From: Gainer, Nathan S <nate.gainer@deq.nc.gov>
Sent: Thursday,June 5, 2025 1:33 PM
To: Sebastian Vallejo
Subject: RE: [External] Brunswick Crossing EC permit closeout
Attachments: FORSY-2021-031 Brunswick Crossing Phase 2- inspection report 2025-05-20.pdf
External Sender: This email originated from outside of the organization.
Good afternoon Sebastian,
Thank you for your patience and sorry for the delay.Attached is the closeout inspection report for the erosion
control plan FORSY-2021-031 Brunswick Crossing Phase 2. In our database,the older plan FORSY-2019-037
Brunswick Crossing Phase 1,was merged into the phase 2 plan.This document will need to be uploaded to
terminate the NCG01 Construction Stormwater Permit# NCC191048 at our new online portal website called
AccessDEQ: https://portal.deq.nc.gov/login.
Information on that new system can be found here: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-
resources/stormwater/stormwater-program/npdes-construction-program/new-ncg0l-accessdeq-permit-system
From my understanding,you need to first create/register an account (if you do not have one already). Once an account
has been made,you then need to link the project to your account by requesting access to your NCGO1 Permit#.
Here is a link to a user guide (which may be helpful?): https://portal.deq.nc.gov/docs/default-source/default-document-
library/accessdeq-user-guide---ncg01-portal.pdf
If you have any questions or issues about AccessDEQ, please complete this form:
https://portal.deq.nc.gov/help/contact-us
I hope you can get through this process;this is a new system to terminate the NCG01.
Thanks,
Nate
Nathan S. Gainer
Environmental Specialist: Division of Energy, Mineral, &Land Resources
North Carolina Department of Environmental Quality
450 West Hanes Mill Road,Suite 300
Winston-Salem, NC 27105
336-776-9660(0) 1919-302-1685(C)
nate.gainer@deq.nc.gov
, 1.1-'11....E Q 0)
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
1
From:Sebastian Vallejo<svallejo@windsorcompanies.us>
Sent:Thursday,June 5, 2025 12:02 PM
To: Gainer, Nathan S<nate.gainer@deq.nc.gov>
Subject: RE: [External] Brunswick Crossing EC permit closeout
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Nate,
Good afternoon and I hope you are well. I wanted to check in regarding the release of our grading permit at
Brunswick crossing.All the pond work has been completed and has passed inspection. I would like to begin the
process of filing a notice of termination for our grading permit out there. Let me know if you have any questions or if
there is anything I can help with.
Best,
Sebastian Vallejo
Erosion Control and Soil Data Specialist
Windsor Homes
1007 Battleground Avenue,Suite 301
Greensboro, NC 27408
(954)591-6481
WindsorHomes.us
WINDSOR
HOMES
N f
From: Gainer, Nathan S<nate.gainer@deq.nc.gov>
Sent: Friday, April 4, 2025 11:56 AM
To:Sebastian Vallejo<svalleio@windsorcompanies.us>
Subject: RE: [External] Brunswick Crossing EC permit closeout
External Sender: This email originated from outside of the organization.
Good morning Sebastion,
Thanks for the update. I did swing by yesterday and saw the conversion is in progress.Once that work is completed
and all temporary measures are removed, I will close out the plan. I noticed some old silt fence around portions of
the site and construction debris from the most recent homes that were built(see attached photo).
Let me know if you have any questions. Have a nice weekend.
Thanks,
Nate
Nathan S. Gainer
Environmental Specialist: Division of Energy, Mineral, & Land Resources
North Carolina Department of Environmental Quality
2
450 West Hanes Mill Road,Suite 300
Winston-Salem, NC 27105
336-776-9660(0) 1 919-302-1685(C)
nate.gainer@deq.nc.gov
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Sebastian Vallejo<svalleio@windsorcompanies.us>
Sent:Tuesday,April 1, 2025 11:14 AM
To: Gainer, Nathan S<nate.gainer@dec.nc.gov>
Subject: [External] Brunswick Crossing EC permit closeout
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Nate,
Good afternoon and I hope you are doing well. I wanted to let you know that we have completed all building in
Brunswick Crossing, are currently working on converting the temporary ponds to permanent ponds.We would like
to close out our permit(FORSY-2019-037). If you need anything else from me, please let me know.
Thank you!
Sebastian Vallejo
Erosion Control and Soil Data Specialist
Windsor Homes
1007 Battleground Avenue,Suite 301
Greensboro,NC 27408
(954)591-6481
WindsorHomes.us
WINDSOR
HOMES
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
3
Sedimentation/Construction:.Storm •water Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem,NC 27105
(336)776-9800
County: Forsyth Project: Brunswick Crossing Phase 2 River basin: Yadkin-PeeDee
Person financially responsible:WINDSOR INVESTMENTS—David Michaels Project i/: FORSY-2021-03 I
Address: 5603 NEW GARDEN VILLAGE DRIVE,GREENSBORO,NC 27410
1. Project Location: Devron Drive,Kernersville
Pictures: No
2. Weather and soil conditions: 70's,sunny,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stornnvater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: June 05,2025
9. Corrective action needed:
IO. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormmvater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:https://portal.deq.nc.gov/login.Please note that
this correspondence must be uploaded as part of completing the NOT process.
If you have any questions,please contact the Winston Salem Regional Office or
nate.gainer@deq.nc.gov or 336-776-9660.
Reported by: Nate Gainer Others present:
Date of inspection: May 20,2025 Time arriving on site: 3:00 PM Time leaving site: 3:15 PM