HomeMy WebLinkAbout20181638 Ver 4_Table 10_Dry-Ditch_Open-Cut_Cost_20250530Table 10 - Dry -Ditch Open -Cut Crossing Method Cost
Individual Permit Application
MVP Southgate Amendment Project
Stream Crossing Type (Units Indicated)
Stream Crossing Costs a/
Open -Cut Stream/Wetland/Buffer - Cost per Foot ($/ft)
$360
Open -Cut Method - Stream Lump Sum Adder ($/stream)
$42,000
a/ Costs taken from contractor bids on MVP Southgate scope of work received in December 2024.