Loading...
HomeMy WebLinkAbout20181638 Ver 4_Table 10_Dry-Ditch_Open-Cut_Cost_20250530Table 10 - Dry -Ditch Open -Cut Crossing Method Cost Individual Permit Application MVP Southgate Amendment Project Stream Crossing Type (Units Indicated) Stream Crossing Costs a/ Open -Cut Stream/Wetland/Buffer - Cost per Foot ($/ft) $360 Open -Cut Method - Stream Lump Sum Adder ($/stream) $42,000 a/ Costs taken from contractor bids on MVP Southgate scope of work received in December 2024.