HomeMy WebLinkAbout20181638 Ver 4_Attachment J_Construction_Typicals_20250530ATTACHMENT J - CONSTRUCTION DETAILS (TYPICALS)
0
�a
co
w w
N
z z rn
w w<
I
U
d
O
0 ro
U
w as
�o
co
a �
ll.lLU
)
�LL�
N
ww 10
><_�
0�
r
LL
—
Z � V)
z
Q OOZ
c O
- U
rWZOOZ
�..
ONTO
C
O �U
>
Z
3
�>
4�
U M
W
W O
7
M
0 Z
O L
�
s
�
�
LL
w Q
W Z
JwQ
U
a U
�Q
a
V
2 LOw
tr
_ 0
OoNz�/U
11_
W
�
O
O
v
O
0- W
J
>J
Q) W
Z
J
W
a
�a
• •
O
w
z
0
O
a
O
J
o
z
a
w
z
O
❑
Z
Z
r
p
�
a
�
N
�
�
�
Z
O
�
U
w
wa
5
W
5
�
�
j
J
O
O
Z
Z
N
w
}�
�
�
W
❑❑
Z
Z
O
W
w
Q
N
J
g
g
�
❑
w
�
w_
m
r�
Z
Z
d'
d'
K
K
J�
W
Jo
}
J
J
a
==
s
a
N
wY
F
N
F
N==
W
❑�
m
W
a
i�
U
o
Y
a
a���
�
w
w�
z
z
W
o
w
J
x
x
w�
J
a
a�
a�
�
C7
z_
�
W
�������
m
w
J
x
�
zQ
N
w��
W
W
Z
O
Z
O�
W
r
w❑❑
W
O
d
N
N
~
o
w
�
m
3
a.
❑
a
a.
❑
d
W.
❑
N
N❑
Z
Z
o�
N
J
o
K
m
K
m
�
O
~
W
x
LL
LL
LL>>
Iy�Iy��
Iy�IyJJ
aa
sa
❑
❑
❑
2
2
r
J
N❑
Ow-
!r
!r
m
W
�
❑
z
Q
a
J
Z
O
O
O
O
O
O
W
W❑❑
W
W
�
O
W
m
W
m
m❑
7
J
r
U
U
U
�
�
d'
U'
U`
C7
F
F
N
N
N
m
�
�
�
�
zi
O
Z
N
Q
tD
m
(O
Q
N
m
ro
W
O
Q
m
U
Q
M
m
M
Q
m
N
N
W
O
M
�
N
M
M
M
M
I�
M
M
M
M
V
V
N
V
N
V
N
V
V
V
V
V
V
V
V
O
V
r
V
V
V
N
N
N
N
N
N
N
N
N
N
N
N
>N
>N
>N
>N
>N
>N
>N
>N
O
�
N
o
O
O
(❑j
w
Ow
�
Z
�
O`
CCCQ777
J
�
w
O
o
N
w
W
IL
p
w
O
LL
N
J
O
J
�
W
��
W
z
W
a
W
z
O
a
!L'
m
N
J
zd
a
°a
�
a
a
J
�
IyJ
o
Z
o
U
ON
d
�
J
d
�
>
EL
W
J
!L
IL
r
O
Z
O
D
J
F
d
?
W
J
z>
r
a
Z
Q
o
o
�
U
z
R
J�
o�
r
w
❑
a
o�
d
w
�
o
u-,
F
p
o❑
o
w
w
d
p��
J
J
J❑
J
N
z
N
W
Z❑
r❑
w
x
r
m
m
m
a
p
W
N
z
x�❑
❑
r
w
O
m
O❑❑
Z
p
JL
Z
W
O�
m
O
W
W
W
N
O
5a�
O
O
U
m
O
Z
N
u�
N
Z
��000�
Z
U
�
S
w
mO
NZvi
oN
z�
z�
z�
-r
WIX
rDW?oQQQoaLLzoQo00❑dz
J�d
�
CL
J
�
U}��
O
r
O
r
N�}
N
U
U1
m
�n
v�
❑
w
a
w���
m❑❑
_
z
w
w��
m���
a
N
J�
v
0
U
U
0�
Q
w�
w
d��
a
w
0
z
�
a
�
a
x
�
�
�
�
3
?
3
�
a
�
�
�
z
z
iw
N
z
z
z
z
z
z
z
z
z
z
z
z
z
o
0
o
w
w
w
w��
z
J
d
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
F
x
F
x
F2❑❑
x¢¢¢
w
N
N
O
r
a
U
U
U
U
U
U
U
U
U
U
U
U
U`
W
w
Wof
r
r
U
w
J�
w
J
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r
N
Z
r���
N
Z
W
YY
W
YY
W❑❑❑
YY
z
z
z
=
U
!L
!L
r
N
�>
O
O
O
O
O
O
O
O
O
O
O
O
Q
Q
Q
w
w
w
W
0
0
0
r
U
W
U
W
U
W
U
W
U
W
U
W
U
W
U
W
U
W
U
W
U
W
U
W
W
ll�off)f
m
w
m
W�
m
I--J
J
U
W
Z
a
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
m
m
m
J
J
z
j
Z
J
J
J
J
J
J
J
J
J
J
J
J
a
a
d
W
W
W
U
x
x
J
Q❑
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
p
p
p
r
r
r
}E}
W
W
Z
0a_
C7
Z
�y
F
N
O
N
�
M
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
M
N
a�a•a3rm ivaeu\sro�au\s�eunmaVernm\amn - v�Vir�xuios axe wuutaH - cewoe\s�r�roaa\n
- -
pz
�zo
3
� �
w
j=
C
I
I
I
D
-
HIM MOd '1SN03
_
3
—
s�
s
IEN
E
_��
=gig
-'
f2
a�
a
Y
a
uvU m-nozn —PI 11-lx.lu-A-4reN'4PIPW
'A9
PaueuLL
atloa so 3sa3
avoa so 3ea3
11 W11 MOEl Otl021
a�
w
N
X\
M021
MOiI
'd W31
MOiI 'Wil3d
'dW31
_
o
Z�
-
oC,=
a o
ZOO
o =
(r
_
3
a �
� �
w
j=
C
I
I
I
D
-
_ 3
HIM MOd '15NO3
o ,001
_
_
s�
s
_
1NINISVII J0 1001
I
I
AINISV3 JO ]Da3
>J� XX�yX
,0- ODI ,0 ,001
M02
'All Mod 'M 11 MOi 'IMI
.0-'go
B
�
-3�
B�
4
fr
_
Y
W ei m-nozv—PI 11-4-11--A-44eP'4u•PW'Ay
Y
PaueuLL
"NJ
� � I
— Z U
UUU � LCJ
Z fYZ —
3 � �
w
O
H101M MDd N0IOMISNO)
— 3
I _
� I I
�I
I
u�
I —
I
I
I I
if I
r a==
I
o ;oar
"od 'd H 31 MOtI 'W i13d MOiI 'd.,
,0-Sl ,0-,OS 0-Ml ,0-MOl 5�
6 �
0�5
�S E�
3 �
Y
3
uvR m-e102 n—PI 11e4x11u-A-4reN'4PIPW 'A9 P-4—
Vold 3NI13d1d
3003 S,i131tlM
�
1:
--w----------
�|
_ - - U9.
LLJ
- OHO a O
- a �
3 d
w
O
z
U 3f
XO
Y � III �m❑y � � 3_
6 LJ
� w
Q
i
J III
J_ ,OSZ Al31vv41X021ddv - z
O o z III l w
a J
J Q Y o Li
O III w III N
4 O
W
o �� I III III
Q o -
H
Z ,09Z k13iVWIXMJddV
O
N
O
IT I
w
1�
�O
I �
1 wa
za
0 oa
�z
p wa
❑ 8
No�o
�' f2
o�
m 3 Y
LLJ
Nr ezm-e102n w!a'wl+elx+lu.11 •awreN'hl+enN do Pa!!=wLL
� �
3
w
j=
C
I
I
I
MOd NOILMRllSNOJ LO 3003
D
-
3
0
—
3�
—
o
w r
Q
CD
MOd N0I13ndiSN00 10 1003
\
/
\
B
�
— s
�
4
_
fr
Y
uvR m-noz n—PI 11-4x11u-A-4reN'4PIPW
Y
'A9
P-4—
_
zo
a
� �
w
3
j=
C
I
I
I
MOd Wiio 1i115NCJ 10 3003
D
—
0
—
3
wa w
wF w
�
O
N�
MOd NOiondlSNCU 10 3003 N
�zz
5�
6
�
zY�
—3�
c�
fr
Y
Y
W ei m -noz v—PI 11-4-11-.A-44eN'41+enN'A9
Pau-W LL
Z
f1
— �
f1
L(7
N
-
� a
� � O
-
z �
-
�
N
(Y
�
w
j=
C
I
I
I
D
-
-
o- a
H101M MOd '15NO3
-
„o-sz ,o-sz
,o-om
„o ;oo,
3
s�
s
E
,0-'91
,0-,oS
,0-,SC ,0 ,00I
=gig
-'
f2
a�
a
Y
a
uvR m-noz n —PI 11-lx.lu-A-4reN'4PIPW
'A9
P-4—
LI WII M021 Otl021
Otl021 10 3J03
/
X
\
�X\
/
OVOiI j0 3003
11 W11 modOtl0il
modMOiI
I'll
MOiI 'W213d
Y 'd W31
1
d
zQ w
N
o � 3
� � O
- z
- _ o
- g N
N
0
U
� O �
Z
j= I
C I
I
D -
H101M M021 'ENOJ m
_ � 3
S o
- m-
— — — — — — — — — — —
1NNSM3 10 1003
—t 4--I Ovod]vd —1 1 --k I—t +—I J—
LNIWIIII LO L111
E
All M021 5
'd W31 MOiI 'W213d 'dW31 6
:4El
-3�
B�
4 _
fr
Y
Y
uvR m-nozn wla'm 1+-4x11u-A-4reN'4PIPW 'A9 P-4—
_ z
Z (nZ -
_
}
a
o
w
w
C _
H 101M MOiI N011Jf1i11SNOJ
L i
I o 3
_ Y
1 � _
� S o
I`
u1
-
L' �
IF
V' o�d azz
\ 3 w u
Ir
MON 3
n '-^
'dW31Sl MOEI'D9' 0-,O,o
0-,OS L ,0-,OOI
tt
3 �
Y
3
uv Um-e102 n—PI 11e4x11u-A-4reN'4PIPW'A9 P-4—
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. LIMITS OF
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER R.O.W.
DEPENDING UPON FIELD CONDITIONS AND OR R.O.W. DISTURBED R.O.W.
REGULATORY REQUIREMENTS. BOUNDARY 5%, MAX. Np.) BOUNDARY
r
'L' OR 'J' HOOK �l
SILT FENCE EDGE OF
ENERGY B' $ DISTURBED
DISSIPATOR R.O.W.
KEY SILT FENCE
INT❑ WATER
BAR
TEMPORARY BMPS
FLOW
i
STRAW BALE 6'
ENERGY $'
DISSIPATER
KEY STRAW BALE
INT❑ WATER BAR
1 1 1
FLOW
ROCK
ENERGY
DISSIPATER
KEY ROCKS INT❑
WATER BAR
PERMANENT BMPS
STABLE
VEGETATED
AREA
PLAN VIEW
2' MIN R
/ � /'' ��/\ 5' MIN•
NOTES'
1, SLOPE BREAKERS SHALL BE CONSTRUCTED OF COMPACTED NATIVE SOIL AND INSTALLED AT LOCATIONS AS SHOWN ON THE
CONSTRUCTION DRAWINGS OR AS DIRECTED BY THE COMPANY'S INSPECTOR,
2, SLOPE BREAKERS SHALL BE ❑RIENTED AS SHOWN OR OTHER PATTERN AS DIRECTED BY THE COMPANY'S INSPECTOR TO DIRECT THE
WATER OFF THE R,O,W,
3, SLOPE BREAKERS SHALL BE CONSTRUCTED AT A 5% MAXIMUM GRADIENT ACROSS THE SLOPE,
4. THE SLOPE BREAKERS SHALL BE 18' DEEP CAS MEASURED FROM THE TROUGH TO THE TOP OF THE SLOPE BREAKER), THE TROUGH
WILL BE A MINIMUM OF 5' WIDE ACROSS THE WIDTH OF THE RIGHT-OF-WAY,
5. THE OUTLET OF THE SLOPE BREAKER MUST FREELY DISCHARGE RUNOFF OFF FROM THE DISTURBED RIGHT-OF-WAY INT❑ A STABLE,
WELL VEGETATED AREA OR INT❑ AN ENERGY DISSIPATER,
6, WHERE SLOPE BREAKERS EXTEND BEYOND THE EDGE OF THE CONSTRUCTION R,O,W, DIRECT RUNOFF INT❑ STABLE, WELL VEGETATED
AREAS, THESE LOCATIONS MUST BE APPROVED BY THE COMPANY'S INSPECTOR,
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'D XXX DATE X/X/2018 ,�` PIPELINE ur
SCALE N.T.S. SHEET 1 of 1 SLOPE BREAKER/RIGHT—OF—WAY
DIVERSION/WATERBAR
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-17 P1
9" MINIMUM
COMP
FINISHED GRADE
18" MINIMUM AFTER
COMPACTION
FINISHED GRADE
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
SECTION A -A
(TEMPORARY INSTALLATION)
SECTION A -A
(PERMANENT INSTALLATION)
1'1 Mountain Valley
PIPELINE ur
JNDED
JFIGURATION
,ULAR
JFIGURATION
ROUNDED
CONFIGURATION
ANGULAR
CONFIGURATION
SKETCH
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
SLOPE BREAKER/RIGHT-OF-WAY
DIVERSION/WATERBAR
H-650-TYP
DRAWING NO. REV.
MVP-SG-17.1 1 P1
RECOMMENDED MAXIMUM SPACING FOR
PERMANENT SLOPE BREAKERS
PIPELINE GRADE
DISTANCE (FEET)
<2%
- 1, 2
2-5%
400
6-15%
200
16-30%
100
>31%
503
'PERMANENT SLOPE BREAKERS WILL BE INSTALLED AS NEEDED BASED
ON FIELD C❑NDITI❑NS,
2 PERMANENT SLOPE BREAKERS WILL BE INSTALLED 25 FEET FROM
EACH WATERB❑DY BOUNDARY REGARDLESS OF SLOPE C❑NDITI❑NS,
3 SLOPES GREATER THAN 65% MAY REQUIRE SITE SPECIFIC
STABILIZATI❑N MEASURES BASED ON FIELD C❑NDITI❑NS AS APPROVED
BY MVP DESIGN ENGINEERING AND MVP ENVIR❑NMENTAL INSPECT❑R,
NOTES:.
WATERBARS SHALL BE INSPECTED WEEKLY (DAILY ON ACTIVE ROADS) AND
AFTER EACH RUNOFF EVENT, DAMAGED OR ERODED WATERBARS SHALL BE
RESTORED TO ❑RIGINAL DIMENSI❑NS WITHIN 24 HOURS OF INSPECTI❑N
MAINTENANCE OF WATERBARS SHALL BE PR❑VIDED UNTIL ROADWAY,
SKIDTRAIL, OR RIGHT-❑F-WAY HAS ACHIEVED PERMANENT STABILIZATI❑N
WATERBARS ON RETIRED ROADWAYS, SKIDTRAILS, AND RIGHT-❑F-WAYS
SHALL BE LEFT IN PLACE AFTER PERMANENT STABILIZATI❑N HAS BEEN
ACHIEVED
SUMP FILTERS TO BE INSTALLED AT END OF WATERBARS, REFER TO SUMP
FILTER DETAIL ON SHEET 0,09 FOR MORE DETAIL,
OUTLET PR❑TECTI❑N/C❑MP❑ST FILTER SOCK SHOULD BE INSTALLED AT THE
OUTLET OF ALL WATERBARS,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Valley
PIPELINE ur
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
SLOPE BREAKER/RIGHT-OF-WAY
DIVERSION/WATERBAR
H-650-TYP
DRAWING NO. REV.
MVP-SG-17.2 1 P1
W.
w
O
J
Z Q
z�
w
20
J
U)
W 2
Q W
'o
0
~z
w
~
H
Q
w
O
wo
m W
�2
�..
J
Q
w
J
>
a_
FL
QO
W
:
U`
N
>w�
> ~
0
Z X
d�
Z
gw
0
F
Q ww
LLJ
o
r�
O
D
U)
d
p
z0
I
0
M�
I
CDU
J
LLJ o
>
Q
0
�w
a_
z
EL
0-1 w
a
Qf
0
�a
a
w
0
Q
W
U
ll�
W
ro
ro m
Q O
~
^
X \ O
w
X X
W
W W W
Q
O
W
Q Q 2
O O fn
I
O
zz
LO
N
X X ~
Qo
I
w
Z
W O
U
_
O
J
Z
Q
cr
`1 0 W Z
w a-Q m
m
N 00
w
O
of
Q
a
LL
a
0
w
o w
z
wJ
O aQ
`H x
D o w
a
m N w CD
a z V) C/)
a w Q m cn I
as as
w> co V wo >
c�J ww Q �� Z
~ 0
z� a c) U Z
Qw �w C
a
CO ¢ W o
OfU zz
00
z w LO Wz
ap a
� ° c6 a
RCN
V
OQ V
5�
z a Go
w� ro ro
z o 6
a li �lq \ o
rll
0 Oi w X X
LLJ
LLj
a I
O O O fn O
L%
N Qo
X X ~ I
\ I Z �
Z W O U
Y 0 W Z
Q W d Q m
of
m
z
v
LU
0
Q
00
J U Q o
z
ZO
ih
OJ>
0- O
Of 0-
D0Aip
LU
z0
LU
oO QUU)
U L
mi
0Wm Z
OW
Q
W
> Ir x
T-- -T
OU)IrLL
U
Z
Z_
w
ry
co
co
>
Q
w
z
WOf
�
0
v
Z
w
Y
O
oQ
ww
U
D
CC
m ,z
I
Z
=
O
Q
�w
I
U
W
=k
J
�Q�
W
��
Q
o
Ww�
�u�
J O
o0
U
z
�of
0
U 0
r
a
0
r
<
� u
w
0
0
J
LL
>
Z
Z
W
`1! Z
M
W
C
Cm
Q
a
jr
Q
•�
Df
m
O
�r(n
Z
�;~
w0
wow
�00
O�
F�
>v
QH�
JU
W >
�(n(jZJZ
Z W Z— w 0
W 2 — > —
w �
��
� U U) C)
°°
ro °°
Q
QzXU)ZU
Wow Q
o
0
Df 0 0= L L
m
X X
0}zHLU
Z W .-. 0
H
W Y� Z Q
of
w
Ir Qm�0
00
0
0 0
cn
�
m �
z
O w
U
X X
_
X X
Z
0
I
>Q
Z
W
Y
O
W Z
U
w
Q
W d
U Q
Q m
O
d
U
(7 LL
o
in
o
� U
W Z (n
Z .-•
w J
�
U W
=
LL
WUZ
W
o
in
J
_
_
�
J�
Q Q
O
V �
V �
v �
in
o
n
o
SLOPE % DISTANCE PLUG MATERIAL THIS TYPKAI. CONSTRUCTION D�r+1L S INTENDEC TD
Ox — 5x SEE NOTE 6 40NCRETE FILLED SACKS PRWIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
51A — 15X 500 FT SANDBAGS OR CONCRETE FILLED SACKS THE ACTUAL C04ST4UCTICN TECHNIQUES MAY DIFFER
DEFENDING UPON FIELD CONDITIONS AND CR
15% — 25% 300 FT SANDBAGS OR CONCRETE FILLED SACKS REGULATORY REQUIREMENTS.
25% — 35% 200 FT SANDBAGS OR CONCRETE FILLED SACKS
35% — 100% 100 FT SANDBAGS OR CONCRETE FILLED SACKS
a 100% 55 fT CONOtETE FVAED BAGS (WETTED)
� a
yya
PI°:LING y
9
TRBJCH PLLGRAIN PIPE v v GRAPIPE DAYLIGHTS
C a a AT R.O.W EDGE
n � 1
BLEEDER DR, iO BE
CON5TRUCI UP DIP OF IN
FRENCH PLUG PER J7 A;L &7 v o VC PIPE CONNECTED
OR EOL1I>✓AI6NY TO TRMCH PDUG DRAIN
G D OULLFF
PI Pf11NY
v
TOPSOIL
OR NAT11,E
MATERIAL
17'
TOPSOIL OR
Ir WIN. NATAL MATERIAL SACK LIMIT
RIP -GAP DETAIL IPER
TRENCH LNT DFAIL8.10OR
KEY SLOT SILDT LYT ELIUIVALENLI Y F
(STEEP X 12' SHOE) INTO UNDIMMED � KEY BREAKER If COMPOST FILTER
Rd CH WALL MON PADDHC SOCK OR E GMALENT
AND BOTTOM 1N ROCK OR
NOTES;
CROSS SECTION H9JXER AREAS SIDE VIEW
1. TRENCH BREAKERS SHALL BE 14STALLED:
• ON SLOPES ALONG THE MOO UHE *HERE THE NATURAL CRANACE PATTERN, PROFILE, AND TYPE OF BACKFILL kATERIAL WAY RESULT IN LOSS OF
BAC7KFILL MATERIAL OR ALTERATION OF THE NATURAL PA7EM;
• AT THE BASE OF SLOPES ADJACENT TO WATERBODIES AND WETLANDS:
• A47RE NEEDED TD AVOID DRAINING A VETLAND;
• ON UPLAND SLOPES, AT THE SAME SPACING AS SLOPE BREAKKERS AND UP SLOPE OF SLOPE BREAKERS',
• IN CULTNATEO LAND AND RESIDENTIAL AREAS MERE PERMANENT SLOPE BREAKERS ARE NOT TYPICALLY 1NSTALLE0. AT THE SAME SPACING AS IF
PERMANENT SLOPE BREAKERS *HERE REQUIRED.
2. MATERIALS APPROPRIA$ FOR USE AS PERMANENT TRENCH BWAKERS INCLUDE SANDBAGS OR CONCRETE FILLED SAM. TOPSOIL SHALL NOT BE USED
FOR TRENCH BREAKERS
3. TRENCH BREAKERS INSTALLED AT WATFRBODY AND YIETLAND CROSSINGS SHALL BE CONSTRUCTED OF IMPERVIOUS MATERIALS (CONCRETE FILLED SACKS).
4, BREAKER SPACING AND CONFIGURATION MAY BE CHANGED AS DIRECTED BY MVP. DEPTH OF DITCH MAY VARY WITH SITE CONDITIONS.
5. ALL MATERIALS SHALL BE SUPPLED BY CONTRACTOR.
8. TRENCH BREAKERS ARE REWIRED AT ALL WA1ERBODY CROSSINGS REGARDLESS OF TRENCH SLOPE OTHERV T NOTE REQUIRED AT SLOPE'S < 51
7. SINGLE TRENCH BREAKERS WALL BE A MINIMUM WIDTH OF 24' AND DOUBLE TRENCH BREAKERS WILL BE A MINIMUM WIDTH OF 36'.
8. FOR SUBSURFACE AND TRENCH BREAKER DRAINAGE DETAILS INCLUDING THOSE FOR STEEP SLOPES, SEE LANDSLIDE MTIGATION TYPICAL DETAILS.
9. FOR SLOPES CXCEEDING 50K CONCRETE FILLED SACKS ARE REWIRED UNLESS OTHERWSE APPROVED BY MVP.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Valley
PIPELINE ui
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TYPICAL TRENCH BREAKER
REQUIREMENTS
H-650-TYP
DRAWING NO. REV.
MVP-SG-20 I P1
PIPELINE
6" PERFORATED,
CORRUGATED
DRAIN PIPE
MAINLINE CROSS SECTION
16" TO 18"
-STANDARD TRENCH
BACKFILL
F" TO 6"
OVERLAP GEOTEXTILE V)
0
`
FILTER FABRIC
Z
T.O.P.
UN -COMPACTED >
1" STONE (TYP)
N
w
B.O.P.
0
-6" PERFORATED 7
CORRUGATED
DRAIN PIPE
TO 6"
SECTION A -A
6" SOLID
DRAIN PIPE
.CUT PIPE
TO MATCH
TOPOGRAPHY
�YARD OF
RIPRAP FOR
DISPERSION
16" TO 18"
B.O.P.
TO 6"
SECTION B-B
SOIL BAC
6" SOLID
DRAIN PIPE
NOTES
1. LOW POINT DITCH DRAINS SHALL BE INSTALLED AT LOCATIONS SPECIFIED IN THE APPROVED EROSION & SEDIMENTATION
CONTROL PLAN, AND AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR.
2. FILL STONE SHOULD BE 1" AGGREGATE WITHOUT FINES, CRUSHER RUN WITHOUT FINES, OR EQUIVALENT.
3. DRAIN PIPE TO BE CONNECTED USING STANDARD PIPE COLLARS.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED
XXX
DATE X/X/2018
M
Mountain Va I I ey
APP'D
XXX
DATE X/X/201B
PIPELINE
SCALE
N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
SIDEHILL LOW -POINT DRAIN
TYPICAL
DRAWING NO. REV.
MVP-SG-24 P1
CON
N OTES:
1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING
CONSTRUCTION ON STEEP LONGITUDINAL SLOPES.
2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES.
3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 3D% (1T) AND UP
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
M Mountain Valley
APP'D
XXX
DATE
X/X/2018
PIPELINE u�
SCALE
N.T.S.
SHEET
1 OF 1
I JOB NO.
I PROJECT ID:
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "B" SOIL
TYPICAL CONSTRUCTION DETAIL
MAINLINE CONSTRUCTION
STEEP HILL PARALLEL CONSTRUCTION
NO TOP SOIL SEGREGATION
H-650-TYP
DRAWING NO. REV.
MVP-SG-31 I P1
a
p \a
=i
'p
co
PVC PIPE CONNECTED o -
TO TRENCH BREAKER a Q
DRAIN OUTLET
Q
DRAIN PIPE DAYLIGHTS
AT R.O.W EDGE
d
� zI 14
COMPOST FILTER SOCK O + I
DR EQUIVALENT Ics
O RIP -RAP 1 V
{AS NEEDED)_
SPOIL PILE � � � 4--------------
NOTES:
1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING
CONSTRUCTION ON STEEP LONGITUDINAL SLOPES.
2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES.
3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 30% (17) AND UP.
DRAWN TRC
DATE 8/7/2018
CHECKED XXX
DATE X/X/2018
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
III Mountain Valley
PIPELINE u,
THIS TYPICAL CONSTRUCTION DETAIL IS 114TENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS,
DRAWING ASSUMES TYPE °B" S01
TYPICAL CONSTRUCTION DETAIL
MAINLINE CONSTRUCTION
STEEP HILL STOVE PIPE CONSTRUCTION
NO TOP SOIL SEGREGATION
DRAWING NO. REV.
MVP-SG-32 P1
A 4"0 DRAIN PIPE
CAP END OF PIPE DAYLIGHT AT LOW POINT
3 OF TRENCH
0
N_
2
H
PERFORATED
DRAIN PIPE
SOLID
DRAIN PIPE
TRENCH
BREAKER
PIPELINE
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
N
A RIP -RAP APRON
(6--12- ROCK)
AT OUTLET
APRON LENGTH - 13'
INITIAL WIDTH - 1.5'
TERMINAL WIDTH - 13.5'
PLAN
SCALE: NOT TO SCALE
PERMEABLE
TRENCH
BREAKER
�
PERFORATED SOLID
DRAIN PIPE DRAIN PIPE
SECTION A -A
SCALE: NOT TO SCALE
M Mountain Valley
PIPELINE uc
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TRENCH BREAKER DAYLIGHT DRAIN
H-650-TYP
DRAWING NO. REV.
MVP-SG-35 I P1
rI
SEE NOTE 1
SEE NOTE 2
SEE NOTE 1
C A
o +/- 50'
i
rn c�
� N
a ----------------------------------------------------------
DAYLIGHT TO
ROCK
APRON
U�o/STUBBED
BUT
LOCATE CUT OFF DRAI
+/- 2' BELOW SEEP/
AREAS #57 TO EXTEN
INTO SEEP AREA
NOTES:
6"0 DRAIN PIPE
OI 1. PERFORATED PIPE SURROUNDED BY #57 STONE.
2. SOLID PIPE (IN TRENCH) SURROUNDED BY TRENCH BACKFILL.
V
DRAWN TRC DATE 8/7/2018
o CHECKED XXX DATE X/X/2018
C
APP'D XXX DATE X/X/2018
C
n SCALE N.T.S. SHEET 1 OF 2
E
0
JOB NO.
0
PROJECT ID:
T
0
0
0
H-650-TYP
c�
3
0
N
x
C
PLAN
SCALE: NOT TO SCALE
SECTION C-C
SCALE:NOT TO SCALE
r9 Mountain Valley
191994103
DAYLIGHT TO
ROCK
APRON
kYLIGHT TO
P-RAP
'RON
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
CUTOFF DRAIN-SIDEHILL
DRAWING NO. REV.
MVP-SG-36A P1
:ile Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-36A.dwg
1:1LN3yI��liZN 7U1�
z
FILTER FABRIC
AROUND STONE
(OVERLAP 12")
z
N
:Iis] 3911mfiZN:7-1 110
aK 41
----�!r-� ' ' '
IPERFORATED 6"0 SOLID PIPE
PIPE
MR
18"-24"
SECTION A -A
SCALE: NOT TO SCALE
FROM MVP—SG-36A
z
a
T
IO
DRAWN
TRC
DATE 8/7/2018
0 CHECKED
XXX
DATE X/X/2018
c
APP'D
XXX
DATE X/X/2018
c
SCALE
E
N.T.S.
SHEET 2 OF 2
0
JOB NO.
w
0
PROJECT ID:
T
0
0
0
H-650-TYP
r9 Mountain VallPJPELIey
18"-24"
SECTION B-B
SCALE: NOT TO SCALE
FROM MVP—SG-36A
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
CUTOFF DRAIN-SIDEHILL
DRAWING NO. REV.
MVP-SG-36B P1
ile Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-36B.dwg
PERFORATED DRAIN PIPEI SOLID DRAIN PIPE
SOLID DRAIN PIPE
DRAIN PIPE
PERFORATED
DRAIN PIPE
SOLID
DRAIN PIPE
DAYLIGHT INTO
RIP —RAP APRON
TO GRADE
FILTER FABRIC
(OVERLAP 12")
AASHTO #57 STONE
(UNCOMPACTED)
6"0 PERFORATED
PIPE
18"-24"
�1
SECTION A -A
SCALE: NOT TO SCALE
ZT �BACKFILL TO GRADE
v Muhl
PLAN
PIPI
--------------
DAYLIGHT INTO
RIP —RAP APRON
NOTES:
1. EACH CUTOFF DRAIN SHALL UTILIZE A TRENCH BREAKER DRAIN
(SEE DETAIL 1) TO DRAIN THE TRENCH.
PERMEABLE
TRENCH BREAKER
I_ _I
TRENCH BACKFILL TRENCH BREAKER DRAIN
.�
(SEE MVP—SG-35)
m
cc/)
6"0 SOLID PIPE
SECTION C-C
SCALE:NOT TO SCALE
I=
a
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
18"-24"
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
V
I� ►�
DEPENDING UPON FIELD CONDITIONS AND OR
ri
V
SECTION B-B
REGULATORY REQUIREMENTS.
SCALE:NOT TO SCALE
DRAWN
TRC
DATE 8/7/2018
r9 Mountain Va I I ey
7, P! P E L I N E u�
TYPICAL CONSTRUCTION DETAIL
o CHECKED XXX
DATE X/X/2018
CUTOFF DRAIN —PLANAR
c
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
o
JOB NO.
a
0
PROJECT ID:
DRAWING NO.
REV.
o
0
0
H-650-TYP
MVP-SG-37
P1
.e Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-37.dwg
U*o/s;1,
�Ul
PIPE
4"0 PERFORATED
DRAIN PIPE
in'
APRON
PLAN
SCALE:NOT TO SCALE
�I• N
� I
aW
w w
DRAWN
TRC
DATE 8/7/2018
r9 Mountain Va I I ey
P!PELINEAPP'D
o CHECKED XXX
DATE X/X/2018
XXX
DATE X/X/2018
C
n SCALE N.T.S.
E
SHEET 1 OF 2
0
JOB NO.
a
0
PROJECT ID:
T
a
o
i
H-650—TYP
4" CAP
WED
1YLIGHT TO
P—RAP
'RON
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TRANSVERSE TRENCH DRAIN
DRAWING NO. REV.
MVP—SG-38A I P1
File Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-38A.dwg
I
C
SECTION A -A
SCALE:NOT TO SCALE
FROM MVP—SG-38A
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
2 OF 2
JOB NO.
PROJECT ID:
TRENCH FILL
FILTER FABRIC
(OVERLAP 12")
4"0
PERFORATED
PIPE
AASHTO #57 STONE
(UNCOMPACTED)
Mountain Valley
PELINE
PACT
BACKFILL
SOLID PIPE
18"-24"
SECTIIDN B-B
FROM MVP—SG-38A
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TRANSVERSE TRENCH DRAIN
H-650-TYP
File Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-38B.dwg
DRAWING NO. REV.
MVP-38B I P1
ROW
i
i
A THIS DWG THIS DWG A
ROW
PLAN
SCALE:NOT TO SCALE
' MIN 'MIN
6"-12" ROCK,
12" THICK
L— '-- J
GEOTEXTILE
4' 1 2' 1 4' FABRIC
SECTION A -A
SCALE: NOT TO SCALE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018 Mau nta i n Va I ley
APP'D XXX DATE X/X/2018 PIPELINE u�
SCALE N.T.S. SHEET 1 OF 1
ROCK LINED SWALE
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-39 P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\ Draw ings\Typicals\MVP- SG- 39.dwg
NATURAL DRAIN
ROW
A THIS DWG
ROW
NATURAL DRAIN
Iftl A\1
RESTORE NATURAL DRAIN
AND ADD RIP —RAP
THIS DWG A
' MIN 1' MIN
2" 1OCK,
1THICK
c/)
W
d'
Pd GEOTEXTILE
FABRIC
VARIES
DEPENDING ON
DIMENSIONS OF
NATURAL DRAIN
SECTION A -A
SCALE: NOT TO SCALE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC
DATE 8/7/2018
Mau nta i n Va I ley
PIPELINE u�
TYPICAL CONSTRUCTION DETAIL
CHECKED XXX
DATE X/X/2018
RIP -RAP NATURAL DRAIN
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
DRAWING NO.
MVP-SG-40
REV.
P1
File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP- SG- 40.dwg
3
O
DOWN
HILL
1
SLOPE BREAKER
(PER ESCP DRAWINGS)
ADD 3"-6" ROCK
TO LINE SLOPE
BREAKER
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
PIPELINE
3
O
w
PLAN
SCALE: NOT TO SCALE
SLOPE BREAKER
(PER ESCP DRAWINGS)
SECTION A -A THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
SCALE:NOT TO SCALE THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
1'1 Mountain Valley
PIPELINE u�
RIP -RAP SLOPE BREAKERS
H-650-TYP
DRAWING NO. REV.
MVP-SG-41 I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-41.dwg
COMPACTED BACKFILL
(SEE NOTES SHEET)
MAINTAIN 2' MIN.
CLEARANCE BETWEEN
PIPE AND GEOGRID
COMPACTION
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 3
JOB NO.
PROJECT ID:
LIMITS OF EXCAVATION
1'1 Mountain Valley
PIPELINE u�
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
GEOGRID-SIDEHILL
H-650-TYP
DRAWING NO. REV.
MVP-SG-42A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42A.dwg
MAINTAIN 2' MIN.
CLEARANCE BETWEEN
PIPE AND GEOGRID
COMPACTION
DRAWN
TRC
DATE
8/7/2018
ct
CHECKED
0
XXX
DATE
X/X/2018
v APP'D
XXX
DATE
X/X/2018
n SCALE
N.T.S.
SHEET
2 OF 3
v
a JOB NO.
E
'11
PROJECT
ID:
H-650-TYP
SECTION VIEW
SCALE:NOT TO SCALE
Mountain Valley
PIPELINE ccc
PIPELINE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
SLIDE MITIGATION DETAIL
GEOGRID-PLANAR
DRAWING NO. REV.
MVP-SG-42B P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP- SG- 42B.dwg
COMPACTION NOTES
1) ALL ROCKS LARGER THAN 6 INCHES IN SIZE, AND MORE THAN 10 PERCENT BY VOLUME SHOULD BE REMOVED AND PROPERLY
DISPOSED FROM THE BACKFILL MATERIAL
2) THE SUBGRADE AT THE BASE OF THE EXCAVATION SHOULD BE PROOFROLLED WITH A PNEUMATIC TIRED ROLLER OR VEHICLE.
3) THE EXCAVATED AREA SHALL BE BACKFILLED WITH THE CLEANED EXCAVATED SOIL MATERIAL AND COMPACTED IN PLACE.
4) BACKFILL OPERATIONS SHALL BE PERFORMED WHEN SOIL IS SUITABLE FOR COMPACTION (I.E., NOT IMMEDIATELY FOLLOWING A
LARGE RAIN, SNOW, OR ICE EVENT). FROZEN FILL SHALL NOT BE USED.
5) THE BACKFILL SHALL BE PLACED IN COMPACTED LIFTS NO GREATER THAN 12 INCHES.
6) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN COMPACTION ACTIVITY AND THE GAS PIPELINE.
GRAVEL DRAIN NOTES
1) GEOTEXTILE FABRIC SHALL BE TENCATE MIRAFI 140N OR APPROVED EQUIVALENT.
2) THE GEOTEXTILE FABRIC SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS.
3) DO NOT OPERATE CONSTRUCTION EQUIPMENT DIRECTLY ON THE GEOTEXTILE FABRIC.
4) DRAINAGE AGGREGATE SHALL MEET THE REQUIREMENTS OF AASHTO NO. 57 STONE.
5) DRAINAGE AGGREGATE SHALL NOT BE COMPACTED.
GEOGRID NOTES
1) GEOGRID REINFORCEMENT SHALL BE TENCATE MIRAFI 3XT OR APPROVED EQUIVALENT.
2) THE GEOGRID MATERIAL SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS.
3) GEOGRID SHALL BE PLACED HORIZONTALLY ON THE BACKFILL WITH THE PRINCIPAL STRENGTH DIRECTION PERPENDICULAR TO THE
FACE OF THE SLOPE. ADJACENT PIECES OF PRIMARY GEOGRID SHALL NOT OVERLAP BUT ARE TO BE BUTTED SIDE TO SIDE.
4) REMOVE ALL SLACK IN THE GEOGRID MATERIAL AND ANCHOR AS NECESSARY WITH PINS, OR BAGS TO PREVENT SLACK FROM
DEVELOPMENT DURING FILL PLACEMENT AND COMPACTION.
5) FILL IS TO BE PLACED AND SPREAD DIRECTLY ON THE GEOGRID MATERIAL WITH RUBBER TIRED EQUIPMENT ONLY. SPEEDS ARE TO
BE KEPT SLOW WITH AS FEW STOPS AND TURNS AS PRACTICAL
6) DO NOT OPERATE TRACKED EQUIPMENT DIRECTLY ON THE GEOGRID MATERIAL.
7) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN GEOGRID MATERIAL AND THE GAS PIPELINE.
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
3 OF 3
I JOB NO.
I PROJECT ID:
1'1 Mountain Valley
PIPELINE uC
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
GEOGRID NOTES
H-650-TYP
DRAWING NO. REV.
MVP-SG-42C I P1
File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42C.dwg
AASHTO #57 STONE
OR EQUIVALENT
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 2
JOB NO.
PROJECT ID:
c w 3UUU rw rirr
BOTTOM WIDTH OF TRENCH
Ar7@1JYi/11=kr,71
6" MIN.
TRENCH BREAKER BAGS
2"0 SOLID PVC PIPE
(25" LONG)
SECTION VIEW
SCALE:NOT TO SCALE
NOTES:
1. PLACE PVC DRAIN PIPE ON FIRST LAYER OF TRENCH BREAKER
BAGS.
2. PLACE PVC DRAIN PIPE EQUADISTANT FROM THE OUTSIDE EDGE OF
THE 30" GAS PIPE AND THE BOTTOM LIMITS OF THE TRENCH.
3. EXTEND PVC PIPE THROUGH ENTIRE TRENCH BREAKER AND EXTEND
APPROX. 1" PAST END OF BREAKER.
4. AASHTO#57 STONE SHALL BE PLACED TO A MINIMUM 6" THICKNESS
UPSLOPE OF THE DRAIN PIPE.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
1'1 Mountain Valley
PIPELINE uc
TRENCH BREAKER
PASS -THROUGH DRAIN
H-650-TYP
DRAWING NO. REV.
MVP-SG-43A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43A.dwg
TF
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
2 OF 2
JOB NO.
PROJECT ID:
■ E AWN 1/11T\AI
M Mountain Valley
PIPELINE ur
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TRENCH BREAKER
PASS -THROUGH DRAIN
H-650-TYP
DRAWING NO. REV.
MVP-SG-43B I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43B.dwg
GROUND SURFACE
WEEPHOLE
DRAINS
SAKRETE REVETMENT
(MIN 2' THICK)
MIN 6° BATTER
#5 EPDXY —COATED
REBAR
ROAD OR STREAM
CROSSING
MAINTAIN MIN. 2' CLEARANCE
BETWEEN REBAR AND PIPELINE
GAS PIPE
EQT NOTES:
1. SAKRETE BAGS SHOULD EXTEND 4 BAGS DEEP PIPE SHOULD BE
COMPLETELY SURROUNDED BY SAND BAGS, OR CRUSHED ROCK
(MAX 6").
2. SAKRETE BAGS SHOULD BE STAGGERED IN A MASONRY FASHION.
THE FACE OF THE WELL SHALL BE INCLINED 6'-10° FROM
VERTICAL.
3. #5 REBAR SHOULD BE DRIVEN THROUGH THE SAKRETE BAGS (SEE
DETAIL 1).
4. 2"0 PVC WEEPHOLE DRAINS SHALL BE INSTALLED EVERY 15 FT.
DOUBLE
SAKRETE TRENCH
BREAKER W/DRAIN
— WRAP PIPE
IN ROCKSHIELD AND SURROUNDED
BY FABRIC SAND BAGS
ROCK TRENCH
17
BACKFILL TRENCH
W/SAND BAGS OR
CRUSHED ROCK
SIDE VIEW
SCALE:NOT TO SCALE
DRAWN TRC
DATE
8/7/2018
CHECKED XXX
DATE
X/X/2018
M
Mountain Valley
APP'D XXX
DATE
X/X/2018
PIPELINE
SCALE N.T.S.
SHEET
1 OF 2
JOB NO.
PROJECT ID:
SAKRETE TOE KEY
TOE KEY FULLY ENCASED
IN SAKRETE BAGS
12" GRAVEL
LEVELING BASE
USE STONE FOR LEVELING ROCK BASE.
IF BASE IS NOT IN ROCK, USE 12"
STONE LAYER FOR BASE.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
SLIDE MITIGATION
HIGHWALL REVETMENT
SIDE VIEW
H-650-TYP
DRAWING NO. REV.
MVP-SG-44A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP-SG-44A.dwg
#5 EPDXY —COATED
REBAR DRIVEN INTO
PLACE. OVERLAP
REBAR MIN. 3 BAGS.
SPACE REBAR 12"
HORIZONTALLY.
2"0 SCH. 40 SOLID
PVC PIPE
GAS
(SPACE REBAR TO
MAINTAIN
MIN. 2'
CLEARANCE
FROM PIPELINE)
FRONT VIEW
SAKRETE BAGS
(MIN 2' THICK)
SAND BAGS
OR CRUSHED ROCK. SAND
BAGS SHALL BE OF A
MATERIAL THAT DOES NOT
SHIELD CATHODIC
PROTECTION CURRENT
(CLOTH BAGS PREFERRED).
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
2 OF 2
JOB NO.
PROJECT ID:
GAS PIPE
i PVC WEEPHOLE
kINS (SEE DETAIL #2)
12" STONE
LEVELING BASE
1 "0 GRAVEL SURROUND PIPE
INLET. EXTEND PVC PIPE
INTO GRAVEL MIN 3"
BACK OF ROCK TRENCH
�J I THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DRAIN DETAIL DEPENDING UPON FIELD CONDITIONS AND OR
SCALE: NOT TO SCALE REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
1q Mountain Valley
PIPELINE SLIDE MITIGATION
HIGHWALL REVETMENT
FRONT VIEW AND DRAIN DETAIL
H-650-TYP
DRAWING NO. REV.
MVP-SG-44B I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-44B.dwg
SAKRETE OR RIPRAP REVETMENT
(MIN 2' THICK)
SAKRETE BREAKER
WITH DRAIN
(NOT SHOWN)
SPACING TBD
BY ENGINEER
>XN-
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
SIDE VIEW
SCALE: NOT TO SCALE
1'1 Mountain Valley
PIPELINE u�
SANDB gFIL RUSHED
ROCKACK
COMPETENT SOIL OR ROCK
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
STEEP SLOPE REVETMENT
H-650-TYP
DRAWING NO. REV.
MVP-SG-45 I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-45.dwg
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Valley
PIPELINE u�
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
BROW DITCH DETAIL
H-650-TYP
DRAWING NO. REV.
MVP-SG-46 I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-46.dwg
SLOPE
TIMBER
MATS
SLOPE
XISTING GRADE
PIPE BUNDLES - PIPES CONNECTED
BY WELDING OR GALVANIZED STEEL
CABLES,
NOTE:
CFS TO BE INSTALLED AT THE END OF EACH W❑RKING DAY,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Valley
PIPELINE ur
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
TIMBER MAT AND PIPE BUNDLE
TEMPORARY STREAM CROSSING
H-650-TYP
DRAWING NO. REV.
MVP-SG-47 I P1
TIMBER
MATS
SLOPE
GE❑TEXTIL
SLOPE
JERSEY BARRIER
NOTE:
CFS TO BE INSTALLED AT THE END OF EACH W❑RKING DAY,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Valley
PIPELINE ur
XISTING GRADE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
TIMBER MAT AND JERSEY BARRIER
TEMPORARY STREAM CROSSING
H-650-TYP
DRAWING NO. REV.
MVP-SG-48 I P1
STREAM CR❑SSING
BANK TO BANK
CHANNEL /
F
sF WIDTH
Is
WATER FLOW
BAR 10 FT N 10 FT
MIN. MIN.
TEMP,
I
I
I
I
TEMP,
ACCESS
SLOPE
I
TIMBER
BRIDG
i
�
SLOPE
ACCESS
ROAD
I
I
I
I
ROAD
WATER
N SILT FENCE N si BAR
F (TYP.) sj �C❑MP❑ST
TIMBER MAT N N TIMBER MAT FILTER SOCK
/ ` (TYP,)
PLAN VIEW
M❑BILE BRIDGE
SIDEB❑ARD 10 FT BANK TO BANK 10 FT
MIN. MIN.
WATER TIMBER WATER BAR
BAR BRIDGE
SLOPE SLOPE
GE❑TEXTILE APPR❑XIMATE
EXISTING
�CHANNEL� GROUND
WIDTH
CROSS SECTION - MOBILE BRIDGE
NOTES:
1. INSTALL WATER BARS OR SILT FENCE AT APPROACHES TO STREAM CR❑SSING AND COMPOST
FILTER SOCKS ALONG STREAM BANKS, INSTALL COMPOST FILTER SOCK AT OUTLET OF WATER
BARS,
2. MAINTAIN SURFACE OF TEMPORARY EQUIPMENT CR❑SSING TO PREVENT S❑IL
DISCHARGES TO STREAM,
3. APPROACHES TO CR❑SSINGS ARE NOT TO EXCEED A DEPTH OF 6 INCHES ABOVE ❑RIGINAL GRADE,
4. GE❑TEXTILE LINER TO COME UP ON THE SIDES OF THE BRIDGE A MINIMUM OF 18'.
5. SIDEB❑ARDS TO BE ATTACHED TO THE UPPER DECK, GE❑TEXTILE TO BE WRAPPED AROUND
SIDEB❑ARDS PRI❑R TO FASTENING,
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC
DATE 8/7/2018
M Mountain Valley
PIPELINE ur
TYPICAL CONSTRUCTION DETAIL
CHECKED XXX
DATE X/X/2018
MOBILE BRIDGE
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP-SG-49
P1
APPR❑XIMATE
EXISTING
GROUND BANK TO BANK
CHANNEL
WIDTH
BAILEY PANEL d FLOW
I � I
TEMPORARY
�
ACCESS
R❑AD
TEMPORARY
ACCESS
ROAD
DRAWN TRC
DATE 8/7/2018
CHECKED XXX
DATE X/X/2018
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
i
S❑LID BRID
DECK
i
a
REINF❑RCE
FILTRATI❑N
a
SUPP❑RT
DEVICE
I
(TYP.)
I
9
410
/
PLAN VIEW
S❑LID
DECK
BAILEY PANEL —
SUPPORT ------
REINF❑RCED
�j
FILTRATI❑N
DEVICE PROFILE
1'1 Mountain Valley
PIPELINE ur
-APPR❑XIMATE
TOP OF BANK
EXISTING
GROUND
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
MODULAR TEMPORARY
BAILEY BRIDGE
DRAWING NO. REV.
MVP-SG-50 P1
U) U)
J J
o TOPSOIL DITCH o
STORAGE SPOIL
STORAGE
i 12" v
zo TOPSOIL o
/\\ 7 j\\ j\\(MAX.)
0
CONSTRUCTION
MATS
REFER TO REFER TO
NOTES 1, 2, g' NOTES 1, 2,
AND 3 AND 3
10' 50' 15'
TEMP. PERM. ROW WIDTH TEMP.
ROW ROW
WIDTH 35' J. 40' WIDTH
SPOIL SIDE WORKING SIDE
75'
CONSTRUCTION ROW WIDTH
NOTES:
1. TOPSOIL SEGREGATION/REMOVAL WILL ONLY BE CONDUCTED WITHIN THE PERMANENT EASEMENT AT ALL WETLAND
CROSSINGS IN VIRGINIA.
2. GRUBBING ACTIVITIES SHALL BE LIMITED TO THE PERMANENT EASEMENT AT ALL WETLAND CROSSINGS IN VIRGINIA.
OUTSIDE OF THE PERMANENT EASEMENT, WETLAND VEGETATION SHALL ONLY BE REMOVED AT OR ABOVE THE GROUND
SURFACE. WOODY VEGETATION WITHIN THE TEMPORARY EASEMENT SHALL BE CUT AT GROUND SURFACE WITH THE STUMPS
TO REMAIN IN -PLACE.
3. WETLAND CROSSINGS IN VIRGINIA SHALL BE CONDUCTED IN ACCORDANCE WITH NWP12 GENERAL AND NORFOLK DISTRICT
REGIONAL CONDITIONS.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'D XXX DATE X/X/2018 PIPELINE ccc
SCALE N.T.S. SHEET 1 OF 1 WETLAND CROSSING TYPICAL FOR
JOB N0. USACE NORFOLK (VA) DISTRICT
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-53 P1
0
�a
co
w W
u N
N
O
z zcn
-J
N
O
co
ww
}�O~
wa��
)
ALL
N
--wTr
>�=w
-- a
9
LL
N
Z=wZ
z
w
a�o�
c w
�OOz
�
W �
CL
U
m
W
O
(v�,
v
—°T
n
i
I..L
CDQ
e►
a3
W
W
z�J
U
Q
J
W
U
a
a
C ■^/\
V
N
O
J
''W^
VJ
O''^^
QZ
W
111
VJ
1
O
���
�\
�r.n�.
o/
V
/
LL
W
w
J
�J
co
Z
�
J
LU
a
�a
•
O
�
a a
a
d
a
a
a
a
a
d
a d
a
a
a
0
o
z
3
U
m
O
�
C7
Z
�
�
w
❑
(A
U
O
Cl)
Z Z
Z
��
Q
Q
Q
Q
Q❑❑❑❑
W
J
❑
�
�
❑
❑
w
❑
w
❑
w�
❑
�
a
w
F
Z
Z
Z
Z
Z
x
J
x x
x
J�
U
F
7a?
W
LL�����
0 0
0❑
w
7
go
7
7
f0
o.f'
W w7
IXf
m
~
W H❑�
U
U
U
U
U
(�
(� (�
(�
H}
�
U�
W�
m
Q
U
p
m
p
m
p
m
p
m
p
m
0
0 0
0
w'
w
O
a
z
w m�
�����
fn
a
a a
a��
a
0
M.M
V
V
V
N
V
V
V
tp
V
(O tp
V V
[O
V
V
�
(9
Z
W W
Ch Ch
W
Ch
W
Ch
W
Ch
W
C�
W
Ch
W
C�
W
Ch
W
Ch
W W
Ch Ch
W
Ch
W
C�
W
Ch
W
�
a a
a
a
a
a
a
a
a
a
a
a
a
a
Q
U_
~
O
O
N
Z
W
2
U
w
O
UU
5
z
Z
w
w
z
w
z
a
5
�
w
a
a
o
z
O
U
�
m
Qa
S
U
U
O�
a
U
a
p
Z
0
U
g
LL
3
0
?=
Z
U
W
m
❑
�
W
Z
O
p
U
w'
W�
U
U
O
�
C7
Z
N
ZZ
Q
w
U
W
w
J
Z❑
Q
W
w
W
O
Z
W
O
W
L]
w O
a�
a Co
p
�
U
iE
D
d❑
Y
J�
O
U
z
w�
"f
�
F
z�
W
J wJ U
w
z
a�
O
O
O
a�a•a3rm ivaeu\sro�au\s�eunmaVernm\amn - v�Vir�xuios axe wuutaH - cewoe\s�r�roaa\n
SLOPE ROAD SURFACE
�* TOWIIAMS DITCHLINE
PLR SPECTI VE �
VIE W
STAMIZE DITCH V M
APPROPRIM LING SUCH
AS MW OR GRAS5
MVEL SURFACE
----------
ROO 11UN C f ----
-
MIN. SPACNIG
MAX. SPACING
OunET
• PROTECTION
MAX GM
�------ - 10%
OURET PROTECTION
BATED SAT
RETENTION FENCE
GRIWEL
ROADVAY
SMACE
vo-4 Of
MICH pfCK
SUMP
Cully T - DITCH LINE
CROSS SECTION
DRAWN TRC DATE 8/7/2018
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
ITT MountainVall�y
Lc,
ENVIRONMENTAL DETAIL
PROPOSED ACCESS ROAD
TYPICAL LAYOUT
DRAWING NO. REV.
MVP-SG-ES6 P1
STREAM CR❑SSING
TOP ❑F BANK 50 FT
50 FT1j.
SILT FENCESTREAM
(�-,BED SILT FENCE
(TYPJ
FLOW 10 FTCSOIMIN, I SOILPILPILE1
SF -
DAM (SANDBAGINTAKE WATER
BARTRENCH
B---
— --
o
x
PIPELINE PIPELINE
z
o
U
WATER
N ��
BAR DISCHARGE
�
10 Ti 10 FT
v~
MIN. MIN..
o
U
TEMP, T MPORARY EQUIPMENT CROS TEMP,
ACCESS SLOPE (SEE MOBILE BRIDGE DETAIL SHEET SLOPE CCESS
ROAD 12) ROAD
EROSION
CONTROL
DEVICE (TYP,)—,.—��o N N e Cp
SILT FENCE
(TYP.) ENERGY
I
DISSIPATER
NOTES: PLAN VIEW
1. INSTALL EROSION CONTROL DEVICES, TRENCH BREAKERS, PUMP, ENERGY DISSIPATER, AND
DAMS
BEFORE TRENCHING STREAM,
2. PUMP MUST BE OF SUFFICIENT CAPACITY TO CONVEY NORMAL AND/OR EXISTING STREAM FLOW
OVER TRENCH, A BACK-UP PUMP OF EQUAL CAPACITY MUST BE AVAILABLE ON -SITE DURING
CONSTRUCTION OF THE PIPELINE CROSSING. PUMPS WILL BE PLACED WITHIN SECONDARY
CONTAINMENT,
3. PLACE SOIL PILES A MINIMUM OF 10 FEET FROM TOP OF BANK,
4. INSTALL WATER BARS AT APPROACHES TO STREAM CROSSING AND EROSION CONTROL DEVICES,
SILT
FENCE, OR SUPER SILT FENCE (AS INDICATED ON PLAN SHEETS),
5. MAINTAIN SURFACE OF TEMPORARY EQUIPMENT CROSSING TO PREVENT SOIL DISCHARGES TO
STREAM,
6. APPROACHES TO CROSSINGS ARE NOT TO EXCEED A DEPTH OF 6 INCHES ABOVE
ORIGINAL GRADE,
7. RESTORE AREA TO ORIGINAL CONTOURS,
DRAWN TRC
DATE 8/7/2018
M Mountain Valley
PIPELINE ur
ENVIRONMENTAL
DETAIL
CHECKED XXX
DATE X/X/2018
STREAM
CROSSING
APP'0 XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
DAM AND
PUMP
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP-SG-ES8
P1
BONDING STRIP
(1" x $" x 24")
4 STAPLES
(1 "x 1a') GROUND LINE
------ -- --
BOTTOM OF
TRENCH LINE
POST (OAK)
(1-3/4" X 1-1/4" X 48")
Black Band I� U MAX O.C. �I
26" 36" SILT -SAVER
PRIORITY 2 FABRIC
TRENCH
22"
4' LONG WOOD POST (OAK)
SPACED AT 6-0"
FRONT ELEVATI❑N
PRI❑RITY 2
TAKEN FROM SILT —SAVER, INC OR EQUAL
NOTES:
THE TYPE OF REINFORCED FILTRATION DEVICE (PRIORITY 1 OR PRIORITY 2) WILL BE SELECTED BASED ON FIELD
CONDITIONS DURING CONSTRUCTION
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'O XXX DATE X/X/2018 PIPELINE ur
BELTED SILT RETENTION
SCALE N.T.S. SHEET 1 OF 1
FENCE (BSRF)
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650—TYP MVP—SG—ES9.1 P1
STANDARD SYMBOL
DETAIL E-3 SUPER SILT FENCE I hSSF-�
10 FT Max.
IN MIN.
GROUNDf7777
SURFACE36 IN MIN.
2% IN GALVANIZED CHAIN LINK FENCE NTH
GALVANIZED WOVEN SLIT FILM GEOTEXTILE
STEEL OR
ALUMINUM POSTS
ELEVATION
CHAIN LINK FENCING
WOVEN SLIT FILM GEOTEXTILE
fiLOW
EMBED GEOTEXTILE AND
CHAIN LINK FENCE 8 IN
MIN. INTO GROUND
CROSS SECTION
CONSTRUCTION SPECIFICATIONS
1. INSTALL 2% INCH DIAMETER GALVANIZED STEEL POSTS OF 0.095 INCH WALL THICKNESS AND SIX FOOT
LENGTH SPACED NO FURTHER THAN 10 FEET APART. DRIVE THE POSTS A MINIMUM OF 36 INCHES
INTO THE GROUND,
2. FASTEN 9 GAUGE OR HEAVIER GALVANIZED CHAIN LINK FENCE (2% INCH MAXIMUM OPENING) 42
INCHES IN HEIGHT SECURELY TO THE FENCE POSTS WITH WIRE TIES OR HUG RINGS.
3. FASTEN WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS, SECURELY TO THE
UPSLOPE SIDE OF CHAIN LINK FENCE WITH TIES SPACED EVERY 24 INCHES AT THE TOP AND MID
SECTION. EMBED GEOTEXTILE AND CHAIN LINK FENCE A MINIMUM OF 8 INCHES INTO THE GROUND.
4. WHERE ENDS OF THE GEOTEXTILE COME TOGETHER. THE ENDS SHALL BE OVERLAPPED BY 6 INCHES,
FOLDED, AND STAPLED TO PREVENT SEDIMENT BY PASS.
5. EXTEND BOTH ENDS OF THE SUPER SILT FENCE A MINIMUM OF FIVE HORIZONTAL FEET UPSLOPE AT
45 DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND THE ENDS
OF THE SUPER SILT FENCE.
6. PROVIDE MANUFACTURER CERTIFICATION TO THE INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT
GEOTEXTILE USED MEETS THE REQUIREMENTS IN SECTION H-1 MATERIALS.
7. REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP IN FENCE OR WHEN SEDIMENT
REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEX71LE IF TORN. IF UNDERMINING OCCURS, REINSTALL
CHAIN LINK FENCING AND GEOTEXTILE,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
M Mountain Valley
T PIPELINE uc
TYPICAL CONSTRUCTION DETAIL
SUPER SILT FENCE
H-650-TYP
DRAWING NO. REV.
MVP-SG-ES9.2 I P1
(2) 2"x2"x4B+.. HARDWOOO STAKES.
WRAPPED TOGETHER WITH 16 GUAGE
WIRE. 10' O.0
2'x2"x36" HARDWOOD STAKE, 10' O.C..
12" A13OVE SOCK STARTING S FROM ANGLED STAKES
BLOWNIPLACED FILTER MEDIA
REMOVE BRUSH & WOODY DEBRIS
UNDISTURBED GROUND
18" MINIMUM,
��31i�r�
F
f1�1
JiJl ,j� ri.
ter,:, ���;L�
.•,,1-r -„?�;: �.��:;-
NOTES:
THE TYPE OF REINFORCED FILTRATION DEVICE (PRIORITY 1 OR PRIORITY 2) WILL BE SELECTED BASED ON FIELD
CONDITIONS DURING CONSTRUCTION
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'D XXX DATE X/X/2018 PIPELINE ur
STACKED COMPOST FILTER SOCK
SCALE N.T.S. SHEET 1 OF 1
DETAIL CROSS SECTION VIEW
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-ES9.3 P1
PA DEP
IMPERVIOUS -t
I+at;TATC11IF[ ll.lV,IIakha;IA191:111r1-TOPE:0R61:iIli 1e17■;T_l i:0;[*1Ti►1
FIGURE 3.13
Jersey Barrier Cofferdam — End View
SANDBAG TO HOLD IMPERVIOUS �
LINER IN PLACE
WORK AREA
IMPERVIOUS LINER EXTENDED TO
STREAM BOTTOM AND SECURED WITH
SANDBAGS
SANDBAG
NORMAL STREAM FLOW JEFtSEY
BARRIER
OPTIONAL SANDBAG PLATFORM
NOTES: AT NO TIME, SHOULD MORE THE 60% OF THE STREAM CHANNEL WIDTH BE DIVERTED DURING
PIPELINE INSTALLATION.
GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FEET OF TOP -OF -BANK UNTIL ALL MATERIALS REQUIRED TO
COMPLETE CROSSING ARE ON SITE AND PIPE IS READY FOR INSTALLATION. TRENCH BREAKERS SHALL BE
INSTALLED WITHIN THE TRENCH ON BOTH SIDES OF THE STREAM CHANNEL (MVP TYPICAL DETAIL MVP-20).
WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG OR
SEDIMENT TRAP PRIOR TO DISCHARGING INTO ANY RECEIVING SURFACE WATER.
HAZARDOUS OR POLLUTANT MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM
THE TOP OF STREAMBANK. ALL EXCESS EXCAVATED MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE
STREAM CROSSING AREA.
ALL DISTURBED AREAS WITHIN 50 FEET OF TOP -OF -BANK SHALL BE BLANKETED OR MATTED WITHIN 24
HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR
MAJOR STREAMS UNLESS OTHERWISE AUTHORIZED.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Malley
PIPELINE iu
ENVIRONMENTAL DETAIL
COFFERDAM STREAM
CROSSING METHOD
DRAWING NO. REV.
MVP-SG-ES13.2 P1
STANDARD CONSTRUCTION DETAIL
Water Deflector
S IN. x 11 IN- STANDARD GRADE
BBER CONVEYOR BELT
ROAD SURFACE
20C GALVANIZEDJ®RU
DHIPACTED
NAILS (CLINCHBACKFILL
ENDS)
x $1N. niEATED
TIMBER PLANKS
TYPICAL CROSS-SECTION
EDGE OF ROAD
SURFACE FLOW
DOWNGRADE
rp OF ROAD
10" MINIMUM ANGLE
DOWNGRADE
MGE of
IP RAP OUTFALI_ TO
AVOID nOWNWASHING
TYPICAL PLAN VIEW
USDA Forest Service
Deflector shall be inspected weekly and after each runoff event.
Accumulated sediment shall be removed from deflector within 24 hours of inspection.
Belt shall be replaced when worn and no longer effective.
Deflectors may be used to direct runoff from an access road to a well -vegetated area or
sediment removal facility.
A deflector is typically constructed from rubber belting ranging from 5116" to 112" thick
held between two 2" x 8" wooden planks.
This method of directing runoff from an access road works best on low traffic roads,
deflectors can be used on roads with grades exceeding 10g'o.
I ;plu fire Sp ing gt dmau-eased Oipc
x sx
s r�l►
• me
s Irsu
a Ie5
HG
A 15p
IA5
16 OG
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 Mau nta i n Va I ley
APP'D XXX DATE X/X/2018 PIPELINE uc
SCALE N.T.S. SHEET 1 of 1 WATER DEFLECTOR
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-ES14 P1
WOOD
HEIGHT IF RICK FILTER = %
HEIGHT IF STRAW BALES IR
FILTER FABRIC FENCE
OUTLET CROSS SECTION
3' MIN.
UP -SLOPE FACE
MPOST
MCHORED
6' SUMP
#57
STRAW BALES OR
FILTER FABRIC
A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE OF A SILT FENCE OR
STRAW BALE BARRIER HAS OCCURRED DUE TO CONCENTRATED FLOW. ANCHORED
COMPOST LAYER SHALL BE USED ON UPSLOPE FACE IN HQ AND EV WATERSHEDS.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 113 THE HEIGHT OF THE
OUTLET.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Valley
PIPELINE LLC
ENVIRONMENTAL DETAIL
ROCK FILTER OUTLET
DRAWING NO. REV.
MVP-SG-ES17 I P1
STANDARD CONSTRUCTION DETAIL #3-5
Waterbar
16, MIN
ORIGINrU.
ROAR
GRADE
NOT REGOMMENOE3
FOR ACTIVE ROADS
ORIENT AT 2%GRADIENT
TO tO W 510 E OF: ROAD
Adapted from USDA Forest Service
Waterbars shall discharge to a stable area.
Waterbars shad be inspected weekly (daily on active roads) and after each runoff event.
Damaged or eroded waterbars shall be restored to original dimensions wilhin 24 hours of
inspection.
Maintenance of waterbars shall be provided until roadway, skidtrail, or right-of-way has
achieved permanent stabilization.
Waterbars on retired roadways; skidtrails, and right-of-ways shall be left in place after
permanent stabilization has been achieved.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
TABLE 3.1 — Maximum Waterbar Spacing__
PERCENT SLOPE - SPACING (FT)_ -_
If <5 250
5 - 15 150
15 - 30 J 100
> 30 50
Adapted from USDA Forest Service
1'1 Mountain Malley
PIPELINE uC
ENVIRONMENTAL DETAIL
WATERBAR
DRAWING NO. REV.
MVP-SG-ES19 P1
Rock Construction Entrance with Wash Rack
COLLECTOR
/ CHANNEL
DISCHARGING TO
SEDIMENT BASIN
OR TRAP
WASH RACK
AASHTO #1 ROCK
(8" THICK) EXTENDING
25' MIN. ON BOTH
APPROACHES TO
WASH RACK
6' (Min)
llpp=�illl
o 11 5111 I
REINFORCED DRAIN SPACE
CONCRETE OR
WELDED STEEL PIPE
Modified from Smith Cattlequard Company
IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF
ROCK CONSTRUCTION ENTRANCE BY 70 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR
INSTALL WASH RACK.
Wash rack shall be 20 feet (min.) wide or total width of access.
Wash rack shall be designed and constructed to accommodate anticipated construction
vehicular traffic.
A water supply shall be made available to wash the wheels of all vehicles exiting the site.
MAINTENANCE: Rock construction entrance thickness shall be constantly maintained to the
specified dimensions by adding rock. A stockpile of rock material shall be maintained on site
for this purpose. Drain space under wash rack shall be kept open at all times. Damage to the
wash rack shall be repaired prior to further use of the rack. All sediment deposited on
roadways shall be removed and returned to the construction site immediately. Washing the
roadway or sweeping the deposits into roadway ditches, sewers, culverts, or other drainage
courses is not acceptable.
A metal wash rack or livestock grate is an acceptable alternative to the reinforced concrete
one shown in the standard detail. Approaches to the wash rack should be lined with aashto #1
at a minimum of 25' on both sides. The wash rack should discharge to a sediment removal
facility, such as a vegetated filter strip or into a channel leading to a sediment removal device
(e.g. a sediment trap or sediment basin). Rock construction entrances with wash racks should
be maintained to the specified dimensions by adding rock when necessary at the and of each
workday. A stockpile of rock material should be maintained on site for this purpose.
Sediment deposited on paved roadways should be removed and returned to the construction
site.
NOTE: Washing the roadway or sweeping the deposits into roadway ditches, sewers, culverts,
or other drainage courses is not acceptable. Damaged wash racks should be repaired as
necessary to maintain their effectiveness. In lieu of washrack installation, MVP will extend the
RCE by 70' increments until mud tracking condition is alleviated.
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Malley
PIPELINE uC
ENVIRONMENTAL DETAIL
ROCK CONSTRUCTION ENTRANCE
WITH WASH RACK
DRAWING NO. I REV.
H-650—TYP
MVP—SG—ES20 I P1
Riprap Streambank Protection with Optional Live Stakes
CROSS SECTION
H07 TO SCALE __ =•r� ,> ..
MAY. SLOPE 2114:1V
•G
�
C
STRLAAVfAlU[
K
y
� ERoslol!
CONTROL
`� •
HLANI[LT
rpFA4STOUT
NORM A L FLOW I3EP I '.: ;! - `2 TOS Ffff
- - -'� (TRIkl1GULAR SPAONGy
I
_ - LIVE CUT rING
i r 11 To 1117 FIICHCS N1 11TAME7Fk
RIPRAP TOE PROTECTION
HOTE:A40►EU.LEAFEDCOHUITIOU OF fHEL;V;HG
• GEOTE%TILE
�` � `'" . �• "� FLAI11 YHR rEYT1AL IS lY[71 REPl1tSf11 E Al IVt 611- I t}t
11ME OF HIS TALL AT 10R.
Adapted from USDA NRCS, Engineering Field Handbook, Chapter 15
Filter stone may be substituted For the geotextile where site and sail conditions warrant.
NOTE: Extend riprap into streambed only as far as required to provide proper toe support.
DRAWN TRC DATE 8/7/2018
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Malley
PIPELINE u�
ENVIRONMENTAL DETAIL
RIPRAP STREAMBANK PROTECTION
WITH OPTIONAL LIVE STAKES
DRAWING NO. REV.
MVP-SG-ES25 P1
FOR PERMANENT ACCESS ROADS USE 4"
COMPACTED AASHTO #357 CLEAN STONE.
FOR MLV PADS USE 4" COMPACTED
AASHTO #57 STONE.
UNDISTURBED SOIL
EXISTING GRADE
/ FOR PERMANENT ACCESS ROADS USE
MINIMUM 8" AASHTO #3 STONE.
FOR MLV PADS USE 8" TO 20" AASHTO
#3 STONE.
8-OZ. NON -WOVEN
GEOTEXTILE
COMPACTED SUBGRADE
NOTESI
1. THICKNESS OF AASHTO #3 STONE/AGGREGATE LAYER FOR MLV PADS TO BE
BETWEEN 8' AND 20' DEPENDING ON THE STORAGE VOLUME NEEDED TO MEET
ST❑RMWATER QUANTITY REQUIREMENTS.
2, THICKNESS OF ASSHT❑ #3 STONE/AGGREGATE LAYER FOR ACCESS ROADS TO BE
A MINUMUM OF 8' OR MORE AS DIRECTED.
3, COMPACT SUBGRADE PRI❑R TO BACKFILL PLACEMENT, FOR BACKFILL, A MIN. 95%
C❑MPACTI❑N (ASTM D 698) IS REQUIRED.
4, UNSUITABLE MATERIAL SHALL BE REMOVED PRI❑R TO SUBGRADE C❑MPACTI❑N AND
BACKFILL PLACEMENT. ADDITI❑NAL SUBGRADE C❑MPACTI❑N NOT REQUIRED FOR
MLV PADS.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Malley
PIPELINE uC
ENVIRONMENTAL DETAIL
GAP GRADED GRAVEL DETAIL
FOR MAINLINE VALVE PADS &
PERMANENT ACCESS ROADS
DRAWING NO. REV.
MVP-SG-ES33 I P1
PROPOSED SURFACE
2
1I
N❑TEI
EXISTING SURFACES
,.
4 6%SLOPE
_i MIN. DEPTH 12"
2
"
TOP SOIL TO BE REMOVED
AND FILL SLOPE TO BE
KEYED INTO EXISTING SOIL.
11
H
BOTTOM
WIDTH 2'
1, INSL❑PE WITH DITCH SECTI❑N FOR USE ON STEEP SLOPE AND AREAS WITH
POOR S❑ILS,
2, ER❑SI❑N CONTROL MATTING TO BE INSTALLED ON CUT AND FILL SLOPES
STEEPER THAN 3H11V, SLOPES LESS THAN 3H11V WILL BE MULCHED PER
MVP-ES45 TO MVP-ES45,5,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
T PIPELINE ..
M,
ENVIRONMENTAL DETAIL
PROPOSED ACCESS ROAD
TYPICAL SECTION
DRAWING NO. REV.
MVP-SG-ES34 P1
FINISH GRADE
4'-6' FLEXIBLE
PERFORATED
PIPE
WATER
BAR
TRENCH
BREAKER
BOTTOM OF
EXCAVATED TRENCH
GAS PIPELINE
NOTE,
4'-6'
FLEXIBLE PERFORATED PIPE TO BE INSTALLED AT TRENCH BREAKERS ON
STEEP
SLOPES TO DRAIN SUBSURFACE WATER INT❑ WATER BARS.
DRAWN TRC
DATE
8/7/2018
Mountain Valley
P I P E L IN E uC
ENVIRONMENTAL DETAIL
CHECKED XXX
DATE X/X/2018
TRENCH DETAIL
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP-SG-ES35
P1
Typical Wood Mat for Wetland Crossing
All woo<11menters Direction
are 4" n 4" of tra+rrt
3/l6"galrraAtzed
AP10, steel cablt
Connect loops
with 3/16"
cable d 4irnps
2 ft i
10 fl
University cif Minnesota FS 07009
A geotextile underlayment shall be used under the woad mat.
urca:PaDEP,E Pcill_1ticinC-ontrolManual, March 2I]12
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
1'1 Mountain Malley
PIPELINE u�
ENVIRONMENTAL DETAIL
TIMBER MAT/WETLAND CROSSING
H-650—TYP
DRAWING NO. REV.
MVP—SG—ES37 I Pi
LIMITS OF PERMANENT ROW
FLOW
SOIL AMENDMENT
AREA
MINIMUM 2' LONG LEVEL L W
SLOPE BREAKER/ROW
EARTHEN BERM (KEY INTO DIVERSION/WATER BAR
WATER BAR AND SIDE SLOPE)- �p
PLAN VIEW
Compacted Soil EARTHEN BERM AT
END OF WATERBAR
18" min.
--Flow 6
Q
IF
-I�'I ill
4.5' min. � W
SECTION VIEW
N❑TES
1. WIDTH 'W' ❑F S❑IL AMENDMENT PER PERMANENT DIVERSI❑N DIKE/WATERBAR WITH S❑IL AMENDMENT
SCHEDULE.
2. THE INC❑RP❑RATI❑N DEPTH 'D' IS ASSUMED T❑ BE 1 FT PER TABLE 4.3 IN VA DEQ ST❑RMWATER DESIGN
SPEC #4. AN INC❑RP❑RATI❑N DEPTH ❑F 2 FT IS USED IN CASES WHERE ADDITI❑NAL ST❑RAGE CAPACITY
IS NEEDED IN ❑RDER T❑ MEET WATER QUANTITY REQUIREMENTS.
3. DEVEL❑PED FR❑M VA. DSWC PLATE 3.09-1.
4. SEE SHEET 0.7, TEMP❑RARY RIGHT ❑F WAY DIVERSI❑NIWATERBAR ADDITIONAL DETAILS F❑R PLAN VIEW.
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Va ! I ey
APP'D xxx DATE X/X/2018 PIPELINE DIVERSION DIKE/WATERBARS
SCALE N.T.S. SHEET 1 OF 1
WITH COMPOST
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-ES38 P1
SEE
WATERBAR DETAIL
(IF NECESSARY)
COMPOST
FILTER SOCK
BARRIER
SEE DETAIL
12" COMPOST
FILTER SOCK
FLOW
WELL
VEGETATED
AREA
FORAGE AREA WILL BE EXCAVATED TO A
1-1111.ivi.i u11.IENSION OF 1 FOOT DEEP BY 3 FEET WIDE
BY 6 FEET LONG. ADDITIONAL STORAGE, IF REQUIRED, WILL
BE EITHER ADDED THROUGH INCREASING THE SUMP FILTER
DIMENSIONS OR STACKING COMPOST FILTER SOCK TO
INCREASE BMP HEIGHT.
NOTES:
1. SUMP FILTER MAY BE USED IN C❑NJUNCTI❑N WITH TEMPORARY WATERBAR (AS DIRECTED BY OWNER
REPRESENTATIVE),
2. SUMP FILTER SHALL BE LOCATED ENTIRELY WITHIN THE LIMITS OF DISTURBANCE,
3. BMP SHOULD BE CHECKED EVERY 4 BUSINESS DAYS FOR SEDIMENT ACCUMULATI❑N, PROPER
❑PERATI❑N, AND COMPOST FILTER SOCK INTEGRITY,
4. ADDITI❑NAL COMPOST FILTER SOCKS MAY BE NECESSARY BEYOND WHAT IS SHOWN ON DETAIL TO
MEET INTENDED BMP REQUIREMENTS,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Valley
PIPELINE ur
ENVIRONMENTAL DETAIL
TYPICAL SUMP FILTER
DRAWING NO. REV.
MVP-SG-ES42 P1
TYPICAL LAYOUTS:
STREAMS, PONDS & LAKES (PROTECTED & NON -TIDAL)
STREAM FLOW
ANCHOR PT.
�. STAKE OR ANCHOR,
EVERY 100' (TYPICAL)
SHORELINE ® FILL AREA
L1MrM ❑F �_+
CdNSTR. _�
SHORELINE
ANCHOR PT. TURBIDITY ■ THIS DISTANCE IS VARIA13LE
CURTAIN
TIDAL WATERS AND/OR HEAVY WIND & WAVE ACTION
FLOOD
/�- oononccn rnr
SHORELINE BARRIER MOVEMENT SHORELINE
ANCHOR PT. > DUE TO TIDAL CHANGE ANCHOR PT.
■ THIS DISTANCE IS VARIABLE ® FILL AREA
DRAWN TRC
DATE 8/7/2018
CHECKED XXX
DATE X/X/2018
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1�1 Mountain Malley
PIPELINE uc
ENVIRONMENTAL DETAIL
TURBIDITY CURTAIN DETAIL
DRAWING NO. REV.
MVP-SG-ES43 P1
TYPE I
5/8 IN. POLYPROPYLENE ROPE
1/4 IN. TIE ROPE
FOLDS FOR COMPACT STORAGE
ACCORDING TO 'NEED
FLOATATION
ECONOMY FABRICS AVAILABLE
18 OZ. 300 LB/IN. STANDARD
NYLON REINFORCED 'VINYL ALL SEAMS HEAT SEALED 1/4 IN. CHAIN
(BLOW—UP OF SHACKLE CONNECTION)
0
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Malley
PIPELINE uc
ENVIRONMENTAL DETAIL
TURBIDITY CURTAIN DETAIL
DRAWING NO. REV.
MVP-SG-ES43.1 I P1
18 (OR 22) DZ. VINYL COVERED NYLON
TYPE 7
GALVANIZED #24 SAFETY HOOK
WATER TOP LOAD LINE
PVC SLOT -CONNECTOR SEAL 5/16 VINYL COATED CABLE
STRESS PLATE (TO REMOVE \ FLOATATION
\ PRESSURE FROM FLOATS)
100 FT, STANDARD LENGTH
DEPTH ACCORDING TO NEED
STRESS BAND
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
STRESS PLATE
1'1 Mountain Valley
PIPELINE ur
FOLDS EVERY 6 FEET
5/16 IN. CHAIN
BALLAST & LOAD LINE
ENVIRONMENTAL DETAIL
TURBIDITY CURTAIN DETAIL
DRAWING NO. REV.
MVP-SG-ES43.2 I P1
TY P E III
22 OZ. NYLON REINFORCED VINYL STRESS BAND ATATION
PVC BLOT -CONNECTOR FLO
Z�kf:�1Vi1��
,ACCORDING TO NEED
5/16 VINYL COATING CABLE #24 SAFETY HOOK STRESS PLATE LAP LINK
4To REDUCE STUN) OTH SIDES OF CURTAIN
DRAWN TRC DATE 8/7/2018
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
r9 Mountain Valley
PIPELINE .
5/16 IN.
CHAIN
ENVIRONMENTAL DETAIL
TURBIDITY CURTAIN DETAIL
DRAWING NO. REV.
MVP-SG-ES43.3 P1
ORIENTATION WHEN INSTALLED
(TIDAL SITUATION -- TYPE M)
NOTE: ANCHORING WITH BUOYS, ATTACH LINES AUTOMATIC FLASHING
AS SHOWN, REMOVES ALL BUOY TO SHACKLE LIGHT (ON AT DUSK -
VERTICAL FORCES FROM THE OFF AT DAWN) IDO-
CURTAIN. HENCE, THE CURTAIN y y ON CENTER SHALL BE
WILL NOT SINK FROM WINE] OR USED IN NAVIGABLE
CURRENT LOADS. CHANNELS ONLY
MIN 2' ft SSTAN�D COT BUOYM
AN CHO R (AS
WATER SURFACE 5 aC RECOMMENDED
ECOMENDS TU Y THE M
�Q MIN. 12" CURTAIN
� r-- RIVERBED
v ¢ a 4 Q O d v ¢ d d v ¢ O ¢ v O d 9 4 v4
¢ d ¢ p d d 4 ❑ ¢ ❑ O 4 9 ¢ 4 4 O
q d q ¢ ❑
d a
❑ ¢ O ¢ ¢ 4 4 O ❑ 4 ¢❑ 4 4 O v Q 4 O 4 d d Q
❑ ❑ 4 4 a ❑ ❑ ❑ V
¢
4 4 d
DRAWN TRC
DATE 8/7/2018
CHECKED XXX
DATE X/X/2018
APP'D XXX
DATE X/X/2018
SCALE N.T.S.
SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Malley
PIPELINE uc
ENVIRONMENTAL DETAIL
TURBIDITY CURTAIN DETAIL
DRAWING NO. REV.
MVP-SG-ES43.4 P1
TOPSOILING AND SOIL HANDLING FROM SOUTHGATE
Definition
Methods of preserving and using the surface layer of undisturbed soil, often enriched in organic matter, in
order to obtain a more desirable planting and growth medium.
Purposes
To provide a suitable growth medium for final site stabilization with vegetation and promote successful
reforestation.
Conditions Where Practice Applies
1. Where the preservation or importation of topsoil is determined to be the most effective method of
providing a suitable growth medium.
2. Where the subsoil or existing soil presents the following problems:
a. The texture, pH, or nutrient balance of the available soil cannot be modified by
reasonable means to provide an adequate growth medium.
b. The soil material is too shallow to provide an adequate root zone and to supply necessary
moisture and nutrients for plant growth.
c. The soil contains substances potentially toxic to plant growth.
3. Only on slopes that are 2:1 or flatter unless other measures are taken to prevent erosion and
sloughing.
Plannin-a Considerations
Topsoil is the surface layer of the soil profile, generally characterized as being darker than the subsoil due
to the presence of organic matter. It is the major zone of root development, carrying much of the nutrients
available to plants, and supplying a large share of the water used by plants.
Although topsoil provides an excellent growth medium, there are disadvantages to its use. Stripping,
stockpiling, and reapplying topsoil, or importing topsoil, may not always be cost-effective. Topsoiling can
delay seeding or sodding operations, increasing the exposure time of denuded areas. Most topsoil contains
weed seeds, and weeds may compete with desirable species.
Advantages of topsoil include its high organic matter content and friable consistence, water -holding
capacity, and nutrient content.
In site planning, the option of topsoiling should be compared with that of preparing a seedbed in subsoil.
The clay content of subsoils does provide high moisture availability and deter leaching of nutrients and,
when properly limed and Fertilized, subsoils may provide a good growth medium which is generally free
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
ENVIRONMENTAL DETAIL
TOPSOILING & SOIL HANDLING
DRAWING NO. I REV.
H-650-TYP
MVP-SG-ES46 I P1
of weed seeds. In many cases topsoiling may not be required for the establishment of less demanding,
lower maintenance plant material. Topsoil ing is strongly recommended where ornamental plants or high -
maintenance turf will be grown. Topsoi ling is a required procedure when establishing vegetation on
shallow soils, soils containing potentially toxic materials, and soils of critically low pH (high acid) levels.
If topsoiling is to be done, the following items should be considered:
1. Whether an adequate volume of topsoil exists on the site. Topsoil will be spread at a compacted
depth of 2 to 4 inches (depths closer to 4 inches are preferred).
2. Location of the topsoil stockpile so that it meets specifications and does not interfere with work
on the site.
3. Allow sufficient time in scheduling for topsoil to be spread and bonded prior to seeding or
planting.
4. Care must be taken not to apply topsoil to subsoil if the two soils have contrasting textures.
Clayey topsoil over sandy subsoil is a particularly poor combination, as water may creep along
the junction between the soil layers, causing the topsoil to slough. Sandy topsoil over a clay
subsoil is equally as likely to fail.
5. If topsoil and subsoil are not properly bonded, water will not infiltrate the soil profile evenly and
it will be difficult to establish vegetation. Topsoiling of steep slopes should be discouraged unless
good bonding of soils can be achieved.
Specifications
Materials
Field exploration of the site shall be made to determine if there is sufficient surface soil of good quality to
justify stripping. Topsoil shall be friable and loamy (loam, sandy loam, silt loam, sandy clay loam, clay
loam). It shall be free of debris, trash, stumps, rocks, roots, and noxious weeds, and shall give evidence of
being able to support healthy vegetation. It shall contain no substance that is potentially toxic to plant
growth.
In areas where revegetation is of concern based on existing soil conditions and determined by the MVP
Environmental Inspector (EI), topsoil samples shall be taken for analysis. Samples will be collected by
the MVP El and sent to a recognized laboratory for analysis of the following criteria:
Organic matter content shall be not less than 1.5% by weight.
pH range shall be from 6.0-7.5. If pH is less than 6.0, lime shall be added in accordance with soil
test results or in accordanec with the recommendations of the vegetative establishment practice
being used.
Soluble salts shall not exceed 500 ppm.
Soil samples collected and sent for analysis will be identified by the MVP Constructions Spread # and
pipeline station from which the sample was obtained. Areas that fail to revegetate following restoration
will be sampled and analyzed based on the above parameters.
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
r9 Mountain Valley
T PIPELINE u,
ENVIRONMENTAL DETAIL
TOPSOILING & SOIL HANDLING
DRAWING NO. I REV.
H-650-TYP
MVP-SG-ES46.1 I P1
Topsoil lmporting
Topsoil would be imported as needed in residential areas only. if additional off -site topsoil is needed, it
must meet the standards stated above.
Stripping
Topsoil operations should not be performed when the soil is wet or frozen. Stripping shall be confined to
the immediate construction area. A 4-to 6-inch stripping depth is common, but depth may vary depending
on the particular soil. All perimeter dikes, basins, and other sediment controls shall be in place prior to
stripping.
Stockpiling
Topsoil shall be stockpiled in such a manner that natural drainage is not obstructed and no off -site
sediment damage shall result. Stabilize or protect stockpiles in accordance with MS #2.
Excavated subsoil shall be stockpiled separately from topsoil.
Side slopes of the stockpile shall not exceed 2:1.
Perimeter controls must be placed around the stockpile immediately; seeding of stockpiles shall be
completed within 7 days of the formation of the stockpile, in accordance with Std. & Spec. 3.31,
TEMPORARY SEEDING if it is to remain donnant for longer than 14 days (refer to MS # 1 and MS #2).
Site Preparation Prior to and Maintenance During Topsoiling and Excavation
Before topsoiling or excavation, establish needed erosion and sediment control practices such as
diversions, grade stabilization structures, berms, dikes, level spreaders, waterways, sediment basins, etc.
These practices must be maintained during topsoiling and excavation.
Gradin . Previously established grades on the areas to be topsoiled shall be maintained according to the
approved plan.
Liming: Where the pH of the subsoil is 6.0 or less, or the soil is composed of heavy clays, agricultural
limestone shall be spread in accordance with the soil test or the vegetative establishment practice being
used.
Bonding: After the areas to be topsoilcd have been brought to grade, and immediately prior to dumping
and spreading the topsoil, the subgrade shalt be loosened by disking or scarifying to a depth of at least 4-6
inches to ensure bonding of the topsoil and subsoil. Refer to 2.8.3 Soil Compaction Mitigation within the
Project Standards and Specifications for additional inforination,
Apnlving Topsoil
Topsoil shall not be placed while in a frozen or muddy condition, when topsoil or subgrade is excessively
wet, or in a condition that may otherwise be detrimental to proper grading or seeding. The topsoil shall be
uniformly distributed to a minimum compacted depth of 2 inches on 3:1 or steeper slopes and 4 inches on
flatter slopes or to mimic existing conditions present in the adjacent undisturbed areas. (See Table 3.30-A
to determine volume of topsoil required for application to various depths). Any irregularities in the
surface, resulting from topsoiling or other operations, shall be corrected in order to prevent the formation
of depressions or water pockets.
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
M Mountain Valley
ENVIRONMENTAL DETAIL
TOPSOILING & SOIL HANDLING
DRAWING NO. I REV.
H-650-TYP
MVP-SG-ES46.2 I P1
Once the topsoil has been applied to the subgrade the topsoil should be disked and raked. Excess rock
will be removed from at least the top 12 inches of soil to the extent practicable in all cultivated or rotated
cropland, managed pastures, hayfields, and residential areas, as well as other areas at the landowner's
request. The size, density, and distribution of rock on the construction work area shall be similar to
adjacent areas not disturbed by construction. The landowner or land management agency may approve
other provisions in writing. Refer to Standards and Specifications Section 2.8 Final Grading for
additional information.
TABLE 3.30—A
CUBIC YARDS OF T❑PS❑IL REQUIRED FOR
APPLICATI❑N TO VARI❑US DEPTHS
DOH PER 1 AW
PM AM
1 3.1 134
2 6.2 268
3 9.3 4'
4 12A 537
5 15.5 672
6 19.6 BOB
SOURCE, Va, DSWC
Soil Sterilants
No seed shall be placed on soil which has been treated with soil sterilants until sufficient time has elapsed
to permit dissipation of toxic materials.
Special Soil Related Requirements for Working in Wetlands
Norfolk District 2017 Nationwide Permit Regional Conditions, dated March 20, 2017 (subject to revision
in Spring of 2017), NWP 12 — Utility Line Activities items 3.b.iii, 5.a, and 5.b require the following:
1. Minimizing clearing of wetlands. Grubbing shall be limited to the permanent easement for
underground utility lines. Outside of the permanent easement, wetland vegetation shall only be
removed at or above the ground surface unless written justification is provided and the impacts
are reviewed and approved by the Corps.
2. Whenever practicable, excavated material shall be placed on a Corps confirmed upland site.
However, when this is not practicable, temporary stockpiling is hereby authorized provided that:
a. All excavated material stockpiled in a vegetated wetland area is placed on filter cloth, mats, or
some other semi -permeable surface. The material will be stabilized with straw bales, filter cloth,
etc. to prevent reentry into any waterway.
b. All excavated material must be placed back into the trench to the original contour and all
excess excavated material must be completely removed from the wetlands within 30 days after
the pipeline has been laid through the wetland areas. Permission must be granted by the District
Commander or his authorized representatives if the material is to be stockpiled longer than 30
days.
DRAWN TRC
DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
M Mountain Valley
T PIPELINE u,
ENVIRONMENTAL DETAIL
TOPSOILING & SOIL HANDLING
DRAWING NO. I REV.
H-650-TYP
MVP-SG-ES46.3 I P1
SLR
- COMPOST FILTER SOCK OR SUPER
SILT FENCE AS REQUIRED BASED
ON SLOPES AT CROSSING (TYP.)
TOP OF
BANK
50' 3
0
J
LL
I I
TRENCH
TRENCH BREAKER _1"
(TYP.)
SSF
SUMP FILTER
STREAMBANK SWALE
�MIT OF
DISTURBANCE
MAX Z> WtA
BED
PLAN
TIMBER MAT
BRIDGE
PERMANENT WATER BAR
® 2% TRANSVERSE SLOPE
� A
SLOPE
2+00 12" COMPOST 3+00
FILTER SOCK M.
SSF�
10' MIN.
75' LIMIT OF DISTURBANCE 50' PERMANENT
AT WATER -BODY CROSSING RIGHT-OF-WAY
STREAM (TOP OF
BANK WIDTH)
EXISTING TIMBER MAT
GRADE BRIDGE
25 T
_ MAX PERMANENERMANEN —
WATERBAR
z
BOTTOM OF TRENCH
42" PROPOSED NATURAL
GAS PIPELINE
TRENCH BREAKER SECTION A -A
(TYP.)
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'D XXX DATE X/X/2018 PIPELINE ur
SCALE N.T.S. SHEET 1 of 1 TIMBER MAT BRIDGE
STREAM CROSSING
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-ES49 P1
LIMIT OF DISTURBANCE /
/
/ 1
1�P /
/ Q4
�O
5�
/ PROPOSED VEHICLE PULL OFF AREA
/ TO BE SURFACED WITH TIMBER MATS
OR GRAVEL
/
6" MIN. DOT #1
COARSE AGGREGATE
/ WOVEN GEOTEXTILE
LIMIT OF DISTURBANCE FABRIC OR GEOGRID
(AS NEEDED)
—III—III—III—I I I
1(-
PROPOSED
GRAVEL SECTION
/
/ NOTE:
1. NO GRADING ANTICIPATED. IMPROVEMENTS LIMITED TO TEMPORARY GRAVEL PLACEMENT AND TREE REMOVAL
WITHIN LOD.
2. WOVEN GEOTEXTILE FABRIC OR GEOGRID MAY BE PLACED UNDER THE GRAVEL PULL OFF AS NEEDED.
DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL
CHECKED XXX DATE X/X/2018 Mountain Va ! I ey
APP'D XXX DATE X/X/2018 �" PIPELINE uc
SCALE N.T.S. SHEET 1 OF 1 TEMPORARY VEHICLE
PULL OFF DETAIL
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP-SG-ES54 P1