontactContext...................................................................................................................... 9 Paleoindian Period (ca. 10,000 B.C.-8000 B.C.)................................................................... 9 Archaic Period (ca. 8000 B.C.-1200 B.C.)........................................................................... 10 Woodland Period (ca. 1200 B.C.-1600 A.D.)...................................................................... 11 Archaeology of Tenant Farm Sites........................................................................................... 13 Previously Identified Cultural Resources................................................................................. 17 Berry Hill Archaeological District(44PY627)..................................................................... 23 Berry Hill Archaeological District Contributing Sites within the APE ................................ 26 HistoricContext........................................................................................................................ 27 Reconstruction and Growth (1865 to 1914).......................................................................... 27 World War I to World War II (1914 to 1945)...................................................................... 30 The New Dominion (1945 to present).................................................................................. 33 IV. METHODS............................................................................................................................. 37 BackgroundResearch............................................................................................................... 37 ArchaeologicalSurvey.............................................................................................................. 44 National Register of Historic Places Evaluation....................................................................... 45 V. RESULTS AND RECOMMENDATIONS............................................................................. 47 Archaeological Survey Results................................................................................................. 47 IsolatedFinds........................................................................................................................ 51 ArchaeologicalSites............................................................................................................. 54 VI. CONCLUSION AND RECOMMENDATIONS.................................................................. 71 REFERENCES CITED................................................................................................................. 73 IV APPENDIX A: SPECIMEN CATALOG..................................................................................... 82 APPENDIX B: SHOVEL TEST LOG......................................................................................... 83 APPENDIX C: SITE FORMS...................................................................................................... 84 ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR v ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA LIST OF FIGURES Figure1.1. Project Location Map................................................................................................. 2 Figure2.1. Soils Map.................................................................................................................... 5 Figure 3.1. Previous Cultural Resource Surveys Within 1 Mile of the APE .............................. 18 Figure 3.2. Previously Identified Archaeological Resources within 1 Mile of the APE............ 19 Figure 3.3. Historic Topographic Map with Site 44PY0333 Site Boundaries ............................ 32 Figure 3.4. Historic Aerial Photographs of Berry Hill Road Area ............................................. 35 Figure 3.5. 1986 Birds Eye View of Site 44PY0333.................................................................. 36 Figure 4.1. 1778 Hutchins and Cheevers New Map of Virginia showing Location of APE...... 38 Figure 4.2. 1924 Draper Topographic Map showing the APE ................................................... 39 Figure 4.3. 1944 Draper Topographic Map showing the APE ................................................... 40 Figure 4.4. 1965 Brosville Topographic Map showing the APE ................................................ 41 Figure 4.5. 2019 Brosville Topographic Map showing the APE ................................................ 42 Figure 4.6. 2021 Google Earth Aerial View of APE.................................................................. 43 Figure 5.1. McGuff Creek on northern part of APE................................................................... 48 Figure 5.2. Clearcut areas within APE........................................................................................ 49 Figure 5.3. Shovel Test Results.................................................................................................. 50 Figure 5.4. IF-1 and IF-2 Artifacts.............................................................................................. 52 Figure 5.5. Site 44PY675............................................................................................................ 53 Figure 5.6. Bricks from 44PY675, N500 E500.......................................................................... 55 Figure 5.7. Soil Profile Site 44PY675, STP N500 E492............................................................ 56 Figure 5.8. Site 44PY676.1......................................................................................................... 58 Figure 5.9. Site 44PY677............................................................................................................ 60 Figure 5.10. Typical Shovel Test Profile, Site 44PY677.............................................................. 61 Figure 5.11. Historic Topographic Map Showing Location of Site 44PY677 and Extant Structures.................................................................................................................. 62 Figure 5.12. Artifacts Recovered from Site 44PY677.................................................................. 65 Figure 5.13. Site 44PY678............................................................................................................ 67 Figure 5.14. Site 44PY679............................................................................................................ 69 vl LIST OF TABLES Table 2.1. Soils within the APE...................................................................................................... 4 Table 3.1 Previously Recorded Sites within One Mile of the APE .............................................. 20 Table 5.1 Artifacts Recovered from Site 44PY677...................................................................... 63 ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA I. INTRODUCTION New South Associates, Inc. (NSA) completed an archaeological survey for the Berry Hill Connector Road Extension project in Pittsylvania County, Virginia from February 27-March 17, 2023. The proposed project will include reconfiguring a 2.74-mile section of Berry Hill Road from a 2-lane to a 4-lane road. The survey followed procedures defined by VDOT Governance Document: Expectations and Standard Products for Cultural Resource Surveys and the guidelines of the Virginia Department of Historic Resources (VDHR). The Area of Potential Effects (APE) for this project is a 2.74-mile-long corridor along Berry Hill Road (Figure 1.1). The corridor is approximately 122 meters (400 feet) wide with minor variations, for a total area of approximately 144 acres. The APE is centered on the existing Berry Hill Road, except at the far northeast end. The archaeological survey included the entire APE except for the portions within the current boundaries of Sites 44PY0333, 44PY0381, and 44PY0382. Survey included pedestrian walkover and systematic shovel testing at 50-foot (15.24-meter) intervals. The survey was completed between February 24-March 17, 2023. Maureen Meyers, PhD, RPA, was the Principal Investigator. James Stewart, MA, RPA, served as Project Archaeologist. Field Technicians included Abigail Bythell, Matthew Donathan, Dallon Olive, Chloe Scalf, and Michael Wolf. 4 Figure 1.1. Project Location Map Perkins Mountain 4a e Fn HarryY �i ry. �❑`ye Judy Byrd Mountain 31 p 616}Y m x, R6 err 0pn River opkO eev Dan River a in,ce 4ro� r. Old Cabin Fa VIRGINIA NORTH CAROLINA x 61 C z o w Bedford Campbell 0 0.25 0.5 mi Survey Area I C Pittsylvania x PMsylvania County 0 0.5 1 km ^' Danville Basemap: ESRI World Topographic Map (2022) ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 3 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA II. ENVIRONMENTAL CONTEXT PHYSIOGRAPHY AND GEOMORPHOLOGY The APE is in the Piedmont Physiographic Province of Virginia, which is the largest province in the Commonwealth (Egghart 2020). It lies between the Fall Line to the east and the Blue Ridge massif to the west. The landscape is generally rolling to hilly, and it gently slopes from 300 meters in elevation (1,000 ft.) in the west to 50 meters (160 ft.) in the east (Fleming 2012:8). It widens from northern Virginia to the south, extending 150 miles across at the North Carolina -Virginia border (Egloff 2020). The APE lies in the outer Piedmont, which includes several low Mesozoic basins created by Triassic and Jurassic rift valleys that were filled in with magma and sediments eroded from the Appalachians (Fleming 2012:9). The Triassic Basin extends across the county (from the northeast to the southwest corner) is lower than the rest of the county (Nicholson 1994:2). Pittsylvania County is located in the center of south midland Virginia and is on the Virginia - North Carolina state line (Clement 1952:22). White Oak Mountain is in the southeastern part of the county, with Turkey Cock Mountain in the west and Smith Mountain in the southwest. Farther north, Jasper, Farmers, and Brushy Mountains rise several hundred feet about the upland area (Clement 1952:22). The County is drained by three water systems: the Dan River in the south, the Banister River in the center, and the Staunton River in the north. BEDROCK GEOLOGY The geology of the Piedmont is very complex and difficult to interpret (Fleming 2012). Igneous and metamorphic rock underlie the region and have undergone a long history of "deposition, uplift, deformation, and erosion" (Fleming 2012: 9). Formations near the surface, along with Triassic sedimentary rock, diabase dikes, and ancient basalt flows, date to the Proterozoic to Paleozoic eras (Egloff 2020:6). HYDROLOGY The Dan River originates in the Blue Ridge Mountains west of the APE, in Patrick County, and runs for 200 miles through Stokes, Rockingham, Caswell and Pittsylvania Counties before entering the Kerr Reservoir in Halifax County near South Boston, Virginia. On its course, it meanders between Virginia and North Carolina, crossing the state line eight times. Five main tributaries feed it, the Smith, Mayo, Sandy, Hyco, and Banister rivers. It forms part of the headwaters of the Roanoke River, which itself is a major source of the Albemarle Sound in coastal North Carolina. M Land along the river is mostly forested, with open areas used for crops and grazing, and other sections are used for sand mines (Dan Scenic River Report:6). Because it flows through the Piedmont Plateau, this results in a wide, slow river (Dan River Scenic River Report: 10). SOILS Soils in the Piedmont have weathered in place over extremely long periods of time and form a thick mantle over most of the region (Fleming 2012: 9). They tend to be clayey and mineral rich, with a red -orange hue from iron and other oxide compounds (Egloff 2020). The soils lie atop a layer of saprolite, or eroded bedrock. Six soil types are found in the APE (Figure 2.1): Codorus loam, 0 to 2 percent slopes (7A); Codorus-Comus complex, 0-2 percent slopes (8A); Lackstown fine sandy loam, 2 to 7 percent slopes (9B); Yadkin clay loam, 7 to 15 percent slopes; Clover fine sandy loam, various slopes; Sheva fine sandy loam, various slopes; and Stoneville silt loam, various slopes (Nicholson 1994). Each soil type is described below in detail. Table 2.1. Soils within the APE Map Unit Symbol Soil Type Acres in AOI Percent ofAOI 7A Codorus loam, 0 to 2 percent slopes, occasionally flooded 5.2 3.8% 8A Codorus-Comus complex, 0 to 2 percent slopes, frequently flooded 7.3 5.4% 913 Lackstown fine sandy loam, 2 to 7 percent slopes 9.6 7.0% 18C3 Yadkin clay loam, 7 to 15 percent slopes, severely eroded 0.7 0.5% 23B Clover fine sandy loam, 2 to 7 percent slopes 56.2 41.2% 23C Clover fine sandy loam, 7 to 15 percent slopes 12.7 9.3% 23D Clover fine sandy loam, 15 to 25 percent slopes 0.0 0.0% 34B Sheva fine sandy loam, 2 to 7 percent slopes 3.9 2.8% 34C Sheva fine sandy loam, 7 to 15 percent slopes 14.4 10.5% 36B Stoneville silt loam, 2 to 7 percent slopes 14.3 10.5% 36C Stoneville silt loam, 7 to 15 percent slopes 12.2 9.0% Totals for Area of Interest 144 100.0% Codorus-Comus complex, 0-2 percent slopes, is found on floodplains and toe slopes. It is derived from igneous and metamorphic rock and has a moderately high to high capacity to transmit water. Typical soil profiles include an Ap loam horizon, 0 to 6 inches underlain by a Bw horizon of silty clay loam, 6 to 65 inches. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 5 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 2.1. Soils Map Basemap: Bing Maps Hybrid (2022) Con Lackstown fine sandy loam, 2-7 percent slopes, is found on summit and interfluves and is moderately well drained. Its parent material is Triassic residuum weathered from igneous and sedimentary rocks. Its Ap horizon is composed of fine sandy loam, 0-10 inches thick, underlain by a sandy clay Bt horizon, 10-65 inches thick. It rarely floods, and is found on basin upland forests, and as such can be moderately wet. Yadkin clay loam, 7-15 percent slopes, severely eroded, is found on hillslopes, shoulders, and interfluves. Derived from igneous and metamorphic rock, it consists of an Ap horizon of cobbly sandy loam, 0-6 inches thick, underlain by a Bt horizon of clay, 6 to 65 inches thick. It is a well - drained soil found in the Northern inner Piedmont acidic upland forest. Clover fine sandy loam, 2-7 percent slopes, is found on hillslopes, summit, and interfluves. It is composed of residuum weathered from granite and gneiss. It is composed of an Ap horizon, 0-9 inches of fine sandy loam, underlain by a Bt clay horizon, 9-39 inches and a C sandy clay loam horizon, 39-65 inches. This soil type is prime farmland. Clover fine sandy loam, 7 to 15 percent slopes, is found on summits and interfluves. It is well drained soil made from residuum weathered from granite and gneiss. It is found in Triassic basin upland forests in moist environments. Its typical soil profile is an Ap fine sandy loam, 0-9 inches, underlain by a Bt clay, 9-39 inches, and a C sandy clay loam, 39-65 inches. It is used for farmland. Clover fine sandy loam, 15 to 25 percent slopes, is found on summit and interfluves, also in Triassic basin upland forests that are moist. It is a well -drained soil that derives from residuum weathered from granite and gneiss. Its typical profile is an Ap fine sandy loam, 0-9 inches, underlain by a Bt clay, 9 to 39 inches and a C sandy clay loam horizon, 39-65 inches. Sheva fine sandy loam, 2-7 percent slopes, is found on hillslopes, shoulders, and interfluves. It is not considered prime farmland. It derives from Triassic residuum weathered from igneous and sedimentary rock. This well drained soil has a low capacity to transmit water and is found in moist Triassic basin upland forests. Its typical soil profile is composed of an Ap horizon of fine sandy loam, 0-10 inches, underlain by a Bt clay loam, 10-29 inches, a Cr bedrock, 29-56 inches, and finally an R bedrock 56-66 inches. Sheva fine sandy loam, 7-15 percent slopes, is found on hillslopes, shoulders, and interfluvial areas. It is derived from Triassic residuum weathered from igneous and sedimentary rocks and is moderately well drained. Its typical soil profile consists of an Ap fine sandy loam horizon, 0-10 inches, underlain by a Bt clay loam, 10-29 inches, a Cr bedrock, 29-56 inches and an R horizon of bedrock, 56-66 inches. It is not useful as farmland. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 7 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Stoneville silt loam, 2-7 percent slopes, is found on hillslopes, backslopes, and side slopes. It is derived from Triassic residuum weathered from igneous and sedimentary rock. It is a well -drained soil, found in moist Triassic basin upland forests. Its typical soil profile consists of an Ap horizon, 0-9 inches, silt loam, underlain by a Bt clay horizon, 9-21 inches, a C silt loam, 21-43 inches, and a Cr bedrock, 43-65 inches. It is considered prime farmland. Stoneville silt loam, 7-15 percent slopes, is found on hillslopes, backslopes, and side slopes. It is derived from Triassic residuum weathered from igneous and sedimentary rock and is found in Triassic upland forests that are moist; it is a well -drained soil. Its typical soil profile consists of an Ap silt loam horizon, 0-9 inches, underlain by a Bt clay horizon, 9-21 inches, a C silt loam horizon, 21-43 inches, and a Cr bedrock horizon, 43-65 inches. CLIMATE AND ECOLOGY The climate of Virginia is classified as humid subtropical with warm to hot summers and mild winters (Fleming 2012). The APE receives an average of 42.9 inches of precipitation per year, most of which falls from April through October (Nicholson 1994:3). The average annual snowfall is 8.8 inches. The mean annual air temperature is 58.4 degrees Fahrenheit. Based on data collected from 1956-1985, the average temperature in winter is 38.4 degrees and the average daily low temperature is 27.4 degrees (Nicholson 1994). In summer, the average temperature is 76.2 degrees, and the average daily maximum temperature is 87.8 degrees. The area experiences 179 to 222 frost -free days annually (Nicholson 1994). In 1985 the majority (62%) of the APE was forested (Nicholson 1994:99). Pittsylvania County contains a diverse population of fish and wildlife, including deer, wild turkey, squirrel, raccoon, and fox in forested areas; and opossum, rabbits, and woodchucks in open fields and farmed areas. Game birds include wild turkey, bobwhite quail, and mourning dove. The lakes provide habitat for largemouth bass, bluegill, and pike (Nicholson 1994). Within the rivers and streams, channel catfish are common. Forested areas in the uplands include hardwoods and pine, including Virginia pine, shortleaf pine, and loblolly pine; yellow poplar, river birch, sycamore, red maple, willow oak, and sweetgum are also common (Nicholson 1994). Intentionally left blank ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 9 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA III. CULTURAL CONTEXT PRECONTACT CONTEXT Pittsylvania County is located in the Southern Piedmont region of Virginia, as designated by the VDHR (Virginia Department of Historic Resources 2003). It is in the western end of the region, and therefore is similar to the Southwest Virginia region. The VDHR divides Native American settlement in Virginia into three general periods: Paleo-Indian (ca. 10,000 B.C.-8000 B.C.); the Archaic (ca. 8000 B.C.-1200 B.C.) and the Woodland period (ca. 1200 B.C.—A.D. 1600)(Virginia Department of Historic Resources 2003). These can further be subdivided into early, middle, and late periods. PALEOINDIAN PERIOD (CA. 10,000 B.C.-8000 B.C.) The beginning of the Paleoindian Period in Virginia is generally recognized to have begun approximately 16,000 years before present (B.P.) (14,000 B.C.) during the Late/Terminal Pleistocene epoch, though not all Virginia archaeologists agree (Boyd 2020; Purrington 1983:112). The most famous Paleoindian site in Virginia is the Cactus Hill site (44SX202), where blade component features have been dated to 13,120 +/- 70 and 12,230 +/- 80 B.C. It is the oldest site in Virginia and one of the oldest in North America. The Cactus Hill site makes the case for a "pre - Clovis" population. It is located approximately 150 miles east of the APE. The Clovis period was previously thought to represent the first group of migrants to the continent. In North America, the Clovis period was characterized by rapid movement across the continent and the widespread use of distinctive, Clovis style fluted projectile points. The Clovis period is now understood to have been a narrow range of 13,125-12,925 years B.P., making this a 200-year period across North America (Boyd 2020:31). Following Clovis are the Mid and Late Paleoindian occupations, recognized by the presence of Hardaway or Dalton proj ectile-point technology (Boyd 2020). The Paleoindian period coincides with the transition from the Late Wisconsin to the Holocene epochs from 10,000-8000 B.C. (Boyd 2020:34). This marked the transition from the last Ice Age and the final retreat of the glacial ice sheets that covered much of North America. There were extreme changes in temperature, plant and animal extinction and expansion, and sea level rise, differing greatly from modern environmental conditions (Boyd 2020:34). 10 One of the earliest Paleoindian surveys in Virginia was conducted from 1947 to 1991 by avocational archaeologist Dr. Ben McCary. He published descriptions of his fluted point finds in the Quarterly Bulletin of the Archeological Society of Virginia beginning in 1947 and continuing in subsequent decades. McCary documented more than 1,000 points and assigned each point a unique number. Eleven points from McCary's survey were recorded in Pittsylvania County, Virginia (database accessed October 15, 2022). A 2014 assessment of Virginia Cultural Resources Information System (V-CRIS) data confirmed the presence of 30 Paleoindian components in the Piedmont physiographic province of Virginia (Boyd 2020). ARCHAIC PERIOD (CA. 8000 B.C.-1200 B.C.) During the Archaic period, people became increasingly sedentary. Settlement patterns were focused on riverine resources during the Early and Middle periods, with settlement moving to the uplands at the end of the period. Hunting and gathering of resources, including white-tailed deer, small mammals, nuts, and berries, were a predominant determining factor of subsistence, as was the proximity to cryptocrystalline quartz for tools. Toward the end of the period, the use of soapstone for cooking bowls increased across the Southeast, and a main resource for soapstone was in eastern Virginia. At the same time, religion and ritual became more recognized in the material remains left by Archaic peoples. During the Early Archaic period (8000 B.C.-6500 B.C.), settlement was focused on major river drainages, with extractive sites located in upland areas as well as specific settings such as bogs or springs (Custer 1990:27). In the Mount Rogers area of Virginia, hafted biface forms of rhyolite are common along with local vein quartz (Purrington 1983:112). Overall, earlier Paleoindian fluted points are replaced with hafted, side -notched bifaces, which are often serrated. These include Kirk Stemmed and Notched, Palmer Corner -Notched, and smaller types such as LeCroy and MacCorkle. A wider range of groundstone technology and tools, including drills, blades, adzes, scrapers, and gravers are present, indicating an adaption to the different environment (Chapman 1985; Gardner 1989; Lowery and Custer 1990). The presence of mortars and pestles and nutting stones indicates the importance of floral resources in the diet. Around 9000 B.C., upland settings were favored for settlement. An example of an important Early Archaic site in Virginia is Daugherty's Cave in Russell County (Benthall 1990). During the Middle Archaic Period (6500 B.C.-3000 B.C.), occupation was focused in bottomlands of large rivers, as well as rockshelters, caves, and other upland areas (Brown and Vierra 1983; Chapman 1985). Overall, people settled in larger base camps along river systems and smaller base camps in the uplands. Lithic technologies included the continued use of hafted bifaces, which at this time were large, notched, and stemmed forms, such as Morrow Mountain, Guilford, Stanly, ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 1 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA and Big Sandy (Coe 1964; Purrington 1983). Groundstone increased in importance, indicating more plant harvesting at this time (Ford 1977). Middle Archaic sites of note in Virginia include the Slade site, where carbonized hickory nutshell fragments and charcoal were found in association with Morrow Mountain I points (McAvoy 1988). At the Dryfoot site (44RB281) in Rockbridge County, Blanton et al. (1992) documented activity areas including a lithic tool -maintenance area and a stone hearth. During the Late Archaic Period (3000 B.C.-1200 B.C.), hafted biface forms became more regionalized, resulting in a diversity of forms and tools. The presence of a range of lithic sources speaks to the presence of exchange networks. Common forms include Halifax, Iddins, and Savannah River. A seasonal settlement period was used at this time, where highland areas were used in the fall for nuts and game animals, and valley bottoms for larger aggregation base camps for fish, plants, and birds during spring and summer (Anderson and Hanson 1988; Sassaman 1993). The use of soapstone pottery followed by fiber -tempered pottery also occurred at this time, which suggests increasing sedentariness (Sassaman 1993). Broadspears such as Savannah River points were also used, likely as multifunctional tools. Late Archaic residential sites had distinctive features, including hearths and even fire -cracked rock platforms, possibly used for fish or shellfish processing (Jefferies 1990; LeeDecker et al. 1991; McLearen 1991). Other sites included refuse pits or small cooking pits, and lithic reduction sites were also found. Some evidence of structures has been found in Kentucky; rockshelters were also commonly used at this time. Also, of note is the increasing complexity visible in the presence of mortuary ceremonialism centers across the Southeast at this time; however, these centers are not common in Virginia. WOODLAND PERIOD (CA. 1200 B.C.-1600 A.D.) The Woodland period is known for multiple changes that include a generalized pattern of seasonal hunting and gathering, an increased use of cultigens, the development of ceramic technology, and over time, regional characterizations (identified by a diversity of temper, surface decoration and vessel forms), sedentary village life, and in some areas an increase in trade. During the Early Woodland Period (1200 B.C.—A.D. 300), many lifeways of the earlier Late Archaic patterns continued. One key distinction was the widespread adoption of ceramic technology (McLearen 1991). An adaptation to bottomland and upland resources, with a specific emphasis on the use of cultigens was occurring at the same time, over time this resulted in the domestication of foods, primarily Chenopodium, sunflower, and sumpweed. Small, stemmed, and notched forms replaced the broadspear forms, including types such as Adena, Kramer, Robbins, and Turkey -Tail. Ground. Grooved axes seen during the Late Archaic continued to appear. Slate gorgets, pendants, and ground slate pieces were also used. 12 The Middle Woodland Period (A.D. 300-1000) is known for its changes in lithic and ceramic technology. Vessel form diversity and a range of decorative surface treatments marked this period. Ceramic vessels increased in size, and storage vessels became more common. Surface treatments included rocker -stamped, check -stamped, and simple -stamped types. Triangular projectile points were introduced at this time. Typical points included Potts, Fox Creek/Selby Bay, Jack's Reef, and Yadkin -style points (Egloff et al. 1988; MacCord, Sr. and Hranicky 1979). Mauls were also present. In addition, blade technology reappeared, especially in the Appalachian region (Purrington 1983). Trade networks intensified, and burial mounds were constructed across the eastern United States at this time. Subsistence was like the earlier period; however, it intensified, as did cultivation of domesticates. Tied to this, year-round occupation of villages continued and intensified. As a result, people began using cold- and warm -weather structures in the same village. Additionally, they built more substantial structures to last longer. As a result, midden depth and size increased at this time, but storage pits were not used, as ceramics were used for this purpose. An increase in social complexity was a marked characteristic of this period. In Western Virginia, the Stone Burial Complex was present in the Shenandoah Valley at this time. Stewart (1992) notes that these mounds, made from stone and located on older river terraces or uplands, were similar to those made of earth in the Ohio Valley. The Late Woodland Period (A.D. 1000-1606) saw an increase in settlement into riverine environmental areas. Agriculture, including the use of maize, increased in importance. In southwestern Virginia, this period was marked by the intensive horticultural subsistence base, primarily maize, beans and squash, supplemented by hunting and gathering (Egloff 1992). People lived in large villages along river floodplains, although there was an intensive use of upland rockshelters and upland regions (Barber 1987). Most villages were enclosed with an oval to circular palisade, with gates where the palisade overlapped. Burials and storage pits were within the palisade. Houses were usually circular, with vertical posts set into the ground and large interior posts around a central hearth (Boyd 2020; Klatka 1995; Meyers 2011). Large and small storage pits were located within the houses. Burials were sometimes inside the houses and other times in special cemetery areas. Sites such as Trigg (44MY3) and Shannon (44MY7) in Montgomery County located northwest of the APE were arranged in this way located. Ceramic wares consisted of multiple types; in Pittsylvania County, these included Grayson, Wythe, Smyth and Lee, as well as Radford and New River wares (Evans 1955; Holland 1970). Most were limestone or sand tempered, with simple plain or cordmarked surface decorations. However, New River was shell -tempered and likely an incursion from northeast Tennessee or a modified version of Dallas wares from that region. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 13 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Projectile points at this time included small triangulars like Dallas, Madison, and Hamilton points. Other common tools at this time included hoes, microlithic tools, gravers, perforators, drills, and flake tools. Bone and shell tools and ornaments, including beamers, awls, fishhooks, hoes, and needles, were also present. Some copper artifacts have been recovered from sites west of the APE and could represent both native and later European copper traded into the region. Indirect contact likely occurred as early as the sixteenth century, and more direct contact came later, during the eighteenth century. ARCHAEOLOGY OF TENANT FARM SITES This section is included to provide a context in which to better interpret archaeological remains identified during the project survey. The archaeological signature of tenant farming sites shares similarities with other impoverished, rural sites that date from the late nineteenth and twentieth centuries. Tenant sites also have a high likelihood for destruction after occupancy, as the land often reverted to agricultural use at the end of tenancy (Joseph et al. 2004:86, 89; Orser et al. 1987:82- 137). Tenant sites do not typically leave behind archaeological deposits that are as dense and visible as those associated with the main residences of farms and plantations. As a result of limited features and artifacts found during surveys, these sites are likely under -represented and recorded simply as "historic scatters" (Joseph et al. 2004:86). However, across the Southeast, historic sites with intact deposits have produced a wealth of data about the lives of tenants, race and class, agricultural landscapes in the late nineteenth and early twentieth centuries, technology, and the dynamic socioeconomics of the period (Joseph et al. 2004:88-91; Reed et al. 2011:95-104). At the largest scale, archeological investigations at tenant sites incorporate settlement patterns, which can change based on a multitude of factors. Previous research indicates that the structure of tenancy (renter, sharecropper, etc.) plays a large role in settlement patterns, and there is some correlation between time period and prevalence of tenancy type and land use (Adams 1980; Crass and Brooks 1997; Prunty 1955; Wendt 2014). In the 1950s, Prunty (1955) provided a geographical perspective of the changing southern agricultural landscape from the antebellum period through the mid -twentieth century, establishing the postbellum settlement organizations beginning with the gang labor system of the early Reconstruction period, transitioning into the settlement types of sharecroppers and tenant -renters, and concluding with the neo plantation pattern that became prevalent with the mechanization of agriculture. Based on archaeology and ethnography at Waverly Plantation, Adams (1980) expanded upon Prunty's patterns, specifically how each might be visible in the archaeological record. Due to the archaeological aspect of this analysis and its use by subsequent researchers, the Waverly Plantation settlement descriptions are discussed in greater detail than are other tenant farm studies. The work gangs employed by large landowners in the immediate postbellum years often occupied the 14 existing buildings where the formerly enslaved lived. The only shift from enslavement to tenancy under the gang labor system might be in the types of cultural material recovered, rather than by settlement distribution. Settlement patterns become more dispersed during the initial sharecropper period, when residences were more spread out across the landscape, typically constructed along roadways or other access routes (such as waterways). However, numerous tenant houses were also built away from the roads, as far as 200 meters from a main road at Waverly (Adams 1980:312). Outbuildings were often centrally located as shared resources between sharecroppers. Distribution across the landscape was likely slow at first, and clusters likely represented kin groups, but each sharecropping unit typically consisted of 30-40 acres (Adams 1980:309). From the sharecropper system emerged the early tenant settlement pattern, where residences generally remained in the same locations as sharecropper settlements, but outbuildings and ancillary structures become less centralized (Adams 1980:310). Early tenant sites can be difficult to distinguish from small owner -occupied farms due to the presence of additional buildings surrounding each residence. Around the turn of the twentieth century, Adams (1980) identified the later tenant settlement pattern, which emphasized the increasing importance of rail lines to tenant communities. While the dispersed pattern was still common across the landscape, the focus of settlements moved from ferry locations on the rivers to rail depots. The final settlement pattern recorded at Waverly Plantation was the later sharecropper, where sharecroppers took over the existing structures of the later tenants. The primary difference between the two types was not visible in the pattern of residences and outbuildings but rather in material culture, refuse disposal, and perhaps in the actual use of the outbuildings, which may differ from the previous tenant pattern. Wendt's (2014) analysis of sharecropper settlements at Strawberry Plains in Holly Springs, Mississippi in north -central Mississippi draws from Adams (1980) and others. The Strawberry Plains research focuses more on the power dynamic between landowners and the enslaved and later tenants as compared to previous studies, which mention power but do not deeply examine the underlying structure as related to settlement patterns. Wendt (2014) points out that access to resources and transportation were highly restricted by landowners (even absentee landowners) from the antebellum period through all types of tenancy. Overall, the type of tenancy strongly impacts the settlement patterns of tenant sites as well as the types of structural remains that might be present. However, even archival research may not reveal the specific type and date of tenancy or the presence of tenant farming at all. As mentioned, there are many commonalities between the different settlement patterns, which was in part the result of reuse of existing structure by different tenant types. Some tenant farms also had many commonalities with small owner -occupied farms of a similar age, further conflating settlement patterns used for identifying tenancy. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 15 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Another factor in settlement organization for tenant farming that may be of more use in identifying tenant farm locations is landform type. Crass and Brooks (1997) discuss settlement patterning during the postbellum and modern period based on data collected in South Carolina. The researchers emphasize the changes in land use beginning in the postbellum period more than changes in the system of tenancy, as detailed by previously discussed investigations. The focus is on the cultivation of land (and landforms) that had not been intensively farmed prior to Emancipation. In particular, dry uplands away from surface water became more important to the agricultural landscape, and this was tied to both the increase in tenant farming and intensive monocropping in the postbellum period (Crass and Brooks 1997:77-79). The influence of the railroad and improved road systems in the twentieth century is highlighted in relation to general settlement location, the dispersal of settlements across the landscape, and how improved transportation networks localized commercial centers to the benefit of large landowners (Crass and Brooks 1997:77-79). Soils at a site or on a landform are another environmental factor to consider in the placement of tenant farm locations. Both Adams (1980) and Wendt (2014) review the soil types and their suitability for agriculture at tenant sites. At Waverly Plantation, tenant houses were often situated on the poorest soils. At Strawberry Plains, tenant houses were similarly situated on unproductive soils but at the margin of soils suitable for agriculture to maximize use of productive cropland (Adams 1980:300; Wendt 2014:143). This location on unproductive land was a result of a necessity for former enslaved individuals with little or no economic power to find soils not depleted by cotton monoculture and move onto cheap and uneroded land, and of living within a system where white farmers had privileged or exclusive access to terrace and floodplain lands that were more easily farmed. Consequently, Black farmers were forced to farm less productive upland lands. At the site level, material culture is the primary resource available to archaeologists to interpret tenancy. This includes above ground and buried features as well as the artifact assemblage from any given site. Tenant sites are particularly challenging due to the ephemeral nature of the site and both the impoverishment and resourcefulness of site occupants. Tenant farmers did not frequently leave behind much in the way of material culture because they typically had few possessions, would reuse or repurpose old materials, and did not discard what may have a future purpose (Adams 1980:359, 371). There have been multiple failures to define a South or Orser artifact pattern that is diagnostic of all tenant sites, and that can distinguish a tenant house from a small, owner -operated farm. 16 Tenants disposed of what refuse they had in different ways. No evidence for trash middens, piles, or pits was identified at Waverly Plantation, and oral histories collected from tenants indicated that the little refuse they recalled was burned and/or hauled away (Adams 1980:359). The sparse material culture that remained consisted of small items or fragments that were likely overlooked when dropped or otherwise lost. While this appears to be common at tenant sites across the Southeast, there is also evidence for preserved refuse deposits. Sheet midden deposits have been recorded at multiple tenant sites, and excavations at the Free Cabin tenant structure in Georgia revealed intact features in addition to sheet midden (Joseph et al. 2004:89-90). It is noteworthy that even tenant sites with archaeological integrity, such as Free Cabin, still yielded low artifact counts from the period of tenancy, reflecting the low socio-economic status of the tenants as well as the removal of any portable materials when tenants vacated a property (Joseph et al. 2004:89). As tenancy became less common throughout the twentieth century, owners of large scale farms, now reliant on mechanized and/or industrial farming techniques, often demolished the remains of tenant sites, further decreasing the visibility of these resources (Holland 1990:63-64). Although even destroyed sites yield useful archaeological data, sites with standing architecture are more likely to possess intact subsurface features (Joseph et al. 2004:89). Tenant houses were architecturally more ephemeral than residences of large farmer -owner plantations, and twentieth- century clearances were fast and highly impactful. Post -abandonment dumping often reduced the clarity and integrity of tenant house deposits. An abandoned tenant house over most of the South was a beacon for dumping, often resulting in a mixture of occupant -related artifacts and off -site refuse. When a house was ultimately burnt or razed, the topsoil/plowzone deposits became a confusing mix of relatively uninformative materials. Although tenancy was prevalent on the landscape during the late nineteenth through twentieth centuries across the Southeast, without sufficient documentary or oral history evidence, it is difficult to confirm the nature of ownership and occupancy at sparse, historic period sites. When the sample of material culture recovered from a site is sufficient to address research questions, archaeologists often try to discern the dates of occupation, the type of tenancy, the economic status and ethnicity of the previous occupants, consumer choices, intersite and intrasite patterning, and themes of power and resistance. Researchers may attempt to address these questions at the site, community, or regional level. Any material culture collected is substantially enhanced by additional historic research, especially oral history or ethnography (Bartle 2004:98; Holland 1990:60-62; Joseph et al. 2004:86; Reed et al. 2011:172; Wendt 2014). ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 17 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA PREVIOUSLY IDENTIFIED CULTURAL RESOURCES Four cultural resources surveys have been conducted within a mile of the APE (Figure 3.1). Browning's (2011) survey included all of the current APE. Tippett et al.'s survey (2015) included most of the APE. Fiedel and Merritt's survey (2016) encompassed the southwestern part of the APE and the Jones et al. survey (2017) included the central northeastern part of the APE. Browning (2011) surveyed a large APE of 3464 acres and identified 71 sites, 31 architectural resources, and one previously identified building in a survey of the area; this survey encompassed the entire present APE. No shovel test map locations were provided in this survey. Methods included shovel testing and machine -cleared (rototilling or disking) that were then visually examined; the second method was more commonly used on historic sites. As a result, precontact sites may be underrepresented in the total number of identified sites. Tippett et al. (2015) undertook Phase II evaluations and recommended ten sites (44PY358, 44PY359, 44PY360, 44PY371, 44PY377, 44PY381, 44PY383, 44PY384, 44PY385, and 44PY389) as not eligible for listing on the NRHP. The VDHR initially stated that three resources were potentially contributing to a historic district (44PY627), but later said they were not eligible as part of the district; however, two of the resources were individually eligible (LaBudde 2015). In 2016 Fiedel and Merritt (2016) tested four sites (44PY373, 44PY374, 44PY375, and 44PY376) and four architectural resources. VDHR determined that the four sites were potentially eligible (LaBudde 2015). Jones et al. (2017) tested four sites (44PY330, 44PY331, 44PY332 and 44PY335) and conducted metal detecting at Site 44PY328; of these, only 44PY328 was determined to be potentially eligible. VDHR stated that there was insufficient testing for Sites 44PY331 and 44PY332 and as a result they should be managed as if they are potentially eligible (Bellville-Marrion 2019). The VDHR further determined that Sites 44PY330 and 44PY335 are eligible for listing on the NRHP. The Virginia Cultural Resource Information System (V-CRIS) was used to search for previously identified archaeological resources within one mile of the APE (Figure 3.2). Seventy-two registered sites were identified, which are summarized in Table 3.1. Of these, nine sites are single component that are precontact. Of these nine sites, two are unidentifiable to occupation period, two are Early Archaic, two are Middle Archaic, one is Late Archaic, one was occupied during the entire Archaic period, and one is a general Woodland occupation. Five are sites with single components that are historic. Of these, one is a domestic site (1790-present) with evidence of subsistence/agriculture; one is a DSS Legacy site dating between 1700-1899; one is an indeterminate historic site, 1861-1945; and two are subsistence/agriculture sites, one dating to 1790-1916 and second dating to 1866-1945. The remaining sites are multi -component, many with indeterminate precontact components and historic domestic, industry, process, and extraction components. These data suggest the location was favored during the Archaic period, especially Le) W) a Q I _ ,■ a ' a 2 2 �■ % / § } � • 10 s ` �Q � �� � ■ - k 2 ■ \. I \ \ m § , § 0 >- _ § 'f % \t � § a ■ \ �a ® _ � 22 @� a. k � [ \/ m } _ k 2 40 r m m ) �a § ■ § ■ m m r. � 7/ y/ m G■ 2 G Zaka a$ a �- � �a a■ �a ■n� � § �>�% § ■ £ § � §; or \ \ § ■ k CL - � m i '| ®' ■ m R k % . R 2§. 0. a. 2 ]\ o§ } 0.t ± 3a mJ ■ ; # a ■ # 4 , . dL 7 « 22 co ��� \kk}\ � #aJ'tt _ . \ }) § « LO G / / -� 'DC', \�� �a;■am\;■3 �- . ' 4 20 during the early and middle parts of the period and was occupied less heavily during the Woodland period. In the historic period the location was the site of early occupation that continued through the present day, and most of these sites are tied to subsistence/agriculture, industry/processing, and transportation. Of the identified sites, two are eligible and an additional thirteen are potentially eligible for listing on the NRHP. These sites are listed in Table 3.1 and are discussed above. Within the APE there are four previously identified sites: 44PY0333, 44PY0381, 44PY0382, 44PY0399. In addition, 44PY093 is immediately adjacent to the APE on the south-central side (see Figure 3.2). Site 44PY0333 was identified by during the Browning survey and is a foundation set remnant, likely related to sharecroppers or tenant farmers, and includes house remains with a stone end chimney, two collapsed ancillary storage buildings and a storage barn, with a pipe well near the house. Site 44PY0381 has nineteenth century house remains with outbuildings, including a barn and two sheds; in addition, six precontact flakes were also recovered here. Site 44PY0382 is the remains of a nineteenth-century house with no outbuildings or foundations present. Site 44PY0399 is the location of a ford noted on an 1896 plat of a portion of the of the Hairston properties of Berry Hill and Royal Oak, west of Oak Hill on the Dan River. Table 3.1 Previously Recorded Sites within One Mile of the APE Site Category Types) Time Period NRHP Status 44PY0026 Domestic, Industry/Processing/Extraction Artifact Scatter, Dwelling, Lithic Scatter Middle Archaic to Late Woodland, 1790 - 1991 Not Eligible 44PY0071 Unknown Unknown Indeterminate Precontact Unknown 44PY0317 Domestic Farmstead — Hairston Building Set 1 1800 — 1999 Unknown 44PY0318 Domestic Farmstead — Hairston Building Set 2 1800 — 1999 Unknown 44PY0319 Domestic Farmstead — Hairston Building Set 3 1800 — 1999 Unknown 44PY0320 Domestic, Industry/Processing/Extraction Lithic Scatter, Farmstead — Hairston Building Set 4 Indeterminate Precontact 1800 — 1999 Unknown 44PY0321 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Unknown 44PY0322 Industry/Processing/Extraction Lithic Workshop Middle Archaic Unknown 44PY0333 Domestic Farmstead — Hairston Building Set 10 1866 — 1991 Potentially Eligible 44PY0334 Domestic Single Dwelling — Ridge House 1866 — 1991 Potentially Eligible 44PY0335 Domestic Multiple Dwelling Farmstead — Chadwell Building Set 1751 —1991 Eligible 44PY0350 DSS Legacy Camp General Woodland Unknown 44PY0351 llSS Legacy Camp General Woodland Unknown ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 2 1 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Table 3.1 Previously Recorded Sites within One Mile of the APE Site Category Type(s) 0 IF Time Period NRIIP Status 44PY0352 DSS Legacy, Lithic Scatter, Trach Scatter Indeterminate Precontact Unknown Industry/Processing/Extraction 1850 — 1899 44PY0353 Industry/Processing/Extraction, Lithic Scatter, Trash Scatter Indeterminate Precontact, Not Eligible Transportation/Communication 1917 — 1945 44PY0354 Industry/Processing/Extraction, Lithic Scatter, Trash Scatter Indeterminate Precontact, Not Eligible Transportation/Communication 1866 — 1991 44PY0355 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Not Eligible 44PY0356 Domestic, Artifact Scatter, Lithic Early Archaic to Late Not Eligible Industry/Processing/Extraction Scatter Woodland, 1790 — 1916 44PY0357 Industry/Processing/Extraction Lithic Scatter Early Archaic to Late Not Eligible Archaic 44PY0358 Indeterminate, Artifact Scatter, Lithic Indeterminate Precontact Not Eligible Industry/Processing/Extraction Scatter 1790 — 1860 44PY0359 Industry/Processing/Extraction Lithic Scatter Early Archaic to Late Not Eligible Archaic 44PY0360 Indeterminate, Artifact Scatter, Lithic Early Archaic, 1830 - Not Eligible Industry/Processing/Extraction Scatter Present 44PY0361 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Not Eligible 44PY0362 DSS Legacy, Lithic Scatter, Other Indeterminate Precontact, Not Eligible Industry/Processing/Extraction 1800 — 1899 44PY0364 DSS Legacy, Lithic Scatter, Trash Scatter Early Archaic, 1800 —1899 Not Eligible Industry/Processing/Extraction 44PY0365 DSS Legacy, Lithic Scatter, Other Early Archaic Not Eligible Industry/Processing/Extraction 44PY0366 DSS Legacy, Lithic Scatter, Other Middle Archaic Not Eligible Industry/Processing/Extraction 44PY0367 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Unknown 44PY0368 Industry/Processing/Extraction Lithic Scatter Late Archaic Unknown 44PY0369 Domestic, Camp, Lithic Scatter, Indeterminate Precontact Unknown Industry/Processing/Extraction, Outbuilding, Trash Scatter 1790 — 1916 Subsistence/Agriculture, Transportation/Communication 44PY0370 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Not Eligible 44PY0371 Indeterminate Artifact Scatter 1861 - 1945 Not Eligible 44PY0373 Domestic, Single Dwelling, Lithic Indeterminate Precontact Potentially Industry/Processing/Extraction Scatter 1790 — 1991 Eligible 44PY0374 Domestic, Single Dwelling, Lithic Indeterminate Precontact Potentially Industry/Processing/Extraction Scatter 1830 — 1991 Eligible 44PY0375 Domestic, Farmstead, Lithic Scatter, Indeterminate Precontact Potentially Industry/Processing/Extraction, Trash Scatter 1790 — 1991 Eligible Transportation/Communication 44PY0376 Domestic Camp, Single Dwelling Indeterminate Precontact Potentially 1790 — Present Eligible 44PY0377 Domestic Artifact Scatter 1866 —1945 Not Eligible 44PY0380 Industry/Processing/Extraction, Lithic Scatter, Outbuilding Late Archaic; 1866 — 1991 Not Eligible Subsistence/Agriculture 22 Table 3.1 Previously Recorded Sites within One Mile of the APE Site Category Type(s) Time Period NRIIP Status 44PY0381 Domestic, Farmstead, Lithic Scatter Indeterminate Precontact Unknown Industry/Processing/Extraction 1866 — Present 44PY0382 Domestic Single Dwelling 1790 — Present Not Eligible 44PY0383 Subsistence/Agriculture Tobacco Barn 1790 — 1916 Not Eligible 44PY0384 Domestic, Farmstead, Tobacco Barn 1790 — Present Not Eligible Subsistence/Agriculture 44PY0385 Domestic, Farmstead, Lithic Scatter Indeterminate Precontact, Not Eligible Industry/Processing/Extraction 1790 — Present 44PY0386 Domestic, Single Dwelling, Lithic Middle Archaic to Early Eligible Industry/Processing/Extraction Scatter Woodland, 1790 — 1991 44PY0387 Domestic Single Dwelling 1800 — 1899 Potentially Eligible 44PY0388 Domestic, Single Dwelling, Lithic Indeterminate Precontact Potentially Industry/Processing/Extraction Scatter 1800 — 1899 Eligible 44PY0389 Indeterminate, Domestic Artifact Scatter, Farmstead Indeterminate Precontact Not Eligible 1866 — Present 44PY0390 Industry/Processing/Extraction, Lithic Scatter, Tobacco Indeterminate Precontact Not Eligible Subsistence/Agriculture Barn 1900 — 1999 44PY0391 Domestic Single Dwelling 1800 —1999 Potentially Eligible 44PY0392 DSS Legacy Camp, Other Late Woodland; 1800 — Potentially 1849 Eligible 44PY0393 Domestic, Artifact Scatter, Lithic Indeterminate Precontact Unknown Industry/Processing/Extraction, Scatter, Outbuilding 1790- 1916 Subsistence/Agriculture 44PY0394 Domestic Single Dwelling 1790 — Present Potentially Eligible 44PY0395 Industry/Processing/Extraction, Lithic Scatter, Outbuilding Indeterminate Precontact, Not Eligible Subsistence/Agriculture 1866 — 1991 44PY0396 Industry/Processing/Extraction, Lithic Scatter, Tobacco Indeterminate Precontact Not Eligible Subsistence/Agriculture Barn 1866 — 1991 44PY0397 Domestic, Single Dwelling, Lithic Indeterminate Precontact Not Eligible Industry/Processing/Extraction scatter 1866 — 1991 44PY0398 Domestic Single Dwelling 1866 — Present Potentially Eligible 44PY0399 DSS Legacy Ford — Berry Hill Ford 1700 — 1899 Unknown 44PY0401 Industry/Processing/Extraction Lithic Scatter Indeterminate Precontact Unknown 44PY0440 Domestic, Indeterminate, Farmstead, Other — Oak Indeterminate Precontact Unknown Subsistence/Agriculture Hill Plantation 1607 — 1991 44PY0440- Domestic Multiple Dwellings 1790 — 1991 Unknown 0005 44PY0454 Domestic Farmstead 1866 — 1991 Unknown 44PY0455 Domestic Farmstead 1861 —1945 Potentially Eligible 44PY0475 Industry/Processing/Extraction Lithic Scatter Early Archaic Not Eligible 44PY0497 Domestic Single Dwelling 1866 — 1945 Not Eligible ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 23 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Table 3.1 Previously Recorded Sites within One Mile of the APE Site Category MyrrType(s) Time Period NR1IP Status 44PY0545 Domestic Farmstead 1866 — 1945 Unknown 44PY0546 Domestic Single Dwelling 1866 — 1945 Unknown 44PY0548 Domestic Farmstead 1917 — 1991 Unknown 44PY0552 Domestic Farmstead 1866 —1991 Unknown 44PY0553 Domestic Single Dwelling 1866 — 1945 Unknown 44PY0554 Domestic Farmstead 1917 — 1991 Unknown 44PY0558 Subsistence/Agriculture Outbuilding — Trotters Creek 1866 — 1945 Not Eligible BERRY HILL ARCHAEOLOGICAL DISTRICT (44PY627) The Berry Hill Archaeological District (44PY627) was designated by the VDHR during their review (Bellville-Marrion 2020) of a Phase II evaluation report (Jones et al. 2017). The current APE is located within the Berry Hill Archaeological District. The VDHR letter states that the VDHR Evaluation Team was not able to reach a consensus on the NRHP eligibility of ten sites (44PY331, 44PY332, 44PY382, 44PY386, 44PY373, 44PY374, 44PY375, 44PY376, 44PY454, and 44PY455) and that because these sites contain building foundations and other intact features, a lack of integrity at the sites was not demonstrated by the evaluation work (Bellville-Marrion 2020: 2). Further, the letter states that "while many of the sites appear to not be eligible for listing individually under Criterion D, the Evaluation Team believes the sites are significant collectively as a potential archaeological district defined by a rare collection of post -emancipation African American domestic/agricultural tenant farmer sites clearly associated with the Hairston Plantations of Berry Hill and Oak Hill" (Bellville-Marrion 2020: 2). The letter (Bellville-Marrion 2020:2) also further defines the archaeological district: "This potential district appears to be largely unaltered by modern development and encroachment, which is a rarity for similar late 19' to early 20th century rural black communities in Virginia, and could provide important research information related to the cultural and historic landscape of a former plantation in the period of transition to tenant farming and use of space by African American and white tenant farmers during the late 19' to 20th century. Cumulatively, they present opportunities for better understanding the post -Civil War choices and experiences of a diverse population of sharecroppers, tenant farmers, and renters." 24 The VDHR suggested the use of the Hairston Family Archives to identify individuals or families associated with specific sites (Bellville-Marrion 2020:2): "Comparative study of the distinct assemblages and cultural features associated with these sites may provide a foundational dataset for elucidating patterned and divergent practices of an underrepresented population and complex of relationships in the context of the post - emancipation bright leaf tobacco industry and its twentieth century decline. Given the industry's influence in regional social dynamics and the global economy, it might be argued that an understanding of these themes is of local, state, and national significance." In a response letter to VDHR, Luhman (2021:2) notes that: "Most of the sites have been disturbed by logging. It is true that most of them contain foundations, but the excavation of test units around those foundations has uniformly failed to provide more information about the history or use of the buildings. It has proved very difficult to date any of the archaeological sites precisely, making it impossible to use them for studying change over time. So far as the archaeology can show us, these sites were pretty much identical in 1870 and 1930." Further (Luhman 2021:3): "There is not enough information to put together a complete record of tenancy for any period, or to track changes in how far the plantation was run over time. The farm management records for the Berry Hill plantation were far from consistent, especially during the management by Alfred Varley Sims. Notes to farm managers were scribbled on torn pieces of cardboard that often lacked information that could be linked to specific tenancies on the property. The archival information contains no data on where the families mentioned lived. Changes in road locations and names over time make identification of tenants through census records impossible. The lack of spatial data means family names cannot be connected to structures or archaeological sites. It is therefore not possible to say which sites were occupied by African Americans, and therefore to understand the ethnic dimensions of the property in any meaningful way." ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 25 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA In response, the VDHR (Bellville-Marrion 2021:5) stated that: "...the potential Berry Hill Archaeological District (DHR ID # pending) could provide important research information related to the cultural and historic landscape of a former plantation in the period of transition to tenant farming and use of space by African American and white tenant farmers during the late 19th to 20th century. Cumulatively, the sites within the district present opportunities for better understanding the post -Civil War choices and experiences of a diverse population of sharecroppers, tenant farmers, and renters ... the inherent value of these sites is not necessarily tied to the total amount of artifacts found at one site, but with the comparative study of the distinct assemblages and cultural features associated with these sites. These sites may provide a foundational dataset for elucidating patterned and divergent practices of an underrepresented population. Taken as a whole, they represent the remnants of a cultural historic landscape and offer an opportunity to better understand community and settlement patterning. Under Criterion D, the district may have the potential to yield additional information about changes in land use, and the relationships among the property owners and the occupants of these sites, and other research questions." The VDHR also defined the boundaries and period of significance of the Berry Hill Archaeological District. The district's boundaries are defined by the historical boundaries of the Berry Hill and Oak Hill Plantations. VDHR stated (Bellville-Marrion 2021:5): "visible surface remains, features and artifacts of dwelling sites and agricultural outbuildings [which] might reflect the socioeconomic status or the residents. As a whole, the sites offer an opportunity to answer research questions about social and economic relationships, land use, settlement patterns, and post -emancipation bright leaf tobacco industry... future work should assess the information value of an archaeological resource as a contributing (or non-contributing) element[s] associated with property types linked to the historic context (e.g. dwelling sites, historic road traces, agricultural outbuildings, wells, cisterns, etc.). A landscape approach may be useful in understanding the district and the settlement patterns." 26 With regard to integrity, the VDHR response letter states (Bellville-Marrion 2021:5-6): "it is important to remember that more ephemeral sites are often overlooked when considered individually instead of within the landscape in which they were created. Integrity, in the case of the Berry Hill District, should relate to the types of questions defined within a research design. Sites that lack an abundance of artifacts but still contain interpretable remains and can be linked to the District may be considered contributing elements. The integrity of these sites is relative to the specific significance —the important information that the site conveys about the District and research questions." VDHR concluded by stating (Bellville-Marrion 2021:6-7) that for future studies that identify resources considered not eligible, additional investigation is not necessary but to remember that "some ineligible sites may be contributing elements to the archaeological record and may provide information regarding settlement patterns and behavior across the district." BERRY HILL ARCHAEOLOGICAL DISTRICT CONTRIBUTING SITES WITHIN THE APE There are three previously recorded sites in the APE that are potentially contributing to the Berry Hill Archaeological District: 44PY0333, 44PY381 and 44PY382. Site 44PY0333 was determined potentially eligible as an individual site. Site 44PY0381 was determined not eligible for listing individually and its eligibility for listing in the District is not clear from the VDHR documentation. Site 44PY0382 is considered potentially eligible as part of the district. None of these sites were revisited or resurveyed as part of this Phase I survey per the Scope of Work. Site 44PY333 is a historic domestic single dwelling and agricultural farm complex site known as the Hairston Building Set 10, likely related to sharecroppers or tenant farmers engaged in tobacco production. First identified by Browning (2011) as a foundation set remnant, further testing by WSP in 2020 included the excavation of 92 shovel tests, of which 20 were positive and yielded 99 artifacts (Browning 2011). Two house foundations, diagonally placed, were identified, one with a large fieldstone chimney base and a second with a modern brick and fieldstone chimney pile (Jones et al. 2017). Cultural materials were restricted to the shallow Ap horizon in a heavily logged area; the site lacked integrity. No archival documents were found associated with the structural remains. VDHR determined the site was potentially eligible for listing as an individual resource on the NRHP and that avoidance or Phase 11 testing be undertaken (Bellville-Marrion 2020). It is potentially contributing to the Berry Hill Archaeological District. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 27 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Sites 44PY381 is a late nineteenth- and early twentieth-century two-story house with several outbuildings and sheds, including a modern storage shed. Whiteware, clear bottle glass, a brick fragment, four wire nails, a windowpane fragment and precontact lithic debitage 0 asper and quartz flakes) were recovered from this site (Browning 2011). Testing by Berger included excavation of thirteen shovel tests and four test units which yielded 72 artifacts, all historic (Tippett et al. 2015). In addition, the upper A horizon was often removed or altered, there was a large amount of historic trash, and no subsurface cultural features or intact subsurface deposits were identified. The VDHR Evaluation Team found the site not eligible for listing under Criterion D of the NRHP because it lacks subsurface integrity and research potential. Site 44PY382 is a nineteenth-century house and associated remains as well as one precontact isolated find (Browning 2011). It lacks outbuildings or foundations. Milk glass, porcelain and cut nail fragments, bottle glass and whiteware were recovered from shovel tests here. Further testing by Berger included 86 shovel tests and five test units which yielded 124 historic artifacts and one precontact artifacts from nine positive shovel tests and the test units (Fiedel and Merritt 2016). No historic surface features and no intact subsurface features or cultural deposits were identified. Additional archival research established a range of white renter residents from 1900-1930, none of which were significant locally, at the state -level, or nationally. VDHR concurred that the site is not eligible for listing on the NRHP but that it is a contributing element to the Berry Hill Archaeological District (Bellville-Marrion 2021). HISTORIC CONTEXT RECONSTRUCTION AND GROWTH (1865 TO 1914) Following the Civil War, emancipation resulted in the restructuring of the Southeast's agricultural system. Several variations of management and labor arrangements between African American Freedmen and former white plantation owners developed. Common agreements included the "contract wage" system, sharecropping, and share renting tenancy, leaving Freedmen financially reliant on landlords and creating a cycle of endless borrowing and debt (Bolton 2004). Wage workers and sharecroppers typically lived lives of itinerancy, living and working from farm to farm based on the relationship with the landlord, debts, and quality of land (Alderman -Tuttle 2010:7). In Pittsylvania County, Freedmen without homes, land and no other work options signed contracts under three models: wage labor, sharecropping, and housing and provisions in exchange for work (Swanson 2010:200). Wage contracts were frequently unfair for the workers, paid quarterly or yearly in tightly supervised gang labor, a system mirroring the overseer with a group of enslaved W. people. In 1866, 68 percent of labor contracts in Pittsylvania County were for wages, and bright leaf tobacco farmers preferred these contracts and allowed borrowing to ensure indebtedness and control over their labor supply (Swanson 2010:201). Under sharecropping, the landowner supplied land, a house, half the fertilizer, and the other necessary supplies and equipment such as seeds and draft animals, and the sharecropper supplied the labor. The landlord and the sharecropper typically divided the crops equally (Messick et al. 2001). The third, rarer type of model appeared in the case of ill or elderly people who worked when able (Swanson 2010:201). Landowner Samuel Hairston owned a vast amount of acreage in Pittsylvania County, and one of the tracts was Oak Hill (Site 44PY0440), valued at $3,500. From 1866 to 1871, Ruth Stoval Hairston entered into wage contracts with 13 formerly enslaved people of the plantation, which stipulated half of paid wages at the year's end (Fiedel and Merritt 2016:20). Otherwise, large plantations in Pittsylvania County and other Virginia counties were subdivided and sold or rented to Black and poor white sharecroppers. Settlements of these farmers dispersed across the landscape, fragmenting fields, and house sites. By 1880, Pittsylvania County had double the number of farms as compared to before the war, but because of land divisions, the sizes of the farms had decreased. Most of these farms and 10 or fewer acres were managed by sharecroppers (Swanson 2010:245). Visitors to the region in the 1870s described a landscape plagued by erosion and nutrient -deprived soil, a "level and barren picture" due to abuses of tobacco production (Pollard 1871:18). An estimated 15 percent of topsoil per year in the 1880s washed away from uplands and slopes on tobacco farms, a problem white landowners baselessly blamed on the incompetency Black farmers (Swanson 2010:254). Despite this deterioration in soil, new chemical fertilizers available during Reconstruction helped farmers to amend soil, and growing bright leaf tobacco persisted (Tilley 1948). In fact, according to Edward Pollock's Illustrated Sketch Book of Danville, Virginia; Its Manufactures and Commerce (1885), Danville's sales of bright leaf tobacco nearly tripled from 12 million pounds in 1873 to 33 million pounds in 1880, and the city had 10 warehouses and 26 tobacco manufactories (Fiedel and Merritt 2016:19). Agricultural census data from 1880 indicates that Pittsylvania County contained 22,689 acres on which tobacco grew, far surpassing any other county but also due to the sheer size of the county, the largest in the state. The 12,271,538 pounds of tobacco grown in the county that year demonstrates the geographic range of farmers contributing to Danville's market of 33 million pounds of tobacco. With continued focus on bright leaf tobacco farming, a lack of crop diversity resulted in Pittsylvania County. Although the county population grew, only slightly more corn had been grown, and the production of grains, vegetables, and livestock had diminished from before the war (Swanson 2010:246). ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 29 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Danville, at the southern edge of the county along the Dan River, economically expanded after the war. The Virginia Midland Railway and the Danville & New River Railroad were built, and a second bridge, the Union Street Bridge, spanned the Dan River in 1878. The town also received a new courthouse and post office in 1881 (Fiedel and Merritt 2016:19). The birth of Danville's cotton textile industry somewhat offset the county's economic reliance on tobacco. In 1883, Danville contractor and brick manufacturer Thomas B. Fitzgerald opened the Riverside Cotton Mills with 100 workers, 100 looms, and 2,240 spindles on the south side of the Dan River. By 1894, Long Mill on the north side of the river housed 1,700 looms and 6,000 spindles (Pulice and Kern 2009:7). With its expansion, the mills became known as Dan River, Inc. Water via a system of canals and locks on the Dan River powered the mills, and the Southern Railway system, running north of the mills, transported finished textile products to major metropolitan areas (Pulice and Kern 2009:7). The Southern Railway importantly connected Pittsylvania County with Washington D.C. and Atlanta, allowing the flow of goods from these centers to Danville. The success of Dan River Inc. helped Danville's population double from 7,500 in 1880 to 16,000 in 1900 (Pulice and Kern 2009:7). On the Hairston lands, the 1880 Federal Census listed mostly African American tenant farmers, but plantation records from the Wilson -Hairston Papers in the 1890s recorded both Black and white tenants. The family owned several tracts, including Oak Hill Plantation (owned by Samuel Hairston) and Berry Hill Plantation (owned by A.V. and Ruth Hairston Simms). Cash transactions at the Berry Hill Plantation through 1891 suggest the wage system remained in place for some tenants, who received provisions such as meat and coffee from the Berry Hill stores. The Hairstons kept 30 percent of the crops grown by their tenants as payment for rented farmland. The tenants largely responsible for raising the tobacco crop, which in 1897-1898 yielded 8,829 pounds, were formerly enslaved men Nat and Tommie Hairston, and White and Thornton, also Freedmen. Hairston tenants also built their own housing and farm outbuildings, and buildings were sometimes moved, converted, and repurposed into other uses. Other than tobacco, crops grown on both the bottomlands along the Dan River and on higher ground, included corn and wheat, and rye and oats for animal feed (Fiedel and Merritt 2016:21-22). By the end of the nineteenth century, tobacco farmers in Pittsylvania County were forced to adapt to new demands if they could afford them. They faced increasing competition from new tobacco districts in Georgia, Florida, and coastal North Carolina, monopolies over local markets, the rise of the cigarette that limited market prices, and continued costly environmental devastation (Swanson 2010:278). These issues and the imbalance in social power especially impacted Black farmers. Even though 55 percent of the county population was African American, declining tobacco prices and increased input costs meant few Black sharecroppers could purchase land. Less than two percent of landowners in the county were African American (Swanson 2010:309). Still, Pittsylvania and Halifax counties remained the leading producers of tobacco in Virginia in 1899 (Swanson 2010:285). 30 Pittsylvania County continued to dominate tobacco production in the state as its leading producer in the early twentieth century. According to the 1910 agricultural census figures, farmland covered 92.8 percent of the county. The 22,841,101 pounds of tobacco grown on 34,201 acres in Pittsylvania County accounted for 17-18 percent of acreage and production of tobacco in the state. Despite being a giant in tobacco production, farmers in the county were diversifying their crops more in the twentieth century. In 1910, Pittsylvania ranked fifth in the state for cereal production, predominantly corn and wheat, and stood as one of the leading producers of milk. Livestock, butter, and honey were also good yields for the county that year. About 42 percent of farmers in the county were African American, and 55.6 percent of farmers rented their operations, most of them through shares. The struggles of African American farmers in Pittsylvania may be evident in the decrease in population from 23,553 in 1890 to 20,163 in 1910, compared to the increase of white residents from 26,083 in 1890 to 30,539 in 1910. WORLD WAR I TO WORLD WAR 11(1914 TO 1945) The U.S. entry into World War I sparked a war effort throughout the country. Due to men serving overseas or working at munitions plants, Pittsylvania County experienced a shortage of farm labor. The Council of Defense traveled through the county urging farmers to help "win the war" by planting more corn and wheat and raising more hogs and cattle (Clement 1929:268). This program worked, as 4,000 more acres of land was cleared for wheat and 5,000 more acres for corn in 1919 than nine years before. Pittsylvania farms yielded 858,306 bushels of corn and 289,841 bushels of wheat, both surpassing 1910 harvests (Clement 1929:268). At Berry Hill Plantation, tenants continued to give 30 percent of their crops in exchange for rented land, and in 1915, the yield for tobacco had risen to 25,960 pounds (Fiedel and Merritt 2016:22). By 1920, Danville's population had increased to 21,500 people. Dan River, Inc. had become one of the largest and best equipped textile mills in the South (Pulice and Kern 2009:7). Steam power replaced water power in 1913 and an imposing four-story reinforced concrete mill with modern electrical machinery, designed by Lockwood, Greene, and Company of Boston and constructed by Italian immigrants, was completed in 1921 (Pulice and Kern 2009:8). Wynn's Falls on the Dan River supplied power for other industries such as the Dan Valley Flouring Mills, the Knitting Mills, and the city's tobacco factories, which manufactured cigarettes, cigars, and chewing tobacco (Clement 1929:258). The 1924 topographical map of the Draper quad shows 11 buildings along Danville Road (Berry Hill Road) from just west of Oak Hill Road to the Wenonda School (Site 44PY398) on the north side of the road. Along the Danville and Western Railroad, running parallel to the Dan River on its north side, Oak Hill Station was also known as Wenonda P.O., referred to in some records as simply "Wenonda." The Danville Road alignment nearly followed the current Berry Hill Road alignment from Oak Hill/Wenonda northwest to the Trotters Creek crossing. There, the 1920s road ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 31 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA alignment crossed the creek slightly north of the current bridge, and the road sharply turned toward the southeast before curving back to the present alignment near Site 44PY0333 (Figure 3.3). The road then proceeded east to cross McGuff Creek just south of its current crossing before returning to follow the present road alignment. Berry Hill Road ran its present alignment by the early 1940s. At that time, topographical maps show more farm roads and buildings standing at the farms along Berry Hill Road, suggesting a degree of growth during the late 1920s and 1930s. The number of buildings along the road, both houses and agricultural outbuildings, doubled from 1924 to 1944. Additional farm roads connected clusters of buildings to each other and to Berry Hill Road and other routes. This visible development alone demonstrates the enduring success of the farm operations of the Hairston family. However, a written description of Oak Hill by the James River Garden Club in 1923 appropriately characterizes the modern farm. In Historic Gardens of Virginia, the club wrote: Oak Hill is now an up-to-date farm, with the house supplied with all modern conveniences, a side annex having been built and hot and cold water supplied. Arrangements are being made for an electric plant to be put in to light the whole place. The outhouses and servants' quarters are well kept up, and a large, perfectly equipped dairy has been created, for Oak Hill is known as a stock farm. Its milch cows and Angus cattle, Shropshire sheep and Berkshire hogs claim attention, as well as its thoroughbred saddle horses. This livestock is well supported, for the 2,000 acres attached are in splendid cultivation. Corn yields from thirty to forty bushels per acre, while wheat figures out from ten to fifteen bushels. Large quantities of hay are also raised. The American field wire fencing gives the plantation a cared -for appearance, and in every detail about the farm Mr. Hairston, the proprietor of the place, and one of the largest landowners in Virginia, is characterized as a progressive and successful man in his line of business (Sale 1923:320). The Sims family continued to run the Berry Hill Plantation and likewise owned the Briarfield Plantation after 1927. Samuel Hairston, Jr. passed away in 1933, leaving his son, Samuel, the Oak Hill farm that consisted of the Oak Hill Tract (Site 44PY0440) and the Harrison, Murphy, and Adams tracts (Fiedel and Merritt 2016:22). During the interwar period, automobiles and paved roads hastened agricultural and industrial development. Farms and mills more easily moved their products to market. Empowered with a car or truck, the tobacco farmer in Pittsylvania County could load his harvest and transport it himself to markets in Danville, Lynchburg, or Roanoke, then drive home the same day (Salmon and Salmon 1993:370-371). 32 Figure 3.3. Historic Topographic Map with Site 44PY0333 Site Boundaries Basemap: USGS 15-minute Draper (1924). VATopographbic Quadrangle ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 33 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA In the 1920s, however, many Pittsylvania farmers still drove their wagons to Danville, at that time the largest tobacco market in the Old Belt Section and one of the world's largest bright leaf tobacco markets (Clement 1929:258). Despite the poor tobacco market prices in Danville and the surrounding region due to overproduction and constant struggles with soil and outside competition, farmers' reactions to tobacco problems was to "plant more tobacco" (Gosney 2022:18). The season of 1926-1927 brought 50,592,300 pounds of tobacco worth $12,455,642 to the Danville market (Clement 1929:258). When the Depression hit in the early 1930s, tobacco crop prices fell, and the Agricultural Adjustment of 1938 enacted quotas that limited growing tobacco to stabilize prices. However, "fixed" acreage reduced the need for sharecroppers, predominantly Black. These smaller farms sold their quotas to the larger farms, thus further putting the control of tobacco in the hands of white landowners (Swanson 2014:252). Agricultural census data reveals that the number of farms in Pittsylvania County fell from 7,563 in 1930 to 6,932 in 1940. The amount of farmland for white operators increased from 441,226 acres in 1930 to 445,263 acres in 1940, while farmland for "non- white" operators decreased from 117,977 acres in 1930 to 112,229 acres in 1940. In terms of tobacco acreage, the county had 38,549 acres for growing tobacco in 1920, a number that plummeted to 19,457 acres in 1934 during the worst of the Depression. Tobacco acreage rebounded to 31,485 acres in 1939, and production of the crop almost doubled from 14,784,534 pounds in 1934 to 26,609,247 pounds in 1939. THE NEW DOMINION (1945 TO PRESENT) Tobacco farming and diversified agriculture continued to characterize much of Pittsylvania County's economy and landscape in the post -World War II era. According to 1950 agricultural census data, 85.9 percent of acreage in Pittsylvania County remained devoted to agricultural use, and 47.5 percent of farmers in the county were listed as tenants, the third highest proportion in the state. The number of Black tenants (899) surpassed the number of white tenants (803). Pittsylvania County had 5,271 tobacco farmers growing over 24 million pounds on 23,019 acres, a crop valued at over $11,000,000. The industry had declined since the years prior to World War 11. Although tobacco production supported most of the agricultural economy, about 38 percent of farmland in the county contained fields for wheat crops, revealing greater agricultural diversification. Still, tobacco remained the principal cash crop in Pittsylvania County during the mid -twentieth century. The Hairston and Sims families continued to own and operate most of their land tracts. The population of Danville grew dramatically after World War 11 so that by 1960, 60,000 people lived within the city (Fiedel and Merritt 2016:26). Different sections lying adjacent to Danville, such as Schoolfield, an area populated by cotton mill employees, were also annexed to the city and 34 expanded its city limits (Lifsey et al. 2008:12). New industrial plants came to Danville, including Corning Glass Works, which opened in 1962, and U.S. Gypsum, established in 1967 (Richmond Times Dispatch 2019; The Associated Press 2015). The Goodyear plant opened in Danville in 1966 and became the world's largest plant for manufacturing automobile and airplane tires. It remains the city's largest employer after both Corning and Masonite (U. S. Gypsum) had closed by 2019 (Bell 2019; Fountain 1979:161). Textile productions ceased at Dan River Inc. in 1996 (Pulice and Kern 2009:8). While housing developments and local industries sprang up on the outskirts of Danville in postwar years, the Berry Hill Road area remained relatively unchanged from the 1950s through the 1960s. The 1950 historic aerial photograph illustrates the patchwork of fields that characterized the landscape of Oak Hill and the farmland toward the east and northeast (Figure 3.4a). On other topographical maps and aerial photographs from the 1950s through the 1970s, only two new buildings appeared along the road in or near the APE. Most of the buildings on the 1965 USGS topographical map of Brosville quad were depicted as blank squares, designating agricultural outbuildings or vacant buildings. A transmission line was constructed across Berry Hill Road near Trotter's Creek in the early 1970s. The major changes to the landscape of the area from the 1950s through the 1970s included agricultural fields gradually falling into disuse and farm roads disappearing. By the 1977 aerial photograph, most former fields had become wooded lots or green pasture, replacing the patchwork of fields and lines of farm roads (Figure 3.4b). That year, the Berry Hill Plantation was listed on the National Register of Historic Places due to its buildings that reflected 160 years of farming. On the north side of Berry Hill Road, birds eye photography from 1986 shows that Site 44PY0333 consisted of two tenant houses that had been attached to one another at an angle so that the front porches formed a shared V-shaped front porch (Figure 3.5). By the early 1990s, the two attached dwellings had been demolished. The Danville Pittsylvania Regional Industrial Facility Authority purchased much of the Hairston family land that had been part of the Oak Hill and Briarfield plantations in 2008 and 2009. By that time, the agricultural outbuildings to the south at Site 44PY0393 were no longer standing. The house at Site 44PY0381, along with its two historic outbuildings, stood until 2017 when the wooded area was cleared. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 35 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 3.4. Historic Aerial Photographs of Berry Hill Road Area Georeferenced Basemap: 1950Aerial Photograph Georeferenced Basemap: 1977Aerial Photograph 0 0.25 0.5 mi Survey Area I I I 0 0.5 1 km 36 Figure 3.5. 1986 Birds Eye View of Site 44PY0333 ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 37 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA IV. METHODS The Archaeological Resources Survey followed the Guidelines for Conducting Historic Resources Survey in Virginia (Virginia Department of Historic Resources 2017). This project included background research, archaeological subsurface survey and visual examination, photography, mapping, site forms, and reporting. BACKGROUND RESEARCH Background research was conducted to determine historic patterns relevant to the project vicinity, to locate settlements in the APE, and to identify previously surveyed archaeological and historic architectural resources. V-CRIS was consulted to establish previously identified resources. Historic maps including the following were examined: A 1778 map of the western parts of Virginia shows the river but no settlements in the general area (Cheevers and Hutchins 1778) (Figure 4.1). • A 1924 Draper map shows eight structures on the south side of the road on the western half of the APE and two structures on the southeastern half, on the northern half, there are two structures in the southwestern edge and two on the northeastern half. The original road varies slightly from the current road. no structures in the APE (Figure 4.2). • A 1944 Draper topographic map shows settlement expanded in the southeastern portion. Here, two settlement clusters are present, with roads in the center one. A school, "Wenonda School" is present at the southeastern end of the project. On the north side, a dozen houses are present in three clusters, somewhat more dispersed than the southern clusters. (Figure 4.3). • A 1965 Brosville topographic map shows standing structures in the location of the earlier southern clusters, but most structures appear abandoned. The school is no longer marked. On the northern side of the road, most structures also appear abandoned. The road also is closer to the current road configuration (Figure 4.4). • A 2016 Brosville topographic map shows minimal settlement north or south of the road (Figure 4.5). The road is in its current alignment. Aerial photography was also used to understand the history of the APE. A 2021 Google Earth view shows strip mining located on the northeastern portion of the APE, and forest located in the remaining area (Figure 4.6). Earlier maps do not show any substantial differences than what is visible on the historic topographic maps. - AJI M Survey Area ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 141 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 4.4. 1965 Brosville Topographic Map showing the Project Area 0 0.5 1 mi I I I 0 0.5 1 km " Basemap: USGS 7.5-minute Brosville (1965). VATopographbic Quadrangle 42 Figure 4.5. 2019 Brosville Topographic Map showing the Project Area 1 i _ l } _ I��r y � l � • - - g- I, •R �" � �—Aan-R•iuerIRD ��` /�ViiRGI'ItiIA - -` -- --- .jN0RTH CAROLINX �. • -� l I C�--'— GRAVEl."$iLi 7 0 0.5 1 mi Survey Area I I I 0 0.5 1 km " Basemap: USGS 7.5-minute Brosville (2019). VATopographbic Quadrangle ARCHAEOLOGICAL SURVEY Prior to fieldwork, NSA created a Geographic Information System (GIS) project in ESRI ArcPro populated with geospatial data, including the APE, and previously identified cultural resources. These data were used to create a GeoPDF of the APE that was uploaded into Avenza and used to navigate the survey area. The approximately 144-acre APE was examined using a combination of shovel -testing transects and visual inspection. Shovel testing at 50-foot (15.2-m) intervals was conducted across the APE. Before the fieldwork, test locations were pre -plotted within the survey area, as defined in the Scope of Work. These test locations were entered into NSA's provenience tracking system built in ArcGIS Pro and uploaded to a cloud -based database. NSA has developed and implemented procedures for digitally recording standard field survey data using Motorola Moto E6 cellphones enabled with GPS. The electronic documentation process is driven by spatial data and can generate a range of digital data. The Avenza PDF Maps application is used to find the approximate location of each pre -plotted shovel test. The Memento database allows for in -field data collection. Recording of shovel test attributes included USDA NCRS soil texture and Munsell color designation, depth, and artifacts recovered in a consistent format with dropdown menus and required fields. Photographs of general settings, disturbances and selected shovel test profiles were taken using Moto E6 phones and a Pentax WG-3 GPS digital camera. At the end of the field day, the records were automatically synced to NSA's server once the user completed review of the data and connected to a Wi-Fi network. The Field Director then performed additional QA/QC as necessary. Shovel test locations were recorded as "not excavated" if it was impossible to dig in areas of substantial disturbance, excessive slope, or pavement. Areas excluded from shovel testing were documented with notes and photographs. Shovel tests measured 34 centimeters (15 inches) in diameter and were excavated by hand to depths of 30 centimeters (1.0 ft.) or until sterile subsoil, water table, or an impenetrable substrate was encountered. All soils were screened through 0.25-inch mesh hardware cloth for consistent artifact recovery. Soils encountered in shovel tests were described with standard terminology for texture and color using a Munsell soil chart. All shovel tests were fully backfilled upon completion. Twenty -five-foot (7.62-m) interval radial tests were used to assess the extent of subsurface artifact deposits. Resource boundaries were defined by two consecutive negative tests. Site delineation was limited by disturbance and slope in some instances. All positive and radial shovel tests were ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 45 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA mapped using a sub -meter Trimble Geo 7X GPS receiver. Resources were identified as archaeological sites with V-CRIS if they possessed more than three artifacts within a spatially restricted area, recommended as 300 square feet (Virginia Department of Historic Resources 2017). Site boundaries were defined by negative shovel tests and geographic boundaries. NATIONAL REGISTER OF HISTORIC PLACES EVALUATION Cultural resources were evaluated based on criteria for NRHP eligibility specified in the Department of Interior Regulations 36 CFR Part 60: National Register of Historic Places. Cultural resources can be defined as significant if they "possess integrity of location, design, setting, materials, workmanship, feeling, and association," and if they: A) are associated with events that have made a significant contribution to the broad pattern of history; or B) are associated with the lives of persons significant in the past; or C) embody the distinctive characteristics of a type, period, or method of construction, or represent the work of a master, possess high artistic values, or represent a significant and distinguishable entity whose components may lack individual distinction; or D) have yielded, or may be likely to yield, information important in prehistory or history. EEO Intentionally left blank ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 47 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA V. RESULTS AND RECOMMENDATIONS ARCHAEOLOGICAL SURVEY RESULTS The APE is located in a rolling inter-riverine upland overlooking several small tributaries and the Dan River. The APE follows a section of the current Berry Hill Road. On the northwest side, Oak Hill Road intersects Berry Hill Road in the APE. The railroad and the Dan River are located south of the APE. Two creeks cross the APE. Trotter's Creek crosses the APE in the middle of the APE. McGuff Creek intersects the APE on the northern section (Figure 5.1). The southern half and most of the northern half of the APE is wooded. In the north central and northeastern portion of the APE, large areas have been clearcut and graded (Figure 5.2). Woods in the APE are mostly composed of young, row -planted pines. The area around Harristown Plantation was the only area with a large expanse of hardwood forest with sparse understory. NSA investigated 1,741 shovel test locations during the survey. All tests were excavated 10 centimeters into sterile subsoil unless prevented by the presence of water table, impasses (e.g., large rocks), or excessive depth (e.g., deeply buried alluvium). Of these, 26 were positive for cultural materials, 1,509 were negative, and 206 were not excavated due to slope greater than 15 degrees (n=21), buried utilities (n=11), paved areas (n=8), standing water (n=76) or other reasons such as location in road cuts, gullies, or disturbed areas (n=90) (Figure 5.3). Positive shovel tests were delineated at 25-foot intervals. Shovel Test Pit (STP) 762 (I17-2) and STP 775 (IF-1) are isolated finds. The profiles of shovel tests excavated for this survey indicated that the APE was eroded. These indications included a general absence of 0-horizon or A -horizon strata. Stratigraphy within the APE varied somewhat by location. These variations are attributable to erosional and alluvial processes and mechanical disturbance. In the northwestern part of the APE, STP 108 revealed two strata. Those strata included a 17-centimeter-deep pale brown (10YR6/3) silty clay Bh horizon underlain by a Bt horizon of pale brown (10YR6/3) clay from 17-27 centimeters below surface (cmbs) and the water table. STP 855 exposed nine centimeters of yellowish brown (10YR5/8) clay identified as a Bt or C horizon. This suggests severe erosion, likely exacerbated by tree -planting and logging has occurred in this part of the APE. Residual amounts of A horizon were identified in the northcentral portion of the APE. Two strata were normally encountered in that area. In STP 889, the Ap horizon was a 12-centimeter-deep dark brown (7.5YR3/4) sandy clay loam, underlain by Stratum 11, a light brown (7.5YR6/4) sandy clay that extended from 13-28 cmbs. The lower stratum in this test was identified as a Bt horizon. In the south-central portion of the APE the typical shovel test profile as seen in STP 160 also W. Al, s�av 1.: t Figure 5.1. McGuff Creek on northern part of APE ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 49 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.2. Clearcut Areas within APE Pk'a 4 c. PYos sy - F-1 r IF-2 f �� 1 i5. mor Oak Hill — 44PY0679 - - - - Dan River 7a x bing `� Rd ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 51 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA exposed an Ap horizon and a Bt horizon. The Ap horizon was a grayish brown (10YR5/2) sandy loam from 0-21 cmbs underlain by a yellowish brown (10YR5/4) sandy clay that was excavated to a depth of 35 cmbs. Stratum I in this area represents the Ap horizon typically found here; however, it is shallower than recorded and suggests erosion is present. Stratum 11 appears to be a mixture of the Ap horizon and the underlying Bt horizon, suggesting some disturbance from logging and road construction has occurred. Two strata were identified in the tests excavated in the floodplain adjacent to McGuff Creek. STP 1020 exposed a brown (10YR4/3) sandy clay loam colluvium extending to a depth of 50 cmbs overlying 10-centimeters of hydric gray (10YR6/1) clay loam. Shovel tests excavated nearer the stream channel (e.g., STP 305) exposed alluvial sediment overlying a C horizon located 40-50 cmbs. Prolonged periods of rainfall occurred prior to and during the NSA survey. As a result, the water table was encountered at shallow depths in tests excavated along the low-lying southeastern edge of the APE. In that area, profiles like those seen in STP 1500, usually included two strata. Stratum I is a 15-centimeter-deep very pale brown (10YR8/3) sandy clay Bh horizon underlain by at least 12 centimeters of yellow (5Y8/8) sandy clay Bt horizon. This test was terminated when water filled the test to a depth of 27 cmbs. The general absence of A horizon soils and the truncated profiles exposed through shovel testing indicated that erosion had interrupted the normal processes of soil deposition in the APE. Artifact deposits found in these soil conditions are unlikely to retain stratigraphic integrity. Given NSA's shovel testing results, previous surveys in the APE, the presence of row -planted trees, and the history of land use described in the preceding chapters of this report, soils in the APE are heavily eroded and deflated. ISOLATED FINDS IF-1 IF-1 is a single metavolcanic flake recovered from STP 775 (Figure 5.4a; see Figure 5.3). The shovel test is in the northeastern portion of the APE, about 75 meters east of the intersection of Berry Hill Connector Road and a private driveway and about 15 meters north of Berry Hill Road. This area was covered by an extensive daffodil bed and a canopy of mature hardwoods. Soils in STP 775 were typical for this portion of the APE and included one stratum. Stratum I was a 14- centimeter-deep brown (7.5YR4.4) silty clay Bh horizon. Stratum I was underlain by a shallow (14-34 cmbs) light reddish brown (2.5YR 6/3) clay Bt horizon. The flake was recovered from Stratum I. IF-1 was delineated with eight close -interval shovel tests in all four cardinal directions. Because the artifact recovered is an isolated occurrence, it lacks integrity and significance. Isolated finds, by definition, are not eligible for listing on the NRHP. No further work is recommended for IF-1. A. IF-], Flake Recovered from STP 775 mooB. IF-2, Flake Recovered from STP 762 1/2 0 112 1 inch 2 centimeters ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 53 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.5. Site 44PY0675 54 IF-2 The single metavolcanic flake collected from STP 762 was documented as IF-2. This flake was found in a mechanically disturbed area approximately 105 meters west of the same driveway intersection noted in IF-1 (Figure 5.4b; see Figure 5.3). Evidence of mechanical disturbance included the presence of push piles and a linear utility gouge. Local vegetation included scrub species and a mix of young pines and hardwood trees. The twelve -centimeter -deep shovel test revealed 12 centimeters of pale yellow (2.5Y8/3) silty clay. Soils in IF-2 are truncated, with the silty clay stratum identified as a Bt or C horizon. IF-2 was delineated with eight close -interval shovel tests in all cardinal directions. Because the artifact recovered is an isolated occurrence, it lacks integrity and significance. Isolated finds, by definition, are not eligible for listing on the NRHP. No further work is recommended for IF-2. ARCHAEOLOGICAL SITES Site 44PY675 Site 44PY675 is a historic brick dump (Figures 5.5 and 5.6) located in an upland, mixed woods setting. Six brick fragments, three large and three small, were identified in the upper stratum of STP 1131 (see Figure 5.6). This shovel test was excavated in between ruts of an unused two -track road. The handmade bricks were recorded but not collected. The bricks were delineated by seven close -interval (7.5-meter) STPs, none of which contained artifacts. As such, the bricks were likely part of a fill deposit used to level out a section of the unused road. A typical soil profile for Site 44PY675 is present in the STP at N500 E492, which consisted of two strata. The fill deposit, Stratum I, was a pale brown (10YR6/3) silt from 0-30 cmbs underlain by Stratum 11, a Bt horizon of a light red (10YR7/6) silty clay that extended from 31-40 cmbs (Figure 5.7). Evidence of redoximorphic activity was present around a depth of 14 cmbs in the first soil strata, suggesting frequent inundation at the site. The 1924 historic topographic map shows driveways both north and south of this location leading away from Berry Hill Road. No structures are located at the road, but there are structures located at the end of both drives, approximately 200 meters from the main road. By 1944, there are more structures along these drives but they are located approximately 100 meters from the main road. In 1965 no structures are present at the road. The secondary context of the artifacts (surface finds only) indicates that 44PY675 lacks subsurface integrity. Based on the lack of assemblage diversity and associated features, 44PY675 lacks information potential and is not associated with events contributing to broad patterns of history of the lives of significant persons, and does not embody distinctive design characteristics, or high artistic values. NSA recommends that 44PY675 is not eligible for listing on the NRHP individually under any of the four criteria. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 55 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.6. Bricks from 44PY0675, N500 E500 AL- �'� 00- k ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 57 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA 44PY675 also lacks sufficient integrity or research potential to be a contributing element to the Berry Hill Archaeological District. The age of the bricks is unknown, and the quantity of bricks (n=6) is low. There are no subsurface deposits associated with the bricks and there are no aboveground surface features. There is no structure located historically in this location. NSA recommends that 44PY675 is not a contributing element to the Berry Hill Archaeological District. No further work is recommended for this site. Site 44PY676 Site 44PY676 is a portion of an old road segment of the original Berry Hill Road (Figure 5.8; see Figure 5.3). It includes two bridge abutments and a segment that extends outside of the APE. It measures approximately 650 m east -west and 15 m wide north -south. It is located immediately east of the center of the APE, and a small portion continues north of Berry Hill Connector Road. The only raised road segment visible was at the bridge abutment. The best -preserved segment of roadway was at the small portion north of the existing road. Here, the cut banks are steeply sloped with little visual evidence of slump or erosion. A section at the northeastern end of the APE was overlapped by the modern alignment and was also freshly logged. Probable linear erosion gullies were also somewhat visible. Review of the historic topographic maps shows that the original road that matches the site shape is present on the 1924 map. This is particularly evident in the middle of the old road layout, where the road jutted south immediately after crossing McGuff Creek heading north. No structures were present on the map in this area. Structures are present farther north. By 1944 the road was realigned to its approximate present alignment. The 1924 structures appear in the same location, and more structures are present. By 1965 the road may have been straightened even more, and most of the structures south of the current road are abandoned, with only one occupied structure north of the road. No structural remains were recovered in any shovel tests located along the old roadbed. Fourteen shovel tests were excavated within the site, and all were negative. No evidence of engineered or deliberate selection of road fill were visible in the shovel test profiles. STP 992 exposed a profile typical of the soils surrounding the road cut. This test contained nine centimeters of a brown (10YR5/3) sandy loam Bh horizon underlain by 20 centimeters of dark yellowish brown (10YR4/6) brown sandy clay Bt horizon. The old road is visible from the two road abutments on its northern section, some lightly visible gullies and some soil compression. The road is documented on historic maps. No artifacts or other subsurface features associated with the road, such as road bed, gravel, or pavement are present, which indicates that 44PY676 lacks integrity. Only evidence of some grading, but no original roadway material, is extant. The roadway likely would not be expected to have artifacts associated w yr ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 59 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA with it that are significant to the functioning of the road; however, there is a lack of road construction materials present. There is also a lack of research potential for this resource. Based on the lack of road materials and research potential, 44PY676 also has no known historic significance or research potential. NSA recommends that 44PY676 is not eligible for listing on the NRHP individually under any of the four criteria. No further work is recommended for this site. The road may be considered a contributing element to the Berry Hill Historic District, which specifically states that historic roads should be considered as part of this historic landscape. The initial layout of the road followed the landform which was likely easier for horse or mule -drawn vehicles to navigate. Studies of tenant farmer settlement note the importance of roadways, where, during the initial sharecropper period of Reconstruction, structures are often located; however, they were also built far from the roads, up to 200 meters, as can be seen at Site 44PY676 (Adams 1980). As the tenant system emerged in the late nineteenth and early twentieth centuries, the same locations used by earlier sharecroppers were used by tenants, with more outbuildings present. The 1944 topographic map, where additional buildings are present, suggests this occurred at 44PY676. At the same time, modern roads were constructed to accommodate changing transportation needs. Based on its location and documented changes through time, the road may be a contributing element to the archaeological district. Site 44PY677 Site 44PY677 is a historic trash scatter (Figure 5.9; see Figure 5.3). It is located on the south side of Berry Hill Connector Road, in the southeastern portion of the APE. It measures approximately 150 in wide east/west and 95 in wide north/south. It was delineated at a 7.5-meter interval. A total of 39 shovel tests were placed to determine site boundaries. Of these, 21 were positive, 17 were negative, and one was not excavated. Shovel test profiles at the site consisted of three strata. Stratum I, a disturbed six -centimeter -deep brown (10YR4/3) silty loam. Stratum II was a brown (7.5YR5) sandy loam that extended from 7- 20 cmbs. Both of these strata were identified as part of the Bh horizon. Stratum III was a yellowish red (5YR5/8) silty clay Bt that extended from 21-30 cmbs (Figure 5.10). Most artifacts (n=86) were recovered from the upper 20 cm, while fifteen artifacts were recovered between 20-30 cmbs and one artifact was recovered from the surface. A review of the historic topographic maps shows two structures present in the location of the site in 1924 (Figure 5.11). These are located south of the existing road, located about 50-60 meters south of the road off an existing driveway. By 1944 this driveway is longer and there are ten total structures located on both sides of the driveway and at its end, including the original two structures. By 1965 the driveway has shifted southwest and all but one of the structures are abandoned including the two original structures on the 1924 map. The pattern of change over time here follows that identified by Adams (1980) of post -Reconstruction sharecropper houses located along :1 Figure 5.9. Site 44PY0677 ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 61 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.10. Typical Shovel Test Profile, Site 44PY0677 m Figure 5.11. Historic Topographic Map showing Location of Site 44PY677 and Extant Structures Basemap: USGS 15-minute Draper (1924). VATopographbic Quadrangle ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 63 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA roadways but also built on drives up to 200 meters from the main roadways, with the addition of outbuildings over time as the tenant system emerged. It also follows the pattern identified by Crass and Brooks (1997) of tenant farm located on dry uplands away from surface water. This is tied to both intentional monocropping agricultural practices and access to improved road and rail lines. By 1944 the road is modernized, and the increased settlement here reflects the desire for road access. A total of 102 artifacts were recovered at this site. Artifacts were recovered from the surface to a depth of 30 cmbs. Of these, most (n=94) were recovered in the upper 10-12 cm. One artifact, a whiteware fragment, was recovered on the surface. Artifacts include a plastic button, canning seal, container glass, flat glass, iron/steel plate, unidentified metal objects, cut and wire nail fragments, non -electrical wire, plastic, stoneware, whiteware, and a porcelain toy tea set (Table 5.1; Figure 5.12a, Figure 5.12b). All diagnostic artifacts have date ranges beginning in the nineteenth century, though most date to the late nineteenth and early twentieth centuries. These artifacts represent typical household refuse, primarily kitchen -related activities. Based on the shovel test data, the subsurface deposits at the site are disturbed by plowing, erosion and soil deflation as indicated by the lack of an extant A horizon; all were recovered from the disturbed Bh horizon. Artifacts that date earlier than others, such as cut nails, were found in the upper 14 cm while more modern artifacts that post-date cut nails, such as a plastic button and wire nails, were found to a depth of 20 cm. Table 5.1 Artifacts Recovered from Site 44PY677 Artifact Type Start Date End Date Total Button, Plastic 1 Button, Porcelain, Prosser 1840 1 Canning Seal, Milk Glass 1869 1 Container Glass, Amber 11 Container Glass, Amethyst Color 1880 1917 1 Container Glass, Aqua 6 Container Glass, Clear 39 Container Glass, Cobalt Blue 8 Container Glass, Light Blue 1 Container Glass, Light Green 3 Container Glass, Machine Made, Light Green 1959 1959 1 Glass, Unmeasured Flat 2 Iron/ Steel Plate 1 Metal Object, Unidentified 2 Nail, Cut fragment 1805 1 Nail, Wire Common, Unmeasured 1860 2 Non -Electrical Wire 1 M Table 5.1 Artifacts Recovered from Site 44PY677 Artifact Type Start Date End Date Total Plastic, Indeterminate 1 Stoneware, Alkaline Glazed 1810 1 Stoneware, Brown Salt Glazed, Unidentified 1 Stoneware, Unidentified Brown Glazed or Slipped 1 Strap Iron/ Metal 1 Toy Tea Set, Porcelain 1 Whiteware, Plain 1830 9 Whiteware, Plain, Molded 1830 2 Whiteware, Simple Bands 1820 1 Total: 102 Site 44PY677 is a scatter of late nineteenth and early -twentieth refuse likely related to a residence. Historic maps show at least one structure present in this location between 1924 and 1965. The site likely represents remains of household trash related to kitchen activities. Artifacts are concentrated in the upper 20 cm; however, the artifacts are chronologically mixed stratigraphically. The site is similar to others located in the APE and previously tested (Fiedel and Merritt 2016; Jones et al. 2017; Tippett et al. 2015). The site did not contain subsurface features or deposits and all artifacts were recovered from chronologically mixed Bh horizon soils indicating that the site lacks subsurface integrity. The lack of evidence for any A horizon suggests not only disturbance caused by repeated plowing, but also subsequent soil erosion and soil deflation. The site lacks the potential to yield important information about the nineteenth-century tenant farming history of the county as an individual archaeological site. NSA recommends that 44PY677 is not eligible for listing on the NRHP individually under any of the four criteria. No further work is recommended for this site. The site may be a contributing element of the Berry Hill Historic District, which specifically includes similar tenant farm sites, most of which are not individually eligible for listing, as part of the district. Studies of tenant farmer settlement indicate the typical location near or off roadways as seen by Site 44PY677. As the tenant system emerged in the late nineteenth and early twentieth centuries, the same locations used by earlier sharecroppers were used by tenants, with more outbuildings present (Adams 1980). The 1944 topographic map, where additional buildings are present, suggests this pattern is present at 44PY677. The artifacts recovered from the site, while from a mixed stratigraphic context, date to the tenant farmer period of occupation. Based on its location and artifact types, NSA recommends 44PY677 may be a contributing element to the archaeological district. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 65 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.12. Artifacts Recovered from Site 44PY0677 :. Site 44PY678 Site 44PY678 is a portion of an old road segment of the original Berry Hill Road (Figure 5.13; see Figure 5.3). It measures approximately 460 m long north -south and 30 m wide east -west. It is located in the southwestern edge of the APE, north of Berry Hill Connector Road. Like 44PY676, this road segment was dirt and does not appear to have been paved before 1944. A review of historic maps shows that the road was aligned to its modern configuration in 1944 and straightened even more in 1965. No structures are present in the 1924, 1944, or 1965 maps in the old road location. One shovel test, STP 688, was excavated within the road and was negative. The shovel test profile for this STP included Stratum I, a brown (7.5YR4/4) sandy loam, 0-16 cmbs underlain by Stratum 11, a reddish brown (5YR4/4) sandy clay from 17-30 crabs. Stratum I appears to be a colluvial deposit, while Stratum 11 is part of an underlying clay C horizon exposed during road construction. The old road is known from historic map documentation and the archaeological evidence of soil compression documented during the survey. No historic structures were located on this segment of the old road. No artifacts or other subsurface features associated with the road, such as road bed, gravel or pavement are present, which indicates that 44PY678 lacks integrity. Only evidence of some grading, but no original roadway material, is present. The roadway likely would not have artifacts associated with it that are significant to the functioning of the road; however, there is a lack of road construction materials present. There is also a lack of research potential for this resource. Based on the lack of road materials and research potential, 44PY678 also has no known historic significance or research potential. NSA recommends that 44PY678 is not eligible for listing on the NRHP individually under any of the four criteria. No further work is recommended for this site. The road may be considered a contributing element to the Berry Hill Historic District, which specifically states that historic roads should be considered as part of this historic landscape. Studies of tenant farmer settlement note the importance of roadways where during the initial sharecropper period of Reconstruction, structures are often located; however, tenant settlements were also built far from the roads, up to 200 meters, as can be seen at Site 44PY678 (Adams 1980). As the tenant system emerged in the late nineteenth and early twentieth centuries, the same locations used by earlier sharecroppers were used by tenants. The 1944 topographic map shows that the original road segment represented by 44PY678 was part of a transportation route important to the region's tenant farmers. At the same time, modern roads were constructed to accommodate changing transportation needs. Based on its location and documented changes through time, NSA recommends that 44PY678 may be a contributing element to the archaeological district. V V� J O � • (9D • 'J :: Site 44PY679 Site 44PY679 is a portion of an old road segment of the original Berry Hill Road (Figure 5.14; see Figure 5.3). It measures approximately 120 meters east -west and 30 m north -south. It is located in the southwestern edge of the APE, on the north side of Berry Hill Connector Road and about 100 m west of Route 862. No visible features associated with the road were identified during survey. Like 44PY676 and 44PY678, Site 44PY679 is part of the original Berry Hill Road. The old road segment is present on the 1924 map and this segment is straightened when the modern road is put in place by 1944. It is straightened again by 1965. No structures are present in this area on any of the three historic maps, and there appears to be minimal changes to the original road layout and immediate surrounding area in the location of Site 44PY679. Five shovel tests were excavated in the APE; all were negative. The soil profile for STP 629 located in the center of the site, was composed of a Stratum I, a 10-centimeter light yellowish brown (10YR6/4) silty loam colluvial deposit underlain by a light red (2.5YR6/6) clay, C horizon. The old road is documented on historic maps and some soil compression is evidenced by archaeological subsurface deposits as a result of its construction and use. No artifacts or other subsurface features associated with the road, such as road bed, gravel, or pavement are present, which indicates that 44PY679 lacks integrity. Only evidence of some grading, but no original roadway material, is extant. The roadway would not be expected to have artifacts associated with it that are significant to the functioning of the road; however, there is a lack of road construction materials present. There is also a lack of research potential for this this resource. Based on the lack of road materials and research potential, 44PY679 also has no known historic significance or research potential. NSA recommends that 44PY679 is not eligible for listing on the NRHP individually under any of the four criteria. No further work is recommended for this site. The road may be considered a contributing element to the Berry Hill Historic District, which specifically states that historic roads should be considered as part of this historic landscape. Studies of tenant farmer settlement note the importance of roadways. At the same time, modern roads were constructed to accommodate changing transportation needs. Based on its location and documented changes through time, NSA recommends that 44PY679 may be a contributing element to the archaeological district. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 69 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Figure 5.14. Site 44PY0679 70 Intentionally left blank ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 71 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA VI. CONCLUSION AND RECOMMENDATIONS New South Associates, Inc. (NSA) completed an archaeological survey for the Berry Hill Connector Road Extension project in Pittsylvania County, Virginia. The proposed project will include reconfiguring a 2.74-mile section of Berry Hill Road from a 2-lane to a 4-lane road. The survey followed procedures defined by VDOT Governance Document: Expectations and Standard Products for Cultural Resource Surveys and the guidelines of the Virginia Department of Historic Resources (VDHR). The Area of Potential Effects (APE) for this project is an Environmental Study Area (ESA) that includes a 2.74-mile-long corridor along Berry Hill Road. Three previously identified archaeological sites are located in the APE: 44PY333, 44PY381 and 44PY382. All three have late -nineteenth and early -twentieth-century components. Site 44PY333 is considered potentially eligible for listing under Criterion D of the NRHP, and avoidance or Phase 11 testing is recommended. Sites 44PY381 and 44PY382 are recommended not eligible for individual listing on the NRHP but are contributing elements to the Berry Hill Archaeological District. The archaeological survey included the entire APE except for the portions within the current boundaries of Sites 44PY0333, 44PY0381, and 44PY0382. Survey included pedestrian walkover and systematic shovel testing at 50-foot (15.24-meter) intervals. Five historic sites and two IFs were identified during the survey. Site 44PY675 is a brick dump located in road fill. There are no subsurface deposits or any features present at the site. There are no extant or documented historic structures. Site 44PY675 lacks integrity and does not have the potential to convey information important to the history of Pittsylvania County. NSA recommends that 44PY675 is not eligible for listing on the NRHP under any of the four criteria. NSA further recommends that 44PY675 is not a contributing element to the Berry Hill Archaeological District. No additional work is recommended. Site 44PY676 is a remnant portion of the original road dating to 1924 that includes remnants of two bridge abutments and a segment that extends outside of the APE. No subsurface deposits are present at the site, and no features of historic significance. Although artifacts are not typically associated with roads, the site lacks evidence of road construction materials and research potential. Site 44PY676 lacks integrity and does not have the potential to convey significant research 72 potential, nor does it contain any historic significance. NSA recommends that 44PY676 is not eligible for listing on the NRHP under any of the four criteria. NSA further recommends that 44PY676 is a contributing element to the Berry Hill Archaeological District as an example of a historic roadway that was important to tenant farm settlement. No further work is recommended. 44PY677 is a late nineteenth and early twentieth-century trash scatter and subsurface deposit with mixed stratigraphy. It is likely the remnants of structures present on the 1924 and 1944 topographic maps. It lacks intact features, and the mixed stratigraphic nature of the artifact deposits indicate it lacks integrity and does not have the potential to yield information important to the history of Pittsylvania County. NSA recommends 44PY677 is not eligible for listing on the NRHP under any of the four criteria. NSA further recommends that 44PY677 is a contributing element to the Berry Hill Archaeological District as an example of a tenant farm that comprised the post -Emancipation landscape. No further work is recommended. Two other sites (44PY678 and 44PY679) are segments of the same abandoned road. Neither site contains subsurface deposits or subsurface or above ground features. Both road segments were present on historic topographic maps dating to 1924 and the roads were modernized to their current alignment by 1965. No structures are located near these road segments. Although artifacts are not typically associated with roads, the site lacks evidence of road construction materials and research potential. Site 44PY678 and 44PY679 lack integrity and do not have the potential to yield information important to the history of Pittsylvania County as individual resources. NSA recommends that 44PY678 and 44PY679 are not eligible for listing on the NRHP under any of the four criteria. NSA further recommends that 44PY678 and 44PY679 are contributing elements to the Berry Hill Archaeological District as an example of historic roadways that were important to tenant farm settlement. No further work is recommended at either site. The two isolated finds, IF-1 and IF-2 are precontact lithic isolates. By definition, isolated finds lack integrity and significance and are not eligible for listing on the NRHP. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 73 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA REFERENCES CITED Adams, William Hampton 1980 Waverly Plantation: Ethnoarchaeology of a Tenant Farming Community. Resource Analysts, Inc, Bloomington, Indiana. Alderman -Tuttle, Zoey 2010 "A Dress of the Right Length to Die In": Mortuary and Memorial Practices Amongst Depression -Era Tenant Farmers of the Piedmont South. College of William and Mary, Williamsburg, Virginia. Anderson, David G., and Glen T. Hanson 1988 Early Archaic Settlement in the Southeastern United States: A Case Study from the Savannah River Valley. American Antiquity 53(2):262-286. Barber, Michael B. 1987 A View of Settlement Pattern Change on the Periphery of the Appalachian Plateau: Rock Shelters on the Coeburn Exchange, Wise County, Virginia. In Upland Archaeology in the East: A Third Symposium, edited by Michael B. Barber, pp. 152-167. U.S. Forest Service, Southern Region, Atlanta, Georgia. Barile, Kerri S. 2004 Race, the National Register, and Cultural Resource Management: Creating an Historic Context for Postbellum Sites. Historical Archaeology 38(l):90-100. Bell, Matt 2019 Goodyear: No Plans to Close Danville Plant. Star Tribune. https://www. chathamstartribune.com/news/article—f'9815ec4-3c62-1 le9-9lba-8b8a85bf36f8. html, accessed March 29, 2023. Bellville-Marrion, Jenny 2019 SoVA Megasite at Berry Hill Technical Assistance Review Pittsylvania County, Virginia to Hope Luhmann, Louis Berger. Virginia Department Historic Resources, Richmond. 74 2020 SoVA Megasite-Berry Hill Industrial Park Lots 1-5 and 8-9 Pittsylvania County, Virginia DHR File No. 2012-0023 Letter to Ms. Hope E. Luhman, Louis Berger - A WSP Company. Virginia Department of Historic Resources. 2021 SoVA Megasite-Berry Hill Industrial Park Lots 1-5 and 8-9 Pittsylvania County, Virginia DHR File No. 2012-0023 Letter to Hope Luhman Louis Berger --A WSP Company. Virginia Department of Health; Richmond, Virginia. Benthall, Joseph L. 1990 Daugherty's Cave: A Stratified Site in Russell County, Virginia. Richmond, Virginia. Blanton, Dennis B., Eric Voigt, and Joseph Schuldenrein III 1992 Phase III Archaeological Data Recovery at Site 44RB281, the Dryfoot Site, Route 602 Bridge Replacement, Rockbridge County, Virginia: Project 0602081151, C501. William and Mary Center for Archaeological Research, Williamsburg, Virginia. Bolton, Charles C. 2004 Farmers Without Land: The Plight of White Tenant Farmers and Sharecroppers. Mississippi History Now. http://mshistory.k12.ms.us/articles/228/farfners-without- I and -the -plight -of -white -tenant -farmers -and- sharecroppers, accessed March 9, 2012. Boyd, Cliff 2020 A Review of Paleoindian Research in Virginia and a View Towards the Future. In The Archaeology of Virginia's First Peoples, edited by Elizabeth A. Moore and Bernard K Means. The Archeological Society of Virginia, Richmond. Brown, James A., and R. Vierra 1983 What Happened in the Middle Archaic? An Introduction to an Ecological Approach to Koster Site Archaeology. In Archaic Hunter -Gatherers in the American Midwest: Multidisciplinary Studies of the Archaic Period, edited by J. Phillips and James A. Brown, pp. 165-195. Academic Press, New York. Browning, Lyle 2011 Berry Hill Mega Park Pittsylvania County, Virginia Phase I Intensive Cultural Resources Survey. Midlothian, Virginia. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 75 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Chapman, Jefferson 1985 Tellico Archaeology: 12,000 Years of Native American History. University of Tennessee Press, Knoxville. Cheevers, T., and Thomas Hutchins 1778 A new map of the western parts of Virginia, Pennsylvania, Maryland and North Carolina; comprehending the river Ohio, and all the rivers, which fall into it; part of the river Mississippi, the whole of the Illinois River, Lake Erie; part of the lakes Huron, Michigan &c. and all the country bordering on these lakes and rivers. London. Clement, Maud Carter 1929 The History of Pittsylvania County, Virginia. J.P. Bell Company, Lynchburg, Virginia. 1952 An Abbreviated History of Pittsylvania County, Virginia. Mitchells Publications, Chatham, Virginia. Coe, Joffre L. 1964 The Formative Cultures of the Carolina Piedmont. Transactions of the American Philosophical Society 54(5):1-130. Crass, David Colin, and Richard D. Brooks 1997 Settlement Patterning on an Agriculturally Marginal Landscape. In Carolina's Historical Landscapes: Archaeological Perspectives, pp. 71. University of Tennessee Press, Knoxville. Custer, Jay F. 1990 Early and Middle Cultures of Virginia: Culture Change and Continuity. Early and Middle Archaic Research in Virginia: A Synthesis Special Publication No. 22. The Archeological Society of Virginia, Richmond. Dent, Richard J. 1995 Chesapeake Prehistory: Old Traditions, New Directions. Plenum Press, New York. Egghart, Christopher 2020 Physiographic and Environmental Overview of the Commonwealth. In The Archaeology of Virginia's First Peoples, edited by Elizabeth A. Moore and Bernard K. Means, pp. 3-16. Archeological Society of Virginia. 76 Egloff, Keith T. 1992 The Late Woodland Period in Southwestern Virginia. In Middle and Late Woodland Research in Virginia: A Synthesis, pp. 187-224. Archeological Society of Virginia Special Publication 29. Dietz Press, Richmond, Virginia. 2020 Late Woodland (A.D. 900-1650) over the Blue Ridge: Piedmont to Mountain in Southern Virginia. In The Archaeology of Virginia's First Peoples, edited by Elizabeth Moore and Bernard Means, pp. 203-236. Archeological Society of Virginia. Egloff, Keith T., Mary Ellen N. Hodges, Jay F. Custer, Keith R. Doms, and Leslie D. McFaden 1988 Archaeological Investigations at Croaker Landing, 44JC70 and 44JC71. Research Report Series No. 4. Virginia Division of Historic Landmarks, Richmond. Evans, Clifford 1955 A Ceramic Study of Virginia Archaeology. Smithsonian Institution, Bureau of American Ethnology, Washington, D.C. Fiedel, Stuart, and Caitlin Merritt 2016 National Register Evaluations of Archaeological Sites, Surveys, and Evaluations of Architectural Resources in Lots 8 and 9 Berry Hill Commercial Complex, Phase IT Louis Berger, Richmond, Virginia. Fleming, G.P. 2012 The Nature of Virginia Flora. In Flora of Virginia, pp. 24-75. Foundation of the Virginia Flora Project, Inc., Richmond. Botanical Research Institute of Texas Press, Fort Worth. Ford, Richard I. 1977 Evolutionary Ecology and Evolution of Human Ecosystems: A Case Study from the Midwestern United States of America. In Explanation of Prehistoric Change, edited by James N. Hill, pp. 153-184. University of New Mexico Press. Fountain, Clara G. 1979 Danville: A Pictorial History. Donning Company Publishers, Virginia Beach, Virginia. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 77 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Gardner, William M. 1989 An Examination of Cultural Change in the Late Pleistocene and Early Holocene (Circa 9200 to 6800 B.C.). In Paleoindian Research in Virginia: A Synthesis, edited by J. Mark Wittkofski and Theodore Reinhart, pp. 5-52. Special Publication No. 19. Archeological Society of Virginia, Cortland. Gosney, James E. 2022 Gosney Store National Register of Historic Places Nomination. National Park Service, Washington, D.C. Holland, C.G. 1970 An Archaeological Survey of Southwest Virginia. Smithsonian Institution Press, Washington, D.C. Holland, Claudia C. 1990 Tenant Farms of the past, present, and Future: An Ethnoarchaeological View. Historical Archaeology 24(4):60-69. Jefferies, Richard W. 1990 The Archaic Period. In The Archaeology of Kentucky: Past Accomplishments and Future Directions, edited by David Pollack, 1: pp. 143-246. Kentucky Heritage Council, State Historic Preservation Comprehensive Plan Report No. 1, Frankfort, Kentucky. Jones, Tracy, Stuart Fiedel, Camilla Deiber, and John Bedell 2017 National Register Evaluations of Four Archaeological Sites in Lot 3 and Additional Testing at Site 44PY0328 Berry Hill Commercial Complex, Pittsylvania County, Virginia. Louis Berger, Richmond, Virginia. Joseph, J.W., Theresa M. Hamby, and Catherine Long 2004 Historical Archaeology in Georgia. University of Georgia Laboratory of Archaeology Series Report Number 39; Georgia Archaeological Research Design Paper No. 14. New South Associates, Inc., Stone Mountain, Georgia. Klatka, Thomas S. 1995 An Interim Report of the 1994 Archaeological Investigation at the Fox Site (44SM4) in Smyth County, Virginia. Roanoke Regional Preservation Office, Virginia Department of Historic Resources, Richmond. LaBudde, GregReview Letter 2015 National Register Evaluations of 10 Archaeological Sites in Lots 4 and 5, Surveys and Evaluations of Architectural Resources in Lots 1-5, Berry Hill Industrial Park, Pittsylvania County, Virginia DHR File No. 2012-0023 to Ms. Jeanne Richardson, U.S. Army Corps of Engineers. Virginia Department Historic Resources, Richmond. LeeDecker, Charles H., Brad Koldehoff, Cheryl A. Holt, Daniel P. Wagner, Grace S. Brush, and Margaret Newman 1991 Excavation of the Indian Creek V Site (18PR94), Prince Georges County, Maryland. Cultural Resource Group, Louis Berger & Associates, Inc. for Wallace Roberts & Todd and Washington Metropolitan Area Transit Authority, Washington, D.C. Lifsey, Emmet W., W. Scott Smith, and Jesse Adams -Doolittle 2008 National Register Nomination for Schoolfield School Complex, Danville, Virginia. National Park Service, Washington D.C. Lowery, D., and Jay F. Custer 1990 Crane Point: An Early Archaic Site in Maryland. Journal of Middle Atlantic Archaeology 6:75-120. Luhman, Hope 2021 NRHP Evlauation of SoVirginia Megasite--Berry Hill Industrial Park Lots 1-5, 8, and 9, Pittsylvania County, Virginia Letter to Jenny Bellville-Marrion. Virginia Department Historic Resources, Richmond. MacCord, Sr., Howard A., and William Jack Hranicky 1979 A Basic Guide to Virginia Prehistoric Projectile Points. Special Publication No. 6. The Archeological Society of Virginia, Richmond. McAvoy, Joseph M. 1988 A Paleo-Indian Site Discovered in Greene County presented at the Annual Meeting of the Virginia Society of Archaeology, 1988, Hampton, Virginia. McLearen, Douglas C. 1991 Late Archaic and Early Woodland Material Culture in Virginia. In Late Archaic and Early Woodland Research in Virginia: A Synthesis, edited by Theodore R. Reinhart and Mary Ellen N. Hodges, pp. 89-138. Council of Virginia ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 79 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA Archaeologists and the Archeological Society of Virginia. The Dietz Press, Richmond, Virginia. Messick, Denise, J.W. Joseph, and Natalie P. Adams 2001 Tilling the Earth: Georgia's Historic Agricultural Heritage A Context. New South Associates, Inc., Stone Mountain, Georgia. Meyers, Maureen 2011 The Political Economy of Exotic Trade on the Mississippian Frontier: A Case Study of a Fourteenth -Century Chiefdom in Southwestern Virginia. Unpublished Dissertation, University of Kentucky, Lexington. Nicholson, J.C. 1994 Soil Survey of Pittsylvania County and hte city of Danville, Virginia. Soil Conservation Service, U.S. Government Printing Office, Washington D.C. Orser, Charles E. Jr., Annette M. Nedola, and James L. Roark 1987 Exploring the Rustic Life: Multidisciplinary Research at Millwood Plantation, A Large Piedmont Plantation in Abbeville County, South Carolina, and Elbert County, Georgia. Report available from Mid -American Research Center, Loyola University of Chicago, Chicago, Illinois. Pollard, Edward A. 1871 The Virginia Tourist: Sketches of the Springs and Mountains of Virginia. J.B. Lippincott & Co., Philadelphia, Pennsylvania. Prunty, Merle 1955 The Renaissance of the Southern Plantation. The Geographical Review 45(4):459- 491. Pulice, Michael J, and John R. Kern 2009 National Register of Historic Places Nomination Dan River Mill No. 8. National Park Service, Washington D.C. Purrington, Burton L. 1983 Ancient Mountaineers: An Overview of Prehistoric Archaeology of North Carolina's Western Mountain Region. In The Prehistory of North Carolina: an Archaeological Symposium, edited by Mark A. Mathis and Jeffrey J. Crow, pp. 8 3 — 160. North Carolina Division of Archives and History, Department of Cultural Resources, Raleigh. Reed, Mary Beth, Natalie Adams, Jennifer Azzarello, Terri Lotti, and Sharman Southall 2011 We Made A Day: History and Archaeology of Tenancy on the L.E. Gay Plantation, Randolph County, Georgia. New South Associates, Inc., Stone Mountain, Georgia. Richmond Times Dispatch 2019 Corning Closing Danville plant, Adding to City's Woes. Richmond Times Dispatch. https:Hrichmond.com/business/corning-closing-danville-plant-adding- to-citys-woes/article-5879bfbb-4a88-57f6-b632-54fdbcee0d6b.html, accessed March 29, 2023. Sale, Edith Tunis (editor) 1923 The Piedmont Secction. In Historic Gardens of Virginia, pp. 320-323. James River Garden Club, Richmond, Virginia. Salmon, John S., and Emily J. Salmon 1993 Pittsylvania County, Virginia, 1786r1986: A Bicentennial History. Pittsylvania County Board of Supervisors, Rocky Mount, Virginia. Sassaman, Kenneth E. 1993 Early Pottery in the Southeast: Tradition and Innovation in Cooking Technology. University of Alabama Press, Tuscaloosa. Stewart, R. Michael 1992 Observations on the Middle Woodland Period of Virginia: A Middle Atlantic Region Perspective. In Middle and Late Woodland Research in Virginia: A Synthesis, edited by Theodore R. Reinhart and Mary Ellen N. Hodges, pp. 1-38. Archeological Society of Virginia Special Publication 29. The Dietz Press, Richmond, Virginia. Swanson, Drew A. 2010 Land of the Bright Leaf: Yellow Tobacco, Environment, and Culture Along the Border of Virginia and North Carolina. Unpublished Dissertation, University of Georgia, Athens. 2014 A Golden Weed: Tobacco and Environment in the Piedmont South. Yale University Press, New Haven, Connecticut. ARCHAEOLOGICAL SURVEY FOR THE BERRY HILL CONNECTOR 1 81 ROAD EXTENSION, PITTSYLVANIA COUNTY, VIRGINIA The Associated Press 2015 Masonite Shuts Danville Plant. Greensboro News & Record. https://greensboro. com/news/masonite-shuts-danville-plant/article—a37897b 1-7671-5aac-8f5d- dd6ffbb245fc.html, accessed March 29, 2023. Tilley, Nannie M. 1948 The Bright -Tobacco Industry, 18601929. University of North Carolina Press, Chapel Hill. Tippett, Lee, Tracy Jones, April Greenberg, Stuart Fiedel, Camilla Deiber, and Eric Barr 2015 National Register Evaluations of 10 Archaeological Sites in Lots 4 and 5 and Surveys and Evaluations of Architectural Resources in Lots 15 Berry Industrial Park, Pittsylvania County, Virginia. Louis Berger, Richmond, Virginia. Virginia Department of Historic Resources 2003 Guidelines for Conducting Cultural Resources Survey in Virginia. Virginia Department of Historic Resources, Richmond. 2017 Guidelines for Conducting Historic Resources Survey in Virginia. Virginia Department of Historic Resources, Richmond. Wendt, LeeAnne J. 2014 Understanding Strawberry Plains Through Landscape Archaeology. Unpublished Thesis, The University of Mississippi, Oxford. Intentionally left blank APPENDIX A: SPECIMEN CATALOG Intentionally left blank Specimen Catalog County: Pittsylvania County State: Virginia Project: Berry Hill Connector (2023) Field Site # State Site # Field Bag # Excavation Unit Horizontal Location Vertical Location Count/ Weight Artifact Description Field Date FS-2 44PY00-IF1 28 STP 775 N500 E500 10-34 curbs_ Stratum 11 1 Metavolcanic-Unidentified, Flake-Indeterminant, (Analyzed In Field: Not Collected) 2/24/23 FS-4 44PY00-IF2 27 STP 762 N500 E500 0-12 curbs Stratum I I Metavolcanic-Unidentified, Flake-Indeterminant, (Analyzed In Field: Not Collected) 2/24/23 FS-5 44PY0677 1 N500 E530 0-20 curbs 1 (OAg) 1Button, Porcelain, Prosser 2/27/23 FS-5 44PY0677 1 N500 E530 0-20 curbs 1 (0.2u) Container Glass, Amber__ Red 2/27/23 FS-5 44PY0677 1 N500 E530 0-20 curbs 2 (0.6-) Container Glass, Clear 2/27/23 FS-5 44PY0677 2 N500 E477.5 Surface 1 (7_1 Whiteware, Plain 2/27/23 FS-5 44PY0677 3 N500 E515 0-10 ctnbs 1 2.7g Non -Electrical Wire 2/27/23 FS-5 44PY0677 3 N500 E515 0-10 curbs 1 l A Container Glass, Clear 2/27/23 FS-5 44PY0677 4 N500 E500 1-10 curbs 1 S 4 Container Glass Ametln st Color 2/27/23 FS-5 44PY0677 5 N495 E530 0-14 curbs 1 (3.2a) INail Cut Fragment 2/27/23 FS-5 44PY0677 5 N485 E530 0-14 cmbs I (I ) lCoritainei Glass Aqua 2/27/23 FS-5 44PY0677 5 N485 E530 0-14 cmbs 2 (22g) I Whiteware Plain 2/27/23 FS-5 44PY0677 5 N485 E530 0-14 cmbs 5 730 lCoritarner Glass Cobalt Blue 2/27/23 FS-5 44PY0677 5 N485 E530 0-14 cmbs 2 6g) Container Glass, Clear 2/27/23 FS-5 44PY0677 5 N485 E530 0-14 cmbs 1 (61.8u) Stoneware, Alkaline Glazed, Salt glaze with albany and bristol glaze 2/27/23 FS-5 44PY0677 6 N485 E530 14-28 cmbs 1 (L3�) Container Glass, Cobalt Blue 2/27/23 FS-5 44PY0677 6 N485 E530 14-28 cmbs 1 (02a) Whiteware, Plain 2/27/23 FS-5 44PY0677 7 N500 E485 0-10 cmbs 11 (0.6g) Container Glass, Clear 2/27/23 FS-5 44PY0677 8 N492.5 E485 0-16 cmbs 1 1.6 Container Glass, Clear, With embossed line 2/27/23 FS-5 44PY0677 9 N485 E515 0-IS cinbs 1 16.7g Container Glass, Clear 2/27/23 FS-5 44PY0677 10 N515 E440 0-18 cmbs 1 (6.2g) Nail Wire Common Unmeasured 2/27/23 FS-5 44PY0677 10 N515 E440 0-18 cribs 1 (592g) iron/ Steel Plate 2/27/23 FS-5 44PY0677 I I N515 E537 0-20 cmbs I 43g Canning Seal Milk Glass 'LINED' 2/27/23 FS-5 44PY0677 11 N515 E537 0-20 cmbs 1 36.5 Metal Object_ Unidentified, Triangular rod -like 2/27/23 New South Associates, Inc 6150 E. Ponce & LeonAvenue Stone Mountain, GA 30083 Page 1 of 3 Specimen Catalog County: Pittsylvania County State: Virginia Project: Berry Hill Connector (2023) Field Site # Sta a Site # Field Ba # Excavation Unit Horizontal Location Vertical Location Count/ Weight Artifact Descri do Field I FS-5 44PY0677 12 N500 E522 0-30 cmbs 1 (0.4g) Container Glass, Aqua 2/27/23 FS-5 44PY0677 12 N500 E522 0-30 cmbs 1 (3.6g) Container Glass Clear Embossed line 2/27/23 FS-5 44PY0677 12 1 N500 E522 0-30 cmbs I 8.9g Metal Object. Unidentified Oval strap-] ike obiect; Mend 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 1 (09 Container Glass, Cobalt Blue 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 3 (3.2g) Container Glass, Aqua 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 1 (L6�) Container Glass, Clear, With partial embossed design (Maker's Mark?) 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 2 (2.6g) Container Glass, Clear, With embossed boubles and milky 1 inclusions 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 1 4.7g S trap Iron/ Metal 2/27/23 FS-5 44PY0677 13 N5IS E530 0-20 cmbs 1 6.1 Container Glass, Clear 2/27/23 FS-5 44PY0677 13 N515 E530 0-20 cmbs 1 4.5 Stoneware Brown Salt Glazed IJnidentified 2/27/23 FS-5 44PY0677 14 N530 E545 0-20 cmbs 3 (12.6a) Container Glass, Light Green 2/27/23 FS-5 144PY0677 14 1 N530 E545 0-20 cmbs 1 (97.4g) Container Glass, Machine Made, Light Green, Owens-Illinois beverage bottle, Atlanta GA Maker's mark indicates 1959, sha.org/bottle/pdffiles/Owenslllinois2Ol5.pdf ; isha.org/botle/Typing/011933/011933y.pdf 2/27/23 FS-5 44PY0677 15 N530 E500 0-20 cmbs 1 (4Ag) Container Glass, Amber 2/27/23 FS-5 44PY0677 15 N530 E500 0-20 cmbs 1 (11�) Container Glass, Clear 2/27/23 FS-5 44PY0677 15 N530 E500 0-20 cmbs 2 (0.5a) Whiteware, Plain 2/27/23 FS-5 44PY0677 15 N530 E500 0-20 cmbs 9 38.8g Container Glass, Amber_ With stippling design throughout 2/27/23 FS-5 44PY0677 15 N530 E500 0-20 cmbs 2 3 6 Whiteware, Plain, Molded 2/27/23 FS-5 44PY0677 16 N492 E530 0-25 cmbs 1 (1 3,-,) Whiteware, Plain 2/27/23 FS-5 44PY0677 16 N492 E530 0-25 cmbs 3 (9.4g) Container Glass, Clear 2/27/23 FS-5 44PY0677 16 N492 E530 0-25 cmbs 1 (5.9g) Glass Unmeasured Flat 2/27/23 FS-5 44PY0677 17 N492 E545 0-8 cmbs I 0. I g Plastic indeterminate Flat and white 2/27/23 IFS-5 144PY0677 1 171 N492 E545 0-8 cmbs 1 0.5 Container Glass Clear 2/27/23 New South Associates, Inc 6150 E. Ponce & LeonAvenue Stone Mountain, GA 30083 Page 2 of 3 Specimen Catalog County: Pittsylvania County State: Virginia Project: Berry Hill Connector (2023) Site # Field Bag # Excavation Unit Horizontal Location Vertical Location Count/ Weight Artifact Description Field Date 744PY0677 17 N492 E545 0-8 cmbs 1 (4.2a Container Glass Light Blue With embossed artial star oints 2/27/23 0677 18 N492 E560 0-15 cmbs 2 (3.6g) Container Glass, Clear 2/27/23 FS-5 44PY0677 19 N492 E530 0-6 cmbs 1 (17 2 Stoneware, Unidentified Brown Glazed Or Slipped, lustrous 2/27/23 FS-5 44PY0677 20 N507 E515 0-11 cmbs 1 (LIg) Container Glass, Cobalt Blue 2/27/23 FS-5 44PY0677 21 N507 E537 0-14 cmbs 1 (2.1u) Container Glass, Aqua 2/27/23 FS-5 44PY0677 21 N507 E537 0-14 cmbs 2 (1 4a) Container Glass, Clear, One with two attached shards 2/27/23 FS-5 44PY0677 22 N507 E485 0-6 cmbs 1 (5g) Whiteware, Plain 2/27/23 FS-5 44PY0677 23 N515 E485 6-17 cmbs 1 0.5g Glass, Unmeasured Flat 2/27/23 FS-5 44PY0677 23 N515 E485 6-17 cmbs 2 (12 Container Glass, Clear 2/27/23 FS-5 44PY0677 23 N515 E485 6-17 cmbs 1 8.8 Nail Wire Common Unmeasured 2/27/23 FS-5 44PY0677 24 N515 E545 0-20 cmbs 2 (5.8g) Container Glass, Clear, Stipppling One with partial maker's mark 2/27/23 FS-5 44PY0677 24 N515 E545 0-20 cmbs 2 (15 5g) Container Glass Clear One with mold seam 2/27/23 FS-5 44PY0677 24 N515 E545 0-20 cmbs I 0.1 g) Button, Plastic, Fragment 2/27/23 FS-5 44PY0677 24 N515 E545 0-20 cmbs 1 (29g) Whiteware, Simple Bands_ Single red/orange band on rim 2/27/23 FS-5 44PY0677 24 N515 E545 0-20 cmbs 1 (3.6u) Toy Tea Set, Porcelain__ Miniature cup 2/27/23 FS-5 44PY0677 25 IN530 E485 0-14 cmbs 19 (5.3g Container Glass, Clear 2/27/23 FS-5 44PY0677 25 IN530 E485 0-14 cmbs 1 (1.3a) Container Glass, Clear, Embossed design 2/27/23 FS-5 44PY0677 26 IN530 E477 0-12 cmbs I 1 (1_lg) lWhiteware, Plain 2/27/23 FS-5 44PY0677 26 IN530 E477 0-12 cmbs I 1 12g Container Glass, Clear 2/27/23 New South Associates, Inc 6150 E. Ponce & LeonAvenge Stone Mountain, GA 30083 Page 3 of 3 Attachment F Section 408 Documentation RE: [Non-DoD Source] Section 408 Verification: VDOT Project 0311-071-835, P101 (UPC 119164) BERRY HILL CONNECTOR RD EXTENSION, Trotters Cr, McGuff Cr, Quinlan, Timothy CIV SAW <Timothy.Quinlan@usace.army.mil> Fri 5/12/2023 3:48 PM To:Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov> Frank, This project is not located in the vicinity of a Federal Project. No impact, no 408 required. V/R Tim Quinlan Project Manager Section 408 Reviewer CESAW 910-251- 4415 860-966-5345 From: Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov> Sent: Monday, May 8, 2023 7:35 AM To: Quinlan, Timothy CIV SAW <Timothy.Quinlan@usace.army.mil> Subject: [Non-DoD Source] Section 408 Verification: VDOT Project 0311-071-835, P101 (UPC 119164) BERRY HILL CONNECTOR RD EXTENSION, Trotters Cr, McGuff Cr, VDOT Berry Hill Connector Road Extension Project: 0311-071-835, P101 (UPC 119164) Rte 311 Berry Hill Road Pittsylvania County, Virginia Crossings at: McGuff Creek; Trotters Creek Drainage Area: 6.14 sq. miles; 6.04 sq. miles Lat 36.569941, Long-79.574013; Lat 36.565306, Long-79.583968 Hi Tim, I do not recognize any Section 408 civil works projects in the vicinity of the Berry Hill Connector Road Extension Project noted above. Please provide VDOT with a confirmation email. I have attached a detailed scope of work (VDOT EQ429 Early Project Notification) with topo map, and a USACE Wilmington Section 408 map from your website with the project location marked. Please review the attachments and let me know what additional information you need. thanks! Frank Scearce 434-251-7434 Frank Scearce Environmental / Lynchburg XVDOT I Virginia Department of Transportation Cell: 434-251-7434 fra n k.scea rce@VDOT.Vi rg i n ia.gov Attachment G Threatened & Endangered Species Information z a O � v s•, b0 � � � � � Cd cd cd Cd W Cd cn u cd o (1) o cn 00a�oa� W O Cd_ ' � L/1 cn c cd N °� � z O U d cn N� +; z W oU� Pam- U(y (yx o�.'a��i�[� z W ti N v� Os, C,3 N U HO W ���o �U W � s. QaH �' N ^Q � U N Op C,3 Q O 0000 Q Off" O �O N Ucn a) Cd U � O `3U`�� o`��O ai A, cd Ncn H cd Cd U _� o 4Wp4NM���W cn cn O a O O O U a) cd N � N x O O� x 00 s� 4' 00 00 Cd Cd � x cn 7 cd a) 4Z �' 4-a w O Cd Cd En U� W W (`1 �t/10°�°��oN oo �� N U -� O~Cd x •• O �N.� O M M N W Ay cd cd N W cz z U 7; cd cd `� � � �� U a U U � "O U •� U Cd "O �1 zz z .. Q'° o.° an..�; Zfs,HcdH 0 "d U U C O cd H Q a W W W W is O U O d F 01 �n m 0 0 o � � U O O T Cd � Fr •� ° Z ° � � on � O ,o o w 'b � � Y � � � 'Ea o � ° op °J � � y G o 'p y c7 a`�i �' y � ° � o �, o .� � � •� o .� CQ N N aCi Cab Ca � w y .� o" C � � � � � y 'Y ✓1 o�A � o 00 chi .� "" aCi � ,k b � •°q N O n o o -°o 3°$ G w °o 75! o H .o .� o a •a 3 b b 3�JCQ ox CQ o oUU o � o O Cd Cd z.� o u �" " W � cn En d UCd a o ,� b w w Cd cC) v +Z c,3 U N� O En W (1) c a cd cn Cd (1) ocn U cn � O cn Cd� x GG,� � a b.� oz9a � 0 IM O u w w w cn N Z •C C F. a; � y N _ � •y � 3 � b o b 4 n f� a Ca o no wo Ca o E� w w w ott�� y � •ti .o > y w � y � U U �❑ � G oA � cd .? cOi y � a> cd .�' � '� w° o U G 3 o a b O o� �o Q 00 �i O urn 00 c Y N b z U U Q M N O � , •� O � qo � O • � •� y .b o Cc�j c� CQ Ca o q w° C N O14. u� ox ° eu o 3 •� �o �� a 14. p � F-�O b �.c �b 3� �•y• � s � N � c Qp"� 8�wCD y�UU❑ �.? u �H� W a a o G O [� U t4o.o U G 3 o M F'i a�'i •„ ,� c M v .� '� .? �a G N c7 o o ° Cu 0�4 o G .o 0 0 o 45 a i 0. a U C) v [ U w° E o U p q �3 a o o a b w O u G y aNi Ca y U U fY7 J7 ci N � OU q i0i W ri c� O E� o y � •ti .o � w p o m w y G O H U G y aNi Ca y U U .Y � o y -d `o o •� � � � z C7 140. Ca o H 14. y ti O Y � o U 14. o ¢, .b C4 y U U G oA .? cOi '-aNi o0A H A y45 a i U 04 .b '5 [ U w° E° cba U p q cpa a o o Ca y b w H IM O r� V T GJ � V U O W z� w � b G 'C Ca q g y j y N c� CL Z U o a 3 a o w 3 G •� C7 � ai y °' a) w � O -0 � 14. o U � c� •Y ❑D❑ ,i � � M w y fr J7 � .p U � cd 'cadc� � Fi .� Lc�i 45 a i U Ca v[ U w° a U a H a w b a w b O o� �o Q 00 �i O u N ,q `n rn o a p o k G �] p o aCi Q aCi 0 0 U U Q M N O �� •� O� O � O• �; •� y b O C� CQ Ca U C N OU y W ti N o U G C C7 �' ai N p 3 P3 >° G C I�-I F'i y •G l'n N U F-i Fr VNi � V�i � cd � N � Q � F'i � iJ a a U v H U woo° o U moo. G 3 a o s y U U c cn w H 4 c� H H w U a G O 0 z y x z W O N cd N N N C,3 �'." �U Cdt;) N N �C4:; M NIt U� N Z CA ccnnN �N .Q! O cn �.O_ v� AO �� N H O ccyy cn N >N ON dEn �n cd N +- - O O M N 7d C) U ago cQ 00 � yN, � O N00 O iIN 45 3 °' 'cncn cn oK ao 23 �R-! tj ��� o� ° Qc° H riU�l CA CA cn pW cQ NQ NN O N� O O Cq Cd Cd N + Cd a)N CD4 '. Cd A N cn Wcd� � +� cq Cd C.4) U >w A� o oZ!, �� , � �t � cn � cn Cd cd a� Q a� vwl a� CDCIA Cd -� Cd OEM s" U N N p cn cn O� O W I —I v ,—, V �' N O AQn O V cn N cn CdO N `n ��' U `n ON �N U �W O O O O • E.y �/ N N N O O O O N N • Q ON • • G� Z xz� � _ o COS O U O.> p bq cd cd cn '-C� Cd C6 CdO s, Cd -Ej cn cn O U �s cd U U cd 4N S U cd Ocn r �M�� O vN cpy cd + r bD. U ,� cn 0 g cn dc0� U �C C3 U P, M U cd cd U O cn �� Cd Np N N U" cd g cd 54. g cd cd U C� g� U N �" g � 42.1 cd �� V1 c� Q. H O U k .. M 0 i O �rna w a O � N d� Cd cd OO cn cd U b0 cdcn bq aticnL7o'�.O gCd cd �, r 44 " V1 Cd Cul M N O N O O 10 cz LE USFWS Correspondence and Reference Documents United States Department of the FISH AND WILDLIFE SERVICE Virginia Field Office 6669 Short Lane Gloucester, VA 23061 Date: 6-6-2024 Self -Certification Letter U.S. FISEIB WILDLIFE SERVICE r Interior Project Name: VDOT Project Berry Hill Rt Connector Extension UPC 119164 Dear Applicant: Thank you for using the U.S. Fish and Wildlife Service (Service) Virginia Ecological Services online project review process. By submitting this letter, in conjunction with your project review package to our office for review, you are certifying that you have completed the online project review process for the project named above in accordance with all instructions provided, using the best available information to reach your determinations. From the date of receipt, our office has 60 days (50 CFR § 402.13(c)(2)) to review your project package. If we do not concur with the Section 7 determination(s) provided or if we have any questions/concerns regarding the information provided, you will be contacted. If you are not contacted during the 60-day review period, this letter and your project review package, complete the review of your project in accordance with the Endangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended (ESA). This letter also provides information for your project review under the National Environmental Policy Act of 1969 (P.L. 91-190, 42 U.S.C.4321-4347, 83 Stat. 852), as amended. A copy of this letter and the project review package must be submitted to this office for this self -certification letter to be valid. This letter and the project review package will be maintained in our records. The ESA Section 7 Determination Table in the enclosed project review package summarizes your ESA analyses and determinations. These analyses resulted in a "no effect" and/or a "may affect, not likely to adversely affect" determination for proposed/listed species and/or proposed/designated critical habitat. VERSION 3.2 Page 2 The use of the online project review process in strict accordance with the instructions provided as documented in the enclosed project review package resulted in reaching the appropriate determinations. Therefore, we concur with the not likely to adversely affect determination(s) for proposed/listed species and proposed/designated critical habitat provided in the ESA Section 7 Determination Table. Should project plans change, surveys expire, or information on the distribution or status of proposed/listed species and/or proposed/designated critical habitat become available/change, this letter is no longer valid and you must submit an updated project package. Note that under 50 CFR 402.12(e) of the regulations implementing Section 7 of the ESA, the accuracy of official species lists should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. Information about the online project review process including instructions and use, species information, and other information regarding project reviews within Virginia is available on our website (https://www.fvvs.gov/office/Virginia-ecological-services/Virginia-field-office-online- review-process). If you have any questions, please contact Troy Andersen of this office at (804) 728-0695. Enclosures - project review package Sincerely, U Cindy Schulz Field Supervisor Virginia Ecological Services VERSION 3.2 a) E Z dA C U m u U C � N 00 O to Q O V>) O O V) N � o 0 00 N 00 M LO 0 N rl- i > M o O N (� u04 M cO 04 C > O > � 0 N •— a O V C � o M o o m V w OP m O • 0 cI U V m o G^J o C) U Q � L tA 1 V Z_ L z LL UtA U a) m a D C >- >- O �; 4��; o 0 Z Zo V = > > W L � N 49 4+ (6 >, 4� M >, +J G J (0 c J (0 C p a) C U U a) I O 75 a) > U a) s Q . U Lf) n n > O a) > co V a E o `—° E O c O. a) U U U O +J a�o� s o m 3 c O p 7 O N U ,E Q) O ro m c N i s (7 = Z a•' +J fa a) f0 U N f�6 4O -1 � � � � rn E 3 � c Q � c) o E a) MM�, .X o + ° o +' °' a) a" E O O c a) v E co c L a O O v O E i X (6 a) 4' Q v� a)c OU a; o CL p U O Q i O m 'a m H Q m 4s .� Z Q 2 Z C a) bi0 O C C 0O o6 C � 3 aj E �ibu s toU0 ca O m c +J E s +� 0 cO 3 a) a) 'C: a) c Ot cO C U +co u a; _ 7 Q L 0 0 fC6 4- QC 41 ,C cC 7 41 C U � 'm y� O i C r > 4 O� U -1 U 4M u Q4� 4- O �; +' O m -0 m m � aM o U aJ i E a) v� C7 3i 'a s i U +' v� p u g dA O 4+ O O 0 U N O U a) 4 J 0 i a) C�4� O 4- O O +, Q i nj O C ci i U O ca to a) U -a a) M4�U U 41 U N i > Q Q C n a) lV Q O m v� s c0 C 4 U a) ~a s3 }a 'ac -a Q� -C4� - ° ai aO o a a a) cc O 'a 4� 7 ; 4� s o 4� m Ov O m !Ea a soOs-C-Cs o Oo m Ha -C -C C � E om4� a- 3 Uv +� _ f0 N v v Na a U_ U- v m C m 0 Z L f6 m O 7 J q_- Z IA L M 7 f0 m 4 � f6 O LL O > 4� v > o U .E i U z a) 0 l� a) C � (D Vf U a ci a010AT OF rr P' fi �u r �- A � J '4C11 1. 59 United States Department of the Interior FISH AND WILDLIFE SERVICE Virginia Ecological Services Field Office 6669 Short Lane Gloucester, VA 23061-4410 Phone: (804) 693-6694 In Reply Refer To: 06/02/202419:19:21 UTC Project Code: 2022-0090089 Project Name: Project 0311-071-835, P101 (UPC 119164) Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). Any activity proposed on National Wildlife Refuge lands must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. Project code: 2022-0090089 06/02/2024 19:19:21 UTC A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/sites/defaultlfiles/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/what- we-do. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures, see https://www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Project Code in the header of this 2of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): ■ Official Species List ■ USFWS National Wildlife Refuges and Fish Hatcheries ■ Bald & Golden Eagles • Migratory Birds OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Virginia Ecological Services Field Office 6669 Short Lane Gloucester, VA 23061-4410 (804) 693-6694 3of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC PROJECT SUMMARY Project Code: 2022-0090089 Project Name: Project 0311-071-835, P101 (UPC 119164) Project Type: Road/Hwy - New Construction Project Description: Berry Hill Connector Road Extension. Road widening from 2 to 4 lanes; major widening to occur on north side of roadway. Add turn lane/improve intersection with Oak Hill Rd. Project Location: The approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/(a)36.56401245.-79,58239122936104.14z x l.Ysi/rn q- Counties: Pittsylvania County, Virginia 4of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC ENDANGERED SPECIES ACT SPECIES There is a total of 4 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. Note that 1 of these species should be considered only under certain conditions. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries1, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 5of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC MAMMALS NAME STATUS Northern Long-eared Bat Myotis septentrionalis Endangered No critical habitat has been designated for this species. This species only needs to be considered under the following conditions: ■ This species only needs to be considered if the project includes wind turbine operations. Species profile: https://ecos.fws.gov/ecp/species/9045 Tricolored Bat Perimyotis sub flavus Proposed No critical habitat has been designated for this species. Endangered Species profile: https://ecos.fws.gov/ecp/species/10515 CLAMS NAME STATUS Green Floater Lasmigona subviridis Proposed There is proposed critical habitat for this species. Your location does not overlap the critical Threatened habitat. Species profile: https://ecos.fws.gov/ecp/species/7541 INSECTS NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/9743 CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HAVE EFFECTS ON ALL ABOVE LISTED SPECIES. USFWS NATIONAL WILDLIFE REFUGE LANDS AND FISH HATCHERIES Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. 6of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC BALD & GOLDEN EAGLES Bald and golden eagles are protected under the Bald and Golden Eagle Protection Act1 and the Migratory Bird Treaty ActZ. Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats3, should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". 1. The Bald and Golden Eagle Protection Act of 1940. 2. The Migratory Birds Treaty Act of 1918. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) There are likely bald eagles present in your project area. For additional information on bald eagles, refer to Bald Eagle Nesting and Sensitivity to Human Activity For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. 1►/1ul5l BREEDING SEASON Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. btips://ecos.fws.gov/eqp/species/1626 PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. 7of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC Survey Effort () Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data( ) A week is marked as having no data if there were no survey events for that week. probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle Non -BCC Vulnerable Additional information can be found using the following links: • Eagle Management https://www.fws.gov/program/eagle-management ■ Measures for avoiding and minimizing impacts to birds https://www.fws.gov/librar3L/ collections/avoiding-and-minimizing-incidental-take-migratory-birds ■ Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf ■ Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action MIGRATORY BIRDS Certain birds are protected under the Migratory Bird Treaty Act1 and the Bald and Golden Eagle Protection ActZ. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) 8of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. fts://ecos.fws.gov/ecp/species/1626 Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 25 and Alaska. fts://ecos.fws.gov/eW/species/9406 Eastern Whip -poor -will Antrostomus voci ferns Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 20 and Alaska. fts://ecos.fws.gov/eW/species/10678 Grasshopper Sparrow Ammodramus savannarum perpallidus Breeds Jun 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Aug 20 (BCRs) in the continental USA btips://ecos.fws.gov/eqp/species/8329 Prairie Warbler Setophaga discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. fts://ecos.fws.gov/ecp/species/9513 Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. fts://ecos.fws.gov/ecp/species/9439 Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10 and Alaska. fts://ecos.fws.gov/eqp/species/9398 Rusty Blackbird Euphagus carolinus Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (BCRs) in the continental USA btips://ecos.fws.gov/eqp/species/9478 Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. fts://ecos.fws.gov/eqp/species/9431 9of12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. Survey Effort () Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data( ) A week is marked as having no data if there were no survey events for that week. probability of presence breeding season survey effort no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle --- dill Non -BCC � � � � I Vulnerable Chimney Swift��-- BCC Rangewide (CON) Eastern Whip -poor - Will — — — - - — — - -'— BCC Rangewide(CON) Grasshopper Grasshopper��-- Sparrow— BCC-BCR Prairie Warbler—� IIII IIII IIII BCC Ran ewide ��-- �--- �--- — — — — - - — — - --(CON) Prothonotary Prothonotary . — — +--- 1111 1111 1111 1111 — — — — — — — — --+— — — — — - Warbler 10 of 12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC BCC Rangewide (CON) Red-headed +-- '— '— f� •!,; �JIIJill I--- Woodpecker + —+ — -- --�— ++—� BCC Rangewide (CON) Rusty Blackbird — • — — —'— —+-- — — — — —+-- —++— — — — — — — — — --+— — — — — —'— BCC -BCR Wood Thrush BCC Rangewide - - — — - — — — - — — — -IF —III Jill Jill Jill ------(CON) Additional Additional information can be found using the following links: • Eagle Management https://www.fws.gov/program/eagle-management ■ Measures for avoiding and minimizing impacts to birds https://www.fws.gov/librar collections/avoiding-and-minimizing-incidental-take-migratory-birds ■ Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf ■ Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action 11 of 12 Project code: 2022-0090089 06/02/2024 19:19:21 UTC IPAC USER CONTACT INFORMATION Agency: Virginia Department of Transportation Name: Frank Scearce Address: 4219 Campbell Ave City: Lynchburg State: VA Zip: 24501 Email frank.scearce@vdot.virginia.gov Phone: 4349476559 LEAD AGENCY CONTACT INFORMATION Lead Agency: Army Corps of Engineers 12 of 12 cn co O O cn O O N N O N a c O LL O N O O J C O ca L V N 7— _cn r V a V a� �O L a O N i J Z GC W x u a m N f,7 lfl L.L N N Y � U m ; ►] a N Ln N O N CV m ffi m L fy V1 F 00 0 0 rn 0 O N N O N U f0 a fu c U- W m Ln L fu J C O U In ko n > O 0o a D U fL O .O -6 a c > m V Ln 0 0) fL U iY O Z a� w M X m u > H (A en E M c O O. L L O ur +1 c 0 s 40 ++ m cn C. O I c O cn u L c u N O 0 O 0 IA +0 O Q M L c N s .E, `W r c0 O IL O CN _O co C co 0 O LO LO M OP ti O 1 M O d m 7 Z AV W .O IL (D m co O U a Z) U N 0 a- H 0 L.O LO m 000 ULO O O Q ti N(3) La)qt O19t t U t _ CO O M U M � N O 0 O N �U c0 O � •C > a U) U) cv a •� C O � O U O � •fn a) O X W ^0 W C "+ O aU O C U .3 WAU' O Q. a) L O C� CD O y CD 00 y yo CCD N �Q M CDCD es O Mt Ix 0 cc CD v to C y O y.. CJ C�Oc � � C O L O V CD � C O M m � O CDCD C occ Q y C (D C 04O CD O C 4 Cc c cc to .0 C Cc = N N o) to cc tx C CD , '4ha Cc cc W 0 N O O 0Q) cc � N CINA O O y cc y es � O O) O O) CD toi E_ m H C O ico 0 V c 3 C m 5 C'%Mto C1i7 U QU ty��o0 O mU y � � 0 .0 • CD Q cc moo � D es 4 OM CD -r e0 C US 0 U cc C0 C (D Z O O c `� .' N a' y m 0 0000� -cam QU '0,003� 00 Qc CD 2CD coo coo 12wc� wQ (DU 0CD CD Q) orn o0 CDoE� (-00 co c � �' -C, 00 O C1 Z w c CDU O C y }Q U N NSD N E ca Q nj O _O ccC cc*a �� O co� Q U O C O •N4" ca N 'O O 3 U U O O cc ca Ct t ca � uQi � c Q. 0 0,C O cm`'O �00.*a .-� N�Co y O4.. y. Q ` �_^0 p 0 'p .0,0 O M co Q C Q +CD 0 C O Q Q •O �O = es o C c � m0 44�vN C 0 0 >CD at 0 cu,o cc CIO c „cc 0 0: -C N 3 V c a V O C6 QO N O Q. yoac°i oc e�4a� �0(D L U •� i 'O +Q) 0 4 ca N N 'Co —0O 4 L O N C m C Q eo 12 H e Hw 02 c O c C O O Q- N LM c O � H c-, o 10 c J N cM Q m C C. UD G� N N N N C m cM C C N c LL u L) c 4- E U N ❑ A Q U ~ ❑ L 3 � N O O A LL 4 Re -submittal: VDOT Project: UPC 119164 Self Certification Letter; State Funded; (IPaC: 2022-0090089) Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov> Thu 5/2/2024 5:52 PM To:Virginia Field Office, FW5 (virginiafieldoffice@fws.gov) <virginiafieldoffice@fws.gov> g 1 attachments (7 MB) 5-2-2024 FWS submittal package 2).pdf, Project Name: Berry Hill Connector Road Extension; Pittsylvania County Project Number: 0311-071-835, C501, D648, D649, P101, R201 UPC: 119164 0 Attached is a re -submittal (original sent 10-6-2023) self -certification review package for VDOT Project UPC 119164, Berry Hill Connector Extension located in Pittsylvania County (Lat 36.564444, Long:-79.585556). The project will consist of: ... reconfiguring Berry Hill Rd as an extension of the Berry Hill Road Connector (UPC 115493) by widening Segment C of the road from existing 2 lanes to a proposed 4-lane Rural Collector Road system (GS-3). The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. A 2018 study indicates the road is not sufficient to accommodate traffic from the developing adjacent Southern Virginia Mega Site at Berry Hill. The project also proposes intersection improvement to the Rte. 3111 Oak Hill intersection. The proposed intersection improvement to include a 50 foot and 80 foot intersection radii and an approximate 50 foot storage and a 50 foot taper to facilitate larger vehicles to accelerate and merge onto westbound US311. The project will remove approximately 29 acres of trees along the 2.3 mile corridor with the extension of several jurisdictional culverts. Impacts to stream channels and wetlands will be necessary. The 10-6-2023 coordination included a TOYR for the Northern Long Eared Bat, but the current Ipac Official Species List has the note about wind turbines for that species, so the TOYR is no longer proposed for the NLEB. The current coordination is being submitted for the concurrence of the application of the Tri- colored Bat pup season Time of Year Restriction (May 15-July 31) for the purposes of tree cutting only and concurrence with the Species Conclusion Table as it relates to other protected and proposed species. Please contact me if you need additional information. thanks, Frank Scearce 434-251-7434 Frank Scearce Environmental / Lynchburg Virginia Department of Transportation XVD13T Cell: 434-251-7434 frank.scearce@VDOT.Virginia.gov Resource Agency Coordination VDOT PROJECT: Rte 311 Berry Hill Connector Road Extension; Pittsylvania County VDOT PROJECT Number: UPC 119164; 0311-071-835, C501, D648, D649, P101, R201 Latitude: 36.564444 Longitude:-79.585556 Date: 5-2-2024 By copy of this email, we are requesting review from: ®FWS: This is an ❑X updated review/❑ new project. The referenced project was reviewed on 5- 1-2024 using the Virginia Field Office's online project review process, in accordance with all guidance and instructions. The FWS Consultation Code is 2022-0090089. Included is a self - certification letter. ❑ DNH: This is an ❑updated review/❑ new project. The project area intersects identified natural heritage resources and/or predicted suitable habitat and has been/has not been submitted through the Natural Heritage Data Explorer (NHDE). The Web Project ID number is (Enter DNH number here) ❑ DWR: This is an ❑updated review/❑ new project. List the species or resource you are requesting review from DWR for. The DWR ESSL number is 44293. ❑ NOAA: This is an ❑updated review/❑ new project. List the species, resources or CH you are requesting review for. NOAA species and CH can be found here: FEDERAL NEXUS This project review IS needed for water quality permits from the Army Corps of Engineers for impacts to jurisdictional waters. The project IS NOT eligible for federal funding. The project IS NOT located on federal lands. The lead agency is USACOE. For additional information, please contact me at the email listed below. ENCLOSURES ❑ DWR Project Review Package X FWS Project Review Package ❑ NOAA Section 7 and/or EFH Project Review Package Thank you, Frank Scearce Environmental / Lynchburg XVDOT I Virginia Department of Transportation Cell: 434-251-7434 frank.scearce@VDOT.Virginia.gov m l i Mr-s— • F134W-fn, x is MYIUaEsux+ - v x (j!ivr!:OyiF-virginu.fNps.i*�iC.lom+avys/webappue�w.lr•7YcMml'M1E. Skf32y9rg2bJ26Po.6a6ed'166cEd56b23 A° [? Lu {= � ••• 4 Is 6•,i = .• :. =.. '=�-; .:cmpr.nr... c.rfnr lag:. Ngr C6 En:e•nww� •._ I$Mll Dm p JAT.I ryrs.asyL.. a9�;rywausnce... arr+clr~wa... srn-C.ronrnascw. ) o.Lwr..vrx.s R is lri colored and Idfle brown IliBerna[Ulii i+. o t. � Helf Mik Guflur U colored and Offle Brown Ilibernaculu In "• - ' 5-5 Nik 6ufl.r ' 4 . Project Site tledn.ai _ .n , - r iiI Ir .. R•.rLr ...r=... r. .,-. .: ..-- rcn .. �. .. m�[.�Fa�ny.}� 11:"2A � MH2O2+ OWN Correspondence and Reference Documents VDQT UPC 119164 CEDAR 2mi T&E Map 6-2-2024 I"y,n i., Occ.,—.t, Trar. wla1i.•.. Area of Interest (AOI) Information Radius: 2 Miles Area: 23.55 mil Jun 2 2024 15:41:07 Eastern Daylight Time Letter ANSI A Portrait $nyp 7 t �}R a Soydr Mountain Perkens 259 m M DUron �70 rn )udyByrd Pitt5y3vania w TIE ap— EEV Lori- i-ia 1' h ,; wcatlaas — eue �Feeer+J Lkx[ CCE BaIC Eage ties[ L.—[rs-31tl a,.hr LGgp[rcr-Rn[cLc Sou L:see icy Lme-ln re kes Ae{ams TIE Sieal..a I —I "rA�r[tlrFriLrC .3YP'2x�e-iw-'Ix r%r,:LxeW+, E[ al',Eade'ri- 6A.-WCenx[W a+n Pooal T�[[a fneanxwe %le•. iF[Qcal�Thrtwx-na S 0.b Nlk Roos[T,e[ Lorvlm'xo F[c[rali P.xRn[] CaNlk � %ihen-xuk �— � Pak-rla Slate usxc 97 .a SSNIk-:ieertuc�n ddcr.eabeyr �] L•p•aa Nlpnrp•., 9�GAR � MCPG .. vey;se J.�1,HCJon LLEl9eld Ea4[�+eet L.ouitr+s-66V 6'va[' Es,er[ial Fkr•'�'e' ;k I.r.'. Vu gu ela Upril, 1:72,224 0 0.5 4 2N 0 0.75 1.5 3 krn L13p tl]a . CpB g"[ lap —Mbubu . CC�7-SA, MOT. ITDBES, V-0CT. ITD. CO. ft.I—d VA A— 8M T1,.r ESSLog #44293_VDOT 44293_Berry Hill Con nector_DWR_TMD202540418 Doucette, Tamara (DWR) <Tamara.Doucette@dwr.virginia.gov> Thu 4/18/2024 10:29 AM To:Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov> Cc:Strawderman, Nicole (DWR) <Nicole.Strawderman@dwr.virginia.gov>;Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Frank, Our comments remain the same as last time for listed mussels for this project. Thank you! Tamara Tamara Doucette Environmental Services Biologist Wildlife Information and Environmental Services P 804.367.8364 Department of Wildlife Resources CONSERVE. CONNECT. PROTECT. A 7870 Villa Park Drive, P.O. Box 90778, Henrico, VA 23228 www.VirginiaWfidlife.gov Project Review Request VDOT Project: UPC 119164 Berry Hill Connector Road Extension Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov> Fri 3/15/2024 1:42 AM To:ProjectReview (DWR) <ProjectReview@dwr.virginia.gov> 1 1 attachments (17 MB) UPC 119164 DWR updated Coordination submittal docs 3-15-204.pdf; Project Name: Berry Hill Connector Road Extension; Pittsylvania County Project Number: 0311-071-835, C501, D648, D649, P101, R201 UPC: 119164 Hi, Attached is the review request package for VDOT Project UPC 119164, Berry Hill Connector Extension (Rte 311) located in Pittsylvania County (Lat 36.564444, Long:-79.585556). We are requesting an updated review of protected mussel species: Green Floater, Atlantic Pigtoe, and James Spinymussel. Comments regarding protected mussel species were provided directly from Brian Watson on 6-21-2023 (attached), no DWR ESSL number is shown on his comment email. The project will consist of: ... reconfiguring Berry Hill Rd as an extension of the Berry Hill Road Connector (UPC 115493) by widening Segment C of the road from existing 2 lanes to a proposed 4-lane Rural Collector Road system (GS-3). The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. A 2018 study indicates the road is not sufficient to accommodate traffic from the developing adjacent Southern Virginia Mega Site at Berry Hill. The project also proposes intersection improvement to the Rte. 3111 Oak Hill intersection. The proposed intersection improvement to include a 50 foot and 80 foot intersection radii and an approximate 50 foot storage and a 50 foot taper to facilitate larger vehicles to accelerate and merge onto westbound US311. The project will remove approximately 29 acres of trees along the 2.3 mile corridor with the extension of several jurisdictional culverts. At several locations along the 2.3 mile corridor, tree removal will extend beyond 100 feet but less than 300 feet beyond the existing edge of pavement. Impacts to stream channels and wetlands will be necessary. Work will adhere to DWR "standard in -stream BMPs including work in the dry". Work is expected to begin in the fall of 2025. Please contact me if you need additional information. thanks, Frank Scearce 434-251-7434 Frank Scearce Environmental / Lynchburg Virginia Department of Transportation %%V ❑ OT Cell: 434-251-7434 frank.scearce@VDOT.Virginia.gov Resource Agency Coordination VDOT PROJECT: Rte 311 Berry Hill Connector Road Extension; Pittsylvania County VDOT PROJECT Number: UPC 119164; 0311-071-835, C501, D648, D649, P101, R201 Latitude: 36.564444 Longitude:-79.585556 Date: 3-15-2024 By copy of this email, we are requesting review from: FWS: This is an ❑updated review/❑ new project. The referenced project was reviewed on 10- 4-2023 using the Virginia Field Off ice's online project review process, in accordance with all guidance and instructions. The FWS Consultation Code is 2022-0090089. ❑ DNH: This is an ❑updated review/❑ new project. The project area intersects identified natural heritage resources and/or predicted suitable habitat and has been/has not been submitted through the Natural Heritage Data Explorer (NHDE). The Web Project ID number is (Enter DNH number here) XDWR: This is an ❑X updated review/❑ new project. We are requesting an updated review of protected mussel species: Green Floater, Atlantic Pigtoe, and James Spinymussel. Comments regarding protected mussel species were provided directly from Brian Watson on 6-21-2023 (attached), no DWR ESSL number is shown on his comment email. ❑ NOAA: This is an ❑updated review/❑ new project. List the species, resources or CH you are requesting review for. NOAA species and CH can be found here: FEDERAL NEXUS This project review IS needed for water quality permits from the Army Corps of Engineers for impacts to jurisdictional waters. The project IS NOT eligible for federal funding. The project IS NOT located on federal lands. The lead agency is USACOE. For additional information, please contact me at the email listed below. ENCLOSURES X DWR Project Review Package FWS Project Review Package NOAA Section 7 and/or EFH Project Review Package Thank you, Frank Scearce Environmental / Lynchburg XVDOT I Virginia Department of Transportation Cell: 434-251-7434 frank.scearce@VDOT.Virginia.gov Re: Mussel Hab Assess Summary: McGuff Creek at Rt. 311, Berry Hill Rd; Pittsylvania Co (VDOT# 0311-071-835, P101 U PC:119164) Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Wed 6/21/2023 2:47 PM To:Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> CaScearce, Jr., Frank W. (VDOT)<FrankScearce@VDOT.Virginia.gov>;Hartman, Mark A. (VDOT)<MarkHartman@VDOT.Virginia.gov>;ProjectReview (DWR) <ProjectReview@dwr.virginia.gov>;Doucette, Tamara (DWR) <Tamara.Doucette@dwr.virginia.gov> Susan, Based on the habitat assessment, DWR does not recommend a larger mussel survey be conducted at the site, nor does DWR recommend a TOYR for instream work. The results of the assessment tracks with older mussel surveys in McGuff Creek. Our ES biologist may have other comments regarding work at the site like BMPs. If you have any questions, let me know. Brian (r Wg I V1RGI11ilA DWR Brian T. Watson Aquatic Resources Biologist/State Malacologist r 434.525.7522, x114 / m 434.941.5990 / F 434.525.7720 Virginia Department of Wildlife Resources CONSERVE. CONNECT. PROTECT. A 1132 Thomas Jefferson Road, Forest, VA 24551 www.dwrvirginia.gov From: Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> Sent: Wednesday, May 31, 2023 4:32 PM To: Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Cc: Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov>; Hartman, Mark A. (VDOT)<Mark.Hartman@VDOT.Virginia.gov>; ProjectReview (DWR) <ProjectReview@dwr.virginia.gov> Subject: Mussel Hab Assess Summary: McGuff Creek at Rt. 311, Berry Hill Rd; Pittsylvania Co (VDOT# 0311-071-835, P101 UPC:119164) Brian, Mark Hartman and I completed a mussel habitat assessment at 2 crossing along Rt. 311 in Pittsylvania County, VA on April 11, 2023. The project involves reconfiguring Berry Hill Rd as an extension of the Berry Hill Road Connector by widening the road from the existing 2-lane to a proposed 4-lane Rural Collector Road system. The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. The stream crossings for this project are McGuff Creek and Trotters Creek. The summary for McGuff Creek is below. I will send the Trotters Creek summary in a separate email. Final reports for both assessments will be sent shortly. McGuff Creek: The project coordinates are, 36.569935"N,-79.573505"W, which is located about 14 kilometers (8.8 miles) west of Danville. From the project site, McGuff Creek flows south for about 3.1 km (1.96 mi) before its confluence with the Dan River. There are no mussel collection records in McGuff Creek; the records associated with this site are from the Dan River; Atlantic pigtoe, James spinymussel, and the Green floater. The survey coordinates: Upon a 2.35 person -hours effort, no mussels were found, live or shells within a reach starting 113 m downstream to 52 m upstream from the Rt. 311 crossing. The non-native clam Corbicula fluminea was very abundant and could be see siphoning just below the surface in the sand/silt substrates. The first half of the downstream reach consisted mostly of cobble, boulder, bedrock with gravel and patches of sand. Flow was glide/run, and the channel was fairly narrow with a width of about 3.0 m. There were indications of high flows through this section as the left ascending (LA) bank was considerably scoured, exposing the roots of a few trees along the bank, and large woody debris was lodged across the channel and against rocks. Water was slightly turbid with visibility of about 0.75 m. In the segment between 45 m downstream to the Rt. 311 crossing, the instream habitat was sand and silt with some bedrock along the edges. Flow was a glide, and the channel was wide (about 5m) and shallow (about 0.3m). There was no evidence of mussels residing in this area. Upstream from the culverts under Rt. 311, the channel was fairly wide 4.5m) and moderately deep (0.7m). The flow was a glide with some pools along the banks, and substrates consisted of sand along the right half of the channel, and large cobble, boulder and bedrock along the LA half. There was no evidence of mussels in this reach. Recent logging had taken place on several plots in this area, including a section adjacent to the downstream reach. However, the forested buffer and vegetated floodplain was intact, providing some protection for the downstream reach from the upland activities. Based on the observations taken during this assessment, it is unlikely that native freshwater mussel reside in this segment of McGuff Creek. The sandy areas were somewhat depositional and unstable, and in areas were the habitat looked potentially suitable, no mussels were seen. We are asking for you/DWR to please provide comments as to whether or not DWR would recommend a more extensive (500m or 1000m) survey to be completed along McGuff Creek for this project. Thank you. Please let me/us know if you have any questions regarding this assessment or project. Susan Susan Alexander Aquatic Wildlife Biologist Environmental /Biological Resources V DOT ";7";Pow Virginia Department of Transportation 1401 E. Broad Street / Richmond, VA23219 804-840-1084 Susan.alexander@VDOT.Virginia.gov Re: Mussel Hab Assess Summary: Rt. 311 at Trotters Cr, Berry Hill Rd, Pittsylvania Co, (VDOT# 0311-071-835, P101 U PC:119164) Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Wed 6/21/2023 2:27 PM To:Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov>;ProjectReview (DWR) <ProjectReview@dwr.virginia.gov> CaScearce, Jr., Frank W. (VDOT)<FrankScearce@VDOT.Virginia.gov>;Hartman, Mark A. (VDOT)<MarkHartman@VDOT.Virginia.gov>;Doucette, Tamara (DWR) <Ta m a ra. D o u cette @ dw r.v i rg i n i a. g ov> Susan, Based on the habitat assessment, DWR does not recommend a larger mussel survey be conducted at the site, nor does DWR recommend a TOYR for instream work. The results of the assessment tracks with older mussel surveys in Trotters Creek. Our ES biologist may have other comments regarding work at the site like BMPs. If you have any questions, let me know. Brian (r Wg I V1RGI11ilA DWR Brian T. Watson Aquatic Resources Biologist/State Malacologist r 434.525.7522, x114 / m 434.941.5990 / F 434.525.7720 Virginia Department of Wildlife Resources CONSERVE. CONNECT. PROTECT. A 1132 Thomas Jefferson Road, Forest, VA 24551 www.dwrvirginia.gov From: Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> Sent: Thursday, June 1, 2023 2:45 PM To: Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov>; ProjectReview (DWR) <ProjectReview@dwr.virginia.gov> Cc: Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov>; Hartman, Mark A. (VDOT) <Mark.Hartman@VDOT.Virginia.gov> Subject: Mussel Hab Assess Summary: Rt. 311 at Trotters Cr, Berry Hill Rd, Pittsylvania Co, (VDOT# 0311-071-835, P101 UPC:119164) Brian, Mark Hartman and I completed a mussel habitat assessment at 2 crossing along Rt. 311 in Pittsylvania County, VA on April 11, 2023. The project involves reconfiguring Rt 311 Berry Hill Rd as an extension of the Berry Hill Road Connector by widening the road from the existing 2-lane to a proposed 4-lane Rural Collector Road system. The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. The stream crossings for this project are McGuff Creek and Trotters Creek. The summary for Trotters Creek is below, and photos are attached. The McGuff Creek summary was sent in a separate email. Final reports for both assessments will be sent shortly. Trotters Creek: The project coordinates are 36.56509"N,-79.58387"W, which is located about 15 kilometers (9.3 miles) west of Danville. From the project site, Trotters Creek meanders southeast for about 2.2 km (1.3 mi) before flowing into McGuff Creek, about 0.6 km (0.35 mi) upstream from the confluence with the Dan River. There are no mussel collection records in Trotters Creek; the records associated with this site are from the Dan River; Atlantic pigtoe, James spinymussel, and the Green floater. Upon a 1.7 person -hours effort, no mussels were found, live or shells within a reach starting 116 m downstream to 54 m upstream from the Rt. 311 crossing. The non-native clam Corbicula fluminea was present. The habitats along the downstream each consisted of cobble, gravel, sand and bedrock, and flow was a mostly a glide/run, with riffles and a few shallow pools. The channel wetted -width ranged between 3 - 4 m, and depth averaged around 0.4 m. The water was mostly clear with visibility up to a meter. Both riparian zones were wooded with understory shrubs, vines, herbaceous species, and grasses, and the stream banks in the downstream reach appeared mostly stable with minor erosion. Instream habitat was mixed, and there were areas where mussel could inhabit, however we did not see any signs of mussels here. In the segment from about 35 m downstream up to the Rt. 311 crossing, the instream habitat was mostly sand with patches of gravel and cobble. The channel widened slightly and the streambed was fairly level where the thalweg was not well defined. Flow was primarily a glide with some pools. A sediment bar had formed mid -channel about 15 m downstream from the road crossing. Though mussel habitat was patchy in the reach down from the culverts, there were a couple areas that were potentially suitable. We did not see evidence of mussels residing here or at the culvert outlets. Upstream from the Rt. 311 crossing, the channel was about 3 m wide, and depth was about 0.4 m. The flow was mostly a glide with riffles and a couple of pools at the base of the stream banks. The substrates consisted of sand with gravel and cobble and patches of bedrock. The banks through this reach were steep and scoured, exposing tree roots, however overhanging vegetation appeared to provide some stability to the streambanks. At the survey end, the substrates became more consolidated with cobble and large gravel. Cobbles and sediment had accreted to form a mid -channel bar. Several trees had fallen across the channel, an indication of high flows and recent storm events in this area. Again, though some suitable habitat was present, mussels were not seen, live or shells. Since the 2 streams are close to each other, recent logging had also taken place along a plot adjacent Trotters Creek. However, from observations taken during the assessment, the forested buffer and vegetated floodplain was mostly intact, providing some protection for the downstream reach from the upland activities. Based on the observations taken during this assessment, it is unlikely that native freshwater mussel reside in this segment of Trotters Creek. Until I am able to complete the report, we are asking for you/DWR to please provide comments as to whether or not DWR would recommend a more extensive (500m or 1000m) survey to be completed along Trotters Creek for this project. Thank you. Please let me/us know if you have any questions regarding this assessment or project. Susan Susan Alexander Aquatic Wildlife Biologist Environmental /Biological Resources XVDOTw:a;pon Virginia Department of Transportation 1401 E. Broad Street / Richmond, VA23219 804-840-1084 Susan.alexander@VDOT.Virginia.gov Re: Mussel Hab Assess Summary: McGuff Creek at Rt. 311, Berry Hill Rd; Pittsylvania Co (VDOT# 0311-071-835, P101 UPC:119164) Doucette, Tamara (DWR) <Tamara.Doucette@dwr.virginia.gov> Wed 6/21/2023 2:56 PM To:Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov>;Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> CaScearce, Jr., Frank W. (VDOT)<FrankScearce@VDOT.Virginia.gov>;Hartman, Mark A. (VDOT)<MarkHartman@VDOT.Virginia.gov>;ProjectReview (DWR) <ProjectReview@dwr.vi rg i nia.gov> Susan, No additional comments from ESS. We recommend adherence to our standard in -stream BMPs including work in the dry. Thank you, Tamara Tamara Doucette Environmental Services Biologist Wildlife Informatiion and Environmental Services P 804.367.8364 c 804.659.3428 Department of Wildlife Resources CONSERVE. CONNECT. PROTECT. A 7870 Villa Park Drive, P.O. Box 90778, Henrico, VA 23228 www.VirgmiaWildlife.gov From: Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Sent: Wednesday, June 21, 2023 2:47 PM To: Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> Cc: Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov>; Hartman, Mark A. (VDOT)<Mark.Hartman@VDOT.Virginia.gov>; ProjectReview (DWR) <ProjectReview@dwr.virginia.gov>; Doucette, Tamara (DWR) <Tamara.Doucette@dwrvirginia.gov> Subject: Re: Mussel Hab Assess Summary: McGuff Creek at Rt. 311, Berry Hill Rd; Pittsylvania Co (VDOT# 0311-071-835, P101 UPC:119164) Susan, Based on the habitat assessment, DWR does not recommend a larger mussel survey be conducted at the site, nor does DWR recommend a TOYR for instream work. The results of the assessment tracks with older mussel surveys in McGuff Creek. Our ES biologist may have other comments regarding work at the site like BMPs. If you have any questions, let me know. Brian Brian T. Watson Aquatic Resources Biologist/State Malacologist P 434.525.7522, xl 14 / M 434.941.5990 / F 434.525.7720 Virginia Department of Wildlife Resources CONSERVE. CONNECT. PROTECT. A 1132 Thomas Jefferson Road, Forest, VA 24551 www.dwrvirginia.gov From: Alexander, Susan (VDOT) <Susan.Alexander@VDOT.Virginia.gov> Sent: Wednesday, May 31, 2023 4:32 PM To: Watson, Brian (DWR) <Brian.Watson@dwr.virginia.gov> Cc: Scearce, Jr., Frank W. (VDOT) <Frank.Scearce@VDOT.Virginia.gov>; Hartman, Mark A. (VDOT)<Mark.Hartman@VDOT.Virginia.gov>; ProjectReview (DWR) <ProjectReview@dwr.virginia.gov> Subject: Mussel Hab Assess Summary: McGuff Creek at Rt. 311, Berry Hill Rd; Pittsylvania Co (VDOT# 0311-071-835, P101 UPC:119164) Brian, Mark Hartman and I completed a mussel habitat assessment at 2 crossing along Rt. 311 in Pittsylvania County, VA on April 11, 2023. The project involves reconfiguring Berry Hill Rd as an extension of the Berry Hill Road Connector by widening the road from the existing 2-lane to a proposed 4-lane Rural Collector Road system. The improvements would extend approximately 2.3 miles from the intersection of the new Connector Road south to Oak Hill Rd. The stream crossings for this project are McGuff Creek and Trotters Creek. The summary for McGuff Creek is below. I will send the Trotters Creek summary in a separate email. Final reports for both assessments will be sent shortly. McGuff Creek: The project coordinates are, 36.569935"N,-79.573505"W, which is located about 14 kilometers (8.8 miles) west of Danville. From the project site, McGuff Creek flows south for about 3.1 km (1.96 mi) before its confluence with the Dan River. There are no mussel collection records in McGuff Creek; the records associated with this site are from the Dan River; Atlantic pigtoe, James spinymussel, and the Green floater. The survey coordinates: Upon a 2.35 person -hours effort, no mussels were found, live or shells within a reach starting 113 m downstream to 52 m upstream from the Rt. 311 crossing. The non-native clam Corbicula fluminea was very abundant and could be see siphoning just below the surface in the sand/silt substrates. The first half of the downstream reach consisted mostly of cobble, boulder, bedrock with gravel and patches of sand. Flow was glide/run, and the channel was fairly narrow with a width of about 3.0 m. There were indications of high flows through this section as the left ascending (LA) bank was considerably scoured, exposing the roots of a few trees along the bank, and large woody debris was lodged across the channel and against rocks. Water was slightly turbid with visibility of about 0.75 m. In the segment between 45 m downstream to the Rt. 311 crossing, the instream habitat was sand and silt with some bedrock along the edges. Flow was a glide, and the channel was wide (about 5m) and shallow (about 0.3m). There was no evidence of mussels residing in this area. Upstream from the culverts under Rt. 311, the channel was fairly wide 4.5m) and moderately deep (0.7m). The flow was a glide with some pools along the banks, and substrates consisted of sand along the right half of the channel, and large cobble, boulder and bedrock along the LA half. There was no evidence of mussels in this reach. Recent logging had taken place on several plots in this area, including a section adjacent to the downstream reach. However, the forested buffer and vegetated floodplain was intact, providing some protection for the downstream reach from the upland activities. Based on the observations taken during this assessment, it is unlikely that native freshwater mussel reside in this segment of McGuff Creek. The sandy areas were somewhat depositional and unstable, and in areas were the habitat looked potentially suitable, no mussels were seen. We are asking for you/DWR to please provide comments as to whether or not DWR would recommend a more extensive (500m or 1000m) survey to be completed along McGuff Creek for this project. Thank you. Please let me/us know if you have any questions regarding this assessment or project. Susan Susan Alexander Aquatic Wildlife Biologist Environmental /Biological Resources XVD❑TVirginia Department ofTransportation 1401 E. Broad Street / Richmond, VA23219 804-840-1084 susan.alexander@VDOT.Virginia.gov Attachment H Signed Certification Statement IACM DATE: 07;'09l2024 VDOT PROJhCTtf: 0311-071-835, C501, D648. D649, P10L R20� PERMIT #: 24-4024 PRE-APP#: XV. CERTIFICATION (for SPGPIVWPP only): "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Applicant Signature: Name of person signing above: Ir V1N"-.rj 40yd'fAty (print or type) Title: jftc4 C4W5AWC71W F..VGweaA. Date: Authorized Agent Signature: Name of person signing above Title: /Z — ;?. 1�. ZIA l-Fof� (print or type) VA,Cn-W IAAW pe/R Date: ?A1126 -2 1ACM Coordination Form ? 1.201' Page 8 09'9 Attachment I Alternatives Analysis Alternative Comparison Matrix for Practicability Practicability Factor Alternative 1 Alternative 2 Category Applicant's Preferred Available Available for YES (No conflict NO (Opposition to Acquisition with landowners additional VDOT regarding R/W acquisition and acquisition.) roadway expansion already received from the owner of Oak Hill Estate.) Logistics Sufficient Land Size YES YES for Project Sufficient Zoning YES (Zoned for this NO (Several parcels Appropriate & project type). would need to be Potential for Zoning acquired and Change rezoned. Dominion Energy Solar Farm already under construction.) Utilities NO (Underground NO (Aerial electrical water and sewer utilities to be utilities to be relocated). relocated). Availability for YES (Land available NO (Owned by Access with no contest). private parties). Danville-Pittsylvania Potential, imminent Regional Industrial domain not suitable Facility Authority for industrial solar (RIFA) intends to farm. Potential donate R/W on their imminent domain property. not suitable for Oak Hill Estate which is listed on the National Register of Historic Places and a contributing element to the Berry Hill Archaeological District. Alternative Comparison Matrix for Practicability Existing Technology Topography and YES YES Other Site Conditions Feasible for Construction of Project Cost (No cost Reasonable YES (Allows for RIFA NO (Additional fees threshold Acquisition Costs to donate R/W thus to purchase and/or established) (non -exorbitant) reducing overall execute imminent project costs). domain to acquire R/W). Environmental Factor Matrix Environmental Factors Alternative 1 Alternative 2 Applicant's Preferred Wetland Impacts 0.363 (Acres) 0.152 (Acres) 15,849 (Sq. Ft.) 6,609 (Sq. Ft.) Stream Impacts 0.388 (Acres) 0.157 (Acres) 16,903 (Sq. Ft.) 6,830 (Sq. Ft.) 1,285 (Linear Ft.) 360 (Linear Ft.) Cultural Resource Impacts Impacts to Berry Hill Impacts to Oak Hill Estate Archaeological District. and Berry Hill Avoids impacts to Oak Hill Archaeological District Estate. T&E Species Impacts Protected Bats Protected Bats LEDPA YES No *LEDPA = Least Environmentally Damaging Practicable Alternative Attachment J Wetland Delineation Documents _J 4y N 4 a_ cl �O \\ m O M U \ — LO 61 99 ' T, L N CD .� r U O 1133H5 00WZI b15 3N17 HJIVIY N O m�wo W LL� Utilized for both UPC 115493 Berry Hill Connector and UPC 119164 Berry Hill Connector Extension Crossing 12 Wetland Determination Data Form - Eastern Mountains and Piedmont Region Sampling Point Number: 3A T Project: BERRY HILL CONNECTOR l/Lf`J�j S}an}er Applicant: VIRGINIA DEPARTMENT OF TRANSPORTATION Section/Township/Range: N/A L L 4 City/County. PITTSYLVANIA COUNTY Subregion (LRR or MLRA): LRR P State: VIRGINIA Start Coordinates: 37.365155560-76.74583333o Investigator(s): C. NICE Terminus Coordinates: 37.270213890-76.65555556o Date: 1 /7/2020 Soil Map Unit Name: STONEVILLE SILT LOAM Summary of Findings: WETLAND WEST OF FLAG CNWB43. Hydrophytic Vegetation is Present: X Normal Circumstances: X NWI Classification: N/A Hydric Soils are Present: X Disturbed Parameters (see Remarks): Local Relief: CONCAVE Wetland Hydrology is Present: X Problematic Parameters (see Remarks): _ Landform: FLAT Sampled Area is within a Wetland: X Atypical Climate/Hydrology (see Remarks): Slope %: 0-1 Avdrnlnov Paramotar• PrimaryIndicators: Secondary Indicators: Surface Soil Cracks (B6) X Surface Water (Al) X Water Stained Leaves (B9) _ Sparsely Vegetated Concave Surface (B8) X High Water Table (A2) _Aquatic Fauna (B 13) _Drainage Patterns (B10) X Saturation (A3) —True Aquatic Plants (B 14) —Moss Trim Lines (B 16) Water Marks (B1) _Hydrogen Sulfide Odor (C1) _Dry -Season Water Table (C2) _ Sediment Deposits (B2) —Oxidized Rhizospheres on Living Roots (0) _ Crayfish Burrows (C8) Drift Deposits (B3) Presence of Reduced Iron (C4) Saturation Visible on Aerial Imagery (C9) Algal Mat or Crust (B4) _ Recent Iron Reduction in Tilled Soils (C6) _ Stunted or Stressed Plants (D 1) —Iron Deposits (B5) _ Thin Muck Surface (0) X Geomorphic Position (D2) Inundation Visible on Aerial Imagery (B7) _ Other _ Shallow Aquitard (D3) _ Microtopographic Relief (D4) FAC-Neutral Test 5 Water Depths (inches): Remarks: HYDROLOGY PARAMETER MET. Surface Water: 1 Water Table: O RECENT RAIN EVENT. Saturated soil: O Dominant Species Stratum IND Pimus taeda Tree FAC 35 LiquidambarstyraciJdua Sapling FAC 10 Pima virginiana Sapling UPI, 5 Pima taeda Sapling FAC 5 Dichanthelium scoparium Herbaceous FACW 40 Panicum virgatum Herbaceous FAC 30 Non -Dominant Species Stratum IND Arthraxon hispidus Herbaceous FAC 20 Solidago ragosa Herbaceous FAC 10 Solidago altissima Herbaceous FACU 5 Boehmeria cylindrica Herbaceous FACW 5 % Dominant species FAC or wetter: 83% Prevalence Index: 2.8 NOTE: SPECIES INDICATOR STATUS ACCORDING TO 2016 NATIONAL WETLAND PLANT LIST Calculated mine aU weries I re mt Dominance Test>50%: X Prevalence Index is < 3.0: X Morphological Adaptations: Problematic Hydrophytic Vegetation: Matrix Redox Features Depth inches Color(Moist) % Color(Moist) % Type Loc Texture 0-14 2.5Y 5/2 95 l0YR 4/6 5 C M CLAY LOAM 14-20 10YR 6/4 80 10YR 6/8 20 C M CLAY Hydric Soil Indicators: Indicators for Problematic Hydric Soils _Histosol(Al) _ Sandy Mucky Mineral (S1) X Depleted Matrix (F3) _2cmMuck(A10) _ Histic Epipedon (A2) —Sandy Gleyed Matrix (S4) _ Redox Dark Surface (F6) _ Coast Prairie Redox (A16) —Black Histic (A3) —Sandy Redox (S5) —Depleted Dark Surface (F7) _ Piedmont Floodplain Soils (F 19) Hydrogen Sulfide (A4) _ Stripped Matrix (S6) _ Redox Depressions (F8) _Red Parent Material (TF2) _ Stratified Layers (A5) —Dark Surface (S7) _ Iron -Manganese Masses (F 12) _ Very Shallow Dark Surface (IT 12) _2 cm Muck (A10) Polyvalue Below Surface (S8) _Umbnc Surface (F13) _Other _Depleted Below Dark Surface (Al1) _Thin Dark Surface (S9) _Piedmont Floodplain Soils (F19) Thick Dark Surface (Al2) Loamy Gleyed Matrix (F2) Restrictive Layer (If Observed) Remarks: SOIL PARAMETER MET. Type: Depth (inches): Utilized for both UPC 115493 Berry Hill Connector and UPC 119164 Berry Hill Connector Extension Crossing 12 Wetland Determination Data Form - Eastern Mountains and Piedmont Region Sampling Point Number: 313 T Project: BERRY HILL CONNECTOR S}an}er Applicant: VIRGINIA DEPARTMENT OF TRANSPORTATION Section/Township/Range: N/A l/Lf`J�j L L 4 City/County. PITTSYLVANIA COUNTY Subregion (LRR or MLRA): LRR P State: VIRGINIA Start Coordinates: 37.365155560-76.74583333o Investigator(s): C. NICE Terminus Coordinates: 37.270213890-76.65555556o Date: 1 /7/2020 Soil Map Unit Name: STONEVILLE SILT LOAM Summary of Findings: UPLAND EAST OF FLAG CNWB45. Hydrophytic Vegetation is Present: X Normal Circumstances: X NWI Classification: N/A Hydric Soils are Present: Disturbed Parameters (see Remarks): Local Relief: NONE Wetland Hydrology is Present: X Problematic Parameters (see Remarks): _ Landform: SLOPE Sampled Area is within a Wetland: Atypical Climate/Hydrology (see Remarks): Slope %: 0-1 Hydrology Parameter: Prim Indicators: Secondary Indicators: Surface Soil Cracks (B6) _ Surface Water (Al) —Water Stained Leaves (B9) _ Sparsely Vegetated Concave Surface (B8) High Water Table (A2) _Aquatic Fauna (B13) _Drainage Patterns (B10) X Saturation (A3) —True Aquatic Plants (B 14) —Moss Trim Lines (B 16) Water Marks (B1) _Hydrogen Sulfide Odor (C1) _Dry -Season Water Table (C2) _ Sediment Deposits (B2) —Oxidized Rhizospheres on Living Roots (0) _ Crayfish Burrows (C8) Drift Deposits (B3) Presence of Reduced Iron (C4) Saturation Visible on Aerial Imagery (C9) Algal Mat or Crust (B4) _ Recent Iron Reduction in Tilled Soils (C6) _ Stunted or Stressed Plants (D 1) —Iron Deposits (B5) _ Thin Muck Surface (0) _ Geomorphic Position (D2) Inundation Visible on Aerial Imagery (B7) _ Other _ Shallow Aquitard (D3) _ Microtopographic Relief (D4) FAC-Neutral Test 5 Water Depths (inches): Remarks: HYDROLOGY PARAMETER MET. Surface Water: Water Table: RECENT RAIN EVENT. Saturated soil: O Dominant Species Stratum IND Pimus taeda Tree FAC 90 Liquidambarstyraciilua Sapling FAC 5 Quercus rubra Sapling FACU 5 Pima taeda Sapling FAC 5 Rubes argutus Herbaceous FACU 10 Vitis rotundifolia Vine FAC 5 Lonicerajaponica Vine FACU 2 Non -Dominant Species Stratum IND Quercus phellos Herbaceous FAC 3 Chasmanthium laxum Herbaceous FAC 2 Asplenium platyneuron Herbaceous FACU 2 % Dominant species FAC or wetter: 57% Prevalence Index: 3.1 NOTE: SPECIES INDICATOR STATUS ACCORDING TO 2016 NATIONAL WETLAND PLANT 119F Calculated mine all wedes I re rat Dominance Test>50%: Prevalence Index is < 3.0: Morphological Adaptations: Problematic Hvdroohvtic Vegetation: Matrix Redox Features Depth Inches Color(Moist) % Color(Moist) % Type Loc Texture 0-8 2.5Y 5/2 100 SANDY CLAY LOAM 8-20 10YR 5/3 100 CLAY Hydric Soil Indicators: Indicators for Problematic Hydric Soils _Histosol(Al) _ Sandy Mucky Mineral (S1) —Depleted Matrix (F3) _2cmMuck(A10) _ Histic Epipedon (A2) —Sandy Gleyed Matrix (S4) _ Redox Dark Surface (F6) _ Coast Prairie Redox (A16) —Black Histic (A3) —Sandy Redox (S5) —Depleted Dark Surface (F7) _ Piedmont Floodplain Soils (F 19) Hydrogen Sulfide (A4) _ Stripped Matrix (S6) _ Redox Depressions (F8) _Red Parent Material (TF2) _ Stratified Layers (A5) —Dark Surface (S7) _ Iron -Manganese Masses (F 12) _ Very Shallow Dark Surface (IT 12) _2 cm Muck (A10) Polyvalue Below Surface (S8) _Umbnc Surface (F13) _Other _Depleted Below Dark Surface (Al1) _Thin Dark Surface (S9) _Piedmont Floodplain Soils (F19) Thick Dark Surface (Al2) Loamy Gleyed Matrix (F2) Restrictive Layer (If Observed) Remarks: SOIL PARAMETER NOT MET. Type: Depth (inches): Attachment K Jurisdictional Determination Form DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS NORFOLK DISTRICT �- FORT NORFOLK 803 FRONT STREET NORFOLK VA 23510-1011 April 5, 2021 APPROVED JURISDICTIONAL DETERMINATION Western Virginia Regulatory Section NAO 2010-00423 (Overall Site) Pittsylvania County Berry Hill Industrial Park (Overall Site) CIO Mr. Troy Shelton Dewberry 551 Piney Forest Road Danville, Virginia 24540 Dear Shelton: INIF Crossing 1 Crossing 2 Crossing 3 Crossing 4 Crossing 5 Crossing 6 Crossing 7 Crossing 8 Crossing 8a Crossing 9 Crossing 10 Crossing 11 This letter is regarding your request for an approved jurisdictional determination for waters of the U.S. (including wetlands) located at the Southern Virginia Mega -site at Berry Hill. The site is located near Berry Hill Road, Pittsylvania County, Virginia. This letter supersedes any previous determinations for the Berry Hill site. An on -site jurisdictional determination (July 23, 2020, September 2, 2020) has found waters regulated under Section 404 of the Clean Water Act (33 U.S.C. 1344) on the property listed above. Both jurisdictional and non -jurisdictional features have been identified on the site. This letter shall serve to confirm the streams, as surveyed and shown on the map titled, "Southern Virginia Mega -site at Berry Hill - Overall Federal Jurisdiction", dated September 2, 2020 by Dewberry, are under Federal jurisdiction as well as those water features not under Federal jurisdiction. Our basis for this determination is the application of the Corps' definition of waters of the United States. These waters are part of a tributary system to interstate waters (33 CFR 328.3 (a)) and have an ordinary high water mark. This letter is not confirming the Cowardin classifications of these aquatic resources_ The attached approved jurisdictional determination form shows the acreage/linear feet) of water features (both under Federal Jurisdiction and non -Federal jurisdiction) on the Berry Hill site. Any discharge of dredged and/or fill material into any non -Federally regulated will not require a Department of the Army permit. However, a permit may be required from the Virginia Department of Environmental Quality (DEQ) and we are notifying them by copy of this letter. Discharges of dredged or fill material, including those associated with mechanized landclearing, into jurisdictional waters and/or wetlands on this site will require a Department of the Army permit and may require authorization by state and local authorities, including a Virginia Water Protection Permit from the Virginia Department of N Environmental Quality (DEQ), a permit from the Virginia Marine Resources Commission (VMRC) and/or a permit from your local wetlands board. This letter is a confirmation of the Corps jurisdiction for the waters on the subject property and does not authorize any work in these jurisdictional areas. Please obtain all required permits before starting work in the delineated waters/wetland areas. This letter contains an approved jurisdictional determination for your subject site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the North Atlantic Division Office at the following address: ATTN: Ms. Naomi J. Handell Regulatory Program Manager (CENAD-PD-OR) U.S. Army Corps of Engineers Fort Hamilton Military Community 301 General Lee Avenue Brooklyn, New York 11252-6700 Telephone number: (917) 789-4841 Naomi.J.Handell(d)usace army mil In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 C F.R. part 331.5, and that it has been received by the Division Office within 50 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by June 5, 2021. It is riot necessary to submit an RFA Form to the Division office if you do not object to the determination in this letter. This jurisdictional determination is valid for a period of five (5) years from the date of this letter unless new information warrants revision prior to the expiration date. If you have any questions, please contact me at V_ incent.d.perc(a-]usace.army.mil or at 757- 297-0011 Sincerely, vi;lcellt D ?21-0 Vincent D. Pero Project Manager, Western Virginia Regulatory Section Enclosure(s) -3- C4lTle91aIN Supplememntal Table 1. Cross Reference Table VDOT Crossing Location/ADJ Wetland Zone Location VDOT Project UPC 119164 Berry Hill Road Connector Extension Approved Jurisdictional Determination (COE AJD NAO 2010-00423, dated 4/5/ 2021) (DEQ VASSW #21-001361, dated 9-20-2021) VDOT Crossing g Lat/Long (Location of Actual VDOT Crossing) Wetland Zone Cowardin Classification Lat/Long (Location shown on AJD Table) N (DD) W (DD) N (DD) W (DD) Crossing 1 36.554722 -79.598611 EA PSS 36.55530 79.59865 Crossing 2 36.555556 -79.595833 EP PSS 36.55761 179.59558 Crossing 3 36.557222 -79.594167 EP PSS Crossing 4 36.558333 -79.593333 DW PFO 36.55861 79.59283 Crossing 5 36.560833 -79.590833 DQ PFO 36.56236 79.59222 Crossing 6 36.564722 -79.583889 B WOUS R3 36.56483 79.58369 Crossing 6 36.565010 79.583230 BT PFO 36.56501 79.58323 Crossing 6 36.565070 79.583150 BU PFO 36.56507 179.58315 Crossing 7 36.565556 -79.583889 B WOUS R3 Crossing 7 36.565556 -79.583889 R IWOUS R4 36.56556 179.58394 Crossing 8 36.565556 -79.583055 R WOUS R4 Crossing 8 36.565556 -79.583055 RA1 WOUS R4 36.56550 79.58330 Crossing 8a 36.565556 -79.582222 R EPH [See R (R4)] 36.56623 79.58166 Crossing 9 36.568889 -79.576667 MT PEM 36.56883 79.57664 Crossing 10 36.569722 -79.573056 A WOUS R3 36.57002 79.57345 Crossing 11 36.570000 -79.573611 A WOUS R3 36.57002 79.57345 Crossing 11 36.570000 -79.573611 AA WOUS R4 36.57005 179.57346 Crossing 11 36.570000 -79.573611 AZ PFO 36.57107 179.57293 ReferencePermit ZU-4Ubd Previous Impacts Crossing 12 1 36.573333 -79.563056 1 PSS yellow highlighted waters and wetland zones are impacted by this project U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) m NAVIGABLE WATERS PROTECTION RULE ADMINISTRATIVE INFORMATION Completion Date of Approved Jurisdictional Determination (AJD): April 5, 2021 ORM Number: NAO-2010-00423-VDP Associated JDs: N/A or ORM numbers and identifiers (e.g. HQS-2020-00001-MSW-MITSITE) Review Area Location': State/Territory: VA City: County/Parish/Borough: Pittsylvania County Center Coordinates of Review Area: Latitude 36.570343 Longitude-79.589515 II. FINDINGS A. Summary: Check all that apply. At least one box from the following list MUST be selected. Complete the corresponding sections/tables and summarize data sources. ❑ The review area is comprised entirely of dry land (i.e., there are no waters or water features, including wetlands, of any kind in the entire review area). Rationale: N/A or describe rationale. ❑ There are "navigable waters of the United States" within Rivers and Harbors Act jurisdiction within the review area (complete table in section 11.13). There are "waters of the United States" within Clean Water Act jurisdiction within the review area (complete appropriate tables in section II.C). There are waters or water features excluded from Clean Water Act jurisdiction within the review area (complete table in section II.D). B. Rivers and Harbors Act of 1899 Section 10 10 z 10 Name § 10 Size I § 10 Criteria Rationale for § 10 Determination N/A N/A I N/A N/A C. Clean Water Act Section 404 Territorial Seas and Traditional Navigable Waters ((a)(1) waters)3 (a)(1) Name (a)(1) Size I (a)(1) Criteria Rationale for (a)(1) Determination N/A N/A I N/A N/A Tributaries ((a)(2) waters): (a)(2) Name (a)(2) Size (a)(2) Criteria Rationale fora 2 Determination A 10540 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a typical year VDOT A(McGuff) 9611 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or crossings: 10; indirectly to an (a)(1) water in a 11 typical year AA 941 feet (a)(2) Intermittent tributary flow observed during site visit however consultant VDOT contributes surface water flow observed periods of dry stream bed during other visits crossings: 11 directly or indirectly to an (a)(1) water in a typical year Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 1 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE AG-R4 1391 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year AK-R4 732 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year AO-R4 162 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year AR-R4 432 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year AT(Trayner's 539 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit and blue line Branch) surface water flow directly or stream indirectly to an (a)(1) water in a typical year AV 522 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year Blue line stream and perennial flow observed during VDOT B 6469 feet (a)(2) Perennial tributary contributes surface water flow directly or site visit crossings: 6; 7 indirectly to an (a)(1) water in a typical year B-R4 1515 feet (a)(2) Perennial tributary contributes Blue line stream and perennial flow observed during surface water flow directly or site visit indirectly to an (a)(1) water in a typical vear BB-R4 128 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year BD 497 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year C-R4 229 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year CA-R4 797 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year CAA 100 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 2 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE CC 423 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year D 2142 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DA-R4 775 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DA-R4-2 123 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DB-R4 429 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DH-R3 514 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a ical vear DL-R3 116 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a typical year DL-R4 2124 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DQ-R4 479 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DR 219 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DU-R4 150 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year DW-R4 2091 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year EA-R4 43 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 3 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE EB 656 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year EB-R4 307 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year EK-R4 543 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ELB 221 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ET 2065 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ET-R4 2075 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year F-R4 88 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year FB-R4 405 feet (a)(2) Intermittent tributary contributes surface water flow Flow observed during site visits however consultant directly or indirectly to an (a)(1) observed periods of dry stream during other visits water in a typical year FC-R4 962 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year G-R4 513 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year H 5092 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a typical year H-R4 1617 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year HA 2458 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 4 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE HB 831 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year HD-R4 157 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year HQ 156 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year HU-R4 70 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year HV 1904 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year J-R3 1553 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a ical vear J-R4 1578 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year JA 773 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year JP 383 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year JT 274 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year KC-R4 1526 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year KD 581 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a typical year L 2122 feet (a)(2) Perennial tributary contributes Perennial flow observed during site visit surface water flow directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 5 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE LH-R4 695 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year M 6829 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year MAR-R4 912 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year MD 413 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year MF 1080 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year MI 1548 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year P-R4 1211 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year PA/PB(Trotters 8207 feet (a)(2) Perennial tributary contributes Blue line stream and perennial flow observed during Creek) surface water flow directly or site visit indirectly to an (a)(1) water in a typical vear Flow observed during site visits however consultant QQ 145 feet (a)(2) Intermittent tributary contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year Flow observed during site visits however consultan VDOT R-R4 554 feet (a)(2) Intermittent tributary contributes surface water flow observed periods of dry stream during other visits crossings: 7; 8; 8a directly or indirectly to an (a)(1) water in a typical year RA 104 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year Flow observed during site visits however consultant VDOT RA1 145 feet (a)(2) Intermittent tributary contributes surface water flow observed periods of dry stream during other visits crossing: 8 directly or indirectly to an (a)(1) water in a typical year RB-R4 624 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 6 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE RC 531 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year RG-R4 141 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year RI 1691 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year RK 176 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year RP-R4 380 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year RQ 328 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year SC 547 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year SD-R4 1479 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year SE-R4 1111 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year SN 1793 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year TB-R4 726 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year TC-R4 558 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year TI-R4 214 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 7 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM I APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE TJ-R4 391 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year TJA-R4 787 feet (a)(2) Intermittent tributary Flow observed during site visits however consultant contributes surface water flow observed periods of dry stream during other visits directly or indirectly to an (a)(1) water in a typical year Lakes and ponds, and impoundments of jurisdictional waters ((a)(3) waters): (a)(3) Name (a)(3) Size a 3 Criteria Rationale fora 3 Determination J-POW 0.7279 acres (a)(3) Lake/pond or impoundment of Small impoundment that is an impoundment of an a jurisdictional water contributes (a)(2) water surface water flow directly or indirectly to an (a)(1) water in a typical year K-POW 0.6868 acres (a)(3) Lake/pond or impoundment of Small impoundment that is an impoundment of an a jurisdictional water contributes (a)(2) water surface water flow directly or indirectly to an (a)(1) water in a typical year Adiacent wetlands ((a)(4) waters): (a)(4) Name (a)(4) Size (a)(4) Criteria Rationale fora 4 Determination AB 0.034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AC 0.1955 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AC-PEM 0.023 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AD 0.015 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AD-PFO 0.1072 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AE 0.5942 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AE-PFO 0.1704 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AF 0.0205 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AF-PEM 0.1101 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AF-PFO 0.1965 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AG 0.0063 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AH 1.6717 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AH-PEM 0.47 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 8 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Al 52.5052 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AJ 0.0658 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AK 0.453 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AK-PFO 0.1599 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AN-PFO 0.63 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AO 0.1312 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AP 0.5059 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AP-PFO 0.2983 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AQ 0.0032 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AR 0.0831 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature AS 0.0119 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature AT 0.2743 acres (a)(4) Wetland separated from an Wetland separated from of stream and only separated (a)(1)-(a)(3) water only by a natural by natural berm, small depressional area or stream feature bank AU 0.7127 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AW 1.9958 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AZ-PEM 0.6486 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water AZ-PFO 1.1474 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream DOT water c'ossinc AZE-PFO 0.1179 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature AZE-PSS 0.0351 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature AZF-PFO 0.0408 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature AZG-PFO 0.1838 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature B-PFO 0.353 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BA 0.0168 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 9 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE BB-PFO 0.5198 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BE 0.1519 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BH 0.2263 acres (a)(4) Wetland separated from an Wetland directly connected to stream (a)(1)-(a)(3) water only by a natural feature BI 0.2941 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BJ 0.0633 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BK 0.233 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water BS 0.0088 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature BT 0.0269 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by IV (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots a feature BU 0.0255 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature C(2) 0.0347 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water C-PEM 0.0582 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water C-PFO 0.0105 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature C-PFO-2 0.0283 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature CA-PEM 0.009 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CAB 0.369 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CAB-PEM 0.0073 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CB 0.0114 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature CB-PEM 0.1104 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CB-PEM-2 0.052 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature CB-PFO 0.4097 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CB-PFO-2 0.0555 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ' Map(s)/Figure(s) are attached to the AJD provided to the requestor DOT -ossing: 6 DOT -ossing: 6 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 10 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE D-PFO 0.1709 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature DA 0.1492 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DAA 0.0013 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DAB 0.0034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DB 0.0323 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DB(2) 0.0123 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DB-PSS 0.0917 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DC 0.0077 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DD 0.0135 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DG-PFO 0.032 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature DH-PEM 0.0212 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DH-PFO 0.1248 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DHA 0.0061 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DK 0.1276 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DL-PFO 0.0009 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DLA 0.0711 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DM 0.0033 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DN 0.0206 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DQ-PEM 0.1176 acres (a Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream ter water DQ-PFO 0.3346 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream DOT crossi water DS 0.061 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DT 0.0211 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DU-PFO 0.0798 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DV 0.009 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DW-PFO 0.4988 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream DOT crossi ' Map(s)/Figure(s) are attached to the AJD provided to the requestor ng: 5 ng: 4 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 11 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water DWA-PEM 0.0315 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DWA-PFO 0.059 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water DWB 0.0053 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water E 986 feet (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EA 0.125 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EA-PFO 0.5329 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature EA-PSS 0.8045 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream DO water EB-PFO 0.0499 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature EB-PFO-2 0.1204 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EC 3.942 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ED 0.0448 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature EF 0.0599 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EG 0.4731 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EH 0.8377 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EK-PFO 0.0268 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EKA-PEM 0.0373 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EKA-PFO 0.2242 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EL-PFO 1.3162 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EL-PSS 1.0527 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ELA 2.5973 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ELA(2) 0.0442 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EP 3.7817 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream DO water cross ER 0.0085 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ES 0.0081 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream ' Map(s)/Figure(s) are attached to the AJD provided to the requestor T crossing: 1 T pings: 2; 3 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 12 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water ETA-PFO 0.0503 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ETB 0.0363 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ETD 0.011 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ETF 0.0221 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water EU 0.0755 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature F-PEM 0.4899 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature F-PFO 0.0677 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature F1-PEM 0.0803 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water F1-PFO 0.1436 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FA-PEM 0.2598 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature FB-PFO 0.0023 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FC-PEM 0.0053 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FC-PFO 0.0337 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FD 0.0541 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FE 0.1568 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FF 0.0887 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FF/FG-PFO 0.6484 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature FF/FG-PSS 1.4746 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature FH 0.1506 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature FI 0.0439 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water FI-PFO 0.0276 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water G-PEM 0.1 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 13 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water GA 0.0794 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water GY 0.0708 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water GZ 0.3335 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water H-PFO 0.2709 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HA-PEM 2.6468 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HAA 0.0129 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HB-PEM 0.2745 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HC 0.0389 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HD 1.0331 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HD-PEM 0.0021 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HE 0.0032 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HE1 0.0445 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HF 0.0034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HI(2) 0.1003 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HI-PEM 0.0149 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HI-PFO 0.0588 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HI-R4 148 feet (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HK 0.0116 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature HS 0.0692 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HT 0.0268 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HU-PEM 0.0034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water HW 0.1338 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JB 0.0013 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JC 0.0036 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JC-PFO 10.0368 acres (a)(4) Wetland separated from an Wetland separated from stream and onlyse arated b ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 14 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature JCC-PEM 0.0121 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JCC-PFO 0.0103 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JD 0.0023 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JD1 0.0235 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JE 0.0053 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JF 0.0104 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JG 0.0094 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JH 0.0266 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JJ 0.0082 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JK 0.0034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JL 0.5197 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JM 0.0265 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JN 0.1582 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JQ 0.0006 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JR 0.0017 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JSS 0.0127 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water JU 0.0983 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water K 0.0579 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KA 0.1702 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KA-PEM 0.0164 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KB 0.0597 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KC 0.0151 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KC(2) 0.0464 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KC-PFO 0.0533 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KCA 0.0132 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 15 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water KDD 0.0008 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KE 0.0522 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KE-PSS 0.0199 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KF 0.0255 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water KG 0.2348 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water L-PFO 0.0063 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature LA 0.0011 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LAA 0.0301 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LB 0.0064 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LC 0.0062 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LD 0.0381 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LDA 0.0129 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LE 0.0054 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LF 0.0247 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LG 0.0035 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LGA 0.0314 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water LH-PEM 0.0054 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MA 0.1048 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MAR-PEM 0.0022 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MAR-PFO 0.0064 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MB 0.006 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MC-PFO 0.0364 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ME 0.0243 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MEA 0.0666 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MG 0.0034 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 16 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water MH 0.0037 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ML-PEM 0.0475 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ML-PFO 0.0326 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature MM 0.0098 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MN 0.0048 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MO 0.0064 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MP 0.0983 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water MRA 0.0119 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature MRR-PFO 0.0063 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature MS 0.1854 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature MT 0.0414 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by DOT (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots crossing: 9 feature MX 0.0144 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water P 0.8681 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PA 0.2118 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PA/PB 0.1373 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PC-PFO 0.2266 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PC-PSS 6.2621 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PC/SS 1.8762 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water PF 0.0196 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature Q 0.0034 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water Q-PFO 0.425 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water CA 0.5453 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated b ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 17 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature QB 1.4873 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature QC 0.1648 acres (a)(4) Wetland separated from an Wetland is separated from stream by artificial dike that (a)(1)-(a)(3) water only by an allows direct flow to the stream artificial structure allowing a direct hydrologic surface connection between the wetland and the (a)(1)- a 3 water in a typical year QD 0.2503 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water QE 0.0164 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water QF 0.0092 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water QZ 0.1262 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature RB-PFO 0.208 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water RF-PFO 0.4181 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature RF-PFO-2 0.3763 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature RF2 0.0121 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water RG-PFO 0.5825 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water RHH 0.0517 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature RL 0.0498 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water RM 0.0053 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water RN-PFO 0.1541 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature RP-PFO 0.0169 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SA 0.0488 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature SB 0.5695 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SD-PFO 1.5418 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SE-PFO 0.0512 acres (a)(4) Wetland abuts an a 1 - a 3 Wetland directly connected to stream ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 18 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE water SH-PFO 1.5767 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SH-PSS 0.0627 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SI-PFO 0.0652 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SI-PSS 0.0219 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water Si 0.0204 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SK-PFO 0.1927 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature SL 0.0581 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature SNB 0.0065 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature SND 0.0034 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature SNE 0.0121 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SO 0.0585 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water S02-PFO 1.8439 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SP 0.2439 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water Su 0.3245 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SV 0.0394 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water SW 2.1465 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water T 0.9038 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TA 0.1335 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TA-PSS 0.8641 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TB-PEM 0.0776 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TB-PFO 0.5326 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TC-PFO 0.0093 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TC-PSS 0.4301 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 19 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE TD 0.0268 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TD-PFO 0.0225 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TF 0.1701 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature TF-PFO 0.9786 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature TG-PEM 0.0768 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature TG-PFO 0.2125 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TH 0.3151 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature TI-PEM 0.0607 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water TK 0.1552 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water V 0.0029 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature VA 0.0037 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature VB 0.0017 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature VP 0.0041 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature W 0.6684 acres (a)(4) Wetland abuts an (a)(1)-(a)(3) Wetland directly connected to stream water ZA-PFO 0.0675 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ZE-PEM 0.0207 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ZE-PFO 0.0602 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ZF 0.0383 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ZG 0.0091 acres (a)(4) Wetland separated from an Wetland separated from stream and only separated by (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature ZI 10.0206 acres (a)(4) Wetland separated from an Wetland separated from stream and onlyse arated b ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 20 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM I APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE (a)(1)-(a)(3) water only by a natural natural berm, small depressional area or tree roots feature Excluded Waters or Features Excluded waters ((b)(1) — NO2))4: Exclusion Name Exclusion Size Exclusions Rationale for Exclusion Determination AB-R6 150 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AEP 162 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AF-R6 142 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AI-R6 151 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AJ-R6 425 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AN-R6 257 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ANT 310 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AR-R6 624 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AZF-R6 170 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool AZG-R6 513 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool C-R6 182 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool D-R6 226 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool DG-R6 310 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool DI 53 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool DP 118 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 21 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE E-R6 318 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool EC-R6 194 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool EDA 40 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool EJ 65 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool EM 68 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool EQ 251 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ETA 536 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ETC 31 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool F-R6 444 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool F-R6-2 912 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool F-R6-3 77 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FA 36 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FA-R6 130 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FA-R6-2 713 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FB-R6 233 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FB-R6-2 87 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool FB-R6-3 68 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool G 185 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 22 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool G-R6 213 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool HG 37 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool HH 105 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool HJ 122 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool HJ(2) 165 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool HR* 178 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool JA-R6 640 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool JB-R6 61 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool JS 206 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool JV 19 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool KB-R6 258 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool KD-R6 956 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool KF-R6 596 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MAR-R6 216 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MC-R6 101 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MCA 213 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pooI MEB 212 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, Swale, gully, sorting of bed load, or OHW ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 23 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE rill, or pool MJ 1142 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MK 457 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MQ 223 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MR 941 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MRR-R6 85 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MRS 216 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool MW 105 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool PD 436 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool PE 882 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool PG 397 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool PH 198 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool R-R6 183 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool RB-R6 799 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool RBA 52 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool RD 484 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool RGA 90 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool RH 889 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 24 of 27 Form Version 29 July 2020_updated M,� RHA RJ RN-R6 RR U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE 47 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool 287 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool 336 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool 394 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW RS 183 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool S 457 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool SK-R6 448 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool SM 392 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool SNA 225 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool SNC 355 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool S02-R6 44 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool ST 448 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool SUA 619 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool TAA 518 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool TB-R6 21 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool TC-R6 157 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool TCA 402 feet (b)(3) Ephemeral feature, including an ephemeral stream, swale, gully, rill, or pool TE 430 feet (b)(3) Ephemeral feature. includina Map(s)/Figure(s) are attached to the AJD provided to the requestor Dry stream bed at time of site visit, no sign of flow! sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit, no sign of flow, sorting of bed load, or OHW Dry stream bed at time of site visit. no sian of flow. VDOT crossing: 8a (included with R4 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. s Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 25 of 27 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool TE-R6 31 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool TG-R6 45 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool TJ-R6 157 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool TJA-R6 240 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool TL 404 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZA-R6 365 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZB 233 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZC 389 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZD 54 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZE-R6 152 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZF-R6 182 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZG-R6 885 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZH 417 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool ZHA 292 feet (b)(3) Ephemeral feature, including Dry stream bed at time of site visit, no sign of flow, an ephemeral stream, swale, gully, sorting of bed load, or OHW rill, or pool III. SUPPORTING INFORMATION A. Select/enter all resources that were used to aid in this determination and attach data/maps to this document and/or references/citations in the administrative record, as appropriate. _X_ Information submitted by, or on behalf of, the applicant/consultant: This information (is/is not/is and is not) sufficient for purposes of this AJD. ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 26 of 27 Form Version 29 July 2020_updated B C U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM I APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Rationale: N/A or describe rationale for insufficiency (including partial insufficiency). _X Data sheets prepared by the Corps: Dewberry _ Photographs: (NA, aerial, other, aerial and other) Title(s) and/or date(s). X Corps Site visit(s) conducted on: Date(s). _ Previous Jurisdictional Determinations (AJDs or PJDs): ORM Number(s) and date(s). X Antecedent Precipitation Tool: provide detailed discussion in Section 111.B. _X USDA NRCS Soil Survey: Pittsylvania County _X USFWS NWI maps: Pittsylvania County USGS topographic maps: Brosville Other data sources used to aid in this determination: Data Source select Name and/or date and other relevant information USGS Sources N/A. USDA Sources N/A. NOAA Sources N/A. USACE Sources N/A. State/Local/Tribal Sources N/A. Other Sources N/A. Typical year assessment(s): The APT shows that the typical year (2020) of the site visits was a wetter than normal year. Additional comments to support AJD: N/A or provide additional discussion as appropriate. ' Map(s)/Figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where independent upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD form. ° Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps Districts may, in case -by -case instances, choose to identity some or all of these waters within the review area. 6 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 27 of 27 Form Version 29 July 2020_updated Utilized for VDOT UPC 119164: f; Crossing 1 Crossing 2 Crossing 3 Crossing 4 Crossing 5 Commonwealth of Virginia Crossing 6 Crossing 7 VIRGINIA DEPARTMENT OF ENVIRONMENTAL SCrossing 8 BLUE RIDGE REGIONAL OFFICE Crossing 8a 901 Russell Drive, Salem, Virginia 24153 Crossing 9 (540) 562-6700 FAX (804) 699-4178 Crossing 10 ►%ww,deu.virjinia.t:ov Crossing 11 Matthew J Strickler Secretary of Natural and Historic Resources urccar (804)698.4DDO Robert J Weld Regional Director September 20, 2021 Matthew Rowe Danville-Pittsylvania Regional Industrial Facility Authority PO Box 3300 SENT VIA E-MAIL: Matthew.Rawe rjsilt u►,n Danville, Virginia 24543 RECEIPT CONFIRMATION REQUESTED Re: Virginia State Surface Waters Determination Number 211-001361 Southern Virginia Megasite at Berry Hill, Pittsylvania County, Virginia Dear Mr. Rowe: Pursuant to the Virginia Water Protection (VWP) Permit Program Regulations 9VAC25-210-45 and 9VAC25-210-10 of the Virginia Administrative Code, the Virginia Department of Environmental Quality has enclosed the above referenced Preliminary Virginia State Surface Waters Determination for Southern Virginia Megasite at Berry Hill (Pittsylvania County Tax Parcel ID 1367-30-1931). The maps entitled: 1. Southern Virginia Megasite at Berry Hill Jurisdiction Map, September 2, 2020 2. Wetland and Stream Delineation Map Lot 1, September 2, 2020 3. Wetland and Stream Delineation Map Lot 2, September 2, 2020 4. Wetland and Stream Delineation Map Lot 3 W1.01, September 2, 2020 5. Wetland and Stream Delineation Map Lot 3 W2.01, April 20, 2021 6. Wetla nd and Stream Delineation Map Lot 3 W2.02, April 20, 2021 7. Wetland and Stream Delineation Map Lot 3 W2.03, April 20, 2021 8. Wetland and Stream Delineation Map Lot 3 W2.04, April 20, 2021 9. Wetland and Stream Delineation Map Lot 4, September 2, 2020 10. Wetland and Stream Delineation Map Lot 5, September 2, 2020 11. Wetland and Stream Delineation Map Lot S, September 2, 2020 12. Wetland and Stream Delineation Map Lot 9, September 2, 2020 13. Wetland and Stream Delineation Map Lot 11, September 2, 2020 14. Wetland and Stream Delineation Map Lot 12, September 2, 2020 State Surface Waters Determination No. 21-001361 Page 2 of 2 provide a preliminary determination of the locations of state surface waters and/or wetlands on the above listed property. The basis for this delineation includes application of the State Water Control Law, VWP Regulation, the Corps' 1987 Wetland Delineation Manual and Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont region (Version 2.0), the positive indicators of wetland hydrology, hydric soils, hydrophytic vegetation, and/or the presence of an ordinary high water mark. Activities that discharge fill to, dredge, drain or otherwise cause significant alteration or degradation of state surface waters, including wetlands, on this site may require a VWP Permit. ® The characterization (PFO, PEM, PSS, stream channel and/or ephemeral stream channel) of state surface waters is included in this approval. 0 The characterization (PFO, PEM, PSS, stream channel and/or ephemeral stream channel) of state surface waters was NOT reviewed or approved in this process. This preliminary state surface waters determination is valid for 5 years from the date of issuance. Please contact me by email at shawn.crist r� deq.virginia.gov; by phone at 434-31 G-403 l ; or at the above address if you have any questions. Respectfully, Shawn Crist VWP Project Manager Enclosures: Delineation Maps Virginia State Surface Waters Determination Form cc: Vinny Pero, U.S. Army Corps of Engineers (via email Vincent.D.Pero(a)usace arm_r.i� i il] Troy Shelton, Dewberry (via email TShehon a.Dewbem.com) VIRGINIA STATE SURFACE WATERS DETERMINATION NO.21-001361 Name and Address of Person Requesting State Surface Waters Determination (SSWD): Requestor: Agent: Matthew Rowe Troy Shelton Danville-Pittsylvania Regional Industrial Facility Authority Dewberry PO Box 3300 551 Piney Forest Road Danville, Virginia 24543 Danville. VA 24540 434-432-1669 434-549-8525 Matthew. Rome tshelton`c• r dewberry _Mn Owner: Matthew Rowe Danville-Pittsylvania Regional Industrial Facility Authority PO Box 3300 Danville, Virginia 24543 434-432-1669 a1t]Ijew.yZaWe Site Location Information: Site Name: Southern Virginia Megasite at Berry Hill Street Address: Located in southwest Pittsyivania County, just west of the City of Danville, Virginia along U.S. Route 311 /SR 770 (Berry Hi 11 Road), approximately four (4) miles southwest of the intersection of U.S. Rates 58 and 31 1. Tax Parcel Number: 1367-30-11931 City/County, Pittsyivania County Zip Code: 24502 Coordinates at Center of Site: Latitude: 36.570343 s- Longitude: - 79.589515 U.S.G.S. Quadrangle: Brosville VA Nearest Waterbody: McGuffs Creek, Trotters Creek & unnamed tributaries to both Basin: Dan River Subbasin: Upper Dan River H UC: 03010103 Site Evaluation Review (check a1l that app1)�}: ❑Office (Desk) Determination. D Date: NIA ®Field Determination. Date(s): September 2, 2020, October 7, 2020 & June 17, 2021 Virginia State Waters Determination Form Page 1 of 5 Supporting Data Review ® Maps, plans, plots or plat submitted by or on behalf of the S W D requestor Map name and revision date: 1. Southern Virginia Megasite at Berry Hill Jurisdiction Map, September 2, 2020 2. Wetland and Stream Delineation Map Lot 1, September 2, 2020 3. Wetland and Stream Delineation Map Lot 2, September 2, 2020 4. Wetland and Stream Delineation Map Lot 3 W1.01, September 2, 2020 S. Wetland and Stream Delineation Map Lot 3 W2.01, April 20, 2021 6. Wetland and Stream Delineation Map Lot 3 W2.02, April 20, 2021 7. Wetland and Stream Delineation Map Lot 3 W2.03, April 20, 2021 8. Wetland and Stream Delineation Map Lot 3 W2.04, April 20, 2021 9. Wetland and Stream Delineation Map Lot 4, September 2, 2020 10. Wetland and Stream Delineation Map Lot 5, September 2, 2020 11. Wetland and Stream Delineation Map Lot S, September 2, 2020 12. Wetland and Stream Delineation Map Lot 9, September 2, 2020 13. Wetland and Stream Delineation Map Lot 11, September 2, 2020 14. Wetland and Stream Delineation Map Lot 12, September 2, 2020 ❑ Wetland Determination Data Sheets completed by DEQ regulatory staff y Date(s) of completion: ® Wetland Determination Data Sheets submitted by or on behalf of the SWD requestor M Project Manager concurs with submitted data sheets ❑ Project Manager does not concur with submitted data sheets (provide rationale): ❑ United Stream Methodology assessment forms submitted by or on behalf of the S W D requestor ❑ Project Manager concurs with submitted USM assessment forms ❑ Project Manager does not concur with U S M assessment forms (provide rationale): ❑ Other stream assessment forms submitted by or on behalf of the SW D requestor Specify methodology: ❑ Project Manager concurs with submitted stream assessment forms ❑ Project Manager does not concur with submitted stream assessment forms (provide rationale): ® Previous determination(s) and Permits ➢ Determinations, Permit an&or Project number(s) and/or determination letter date: US Army Corps of Engineers Approved .Jurisdictional Determination - MAD 2010-00423 — April 5, 2021 ➢ VWP Permit WP4-WP4-19-0656 ❑ USGS National Hydrography Dataset ❑ USGS 8 and 12 digit HUC maps ® U.S. Geological Survey map(s) ➢ Brosville, VA Virginia State Waters Determination Form Page 2 of ® Natural Resources Conservation Service Soil Survey :- Citation: Berry Hill Mega Park Wetland Investigation ® National Wetlands Inventory map(s) ➢ Citation: Berry Hill Mega Park Wetland Investigation ® State/local wetland inventory map(s) Citation: Berry Hill Mega Park Wetland Investigation ❑ FEMA/FIRM maps r Citation: ® Aerial Photographs: Berry Hill Mega Park Wetland Investigation ® Other Photographs )�- Name & date: Berry Hill Mega Park Wetland Investigation ❑ Other Information: State Surface Waters Identified within the Site Review Area that are not WOUS Mal) Name and Revision Date: 1. Southern Virginia Megasite at Berry Hill Jurisdiction Map, September 2, 2020 2. Wetland and Stream Delineation Map Lot 1, September 2, 2020 3. Wetland and Stream Delineation Map Lot 2, September 2, 2020 4. Wetland and Stream Delineation Map Lot 3 W 1.01, September 2, 2020 5. Wetland and Stream Delineation Map Lot 3 W2.01, April 20, 2021 6. Wetland and Stream Delineation Map Lot 3 W2.02, April 20, 2021 7. Wetland and Stream Delineation Map Lot 3 W2.03, April 20, 2021 8. Wetland and Stream Delineation Map Lot 3 W2.04, April 20, 2021 9. Wetland and Stream Delineation Map Lot 4, September 2, 2020 10. Wetland and Stream Delineation Map Lot 5, September 2, 2020 11. Wetland and Stream Delineation Map Lot 8, September 2, 2020 12. Wetland and Stream Delineation Map Lot 9, September 2, 2020 13. Wetland and Stream Delineation Map Lot 11, September 2, 2020 14. Wetland and Stream Delineation Map Lot 12, September 2, 2020 Lot Site Latitude Longitude Resource Type Estimated Number (decimal (decimal (i.e., stream, acreage and/or degrees) degrees) wetland, open linear footage water) Lot 1 AEP 36,57938 79.56587 Ephemeral 162 If AN 36.58111 79.56249 Ephemeral 2571f AN 36.58117 79.56176 PFO-Wetland .630 acre ANT 36.57953 79.56390 Ephemeral 3101f B 36.57731 79.55844 PFO-Wetland 0.353 acre C 36.57637 79.56004 PFO-Wetland 0.011 acre Lot 3 AB 36.57010 79.57417 Ephemeral 150 Virginia State Waters Determination Form Page 3 of 5 AF 36.57647 79.57013 Ephemeral 142 Al 36.57741 79.56976 Ephemeral 151 AJ 36.57802 79.56906 Ephemeral 425 AZF 36.57675 79.58669 Ephemeral 170 AZG 36.57604 79.58658 Ephemeral 513 E 36.56917 79.58003 Ephemeral 318 F 36.57825 79.57283 Ephemeral 444 FA 36.57644 79.57358 Ephemeral 130 FB 36.57592 79.57308 Ephemeral 233 G 36.57567 79.57175 Ephemeral 213 HJ 36.58189 79.58625 Ephemeral 122 HJ 2 36.57729 79.57519 Ephemeral 165 JA 36.58058 79.57567 Ephemeral 640 JB 36.57981 79.57514 Ephemeral 61 KB 36.58072 79.57889 Ephemeral 258 KD 36.57947 79.57794 Ephemeral 956 KF 36.57983 79.57686 Ephemeral 596 MAR 36.57283 79.58142 E hemeral 216 MC 36.58203 79.58931 E hemeral 101 MCA 36.58183 79.58933 Ephemeral 213 MEB 36.58128 79.59042 Ephemeral 212 MJ 36.58078 79.58136 Ephemeral 1,142 MK 36.57725 79.58431 Ephemeral 457 MQ 36.57306 79.58119 Ephemeral 223 MR 36.57228 79.58394 Ephemeral 941 MRR 36.57247 79.58293 Ephemeral 85 MRS 36.57250 79.58381 Ephemeral 216 MW 36.57267 79.58097 Ephemeral 105 PD 36.57239 79.58758 Ephemeral 436 PE 36.57275 79.58744 Ephemeral 882 PG 36.57339 79.58714 Ephemeral 397 PH 36.57403 79.58881 Ephemeral 198 R 36.56623 79.58166 Ephemeral 183 RB 36.56628 79,58469 Ephemeral 799 RRA 36.56747 79.58394 Ephemeral 52 RD 36.56683 79.58428 Ephemeral 484 RGA 36.56942 79.58425 Ephemeral 90 RH 36.57158 79.58767 Ephemeral 889 RHA 36.57192 79.58700 Ephemeral 47 RJ 36.56%4 79.59206 Ephemeral 287 RN 36.57050 79.58953 Ephemeral 336 RR 36.56622 79.58819 Ephemeral 394 RS 36.56775 79.59042 Ephemeral 183 SK 36.57014 79.59561 Ephemeral 448 SM 36.56878 79.59456 Ephemeral 392 SNA 36.57208 79.59561 Ephemeral 225 SNC 36.57178 79.59536 Ephemeral 355 S02 36.57333 79.59224 Ephemeral 44 ST 36.57336 79.59208 Ephemeral 448 SUA 36.57739 79.59403 Ephemeral 619 TAA 36.57592 79.59778 Ephemeral 518 TB 36.57546 79.58881 E hemeral 21 TE 36.57222 79.58678 Ephemeral 31 TJ 36.57650 79.59575 Ephemeral 157 Virginia State Waters Determination Form Page 4 of TJA 36.57831 79.59444 Ephemeral 240 ZA 36.57121 79.58127 Ephemeral 365 ZB 36.57106 79.58053 Ephemeral 233 7_C; 36.56819 79.58186 Ephemeral 389 ZD 36.56858 79.58175 Ephemeral 54 ZE 36,57521 79.58483 Ephemeral 152 ZF 36.57541 79.58501 Ephemeral 182 ZG 36.57529 79.59811 Ephemeral 885 ZH 36.57742 79.59194 Ephemeral 417 ZHA 36.57769 79.59081 Ephemeral 292 5 36,57659 79.59724 Ephemeral 457 TL 36.57394 79.59950 Ephemeral 404If Lot 4 D 36.56725 79.59392 Ephemeral 226 if DG 36.56494 79.59097 Ephemeral 3101f Dl 36.56381 79.58928 Ephemeral 531f DIP 36.59611 79.59331 79.59931 Ephemeral Ephemeral 118If 1941f EC 36.55794 EDA 36.55747 79.59992 Ephemeral 401f EJ 36.55969 79.59711 Ephemeral 651f EM 36.55792 79.59981 Ephemeral 681f ETC 36.56417 79.60014 Ephemeral 31 If EQ 36.55769 79.59553 Ephemeral 251 1f Lot 5 ETA 36.56870 79.60264 Ephemeral 5361f F 36.56867 79.59839 Ephemeral 9121f FA 36.57119 79.59910 Ephemeral 7131f FB 36.57138 79.59901 Ephemeral 871f G 36.57011 79.59580 Ephemeral 1851f Lot 8 HG 36.55985 79.61 124 Ephemeral 37 if HH 36.56040 79.61201 Ephemeral 105 if JS 36.56537 79.60672 Ephemeral 206 if JV 36.56156 79.60238 Ephemeral 191f Lot 9 HR 36.55647 79.60759 Ephemeral 178 If Lot 11 C 36.56198 79.58374 Ephemeral 182 If F 36.55553 79.57986 E hemeral 771f FA 36,55542 79.58D08 Ephemeral 361f FB 36,55528 79.58081 Ephemeral 681f TC 36.55653 79.58700 Ephemeral 157If TCA 36.55700 79.58689 Ephemeral 4021f TE 36.55583 79.58575 Ephemeral 4301f TG 36.56016 79.58821 Ephemeral 451f Lot 12 AR 36.56353 79.57916 Ephemeral 624 If i t (�� - Signature of regulatory staff completing the State Surface Waters Determination 9/20/2021 DATE Virginia State Waters Determination Form Page 5 of 5 Utilized for both UPC 115493 Berry Hill Connector and UPC 119164 Berry Hill Connector Extension Crossing 12 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM ` 1 I NJ I l I m-L61V 1 A. REPORT COMPLETION DATE FOR PJD: May 28, 2020 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Kevin Bradley - VDOT C. DISTRICT OFFICE, FILE NAME, AND NUMBER: NAO, 2020-00567, Berry Hill Connector Road (VDOT), JD D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: Virginia County/parish/borough: PittsyivaniE City: Center coordinates of site (latllong in degree decimal format): 38.076,-78.508 Lat.: xx.xxx° Long.: yy.yyy° Universal Transverse Mercator: Name of nearest waterbody; McGuff Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): �✓ Office (Desk) Determination. Date: May 28, 2020 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Latitude Longitude Estimated amount Type of aquatic Geographic authority number (decimal (decimal of aquatic resource resource (i.e., wetland to which the aquatic degrees) degrees) In review area vs. non -wetland resource "may be" (acreage and linear waters) subject (i.e., Section feet, if applicable) 404 or Section 10/404) 1 15530 L.F. stream 404 2 12.38 ac Wetlands 404 i 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, -and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S, on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Stantec 0 Data sheets prepared/submitted by or on behalf of the PJD requestor. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: Corps navigable waters' study: U.S. Geological Survey Hydrologic Atlas: USGS NHD data. USGS 8 and 12 digit HUC maps. 0 U.S. Geological Survey map(s). Cite scale & quad name: Brosville WIN atural Resources Conservation Service Soil Survey. Citation: Pittsylvania National wetlands inventory map(s). Cite name: Brosville State/local wetland inventory map(s): FEMAIFIRM maps: 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) Photographs: Aerial (Name & Date): or HOther (Name & Date): Previous determination(s). File no. and date of response letter: Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by Vincent D. Vincent D. Pero Pero Date: 2020.05.28 10:53:13-04'00' Signature and date of Regulatory staff member completing PJD 644ZOW Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' I Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Attachment L USM Stream Assessment Form(s) Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or erennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date SAR # Class. length Factor 119164 Berry Hill Rd Connector Extension Pittsylvania R3UB 03010103 1 4-10-2024 Impact 6-3 64 1 Name(s) of Evaluator(s) Stream Name and Information Frank Scearce Trotters Creek downstream; Crossing 6 (Impact Area 6-3) 1. Channel COndltlOn: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or 11-id.n.d71ncis.d. Slightly incised, few areas of active 9 Y Poor. Banks more stable than Severe Vertically/laterally unstable. Likely to Deeply incised (or excavated), erosion or unprotected banks. Majority or Poor due to lower bank slopes. widen further. Majority of both banks vertical/lateral instability. Severe Channel Very little incision or active erasion; 8ce of banks are stabler % ). Erosion may be resent on 40-60% of Y P are near vertical. Erosion resent on 60 p ion, flow contained within the Condition 100 % stable banks. Vegetative surface g natural Vegetative protection or natural rack p bath banks. Vegetative protection an 4 8 of banks. Vegetative protection banks. Stepth, protection or natural rack, prominent prominent (60-80%)AND/OR 60% of banks. Streambanks may present on 20-40% of banks, and is re of banks rooting depth, majority of banks majority (80-100%). AND/OR Stable point Depositional features contribute to bevertical or undercut. AND/OR 40- insufficient to prevent erosion. AND/OR vertical/undercut. Vegetative protection bars/b benches are present. stability. The bankfuand low, flaw 60% of stream is covered b sediment. Y 60-80% of the stream is covered b Y present on less than 20%of banks, is to the Access to their original floodplain or d. Stream likely channels are well defined. Sediment may be temporary/transient, sediment. Sediment is not preventing erosion. Obvious bank fully developed wide 11 benches. has access to bankfull benches, or contribute instability. Deposition that ty Psloughing temporary/transient in nature, and present. Erosiontraw, banks d transverse Mid -channel bars, and transverse bars newly developed floodplains along contribute to stability, may be contributing to instability. AND/OR V- on 80-100%. AND/OR Aggrading few. Transient sediment deposition portions of the reach. Transientp forming/present. AND/OR V-sha ed sha ed channels have vegetative p g channel. Greater than 80% of stream covers less than 10%of bottom. sediment covers 10-40%of the stream channels have vegetative protection on protection is present on > 40% of the bed is covered by deposition, bottom. > 40% of the banks and depositional banks and stable sediment deposition is contributing to instability. Multiple features which contribute to stability. absent. thread channels and/or subterranean Cl flow. Score 3 2.4 1 2 1 1.6 1 1.6 NOTES>> laterally unstable, streambed covered by 60-80% sediment 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> Maintained 33' overhead power utility r/w Optimal Suboptimal Marginal Poor parallel the travel lane; Low Marginal: High Poor: Lawns, High Suboptimal: Low Suboptimal: Nan -maintained, mowed, and Riparian areas with Riparian areas with High Marginal: dense herbaceous maintained areas, Low Poor: tree stratum (dbh > tree stratum (dbh > Non -maintained, vegetation, riparian nurseries; no -till Impervious 3 inches) present, 3 inches) present, dense herbaceous areas lacking shrub cmpland; actively surfaces, mine Riparian Tree stratum (dbh > 3 inches) present, w;tn 3o%tn so% with > 30% tree vegetation with and tree stratum, grazed pasture, spoil lands, with > 60% time canopy cover and a tree canopy cover canopy cover and either a shrub layer hay production, sparsely vegetated denuded surfaces, Buffers non -maintained understory. Wetlands and containing both a maintained or tree layer (dbh ponds, open water. non -maintained row crops, active located within the riparian areas. herbaceous and understory. Recenshrubt > 3 inches) If present, tree area, recently feed lots, trails, or layers ora cveget (dense present, with 130% stratum (dbh>3 seeded and other comparable non- non -maintained vegetation). tree canopy cover. inches) present, stabilized, or other conditions. understory. with <30%tree comparable canopy cover with condition. maintained understory. High Low High Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you below. of % Riparian 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Rparian Area> 1 52% 1 48% 1 1 100% Right Bank Score> 0.6 1.2 CI=(Sum % RA `Scares`o.01)/2 Left Bank M�L 52% 48% 100% RtBank CI > 0.89 CI 1 0.6 1.2 Lt Bank Cl > 0.89 0.89 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; undercut NOTES>> ongoing scour banks; root mats; SAV; riffle poole complexes, stable features. and sediment deposits Conditional Category Optimal Suboptimal Marginal Poor Instream Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30-50% of the reach and are present in 10-30% of the reach and are lacking or are unstable. Habitat Cover in greater than 50%of the reach. adequate for maintenance of adequate for maintenance of elements are typically present in less populations. populations. than 10%of the reach. CI Score 1.5 1.2 0.9 0.5 0.90 Stream Impact Assessment For Project# Applicant Locality Co.ardin Class. HUC 119164 VDOT Pittsylvania R31JB 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of chanr spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20 % of 20-40 % of the of the channel of the channel Channel the stream reach is stream reach is alterations listed in alterations listed in Alteration Channelization, dredging, alteration, or disrupted by any of disrupted by any of the parameter guidelines. If the parameter guidelines. If hardening absent. Streamhas hasze the channel the channel stream has been stream has been na unaltered pattern or has naturalized. alterations listed in alterations listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1 1.3 1 1.1 1 0.9 1 0.7 REACH CONDITION INDEX and STREAM CONDITION UNI NOTE: The Cis and RCI should be rounded to 2 decimal places. The CR should be rounded to a whole number. RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) >> 55 CR=RCIXLFXIF DESCRIBE PROPOSED IMPACT: The two existing culverts will remain with a third culvert added immediately parallel, riprap outlet protection will be added. Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Cowardin Impact/SAR Impact Project# Project Name Locality HUC Date I SAR# Class. length Factor 119164 1 Berry Hill Rd Connector Extension Pittsylvania R3UB 1 03010103 1 4.10.2024 lmpact7-2 76 1 Name(s) of Evaluator(s) Stream Name and Information Frank Scearce Trotters Creek upstream Crossing 7 (Impact Area 7.2) 1. Channel Condition: Assess the cross-section ofthe stream and prevailing condition (erosion, aggradabon) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severeor OverMdened/incised. Slightly incised, few areas of active Poor. Banks more stable than Severe Vertically/laterally unstable. Likelyto Deeply incised (or excavated), Very little incision or active erosion;80-erosion or unprotected banks. Majority or Poor due to lower bank slopes. widen further. Majority of both banks verticaVlateral instability.Severe Channel of banks are stable(60-80%f Erosion may be non 4060%of y preenprese arevertical. Erosion non on, Flow contained within the Condition 100%stablebanks. V tative e9e ege pro Vegetative protection or natural rock both banks. Vegetative protection on 60-80% of banks. Vegetative banks. Streambed below average pro surface tec ion or natural rock, prominent(80-100%). AND/OR prominent (60-80%) AND/OR 40-60%of banks. Streambanks may protection present on 20-40%of r ti depth, ma f banks oo P majority Stable point bars/ba benches are De dional features contribute to fi bevedical or undemut. AND/OR 40- 60 % of stream is covered b y banks, and is insufficient to t prevent rosion. AND/OR 60-80 % o(the the verical/undercut. Vegetative present. Access tot original tot stability. The bank(ull and low flow channels are well defrietl. Stream sediment. Sediment may be stream is covered b sediment. Pro sthan tection present on less than 20 % of fbotlplain or fully developed wide likely has access to bankfull benches, temporary/transient, contribute Sediment is temporary/transient in banks, is not preventing erosion. is not benches. bars, newly developed fbotlplains along dY pos' ion instability. Deposition that contribute to nature, and contributing to instabil' g io/' Obvious bank sloughing present. u9 g prese and transverse and transverse bars few. Transient re few ran rti-of the reach. Transient stability, may be forming/present. AND/OR V-shaped channels have Erosiondraw banks on 80-100%. sediment deposdbncoversless than sediment covers l0-40%o(the Ped AND/OR V-shaped channels have vege pm prese tatwe tection is nt on> AND/OR di h Greater A9gra ngc channel. 10 % of bottom. stream bottom. a rve pro ve t t tection on > 40% of the 40% of the banks and stable sediment than 80%of stream betl is coveretlb y nk which banks anddepositto deposition is absent. deposition, contributing to instability. slfeility. contribute to stability. Multiple thread channels and/or subterranean Flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> stream banks near vertical, stream under cutting trees, widening, <40 stream covered by sediment 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length &width maybe acceptable) Conditional Category NOTES>> Maintained 20' underground utility easement parallel the Optimal Suboptimal Marginal Poor Low Suboptimal: Low Marginal: Non -maintained, High Poor: roadway; ongoing High Suboptimal: Riparianstrata RiparianHigh Marginal: Ig g dense herbaceous Lawns, mowed, and maintained Low Poor: logging operations vnth tree stratum with tree stratum strata (dbh>3inches) Non -maintained, dense herbaceous vegetation, riparian areas lacking areas, nurseries; perHous um adjacent the site; (dbhn 3inches) present, with> vegetation with shrub and tree no -till cropland; surfaces, mine Riparian Tree stratum (dbh > 3 inches) presets, present, with 30% 30%tree carwpy edhera shrub stratum, hay activelygrazedspoil lands, vnt-m 60 % bee cann and a to so %tree COV a r aritl a layer or a tree protluction, ponds, pasture, sparsely denuded surfaces Buffers rvmain ai ed untlerstory. Wetands tors. w canopy co erantl maintained layer (dbh> 3 open water. Fl vegetated non now crops, active Located within the riparian areas. containing corba a both anent nche tree maintained area, feed lots, trails, or herbaceous and Recent er culov 30%tree tree stratpreseum (dbh>3 (dbh> recently seeded other comparable shrub la yntaX (dense camp c canopy cover. inches) nches)present, and stabilized, or conditions. n a stor ietl vegetation). with <30%tree other comparable untlerstory. campycover wdh ndition maintained untlerstory. High 1 LOW High I Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 Riparian Area> 1 63 % 1 26 % 1 11 % 100 % Right Bank sonre> 1 1.2 1 0.6 1 0.75 Cl- (sum % RA LL Sm.s*0.01)/2 %Riparian Area, 1 74% 1 26% 100% Rt Bank Cl> 0.99 Cl Left Bank score> 1 1.2 1 0.6 1 LtBank Cl> 1 1.04 1.02 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> minor ripples undercut banks; root mats; SAV; riffle poole complexes, stable features. and pools Conditional Category Instream Optimal Suboptimal Marginal Poor Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30-50%of the reach and present in 10-30%of the reach and lacking or are unstable. Habitat Cover in greater than 50%of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less populations. populations. than 10% ofthe reach. CI 1.20 Score 1.5 1.2 0.9 0.5 Stream Impact Assessment Foi Project# Applicant Localtty Cowardin Class. HUC 119164 VDOT Pittsylvania R3UB 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of c embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40-60%of reach 60-80%of reach is disrupted by any is disrupted by any Less than 20%o( 20-00%o(the of the channel of the channel Channel the stream reach ao-eamreach le aneratbnlletedb aneratbnlletedb Alteration Channelizatbn, dredging, aneratbn, or is disrupted byany disrupted byanyof the parameter the parameter hardening absent. Stream has an of the channel the channel guide"i guimhasbe unaltered pattern or has naturalized. aneratbn listed in aneratbn listed in lbtt stream has been stream has been the parameter the parameter channeled, channeled, guidelines. guidelines. normal stable stream meander normal stable stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1 1.3 1 1.1 1 0.9 1 0.7 REACH CONDITION INDEX and STREAM CONDITION UN RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) > $7 CR=RCIXLFX IF Existing double concrete box culvert will be extended upstream; and a third culvert of same size will be added parallel the existing culverts Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Project # Project Name Locality Cowardin HUC Date SAR # Impact/SAR Impact Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania Ephemeral 03010103 7-24-2024 Impact 8-1 280 1 Name(s) of Evaluator(s) Stream Name and Information Frank Scearce un-named ephemeral tributary to Trotters Creek, Crossing 8 (Impact Area 8-1) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe ILL Often incised, but less than Severe or Overwidenedlncised. Slightly incised, few areas of active Poor. Banks more stable than Severe VerticallyAaterally unstable. Likely to Deeply incised (or excavated), Very lisle incision or active erosion; 80 erosion or unprotected banks. Majority or Poor due to lower bank slopes. widen further. Majority of both banks vertical/lateral instability. Severe tY Channel 100% stable banks. Vegetative of banks are stable (60-80%). Erosion may present 40-60% of are near vertical. Erosion present incision, Flow contained within the Condition surface protection or natural rock, Vegetative protection or natural rock both banks. Vegetative protection on 60-80%of banks. Vegetative banks. Streambed below average prominent (8 AND/OR prominent (60-80%) AND/OR 40-60% of banks. Streambanks may y o[ection present 20-40% of P P rootin depth, majority of banks 9 P 1 Y Stable point rstban f benches Depositional features contribute to stability. The bankfull and low Flow bevertical or undercut. AND/OR 40- 60 % of stream is covered by banks, and is insufficient to prevent erosion. AND/OR 60-80% of the ,vertical/undercut. Vegetative 9 Access to their are present. Access to [heir original channels are well defined. Stream sediment. Sediment may be stream is covered by sediment. rotection resent on less than 20% of P P banks, is not revendn erosion. Floodplain or fully developed wide likely has access to bankfull benches, temporaryftransien[, contribute Sediment is temporaryftransien[in P 9 Obvious bank sloughing resent. 9 P bankfulI benches. Mid -channel bars, or newlydeveloped Floodplainsalong instability. Deposition that contribute to nature, and contributing to instability. 8 Erosion/raw banksha Bel. and transverse bars few. Transient sedimen[depositlon covers less than portlons of the reach. Transient stability, maybe forming/present. AND/ AND/OR V-shaped channels have Greater AND/OR Aggrading channel. Greater 10 % of bottom. sedimen[cevers 10-40%of the AND/OR V-shaped channels have vegefative protection is present on> than 80% of stream bed is covered by stream bottom. ve etative rotection on > 40% of the 9 P 40%of the banks and stable sediment deposition, contributing instability. CI banks and depositional features which deposition is absent. Multiple thread channelel s and/or contribute to stability. subterranean Flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> Only slightly incised, with a few areas of active erosion, 123 In feet riprap channel 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> 123 In ft. of riprap channel; bisected Optimal Suboptimal Marginal Poor by underground utility Low Marginal: High Poor: d; right bank access road; g High Suboptimal: Low Suboptimal: Non -maintained, Lawns, mowed, ongoing logging,left g Riparian areas Riparian areas with tree stratum with High Marginal: Non -maintained, dense herbaceous vegetation, and maintained Low Poor: bank parallel VDOT bank with tree stratum (dbh > 3 inches) (dbh > 3 inches) dense herbaceous riparian areas nurseries; no -till cropland; Impervious surfaces, mine maintained R/W and Riparian P Tree stratum dbh > 3 inches resent, ( present, present, with > 30%[reecanopy vegetation with either lacking shrub and treestraWm,hay actively grazed spoil lands, underground utilityR/W; cover with > 60% tree canopy cover and a to 60 % tree cover and a layer or a tree production, ponds, Pasture, sparsely denuded surfaces, Buffers non -maintained understory. Wetlands canopy cover and maintained layer (dbh > 3 open water. If vegetated non- row crops, active located within the riparian areas. containing both understory. inches) present, present, tree maintained area, feed lots, trails, or herbaceousand Recent cutover with <30%tree stratum (dbh >3 recenlly seeded other comparable shrub layers or a (dense canopy cover. inches) present, and stabilized, or conditions. non -maintained understory. vegetation). with tree other comparable condition. canopy cover with y cover maintained understory. High Low Hi h Low Hi h Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 Riparian Area> 56% 44% 100% Right Bank Score> 0.85 0.5 C I= (Sum % RA " Scores"0.01 )/2 Left Bank RiparianArea> 12% 60% 28% 100% RtBank CI> 0.70 Cl score> 0.85 0.6 0.5 LtBank Cl> 0.60 0.65 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Optimal Suboptimal Marginal Poor Instream Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30-50% of the reach and present in 10-30% of the reach and lacking or are unstable. Habitat Cover in greater than 50% of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less populations. populations. than 10% of the reach. CI Score 1.5 1.2 0.9 0.5 0.50 Stream Impact Assessment Foi Project# Applicant Locality Cowardin Class. HUC 119164 VDOT Pittsylvania Ephemeral 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of cf embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20%of 20-40%of the of the channel of the channel Channel the stream reach stream reach is alterations listed in alteralions listed in Alteration Channelization, dredging, alteration, is disrupted by any disrupted by any the parameter guidelines. If the parameter guidelines. If or hardening absent. Stream has an of the channel of the channel stream has been stream has been unaltered pattern or has naturalized. alteralions listed in alteralions listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1.3 1.1 0.9 i 0.7 REACH CONDITION INDEX and STREAM CONDITION LIN NOTE. The CIs and RCI shoultl be rounded to 2 decimal places. The CR shoultl be rounded to a whole number. DESCRIBE PROPOSED IMPACT: Channel proposed to be filled. RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR)>> 204 CR=RCIXLFXIF Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Project # Project Name Locality Cowardin HUC Date SAR # Impact/SAR Impact Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania Ephemeral 03010103 7-24-2024 Impact 8-2 32 1 Name(s) of Evaluator(s) Stream Name and Information Frank scearce Un-named ephemeral triburtary to Trotters Creek, Crossing 8 (Impact Area 8-2) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Overwidenedlncised. Slightly incised, few areas of active Poor. Banks more stable than Severe VerticallyAatemlly unstable. Likely to Deeply incised (or excavated), Very lisle incision or active erosion; 80 erosion or unprotected banks. Majority or Poor due to lower bank slopes. widen further. Majority of both banks instability. vertical/lateral instabili Severe Channel 100%stable banks. Vegetative of banks are stable (60-80%). Erosion may present on 40-60% of are near vertical. Erosion present on incision, Flow contained within the Condition surface protection or )Aral rock, Vegetative protection or natural rock both banks. Vegetative protection on 60-80%of banks. Vegetative banks. Stre below average prominent (8 AND/OR prominent (60-80%)AND/OR 40-60%of banks. Streambanks may Y rotection resent on 20-40%of P P depth, ma rootln de [h, majority of banks 9 P 1 Y Stable point rs/ban f benches Depositional features contribute to stability. The bankfull and low Flow bevertical or undercut. AND/OR 40- 60 % of stream is covered by banks, and is insufficient to prevent erosion. AND/OR 60-80% of the ,vertical/undercut. Vegetative 9 Access to their are present. Access to [heir original channels are well defined. Stream sediment. Sediment may be stream is covered by sediment. protection resent on less than 20% of P P banks, is not reventin erosion. Floodplain or fully developed wide likely has access to bankfull benches, temporaryftransien[, contribute Sediment is temporaryftransien[in P 9 Obvious bank sloughing resent. 9 P band benches. Mid -channel bars, or newly developed Floodplains along instability. Deposition that contribute to nature, and contributing to instability. 8 Erosion/raw banks on 80-100%. tra and transverse bars few. Transient sedimen[depositlon covers less than portlons of the reach. Transient stability, may be forming/present. AND/OR V-shaped channels have AND/OR Aggrading channel. Greater 10 % of bottom. sedimen[cevers 10-40%of the AND/OR V-shaped channels have vegefative protection is presen[on> than 80% of stream bed is covered by stream bottom. ve etative rotection on > 40% of the 9 P 40%of the banks and stable sediment deposition, contributing instability. CI banks and depositional features which deposition is absent. Multiple thread channels s and/or contribute to stability. subterranean Flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> riprap stable channel 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width maybe acceptable) Conditional Category NOTES>> Optimal Suboptimal Marginal Poor Low Marginal: High Poor: High Suboptimal: Low Suboptimal: Non -maintained, Lawns, mowed, Riparian areas Riparian areas High Marginal: dense herbaceous and maintained Low Poor: with tree stratum with tree stratum with (dbh > 3 inches) Non -maintained, dense herbaceous vegetation, riparian areas nurseries; Impervious Tree stratum dbh > 3 inches resent, ( ) p (dbh > 3 inches) present, with 30% present, with > vegetation with lacking shrub and no -till cropland; a.hvelysture, grazed surfaces, mine spoil lands, Riparian P with > 60% tree canopy cover and a to 60 % tree 30% tree, canopy either shrub tree stratum, hay Pasture, sparsely denuded surfaces, Buffers non -maintained understory. Wetlands canopy cover and cover and a layer or a tree production, ponds, vegetated non- row crops, active located within the riparian areas. containing both maintained understory. layer (dbh > 3 inches) present, open water. tr If tJbh maintained area , feed lots, trails, or herbaceousand Rec(d cutover with <30%tree raburnprese staam (dbh >3 recently seeded other comparable shrub layers or a (dense canopy cover. inches) present, and stabilized, conditions. non -maintained understory. vegetation). with tree l other comparable condition. y cover canopy cover with maintained understory. High Low High Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Riparian Area> 100% 100% Right Bank Score> 0.5 C I= (Sum % RA " Scores"0.01 )/2 Left Bank Riparian Area> 100% 100% Rt Bank Cl > 0.50 Cl score> 0.5 Lt Bank Cl> 0.50 0.50 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Optimal Suboptimal Marginal Poor Instream Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30-50% of the reach and present in 10-30% of the reach and lacking or are unstable. Habitat Cover in greater than 50% of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less populations. populations. than 10% of the reach. CI Score 1.5 1.2 0.9 0.5 0.50 Stream Impact Assessment Foi Project# Applicant Locality Cowardin Class. HUC 119164 VDOT Pittsylvania Ephemeral 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of cf embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20%of 20-40%of the of the channel of the channel Channel the stream reach stream reach is alterations listed in alteralions listed in Alteration Channelization, dredging, alteration, is disrupted by any disrupted by any the parameter guidelines. If the parameter guidelines. If or hardening absent. Stream has an of the channel of the channel stream has been stream has been unaltered pattern or has naturalized. alteralions listed in alteralions listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1.3 1.1 0.9 i 0.7 REACH CONDITION INDEX and STREAM CONDITION LIN NOTE. The CIs and RCI shoultl be rounded to 2 decimal places. The CR shoultl be rounded to a whole number. DESCRIBE PROPOSED IMPACT: Channel proposed to be filled RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR)>> 22 CR=RCIXLFXIF Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Project # Project Name Locality Cowardin HUC Date SAR # Impact/SAR Impact Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania Ephemeral 03010103 7-24-2024 Impact 8s-1 183 1 Name(s) of Evaluator(s) Stream Name and Information Frank scearce unnamed ephemeral tributary to Trotters Creek, Crossing 8a (Impact Area 8a-1) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Overwidenedlncised. Slightly incised, few areas of active Poor. Banks more stable than Severe VerticallyAatemlly unstable. Likely to Deeply incised (or excavated), Very lisle incision or active erosion; 80 erosion or unprotected banks. Majority or Poor due to lower bank slopes. widen further. Majority of both banks vertical/lateral instability. Severe tY Channel 100%stable banks. Vegetative of banks are stable (60-80%). Erosion may present 40-60% of are near vertical. Erosion present incision, Flow contained within the Condition surface protection or )Aral rock, Vegetative protection or natural rock both banks. Vegetative protection on 60-80%of banks. Vegetative banks. Stre below average i AND/OR prominent (8 prominent (60-80%)AND/OR 40-60%of banks. Streambanks may Y rotection resent on 20-40%of P P rootln de [h, majority of banks depth, ma 9 P 1 Y Stable point rs/ban f benches Depositional features contribute to stability. The bankfull and low Flow bevertical or undercut. AND/OR 40- 60 % of stream is covered by banks, and is insufficient to prevent erosion. AND/OR 60-80% of the ,vertical/undercut. Vegetative 9 Access to their are present. Access to [heir original channels are well defined. Stream sediment. Sediment may be stream is covered by sediment. protection resent on less than 20% of P P banks, is not revendn erosion. Floodplain or fully developed wide likely has access to bankfull benches, temporaryftransien[, contribute Sediment is temporaryftransien[in P 9 Obvious bank sloughing resent. 9 P band benches. Mid -channel bars, or newly developed Floodplains along instability. Deposition that contribute to nature, and contributing to instability. 8 Erosion/raw banks on 80-100%. tra and transverse bars few. Transient sedimen[depositlon covers less than portlons of the reach. Transient stability, may be forming/present. AND/OR V-shaped channels have AND/OR Aggrading channel. Greater 10 % of bottom. sedimen[covers 10-40%of the AND/OR V-shaped channels have vegefative protection is presen[on> than 80% of stream bed is covered by stream bottom. ve etative rotection on > 40% of the 9 P 40%of the banks and stable sediment deposition, contributing instability. CI banks and depositional features which deposition is absent. s and/or Multiple thread channels contribute to stability. subterranean Flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width maybe acceptable) Conditional Category NOTES>> ongoing logging operations, Optimal Suboptimal Marginal Poor Channel parallel existing Low Marginal: High Poor: wad roadway High Suboptimal: Low Suboptimal: Non -maintained, Lawns, mowed, Riparian areas Riparian areas High Marginal: dense herbaceous and maintained Low Poor: with tree stratum with with tree stratum (dbh > 3 inches) Non -maintained, dense herbaceous vegetation, riparian areas nurseries; Impervious Tree stratum dbh > 3 inches resent, ( ) p (dbh > 3 inches) present, with 30% present, with > vegetation with lacking shrub and no -till cropland; actively grazed surfaces, mine spoil lands, Riparian P with > 60% tree canopy cover and a to 60 % tree 30% tree, canopy either shrub tree stratum, hay sture, Pasture, sparsely denuded surfaces, Buffers non -maintained understory. Wetlands canopy cover and cover and a layer or a tree production, ponds, vegetated non- row crops, active located within the riparian areas. containing both maintained layer (dbh > 3 open water. If maintained area, feed lots, trails, or herbaceousand understory. inches) present, present, tree recenlly seeded other comparable shrub layers or a Recent cutover with <30%tree stratum (dbh >3 and stabilized, or conditions. non -maintained (dense canopy cover. inches) present, other comparable understory. vegetation). with tree condition. y cover canopy cover with maintained understory. High Low Hi h Low Hi h Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Riparian Area> 100% 100% Right Bank Score> 0.5 C I= (Sum % RA " Scores"0.01 )/2 Left Bank Riparian Area> 100% 100% Rt Bank Cl > 0.50 Cl score> 0.5 Lt Bank Cl> 0.50 0.50 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Optimal Suboptimal Marginal Poor Instream Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30-50% of the reach and present in 10-30% of the reach and lacking or are unstable. Habitat Cover in greater than 50% of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less populations. populations. than 10% of the reach. CI Score 1.5 1.2 0.9 0.5 0.50 Stream Impact Assessment Foi Project# Applicant Locality Cowardin Class. HUC 119164 VDOT Pittsylvania Ephemeral 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of cf embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20%of 20-40%of the of the channel of the channel Channel the stream reach stream reach is alterations listed in alteralions listed in Alteration Channelization, dredging, alteration, is disrupted by any disrupted by any the parameter guidelines. If the parameter guidelines. If or hardening absent. Stream has an of the channel of the channel stream has been stream has been unaltered pattern or has naturalized. alteralions listed in alteralions listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1.3 1.1 0.9 i 0.7 REACH CONDITION INDEX and STREAM CONDITION LIN NOTE. The CIs and RCI shoultl be rounded to 2 decimal places. The CR shoultl be rounded to a whole number. DESCRIBE PROPOSED IMPACT: Channel proposed to be filled RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR)>> 157 CR=RCIXLFXIF Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date I SAR # I Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania R3UB 03010103 1 4-10-2024 1 Impact 10-1 90 1 Names) of Evaluator(s) Stream Name and Information Frank Scearce McGuff Creek, downstream (Crossing 10, Impact Area 10-1) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Overwidene Andsed. Slightly incised, few areas of active Poor. Banks more stable than Severe VerticallyAaterally unstable. Likely to Deeply incised (or excavated), Very little incisionor veerosion; 80 erosion or unprotected banks. Maori P Majority or Poor due to lower bank slopes. widen further. Majority of both banks vertical,lateral instability. Severe Channel anks. 100% stable banks. Vegetative of banks are stable 6o-Bo%). ( Erosion maybe present on 40-60% of are near vertical. Erosion present on flow contained within the Condition surface protectionorna rock, Vegetative protection or natural rock P both banks. Vegetative protection on 60-80 % of banks. Vegetative anks.n, banks. SVeambedbety prominent (8 AND/OR AND/ prominent (60-80%) AND/OR 40-60 % of banks. Streambanks may protection present on 20-40 % of barage oflow rootin de [h, ma on of banks g P majority rs/ban f Stable point bars/bankfull benches Depositional features contribute [o bevertical or undercut AND/OR 40- banks, and is insufficient to prevent verlical/undercut. Vegetative are Access to their original stability.The bankfull and low Flow 60%of stream is covered by erosion. AND/OR 60-80% of the protection present less than 20% of present. Fl fully wide channels are well defined. Stream sediment. Sediment may be stream is covered by sediment. v banks, is not preventing erosion. P 9 Mid-channeed l handfulI bin oresor benches. Mid -channel bars, like) has access to bankfull benches, y temporaryftransien[, contribute Sediment temporaryftransien[in Obvious bank sloughing present. d. and transverse bars few. Transient or newt developed floodlains aloe y P g instability. Deposition that contribute [o nature, and contributing to instability. Erosion/raw banks on 80-100%. s'dimentdeposition covers lessthan portions of the reach. Transient stability, may be forming/present. AND/OR V-shaped channels have AND/OR Aggrading channel. Greater 10 % of bottom. sediment covers 10-40% of the AND/OR V-shaped channels have vegetative protection is present on > than 80% of stream bed is covered b y stream bottom. vegetative protection on > 40% of the 9 P 40%of the banks and stable sediment deposition, contributing to instability. CI banks and depositional features which deposition is absent Multiple thread channels and/or contribute to stability. subterranean Flow. Score 3 2.4 2 1.6 1 1.6 NOTES>> laterally unstable, likely to widen further, > 60 stream covered by sediment 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES»Existing 33 In ft maintained utility easement parallel the Optimal Suboptimal Marginal Poor Low Marginal: High Poor: existing roadway 9 y High Suboptimal: Low Suboptimal: Non -maintained, Lawns, mowed, Riparian areas Riparian areas High Marginal: dense herbaceous and maintained Low Poor: with tree stratum with tree stratum (dbh > 3 inches) Non -maintained, dense herbaceous vegetation, riparian areas areas, nurseries; Impervious (dbh > 3 inches) present, with > vegetation with lacking shrub and no -till cropland; surfaces, mine Riparian Tree stratum (dbh > 3 inches) present, present, with 30% 30%tree canopy either a shrub tree stratum, hay actively grazed spoil lands, with > 60% tree canopy cover and a to 6k tree cover and a layer or a tree production, ponds, pasture, sparsely denuded surfaces, Buffers non -maintained understory. Wetlands canopy cover and maintained layer (dbh > 3 open water. If vegetated non- new crops, active located within the riparian areas. containing both understory. inches) present, present, tree remained area, maintained area, feed lots, trails, or herbaceous and shrub layers or a Recent cufover with <30%tree stratum (dbh >3 recently and stabilized, or other comparable conditions. non -maintained (dense canopy cover. inches) present, other comparable understory. Vegetation). with <30%tree condition. canopy cover with maintained understory. High I Low High I Low High I Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 Riparian Area> 37% 63% 100% Right Bank Score > 0.6 1.2 CI= (Sum % RAScores'0.01)2 Riparian Area> 37% 63% 100% Rt Bank Cl > 0.98 Cl Left Bank > Mn 1 0.6 1.2 Lt Bank Cl > 0.98 0.98 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Instream Optimal Suboptimal Marginal Poor Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitatelements listed above are Habitat elements are typically present present in 30-50% of the reach and present in 10-30% of the reach and lacking or are unstable. Habitat Cover in greater than 50% of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less Populations. populations. than 10% of the reach. CI 10.90 Score 1.5 1.2 0.9 0.5 Stream Impact Assessment Foi Project # Applicant Locality Cowardin Class. 1 HUC 119164 VDOT Pittsylvania 114U13 1 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of cl embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20%of 20-40%of the °f the channel of the channel Channel the stream reach stream reach is alteratlons listed in alteratlons listed in Alteration Channelization, dredging, alteration, is disrupted by any disrupted by any of the parameter the parameter or hardening absent. Stream has an of the channel the channel guidelines. If guidelines. If unaltered pattern or has naturalized. alteratlons listed in alteratlons listed in stream has been stream has been the parameter the parameter channelized, channelized, guidelines. guidelines. normal stable normal stable stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1 1.3 1 1.1 1 0.9 1 0.7 REACH CONDITION INDEX and STREAM CONDITION UN NOTE. The Cl, and RCI shoultl be rountletl to 2 tlecimal places. The CR shoultl be rountletl to a whole number. DESCRIBE PROPOSED IMPACT: 3rd parallel culvert installation/tie-in, riprap outlet protection RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR)>> 79 CR=RCIXLFXIF Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date SAR # Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania R3UB 03010103 1 4-10-2024 mpact 11-1 330 1 Name(s) of Evaluator(s) IStream Name and Information Frank Scearce McGuff Creek Upstream, Crossing 11 (Impact Area 11-1) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe r Often incised, but less than Severe or Ovenvidened/incised. Vertically/latac lly Slightly incised, few areas of active Poor. Banks more stable than Severe or unstable. Likely to widen further. erosion or unprotected banks. Majority Poor due to lower bank slopes. Majority of both banks are near vertical. Channel Very little incision or active erosion; 80- of banks are stable (60-80%). Erosion may be present on 40-60% of Erosion present on 60-80% of banks. Deeply incised (or excavated), instability. Severe von Condition 100% stable banks. Vegetative surface Vegetative protection or natural rock both banks. Vegetative rotection on p Vegetative protection resent on 20- pr p flo coattecal incision, flow contained within the banks. protection or natural rock, prominent prominent (60-80%) AND/OR 60% of banks. Streambanks may 40% of banks, and is insufficient to Streambed below average rooting (80-100%). AND/OR Stable point Depositional features contribute to bevertical or undercut. AND/OR 40- prevent erosion. AND/OR 60-80%of depth, majority of banks harstbankfull benches are present. stability. The hankfull and low flow 60% of stream is covered by sediment. the stream is covered by sediment. vertical/undercut. Vegetative protection Access W their original floodplain a Wlly channels are well defined. Stream likely Sediment may be temporary/transient, Sediment is temporary/transient in present on less than 20% of hanks, is developed wide bankfull benches. Mid- has access to hankfull benches, or contribute instability. Deposition that nations, and contdbutlng to instability. not preventing erosion. Obvious bank channel bars, and transverse bars few. newly developed floodplains along contribute to stability, may be AND/OR V-shaped channels have sloughing present. Erosion/raw banks Transient sediment deposition covers porters of the reach. Transient forming/present AND/OR V-shaped vegetative protecfion is present on > on 80-100%. AND/OR Aggrading less than 10%of bottom. sediment covers 10-40% of the stream channels have vegetative protecfion on 40% of the banks and stable sediment channel. Greater than 80%of stream bogom > 40% of the banks and depositional features which contribute to stability. depositon is absent. bed is covered by depositon, CI contributing to instability. Multiple thread channels and/or subterranean flow. Score 3 2.4 2 1.6 1 2.4 NOTES>> 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category Notes>> Stream channel immediately parallel roadway for 160 In ft., Optimal Suboptimal Marginal Poor Low Marginal: High Poor: Lawns, stream channel parallel Non -maintained, mowed, and maintained utility Riparian areas with Riparian areas with High Marginal: dense herbaceous maintained areas, Low Poor: easements bee stratum (dbh bee stratum (dbh > Non -maintained, vegetation, riparian nurseries; no -till Impervious 3 inches) present, hes) p , 3 inches) present, hes) p dense herbaceous areas lacking shrub cropland; actively surfaces, mine Riparian Tree straWm (dbh > 3 inches) present, with 30%to 60% with>30%tree vegetation with and tree stratum, grazed pastors, spoil lands, with >60%tree cano cover and pry ree canopy cover canopy cover and a either a shrub layer y ha y production, sparsely vegetated denuded surfaces, Buffers non -maintained understory. Wetlands and containing both maintained or a tree layer (dbh ponds, open water. non -maintained row, cops, active located within the riparian areas. herbaceous and uncutevery. Recent > 3 inches) present, If present, tree area, recently feed lots, [rails, or shrub layers or a cveget (dense with <30% tree stratum (dbh >3 seeded and other comparable non-maintainedunder vegetation). canopy cover. inches) present, stabilized, or other condifions. unders[ory. with <30%tree comparable canopy cover with condifion. maintained understory. High I Low High I Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 Riparan Ama> 1 49% 1 36% 1 15% 1 100% Right Bank Score > 1.2 0.6 0.5 CI= (Sum %RASceres'0.01y2 adan Ama> Rip % 97% d 100% Fit Bank Cl > 0.88 Cl Left Bank Score > 6 1,5 Lt Bank Cl > 1.64 1.26 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; 9 NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Instream Optimal Suboptimal Marginal Poor Habitat/ Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Available Habitat elements are typically present in present in 30-50% of the reach and are present in 10-30% of the reach and are lacking or are unstable. Habitat Cover greater than 50% of the reach. adequate for maintenance of adequate for maintenance of elements are typically present in less populafions. populafions. than 10% of the reach. CI Score 1.5 1.2 0.9 0.5 1.50 Stream Impact Assessment For Project# Applicant Locality C—rdin Class. HUC 119164 VDOT Pittsylvania R31JB 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of chant spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40-60%of mach 60-60%of reach is disrupted by any is disrupted by any Less than 20 % of 20-40 % of the of the channel of the channel Channel the stream mach is stream mach is altemtions listed in altemtions listed in Alteration Channelizetbn, dredging, alteration, or disrupted by any of disrupted by any of the parameter guidelines. If theparameter guidelines. If hardening absent Stream has an the channel the channel stream has been stream has been unaltered pattern or has naturalized. alterations listed in altemtions listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1 1.3 1 1.1 1 0.9 1 0.7 REACH CONDITION INDEX and STREAM CONDITION UNI NOTE: The Cls and RCI shoultl be rountletl to 2 d-imal places. The CR shoultl be rountletl to a whole number. DESCRIBE PROPOSED IMPACT: Channel proposed to be filled. RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) >> 426 CR=RCIXLFXIF Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date I SAR # I Class. length Factor 119164 Berry Hill Connector Extension Pittsylvania R4SB 03010103 1 4-10-2024 1 Impact 11-2 230 1 Names) of Evaluator(s) Stream Name and Information Frank Scearce un-named tributary to McGuff Creek, Crossing 11 (Impact Area 11-2) 1. Channel Condition: Assess the cross-section of the stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Overwidene Andsed. Slightly incised, few areas of active Poor. Banks more stable than Severe VerticallyAaterally unstable. Likely to Deeply incised (or excavated), Very little incisionor veerosion; 80 erosion or unprotected banks. Maori P Majority or Poor due to lower bank slopes. widen further. Majority of both banks vertical,lateral instability. Severe Channel anks. 100% stable banks. Vegetative of banks are stable 60-80%). ( Erosion maybe present on 40-60% of are near vertical. Erosion present on flow contained within the Condition surface protectionorna rock, V efative protection or natural rock P both banks. Vegetative protection on 60-80 % of banks. Vegetative anks.n, banks. SVeambedbety prominent (8 AND/OR AND/ prominent (60-80%) AND/OR 40-60 % of banks. Streambanks may protection present on 20-40 % of oflow barage rootin de [h, ma on of banks g P majority Stable point bars/bankfull benches rs/ban f Depositional features contribute [o bevertical or undercut AND/OR 40- banks, and is insufficient to prevent verlical/undercut. Vegetative are Access to their original stabili The bankfull and low Flow ty 60%of stream is covered by erosion. AND/OR 60-80% of the protection present less than 20% of present. Fl y pee wide channels are well defined. Stream sediment. Sediment may be stream is covered by sediment. banks, is not preventing erosion. v P 9 handfulI bin ches.or Mid -channel benches. Mid -channel bars, like) has access to bankfull benches, y temporaryftransien[, contribute Sediment temporaryftransien[in Obvious bank sloughing present. and transverse bars few. Transient d. or newt developed Flood lains alonginstability. y P Deposition that contribute [o nature, and contributing to instability. Erosion/raw banks on BO-100%. sediment deposition covers less than P°rtions of the reach. Transient stability, may be forming/present. AND/OR V-shaped channels have AND/OR Aggrading channel. Greater 10 % of bottom. sediment covers 10-40% of the AND/OR V-shaped channels have vegetative protection is present on > than 80% of stream bed is covered b y stream bottom. ve etative rotection on > 40% of the 9 P 40%of the banks and stable sediment position, contributing to instability de. CIMultiple banks and depositional features which deposition is absent thread channels and/or contribute to stability. subterranean Flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> Channel parallel existing roadway toe of slope for 130 In ft; Optimal Suboptimal Marginal Poor Low Marginal: High Poor: High Suboptimal: Low Suboptimal: Non -maintained, Lawns, mowed, Riparian areas Riparian areas High Marginal: dense herbaceous and maintained Low Poor: with tree stratum with tree stratum (dbh > 3 inches) Non -maintained, dense herbaceous vegetation, riparian areas areas, nurseries; Impervious (dbh > 3 inches) present, with > vegetation with lacking shrub and no -till cropland; surfaces, mine Riparian Tree stratum (dbh > 3 inches) present, present, with 30% 30% tree canopy tree haynds actively grazed spoil lands, 0%trd to tree cover and a layer or layer or a tree coon p production, ponds, pasture, sparsely denuded surfaces, Buffers non -maintained underpycoveranda non -maintained understory. Wetlands canopy cover yc maintained layer (dbh > 3 open water. If vegetated non- new crops, active located within the riparian areas. containing both both understory. inches) s present,dbh maintained area, feed lots, trails, or herbaceous and shrub layers or a Recent cutover 0%tpresent,a, staam (dbh>3 recently seeded and stabilized, or other comparable conditions. non -maintained (dense weep cover. canopy cover. inches) present, other comparable understory. vegetation). with <30%hee condition. canopy cover with maintained understory. High I Low High I Low High I Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the Ensure the sums descriptors. 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you of %Riparian below. 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 Riparian Area> 100% 100% Right Bank Scere> 1.5 CI=(Sum %RA"Scores"0.01)/2 Riparian Area> 50% 20% 30% 100% Rt Bank CI > 1.50 Cl Left Bank score > 1 1.2 1 6 1 0.5 1 1 Lt Bank Cl > 1.95 1.73 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness; shade; NOTES>> undercut banks; root mats; SAV; riffle poole complexes, stable features. Conditional Category Instream Optimal Suboptimal Marginal Poor Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitatelements listed above are Habitat elements are typically present present in 30-50% of the reach and present in 10-30% of the reach and lacking or are unstable. Habitat Cover in greater than 50% of the reach. are adequate for maintenance of are adequate for maintenance of elements are typically present in less Populations. populations. than 10% of the reach. CI 10.90 Score 1.5 1.2 0.9 0.5 Stream Impact Assessment Foi Project# Applicant Locality C—edin Class. 1 HUC 119164 VDOT Pittsylvania R4SB 03010103 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of cl embankments, spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20 % of 20-40 % of the of the channel of the channel Channel the stream reach stream reach is alterations listed in alterations listed in Alteration Channelization, dredging, alteration, is disrupted by any disrupted by any of the parameter the parameter or hardening absent. Stream has an of the channel the channel guidelines. If guidelines. If unaltered pattern or has naturalized. alterations listed in alterations listed in stream has been stream has been the parameter the parameter channelized, channelized, guidelines. guidelines. normal stable normal stable stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1.5 1 1.3 1 1.1 1 0.9 1 0.7 REACH CONDITION INDEX and STREAM CONDITION LIN NOTE: The CI, and RCI shoultl be rountletl to 2 tlecimal places. The CR shoultl be rountletl to a whole number. DESCRIBE PROPOSED IMPACT: Channel proposed to be filled. RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) >> 283 CR=RCIXLFXIF Attachment M Compensatory Mitigation N J O 0 M M r V: a 0 O w on v; v; x U F"' O z ui `m o o O o 0 O co co � M M co a.) >� O N M a a N 0 O 0 C C O O C O — — N O O N O Vl O V1 l� O P N T N EA � EA MEA EA a V 00 00 M O T V 00 Vl O\ N Q z W a � o ti O O O O x o 0 0 0 M O M O M O M O M C T a .o x x � o a on 0 0 0 0 0 RS RS RS RS RS N N pj O O O O O M M en en en O O O O en en enM O O O O M O M M O O O O M M M M O O M M O O O O O O O O O O en 0 0 O O O O O O cq 0p O O T V ^� en M Z Z Z. Z 00 It �p M �+ "�' p cC • q `O�' > q F7 y>cn O O z In cn 1 o f a7i O N z Q O CIO r, r r, .to •to • Q '� N to bap V] ❑ C U " " Oa (T �t O C4 (4 C4 LO r-- LO r-- L M Cl) LO Cl) M a 0) q 00 LO O O O LO I-- r-- � M O N O i ca y O O O O O O O O O ea LO O O O N 00 F� ^C w � o U 0 0 LO .-. N LO � Lq cq 000 000 00 ' M Cl) Cl) N N N N N N CT N �o y Q CX� p y CA Q CA CO CO I-- M O 00 O O I-- �t Cl) C4 p N co Cn Cn Cn Cn Cn Cn Cn Cn U � L y cr 0 l\ 00 LO N N 0 �O N � O N J N �t I-- O) O �t N 00 N N P- 0') co .-� N Cl) N o O �Ho � W ti N �i y LOU O cn DM Ow U O c 0 0 Q W M w w U) w LL N w �t Q N U) L O o d d d d d d Z d d M D O a_ U ° m Z)co m O v Z) O .�T. "-' O O U = U) a mLO a a o = c m o 0 0 0 0 LO 0 0 0 LO 0 U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 x m q c c c c c c c c c a a a a a a a a a a a m ) ) ) ) ) ) ) ) m)O m ip- E �t N C)(6 0 pl�(6 O 00 (6 O «�+ C O J Z N Z N C O J Z C4 O C O Z N J Q Q Z Z O C O O a Z A C7 N O O M Oi CJ Z .E M (� O O d M 0 O 0 w E co 00 CD Cl) M Q N E M (D 0 > a' co 00 00 0- E M co >d > 00 >d > 41 Z >N> > p >N> > p >d > 41 O a 0 >a > O > p > 41 p a.i F� ."-i > d> N U) Z > > d Z N Z N >> > d> N U) > J Z N >> > d> N a L H o LO rn rn LO X o w of m rn LO LO 0 0) I?O 0) o O 0) O I?z 0) 1- O LO 0 C) � N Lo Cl) �t 00 00 NO O O ' O I Lo O O 00 N � 00 O � N CO � M O �t 00 00 O 00 O Cl) � CT a C) 1-0 0 CA C)M Coo 0 1- N0 0 u C?C) C) C? C?O O 0 'O C) 0) Cn C) Q) CS) Cn O 0 N C4 LO O C)co co N r-- r-- co �t O.i co P- O O O D O O O 00 LO OMO N N I� N DD co LO co LO Cl) LO N �t 00 N �t 00 CO O) CO CO �t LO �t N N � O) M O) Cl) O) Cl) O O O O O O O O O O O O O O M O Cl) O O O F� ^ I� N Cl) N Cl) N N N O N CO I� pll� I- Lq C4 O O O O O O d7 d7 d7 d7 a7 a Q\ Q 00 Q C00 EO COO OCM 00 N 00 00 O) N ONO Cl) O) Cl) CD � LO LOLO N co co � O N M Cl) V) U DD � aLO Q� Cl) OO O � ON O O � OO O p 00 Cl)O O 00 Cl) p M Py N p O � N O O U � W � k U) d� O m O m m (n (n O�� m (n (n O�� m (n (n O�� O m U) O� m m U) � Q a~ a d a d a d d d Cl) d O m LU� LU m LU� m m LU� LO m m LU� LO m m LU� LO LU m LU A U) �m 0 m co U) Q W W N W W�t W Cl) In W Cl) In W Cl) In W W Cl) (n LL �t co (n Y O -6 > O � O_ O_ O_ O �, O O Om m m .-. Q m U U U m d m m O O O O O O O Cl) O O O O O O O O O O O O O O co O M O co O M O co O co O co O co O Cl) O O O O O O O O O O O C C C C C C C C C C (D 0) 01 01 01 01 01 01 01 01 U) O O O O O O O O O O O Q Z N N Cl) Cl) Cl) (6 Q Z Q Z m O Cl) N N C O N C O 01 Z Op N 00 O I� O r O 1 O C O 01 ON Q C O O 41 z Cl)N I� O co C\j p ONE M>>> O\)ad M 00 N E M CO N-t N N N aEMCO E M OO) OO O> a OaLO � a p >O > O > O >� a O 4 a i>N U) N i d>N U)ZN Z N Z N Z N i d>N U) i d>>N U) O Z N 0 0 0 O O O I� O a7 M O C4 C4 C4 C4 C4 O O O (4 O C4 O O7 Cl) N O) O O I- O O O O 00 CO 00 00 00 00 00 00 C4 � O) O) I- I- O 00 O) 00 O) 00 O) � LO Cl) N Cl) M N Cl.)N N N OO 00 Il N O O) O O 00 LO LO LO O) O Iz O) O O) O O O O O O O O O O O) N 00 CO 00 00 N N N N N N 00 O O CO N N_ O 0 CO O CO 0 CO O O 0 CO 0 O 0 M 0 � O O C4 O O 00 00 N �t N O N LO N M I- M LO M N N � O CO M CO M CO co M M M M M M O O O O O O O O O O O O O O O O O O O) O O F� ~O 't M M OM CO CO t` 00 00 00 00 I� O Q\ Q 00 O Cfl O O 00 N nl Q O N N 00 — I-- LO 00 N O LO CO LO CO M CO CO M M M co N M p M M M M M M V) U DD � p'^ O t` Q� O) (fl O O O N (D co 00 �t N �t ^ O CO O N 00 I-- M O N .� Py N p M N p O N YZ O O U W 17t COLL CO LL CO LLLL 0 Q n" LL d M N UD U) U) S U) O U) S U) U) d LLI M U) N LLI �t LLI M U) LL �t LLI M U) �t d of d of d J of Z (6 (6 (6 (6 (6 C C C C — C > > > > > o x °c E> d d d d co U d s U o cG co O O M O M O O M O N O O O O O O O O O co O co O co O co O co O co O Q O Z C C C C C C C O m O m 0) O m O O O m 0 Y Y Y Y Y 0 n O n n n n O nO I� 00 OO O O Cy Q O N Z N O O OO O O O O OO O � 7Q7 C N Z J c\j6 6O N O cd9"a i-0d"G N N O Z c N O N O co -0o O E NCn > N > NO c)N N 0 N 0 N� 0 o co > N > d>U) Z N > N Z N > N Z N > COO 0_ O COO O COO O O N O O O O) O � O N LO LO O LO LO O � LO LO O r A CV O ^C O � O O O O ¢ O' M O M CNO M O M O O s a C4 0 N 0 Cfl 0 Cfl 0 O -x LO O �t Cl) O N N LO O G i s. O O O O O R M N 00 N CO — M Cl) O W � O V O O LO LO In 1- 00 Q\ '7 Cl) N LO O N I —I cr � Q I- LO N 00 LO Cfl 0') O LO 00 Cl) O U J w M oc a r O r O � M No o ° umj O O oU�C\j � m C � of a W W ti c� cn ': U Lw Vr W m N m N of CO m D cn L U Cl) (n d� CM a a a O o M a) O c V y 0 0 0 (� U 0 0 0 0 c ca m O O O O co O O O O O O is O Cl) O m O co O Cl) O co O O O G L c 1' c 1 � c 1' � c cn 3� is C C C C m0 O m O m O m O m O U) O O O O R Q > Q > Q > Q > Q > N (6 N N 7 ¢ J � O O d O J O d N O z Z Z U O Cl) U Z p ( Z OO M O d 6 ^� R NN> Cl) E M u) C\jO M U) C\JO >d > O N O >a > O N O >N> > O � > � :Li .�'.i Z N >a> > d> N co > d> >a> N co Z N > ;o C4 a LO rn rn � o o z O O O N N N LU N I` N O N O N N LO co O z O 00 O 00 1- 9 o 0 0 0 ! ' O 7. N CO CO 00 O 00 O O N N Cl) O O O O 0 I- Cl)N O 00 Cl) N O V O M N N N N O N P- 00 M G i •� a�i s. O O O O O O O co O LO 00 Cl) M � R � N O W � O V O _O A" O N O DD O M � Cn O N 07 M cc Q Cl) CO 00 O) LO O O U w O ooc P O a � O A o W O N� a O M 1 O O N m U) m cn U) O m cna_ CO U) � co W ti N �� a cn cn MD m O cmn oa oa W�t W�t W co cn d of d LL �t d of Q Z 04 04 v0 - a_ O _ P -0 O 'E a) M c > -o Y U = _ U U U = = - a a) m ca a P P Y c 2 ca 00 O LO O LO O Cl) O O Cl) O M M 'yr C.% O O O O O _O O _O O O OCl) OCl) O OCl) O O C C C C C j j 7 cn cn cn cn cn a a a a a 0 a is a � 0 n) (6 n) (6 n) n) 0 n) ' Q O 0 0 0(6 0 �t CIO y M is A v I� M M Q O O cV H Q N O CV O Z a) -t J d Z Z cNv cNv Z co � O (6 M 7 7 Z�� V w >d O > O d O > O d d E co cn NO i NO N i NO N i i d> N O i > P, Pam- Cc',) a 0 z LO L G) 0') «+ C4 CO N O I- Ow N N N N L N CD N CD L Cl) N co _0 00 00 W u O O O O) O O O O O O O _ co O � 00 LO 0 o0 O 00 O Pw O O O 0 0 O O p) N LO �_ LO �t x x N CO r r U O O O O O O LO 00 O W � O V O O LOx x f co O M M M M N I —I cr � � Y cr LO � LO M O M U J w N a N oW O � N M a W N 0 C) ° o No Cn O p � U) oU� a d Cl) a W ti N w o. 5 U) MD U) U) dCIO F" O Q H to m cr W Cl) U) W Cl) U) W�t O UO P-i �^� _p LL O G 'C 'C CM 0 O o m >04 > yrl U c m o 0 0 0 0 C O U o o 0 0 0 0 0 0 Cl) o d o x 0 0 0 z 0 C i a a a 0 a x 0 x 0 .M s � o 0 0 C4 a o A M CV 1-13 O ¢ O Q Z O O cV G ^� w '> d O > N > 0- > '> d O > O c. � P� •� cv > N N > > N N > PL, V] Z a 0 z 00 LO o o `Q a N z L LO NLO 7t 7 p OMO x a o7 O O O O 00 O M O SO. Cl) Cl)O 00 O cq Pw CO O O O O O Cl) U) L J O C) I O W 7- LO o 9 U) CD M O �U U) cn = O L- C) U_ H M LO d N CA d r W W w LO O N N CA d LO O CD w N A (yA m O fy On C3 a d U) V] w W Cl) (n ,e;l m P-4 0 U o A x o �C/) 0 a m oU) f as fy d LO a 00 u 9 d �o i. co F4 O q §_ ] 4 ; k LL o a-cn 2=}_ ;§a3r E-� E ease®=7©&m°m7R ���E{@ %/=2[gg= U) o { a f 0 §$m�mmm�m�m�$$$$$�$�m§§© ( am- _ o E )(/2 - Z;\\ ) / Za.}( co 0 \\/\ ; #\»» .v _ \&&& \ [ \9\ \ \ r & & � )\\ 0 @ / § § / \ ) § ; \/ k / E a v §}\2 0 ° L) - r= _ /ƒ{ 1 //§§§ / )/ / r,/ � c � C I e E;f \E )} 0\ L) a. 2\))) ___ [ )) _ ,00„00000)B}}}!)oo)), )( U e±±Ee222122 �±*±±**e / / „ „ g O \\/0-- [ 7 \0c -3=-0= 0c (/(K( 0 � / ALL\\\\ /\»,e»\ 0 \)�f ///////////\//}/}}}}}}} / } ( //////////////////////5 / / / VDOT Project UPC 119164 Berry Hill Connector Extension Mitigation Source Per VDOT Crossing Crossing 1 Crossing 2 Crossing 3 Stream Stream Stream Mitigation Source PEM PSS PFO PEM PSS PFO PEM PSS PFO Amt Amt Amt Banister Bend 0 2194 5 0 6 D D 205C 5 0 0 1 191 0 0 Callaway Stream Mitigation Bank 0 0 0 0 0 0 0 0 0 0 0 0 Roanoke River 0 0 0 0 D D 0 0 0 0 0 0 Mitigation Bank Graham & David 0 0 0 0 0 0 0 0 0 0 0 0 Mitigation Bank VDOT Dick Cross Mitigation Site, 0 0 0 0 0 0 5016 0 0 I 910.5 0 0 Totals. VDOT 0 2194.5 0 0 0 0 7066.5 0 2101.5 0 0 J CrossingI Crossing 4 Crossing 5 Crossing 6 Stream Stream Stream Mitigation Source PEM PSS PFO PEM PSS PFO PEM PSS PFO Amt Amt Amt Banister Bend 0 0 6702 0 0 0 3394 0 0 0 0 C Callaway Stream 0 0 0 D 0 0 0 0 0 0 0 55 Mitigation Bank Roanoke River 0 0 0 0 0 0 0 0 0 0 0 0 Mitigation Bank Graham & David 0 0 0 0 0 0 0 0 0 0 0 0 Miti ation BankDOT Dick Cross 0 0 1716 0 0 0 696 0 0 0 3396 0 Mitigation site, I TotalsNDOT 0 0 8418 0 0 0 4090 0 0 0 3396 55 Crossing Crossing 7 Crossing 8 Crossing Oa Mitigation Source PEM PSS PFO Stream PEM PEM PSS PFO Stream PEM PSS PFO Stream Amt Amt Amt Banister Bend 0 0 0 0 0 0 0 0 0 0 0 0 Callaway Stream 0 0 0 87 0 0 0 226 0 0 0 157 Mitigation Bank Roanoke River 0 0 0 0 0 0 0 0 0 0 0 0 Mitigation Bank Graham & David 0 0 0 0 0 0 0 0 0 0 0 0 Mitigation Bank VDOT Dick Cross 0 0 0 0 0 0 0 0 0 0 0 0 Mitigation Site, Totals VDOT 0 0 0 1 87 0 0 0 226 0 0 0 157 Crossing Crossing 9 Crossing 10 Crossing 11 Stream Stream Stream Mitigation Source PEM PSS PFO Amt PEM PSS PFO Antt PEM PSS PFO Amt Banister Bend 1804 0 0 0 0 0 0 0 0 0 830 0 Callaway Stream Mitigation Bank 0 0 0 0 0 0 0 79 0 0 0 301 Roanoke River 0 0 0 0 0 0 0 0 0 0 0 84 Mitigation Bank Graham & David 0 0 0 0 0 0 0 0 0 0 0 324 Mitigation Bank VDOT Dick Cross 0 0 0 0 0 0 0 0 0 0 915 0 Mitigation Site' Totals'VDOT 1804 0 0 0 0 0 0 79 0 0 1745 709 Crossing Crossing 12 Stream Mitigation Source PEM PSS PFO Amt Banister Bend 0 1682 0 0 Callaway Stream Mitigation Bank 0 0 0 0 Roanoke River Mitigation Bank 0 0 0 0 Graham & David 0 0 0 0 Mitigation Bank VOOT Dick Cross Mitigation Site' 0 0 0 0 Totals,'VDOT 0 1682 0 0 Crossing *Due to the project's location being outside of the VDOT Dick Cross Mitigation Site's Primary GSA, credits purchased from this site were assessed an additional 3:1 compensation requirement. VDOT Project UPC 119164 Berry Hill Connector Extension Mitigation Source Per VDOT Crossing Crossing 1 Crossing 2 Crossing 3 Crossing 4 Crossing 5 Crossing 6 Crossing 7 Mitigation Source Stream Welland Stream Welland Stream Wetland Stream Wetland Stream Wetland Stream Wetland Stream Wetland AN Amt Aml Amt Aml Amt Amt Amt Amt Amt Amt Amt Amt Amt Banister Bend 21945 2050.5 1191 6702 3394 Callaway Stream Mitigation Bank 55 87 Roanoke River Mitigation Bank Graham & David Miti ation Bank VDOT Dick Cross 5016 910.5 1716 696 3396 Mitigation Site' Totals/VDOT Crossing 0.0 2194.5 0.0 7066.5 1 0.0 1 2101.5 1 0.0 1 8418.0 1 0.0 1 4090.0 1 55.0 3396.0 1 87.0 0.0 Crossing 8 Crossing 8a Crossing 9 Crossing 10 Crossing 11 Crossing 12 Stream Wetland Stream Welland Stream Wetland Stream Welland Stream Wetland Stream Wetland MitigationTotall Mitigation Source Amt Amt Amt Aml Amt Aml Amt Amt Amt Amt Amt Amt Source Banister Bend 1804 830 1682 19848 Callaway Stream 226 157 79 301 905.0 Mitigation Bank Roanoke River 84 84.0 Mitigation Bank Graham & David 324 324.0 Mitigation Bank VDOT Dick Cross 915 12649.5 Miti ation Site' TolalsNDOT Crossing 226.0 O.0 157.0 O.O 0.0 1804.0 79.0 0.0 709.0 1745.0 0.0 1682,0 *Due to the project's location being outside of the VDOT Dick Cross Mitigation Site's Primary GSA, credits purchased from this site were assessed an additional 3:1 compensation requirement. «}j \ \ { \ \3-2 ; : \§ - !� j o 2}\ 2 \ x :: ;o - o _` - m _ o 0uz _ \ , _»u : o c f» - - \ �~ / _ : f ` /� 2 u10 u \ : : : mI 1 00-01010 :\ !U m !� ] } ! , I 4� .. \u - - - m\\ / ! m� §\ » x j )/ � ± {2 E 22 & , /3 ) ` / > ) - *� !� \\ \� " \) �u E : - - ` & _ _o . uo:®&\\ -\§!{} z: /\.\\�� . �\\ \\ y � fmo { r/ 2 ° ® \ -° \))) \� )\ { u 2 y u } / 10 { - (} j / ) / \ E0 \ }}\ 2{» ) \ § : - = t = \/\ a10 \//\E / 7- O C) I O Op , LO O O O M O 0 M LO d N CA CIO r 00 00 w O LO O N N V] d r CA Lq O eq }v N Z d A ,e;l m Cl) O i a CO O) CO CO CO LO r-- LO I- LO M Cl) LO Cl) M a C) �_ LO O LO I- LO N +N° O LO O) LO CO LO CO LO LO LO LO LO Cl) LO 00 C3 y U O O O O O O O O O ea LO O O O N 00 F� ^C w � o U 0 LO N LO 00 I-- 00 CO 00 O 00 I� 00 M M M N N N N N N N cr Y O O CO CO CO LO LO LO M M LO N CO 0) �_ LO O LO � L " NO 0) 0) CO CO LO LLO M LO LO LO LO LO LO LO LO O 00 J LO 00 � O _ 0) � O 0 CO M 00 N� O � N I- O N 00 N I- CO w N Cl) O O � A O eNa m m m U) m m m O ¢ N LL d M COd M d M O p U) O U) Q D U) O o (O V� w LL LLI U) W LL N LLI � N U) LL M O > a U o —C/) Lo c Lo Lo d o m° o 0 x L -jam,, T O T T L6 7 O .�. "-' O O C/) () U = U) a m a a o = 1 LO ca O O O 0 0 LO O O O LO O m o 0 0 0 0 0 0 0 0 M M M M M M M M M O O O O O O O O O m � � � 41 41 41 41 41 41 41 41 41 O • C G Q' C O Q' C O Q' C O Q' C O Q' C O Q' C O Q' C O Q' C Ocn Q' C 41 L�6 41 Q � L�6 41 Q � L�6 41 Q � L�6 41 Q � L�6 41 Q � L�6 41 Q � L�6 41 Q � L�6 41 Q � Lcn6 N > p O p ID Z O ZZ CO C O N O>> O O d OZJ Oco M Cl)C pN co 00 C\j N d E M > dC 00 M E cow y ¢ N > O a> p d � > 00 > O a Z > O >> > O > > O a> >>p >dC a> O > N U) Z > i d> Z N Z N > i d> N U) i J Z N > � d> N a H � LO 0 o o Ln w o 0 o LO LO a z 0') «+ I-- �t 0') Cl) LO O o � O� o) o) LO LO o) M 00 00 00 N V O 00 N 00 N LO Cl) Cl) 0') 00 00 Cl) O In LOI� N O CD C) 0 O O V DD N ON 00 i 00 M (35 u O O O O O O O LO O O) Ln O O) CO Ln O O N O CO Cl)O LO O CO N NI-- N I-- � CO CO N O � 0)7. CO O.i CO 0 CO I- 0 0 0 D 0 Q W V V V O O co N co co N O 00 V N SO 1- V [n 00 O v7 W LL U7 a a a fU C m M M O O O co O SU Y O C � O CC C >_ Sn Of 4 M O O C)O N O O O O a J N > a O o a �: o 0 > N SO ST V O V O O O 00 O O O O O C/) LL 0- 00 D W N In m Q O co O SU Y O C � O CC C >_ Sn 4 of 4 7-0 SD a)LO O C O N Z Lq N J o❑ C)CL C)a E M Sp C7 N >a > a > ON U7 N 0 O V 00 N N O O N O O O O Sn V V O O O co N O SO O Sn V V O Sn SU Y O C � O CC C >_ Sn 1- Of 4 -0 Q Lq Z C O Z 00 N J CL a E M O Ur a > a N a cn O co V O N O O O 00 O O O O co Sn V V O O O co N O O O Sn V V O O co Sn D co CC 00 U7 W V fU Y O C m CC All O co O SU Y O C � O CC C 1- Of 4 N N 00 O M N � Z ON O M O 00 O 00 00 O O 00 SO N V V V O O O N N O O co Sn V V co V O Sn O v C LL a - Sn Sn 2i =) =) W CO LO fU 4 f2 E m U O O O co O r O M N> N z o d O 59 co O O 00 00 00 O N LO O N N O O 00 co 00 V N V O O M O N O 00 Sn N V V V O N V O Sn O U d C : _ W co U a � 0 fU 4 f2 E m U O O O co O r O M N N z o d O 59 co O O 00 00 00 O N LO O N N O O rn N N V N V O O O SO O 00 co 00 V N V O O O fU 4 f2 E m U O O O co O r O M N N Z N d O 59 co O O 00 00 00 O N LO O N N O 0 V O O N N V N V 00 O V O LL a W a a O a fU ❑❑ O O O co O SU Y O cn C � O CC C >_ Sn V CC 4 56 Q Lq Z C O — � Z 00 N J C)CL a E M O U a a oN > can O co V O N O O O 00 O O 0 co a) O O O co O O M I- SO N Sp O V 00 V 00 O Sn O v LL a _ ❑p : U W co U a � C a V N O V V N SO co 00 O M O co N O V O co O O O O co a) O O O co O SO co N [n co O v7 LL V SU Y O C � O cn CC C fU ! I- Of 4 � M N V O 1 C O O �ZANJa 1 O0 CL a M O a S. O i > a C,4 � `c O O O V O N co 00 O O O O O V O M O N N O m ❑_ 00 CO CO N O O 00 N �t N Cn �t O) Cn Cn N Cl) I-- Cl) L0 Cl) N N O O) Cl) CO Cl) CO Cl) CO Cl) CO Cl) M Cl) Cl) Cl) Cl) Cl) O O O O O O O O O O O O O O O O O O O O � M Cl) OCl) co C09 r 6 6 00 00 00 00 Il� p O Cl) 00 CO CO O O 00 00 N CD �t Cn �t O) Cn N Cn N Cl) Iz Cl) L0 Cl) N N O 07 M 07 M Cfl Cl) C4 Cl) C4 Cl) Cfl Cl) Cl) Cl) Cl) Cl) M Cn N O Cfl O N CD C4 Cl) 00 N L0 ONO Cfl O N— 00 M � � N O Cl) m m O Cl)a LL d Cl)LL CV LL U) u) D U) u) cn O U) D U) C0 m Cl)D co U) LLI �t LLI Cl) U) N LLI �t LLI Cl) U) LL �t LLI Cl) U) Q O d d d d d d of d d d d J Z Cl) N 0) a -2 > > > > > 0 41 m (6 2 d d d d (6 U d L U O rx O Cn O Cl) O O M O M O O M O N O O O O O O O O O O O Cl) O co O co O co O Cl) O co O Cl) O Cl) O Cl) Q Z O O O O O O O O O U) Q' C Q' C Q' C Q' C Q' C Q' C Q' C Q' C Q' C Q (c6 Q (c6 Q (c6 Q (c6 Q (c6 Q (c6 Q (c6 Q (c6 Q (c6 M CV CV O 00 OO O N Q 41 N Z CV O 00 OO p 00 O 00 OO p O) QQ 7 OM O N Q J OM N N OM Z '6 d N '6 d N C7 Z Z �' 'O d N M 'O d N N O) '> d O > > d O > d E M Ur N In '� d O > N I� '> d O > NO N Cl) > Q1 > o ° o ° o ° o ° a� >a d o ° o ° o ° o ° 0 0 3 0 Z N > N co > N > d> U) Z N > N Z N > N Z N .�-i J a r--o c`_n0 00 CD 0_ Cl) CD 00 co � C%4 o 00 v O O N O O Q O O) O) O N O) O N O N N N Z O M N CO LO O 00 LO O I- Cn O CO * r A N O I� N C4 N 00 L N O) I� O N CD O) 00 yai O N O I? I?O O O O C � N N_ O M N O) CV 1 O L a' m 0 0 Cl) CO O Cl 0 N CD 0 Cl) CO O 0 M CO O 0 O x Q @ § 2 00 @ ° a 2 R 2 / : ] § � A \ \ \ \ \ 2 _ R00& (0 co � ] \ ° E @ § 2 00 @ co3 R 20 I � J � a � 2 I 7 / @ 3 @ I ^ (0 LO / o § o / 0 A C*e) 0 Ch / 6 / ) = _ _ ± 3 _ _ § 5 C*e) \ / \ j j \ \ j § 0 0 = o w ! m\ (D 3 = J = J a)a 0 I o \ » ) \ \ ) # C) U 2 ± _ _ ± E _ @ � = 8 8 8 8 CO o G G G G G _ \ \ \ \ \ \ _O ] m 2 m 2 m 2 m 2 m 2 E 3 a a 3 a 3 a 3 a 0 a / 0 ) Of% 0 ± �� Of% ocno� Of ± « ± G Of % « ± Of « ± Of % « ± Of % « ± � \ \ ) i � § ` co \ / cooƒ ( } \ / r ƒ . cooƒ ) a coE[ a w¥\ a E[ w¥\ a w , LL } <= z a > E* a= > E* a= z a a>_ 2LO - § f f 9 & & g / 2 2 \ \ \ \ & § \ \ $ \ \ % 9 \ \ ° 9 / \ \ \ \ \ I- coN O 00 co N a)7 M [ N N N N O N 00 O O O O O O O O h CO V O LO 00 co N .M. 7 F. a w � o � 0 O O I� M O 00 N co N CT 7 M N N NN oo M N U L � C/1 70 co O 00 O LO O O J w O co O `n .-• C) O a C A C w J C 00cn 00cn m co � CO � d V co Gay A. Of (n � 00 (n d (n Of O (n OCR OCR n W W W co (n Of 0- LL 0-Z C4 C4 ^� _O LL O y r 70 C:) ca C U O ca ca C6 > O O 1 U () ca iC iC C = (0 m � O O O O O o 0 o 0 0 0 0 0 0 (0 = o 0 0 0 0 0 0 [ c c c c c 70 a a () ca 0 a) ca 0 a) ca 0 a) ca 0 a) ca 0 x x > ca c c c ca A A o o o o o Of o c4 o c4 70 > v > v > v > v > v v > c� v > c� A o o 0) io A. CV O N O Q Z a) v (n ON Q Z N Z N Z 7 O 7 7 O 7 7 Z 7 Z O N O 7 Z 7 � 7. � Z L •q > d CT > O > d 0 > O > d > d E M O MO > d > O4 M C4 O4 M C4 O.i i N N i N N i i d> N J i 04 V) 04 V1 L 7 z LO LO v rn rn O O N O V � co V V V a) O.i CA CA N CA N 7 N 7 N N N LO N 00 ' OMO OP W z v v o 0 o 0 O O O O O o 0 0 CD 00 LO a 0 0 0 0 0 0 0 j / \ — # _ - - r r r : ] § A y \ y 2 _ % ® � OW ° - & $ ) ) g r r ® % I 4� � z U � z I 70 7 S 7 y \ \ ) g r / o = R / A C*e) 4. o ! Ch j 5 5 3 // // j� $ } \ \ \ \ \ \ \ E E± E E± z z 7 � E � _ C) w ca ca 70 o \ / / / ) \ 5 \ . � � _ @ � / / / 2 2 = o 0 0 o \ G G G f / m \ § 2 m \ § 2 m \ 0 k_ © caca ca { § § § \ \ Of j \ Of \ \ \ \ I / \ r / $ < k 4 4 = 9 & / 9 \ :! 2 '! 0-, ', E :! \ <- \ c 2 c \ \ N 4 & a a _ _ a > _ a _ _ > _ a > _ a > z > z ) § 2 § j \ 2 \ \ § / \ \ \ 9 9 9 / \ co \ \ c c c Attachment N Photographs VDOT Project UPC 119164 Berry Hill Road Connector Extension, Rte 311 Photographer's Name: Frank Scearce May 2, 2024 Rte 311 Berry Hill Road Corridor Photograph Orientation: Facing east Description: Project begins just beyond the Southside Virginia Mega Park at Berry Hill sign W. Rte 311 Berry Hill Road Corridor Photograph Orientation: Facing east Description: Oak Hill Road intersection Page 1 of 3 VDOT Project UPC 119164 Berry Hill Road Connector Extension, Rte 311 Rte 311 Berry Hill Road Corridor Photograph Orientation: Facing east Description: View towards Trotters Creek Rte 311 Berry Hill Road Corridor Photograph Orientation: Facing east Description: Trotters Creek Page 2 of 3 VDOT Project UPC 119164 Berry Hill Road Connector Extension, Rte 311 Rte 311 Berry Hill Road Corridor Photograph Orientation: Facing east Description: McGuff Creek, project ends just beyond view Page 3 of 3 Attachment O Other Documents COE - Preliminary July 2024 IACM Comments Meeting Date: 9 July 2024 VDOT Project #0311-071-835, C501; UPC #119164; Permit #24-4024 1. A complete description of the proposed activity including necessary drawings, sketches, or plans sufficient for public notice (detailed engineering plans and specifications are not required) VDOT Response: The final JPA includes the updated permit sketches, impacts, compensation, etc. The information included should be sufficient to prepare the public notice. Please let us know if any additional information is required. 2. Location of the proposed activity. VDOT Response: The location of the project is clearly identified in the final JPA. 3. Purpose and need for the proposed activity. VDOT Response: The updated Purpose and Need is included in the final JPA. 4. The names and addresses of adjoining property owners. VDOT Response: A list of all adjoining property owners extending 0.5 miles downstream of the Project is included in the final JPA. 5. The location and dimensions of adjacent structures. VDOT Response: The median and 2 additional lanes will be constructed directly adjacent to existing Route 311 — Berry Hill Road. There are no structures directly adjacent to the roadway. 6. A list of authorizations required by other federal, interstate, state, or local agencies for the work, including all approvals received or denials already made. VDOT Response: The Project will also require a DEQ Individual VWP Permit as well as a DEQ Construction General Permit. 7. All activities which the applicant plans to undertake which are reasonably related to the same project. VDOT Response: This Project is an extension of the Berry Hill Connector Road (Project #6311-071-454, C501; UPC #115493; Permit #20-4068) that is scheduled to be completed Fall/2024. Any future activities associated with the roadway would be maintenance related and will be done under a lesser permit (Nationwide, Regional, SPGP, etc.). 8. A description of the type, composition and quantity of the material to be dredged, the method of dredging, and the site and plans for disposal of the dredged material. VDOT Response: This Project will not involve any dredging operations. 9. The source of the fill material; the purpose of the discharge; a description of the type, composition and quantity of the material; the method of transportation and disposal of the material; and the location of the disposal site. VDOT Response: Any fill material will be associated with construction of the roadway and will need to meet the specification for suitable material. Any material to be disposed of from the Project will be hauled to an upland location. As off -site facilities are the responsibility of the Contractor, the location of any disposal areas that will be used for the Project are unknown at this time. 10. If the activity would include the construction of a filled area or pile or float -supported platform the project description must include the use of, and specific structures to be erected on, the fill or platform. VDOT Response: This is a roadway construction project and does not involve this type of activity. 11. Demonstrate that the impoundment structure complies with established state dam safety criteria or that the structure has been designed by qualified persons and, in appropriate cases, independently reviewed (and modified as the reviewwould indicate) by similarly qualified persons. VDOT Response: Again, this is a roadway construction project and does not involve this type of activity/structure. 12. A statement describing how impacts to waters of the United States are to be avoided and minimized. VDOT Response: Information related to avoidance and minimization( including the requested alternatives matrix) is included in the JPA. 13. A statement describing how impacts to waters of the United States are to be compensated for or a statement explaining why compensatory mitigation should not be required for the proposed impacts. VDOT Response: An updated compensation package for unavoidable stream/wetland impacts associated with the Project is included in the final JPA. Stream and wetland mitigation is being provided through the purchase of credits available at the mitigation banks identified in the final JPA. 14. Signature of the applicant or duly authorized agent. VDOT Response: Signature page is included in the updated JPA. ENCLOSURE —EPA Technical Comments on Preliminary Application for Route 311 Berry Hill Road Connector Extension (NAO-2010-00423) Alternatives, Avoidance & Minimization As directed by the Section 404(b)(1) Guidelines, the Corps' issued permit should reflect the least environmentally damaging practicable alternative (LEDPA) (230.10(a)). To identify the LEDPA, a full range of practicable alternatives, defined by the purpose for the project, is recommended for evaluation. Since the proposed project is a non -water dependent activity, the Guidelines presume that alternatives which avoid and minimize impacts to the aquatic ecosystem are available and restrict discharges when there is a practicable alternative that would have less adverse impact on the aquatic ecosystem. EPA recommends considering the following comments when finalizing the JPA. 1. EPA recommends including estimated impact amounts for Option 1 and Option 2 with the alternatives analysis in the final JPA. VDOT Response: Please see the attached alternatives impacts table that has been included in the final JPA. 2. EPA recommends providing the proposed grades and discussing options to increase grade to avoid and minimize impacts to aquatic resources. VDOT Response: VDOT has formally adopted the 2018 AASHTO A Policy on Geometric Design of Highways and Streets, commonly referred to as the AASHTO "Green Book", as our minimum design standards. Therefore, all design criteria must meet AASHTO minimum standards. Highway improvement plans are based on established AASHTO geometric design standards forvarious elements of the roadway under design. The various elements of the roadway include but are not limited to: the functional classification of the road system, the design speed, the design vehicle, the terrain, and the traffic volume. Based on the elements of the roadway, the geometric standards dictate the horizontal curve radius, vertical profile (grade), lane width and shoulder width, and others. Based on the minimum design standards, the proposed profile (grade) for the project ranges from 0.5 % to 4.86%. Other considerations were also considered when determining the proposed profile such as the elevation of the existing, twenty access roads on both the north and south that must be connected to the new roadway. Also, raising grade only to avoid impacts could have the opposite affect if additional fill material is needed because additional fill would require a stable slope design that could encroach on additional impacts to aquatic resources. 3. EPA recommends evaluating eliminating or reducing the grassed median to avoid and minimize impacts. VDOT Response: The grassed median was incorporated to allow for potential, future construction of left and right turn lanes to accommodate the design vehicle's ability (turning radii) to ingress and egress the economic development site. 4. EPA recommends evaluating shifting the Berry Hill Road and Oak Hill Road connection to the west side of Oak Hill Road to avoid and minimize Impacts 1-1 and 1-2. VDOT— Response: Shifting the Berry Hill Road and Oak Hill Road connection to the west would not only create additional design changes and needed right of way to State Route 862, not currently funded with the current project, but would also impact an existing conservation easement tied to the Regional Industrial Facility Authority 12-SPGP-01 Special Conditions — Permit Number NOA- 2010-0423/15-Vl 114, designated with the letter "O" on the snip below. V Ax 6) IV:33�3373.2Q � �As� E:• 11160185. 48 HEREBY l `� DEDICATED A\ 5. EPA recommends evaluating if the access road resulting in Impacts 6-1 and 6-2 could be shifted to the west of Trotters Creek to avoid and minimize impacts to aquatic resources. VDOT Response: The temporary impacts shown at Crossing #6 have been eliminated. Following discussions with the Utilities Section and Permitting Agencies; the updated, final permit sketches show the wetland impacts as permanent conversion due to the new waterline and maintained utility easement. VDOT proposes to follow the DEQ approved State ratio of 1:1 for PFO and 0.5:1 for PSS. Direct, Secondary, and Cumulative Effects As indicated in the Guidelines, the review of the project should consider the direct, secondary and cumulative effects as a result of this project. Filling onsite wetlands and streams is not only a direct impact but may lead to secondary effects through changes in the biogeochemical and hydrologic conditions of the remaining aquatic resources and downstream aquatic system. EPA offers the following comments to better understand and evaluate the impacts of the proposed project. 6. EPA recommends including the direction of water flow on all future impact maps to aid review of direct and secondary impacts. VDOT Response: The updated, final permit sketches include arrows indicating direction of water flow. 7. EPA supports VA DEQ's recommendation to evaluate potential conversion impacts associated with continued maintenance, including Impacts 2 and 3 to palustrine scrub -shrub (PSS) wetlands and Impacts 4, 5, and 6 to palustrine forested (PFO) wetlands. EPA recommends mitigating for wetland conversion at a ratio of 1:1. VDOT Response: The updated, final permit sketches and compensation package included in the JPA show the impacts associated with the waterline and utility easement as permanent conversion. VDOT proposes to follow the DEQ approved State ratio of 1:1 for PFO and 0.5:1 for PSS. 8. Even if continued maintenance is not proposed, additional compensation may be necessary to mitigate for temporal loss associated with temporary impacts to PFO wetlands, including Impacts 4-2, 5-2, 6-1, and 6-2. EPA recommends providing additional information to better evaluate the need for compensation. VDOT Response: See response to #7 above. 9. Should the placement of fill or dredged material in aquatic resources exceed twelve months, EPA recommends it be considered a permanent impact and additional compensatory mitigation be obtained to offset those impacts. VDOT Response: The final permit sketches have been revised to clearly reflect that the cofferdam will be located within the permanent impact area. 10. EPA recommends clarifying with more detail how temporary impacts will be restored to pre - construction conditions. VDOT Response: The Permit Special Provision thatwill be included in the Bid Proposal/Contract will include the condition that all temporary wetland impact areas are to be restored to pre-existing contours, the soil roughened, seeded with a wetland seed mix and straw mulched. All other temporaryfills will be removed, and the areas restored to pre-existing contours. 11. EPA recommends the applicant demonstrate how the road crossing associated with Impact 12 will avoid disrupting continuous surface connection and potentially isolate wetlands. Such an analysis should include a demonstration of how surface hydrologic connection will remain, including providing ecological functions to downstream and upstream resources. VDOT Response: This is an additional impact to a wetland previously impacted by the Berry Hill Connector Road Project. There is no active channel identified with the area. This system appears to be drainage and groundwater driven. Therefore, we do not foresee the roadway impeding the hydrology of the remaining wetland areas. The wetland determination data form completed for Site #1 of the Connector Road is included in the final JPA. The form also sites surface water and a high water table for hydrology associated with this wetland area. 12. EPA recommends evaluating the potential for secondary impacts throughout the site and clarifying how they will be avoided. Should there be secondary effects, EPA recommends the consideration of additional compensatory mitigation to offset those impacts. VDOT Response: At this time there have been no secondary impacts identified. As noted in the JPA the median and two additional lanes are being constructed directly adjacent to the existing 2-lane facility. The jurisdictional impacts associated with the Project are a result of stream crossings and fill for the new roadway. 13. EPA recommends conducting a cumulative effects analysis that examines the changes in the aquatic ecosystem that are attributable to the collective effect of the proposed discharges of dredged or fill material from the proposed project in combination with past and reasonably foreseeable future activities within the watershed. This should include the previously permitted Berry Hill Connector Road (NAO-2020-00567), planned expansion of the Connector Road into four lanes, the Southern Virginia Mega Site at Berry Hill, and any additional development surrounding the project. Analyzing cumulative effects is particularly important since impacts are proposed to Trotters Creek, which is in good condition for aquatic life and recreation as of 2022, and McGuff Creek, which is in good condition for aquatic life as of 2020 according to How's My Waterway (https://www.epa.gov/waterdata/hows-my-waterway). Additionally, all impacted resources drain to the Dan River, which is a 303(d) listed river impaired for fish consumption for mercury in fish tissue, and for recreation for Escherichia coli (E. coli); and in good condition for aquatic life, public water supply, and wildlife due to temperature and arsenic. The Dan River also has Total Maximum Daily Loads (TMDLs) for E. coli. VDOT Response: The Berry Hill Connector Road Project (#6311-071-454, C501, D641, D642, D643, D644, D645; UPC #115493; Permit #20-4068) resulted in permanent impacts to 101,268 SF (2.32 acres) of forested wetland (PFO), 77,360 SF (1.78 acres) of scrub/shrub wetland (PSS), 10,534 SF (0.24 acre) of emergent wetland (PEM), and 1,915 LF of stream and temporary impacts to 11,603 SF (0.27 acre) of PFO, 8,662 SF (0.20 acres) of PSS, 571 SF (0.01 acre) of PEM, and 360 LF of stream. The JPA and permits issued for the ongoing Project included a compensation package that provided mitigation for all permanent, unavoidable stream and wetland impacts. All temporary fills in streams were removed once no longer required. Temporary impact areas in wetlands were restored to original contours, seeded with a wetland seed mix and straw mulched. The proposed Berry Hill Road Extension Project (#0311-071-835, C501, D648, D649, P101, R201; UPC #119164; Permit #24-4024) will result in permanent wetland impacts to 10060 sf (0.231 ac) of forested wetland, 3985 sf (0.091 ac) of scrub -shrub wetland and 1804 sf (0.041 ac) emergent wetland. The temporary wetland impacts are 1521 sf (0.035 ac) of scrub -shrub wetland. The permanent stream impacts are 1285 if (16903 sf; 0.388 ac) and temporary stream impacts (non - erodible cofferdams) are 335 if (7076 sf; 0.162 ac). Total stream excavation is 290 if (6629 sf; 737 cy) permanent fill is 1285 if (16903 sf; 1357 cy); temporaryfill (non -erodible cofferdams) is 3351f (7076 sf). The JPA that has been submitted includes a compensation package that provides mitigation for all permanent, unavoidable stream and wetland impacts. Temporary fills in streams will be removed once no longer required. Temporary impact areas in wetlands will be restored to previous contours, seeded with a wetland seed mix and straw mulched. Both projects were evaluated for potential mussel habitat for the Green floater (FPT, ST), Atlantic pigtoe (FT,ST), and James spinymussel (FE, SE). A Habitat Assessment was completed and submitted to DWR. They determined that the findings were consistentwith historical results, no TOYR recommended. Project located outside the 0.5-mile buffer for Atlantic pigtoe Critical Habitat. See DWR comments below. DWR comments: "Based on the habitat assessment, DWR does not recommend a larger mussel survey be conducted at the site, nor does DWR recommend a TOYR for instream work. The results of the assessment tracks with older mussel surveys in Trotters Creek". "Based on the habitat assessment, DWR does not recommend a larger mussel survey be conducted at the site, nor does DWR recommend a TOYR for instream work. The results of the assessment tracks with older mussel surveys in McGuff Creek." 6-21-2023. Resubmitted to DWR 3-15-2024 for updated clearance. No revisions to DWR comments. In addition, the Department is accepting a time -of -year restriction (5/15 — 7/31) on tree clearing during the pup season to protect the Tri-colored bat (FPE). Given that this project is not associated with wind turbine operations no restrictions were required for the Northern long-eared bat (FE). The above information documents the cumulative effects of the Berry Hill transportation projects. In addition, it demonstrates the effort and coordination put forth to avoid impacts to aquatic mussel species (Green floater, Atlantic pigtoe and James spinymussel) as well as non -aquatic species (Tri-colored bat). The cumulative effects of the Southern Virginia Mega Site at Berry Hill cannot be measured at this time as the impacts associated with site plans and future development are unknown. Any stream and wetland impacts associated with the Mega Site will be addressed by permits issued to others outside of the Department. DEQ Preliminary July 20241ACM Comments Meeting Date: 9 July 2024 VDOT Project #0311-071-835, C501; UPC #119164; Permit #24-4024 1. DEQ will coordinate regarding purpose and need. VDOT Response: Purpose and Need revised in concurrence with VDOT Environmental Staff and DEQ Permitting Staff. Updated Purpose and Need included in the final JPA. 2. Please send signed certification statement. VDOT Response: Will include signed certification statement with the final JPA. 3. Thank you for discussion of alternatives. DEQ will require a written version noting alternatives and comparison of impacts. VDOT Response: See the alternatives impacts table included in the final JPA. 4. Wetland impacts less than one (1) acre; DEQ will not require functional analysis. VDOT Response: This is a general comment; no response necessary. 5. General Note: VDOT's database appears to be processing or generating [at/long coordinates incorrectly and is adding additional symbology. No need to correct for this application; however, please alert VDOT Central Office to make appropriate database changes for future applications. VDOT Response: Central Office Environmental Staff are copied on the comments and responses, so they are aware of the problem. 6. To facilitate review, provide a copy of the project's erosion and sediment control plans. VDOT Response: A copy of the project's E&S plans are included in the final JPA. 7. DEQ to include time -of -year restriction for tree clearing from 15 May to 31 July as a special condition per USFWS coordination. VDOT Response: This TOYR was identified during the Department's T&E coordination and included in the JPA and IACM presentation. VDOT accepts the TOYR. 8. Is there any gap between the AJD/SSWD from September 2021 and the study area from the construction project? DEQ wished to ensure the entire project area was considered as part of wetland delineations. VDOT Response: There is an overlap at Crossing #12 of the current Project and Crossing #1 of the ongoing Berry Hill Connector Road Project scheduled for completion in Fall/2024. The wetland boundary map created for the PJD submittal (NAO-2020-00567) for the Berry Hill Connector Road Project and the permit plate for Crossing #12 showing the overlap are included with the response. As shown on these documents and reviewed in the field; all jurisdictional streams and wetlands in the project area were considered as part of the stream and wetland delineations completed for the projects. 9. Thank you for highlighting applicable areas of the AJD and including SSWD of 20 September 2021 that overlap with this project's project area. VDOT Response: See response to Comment #8. 10. Thank you for the complete and up to date ME coordination and properly filled out forms. VDOT Response: This is a general comment; no response is required. We appreciate the acknowledgement of the accuracy of the information included in the JPA. 11. Permanent impact on stream crossing table lists 23,532 s.f. versus 16,903 s.f. in narrative, tables, and plates. This error appears to be result of incorrect auto -generation of this page. For the sake of this application, please send an updated markup of this page. Please note error to VDOT Central Office so may be corrected for future applications. Contact Dan Redgate, Taylor Parker and Ceder Administrator to manually enter the correct value in the auto -populated field... VDOT Response: CEDAR is adding excavation to fill and showing the total which increases the figures shown. 12. Plates note Limits of Construction; request add linework for Limit of Disturbance, which also encompasses temporary impact areas. VDOT Response: Permit plates updated and added to the final JPA. 13. Non -impacted wetlands are located immediately adjacent to the project area at Crossing 1, 2, 3, 4, 5, 6, and 12. Wetlands should be marked/flagged to avoid encroachment. This will also need to apply to any resources present where there are gaps between the permit plates. VDOT Response: All non -impacted jurisdictional areas will be flagged at the beginning of construction to avoid any unauthorized impacts. 14. Crossing 10- WUS linework error; second line bisecting the system. VDOT Response: Updated permit plates are included in the final JPA. 15. If/where proposed, please show extent of rip rap on permit plates. VDOT Response: Updated permit plates included in the final JPA with rip rap outlet protection identified. 16. For each crossing with stream impacts, can you provide a table that lists Cowardin class, permanent impact, and temporary impact (l.f. and s.f.)? VDOT Response: Table added to final JPA at the beginning of crossings and with mitigation section. 17. All new culverts must meet countersinking requirements. VDOT Response: Permit plates in the final JPA identify countersinking requirements. 18. DEQ to schedule a field visit per standard practice for IPs. VDOT Response: Field visit was conducted on July 24, 2024. 19. Application notes tree removal before the project begins. No tree removal may occur in wetlands prior to permit acquisition. VDOT Response: No trees in wetland areas will be cut until the Water Quality Permits are received. 20. Crossing 2, 3 (PSS)- If the proposed water line is below ground and the area will be maintained, these locations should be considered a conversion impact rather than a temporary impact. VDOT Response: Permit plates and compensation package included in the final JPA identify these areas as permanent conversion as discussed and agreed with DEQ and the COE. Mitigation ratio will be 1:1 for PFO impacts; 0.5:1 for PSS impacts. 21. Crossing 4 and 5 (PFO) temporary impact shows waterline- similar to previous comment, these locations should be considered a conversion impact if theywill be maintained. VDOT Response: Permit plates and compensation package included in the final JPA identify these areas as permanent conversion as discussed and agreed with DEQ and the COE. Mitigation ratio will be 1:1 for PFO impacts; 0.5:1 for PSS impacts. 22. In order to expedite processing, please send list of riparian owner property owners 0.50- mile downstream from all impacted streams and wetlands abutting streams. VDOT Response: Requested list of property owners is included with VDOT response. 23. DEQ will coordinate regarding application fee upon review/responses to comments and finalization of impacts. VDOT Response: Will process application fee once received as part of the permitting process. 24. On aside note, congratulations on your retirement. Thank you for your collaboration and extraordinary consideration on a number of projects and for your high level and steadfast efforts. Big loss for your agency. VDOT Response: We wish Frank all the best in his retirement and future endeavors. >� m 00 00+80 � \ o 91aauS b �v t sr r' n a A l v ti \ v vs v�� •'���as� v, 0 V v' 1 zao v o M Hz-wff Kz n i CIO CO04 OO��o$ ^\ffi^✓ .1�\1/tf19= �dG 5.;\ -/1` Vj� 1 2 2 -If, 70 Co �� v �v �i1�ti °cs i vv ��v�� V ��> t�l I t� YII t7 �P fl %.. ry f l I l gal �'t �I fjl �.'^ �� �� ✓ / y L f LI I I w '�C � \ VAc ww v w it „ vv �' f�� li r i'� � iIr vvv v, �� i, ���v`vvvv1i 1af gihll��w� lip, /I v 1l y(f�y I ti\ice A. l f,� V II ✓� I 1 1 � II1V��'CVA�,—� AAA v11 VA�� l .III oozff cu n 0 4--i 0 CU E W^ v cc 0 .cn 0 L W a w�� os93my \ i W �'I T�fv ae. dd Op+ W� £ 17 I ONP! cn '� � '�• `` >r ram( ( � `4 rn / r 1 1 11 0� III III III /C—� 8 \ C/ s I cu �r q Old Ohl 0 a--+ Anil _ i1111II / e r'— l i,•I I\ >n ollllll�` �� ' i 1} / Q \ lip j11J ✓ J ml Jfj i �� a I � `L� 'qZ��{�sL\ \. 70 a/yii iA 4A 1^ IlS1 l'\ 1 qj,v �it t�aN JI I dl �J I lk •A - �., e r� �/ " ;a' \ �., �t��,l, � / _ °�J r _ I ��I I II � I .irJ /�// W °�", Y�� l l I `cai> r �� C I 1 11`• / h S � e3 L291? <�a' 8E laaysOO:O�x % rAl 11, y a4�� yole <� <�. ✓ P )0 U �U J J J tug a _ gin JQ, 1 v v v 1 At 1 aW _ r>o`aii� 1 vI l I� S 2" � Ir \ j � f _ , r I �cJ Imo'/ 1 I - l Fly- � - - _ _ _ III Ill, , �� Q . �1 \` $q % til l 11pp', ,\cam � C ®®® 111I �� AUS \ — 1 •® Il v���� Ills/ � �U o� -- 99 JaayS 0( IIIII! dJ ¢ V W� Hill IIIIII) cr Will i W lml V? IIllllllil Unl(I> 1I, If f1 III vlldllli f 0000 U �U o� -- 09 Jaa4S 3 tcv III J _ —, mlrf �'aF_ E Irlullllh ) •� vew iJlIff]lo i -_ � Illy l� ��z-✓ I 11 0+9£6 fIS au17 YOMPY �7 ti� J ! �P I mop l� / 4 pf o s � I I - r J r I g�j i _ 2 !•.' it a�// �/ A v2 f � � O1n l Wy72±yoo�; v I ( to. I✓�o I. �3 tiZCm�� la `'ZL 0000 yT� 9L 7aa4S 00'00+041 'qS auil 4ajeW 1T�—j`�i�- /od; Llllflllg�ji / old( aVl J1 ll��II� (7/ i1V iIIAiV/t/ /11,4 /(f l�/l _ ��� IV ''{{ ' / r �i��—. - lirllll ,I llllirDp4 I �� j111il1�,f' I1 3 I �y 1111 ' �i111 I \'.III I 'ri E / /1' !L 1 ri/ /� •��� ��gU_R___--___ __ _ IfI VL - d/ r 11171 Y { a vCOMq ��i I a III, �I{ 1 ' . ' �/ .i II�o = fulls a3 Of oct L / _ � iilllU ses7� .',' `, I 't✓1��. � i I�r/ �x��� h W i, i — Cl �1i1� a I •/� s x�a . q�l � = I{ �rl�. ' _ h{�{'I,ti�. g+00.00 Sheet 5B 3� a. Match Line St13 > - / / 1 � r J � � 2 ! II III 2 I llllll III M n 0 4-10 CU W C/ :V 0 .cn 0 L W i `w f / I � f / / I _ / I _ J i � / a o / I / Ilt jL IeogS 00'00+096 'e}S aui-I 4jjeW j s4 Lu It I( 1 �1 i III III ems /! N LL i'f { f 1 Ill ( IIIIIII7 _'r -o I Ck �6ab'i; , 3c /lll 00 �9;aaUS 0 Ilt jL IeogS 00'00+096 'e}S aui-I 4jjeW j s4 Lu It I( 1 �1 i III III ems /! N LL i'f { f 1 Ill ( IIIIIII7 _'r -o I Ck �6ab'i; , 3c /lll 00 �9;aaUS 0 Ck �6ab'i; , 3c /lll 00 �9;aaUS 0 --- i/ rt,-� feays tin `' o 00. rnl Mars d// sU) — �/ it t� tiI' m � s j O 1 � llllllllll s � + J � V A 2e f I/=-=� c�{n{ ` , i w �� `� � ,� ��: ���w�, d�r i i /j / l i \V rl E„ 1f /j 1 \l\ i y 8S la \ �� '`� � 1 Q c I l I / 1 �'o�w r++n �Ir^:� ly +, 1 day✓ �+� � � S lrl� r 1/ f `� Is / ll / J 1 1 qN e w o91l sla! , S r �� y + �� S �I i A h� t�-� � Ir ice', S •� is � � '- _`� i ' �� 1n1 99 OeLIS 00'00+091 '97S 90 49aM is v O �n� ogoa � �11R `�h lrrrrr+ ��`r `� srrin�rr4 3 rurrrr4i cu i i —'i O,.\\% ,- t 09 OeLls 00,00+091 'e7S 90-7 yoaeW W� aaUS 00'00+8L I ' [IvivI rlvv��I��tl�r"/'II tj _r gl7s If t IjI{f-��,SI i\ ry . it / I � frj lrri / �4.9)dlU) A�Pn.�, ullbaorrlsl�pi . � 1545ft s \� if r+rr M — CLcn �iJ� vv I rs v�-��t_�flpl(h —T Imo; _ �cffrl� srf v p �rrzr/l/ �a 4-+ /rrllCC i e S I �iii' �v�v IIi1 II �{IJ(�/�i jllll� h I I W , v��/s4clt Q '�AIr71 fA��� W lri�' Hi /�� Ir?��' zsn'�VI9v_3y 1— Ef.rbl�s/ rl�ti � �/f 111 / r srf/ f f e � —\V-1 e— .�/f� v� �I 7111111 .err I / r•- I� 71 LLI h , 4 0000 U 96 #aaUS 6 r rill)" zing/ I�(�11 f ) I of (I I � l r (IOC-w r l —Itl u 04 r / s �u —C�-r�lk v v�lr�r VJ l CRR f sy All �o ,9 70 i. _ ✓ =ill r m -won ; �, - � i ��-- ( 6% — / °'— lv �11) 111 1 Qi �� �I IIIIjA fljlll,-��, / �/// - waI111I III1 I I o\ AIR I _ s w ��� :U J/ /j. 0+8L4e#S — \ CEO A ,- • i v ,'+ I (�Y��!(f�(� �vvAvvt�Aw� 5''�r �f �%Its 'i OWN I ✓!i \ � J � �\\l l 11\\�5� / 1l / M&W Pq 0000 S 00, O+,L 4 0 0 .O W �✓ �`! c �� � � ��J =ice jt �i r1x11�1 II C SH I Aurl,9ul1'I'; s�yy � -, �x ,, • I MOST - " Q0 m l /, vk (( ��11/f ,f I `�111111ir"' N4/i(//¢' l�)��`(/i� \ \ {/ III )`/\�L/ �II+//l�lf I(() (r pal ut bil/a/ !� it lltl Irlli �I// ;r`�Ilr q/hlr i rl'I o/r/! /) I/ /w,` )/1/ irtit ilk/f i ( fti(�il y iievini I/ (I���r� � •/' / / (! !IlhJ I 111/� //r ` I I 1 1' V- _ 0 0 '1 PIS It l '� � �>- 1`1cAit�1 ` l\ lYl t�S 1LN11 ISlxi`-bG �C-�6`y�_ — /1•`11��/S`r )•`t, l� Ili )! I\� /ill) Cl lf��'\-��=.�Y=-", U o �U Odl MOO/s 00'00+90Z 'e7s 007 WXkv I W , mpg —w"��a° d> _ yr , arsy / glss �_�/riyrlrsi� � oa. 14 =nsp1i i __a�rrrrr itia�" ef- I Ar Fr rri��u �� Imo ,—'rgiaciii''�Itirs � -_ NO �rrl ui/�-� � � r� % X�� 1� �� i 71�1 f�iirr� � � r✓� , ��=���� ��rh` \l �I IIIIrIr//rr/ r�k r.f 1 5h5R„ % / N �W,t,r'r'"� ,v 1 r � Ji `I rr� r r r rl urirrr rs1 try, fiusr�l�is s�� rrlrrN ors rs II 1plr)1T1 rl r [1 rl >l rvarvrrrrirlrsrr r' r ,���r or0lylll Ilya II DdZ' s rr_ - � rh n v r SIT"w����`}�IIi��'li�ui��i�>�1>i���/� WI�A � a�s��s 0 Nona �� v� r ror rl r r r r r,✓� r� L. �r r r� a,,, 4-0 O ttt' Ct \ m, \ ��� I(i rl rlt 7/ � I I I � � � � I � • i i, �,-, yyoRs _/ (n l 'i( � C ) ) rky �fO-"s 70 S-�.1� I L , i ri r J ,V�r��,�...— �y t%r� �r to t�- /ir vrr SoyI� t, r rl ��' ��a r`r S�f ���r��r 7C3iii/�, cn - W ailM `_ — \y \ 1 -- aamr uia r Qr ° r 657 — a ro� "w `r4�0%-1 __ Zl 10a4S 00'00+OZZ 'I973aui-714O eye -N_°s `Arm •� � nr I \. � y�1 �� �a � \fit �� I�/ I +ITV �I � fl (� �\ Y �� �� ��rs � r.�" �r�J--''o � � �y ( � f � s � \\. \u �._� f l III �\` tilt�l C -f (J/1 ��'�i✓1�-`z5 �. �r��.-.r--" r. A`I h < _ O istY1 AO�h +-+ � v i l ���.� � � ra i s s z o�r� ri � illryll ,�i � � rli ��'�\.�1aVL`�4\\`y�`a_V�\;�\\\\i lxs\s 11 (\5 J11 \\1lr\ ) 1 \�v vArvlvr �`� CIO �— U \ �cr O ,, M Al 0 LCD w I mil r w yam\ r J aM� `—� Sb sWON159 lbws pp, u6iS uapi a AM ry v "\1' 1 r 1 i r 1 � U �U w �N DZl 1a94S 00'00+OZZ 'e7S aui-7 U y0}eyV Nl; Wu A M so=- = �z�w LL waoo i �a w � uu I I r i I r L -'1> l� � �s �: `t° 1 w �/ nV ) i/� I V l �/o Ai v f f�l� I � I/ p � 1 / � w,% A �J•• r s ��.11 �� �� /J r✓� J ��.r.J clq 6v cuv 0 u ill i Iv / v v/ 70 v/vvv �_° ,_�/�,�s�,�;%;— \,l \\\ \ f _���w������ / 7�!/ i' ,fir \ / (��J��S�OR�����ks\"\�\°, •V% �I�on¢b r 1`�/G � \i Ste\ \\S\\� �s1/ i ; �\\� €�` � /l/\` 1 / J( 7sM�n�1551:W!���5� y` �Slo}aW? i�0 1 V� Sb sgon>1 SS!lls vPw /� �� � �✓ �(��� ��� vrail I vs�j� I1� �i �J� ay��s�� T � m DOl le S 00 00+90Z 'e1S au!l 437eW �m cn I..L 0 U C— W E �a/)� VJ O .O L w P KBEI 7aayS 00'00+f�£Z 'WS e417 yo;eW \�1 0v 1��(���lill _ of, II \ S r �w^$�(S-•� `,_,� 111 �h I 5gw; � ;°a°,1\\I�Iv jtlI IIII \\��\� � ,��o � �= ;��-µ�.JT lei � _ IIIII _ �• � -m v `•, � ,� 4 ��', I n "� I I IIII Il /�/ i..r.�� UII� ter, r`;?v �— r�r/il v• v �.� :` " � � _ Av 11'�I F=�, �I�I ;�I Illluyr I I I � vO�� � vi/'' I , ^=✓y �� � � vl,vIvI, iIhl�A,u II{IIII II I� v t I G� w �'7 � l� 1111��$ I Zzz / ) Y\s tir1�. 1 11 '� I I' �9�1� � l\ � � \ l -• ��� :..�__�r" of, � � r VI � v � �/ d "I) - /IIIv v 0. r o __�tirav" _' � � �v �� —�S i i` l ' IMi✓IIr�IIti}��� < i i ' ,� ° �' '_—°�_ v Ilbllla 1 /iusb r u�o aus bey ein UI� s °blbrxa°To� �- 56 if r�� � < jl�� i_ ♦ I ZJ 7i \ l `; `. �.i / k' \�r' C' l5 \ ��\. � l '✓ti �///i,�v � V \-`V IYI� t�\ i — � �—�_ "t I'I 11 ,_ Iil �r�ros i" i �, •v' �, 1• q If nz//r l II I� ;zzz i IIII _l1 J-��- ,_ 8ll }aayS 00'00+OZZ 'eaS auj7 ya)eW 0 0 U P K�EI 7aayS 00'00+t, eQ17 yo;eW nilul� fad l lill y�llllli I��IIIjIIIL- 1 n VII III III r o All 'II I VIIIII r-� i(II �1�����,—��r--"`-r�r� �i� `� A �I iY� lii�` 1171111 1 � f � r _rr` �r"✓,,.� �11l,K -, i4ol, ,s Ili �IiiIr�l ��J ����� w 111 I lTlil,I! I��or'I,�I�Ila�ll e�s ij 1/f1 1 s —�f1�,6�� i • `s�%z �i?n� I'Nl�yi� Il�liln l f�� fr A i, or not I'1 t ril yl l.ol ti I i,—�az `✓—�nc y�o� l j t f�f —� ;<�� ci. �i 1'✓/o � /NSlil�� �`���`_�..-,�"����,. Sti,`� `»� r ausb6� eA 'ft s ff / i °4ibf-rG �� oipfadoarpraZ ti i ft,! �1 r 1 I I 1 h s/PI/ �i' ✓1 f�t�+ f ef� d 1 � � ! �� I'�^��¢i"'tri'a� , � ��i lr �t�•-�lt� t..f IOT-�41�1i�sr�✓r���; f q 1 I , Jill / i, -p �j fAeo ,I mi l' ;Il. " s fl c — s, �tw`>s.�a's-. „r� — -.��" ( \a ! �J I \� ,/Y� m < ` � 1 Il �,• / \ � � o 1 ! } � tic ^ �l r` � j ll }aayS 00'00+OZZ 'eaS aujl ya)eW n/� l iryg �,j 11 / �_�-�� ,uil /•�/,lar � 1� � � N �6q/ ,a!sio>ai cnA v, I� Ilk, IA . 1l ia� i �� �Y ohs ���• �` l / l l � s / I I I10 � l / •� � l t, �' aisi/e5x�, �,� I lA I: � ��� — � � ., � � � elf I Illllll� � •1 � � � �i,�`-^`^��� ? r` (�, \\ • ..a L'� , �l�\ �. �? LC� . t` l III l l ll ll { � cti.l t 5�:� �Z c �r l� I�l„ lw � � t ti� iA1� � II Iri Ilnul 1, " `�,`�C i � "�,+�• -0v� E`� I 70 lu / �• ej •, , I < l '� �� it /�`'J % I II 1 II IIIII _> .. ?, r W m , / .,� � � •1 m It t'v Y I I I � 1�/��t •:/ �':�� ', rz � — �-� l IIII +�� �� . �\ a X2 71� Icn ha w 0 LU r ogn.� g1111 �s / �;�� •.Lp s, I I a� - 9��� 0000 % /iI ➢i I +0 I QQ nj�� ull �pii paerol (DIN; 1 I I l'�, w � � mi I �.➢// � //nqv/. NO ri 7 r� 5 �I �z�viv �;AI�v �� � �� / �`� n � e+�`v � �� IIII/� I 111 1 I � f II Z 1 i L�ss'� ��'�T$ v . '�,� �A ^>✓ i >11, ,z`: >- I flit �� s�� t� Caka oxllnl� • //\ dd � \I � .a A �/ �- / � �� 7 `° III III � 1p�` U2 VJ ��,ISyp �• \ \ `. I `�� `a \I � 1� L u IIIII li jll� x �. j � {jl/ 2 t < III c LLI rII�iI I � �' �� . ' w� I II �4 � �� � I` 1 � � i�� ,-_v V � III II � <\ p, t � � mils hill S�rI m �.vo ��`�� III � Nlllhh �a albs �- �' wo �ZL Ans 00-00'k, �7S..3 4f)a�W �m�w 0000 = aW(D mU E- E EornE_ a _ - S. E o - a E.c°- o E o E m y N n= > - - _ _ E E' _ol o E o v E oE0 1. _ - o.E E s E u E $ E o o _ -00 £ E v o ? v w o.E v.f u rn.E a o a_ - o ` - - �m ny °4fo ma vE - ��� �� �� EE EE SEw - -E SSp .00.0 _ rEn`° �Ea°`hod amdv _q�.._°oa._- x _ * x E - f u 75 E r _ q E e W op'/� E _ - - - of '-o 'o (n - - E a ° o E _ s i - E a _o o o _ _ - c Z .. m - o o - o _ �Ec a__ a_ - _ % _ __ z _ _ _ __= o E N - _= D E _ - o O° _ c N o o N o - 75 z;- =p _ cEo' d - - _ _ - Wa E - _ m E c _ _ _ o E i d o £o of am _ of --NEc _ -�Eo - 3E° aE °E o5E- o.E - cs •• _i` _ 4E o of y-= aEn _ 3 w o aED _ _ - o E o v E O® E a O® E c y ® O _ w v£ u m E rn_ �.£ " _ _ '- u' - -- E E o vlo - g; °a o 3 o a ° a v o_ o a ._ m o 0 0 o E v E _- c -_ a a_w a. z m m o *' o aaE_ - - Ni eE E - Eo 'a� _cEc O Eoo OK ^_ a E u E 9 -_ - _ N E ol a= _ Hsp U E o ° E E o E a W o_ N E T _ _ a EE E c _ °° E p o o u a _ o E 1. 93 oE1. 75E� _ _ °E _ 00 O ia3 - >E EaE �_ No - - - E o:,v3i u3i.�sa oo op ] "Ev 'mE aE E c cou - - - --- - o oa _o �P`a'`_ _ oEvoEL yoE 75 _ - _ c _-� E m - - o'E u o m Ev 'E m _ - n` E_ c E in 06. o .6Oo x- �' o _ �° E v c -- Z o- o° o s _ o Noa - cn sE win_ nli gym, °„E�' �Im x x _n.E 000 ca map as uu ww=z a; x CD N N Of Yl > Ea °zz15 - w - " EE EE vE� - .n n * n *n H Z _ � o 3 E m£ E W - 0 w _ 71 c _ Q ] W aE— __ -- a = o _ Q _ _ mo — _ _ mo = cE75 O Ev —3o -- - - O _ - N LO - At 0 o, E -- E 0 Q o i E`- _- a o - _- W Z W ` _ yEa - _ o"o cn D 3 .t = _ °Q= _ 3m m _ - _ _8�5 'a- :E - - -_- _ - v o c. Z Q oo - d J acc = - aN o - - — EP- Z Ecc 2m 15 I O - noz am Z; O E oo .. W- - - cn v3i o N n a > W a _ - ° E Eo -_ _ _ - - -_ EvE Ea - - a -_ Of _ _EE nE� 22 -- '_o wFa __ - E 'E = O ~ 15 E S cc - - - - - P E o of c E E W _-5 = _ -_; _ __- v£o 'Em _ v = oEt'o E° - _ _'-EDE -_ aE e £ _ - -- -1.-- - vo - vE'^ - .3v °Eoo CO o. - or _ _ co n E v E E _ __ - � o. E i -o f _,- ° _ _ - ZE— _E _ CO _ Euu_ f� - E % o o --u _— o__ aEE- _o LLI ° _ - _ _ - - _ o.E u; _ _ - - o, _ a_ _ oEo °`E cc o = = $�} LLJ V1 rv°ma Ln a_.. a lovo o ry n v a. a-m-o auom m r m zmcv a� �vv-u-om..w-n�c>s m Is n� v ua �m x x �U N _ _ a E o £ - o _ K _ _ j- _ - lo _ _ ° m - _ - _ - - - - H S _ rc n - _ _` E° E _ °xz __ w o Q E o _ E o76 - - o �m` _ - _ _ _ - ' E '_ - _ _ -_ _ = o _ lo _ _ -_ rnvEE E _° _ _ o Ea° o - = v 'E v E u - - _ _ - - - o E - _o _ E £ E - = c E f v - u E c E aE c -E a_. o,_ m_ o c o - - - * n * n M E p° a E Z _°o a .� _ _ E w v - o_ n - o E o o a E o - - - ' - - °oa -Oyo- o wa E9 aEv S£o'vErnN z _ a %-- - __ - o - Eo C� Z _ - E o° ' _ - g o. J - - Ern - _' _ "h° - o o n - ° - - - E v - E' - a a - _ _ _ _ - _- - - _ - J lo - - __ > _E° _ _ _ _ _ Z E O = 3 3 uLL E o v°i _ - 3 0 3 b a E 0. tt 3= ° E -_ _ -_ aE o O o n ° a d_ _ w- W a €� - Z i3 aE OZ522 �� o J d - w Eq =v_E_oa 'E0 - `ool -� _ _ _ a _ _ E o E m _ - - 3 0- = a- 0 _ °1E - _ - c e 3 i v3i a E _� _ - - -__a - -' E ° _E ° E E y - L £ o V,E - _ oo ;'E = - o. - E a m - - _ _ o N - - - E rn - - - E 'EE u rn E - = o E m - �; oE„ =E _ 15 h k, _ a 'E E °Eo OE oa°n a = u � cE �4 you emu- w co x Ucc t - °m om 0 'a �n Non _aE' -emu Evum `- _ oEa _ _ _ _ Eu° KUI -15 & m - - - Hff za oEo �E iu �>c - -_ -0 ol a`v°nEuEP amo cs - - E o - - ° - £ ; ' vov- o .. of _ - !Lo W - Eucm _ _ zE°' 6z - - O EeEn oEo'�o in V ` ____ z za o° W -_ a a a I W z E E E F ° Ci, a E a m �n w aE rc z _ _ - J eE _ Z _ LLJ- E E 3 - > a o °s E W ? E a `w'e ` r = Eu Z LLJ * N J _ o _ n _ rn E _ w a ' -° E o 0 0 0 O J .. u3wttuo3rcrc>a _mLLn cnr wa>a O�� a Of Li J J ' oe- O Ln 3 3 E E _ _ - - 33 i� LL uuww 33 �O El u 0 >W03 N i;gw4h ¢ R3wY��� a1" ¢� �uwa�2`�x ffi� ��WNxgw WHO a �l ��pWQ>>U �w�2Wg�e h1U am W N,�a to; boo ¢�yjW S bw;'o Wm UJ d Ngwages so waw3�¢ �cz�0 > wNNkam s W U ¢w Q e So °�hbw'aww3� cp� :z i a e'ALI wow H WoRIC E H w x Ni x m 3Q ¢ om �o oo P o x wz 3No`d xoi :a ?� RH w i >w wm¢ o m x � o� x ,W 2ww a J m>J w� cw izwx> ¢�N zW ow $ wi o` $w a ww �'�� ¢o 'Wx" �" xwWi x�w z W n * ?.Zo Ncx, ��� Wow 4 3� h x x OW ` i 'a'$ H19 w_ a>� CIA mj mwa �^ o� wz3 N> zz ¢ az> of % > w� m ¢ w� w 4o� z�^WaQ8� zm: wo o ;io woa �T" i wm`W wWo aQwoW¢ m w XWWow gyp _wwxa'a w �z w 12 ag a ow w o�w¢ m w w`l¢Wi INZ ¢off OWE �m J>� wx>xx �wa'`wi" ww 52> a mQ¢ �a '' wyW� wo x xW awE$ J a'> ow owa�> J MR >¢Wo¢w4 >Iij'a z ¢i by NYE ww :1 `„o w Qns ¢ a w� ax�'w� o f »'moo 'x^ o2w g�w'a m a��w w a'¢ � �o 'a'x 81 .a`' ; a�¢6 Ii o 3� ;j" "''8'x';xuW NJ, w`¢ww �w`+g ate¢ Jc�" w wz- �x :yt ' ~mo 'w¢ w i' ww w w'^ wWz max to w yaw a. m 1> �� w� -'w a°� N 8 ww g w> 1 wW ? i? awP m as "xw¢m >� o �¢mz w'�w�x x�o'"o�o g$¢'a> iiw ww 'haw �a of 3u a ;'ka ¢i o o �c� m`� o >o two waW �''`� W� R�Witza '¢ww N 2: ? � W$ �w o0 oW >w`o xo w Nl ¢ 4j m ooE aw wRo All >x ¢wo 'a � ¢tea i ¢gw ma wi ���; s �� � W m>wQ o ow w ��N w W, Us >ww o Q ¢ Q>`� 3 0 m VIA "1 ' A>w `dad m� w�wou W>¢ 4ax 'W1 Nn '"�>h`+. x ¢'��: $ x w �' w¢ : a� �o�'a Wok '�_ > wm Wm� w' >m� aW m a'i¢ a3Q� wI�¢ag town A 'b'1w Ana W? sw A Wz >`^ ¢a of N � �x wx�w win>� ¢`N ':¢� s i §, x ww i� �J g>x$ xN x WoN� oa'zo owm gz� n wmow �x� x xxW zz 2 &o ¢Q w wa aN J w�, a wQ� >N$ e mwg ;goo ffi°d �' iiw z- o� k a ww�>w, o i ag mNa x Iwo wg3mo wzxa w' �� ¢S mNwz�x Wo m� �a i sm `� o� >w van ¢w aao wi ll .w$>?ww wazo wall Its w �= gg�a�Qa TAT As'N evwi� i�vxi w x N ww Rio w i i z Q m %¢ z"o, z'i z>o N mzw � ;fin as i wt waW o'w w o� �ao¢¢w' i� �� ¢ w $o¢ �3am oW w > w ¢w° 09 w¢ N8wo to im c5 goo w w¢wx� � > 3 w 020 m�wa Wo� 3 ASK AlF 14ml A f SO i'o x¢ � m Q w aooa ow¢a%q ¢q q y NXWW>Q I'. x J , No oN �t 8� ~ m An oo�. Iwo MV» 2Q $'' � wa Ma w¢ �o �� w¢wi�c, o w�a w w aN kx 3w oxaw z w N>w 1'88 ma8' wa¢ ��� �m'� �waw�o UWmi $ a3N awz �aN a'i �m ¢ wa o k p, >wwao w 8 E. aaa `a `^Iw ¢ i<"o"m w��+ Wo '" e o''m w�wgWw �a oya m$ > i Ww ww g ¢"'� a x mw " xw '6w m$ x o a l 4,`- `n�a' ¢�'a3i '" w' w"x' '' Ni aIlld iaa m >onc G w wm; 4w ; as �_ ¢i�W a aw o tU8� 'w ?''nR $ two �w �zo eo ¢w �o% w¢ mo o� ¢�N>m'm xw a ati¢ oNia `¢o'er �� h'a 4w� mo w�a W` W J o wm '"o'� xa' '6a �8 a z> o$ i �w w �, i ow�i�P w�mw ya z m wwg� w w>x Pg w� RIP a `� xR a>oo onz So w >w �a x�> $ w`w 000Qi ao'� �� z¢z� c $�wW $ a' ¢'a wo w�; 8oN `< x', W3 my tea' x i sW �`^oW `^ tog x� ax "' 'Rlt�o�w w�,>c ow 3 W >�mx a w W� xxo� mw¢� N� '' 'soNY�x��`4'2 o aw V to owmIN has RA aim? w?3o `o ai olf R oX bpi m�xw'a wiS q -a 2P w�¢ � co $8 � N�� a oaf w � k 0 J a�hgtia� w LL a��a�a w ixy3'^� U s `w Wm�aW�� o O UU z zLu � »a� \L _ LLJ LLJ O <w z U) _ U h O U'^ =° CO `gas WW _ _ > ty� i0 wW 30� x a W� s i ¢ w S2 Pe'6 8 �a a w x wa?3�a $ham 3 sa3>g8 m8�g Al 0 x aM,� 8 N sg�s �� W38i o� w �o wm o W MNz ti m $ w y¢N Q �Wa�w w �� o °e j w¢ u I Pi 3��i�ut�¢QmN� CD ZO O _ � SS W _mJQPp 5CF5'S ZZWWWzQ W SllaVA Q< ch = W W O}}c}ZWWQO�n > rUa_ OYU3 Q cn (nc >D VARIES SS of Kz SS salavn OQ ao � � oz@ a a - Q 5 J_ Q W 0 Z_ Cn Q 00 Q Z W 0 W Cncn m �qlo 9$ a� m o� W Qo� maQ m Q Z >a 0 W W z� as tea= >o adz aam J m Q z m �Q� - Zz W o W } mo Q� a> 0 a ooJ W �w_ mew mew aN wCD �U o� Q �m > _ Hff n oz: s v � p � v N 1 a N a r OoN /� J. LLJ Z W J c c J 47 W r+ LJo W� �-4 z m J �w Lp$i �� d oUP WW ;ui uig � U VJ M� `W 1 Z 5W G Q O O O O O O O 0 00 O O Lq O O O O �O �O O O CO W 'Lmn 'LDnLnwkuo)w LO CD Ln Cn Lu II Lu II w a ° a o N0 H C o w W o w II w Lu W II W w 'o`^ w 0,`^ LL Q LL W > I I O � � > O II } U w Z Lu o Z II } (� w Z w o Z cc<}(,oF�o ofa}(,oF o c� H J a a m Q ni H Q J> 00Q J> m> Z I I O J LL Q Z I I 3: LL J o LL Q a (D r lJ = a U a Q Q (7 UZ H Z Q Lu Q Q (7 U J z H Z Q W w 00 w a w O O Q °° p= w d L� O o Q �' Z 0 c7 (D u a Z¢ x Z 0 (7 (D u Q z Q X �� '& w LL w Z ?� Q> Lu L w d N w Z 2� Q w w u w o Q p w a w cc U> O Q a y N Ln a�wo emu �U 0 cy > o� ry'/Ar' 1. 5\ 5L L U/ 0 I..V uo!lene�z3 I U 1 Z V i Z Z r0 �// '0y' W vo a;uoJ uo!;e;I!S VDOT Project #0311-071-835, C501; UPC #119164; Permit #24-4024 Property Owner Addresses 1. Danville Pittsylvania Regional Industrial Facility Authority C/O City Finance Department PO Box 3300 Danville, VA 24543 2. Hairston, Allen Waller Remainderman et als 313 Elm Ave Easton, MD 21601 3. Triangle Brick Company 120 Tredegar Street Richmond, VA 23219 4. Rocky Wand Amy B Rakes 6848 Whitmell School Rd Danville, VA 24540 ATTACHMENT G - USACE WILMINGTON DISTRICT PROJECTS Wilmington District Files SAW-2019-01088 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01088 County: Rockingham U.S.G.S. Quad: NC -Southwest Eden GENERAL PERNHT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Eden Attn: Jon Mendenhall Address: 308 East Stadium Drive Eden, NC 27288 Size (acres) —16 Nearest Town Eden Nearest Waterway UT to Smith River River Basin Roanoke USGS HUC 03010103 Coordinates 36.4966 N-79.7437 W Location description: Contract 5A of the City of Eden Phase 14 and 15 - Junction Street Basin Sewer Replacement and Rehabilitation nroiect includes narts of Vallev Drive and Neil Street Outfall, unstream of the Junction Pumn Station (JPS), in Eden, Rockingham County, North Carolina. Description of projects area and activity: This verification, originally authorized via NWP 12 on 9/16/2019, authorizes the replacement of an existing sewer line consisting of two (2) distinct sites (crossings/proiects): 1) Site 1 (Stream Crossings 14-S1) requires the permanent discharge of dredged material into 40 linear feet of stream channel for sewer line construction access and installation and rip rap stabilization. 2) Site 2 (Stream Crossing 15-S2) requires the permanent discharge of fill material into 34 linear feet of stream channel for aerial sewer line construction access and installation and rip rap stabilization. 'Note that the Smith River Siphon Replacement, originally authorized via NWP 12 as part of the Junction Street Basin Sewer Replacement and Rehabilitation project on 911612019, is notproposed or authorized as part of this NWP 58 verification. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 58. Utility Line Activities for Water and Other Substances SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 10/3/2022, emails dated 11130 and 12/14/2022 specifying that only Contract 5A of this project is proposed at this time, and the enclosed Phase 14 plans: Drawing Numbers 14-C1, 14-C2, 14-C3, 14-C4, and 14- C6, Phase 15 plans: Drawing Numbers 15-C3, 15-C4, and 15-05, and Drawing Numbers D9 and D10. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436 or David.E.Bailev2Ousace.armv.mil. Date:2022.12.27 Corps Regulatory Official: 10:05:57-05'00' Date: 12/27/2022 Expiration Date of Verification: 3/14/2026 SPECIAL CONDITIONS 1. Enhanced erosion and sediment control measures (double silt fence and double stone outlets) must be installed at all crossings, due to their relatively close proximity to occupied habitat for Roanoke logperch. 2. Temporary discharge of excavated or fill material into streams will be for the absolute minimum period of time necessary to accomplish the work, and such authorized crossings will be constructed, restored, and seeded per details on Drawing Numbers D9 and D10. 3. Aside from the stream crossings specifically authorized as described above, and shown on Drawing Numbers 14-C1 and 15-C4, no additional impacts to wetlands, streams, and other potential waters of the US are authorized for the City of Eden Phase 14 and 15 — Junction Street Basin Sewer Replacement and Rehabilitation project. Date: 2022.12.27 10:05:43-05'00' Corps Regulatory Official: Date: 12/27/2022 Expiration Date of Verification: 3/14/2026 Copy furnished electronically: Daniel Zurlo, W.K. Dickson, dzurlokwkdickson.com Andy Pitts, W.K. Dickson, apittsgwkdickson.com Sue Homewood, NCDEQ-DWR, Sue.Homewoodgricderingov Zm - iivA olz]A ISH13N Oo o e o _ VNIIOkiVO H1dON 'N303 d0 ALIO U o 9VH39 CINV 1N3W3OV1d39 NISV9133H1S NOLLONnr m m o NVId NOIIVI03VYDH N3O3 a 2 < a < T GD—H NOISIA3H 3WbN 103fOHd 3 N w o NUII'J o _ 000-o_sow �o Qo ybo ap�o opoa� °H°�o o N y �WF: -o °- Q p p boo ty= oo<Qa aoaawaoamao o - op mo - _ o nn\a onsnd 5SOMOTEL & 1S N321f19 NVhS COMMEECIALL G3 w BE SEEVED ====aa.....;�-spg �rRox=spg=-- Rs+�ro�R ELL w ♦61 10 a _ _ - i o?2 -gp fl. o o \ 9 . _ a w w o ar =_ olw =�o aa - ry x�Nmr� Jiff v \ _1 HOd a3SV3d3a ION-AdNO S3SOdund M31n3H HOd-JNIMVHO dVNld MONO N' (.e)NIAIAN v v (.e)(Is)OsO� N�nN� — e m = a)(1)��s N1n� oeo @ — e o (doaa3a d oe - > ye\ ONrHH—Od-d =E z_. o �\\ ow 0. zQOQpW `� ®N soc ol 10 o p � 0. a �11 0� sss 1199 oee - 11 W(s)EEzss-lNNI ANI 9)(3)E9 b9S_=Ni WINi 1 y \\ - �F w y E99 \ IL x - INACYD M HlliIIlV- \ ® a p J ` Ob n r HW 0350dOif � 1 1 v (e)(3)966SSHN0 m3� I�F b09 0O 00+y elf 0. w K if3nW 0311 �\ 3W�d(dOiJ030151f10) �-- 1 1 — y SSS Ol HW IOIONL 0350d"V F �,] �\ 6 og — a p IVE ANIy o \ \ \ 1 w Q y e1syx-1 Ce)(3)tt�A 06 _ w >50 — 1 3 nniM ) 1 1 odois m 199 �w H. doiao 0010 Nr HW—Odoad \ /1 \ sys �oy (/ eys e Ios=ino a� io - nNi - _ ol-o yos (.e)(I N) so IV2 69Oss= - AN - -� 1 1 0o 11 - ss Bolo Nr HW UISOdOad s 0s 31nouDu HHVdlno a3nla HlIWS v'� PQ T m "� i $ — — 31L19NI—VO o o �¢ a Y§ ��- ` � _ VNnOHVO HIHOWN303 d0 k-10 U 1N31I NOHdIS 0NV '_ L ¢ oo NOIlV1n19VH3ki llVdlnO ki3niki HlIWS �, aeoo3e Nolsu�u NVId NOLLVI03IN38 N303 awvry lo3roea 3 N011ondlSNOO HOd 03SVD-BH ION-.IHNO S3Sodlind M31n3H HOzl-JNIMVHO HVNId o8 w w _A sp a ag° _oho op "gw oVo, - o$p- -- -pp° -o �w o ado-- - _ ay�w wa- = w- --° pg�° _ °gpp pg 000 oo p - ° - owo -o - -- - - pQ° °aw °a �ww o "z°"z°s=�wa°a"�aa�w"_o °. o - - _-_-_-_-_-_-_-_-_-- 0 w 96VoNSHw1s�Xl Lu e Ime off= o 'off y yoo �om° °��° 'WE - _ - pi sLLe„�om�mo ezzos=goo oom - ma (111)11101NiANI - - ��wg °� a- -=z w� (MN.e�aonI.Aww d ia� 77 _ I w =xa w " i - LL�o ono wp -o� o - w 1 i ° �_'w ° ssod-d -- ml "- pi mz - - " u o r3 - wNrHwa ° p4 X. — z r tt o N. ioery�"w RRit VIAO 031�0- u�0 0 � �3 eidoi�'P2 / P� tlR y o (Mez) 91 Is p� =o - ozoslNOHN seal+sd s o e s���oisOdosH _ ®� w s 1 1a31dM,M > (MN 11 ��. sw"aw, a a� a� -<I wa w -Od-d s M N ssz� 1 aw"(Ne�asd�°° — L 4 m aNr HN a3sodoa m '>> — 'S r.� XO o —VT NOSHWY - -_ t \--- w a-o _ p F lka(SR2 ----- p _- 1 w mw e��ow -- - -� �-- (Pueuclz--- �o �� M - -'moo"P-mod- - a Np " 0 w Sw5 m o"P o"P w rcs g " i R �O " 'se ° d ssios i t, (N oa)so i - �w o i 9d8 d"m x - _ ® awvada�Os,M 2�° Ir°H zi o"d ' 10� —Od-d % �e oa o _ h °� �mm pg"g �' I c3N si eies-s O ANI \I p i of ?: oxd� wez�IVVosN ° w o° o doao63asydoWsi - - Pia z op _ - o0 =_= JAL e Io � I i o3sodoad I p` — � �dios 1 O 0 oQe9nN N �`° �NVV)IV109 W s0Na 5y doaadaioolg - - M 0. 000 P` 5 o�oL.<<"oowsmm - z E J— o 5 o pw a> _ e,,o,,io 000 esrs"ooaoea3�a�o, os onwm Eff o mph I o �a3z.. 3 "o — °o m — �eoo Nr Hw aasodoa9 0 I � yUoN �ddl� b H11WS-21MSff/�00+6 tl1S 3NIl HO1tlW _ SlIV130 ONISSOHO WVDHIS VNIIOHVO HIHON'N303 d0 ALIOoo SIIV130 H31SM m o o E 8 NVld NOI1VIMIN38 N303 a <a OH-HNOISIA3H 3WbN lO3fOHd 3 N NOIIOf1HISNOO HOd 03SV3I3H ION NOIS30IVNId o = os pap as°www p-po a D 4r �. o w o e a _azpo°p - -aw pp O _ aof . - LL LLQ N a a m o o�"� o �gw: aQ�oQ.w.wo a F op LL o w o Apr N=a �ozLL�d'a iaJ wxs �oaw N N x �p r ooio°ap w aprco'�6� �a$� x W K �a' w �T p of o Lu i o p z� i - � �z Vie« a \\i a �o F a"�y<"PE a ao IF oOQoo % ° 0° oI " I z o — O IN I N o o Z _ Z Q o II ] I a w wap. - I I � mom — F p � I � ld — W„�� — III I � moo= o �J a a a �ma 0', � ip O 0 y Z 0 o € \/\ w Q Qws ao wdaais o o Y - w 0 of p } o Q _ S310N ]OHINOO NOISOHzl VNIIOHVO HIHOWN303 d0 ALIO — — SlIV130 H31SM m o ° E 8 NVld NOLVI03IN38 N303 a <a OF10�3H NOISIA3H3WbN 1�3fOFld 3 N NOIIOf1HISNOO HOd 03SV313H ION NOIS3a -IVNId HO as0 € saws aw^ 0 0§am a.?w a'o - o m - - - O =a -�$6 €a's os aao aid s - _ _ z z z = O So -� m o � °g o z Y s - z O - _ o - - - - of - 00o_ -s p w - _ -Lu _ 22 Lu o If ass - - a0s¢=w � w " - €e - - � - - - - _ O y� Sao <p - -- a z o, w o z - w cr w a h 0) 0 cl o 0 W w$o of wa og wa - '" Wo �vaao z w K of O a w 1h �.w.xaas� �9 woad= o ao - aw=4os os�� w�oo�sms" a o>ss„ a<- soa ass<a��m a a a as3�mo ��"3 -oa awo 0�w a � �� ��,0�z - Ada a - �asvoa �aoo haw =oast oe asee�sw - xs� s oaw=�o' - a a - `'sa aka aka s:�,m ^soansd des a - $s N, aW_ w�sm a� age - � _wa0=4 _ ez - :a, wa<aowa=o "a esm- <9= 0wa= - 0a, o=�30=0 a� Qaa=asaz� - da=.� - - - 0=woad a?o�a aomoe«m" - sa. azaoaw = MOO ? - _� - -- - "sz`=a =sue - �g=aso==3 s�o�, Mm, "o �40= sso.e she e=.o spa a=�a w$ao -®d"e" Q 0wa - as"'s oiw a a a ate: a y o =tea =sa§= owa eg a - ss= §so o waa4 0_= aw _ �o o d 0ms ?a: os s .:0o a a0€ <a9m _ z - 0ws sag = a =¢ss 4aa oa= a9ao o - as - �aa - - "§ - =a� "a x e0a- oaa sa - �§0 aa^ - w H. - "a _- "s - =0 =s= - - - �§ og saM1" - aa _ - aw ss y's os swww o M1Q- aa„ sad aaae�da aid - .maa Ala=<=aye�m z�N oz o" oyE o mm "ws o�� �Q �u 15 ..= 5 r ♦ r 'YG� v a l Q N N t N O1 CL ,yEf N O_ m E a E n n n O d t E N d O C (6 O Ci (6 N d L5 E O O U i E a a) Q N c � L L w 'cu N m LL c O U C 7 Z` 0 0� i ? V``J' U U O c E E u a N3m ne NVA S � \ — � � No dwoA -J \ \. \ \ . 2— \ / \ E / - / « % 370-M » __ _ E E S E E � � � \ \ . - A V 3NN� S 7 . . 1f § L.L U J r � Q (o E i N c CO N (6 E N n N Z Y N U C � (D N (A aEi E (A U U 0 L1 Q E Q m J E E C E Q Q Q N N Action ID Number: SAW-2019-01088 Permittee: City of Eden (Attn: Jon Mendenhall) County: Rockingham Project Name: City of Eden / Junction Basin sewer remediation Contract 5A / Rockingham County Date Verification Issued: 12/27/2022 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Determination of Jurisdiction: A. ❑ There are waters on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ® The jurisdictional areas within the above -described project area have been identified under a previous action. Please reference jurisdictional determination issued 9/16/2019. Action ID: SAW-2019-01088.