Loading...
HomeMy WebLinkAboutNCC232040_NOT Closeout Document_20250610 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Beaufort Project: Wilkinson Solar River basin: Tar-Pamlico Person financially responsible:Wilkinson Solar-Brandon E Stites,VP of Project Project#: BEAUF-2023-017 Construction Address: 12-Tredegar Street,Richmond,VA 23219 1. Project Location: NC 1612& 1619,Pantego Pictures: No 2. Weather and soil conditions: 70 degrees,cloudy,wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Thomas Crisafulli Title: Project Manager Inspection report: Sent Report Date given/sent: May 29,2025 9. Corrective action needed: 10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)via a Notice of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01- Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: May 29,2025 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM CC: