Loading...
HomeMy WebLinkAboutNCC191048_NOT Closeout Document_20250618 Sebastian Vallejo From: Gainer, Nathan S <nate.gainer@deq.nc.gov> Sent: Thursday,June 5, 2025 1:33 PM To: Sebastian Vallejo Subject: RE: [External] Brunswick Crossing EC permit closeout Attachments: FORSY-2021-031 Brunswick Crossing Phase 2- inspection report 2025-05-20.pdf External Sender: This email originated from outside of the organization. Good afternoon Sebastian, Thank you for your patience and sorry for the delay.Attached is the closeout inspection report for the erosion control plan FORSY-2021-031 Brunswick Crossing Phase 2. In our database,the older plan FORSY-2019-037 Brunswick Crossing Phase 1,was merged into the phase 2 plan.This document will need to be uploaded to terminate the NCG01 Construction Stormwater Permit# NCC191048 at our new online portal website called AccessDEQ: https://portal.deq.nc.gov/login. Information on that new system can be found here: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/npdes-construction-program/new-ncg0l-accessdeq-permit-system From my understanding,you need to first create/register an account (if you do not have one already). Once an account has been made,you then need to link the project to your account by requesting access to your NCGO1 Permit#. Here is a link to a user guide (which may be helpful?): https://portal.deq.nc.gov/docs/default-source/default-document- library/accessdeq-user-guide---ncg01-portal.pdf If you have any questions or issues about AccessDEQ, please complete this form: https://portal.deq.nc.gov/help/contact-us I hope you can get through this process;this is a new system to terminate the NCG01. Thanks, Nate Nathan S. Gainer Environmental Specialist: Division of Energy, Mineral, &Land Resources North Carolina Department of Environmental Quality 450 West Hanes Mill Road,Suite 300 Winston-Salem, NC 27105 336-776-9660(0) 1919-302-1685(C) nate.gainer@deq.nc.gov , 1.1-'11....E Q 0) NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From:Sebastian Vallejo<svallejo@windsorcompanies.us> Sent:Thursday,June 5, 2025 12:02 PM To: Gainer, Nathan S<nate.gainer@deq.nc.gov> Subject: RE: [External] Brunswick Crossing EC permit closeout CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Nate, Good afternoon and I hope you are well. I wanted to check in regarding the release of our grading permit at Brunswick crossing.All the pond work has been completed and has passed inspection. I would like to begin the process of filing a notice of termination for our grading permit out there. Let me know if you have any questions or if there is anything I can help with. Best, Sebastian Vallejo Erosion Control and Soil Data Specialist Windsor Homes 1007 Battleground Avenue,Suite 301 Greensboro, NC 27408 (954)591-6481 WindsorHomes.us WINDSOR HOMES N f From: Gainer, Nathan S<nate.gainer@deq.nc.gov> Sent: Friday, April 4, 2025 11:56 AM To:Sebastian Vallejo<svalleio@windsorcompanies.us> Subject: RE: [External] Brunswick Crossing EC permit closeout External Sender: This email originated from outside of the organization. Good morning Sebastion, Thanks for the update. I did swing by yesterday and saw the conversion is in progress.Once that work is completed and all temporary measures are removed, I will close out the plan. I noticed some old silt fence around portions of the site and construction debris from the most recent homes that were built(see attached photo). Let me know if you have any questions. Have a nice weekend. Thanks, Nate Nathan S. Gainer Environmental Specialist: Division of Energy, Mineral, & Land Resources North Carolina Department of Environmental Quality 2 450 West Hanes Mill Road,Suite 300 Winston-Salem, NC 27105 336-776-9660(0) 1 919-302-1685(C) nate.gainer@deq.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Sebastian Vallejo<svalleio@windsorcompanies.us> Sent:Tuesday,April 1, 2025 11:14 AM To: Gainer, Nathan S<nate.gainer@dec.nc.gov> Subject: [External] Brunswick Crossing EC permit closeout CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Nate, Good afternoon and I hope you are doing well. I wanted to let you know that we have completed all building in Brunswick Crossing, are currently working on converting the temporary ponds to permanent ponds.We would like to close out our permit(FORSY-2019-037). If you need anything else from me, please let me know. Thank you! Sebastian Vallejo Erosion Control and Soil Data Specialist Windsor Homes 1007 Battleground Avenue,Suite 301 Greensboro,NC 27408 (954)591-6481 WindsorHomes.us WINDSOR HOMES Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 Sedimentation/Construction:.Storm •water Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem,NC 27105 (336)776-9800 County: Forsyth Project: Brunswick Crossing Phase 2 River basin: Yadkin-PeeDee Person financially responsible:WINDSOR INVESTMENTS—David Michaels Project i/: FORSY-2021-03 I Address: 5603 NEW GARDEN VILLAGE DRIVE,GREENSBORO,NC 27410 1. Project Location: Devron Drive,Kernersville Pictures: No 2. Weather and soil conditions: 70's,sunny,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stornnvater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: June 05,2025 9. Corrective action needed: IO. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormmvater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://portal.deq.nc.gov/login.Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact the Winston Salem Regional Office or nate.gainer@deq.nc.gov or 336-776-9660. Reported by: Nate Gainer Others present: Date of inspection: May 20,2025 Time arriving on site: 3:00 PM Time leaving site: 3:15 PM cc: