HomeMy WebLinkAboutNCC232040_NOT Closeout Document_20250610 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Beaufort Project: Wilkinson Solar River basin: Tar-Pamlico
Person financially responsible:Wilkinson Solar-Brandon E Stites,VP of Project Project#: BEAUF-2023-017
Construction
Address: 12-Tredegar Street,Richmond,VA 23219
1. Project Location: NC 1612& 1619,Pantego
Pictures: No
2. Weather and soil conditions: 70 degrees,cloudy,wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Thomas Crisafulli Title: Project Manager
Inspection report: Sent Report Date given/sent: May 29,2025
9. Corrective action needed:
10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-
monitoring or self-inspections are required.The project is in compliance and released under the SPCA.The permittee
must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities
(NCG01)via a Notice of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-
Termination.Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: May 29,2025 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM
CC: