Loading...
HomeMy WebLinkAbout20181638 Ver 4_Table 09_State_Federal-Permits_20250530Table 9 - State and Federal Permit Status Individual Permit Application MVP Southgate Amendment Project Federal Anticipated Submittal/ Anticipated Permit Receipt/ Authorization or Approval a/ Agency Initiation Date Completion Date Natural Gas Act, Section 7; Amendment Certificate for construction and operation of interstate natural Federal Energy Regulatory Commission Feb-25 Dec-25 gas pipeline b/ Individual Section 404 Permit for impacts on U.S. Army Corps of Engineers (USAGE) Apr-25 May-26 waters of the U.S., including wetlands Consultation under Section 7 of the Endangered Species Act for potential impacts on federally U.S. Fish and Wildlife Service May-25 Mar-26 protected species Virginia Anticipated Submittal/ Anticipated Permit Receipt/ Authorization or Approval a/ Initiation Date Completion Date Consultation and clearance regarding potential impacts on pre -historic and historic resources Virginia Department of Historic Resources (VDHR), Aug-24 Received Mar-25 eligible for listing on the National Register of Division of Review and Compliance c/ Historic Places (NRHP) Individual Section 401 Water Quality Certification Virginia Department of Environmental Quality Apr-25 Dec-25 and Water Protection Permit (VA DEQ), Water Division Standards and Specifications for the discharge of VA DEQ, Water Division In effect d/ Complete d/ construction stormwater General Permitfor Utility Line Encroachments Virginia Marine Resources Commission Apr-25 Dec-25 Consultation for state -threatened and endangered Virginia Department of Conservation and Recreation, plant and insect species and other state- Jul-24 Mar-25 Division of Natural Heritage designated "Natural Heritage" resources Consultation for state -threatened and endangered Virginia Department of Wildlife Resources, Wildlife Jul-24 Mar-25 animal and aquatic species and Environmental Services Division [fBD] [fBD] Road bonds and crossing permits Virginia Department of Transportation Prior to construction Prior to construction North Carolina Anticipated Submittal/ Anticipated Permit Receipt/ Authorization or Approval a/ Agency in Initiation Date Completion Date llo,dividuaoL401 Water Quality Certification, North Carolina Department of Environmental Quality May-25 Dec-25 sated/nn-404wetlandsand water permit (NC DEQ), Division of Water Resources General Permit NCG010000 to discharge NC DEQ, Division of Energy, Mineral and Land stormwater under the National Pollutant Discharge May-25 Aug-25 Resources Elimination System for Construction Activities Consultation for state -threatened and endangered NC DEQ, Natural Heritage Program Jul-24 Mar-25 species Consultation for state -threatened and endangered North Carolina Wildlife Resources Commission Dec-24 Mar-25 species Consultation and clearance regarding potential North Carolina Historic Preservation impacts on pre -historic and historic resources Aug-24 Feb-25 Office (NC HPO) c/ eligible for listing on the NRHP [rBD] [fBD] Road bonds and crossing permits North Carolina Department of Transportation Prior to construction Prior to construction a/ Consultations will occur continuously throughout the development of the Amendment Project. b/ FERC. 2020.171 FERC 161,232 Order Issuing Certificate re Mountain Valley Pipeline, LLC underCP19-14 (FERC eLibrary Accession Number 20200618-3159). c/ FERC developed a Programmatic Agreement (PA) forthe Original Certificated Project, in consultation with the USACE, VDHR, NC HPO, and other parties to resolve adverse effects to affected historic and cultural properties in accordance with 36 CFR g 800.14(b)(3). The PAwas executed on May 17, 2020, and is proposed to be renewed forthe Amendment Project. d/ The Standards and Specifications previously approved by VA DEQ for the Mountain Valley Pipeline mainline also govern the Amendment Project. TBD =to be determined