Loading...
HomeMy WebLinkAbout20181638 Ver 4_Attachment M_Compensatory-Mitigation_20250530Attachment M-1 ATTACHMENT M - COMPENSATORY MITIGATION USACE Norfolk Stream USM Forms Attachment M-2 Mitigation Affidavits and Purchase Agreements Attachment M-1 USACE Norfolk Stream USM Forms Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia For use in wadeable channels classified as intermittent or perennial Cowardin Impact/SAR Impact Project # Project Name Locality HUC Date SAR # Class. length Factor 171511 MVP Southgate Stream Assessments Pittsylvania Co Riverine 030101050203 02-Apr-2025 S-AO07 26 1 Name(s) of Evaluator(s) Stream Name and Information Stephanie Arnold, Patrick Vrablik Unnamed Tributary to Cherrystone Creek, Mile Marker 2.55 (Access Road) 1. Channel COndltlOn: Assess the cross-section ofthe stream and prevailing condition (erosion, aggradation) Conditional Category Optimal Suboptimal Marginal Poor Severe Often incised, but less than Severe or Ovenvidened/incised. Deeply incised (or excavated), Slightly incised, few areas of active erosion or unprotected banks. Majority Poor. Banks more stable than Severe Vertically/laterally unstable. Likely to vertical/lateral instability. Severe Channel Very little incision or active erosion; 80- of banks are stable (60.80%). or Poor due to lower bank slopes. widen further. Majority of both banks incision, flow contained within the Condition 100% stable banks. Vegetative surface Vegetative protection or natural rock Erosion may be present on 40-60% of are near vertical. Erosion present on 60 banks. Streambed below average protection or natural rock, prominent prominent (60.80%) AND/OR bath banks. Vegetative protection on 4 80% of banks. Vegetative protection rooting depth, majority of banks (80.100%). AND/OR Stable point Depositional features contribute to 60% of banks. Stream banks may present 20-00% of banks, and is vertical/undercut. Vegetative protection bars/bankfull benches are present. stability. The bankfull and low flow bevertical or undercut. AND/OR 40- insufficient to prevent erosion. AND/OR t t p present on less than is Access to their original floodplain or channels are well defined. Stream likely 60% of stream is covered sediment. Sediment be temporary/transient, 60.80% of the stream is covered by Sediment is n. Obvbanks, not preventing erosion. Obvious bank fully developed wide bankfull benches. has access to bankfull benches, or may y sediment. sloughing present. Erosion/raw banks Mid -channel bars, and transverse bars newly developed along contribute instability. Deposition that temporary/transient in nature, and on 80-100%. AND/OR Aggrading few. Transient sediment deposition ran portions of the reach. Transient reach. contribute to stability,may be y contributingto instability. AND/OR V- y� channel. Greater than 80% of stream covers less than 10%of bottom. sediment covers 10-40%of the stream forming/present. AND/OR V-shaped shaped channels have vegetative bed is covered by deposition, bottom channels have vegetative protection on protection is present on > 40% of the contributing to instability. Multiple > 40% of the banks and depositional banks and stable sediment deposition is thread channels and/or subterranean CI features which contribute to stability. absent. flow. Score 3 2.4 2 1.6 1 2.0 NOTES>> 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> Optimal Suboptimal Marginal Poor Low Marginal: High Poor: Lawns, High Suboptimal: Low Suboptimal: High Marginal: Non -maintained, dense herbaceous mowed, and maintained areas, Low Poor: Riparian areas with tree stratum (dbh > Riparian areas with tree stratum (dbh > Non -maintained, vegetation, riparian nurseries; no -till Impervious 3 inches) present 3 inches) present dense herbaceous areas lacking shrub cropland; actively surfaces, mine Riparian Tree stratum (dbh > 3 inches) present, , with 30%to 60% , with > 30%tree vegetation with and tree stratum, grazed pasture, spoil lands, with > 60% tree canopycover and a tree canopy cover canopy cover and either a shrub layer ye ha y production, sparsely vegetated denuded surfaces, Buffers non -maintained understo Wetlands ry. and containing both a maintained or a tree layer dbh y ( ponds, open water. non -maintained now crops, active located within the riparian areas. herbaceous and understory. Recent > 3 inches) If present, tree area, recently feed lots, trails, or shrub layers or a cutover (dense present, with <30% stratum (dbh >3 seeded and other comparable non -maintained vegetation). tree canopy cover. inches) present, stabilized, or other conditions. understory. with <30%tree comparable canopy cover with condition. maintained understory. High Low High Low High Low Condition 1.5 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you below. of % Riparian 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Riparian Area> 100% 100% Right Bank Score> 0.85 CI= (Sum % RA ` Scores`0.01)/2 Left Bank Riparian Area> 10% 90% 100% Rt Bank Cl > 0.85 Cl score> 0.85 0.6 Lt Bank CI> 0.63 0.74 3. INSTREAM HABITAT: Varied substrate sizes, water velocity and depths; woody and leafy debris; stable substrate; low embededness, shade; undercut NOTES>> banks, root mats, SAV, riffle poole complexes, stable features. Conditional Category Optimal Suboptimal Marginal Poor Instream Habitat/ Available Stable habitat elements are typically Stable habitat elements are typically Habitat elements listed above are Habitat elements are typically present present in 30.50% of the reach and are present in 10-30% of the reach and are lacking or are unstable. Habitat Cover in greater than 50% of the reach. adequate for maintenance of adequate for maintenance of elements are typically present in less populations. populations. than 10%of the reach. CI Score 1.5 1.2 0.9 0.5 0.50 Stream Impact Assessment For Project# Applicant Locality Cowardin Class. HUC 171511 MVP Southgate Stream Assessments Pittsylvania Co Riverine 030101050203 4. CHANNEL ALTERATION: Stream crossings, riprap, concrete, gabions, or concrete blocks, straightening of chanr spoil piles, constrictions, livestock Conditional Category Negligible Minor Moderate 40 - 60 % of reach 60 - 80 % of reach is disrupted by any is disrupted by any Less than 20 % of 20-40 % of the of the channel of the channel Channel the stream reach is stream reach is alterations listed in alterations listed in Alteration Channel¢ation, dredging, alteration, or disrupted by any of disrupted by any of the parameter guidelines. If the parameter guidelines. If hardening absent. Stream has an the channel the channel stream has been stream has been unaltered pattern or has naturalized. alterations listed in alterations listed in channelized, channelized, the parameter the parameter normal stable normal stable guidelines. guidelines. stream meander stream meander pattern has not pattern has not recovered. recovered. SCORE 1 1.5 1.3 11 1.1 0.9 0.7 REACH CONDITION INDEX and STREAM CONDITION UN; NOTE: The Cis and RCI should be rounded to 2 decimal places. The CR should be rounded to a whole number. DESCRIBE PROPOSED IMPACT: Replacement of existing culvert. RCI= (Sum of all CI's)/5 COMPENSATION REQUIREMENT (CR) >> 24 CR = RCI X LF X IF Ephemeral Stream Assessment Form (Form 1 a) Unified Stream Methodology for use in Virginia For use in ephemeral streams Cowardin Impact/SAR Impact Project# Project Name Locality HUC Date SAR# Class. length Factor 171151 MVP Southgate Stream Assessments Pittsylvania co Riverine 030101030907 02-Apr-2025 S-A065 36 1 Name(s) of Evaluator(s) Stream Name and Information Stephanie Arnold and Patrick Vrablik Unnamed Tributary to Sandy River, Mile Marker 17.65 (Access Road) 2. RIPARIAN BUFFERS: Assess both bank's 100 foot riparian areas along the entire SAR. (rough measurements of length & width may be acceptable) Conditional Category NOTES>> Optimal Suboptimal Marginal Poor Low Marginal: High Poor: Lawns, High Suboptimal: Low Suboptimal: High Marginal: Non -maintained, dense herbaceous mowed, and maintained areas, Low Poor: Riparian areas with tree stratum (dbh > Riparian areas with tree stratum (dbh > Non -maintained, vegetation, riparian nurseries; no -till Impervious 3 inches) present, resent resent 3 inches) present' dense herbaceous areas lacking shrub cropland; actively surfaces, mine Riparian Tree stratum (dbh > 3 inches) present, with 30%to60% with >30%tree vegetation with and tree stratum, grazed pasture, spoil lands, Buffers with > 60%tree canopy cover and an on -maintained understory.Wetlands tree canopyfining both and containing both canopy maintained a maintained either a shrub layer or a tree layer dbh y ( hay production, ponds, open water. sparsely vegetated non -maintained denuded surfaces, row crops, active areas. herbaceous and understory. Recent > 3 inches) If present, tree area, recently feed lots, trails, or shrub layers or a cutover (dense present, with 130% stratum (dbh >3 seeded and other comparable non -maintained vegetation). tree canopy cover. inches) present, stabilized, or other conditions. understory. withycovtree comparable canopy cover with condition. maintained understory. High Low High I Low High Low Condition 15 1.2 1.1 0.85 0.75 0.6 0.5 Scores 1. Delineate riparian areas along each stream bank into Condition Categories and Condition Scores using the descriptors. Ensure the sums 2. Determine square footage for each by measuring or estimating length and width. Calculators are provided for you below. of % Riparian 3. Enter the % Riparian Area and Score for each riparian category in the blocks below. Blocks equal 100 %Riparian Area> 1 20% 1 80% 1 1 1 100% Right Bank Score> 0.6 1.2 CI= (Sum % RAScores'0.01)/2 Left Bank Riparian Area> 100% 100% Rt Bank CI > 1.08 Cl Score> 1.2 Lt Bari 1.20 1.14 REACH CONDITION INDEX and STREAM CONDITION UNITS FOR THIS REACH NOTE: The Cis and RCI should be rounded to 2 decimal places. The CR should be rounded to a whole number. THE REACH CONDITION INDEX (RCI) >> 0.57 RCI= (Riparian CI)/2 COMPENSATION REQUIREMENT (CR) >> 21 CR = RCI X LF X IF DESCRIBE PROPOSED IMPACT: Replacement of existing culvert. Attachment M-2 Mitigation Affidavits and Purchase Agreements 4/7 //2025 EXHIBIT A CREDIT RESERVATION LETTER April 8, 2025 Jeffrey Klinefelter VP, MVP Construction & Engineering 2200 Energy Drive Canonsburg, PA 15317 Re: Stream and Wetland Mitigation Credit Reservation Project Name: Mountain Valley Pipeline, LLC - Southgate Amendment Prcj ect Project Location: Pittsylvania County, VA, Lat/Long: 36.830743' N, 79.344083' W Project HUC: Banister (03010105) and Upper Dan (03010103) Dear Mr. Klinefelter, We appreciate the opportunity to provide stream and wetland mitigation credits for the Mountain Valley Pipeline, LLC (Mountain Valley) Southgate Amendment Project (Amendment Project). As we have discussed, we expect the Copper Hill Mitigation Bank NAO-2023-02173 (Bank) to have 4.57 wetland credits and 5800 stream credits (USM) available to provide compensatory mitigation for unavoidable stream and wetland impacts authorized by U.S. Army Corps of Engineers (USACE) permits pursuant to 33 C.F. R. 332.8(a)(1) and Virginia Department of Environmental Quality (VDEQ) Virginia Water Protection Permits pursuant to § 62.1-44.15:21. As of the date of this letter, the Bank Sponsor anticipates the submittal of the NMI for initial review by April 15, 2025. We anticipate the NMI for the Bank will receive approval from USACE — Norfolk District and VDEQ by January 2026 and that its primary service area will include the Project area; namely, Roanoke sub -basin (HUC: 03010101). The Bank Sponsor anticipates initial release of 0.87 wetland credits and 700 stream credits. It is anticipated that construction will commence upon approval of the MBI. Upon completion (As - built) the Bank Sponsor anticipates initial release of 0.43 wetland credits. It is anticipated that the 1st year monitoring report will be submitted in the winter 2026, and that an accelerated release of 2.61 wetland credits will be available mid-2027. Pursuant to the Agreement, Bank Sponsor has reserved 3.13 wetland credits out of the Bank's initial and accelerated credit releases for Mountain Valley's use on the Amendment Project. Credits are based on initial design and subject to change. David M. Jordan Page 1 of 1 4/7 //2025 EXHIBIT A CREDIT RESERVATION LETTER April 8, 2025 Jeffrey Klinefelter VP, MVP Construction & Engineering 2200 Energy Drive Canonsburg, PA 15317 Re: Stream and Wetland Mitigation Credit Reservation Project Name: Mountain Valley Pipeline, LLC - Southgate Amendment Prcj ect Project Location: Pittsylvania County, VA, Lat/Long: 36.830743' N, 79.344083' W Project HUC: Banister (03010105) and Upper Dan (03010103) Dear Mr. Klinefelter, We appreciate the opportunity to provide stream and wetland mitigation credits for the Mountain Valley Pipeline, LLC (Mountain Valley) Southgate Amendment Project (Amendment Project). As we have discussed, we expect the Copper Hill Mitigation Bank NAO-2023-02173 (Bank) to have 4.57 wetland credits and 5800 stream credits (USM) available to provide compensatory mitigation for unavoidable stream and wetland impacts authorized by U.S. Army Corps of Engineers (USACE) permits pursuant to 33 C.F. R. 332.8(a)(1) and Virginia Department of Environmental Quality (VDEQ) Virginia Water Protection Permits pursuant to § 62.1-44.15:21. As of the date of this letter, the Bank Sponsor anticipates the submittal of the NMI for initial review by April 15, 2025. We anticipate the NMI for the Bank will receive approval from USACE — Norfolk District and VDEQ by January 2026 and that its primary service area will include the Project area; namely, Roanoke sub -basin (HUC: 03010101). The Bank Sponsor anticipates initial release of 0.87 wetland credits and 700 stream credits. It is anticipated that construction will commence upon approval of the MBI. Upon completion (As - built) the Bank Sponsor anticipates initial release of 0.43 wetland credits. It is anticipated that the 1st year monitoring report will be submitted in the winter 2026, and that an accelerated release of 2.61 wetland credits will be available mid-2027. Pursuant to the Agreement, Bank Sponsor has reserved 3.13 wetland credits out of the Bank's initial and accelerated credit releases for Mountain Valley's use on the Amendment Project. Credits are based on initial design and subject to change. David M. Jordan Page 1 of 1