Loading...
HomeMy WebLinkAbout20181638 Ver 4_Attachment J_Construction_Typicals_20250530ATTACHMENT J - CONSTRUCTION DETAILS (TYPICALS) 0 �a co w w N z z rn w w< I U d O 0 ro U w as �o co a � ll.lLU ) �LL� N ww 10 ><_� 0� r LL — Z � V) z Q OOZ c O - U rWZOOZ �.. ONTO C O �U > Z 3 �> 4� U M W W O 7 M 0 Z O L � s � � LL w Q W Z JwQ U a U �Q a V 2 LOw tr _ 0 OoNz�/U 11_ W � O O v O 0- W J >J Q) W Z J W a �a • • O w z 0 O a O J o z a w z O ❑ Z Z r p � a � N � � � Z O � U w wa 5 W 5 � � j J O O Z Z N w }� � � W ❑❑ Z Z O W w Q N J g g � ❑ w � w_ m r� Z Z d' d' K K J� W Jo } J J a == s a N wY F N F N== W ❑� m W a i� U o Y a a��� � w w� z z W o w J x x w� J a a� a� � C7 z_ � W ������� m w J x � zQ N w�� W W Z O Z O� W r w❑❑ W O d N N ~ o w � m 3 a. ❑ a a. ❑ d W. ❑ N N❑ Z Z o� N J o K m K m � O ~ W x LL LL LL>> Iy�Iy�� Iy�IyJJ aa sa ❑ ❑ ❑ 2 2 r J N❑ Ow- !r !r m W � ❑ z Q a J Z O O O O O O W W❑❑ W W � O W m W m m❑ 7 J r U U U � � d' U' U` C7 F F N N N m � � � � zi O Z N Q tD m (O Q N m ro W O Q m U Q M m M Q m N N W O M � N M M M M I� M M M M V V N V N V N V V V V V V V V O V r V V V N N N N N N N N N N N N >N >N >N >N >N >N >N >N O � N o O O (❑j w Ow � Z � O` CCCQ777 J � w O o N w W IL p w O LL N J O J � W �� W z W a W z O a !L' m N J zd a °a � a a J � IyJ o Z o U ON d � J d � > EL W J !L IL r O Z O D J F d ? W J z> r a Z Q o o � U z R J� o� r w ❑ a o� d w � o u-, F p o❑ o w w d p�� J J J❑ J N z N W Z❑ r❑ w x r m m m a p W N z x�❑ ❑ r w O m O❑❑ Z p JL Z W O� m O W W W N O 5a� O O U m O Z N u� N Z ��000� Z U � S w mO NZvi oN z� z� z� -r WIX rDW?oQQQoaLLzoQo00❑dz J�d � CL J � U}�� O r O r N�} N U U1 m �n v� ❑ w a w��� m❑❑ _ z w w�� m��� a N J� v 0 U U 0� Q w� w d�� a w 0 z � a � a x � � � � 3 ? 3 � a � � � z z iw N z z z z z z z z z z z z z o 0 o w w w w�� z J d O F O F O F O F O F O F O F O F O F O F O F O F F x F x F2❑❑ x¢¢¢ w N N O r a U U U U U U U U U U U U U` W w Wof r r U w J� w J r N Z r N Z r N Z r N Z r N Z r N Z r N Z r N Z r N Z r N Z r N Z r��� N Z W YY W YY W❑❑❑ YY z z z = U !L !L r N �> O O O O O O O O O O O O Q Q Q w w w W 0 0 0 r U W U W U W U W U W U W U W U W U W U W U W U W W ll�off)f m w m W� m I--J J U W Z a Z Z Z Z Z Z Z Z Z Z Z Z m m m J J z j Z J J J J J J J J J J J J a a d W W W U x x J Q❑ Z Z Z Z Z Z Z Z Z Z Z Z p p p r r r }E} W W Z 0a_ C7 Z �y F N O N � M N N N N N N N N N N N N N N N M N a�a•a3rm ivaeu\sro�au\s�eunmaVernm\amn - v�Vir�xuios axe wuutaH - cewoe\s�r�roaa\n - - pz �zo 3 � � w j= C I I I D - HIM MOd '1SN03 _ 3 — s� s IEN E _�� =gig -' f2 a� a Y a uvU m-nozn —PI 11-lx.lu-A-4reN'4PIPW 'A9 PaueuLL atloa so 3sa3 avoa so 3ea3 11 W11 MOEl Otl021 a� w N X\ M021 MOiI 'd W31 MOiI 'Wil3d 'dW31 _ o Z� - oC,= a o ZOO o = (r _ 3 a � � � w j= C I I I D - _ 3 HIM MOd '15NO3 o ,001 _ _ s� s _ 1NINISVII J0 1001 I I AINISV3 JO ]Da3 >J� XX�yX ,0- ODI ,0 ,001 M02 'All Mod 'M 11 MOi 'IMI .0-'go B � -3� B� 4 fr _ Y W ei m-nozv—PI 11-4-11--A-44eP'4u•PW'Ay Y PaueuLL "NJ � � I — Z U UUU � LCJ Z fYZ — 3 � � w O H101M MDd N0IOMISNO) — 3 I _ � I I �I I u� I — I I I I if I r a== I o ;oar "od 'd H 31 MOtI 'W i13d MOiI 'd., ,0-Sl ,0-,OS 0-Ml ,0-MOl 5� 6 � 0�5 �S E� 3 � Y 3 uvR m-e102 n—PI 11e4x11u-A-4reN'4PIPW 'A9 P-4— Vold 3NI13d1d 3003 S,i131tlM � 1: --w---------- �| _ - - U9. LLJ - OHO a O - a � 3 d w O z U 3f XO Y � III �m❑y � � 3_ 6 LJ � w Q i J III J_ ,OSZ Al31vv41X021ddv - z O o z III l w a J J Q Y o Li O III w III N 4 O W o �� I III III Q o - H Z ,09Z k13iVWIXMJddV O N O IT I w 1� �O I � 1 wa za 0 oa �z p wa ❑ 8 No�o �' f2 o� m 3 Y LLJ Nr ezm-e102n w!a'wl+elx+lu.11 •awreN'hl+enN do Pa!!=wLL � � 3 w j= C I I I MOd NOILMRllSNOJ LO 3003 D - 3 0 — 3� — o w r Q CD MOd N0I13ndiSN00 10 1003 \ / \ B � — s � 4 _ fr Y uvR m-noz n—PI 11-4x11u-A-4reN'4PIPW Y 'A9 P-4— _ zo a � � w 3 j= C I I I MOd Wiio 1i115NCJ 10 3003 D — 0 — 3 wa w wF w � O N� MOd NOiondlSNCU 10 3003 N �zz 5� 6 � zY� —3� c� fr Y Y W ei m -noz v—PI 11-4-11-.A-44eN'41+enN'A9 Pau-W LL Z f1 — � f1 L(7 N - � a � � O - z � - � N (Y � w j= C I I I D - - o- a H101M MOd '15NO3 - „o-sz ,o-sz ,o-om „o ;oo, 3 s� s E ,0-'91 ,0-,oS ,0-,SC ,0 ,00I =gig -' f2 a� a Y a uvR m-noz n —PI 11-lx.lu-A-4reN'4PIPW 'A9 P-4— LI WII M021 Otl021 Otl021 10 3J03 / X \ �X\ / OVOiI j0 3003 11 W11 modOtl0il modMOiI I'll MOiI 'W213d Y 'd W31 1 d zQ w N o � 3 � � O - z - _ o - g N N 0 U � O � Z j= I C I I D - H101M M021 'ENOJ m _ � 3 S o - m- — — — — — — — — — — — 1NNSM3 10 1003 —t 4--I Ovod]vd —1 1 --k I—t +—I J— LNIWIIII LO L111 E All M021 5 'd W31 MOiI 'W213d 'dW31 6 :4El -3� B� 4 _ fr Y Y uvR m-nozn wla'm 1+-4x11u-A-4reN'4PIPW 'A9 P-4— _ z Z (nZ - _ } a o w w C _ H 101M MOiI N011Jf1i11SNOJ L i I o 3 _ Y 1 � _ � S o I` u1 - L' � IF V' o�d azz \ 3 w u Ir MON 3 n '-^ 'dW31Sl MOEI'D9' 0-,O,o 0-,OS L ,0-,OOI tt 3 � Y 3 uv Um-e102 n—PI 11e4x11u-A-4reN'4PIPW'A9 P-4— THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. LIMITS OF THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER R.O.W. DEPENDING UPON FIELD CONDITIONS AND OR R.O.W. DISTURBED R.O.W. REGULATORY REQUIREMENTS. BOUNDARY 5%, MAX. Np.) BOUNDARY r 'L' OR 'J' HOOK �l SILT FENCE EDGE OF ENERGY B' $ DISTURBED DISSIPATOR R.O.W. KEY SILT FENCE INT❑ WATER BAR TEMPORARY BMPS FLOW i STRAW BALE 6' ENERGY $' DISSIPATER KEY STRAW BALE INT❑ WATER BAR 1 1 1 FLOW ROCK ENERGY DISSIPATER KEY ROCKS INT❑ WATER BAR PERMANENT BMPS STABLE VEGETATED AREA PLAN VIEW 2' MIN R / � /'' ��/\ 5' MIN• NOTES' 1, SLOPE BREAKERS SHALL BE CONSTRUCTED OF COMPACTED NATIVE SOIL AND INSTALLED AT LOCATIONS AS SHOWN ON THE CONSTRUCTION DRAWINGS OR AS DIRECTED BY THE COMPANY'S INSPECTOR, 2, SLOPE BREAKERS SHALL BE ❑RIENTED AS SHOWN OR OTHER PATTERN AS DIRECTED BY THE COMPANY'S INSPECTOR TO DIRECT THE WATER OFF THE R,O,W, 3, SLOPE BREAKERS SHALL BE CONSTRUCTED AT A 5% MAXIMUM GRADIENT ACROSS THE SLOPE, 4. THE SLOPE BREAKERS SHALL BE 18' DEEP CAS MEASURED FROM THE TROUGH TO THE TOP OF THE SLOPE BREAKER), THE TROUGH WILL BE A MINIMUM OF 5' WIDE ACROSS THE WIDTH OF THE RIGHT-OF-WAY, 5. THE OUTLET OF THE SLOPE BREAKER MUST FREELY DISCHARGE RUNOFF OFF FROM THE DISTURBED RIGHT-OF-WAY INT❑ A STABLE, WELL VEGETATED AREA OR INT❑ AN ENERGY DISSIPATER, 6, WHERE SLOPE BREAKERS EXTEND BEYOND THE EDGE OF THE CONSTRUCTION R,O,W, DIRECT RUNOFF INT❑ STABLE, WELL VEGETATED AREAS, THESE LOCATIONS MUST BE APPROVED BY THE COMPANY'S INSPECTOR, DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 ,�` PIPELINE ur SCALE N.T.S. SHEET 1 of 1 SLOPE BREAKER/RIGHT—OF—WAY DIVERSION/WATERBAR JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-17 P1 9" MINIMUM COMP FINISHED GRADE 18" MINIMUM AFTER COMPACTION FINISHED GRADE DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: SECTION A -A (TEMPORARY INSTALLATION) SECTION A -A (PERMANENT INSTALLATION) 1'1 Mountain Valley PIPELINE ur JNDED JFIGURATION ,ULAR JFIGURATION ROUNDED CONFIGURATION ANGULAR CONFIGURATION SKETCH THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL I SLOPE BREAKER/RIGHT-OF-WAY DIVERSION/WATERBAR H-650-TYP DRAWING NO. REV. MVP-SG-17.1 1 P1 RECOMMENDED MAXIMUM SPACING FOR PERMANENT SLOPE BREAKERS PIPELINE GRADE DISTANCE (FEET) <2% - 1, 2 2-5% 400 6-15% 200 16-30% 100 >31% 503 'PERMANENT SLOPE BREAKERS WILL BE INSTALLED AS NEEDED BASED ON FIELD C❑NDITI❑NS, 2 PERMANENT SLOPE BREAKERS WILL BE INSTALLED 25 FEET FROM EACH WATERB❑DY BOUNDARY REGARDLESS OF SLOPE C❑NDITI❑NS, 3 SLOPES GREATER THAN 65% MAY REQUIRE SITE SPECIFIC STABILIZATI❑N MEASURES BASED ON FIELD C❑NDITI❑NS AS APPROVED BY MVP DESIGN ENGINEERING AND MVP ENVIR❑NMENTAL INSPECT❑R, NOTES:. WATERBARS SHALL BE INSPECTED WEEKLY (DAILY ON ACTIVE ROADS) AND AFTER EACH RUNOFF EVENT, DAMAGED OR ERODED WATERBARS SHALL BE RESTORED TO ❑RIGINAL DIMENSI❑NS WITHIN 24 HOURS OF INSPECTI❑N MAINTENANCE OF WATERBARS SHALL BE PR❑VIDED UNTIL ROADWAY, SKIDTRAIL, OR RIGHT-❑F-WAY HAS ACHIEVED PERMANENT STABILIZATI❑N WATERBARS ON RETIRED ROADWAYS, SKIDTRAILS, AND RIGHT-❑F-WAYS SHALL BE LEFT IN PLACE AFTER PERMANENT STABILIZATI❑N HAS BEEN ACHIEVED SUMP FILTERS TO BE INSTALLED AT END OF WATERBARS, REFER TO SUMP FILTER DETAIL ON SHEET 0,09 FOR MORE DETAIL, OUTLET PR❑TECTI❑N/C❑MP❑ST FILTER SOCK SHOULD BE INSTALLED AT THE OUTLET OF ALL WATERBARS, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Valley PIPELINE ur THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL SLOPE BREAKER/RIGHT-OF-WAY DIVERSION/WATERBAR H-650-TYP DRAWING NO. REV. MVP-SG-17.2 1 P1 W. w O J Z Q z� w 20 J U) W 2 Q W 'o 0 ~z w ~ H Q w O wo m W �2 �.. J Q w J > a_ FL QO W : U` N >w� > ~ 0 Z X d� Z gw 0 F Q ww LLJ o r� O D U) d p z0 I 0 M� I CDU J LLJ o > Q 0 �w a_ z EL 0-1 w a Qf 0 �a a w 0 Q W U ll� W ro ro m Q O ~ ^ X \ O w X X W W W W Q O W Q Q 2 O O fn I O zz LO N X X ~ Qo I w Z W O U _ O J Z Q cr `1 0 W Z w a-Q m m N 00 w O of Q a LL a 0 w o w z wJ O aQ `H x D o w a m N w CD a z V) C/) a w Q m cn I as as w> co V wo > c�J ww Q �� Z ~ 0 z� a c) U Z Qw �w C a CO ¢ W o OfU zz 00 z w LO Wz ap a � ° c6 a RCN V OQ V 5� z a Go w� ro ro z o 6 a li �lq \ o rll 0 Oi w X X LLJ LLj a I O O O fn O L% N Qo X X ~ I \ I Z � Z W O U Y 0 W Z Q W d Q m of m z v LU 0 Q 00 J U Q o z ZO ih OJ> 0- O Of 0- D0Aip LU z0 LU oO QUU) U L mi 0Wm Z OW Q W > Ir x T-- -T OU)IrLL U Z Z_ w ry co co > Q w z WOf � 0 v Z w Y O oQ ww U D CC m ,z I Z = O Q �w I U W =k J �Q� W �� Q o Ww� �u� J O o0 U z �of 0 U 0 r a 0 r < � u w 0 0 J LL > Z Z W `1! Z M W C Cm Q a jr Q •� Df m O �r(n Z �;~ w0 wow �00 O� F� >v QH� JU W > �(n(jZJZ Z W Z— w 0 W 2 — > — w � �� � U U) C) °° ro °° Q QzXU)ZU Wow Q o 0 Df 0 0= L L m X X 0}zHLU Z W .-. 0 H W Y� Z Q of w Ir Qm�0 00 0 0 0 cn � m � z O w U X X _ X X Z 0 I >Q Z W Y O W Z U w Q W d U Q Q m O d U (7 LL o in o � U W Z (n Z .-• w J � U W = LL WUZ W o in J _ _ � J� Q Q O V � V � v � in o n o SLOPE % DISTANCE PLUG MATERIAL THIS TYPKAI. CONSTRUCTION D�r+1L S INTENDEC TD Ox — 5x SEE NOTE 6 40NCRETE FILLED SACKS PRWIDE GUIDANCE TO THE PIPELINE CONTRACTOR. 51A — 15X 500 FT SANDBAGS OR CONCRETE FILLED SACKS THE ACTUAL C04ST4UCTICN TECHNIQUES MAY DIFFER DEFENDING UPON FIELD CONDITIONS AND CR 15% — 25% 300 FT SANDBAGS OR CONCRETE FILLED SACKS REGULATORY REQUIREMENTS. 25% — 35% 200 FT SANDBAGS OR CONCRETE FILLED SACKS 35% — 100% 100 FT SANDBAGS OR CONCRETE FILLED SACKS a 100% 55 fT CONOtETE FVAED BAGS (WETTED) � a yya PI°:LING y 9 TRBJCH PLLGRAIN PIPE v v GRAPIPE DAYLIGHTS C a a AT R.O.W EDGE n � 1 BLEEDER DR, iO BE CON5TRUCI UP DIP OF IN FRENCH PLUG PER J7 A;L &7 v o VC PIPE CONNECTED OR EOL1I>✓AI6NY TO TRMCH PDUG DRAIN G D OULLFF PI Pf11NY v TOPSOIL OR NAT11,E MATERIAL 17' TOPSOIL OR Ir WIN. NATAL MATERIAL SACK LIMIT RIP -GAP DETAIL IPER TRENCH LNT DFAIL8.10OR KEY SLOT SILDT LYT ELIUIVALENLI Y F (STEEP X 12' SHOE) INTO UNDIMMED � KEY BREAKER If COMPOST FILTER Rd CH WALL MON PADDHC SOCK OR E GMALENT AND BOTTOM 1N ROCK OR NOTES; CROSS SECTION H9JXER AREAS SIDE VIEW 1. TRENCH BREAKERS SHALL BE 14STALLED: • ON SLOPES ALONG THE MOO UHE *HERE THE NATURAL CRANACE PATTERN, PROFILE, AND TYPE OF BACKFILL kATERIAL WAY RESULT IN LOSS OF BAC7KFILL MATERIAL OR ALTERATION OF THE NATURAL PA7EM; • AT THE BASE OF SLOPES ADJACENT TO WATERBODIES AND WETLANDS: • A47RE NEEDED TD AVOID DRAINING A VETLAND; • ON UPLAND SLOPES, AT THE SAME SPACING AS SLOPE BREAKKERS AND UP SLOPE OF SLOPE BREAKERS', • IN CULTNATEO LAND AND RESIDENTIAL AREAS MERE PERMANENT SLOPE BREAKERS ARE NOT TYPICALLY 1NSTALLE0. AT THE SAME SPACING AS IF PERMANENT SLOPE BREAKERS *HERE REQUIRED. 2. MATERIALS APPROPRIA$ FOR USE AS PERMANENT TRENCH BWAKERS INCLUDE SANDBAGS OR CONCRETE FILLED SAM. TOPSOIL SHALL NOT BE USED FOR TRENCH BREAKERS 3. TRENCH BREAKERS INSTALLED AT WATFRBODY AND YIETLAND CROSSINGS SHALL BE CONSTRUCTED OF IMPERVIOUS MATERIALS (CONCRETE FILLED SACKS). 4, BREAKER SPACING AND CONFIGURATION MAY BE CHANGED AS DIRECTED BY MVP. DEPTH OF DITCH MAY VARY WITH SITE CONDITIONS. 5. ALL MATERIALS SHALL BE SUPPLED BY CONTRACTOR. 8. TRENCH BREAKERS ARE REWIRED AT ALL WA1ERBODY CROSSINGS REGARDLESS OF TRENCH SLOPE OTHERV T NOTE REQUIRED AT SLOPE'S < 51 7. SINGLE TRENCH BREAKERS WALL BE A MINIMUM WIDTH OF 24' AND DOUBLE TRENCH BREAKERS WILL BE A MINIMUM WIDTH OF 36'. 8. FOR SUBSURFACE AND TRENCH BREAKER DRAINAGE DETAILS INCLUDING THOSE FOR STEEP SLOPES, SEE LANDSLIDE MTIGATION TYPICAL DETAILS. 9. FOR SLOPES CXCEEDING 50K CONCRETE FILLED SACKS ARE REWIRED UNLESS OTHERWSE APPROVED BY MVP. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Valley PIPELINE ui THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL TYPICAL TRENCH BREAKER REQUIREMENTS H-650-TYP DRAWING NO. REV. MVP-SG-20 I P1 PIPELINE 6" PERFORATED, CORRUGATED DRAIN PIPE MAINLINE CROSS SECTION 16" TO 18" -STANDARD TRENCH BACKFILL F" TO 6" OVERLAP GEOTEXTILE V) 0 ` FILTER FABRIC Z T.O.P. UN -COMPACTED > 1" STONE (TYP) N w B.O.P. 0 -6" PERFORATED 7 CORRUGATED DRAIN PIPE TO 6" SECTION A -A 6" SOLID DRAIN PIPE .CUT PIPE TO MATCH TOPOGRAPHY �YARD OF RIPRAP FOR DISPERSION 16" TO 18" B.O.P. TO 6" SECTION B-B SOIL BAC 6" SOLID DRAIN PIPE NOTES 1. LOW POINT DITCH DRAINS SHALL BE INSTALLED AT LOCATIONS SPECIFIED IN THE APPROVED EROSION & SEDIMENTATION CONTROL PLAN, AND AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR. 2. FILL STONE SHOULD BE 1" AGGREGATE WITHOUT FINES, CRUSHER RUN WITHOUT FINES, OR EQUIVALENT. 3. DRAIN PIPE TO BE CONNECTED USING STANDARD PIPE COLLARS. THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 M Mountain Va I I ey APP'D XXX DATE X/X/201B PIPELINE SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP SIDEHILL LOW -POINT DRAIN TYPICAL DRAWING NO. REV. MVP-SG-24 P1 CON N OTES: 1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING CONSTRUCTION ON STEEP LONGITUDINAL SLOPES. 2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES. 3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 3D% (1T) AND UP DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 PIPELINE u� SCALE N.T.S. SHEET 1 OF 1 I JOB NO. I PROJECT ID: THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWING ASSUMES TYPE "B" SOIL TYPICAL CONSTRUCTION DETAIL MAINLINE CONSTRUCTION STEEP HILL PARALLEL CONSTRUCTION NO TOP SOIL SEGREGATION H-650-TYP DRAWING NO. REV. MVP-SG-31 I P1 a p \a =i 'p co PVC PIPE CONNECTED o - TO TRENCH BREAKER a Q DRAIN OUTLET Q DRAIN PIPE DAYLIGHTS AT R.O.W EDGE d � zI 14 COMPOST FILTER SOCK O + I DR EQUIVALENT Ics O RIP -RAP 1 V {AS NEEDED)_ SPOIL PILE � � � 4-------------- NOTES: 1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING CONSTRUCTION ON STEEP LONGITUDINAL SLOPES. 2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES. 3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 30% (17) AND UP. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP III Mountain Valley PIPELINE u, THIS TYPICAL CONSTRUCTION DETAIL IS 114TENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS, DRAWING ASSUMES TYPE °B" S01 TYPICAL CONSTRUCTION DETAIL MAINLINE CONSTRUCTION STEEP HILL STOVE PIPE CONSTRUCTION NO TOP SOIL SEGREGATION DRAWING NO. REV. MVP-SG-32 P1 A 4"0 DRAIN PIPE CAP END OF PIPE DAYLIGHT AT LOW POINT 3 OF TRENCH 0 N_ 2 H PERFORATED DRAIN PIPE SOLID DRAIN PIPE TRENCH BREAKER PIPELINE DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: N A RIP -RAP APRON (6--12- ROCK) AT OUTLET APRON LENGTH - 13' INITIAL WIDTH - 1.5' TERMINAL WIDTH - 13.5' PLAN SCALE: NOT TO SCALE PERMEABLE TRENCH BREAKER � PERFORATED SOLID DRAIN PIPE DRAIN PIPE SECTION A -A SCALE: NOT TO SCALE M Mountain Valley PIPELINE uc THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL TRENCH BREAKER DAYLIGHT DRAIN H-650-TYP DRAWING NO. REV. MVP-SG-35 I P1 rI SEE NOTE 1 SEE NOTE 2 SEE NOTE 1 C A o +/- 50' i rn c� � N a ---------------------------------------------------------- DAYLIGHT TO ROCK APRON U�o/STUBBED BUT LOCATE CUT OFF DRAI +/- 2' BELOW SEEP/ AREAS #57 TO EXTEN INTO SEEP AREA NOTES: 6"0 DRAIN PIPE OI 1. PERFORATED PIPE SURROUNDED BY #57 STONE. 2. SOLID PIPE (IN TRENCH) SURROUNDED BY TRENCH BACKFILL. V DRAWN TRC DATE 8/7/2018 o CHECKED XXX DATE X/X/2018 C APP'D XXX DATE X/X/2018 C n SCALE N.T.S. SHEET 1 OF 2 E 0 JOB NO. 0 PROJECT ID: T 0 0 0 H-650-TYP c� 3 0 N x C PLAN SCALE: NOT TO SCALE SECTION C-C SCALE:NOT TO SCALE r9 Mountain Valley 191994103 DAYLIGHT TO ROCK APRON kYLIGHT TO P-RAP 'RON THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL CUTOFF DRAIN-SIDEHILL DRAWING NO. REV. MVP-SG-36A P1 :ile Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-36A.dwg 1:1LN3yI��liZN 7U1� z FILTER FABRIC AROUND STONE (OVERLAP 12") z N :Iis] 3911mfiZN:7-1 110 aK 41 ----�!r-� ' ' ' IPERFORATED 6"0 SOLID PIPE PIPE MR 18"-24" SECTION A -A SCALE: NOT TO SCALE FROM MVP—SG-36A z a T IO DRAWN TRC DATE 8/7/2018 0 CHECKED XXX DATE X/X/2018 c APP'D XXX DATE X/X/2018 c SCALE E N.T.S. SHEET 2 OF 2 0 JOB NO. w 0 PROJECT ID: T 0 0 0 H-650-TYP r9 Mountain VallPJPELIey 18"-24" SECTION B-B SCALE: NOT TO SCALE FROM MVP—SG-36A THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL CUTOFF DRAIN-SIDEHILL DRAWING NO. REV. MVP-SG-36B P1 ile Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-36B.dwg PERFORATED DRAIN PIPEI SOLID DRAIN PIPE SOLID DRAIN PIPE DRAIN PIPE PERFORATED DRAIN PIPE SOLID DRAIN PIPE DAYLIGHT INTO RIP —RAP APRON TO GRADE FILTER FABRIC (OVERLAP 12") AASHTO #57 STONE (UNCOMPACTED) 6"0 PERFORATED PIPE 18"-24" �1 SECTION A -A SCALE: NOT TO SCALE ZT �BACKFILL TO GRADE v Muhl PLAN PIPI -------------- DAYLIGHT INTO RIP —RAP APRON NOTES: 1. EACH CUTOFF DRAIN SHALL UTILIZE A TRENCH BREAKER DRAIN (SEE DETAIL 1) TO DRAIN THE TRENCH. PERMEABLE TRENCH BREAKER I_ _I TRENCH BACKFILL TRENCH BREAKER DRAIN .� (SEE MVP—SG-35) m cc/) 6"0 SOLID PIPE SECTION C-C SCALE:NOT TO SCALE I= a THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. 18"-24" THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER V I� ►� DEPENDING UPON FIELD CONDITIONS AND OR ri V SECTION B-B REGULATORY REQUIREMENTS. SCALE:NOT TO SCALE DRAWN TRC DATE 8/7/2018 r9 Mountain Va I I ey 7, P! P E L I N E u� TYPICAL CONSTRUCTION DETAIL o CHECKED XXX DATE X/X/2018 CUTOFF DRAIN —PLANAR c APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 o JOB NO. a 0 PROJECT ID: DRAWING NO. REV. o 0 0 H-650-TYP MVP-SG-37 P1 .e Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-37.dwg U*o/s;1, �Ul PIPE 4"0 PERFORATED DRAIN PIPE in' APRON PLAN SCALE:NOT TO SCALE �I• N � I aW w w DRAWN TRC DATE 8/7/2018 r9 Mountain Va I I ey P!PELINEAPP'D o CHECKED XXX DATE X/X/2018 XXX DATE X/X/2018 C n SCALE N.T.S. E SHEET 1 OF 2 0 JOB NO. a 0 PROJECT ID: T a o i H-650—TYP 4" CAP WED 1YLIGHT TO P—RAP 'RON THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL TRANSVERSE TRENCH DRAIN DRAWING NO. REV. MVP—SG-38A I P1 File Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-38A.dwg I C SECTION A -A SCALE:NOT TO SCALE FROM MVP—SG-38A DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 2 OF 2 JOB NO. PROJECT ID: TRENCH FILL FILTER FABRIC (OVERLAP 12") 4"0 PERFORATED PIPE AASHTO #57 STONE (UNCOMPACTED) Mountain Valley PELINE PACT BACKFILL SOLID PIPE 18"-24" SECTIIDN B-B FROM MVP—SG-38A THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL TRANSVERSE TRENCH DRAIN H-650-TYP File Path: C:\users\sdoersom\projectwise\fsl\dms27383\MVP-SG-38B.dwg DRAWING NO. REV. MVP-38B I P1 ROW i i A THIS DWG THIS DWG A ROW PLAN SCALE:NOT TO SCALE ' MIN 'MIN 6"-12" ROCK, 12" THICK L— '-- J GEOTEXTILE 4' 1 2' 1 4' FABRIC SECTION A -A SCALE: NOT TO SCALE THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 Mau nta i n Va I ley APP'D XXX DATE X/X/2018 PIPELINE u� SCALE N.T.S. SHEET 1 OF 1 ROCK LINED SWALE JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-39 P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\ Draw ings\Typicals\MVP- SG- 39.dwg NATURAL DRAIN ROW A THIS DWG ROW NATURAL DRAIN Iftl A\1 RESTORE NATURAL DRAIN AND ADD RIP —RAP THIS DWG A ' MIN 1' MIN 2" 1OCK, 1THICK c/) W d' Pd GEOTEXTILE FABRIC VARIES DEPENDING ON DIMENSIONS OF NATURAL DRAIN SECTION A -A SCALE: NOT TO SCALE THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWN TRC DATE 8/7/2018 Mau nta i n Va I ley PIPELINE u� TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 RIP -RAP NATURAL DRAIN APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP DRAWING NO. MVP-SG-40 REV. P1 File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP- SG- 40.dwg 3 O DOWN HILL 1 SLOPE BREAKER (PER ESCP DRAWINGS) ADD 3"-6" ROCK TO LINE SLOPE BREAKER DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: PIPELINE 3 O w PLAN SCALE: NOT TO SCALE SLOPE BREAKER (PER ESCP DRAWINGS) SECTION A -A THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. SCALE:NOT TO SCALE THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL 1'1 Mountain Valley PIPELINE u� RIP -RAP SLOPE BREAKERS H-650-TYP DRAWING NO. REV. MVP-SG-41 I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-41.dwg COMPACTED BACKFILL (SEE NOTES SHEET) MAINTAIN 2' MIN. CLEARANCE BETWEEN PIPE AND GEOGRID COMPACTION DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 3 JOB NO. PROJECT ID: LIMITS OF EXCAVATION 1'1 Mountain Valley PIPELINE u� THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL GEOGRID-SIDEHILL H-650-TYP DRAWING NO. REV. MVP-SG-42A I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42A.dwg MAINTAIN 2' MIN. CLEARANCE BETWEEN PIPE AND GEOGRID COMPACTION DRAWN TRC DATE 8/7/2018 ct CHECKED 0 XXX DATE X/X/2018 v APP'D XXX DATE X/X/2018 n SCALE N.T.S. SHEET 2 OF 3 v a JOB NO. E '11 PROJECT ID: H-650-TYP SECTION VIEW SCALE:NOT TO SCALE Mountain Valley PIPELINE ccc PIPELINE THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. SLIDE MITIGATION DETAIL GEOGRID-PLANAR DRAWING NO. REV. MVP-SG-42B P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP- SG- 42B.dwg COMPACTION NOTES 1) ALL ROCKS LARGER THAN 6 INCHES IN SIZE, AND MORE THAN 10 PERCENT BY VOLUME SHOULD BE REMOVED AND PROPERLY DISPOSED FROM THE BACKFILL MATERIAL 2) THE SUBGRADE AT THE BASE OF THE EXCAVATION SHOULD BE PROOFROLLED WITH A PNEUMATIC TIRED ROLLER OR VEHICLE. 3) THE EXCAVATED AREA SHALL BE BACKFILLED WITH THE CLEANED EXCAVATED SOIL MATERIAL AND COMPACTED IN PLACE. 4) BACKFILL OPERATIONS SHALL BE PERFORMED WHEN SOIL IS SUITABLE FOR COMPACTION (I.E., NOT IMMEDIATELY FOLLOWING A LARGE RAIN, SNOW, OR ICE EVENT). FROZEN FILL SHALL NOT BE USED. 5) THE BACKFILL SHALL BE PLACED IN COMPACTED LIFTS NO GREATER THAN 12 INCHES. 6) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN COMPACTION ACTIVITY AND THE GAS PIPELINE. GRAVEL DRAIN NOTES 1) GEOTEXTILE FABRIC SHALL BE TENCATE MIRAFI 140N OR APPROVED EQUIVALENT. 2) THE GEOTEXTILE FABRIC SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS. 3) DO NOT OPERATE CONSTRUCTION EQUIPMENT DIRECTLY ON THE GEOTEXTILE FABRIC. 4) DRAINAGE AGGREGATE SHALL MEET THE REQUIREMENTS OF AASHTO NO. 57 STONE. 5) DRAINAGE AGGREGATE SHALL NOT BE COMPACTED. GEOGRID NOTES 1) GEOGRID REINFORCEMENT SHALL BE TENCATE MIRAFI 3XT OR APPROVED EQUIVALENT. 2) THE GEOGRID MATERIAL SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS. 3) GEOGRID SHALL BE PLACED HORIZONTALLY ON THE BACKFILL WITH THE PRINCIPAL STRENGTH DIRECTION PERPENDICULAR TO THE FACE OF THE SLOPE. ADJACENT PIECES OF PRIMARY GEOGRID SHALL NOT OVERLAP BUT ARE TO BE BUTTED SIDE TO SIDE. 4) REMOVE ALL SLACK IN THE GEOGRID MATERIAL AND ANCHOR AS NECESSARY WITH PINS, OR BAGS TO PREVENT SLACK FROM DEVELOPMENT DURING FILL PLACEMENT AND COMPACTION. 5) FILL IS TO BE PLACED AND SPREAD DIRECTLY ON THE GEOGRID MATERIAL WITH RUBBER TIRED EQUIPMENT ONLY. SPEEDS ARE TO BE KEPT SLOW WITH AS FEW STOPS AND TURNS AS PRACTICAL 6) DO NOT OPERATE TRACKED EQUIPMENT DIRECTLY ON THE GEOGRID MATERIAL. 7) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN GEOGRID MATERIAL AND THE GAS PIPELINE. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 3 OF 3 I JOB NO. I PROJECT ID: 1'1 Mountain Valley PIPELINE uC THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL GEOGRID NOTES H-650-TYP DRAWING NO. REV. MVP-SG-42C I P1 File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42C.dwg AASHTO #57 STONE OR EQUIVALENT DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 2 JOB NO. PROJECT ID: c w 3UUU rw rirr BOTTOM WIDTH OF TRENCH Ar7@1JYi/11=kr,71 6" MIN. TRENCH BREAKER BAGS 2"0 SOLID PVC PIPE (25" LONG) SECTION VIEW SCALE:NOT TO SCALE NOTES: 1. PLACE PVC DRAIN PIPE ON FIRST LAYER OF TRENCH BREAKER BAGS. 2. PLACE PVC DRAIN PIPE EQUADISTANT FROM THE OUTSIDE EDGE OF THE 30" GAS PIPE AND THE BOTTOM LIMITS OF THE TRENCH. 3. EXTEND PVC PIPE THROUGH ENTIRE TRENCH BREAKER AND EXTEND APPROX. 1" PAST END OF BREAKER. 4. AASHTO#57 STONE SHALL BE PLACED TO A MINIMUM 6" THICKNESS UPSLOPE OF THE DRAIN PIPE. THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL 1'1 Mountain Valley PIPELINE uc TRENCH BREAKER PASS -THROUGH DRAIN H-650-TYP DRAWING NO. REV. MVP-SG-43A I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43A.dwg TF DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 2 OF 2 JOB NO. PROJECT ID: ■ E AWN 1/11T\AI M Mountain Valley PIPELINE ur THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL TRENCH BREAKER PASS -THROUGH DRAIN H-650-TYP DRAWING NO. REV. MVP-SG-43B I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43B.dwg GROUND SURFACE WEEPHOLE DRAINS SAKRETE REVETMENT (MIN 2' THICK) MIN 6° BATTER #5 EPDXY —COATED REBAR ROAD OR STREAM CROSSING MAINTAIN MIN. 2' CLEARANCE BETWEEN REBAR AND PIPELINE GAS PIPE EQT NOTES: 1. SAKRETE BAGS SHOULD EXTEND 4 BAGS DEEP PIPE SHOULD BE COMPLETELY SURROUNDED BY SAND BAGS, OR CRUSHED ROCK (MAX 6"). 2. SAKRETE BAGS SHOULD BE STAGGERED IN A MASONRY FASHION. THE FACE OF THE WELL SHALL BE INCLINED 6'-10° FROM VERTICAL. 3. #5 REBAR SHOULD BE DRIVEN THROUGH THE SAKRETE BAGS (SEE DETAIL 1). 4. 2"0 PVC WEEPHOLE DRAINS SHALL BE INSTALLED EVERY 15 FT. DOUBLE SAKRETE TRENCH BREAKER W/DRAIN — WRAP PIPE IN ROCKSHIELD AND SURROUNDED BY FABRIC SAND BAGS ROCK TRENCH 17 BACKFILL TRENCH W/SAND BAGS OR CRUSHED ROCK SIDE VIEW SCALE:NOT TO SCALE DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 PIPELINE SCALE N.T.S. SHEET 1 OF 2 JOB NO. PROJECT ID: SAKRETE TOE KEY TOE KEY FULLY ENCASED IN SAKRETE BAGS 12" GRAVEL LEVELING BASE USE STONE FOR LEVELING ROCK BASE. IF BASE IS NOT IN ROCK, USE 12" STONE LAYER FOR BASE. THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL SLIDE MITIGATION HIGHWALL REVETMENT SIDE VIEW H-650-TYP DRAWING NO. REV. MVP-SG-44A I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CAD D\Pipeline\ Draw ings\Typicals\MVP-SG-44A.dwg #5 EPDXY —COATED REBAR DRIVEN INTO PLACE. OVERLAP REBAR MIN. 3 BAGS. SPACE REBAR 12" HORIZONTALLY. 2"0 SCH. 40 SOLID PVC PIPE GAS (SPACE REBAR TO MAINTAIN MIN. 2' CLEARANCE FROM PIPELINE) FRONT VIEW SAKRETE BAGS (MIN 2' THICK) SAND BAGS OR CRUSHED ROCK. SAND BAGS SHALL BE OF A MATERIAL THAT DOES NOT SHIELD CATHODIC PROTECTION CURRENT (CLOTH BAGS PREFERRED). DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 2 OF 2 JOB NO. PROJECT ID: GAS PIPE i PVC WEEPHOLE kINS (SEE DETAIL #2) 12" STONE LEVELING BASE 1 "0 GRAVEL SURROUND PIPE INLET. EXTEND PVC PIPE INTO GRAVEL MIN 3" BACK OF ROCK TRENCH �J I THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DRAIN DETAIL DEPENDING UPON FIELD CONDITIONS AND OR SCALE: NOT TO SCALE REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL 1q Mountain Valley PIPELINE SLIDE MITIGATION HIGHWALL REVETMENT FRONT VIEW AND DRAIN DETAIL H-650-TYP DRAWING NO. REV. MVP-SG-44B I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-44B.dwg SAKRETE OR RIPRAP REVETMENT (MIN 2' THICK) SAKRETE BREAKER WITH DRAIN (NOT SHOWN) SPACING TBD BY ENGINEER >XN- DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: SIDE VIEW SCALE: NOT TO SCALE 1'1 Mountain Valley PIPELINE u� SANDB gFIL RUSHED ROCKACK COMPETENT SOIL OR ROCK THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL STEEP SLOPE REVETMENT H-650-TYP DRAWING NO. REV. MVP-SG-45 I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-45.dwg DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Valley PIPELINE u� THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL BROW DITCH DETAIL H-650-TYP DRAWING NO. REV. MVP-SG-46 I P1 File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-46.dwg SLOPE TIMBER MATS SLOPE XISTING GRADE PIPE BUNDLES - PIPES CONNECTED BY WELDING OR GALVANIZED STEEL CABLES, NOTE: CFS TO BE INSTALLED AT THE END OF EACH W❑RKING DAY, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Valley PIPELINE ur THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL I TIMBER MAT AND PIPE BUNDLE TEMPORARY STREAM CROSSING H-650-TYP DRAWING NO. REV. MVP-SG-47 I P1 TIMBER MATS SLOPE GE❑TEXTIL SLOPE JERSEY BARRIER NOTE: CFS TO BE INSTALLED AT THE END OF EACH W❑RKING DAY, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Valley PIPELINE ur XISTING GRADE THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL I TIMBER MAT AND JERSEY BARRIER TEMPORARY STREAM CROSSING H-650-TYP DRAWING NO. REV. MVP-SG-48 I P1 STREAM CR❑SSING BANK TO BANK CHANNEL / F sF WIDTH Is WATER FLOW BAR 10 FT N 10 FT MIN. MIN. TEMP, I I I I TEMP, ACCESS SLOPE I TIMBER BRIDG i � SLOPE ACCESS ROAD I I I I ROAD WATER N SILT FENCE N si BAR F (TYP.) sj �C❑MP❑ST TIMBER MAT N N TIMBER MAT FILTER SOCK / ` (TYP,) PLAN VIEW M❑BILE BRIDGE SIDEB❑ARD 10 FT BANK TO BANK 10 FT MIN. MIN. WATER TIMBER WATER BAR BAR BRIDGE SLOPE SLOPE GE❑TEXTILE APPR❑XIMATE EXISTING �CHANNEL� GROUND WIDTH CROSS SECTION - MOBILE BRIDGE NOTES: 1. INSTALL WATER BARS OR SILT FENCE AT APPROACHES TO STREAM CR❑SSING AND COMPOST FILTER SOCKS ALONG STREAM BANKS, INSTALL COMPOST FILTER SOCK AT OUTLET OF WATER BARS, 2. MAINTAIN SURFACE OF TEMPORARY EQUIPMENT CR❑SSING TO PREVENT S❑IL DISCHARGES TO STREAM, 3. APPROACHES TO CR❑SSINGS ARE NOT TO EXCEED A DEPTH OF 6 INCHES ABOVE ❑RIGINAL GRADE, 4. GE❑TEXTILE LINER TO COME UP ON THE SIDES OF THE BRIDGE A MINIMUM OF 18'. 5. SIDEB❑ARDS TO BE ATTACHED TO THE UPPER DECK, GE❑TEXTILE TO BE WRAPPED AROUND SIDEB❑ARDS PRI❑R TO FASTENING, THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWN TRC DATE 8/7/2018 M Mountain Valley PIPELINE ur TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 MOBILE BRIDGE APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-49 P1 APPR❑XIMATE EXISTING GROUND BANK TO BANK CHANNEL WIDTH BAILEY PANEL d FLOW I � I TEMPORARY � ACCESS R❑AD TEMPORARY ACCESS ROAD DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP i S❑LID BRID DECK i a REINF❑RCE FILTRATI❑N a SUPP❑RT DEVICE I (TYP.) I 9 410 / PLAN VIEW S❑LID DECK BAILEY PANEL — SUPPORT ------ REINF❑RCED �j FILTRATI❑N DEVICE PROFILE 1'1 Mountain Valley PIPELINE ur -APPR❑XIMATE TOP OF BANK EXISTING GROUND THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. TYPICAL CONSTRUCTION DETAIL MODULAR TEMPORARY BAILEY BRIDGE DRAWING NO. REV. MVP-SG-50 P1 U) U) J J o TOPSOIL DITCH o STORAGE SPOIL STORAGE i 12" v zo TOPSOIL o /\\ 7 j\\ j\\(MAX.) 0 CONSTRUCTION MATS REFER TO REFER TO NOTES 1, 2, g' NOTES 1, 2, AND 3 AND 3 10' 50' 15' TEMP. PERM. ROW WIDTH TEMP. ROW ROW WIDTH 35' J. 40' WIDTH SPOIL SIDE WORKING SIDE 75' CONSTRUCTION ROW WIDTH NOTES: 1. TOPSOIL SEGREGATION/REMOVAL WILL ONLY BE CONDUCTED WITHIN THE PERMANENT EASEMENT AT ALL WETLAND CROSSINGS IN VIRGINIA. 2. GRUBBING ACTIVITIES SHALL BE LIMITED TO THE PERMANENT EASEMENT AT ALL WETLAND CROSSINGS IN VIRGINIA. OUTSIDE OF THE PERMANENT EASEMENT, WETLAND VEGETATION SHALL ONLY BE REMOVED AT OR ABOVE THE GROUND SURFACE. WOODY VEGETATION WITHIN THE TEMPORARY EASEMENT SHALL BE CUT AT GROUND SURFACE WITH THE STUMPS TO REMAIN IN -PLACE. 3. WETLAND CROSSINGS IN VIRGINIA SHALL BE CONDUCTED IN ACCORDANCE WITH NWP12 GENERAL AND NORFOLK DISTRICT REGIONAL CONDITIONS. THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER DEPENDING UPON FIELD CONDITIONS AND OR REGULATORY REQUIREMENTS. DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 PIPELINE ccc SCALE N.T.S. SHEET 1 OF 1 WETLAND CROSSING TYPICAL FOR JOB N0. USACE NORFOLK (VA) DISTRICT PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-53 P1 0 �a co w W u N N O z zcn -J N O co ww }�O~ wa�� ) ALL N --wTr >�=w -- a 9 LL N Z=wZ z w a�o� c w �OOz � W � CL U m W O (v�, v —°T n i I..L CDQ e► a3 W W z�J U Q J W U a a C ■^/\ V N O J ''W^ VJ O''^^ QZ W 111 VJ 1 O ��� �\ �r.n�. o/ V / LL W w J �J co Z � J LU a �a • O � a a a d a a a a a d a d a a a 0 o z 3 U m O � C7 Z � � w ❑ (A U O Cl) Z Z Z �� Q Q Q Q Q❑❑❑❑ W J ❑ � � ❑ ❑ w ❑ w ❑ w� ❑ � a w F Z Z Z Z Z x J x x x J� U F 7a? W LL����� 0 0 0❑ w 7 go 7 7 f0 o.f' W w7 IXf m ~ W H❑� U U U U U (� (� (� (� H} � U� W� m Q U p m p m p m p m p m 0 0 0 0 w' w O a z w m� ����� fn a a a a�� a 0 M.M V V V N V V V tp V (O tp V V [O V V � (9 Z W W Ch Ch W Ch W Ch W Ch W C� W Ch W C� W Ch W Ch W W Ch Ch W Ch W C� W Ch W � a a a a a a a a a a a a a a Q U_ ~ O O N Z W 2 U w O UU 5 z Z w w z w z a 5 � w a a o z O U � m Qa S U U O� a U a p Z 0 U g LL 3 0 ?= Z U W m ❑ � W Z O p U w' W� U U O � C7 Z N ZZ Q w U W w J Z❑ Q W w W O Z W O W L] w O a� a Co p � U iE D d❑ Y J� O U z w� "f � F z� W J wJ U w z a� O O O a�a•a3rm ivaeu\sro�au\s�eunmaVernm\amn - v�Vir�xuios axe wuutaH - cewoe\s�r�roaa\n SLOPE ROAD SURFACE �* TOWIIAMS DITCHLINE PLR SPECTI VE � VIE W STAMIZE DITCH V M APPROPRIM LING SUCH AS MW OR GRAS5 MVEL SURFACE ---------- ROO 11UN C f ---- - MIN. SPACNIG MAX. SPACING OunET • PROTECTION MAX GM �------ - 10% OURET PROTECTION BATED SAT RETENTION FENCE GRIWEL ROADVAY SMACE vo-4 Of MICH pfCK SUMP Cully T - DITCH LINE CROSS SECTION DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP ITT MountainVall�y Lc, ENVIRONMENTAL DETAIL PROPOSED ACCESS ROAD TYPICAL LAYOUT DRAWING NO. REV. MVP-SG-ES6 P1 STREAM CR❑SSING TOP ❑F BANK 50 FT 50 FT1j. SILT FENCESTREAM (�-,BED SILT FENCE (TYPJ FLOW 10 FTCSOIMIN, I SOILPILPILE1 SF - DAM (SANDBAGINTAKE WATER BARTRENCH B--- — -- o x PIPELINE PIPELINE z o U WATER N �� BAR DISCHARGE � 10 Ti 10 FT v~ MIN. MIN.. o U TEMP, T MPORARY EQUIPMENT CROS TEMP, ACCESS SLOPE (SEE MOBILE BRIDGE DETAIL SHEET SLOPE CCESS ROAD 12) ROAD EROSION CONTROL DEVICE (TYP,)—,.—��o N N e Cp SILT FENCE (TYP.) ENERGY I DISSIPATER NOTES: PLAN VIEW 1. INSTALL EROSION CONTROL DEVICES, TRENCH BREAKERS, PUMP, ENERGY DISSIPATER, AND DAMS BEFORE TRENCHING STREAM, 2. PUMP MUST BE OF SUFFICIENT CAPACITY TO CONVEY NORMAL AND/OR EXISTING STREAM FLOW OVER TRENCH, A BACK-UP PUMP OF EQUAL CAPACITY MUST BE AVAILABLE ON -SITE DURING CONSTRUCTION OF THE PIPELINE CROSSING. PUMPS WILL BE PLACED WITHIN SECONDARY CONTAINMENT, 3. PLACE SOIL PILES A MINIMUM OF 10 FEET FROM TOP OF BANK, 4. INSTALL WATER BARS AT APPROACHES TO STREAM CROSSING AND EROSION CONTROL DEVICES, SILT FENCE, OR SUPER SILT FENCE (AS INDICATED ON PLAN SHEETS), 5. MAINTAIN SURFACE OF TEMPORARY EQUIPMENT CROSSING TO PREVENT SOIL DISCHARGES TO STREAM, 6. APPROACHES TO CROSSINGS ARE NOT TO EXCEED A DEPTH OF 6 INCHES ABOVE ORIGINAL GRADE, 7. RESTORE AREA TO ORIGINAL CONTOURS, DRAWN TRC DATE 8/7/2018 M Mountain Valley PIPELINE ur ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 STREAM CROSSING APP'0 XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 DAM AND PUMP JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES8 P1 BONDING STRIP (1" x $" x 24") 4 STAPLES (1 "x 1a') GROUND LINE ------ -- -- BOTTOM OF TRENCH LINE POST (OAK) (1-3/4" X 1-1/4" X 48") Black Band I� U MAX O.C. �I 26" 36" SILT -SAVER PRIORITY 2 FABRIC TRENCH 22" 4' LONG WOOD POST (OAK) SPACED AT 6-0" FRONT ELEVATI❑N PRI❑RITY 2 TAKEN FROM SILT —SAVER, INC OR EQUAL NOTES: THE TYPE OF REINFORCED FILTRATION DEVICE (PRIORITY 1 OR PRIORITY 2) WILL BE SELECTED BASED ON FIELD CONDITIONS DURING CONSTRUCTION DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 M Mountain Valley APP'O XXX DATE X/X/2018 PIPELINE ur BELTED SILT RETENTION SCALE N.T.S. SHEET 1 OF 1 FENCE (BSRF) JOB NO. PROJECT ID: DRAWING NO. REV. H-650—TYP MVP—SG—ES9.1 P1 STANDARD SYMBOL DETAIL E-3 SUPER SILT FENCE I hSSF-� 10 FT Max. IN MIN. GROUNDf7777 SURFACE36 IN MIN. 2% IN GALVANIZED CHAIN LINK FENCE NTH GALVANIZED WOVEN SLIT FILM GEOTEXTILE STEEL OR ALUMINUM POSTS ELEVATION CHAIN LINK FENCING WOVEN SLIT FILM GEOTEXTILE fiLOW EMBED GEOTEXTILE AND CHAIN LINK FENCE 8 IN MIN. INTO GROUND CROSS SECTION CONSTRUCTION SPECIFICATIONS 1. INSTALL 2% INCH DIAMETER GALVANIZED STEEL POSTS OF 0.095 INCH WALL THICKNESS AND SIX FOOT LENGTH SPACED NO FURTHER THAN 10 FEET APART. DRIVE THE POSTS A MINIMUM OF 36 INCHES INTO THE GROUND, 2. FASTEN 9 GAUGE OR HEAVIER GALVANIZED CHAIN LINK FENCE (2% INCH MAXIMUM OPENING) 42 INCHES IN HEIGHT SECURELY TO THE FENCE POSTS WITH WIRE TIES OR HUG RINGS. 3. FASTEN WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS, SECURELY TO THE UPSLOPE SIDE OF CHAIN LINK FENCE WITH TIES SPACED EVERY 24 INCHES AT THE TOP AND MID SECTION. EMBED GEOTEXTILE AND CHAIN LINK FENCE A MINIMUM OF 8 INCHES INTO THE GROUND. 4. WHERE ENDS OF THE GEOTEXTILE COME TOGETHER. THE ENDS SHALL BE OVERLAPPED BY 6 INCHES, FOLDED, AND STAPLED TO PREVENT SEDIMENT BY PASS. 5. EXTEND BOTH ENDS OF THE SUPER SILT FENCE A MINIMUM OF FIVE HORIZONTAL FEET UPSLOPE AT 45 DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND THE ENDS OF THE SUPER SILT FENCE. 6. PROVIDE MANUFACTURER CERTIFICATION TO THE INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT GEOTEXTILE USED MEETS THE REQUIREMENTS IN SECTION H-1 MATERIALS. 7. REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP IN FENCE OR WHEN SEDIMENT REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEX71LE IF TORN. IF UNDERMINING OCCURS, REINSTALL CHAIN LINK FENCING AND GEOTEXTILE, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: M Mountain Valley T PIPELINE uc TYPICAL CONSTRUCTION DETAIL SUPER SILT FENCE H-650-TYP DRAWING NO. REV. MVP-SG-ES9.2 I P1 (2) 2"x2"x4B+.. HARDWOOO STAKES. WRAPPED TOGETHER WITH 16 GUAGE WIRE. 10' O.0 2'x2"x36" HARDWOOD STAKE, 10' O.C.. 12" A13OVE SOCK STARTING S FROM ANGLED STAKES BLOWNIPLACED FILTER MEDIA REMOVE BRUSH & WOODY DEBRIS UNDISTURBED GROUND 18" MINIMUM, ��31i�r� F f1�1 JiJl ,j� ri. ter,:, ���;L� .•,,1-r -„?�;: �.��:;- NOTES: THE TYPE OF REINFORCED FILTRATION DEVICE (PRIORITY 1 OR PRIORITY 2) WILL BE SELECTED BASED ON FIELD CONDITIONS DURING CONSTRUCTION DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 PIPELINE ur STACKED COMPOST FILTER SOCK SCALE N.T.S. SHEET 1 OF 1 DETAIL CROSS SECTION VIEW JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES9.3 P1 PA DEP IMPERVIOUS -t I+at;TATC11IF[ ll.lV,IIakha;IA191:111r1-TOPE:0R61:iIli 1e17■;T_l i:0;[*1Ti►1 FIGURE 3.13 Jersey Barrier Cofferdam — End View SANDBAG TO HOLD IMPERVIOUS � LINER IN PLACE WORK AREA IMPERVIOUS LINER EXTENDED TO STREAM BOTTOM AND SECURED WITH SANDBAGS SANDBAG NORMAL STREAM FLOW JEFtSEY BARRIER OPTIONAL SANDBAG PLATFORM NOTES: AT NO TIME, SHOULD MORE THE 60% OF THE STREAM CHANNEL WIDTH BE DIVERTED DURING PIPELINE INSTALLATION. GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FEET OF TOP -OF -BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE CROSSING ARE ON SITE AND PIPE IS READY FOR INSTALLATION. TRENCH BREAKERS SHALL BE INSTALLED WITHIN THE TRENCH ON BOTH SIDES OF THE STREAM CHANNEL (MVP TYPICAL DETAIL MVP-20). WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG OR SEDIMENT TRAP PRIOR TO DISCHARGING INTO ANY RECEIVING SURFACE WATER. HAZARDOUS OR POLLUTANT MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM THE TOP OF STREAMBANK. ALL EXCESS EXCAVATED MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP -OF -BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS UNLESS OTHERWISE AUTHORIZED. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1'1 Mountain Malley PIPELINE iu ENVIRONMENTAL DETAIL COFFERDAM STREAM CROSSING METHOD DRAWING NO. REV. MVP-SG-ES13.2 P1 STANDARD CONSTRUCTION DETAIL Water Deflector S IN. x 11 IN- STANDARD GRADE BBER CONVEYOR BELT ROAD SURFACE 20C GALVANIZEDJ®RU DHIPACTED NAILS (CLINCHBACKFILL ENDS) x $1N. niEATED TIMBER PLANKS TYPICAL CROSS-SECTION EDGE OF ROAD SURFACE FLOW DOWNGRADE rp OF ROAD 10" MINIMUM ANGLE DOWNGRADE MGE of IP RAP OUTFALI_ TO AVOID nOWNWASHING TYPICAL PLAN VIEW USDA Forest Service Deflector shall be inspected weekly and after each runoff event. Accumulated sediment shall be removed from deflector within 24 hours of inspection. Belt shall be replaced when worn and no longer effective. Deflectors may be used to direct runoff from an access road to a well -vegetated area or sediment removal facility. A deflector is typically constructed from rubber belting ranging from 5116" to 112" thick held between two 2" x 8" wooden planks. This method of directing runoff from an access road works best on low traffic roads, deflectors can be used on roads with grades exceeding 10g'o. I ;plu fire Sp ing gt dmau-eased Oipc x sx s r�l► • me s Irsu a Ie5 HG A 15p IA5 16 OG DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 Mau nta i n Va I ley APP'D XXX DATE X/X/2018 PIPELINE uc SCALE N.T.S. SHEET 1 of 1 WATER DEFLECTOR JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES14 P1 WOOD HEIGHT IF RICK FILTER = % HEIGHT IF STRAW BALES IR FILTER FABRIC FENCE OUTLET CROSS SECTION 3' MIN. UP -SLOPE FACE MPOST MCHORED 6' SUMP #57 STRAW BALES OR FILTER FABRIC A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE OF A SILT FENCE OR STRAW BALE BARRIER HAS OCCURRED DUE TO CONCENTRATED FLOW. ANCHORED COMPOST LAYER SHALL BE USED ON UPSLOPE FACE IN HQ AND EV WATERSHEDS. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 113 THE HEIGHT OF THE OUTLET. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1'1 Mountain Valley PIPELINE LLC ENVIRONMENTAL DETAIL ROCK FILTER OUTLET DRAWING NO. REV. MVP-SG-ES17 I P1 STANDARD CONSTRUCTION DETAIL #3-5 Waterbar 16, MIN ORIGINrU. ROAR GRADE NOT REGOMMENOE3 FOR ACTIVE ROADS ORIENT AT 2%GRADIENT TO tO W 510 E OF: ROAD Adapted from USDA Forest Service Waterbars shall discharge to a stable area. Waterbars shad be inspected weekly (daily on active roads) and after each runoff event. Damaged or eroded waterbars shall be restored to original dimensions wilhin 24 hours of inspection. Maintenance of waterbars shall be provided until roadway, skidtrail, or right-of-way has achieved permanent stabilization. Waterbars on retired roadways; skidtrails, and right-of-ways shall be left in place after permanent stabilization has been achieved. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP TABLE 3.1 — Maximum Waterbar Spacing__ PERCENT SLOPE - SPACING (FT)_ -_ If <5 250 5 - 15 150 15 - 30 J 100 > 30 50 Adapted from USDA Forest Service 1'1 Mountain Malley PIPELINE uC ENVIRONMENTAL DETAIL WATERBAR DRAWING NO. REV. MVP-SG-ES19 P1 Rock Construction Entrance with Wash Rack COLLECTOR / CHANNEL DISCHARGING TO SEDIMENT BASIN OR TRAP WASH RACK AASHTO #1 ROCK (8" THICK) EXTENDING 25' MIN. ON BOTH APPROACHES TO WASH RACK 6' (Min) llpp=�illl o 11 5111 I REINFORCED DRAIN SPACE CONCRETE OR WELDED STEEL PIPE Modified from Smith Cattlequard Company IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 70 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. Wash rack shall be 20 feet (min.) wide or total width of access. Wash rack shall be designed and constructed to accommodate anticipated construction vehicular traffic. A water supply shall be made available to wash the wheels of all vehicles exiting the site. MAINTENANCE: Rock construction entrance thickness shall be constantly maintained to the specified dimensions by adding rock. A stockpile of rock material shall be maintained on site for this purpose. Drain space under wash rack shall be kept open at all times. Damage to the wash rack shall be repaired prior to further use of the rack. All sediment deposited on roadways shall be removed and returned to the construction site immediately. Washing the roadway or sweeping the deposits into roadway ditches, sewers, culverts, or other drainage courses is not acceptable. A metal wash rack or livestock grate is an acceptable alternative to the reinforced concrete one shown in the standard detail. Approaches to the wash rack should be lined with aashto #1 at a minimum of 25' on both sides. The wash rack should discharge to a sediment removal facility, such as a vegetated filter strip or into a channel leading to a sediment removal device (e.g. a sediment trap or sediment basin). Rock construction entrances with wash racks should be maintained to the specified dimensions by adding rock when necessary at the and of each workday. A stockpile of rock material should be maintained on site for this purpose. Sediment deposited on paved roadways should be removed and returned to the construction site. NOTE: Washing the roadway or sweeping the deposits into roadway ditches, sewers, culverts, or other drainage courses is not acceptable. Damaged wash racks should be repaired as necessary to maintain their effectiveness. In lieu of washrack installation, MVP will extend the RCE by 70' increments until mud tracking condition is alleviated. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Malley PIPELINE uC ENVIRONMENTAL DETAIL ROCK CONSTRUCTION ENTRANCE WITH WASH RACK DRAWING NO. I REV. H-650—TYP MVP—SG—ES20 I P1 Riprap Streambank Protection with Optional Live Stakes CROSS SECTION H07 TO SCALE __ =•r� ,> .. MAY. SLOPE 2114:1V •G � C STRLAAVfAlU[ K y � ERoslol! CONTROL `� • HLANI[LT rpFA4STOUT NORM A L FLOW I3EP I '.: ;! - `2 TOS Ffff - - -'� (TRIkl1GULAR SPAONGy I _ - LIVE CUT rING i r 11 To 1117 FIICHCS N1 11TAME7Fk RIPRAP TOE PROTECTION HOTE:A40►EU.LEAFEDCOHUITIOU OF fHEL;V;HG • GEOTE%TILE �` � `'" . �• "� FLAI11 YHR rEYT1AL IS lY[71 REPl1tSf11 E Al IVt 611- I t}t 11ME OF HIS TALL AT 10R. Adapted from USDA NRCS, Engineering Field Handbook, Chapter 15 Filter stone may be substituted For the geotextile where site and sail conditions warrant. NOTE: Extend riprap into streambed only as far as required to provide proper toe support. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1'1 Mountain Malley PIPELINE u� ENVIRONMENTAL DETAIL RIPRAP STREAMBANK PROTECTION WITH OPTIONAL LIVE STAKES DRAWING NO. REV. MVP-SG-ES25 P1 FOR PERMANENT ACCESS ROADS USE 4" COMPACTED AASHTO #357 CLEAN STONE. FOR MLV PADS USE 4" COMPACTED AASHTO #57 STONE. UNDISTURBED SOIL EXISTING GRADE / FOR PERMANENT ACCESS ROADS USE MINIMUM 8" AASHTO #3 STONE. FOR MLV PADS USE 8" TO 20" AASHTO #3 STONE. 8-OZ. NON -WOVEN GEOTEXTILE COMPACTED SUBGRADE NOTESI 1. THICKNESS OF AASHTO #3 STONE/AGGREGATE LAYER FOR MLV PADS TO BE BETWEEN 8' AND 20' DEPENDING ON THE STORAGE VOLUME NEEDED TO MEET ST❑RMWATER QUANTITY REQUIREMENTS. 2, THICKNESS OF ASSHT❑ #3 STONE/AGGREGATE LAYER FOR ACCESS ROADS TO BE A MINUMUM OF 8' OR MORE AS DIRECTED. 3, COMPACT SUBGRADE PRI❑R TO BACKFILL PLACEMENT, FOR BACKFILL, A MIN. 95% C❑MPACTI❑N (ASTM D 698) IS REQUIRED. 4, UNSUITABLE MATERIAL SHALL BE REMOVED PRI❑R TO SUBGRADE C❑MPACTI❑N AND BACKFILL PLACEMENT. ADDITI❑NAL SUBGRADE C❑MPACTI❑N NOT REQUIRED FOR MLV PADS. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1'1 Mountain Malley PIPELINE uC ENVIRONMENTAL DETAIL GAP GRADED GRAVEL DETAIL FOR MAINLINE VALVE PADS & PERMANENT ACCESS ROADS DRAWING NO. REV. MVP-SG-ES33 I P1 PROPOSED SURFACE 2 1I N❑TEI EXISTING SURFACES ,. 4 6%SLOPE _i MIN. DEPTH 12" 2 " TOP SOIL TO BE REMOVED AND FILL SLOPE TO BE KEYED INTO EXISTING SOIL. 11 H BOTTOM WIDTH 2' 1, INSL❑PE WITH DITCH SECTI❑N FOR USE ON STEEP SLOPE AND AREAS WITH POOR S❑ILS, 2, ER❑SI❑N CONTROL MATTING TO BE INSTALLED ON CUT AND FILL SLOPES STEEPER THAN 3H11V, SLOPES LESS THAN 3H11V WILL BE MULCHED PER MVP-ES45 TO MVP-ES45,5, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP M Mountain Valley T PIPELINE .. M, ENVIRONMENTAL DETAIL PROPOSED ACCESS ROAD TYPICAL SECTION DRAWING NO. REV. MVP-SG-ES34 P1 FINISH GRADE 4'-6' FLEXIBLE PERFORATED PIPE WATER BAR TRENCH BREAKER BOTTOM OF EXCAVATED TRENCH GAS PIPELINE NOTE, 4'-6' FLEXIBLE PERFORATED PIPE TO BE INSTALLED AT TRENCH BREAKERS ON STEEP SLOPES TO DRAIN SUBSURFACE WATER INT❑ WATER BARS. DRAWN TRC DATE 8/7/2018 Mountain Valley P I P E L IN E uC ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 TRENCH DETAIL APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES35 P1 Typical Wood Mat for Wetland Crossing All woo<11menters Direction are 4" n 4" of tra+rrt 3/l6"galrraAtzed AP10, steel cablt Connect loops with 3/16" cable d 4irnps 2 ft i 10 fl University cif Minnesota FS 07009 A geotextile underlayment shall be used under the woad mat. urca:PaDEP,E Pcill_1ticinC-ontrolManual, March 2I]12 DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: 1'1 Mountain Malley PIPELINE u� ENVIRONMENTAL DETAIL TIMBER MAT/WETLAND CROSSING H-650—TYP DRAWING NO. REV. MVP—SG—ES37 I Pi LIMITS OF PERMANENT ROW FLOW SOIL AMENDMENT AREA MINIMUM 2' LONG LEVEL L W SLOPE BREAKER/ROW EARTHEN BERM (KEY INTO DIVERSION/WATER BAR WATER BAR AND SIDE SLOPE)- �p PLAN VIEW Compacted Soil EARTHEN BERM AT END OF WATERBAR 18" min. --Flow 6 Q IF -I�'I ill 4.5' min. � W SECTION VIEW N❑TES 1. WIDTH 'W' ❑F S❑IL AMENDMENT PER PERMANENT DIVERSI❑N DIKE/WATERBAR WITH S❑IL AMENDMENT SCHEDULE. 2. THE INC❑RP❑RATI❑N DEPTH 'D' IS ASSUMED T❑ BE 1 FT PER TABLE 4.3 IN VA DEQ ST❑RMWATER DESIGN SPEC #4. AN INC❑RP❑RATI❑N DEPTH ❑F 2 FT IS USED IN CASES WHERE ADDITI❑NAL ST❑RAGE CAPACITY IS NEEDED IN ❑RDER T❑ MEET WATER QUANTITY REQUIREMENTS. 3. DEVEL❑PED FR❑M VA. DSWC PLATE 3.09-1. 4. SEE SHEET 0.7, TEMP❑RARY RIGHT ❑F WAY DIVERSI❑NIWATERBAR ADDITIONAL DETAILS F❑R PLAN VIEW. DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 M Mountain Va ! I ey APP'D xxx DATE X/X/2018 PIPELINE DIVERSION DIKE/WATERBARS SCALE N.T.S. SHEET 1 OF 1 WITH COMPOST JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES38 P1 SEE WATERBAR DETAIL (IF NECESSARY) COMPOST FILTER SOCK BARRIER SEE DETAIL 12" COMPOST FILTER SOCK FLOW WELL VEGETATED AREA FORAGE AREA WILL BE EXCAVATED TO A 1-1111.ivi.i u11.IENSION OF 1 FOOT DEEP BY 3 FEET WIDE BY 6 FEET LONG. ADDITIONAL STORAGE, IF REQUIRED, WILL BE EITHER ADDED THROUGH INCREASING THE SUMP FILTER DIMENSIONS OR STACKING COMPOST FILTER SOCK TO INCREASE BMP HEIGHT. NOTES: 1. SUMP FILTER MAY BE USED IN C❑NJUNCTI❑N WITH TEMPORARY WATERBAR (AS DIRECTED BY OWNER REPRESENTATIVE), 2. SUMP FILTER SHALL BE LOCATED ENTIRELY WITHIN THE LIMITS OF DISTURBANCE, 3. BMP SHOULD BE CHECKED EVERY 4 BUSINESS DAYS FOR SEDIMENT ACCUMULATI❑N, PROPER ❑PERATI❑N, AND COMPOST FILTER SOCK INTEGRITY, 4. ADDITI❑NAL COMPOST FILTER SOCKS MAY BE NECESSARY BEYOND WHAT IS SHOWN ON DETAIL TO MEET INTENDED BMP REQUIREMENTS, DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1'1 Mountain Valley PIPELINE ur ENVIRONMENTAL DETAIL TYPICAL SUMP FILTER DRAWING NO. REV. MVP-SG-ES42 P1 TYPICAL LAYOUTS: STREAMS, PONDS & LAKES (PROTECTED & NON -TIDAL) STREAM FLOW ANCHOR PT. �. STAKE OR ANCHOR, EVERY 100' (TYPICAL) SHORELINE ® FILL AREA L1MrM ❑F �_+ CdNSTR. _� SHORELINE ANCHOR PT. TURBIDITY ■ THIS DISTANCE IS VARIA13LE CURTAIN TIDAL WATERS AND/OR HEAVY WIND & WAVE ACTION FLOOD /�- oononccn rnr SHORELINE BARRIER MOVEMENT SHORELINE ANCHOR PT. > DUE TO TIDAL CHANGE ANCHOR PT. ■ THIS DISTANCE IS VARIABLE ® FILL AREA DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP 1�1 Mountain Malley PIPELINE uc ENVIRONMENTAL DETAIL TURBIDITY CURTAIN DETAIL DRAWING NO. REV. MVP-SG-ES43 P1 TYPE I 5/8 IN. POLYPROPYLENE ROPE 1/4 IN. TIE ROPE FOLDS FOR COMPACT STORAGE ACCORDING TO 'NEED FLOATATION ECONOMY FABRICS AVAILABLE 18 OZ. 300 LB/IN. STANDARD NYLON REINFORCED 'VINYL ALL SEAMS HEAT SEALED 1/4 IN. CHAIN (BLOW—UP OF SHACKLE CONNECTION) 0 DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP M Mountain Malley PIPELINE uc ENVIRONMENTAL DETAIL TURBIDITY CURTAIN DETAIL DRAWING NO. REV. MVP-SG-ES43.1 I P1 18 (OR 22) DZ. VINYL COVERED NYLON TYPE 7 GALVANIZED #24 SAFETY HOOK WATER TOP LOAD LINE PVC SLOT -CONNECTOR SEAL 5/16 VINYL COATED CABLE STRESS PLATE (TO REMOVE \ FLOATATION \ PRESSURE FROM FLOATS) 100 FT, STANDARD LENGTH DEPTH ACCORDING TO NEED STRESS BAND DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP STRESS PLATE 1'1 Mountain Valley PIPELINE ur FOLDS EVERY 6 FEET 5/16 IN. CHAIN BALLAST & LOAD LINE ENVIRONMENTAL DETAIL TURBIDITY CURTAIN DETAIL DRAWING NO. REV. MVP-SG-ES43.2 I P1 TY P E III 22 OZ. NYLON REINFORCED VINYL STRESS BAND ATATION PVC BLOT -CONNECTOR FLO Z�kf:�1Vi1�� ,ACCORDING TO NEED 5/16 VINYL COATING CABLE #24 SAFETY HOOK STRESS PLATE LAP LINK 4To REDUCE STUN) OTH SIDES OF CURTAIN DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP r9 Mountain Valley PIPELINE . 5/16 IN. CHAIN ENVIRONMENTAL DETAIL TURBIDITY CURTAIN DETAIL DRAWING NO. REV. MVP-SG-ES43.3 P1 ORIENTATION WHEN INSTALLED (TIDAL SITUATION -- TYPE M) NOTE: ANCHORING WITH BUOYS, ATTACH LINES AUTOMATIC FLASHING AS SHOWN, REMOVES ALL BUOY TO SHACKLE LIGHT (ON AT DUSK - VERTICAL FORCES FROM THE OFF AT DAWN) IDO- CURTAIN. HENCE, THE CURTAIN y y ON CENTER SHALL BE WILL NOT SINK FROM WINE] OR USED IN NAVIGABLE CURRENT LOADS. CHANNELS ONLY MIN 2' ft SSTAN�D COT BUOYM AN CHO R (AS WATER SURFACE 5 aC RECOMMENDED ECOMENDS TU Y THE M �Q MIN. 12" CURTAIN � r-- RIVERBED v ¢ a 4 Q O d v ¢ d d v ¢ O ¢ v O d 9 4 v4 ¢ d ¢ p d d 4 ❑ ¢ ❑ O 4 9 ¢ 4 4 O q d q ¢ ❑ d a ❑ ¢ O ¢ ¢ 4 4 O ❑ 4 ¢❑ 4 4 O v Q 4 O 4 d d Q ❑ ❑ 4 4 a ❑ ❑ ❑ V ¢ 4 4 d DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: H-650-TYP M Mountain Malley PIPELINE uc ENVIRONMENTAL DETAIL TURBIDITY CURTAIN DETAIL DRAWING NO. REV. MVP-SG-ES43.4 P1 TOPSOILING AND SOIL HANDLING FROM SOUTHGATE Definition Methods of preserving and using the surface layer of undisturbed soil, often enriched in organic matter, in order to obtain a more desirable planting and growth medium. Purposes To provide a suitable growth medium for final site stabilization with vegetation and promote successful reforestation. Conditions Where Practice Applies 1. Where the preservation or importation of topsoil is determined to be the most effective method of providing a suitable growth medium. 2. Where the subsoil or existing soil presents the following problems: a. The texture, pH, or nutrient balance of the available soil cannot be modified by reasonable means to provide an adequate growth medium. b. The soil material is too shallow to provide an adequate root zone and to supply necessary moisture and nutrients for plant growth. c. The soil contains substances potentially toxic to plant growth. 3. Only on slopes that are 2:1 or flatter unless other measures are taken to prevent erosion and sloughing. Plannin-a Considerations Topsoil is the surface layer of the soil profile, generally characterized as being darker than the subsoil due to the presence of organic matter. It is the major zone of root development, carrying much of the nutrients available to plants, and supplying a large share of the water used by plants. Although topsoil provides an excellent growth medium, there are disadvantages to its use. Stripping, stockpiling, and reapplying topsoil, or importing topsoil, may not always be cost-effective. Topsoiling can delay seeding or sodding operations, increasing the exposure time of denuded areas. Most topsoil contains weed seeds, and weeds may compete with desirable species. Advantages of topsoil include its high organic matter content and friable consistence, water -holding capacity, and nutrient content. In site planning, the option of topsoiling should be compared with that of preparing a seedbed in subsoil. The clay content of subsoils does provide high moisture availability and deter leaching of nutrients and, when properly limed and Fertilized, subsoils may provide a good growth medium which is generally free DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: ENVIRONMENTAL DETAIL TOPSOILING & SOIL HANDLING DRAWING NO. I REV. H-650-TYP MVP-SG-ES46 I P1 of weed seeds. In many cases topsoiling may not be required for the establishment of less demanding, lower maintenance plant material. Topsoil ing is strongly recommended where ornamental plants or high - maintenance turf will be grown. Topsoi ling is a required procedure when establishing vegetation on shallow soils, soils containing potentially toxic materials, and soils of critically low pH (high acid) levels. If topsoiling is to be done, the following items should be considered: 1. Whether an adequate volume of topsoil exists on the site. Topsoil will be spread at a compacted depth of 2 to 4 inches (depths closer to 4 inches are preferred). 2. Location of the topsoil stockpile so that it meets specifications and does not interfere with work on the site. 3. Allow sufficient time in scheduling for topsoil to be spread and bonded prior to seeding or planting. 4. Care must be taken not to apply topsoil to subsoil if the two soils have contrasting textures. Clayey topsoil over sandy subsoil is a particularly poor combination, as water may creep along the junction between the soil layers, causing the topsoil to slough. Sandy topsoil over a clay subsoil is equally as likely to fail. 5. If topsoil and subsoil are not properly bonded, water will not infiltrate the soil profile evenly and it will be difficult to establish vegetation. Topsoiling of steep slopes should be discouraged unless good bonding of soils can be achieved. Specifications Materials Field exploration of the site shall be made to determine if there is sufficient surface soil of good quality to justify stripping. Topsoil shall be friable and loamy (loam, sandy loam, silt loam, sandy clay loam, clay loam). It shall be free of debris, trash, stumps, rocks, roots, and noxious weeds, and shall give evidence of being able to support healthy vegetation. It shall contain no substance that is potentially toxic to plant growth. In areas where revegetation is of concern based on existing soil conditions and determined by the MVP Environmental Inspector (EI), topsoil samples shall be taken for analysis. Samples will be collected by the MVP El and sent to a recognized laboratory for analysis of the following criteria: Organic matter content shall be not less than 1.5% by weight. pH range shall be from 6.0-7.5. If pH is less than 6.0, lime shall be added in accordance with soil test results or in accordanec with the recommendations of the vegetative establishment practice being used. Soluble salts shall not exceed 500 ppm. Soil samples collected and sent for analysis will be identified by the MVP Constructions Spread # and pipeline station from which the sample was obtained. Areas that fail to revegetate following restoration will be sampled and analyzed based on the above parameters. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: r9 Mountain Valley T PIPELINE u, ENVIRONMENTAL DETAIL TOPSOILING & SOIL HANDLING DRAWING NO. I REV. H-650-TYP MVP-SG-ES46.1 I P1 Topsoil lmporting Topsoil would be imported as needed in residential areas only. if additional off -site topsoil is needed, it must meet the standards stated above. Stripping Topsoil operations should not be performed when the soil is wet or frozen. Stripping shall be confined to the immediate construction area. A 4-to 6-inch stripping depth is common, but depth may vary depending on the particular soil. All perimeter dikes, basins, and other sediment controls shall be in place prior to stripping. Stockpiling Topsoil shall be stockpiled in such a manner that natural drainage is not obstructed and no off -site sediment damage shall result. Stabilize or protect stockpiles in accordance with MS #2. Excavated subsoil shall be stockpiled separately from topsoil. Side slopes of the stockpile shall not exceed 2:1. Perimeter controls must be placed around the stockpile immediately; seeding of stockpiles shall be completed within 7 days of the formation of the stockpile, in accordance with Std. & Spec. 3.31, TEMPORARY SEEDING if it is to remain donnant for longer than 14 days (refer to MS # 1 and MS #2). Site Preparation Prior to and Maintenance During Topsoiling and Excavation Before topsoiling or excavation, establish needed erosion and sediment control practices such as diversions, grade stabilization structures, berms, dikes, level spreaders, waterways, sediment basins, etc. These practices must be maintained during topsoiling and excavation. Gradin . Previously established grades on the areas to be topsoiled shall be maintained according to the approved plan. Liming: Where the pH of the subsoil is 6.0 or less, or the soil is composed of heavy clays, agricultural limestone shall be spread in accordance with the soil test or the vegetative establishment practice being used. Bonding: After the areas to be topsoilcd have been brought to grade, and immediately prior to dumping and spreading the topsoil, the subgrade shalt be loosened by disking or scarifying to a depth of at least 4-6 inches to ensure bonding of the topsoil and subsoil. Refer to 2.8.3 Soil Compaction Mitigation within the Project Standards and Specifications for additional inforination, Apnlving Topsoil Topsoil shall not be placed while in a frozen or muddy condition, when topsoil or subgrade is excessively wet, or in a condition that may otherwise be detrimental to proper grading or seeding. The topsoil shall be uniformly distributed to a minimum compacted depth of 2 inches on 3:1 or steeper slopes and 4 inches on flatter slopes or to mimic existing conditions present in the adjacent undisturbed areas. (See Table 3.30-A to determine volume of topsoil required for application to various depths). Any irregularities in the surface, resulting from topsoiling or other operations, shall be corrected in order to prevent the formation of depressions or water pockets. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: M Mountain Valley ENVIRONMENTAL DETAIL TOPSOILING & SOIL HANDLING DRAWING NO. I REV. H-650-TYP MVP-SG-ES46.2 I P1 Once the topsoil has been applied to the subgrade the topsoil should be disked and raked. Excess rock will be removed from at least the top 12 inches of soil to the extent practicable in all cultivated or rotated cropland, managed pastures, hayfields, and residential areas, as well as other areas at the landowner's request. The size, density, and distribution of rock on the construction work area shall be similar to adjacent areas not disturbed by construction. The landowner or land management agency may approve other provisions in writing. Refer to Standards and Specifications Section 2.8 Final Grading for additional information. TABLE 3.30—A CUBIC YARDS OF T❑PS❑IL REQUIRED FOR APPLICATI❑N TO VARI❑US DEPTHS DOH PER 1 AW PM AM 1 3.1 134 2 6.2 268 3 9.3 4' 4 12A 537 5 15.5 672 6 19.6 BOB SOURCE, Va, DSWC Soil Sterilants No seed shall be placed on soil which has been treated with soil sterilants until sufficient time has elapsed to permit dissipation of toxic materials. Special Soil Related Requirements for Working in Wetlands Norfolk District 2017 Nationwide Permit Regional Conditions, dated March 20, 2017 (subject to revision in Spring of 2017), NWP 12 — Utility Line Activities items 3.b.iii, 5.a, and 5.b require the following: 1. Minimizing clearing of wetlands. Grubbing shall be limited to the permanent easement for underground utility lines. Outside of the permanent easement, wetland vegetation shall only be removed at or above the ground surface unless written justification is provided and the impacts are reviewed and approved by the Corps. 2. Whenever practicable, excavated material shall be placed on a Corps confirmed upland site. However, when this is not practicable, temporary stockpiling is hereby authorized provided that: a. All excavated material stockpiled in a vegetated wetland area is placed on filter cloth, mats, or some other semi -permeable surface. The material will be stabilized with straw bales, filter cloth, etc. to prevent reentry into any waterway. b. All excavated material must be placed back into the trench to the original contour and all excess excavated material must be completely removed from the wetlands within 30 days after the pipeline has been laid through the wetland areas. Permission must be granted by the District Commander or his authorized representatives if the material is to be stockpiled longer than 30 days. DRAWN TRC DATE 8/7/2018 CHECKED XXX DATE X/X/2018 APP'D XXX DATE X/X/2018 SCALE N.T.S. SHEET 1 OF 1 JOB NO. PROJECT ID: M Mountain Valley T PIPELINE u, ENVIRONMENTAL DETAIL TOPSOILING & SOIL HANDLING DRAWING NO. I REV. H-650-TYP MVP-SG-ES46.3 I P1 SLR - COMPOST FILTER SOCK OR SUPER SILT FENCE AS REQUIRED BASED ON SLOPES AT CROSSING (TYP.) TOP OF BANK 50' 3 0 J LL I I TRENCH TRENCH BREAKER _1" (TYP.) SSF SUMP FILTER STREAMBANK SWALE �MIT OF DISTURBANCE MAX Z> WtA BED PLAN TIMBER MAT BRIDGE PERMANENT WATER BAR ® 2% TRANSVERSE SLOPE � A SLOPE 2+00 12" COMPOST 3+00 FILTER SOCK M. SSF� 10' MIN. 75' LIMIT OF DISTURBANCE 50' PERMANENT AT WATER -BODY CROSSING RIGHT-OF-WAY STREAM (TOP OF BANK WIDTH) EXISTING TIMBER MAT GRADE BRIDGE 25 T _ MAX PERMANENERMANEN — WATERBAR z BOTTOM OF TRENCH 42" PROPOSED NATURAL GAS PIPELINE TRENCH BREAKER SECTION A -A (TYP.) DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 M Mountain Valley APP'D XXX DATE X/X/2018 PIPELINE ur SCALE N.T.S. SHEET 1 of 1 TIMBER MAT BRIDGE STREAM CROSSING JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES49 P1 LIMIT OF DISTURBANCE / / / 1 1�P / / Q4 �O 5� / PROPOSED VEHICLE PULL OFF AREA / TO BE SURFACED WITH TIMBER MATS OR GRAVEL / 6" MIN. DOT #1 COARSE AGGREGATE / WOVEN GEOTEXTILE LIMIT OF DISTURBANCE FABRIC OR GEOGRID (AS NEEDED) —III—III—III—I I I 1(- PROPOSED GRAVEL SECTION / / NOTE: 1. NO GRADING ANTICIPATED. IMPROVEMENTS LIMITED TO TEMPORARY GRAVEL PLACEMENT AND TREE REMOVAL WITHIN LOD. 2. WOVEN GEOTEXTILE FABRIC OR GEOGRID MAY BE PLACED UNDER THE GRAVEL PULL OFF AS NEEDED. DRAWN TRC DATE 8/7/2018 ENVIRONMENTAL DETAIL CHECKED XXX DATE X/X/2018 Mountain Va ! I ey APP'D XXX DATE X/X/2018 �" PIPELINE uc SCALE N.T.S. SHEET 1 OF 1 TEMPORARY VEHICLE PULL OFF DETAIL JOB NO. PROJECT ID: DRAWING NO. REV. H-650-TYP MVP-SG-ES54 P1