Loading...
HomeMy WebLinkAbout20181638 Ver 4_Attachment C_VMRC_Permit-Request_April2025_20250530ATTACHMENT C - VMRC PERMIT REQUEST MOUNTAIN VALLEY PIPELINE, LLC MVP SOUTHGATE AMENDMENT PROJECT VIRGINIA MARINE RESOURCES COMMISSION PERMIT REQUEST CONTENTS 1.0 PROJECT INFORMATION..........................................................................1 2.0 PERMIT REQUEST.....................................................................................1 3.0 DESCRIPTION OF TRENCHLESS CROSSING METHODS PROPOSED FOR VMRC JURISDICTIONAL STREAMS ...........................3 3.1 Horizontal Directional Drilling.........................................................................3 3.2 Conventional Bore..........................................................................................4 4.0 ADDITIONAL INFORMATION.....................................................................5 TABLES Table 1. Proposed VWP Permit Stream Crossings with Drainage Areas Greater than Five Square Miles..................................................................2 Table 2. Proposed VMRC Permit Stream Crossings with Drainage Areas Greater than Five Square Miles..................................................................2 ATTACHMENTS Attachment C-1 USACE Norfolk District Standard JPA Form Attachment C-2 VMRC Stream Impact Map Attachment C-3 Stream Impact Plans and Cross Sections Attachment C-4 Inadvertent Return Plan Attachment C-5 Adjacent Property Owner Map and Property Owner Information MVP Southgate Amendment Project VMRC Permit Request 1.0 Project Information Mountain Valley Pipeline, LLC (Mountain Valley') is seeking an Individual Permit from the United States Army Corps of Engineers (USACE) Norfolk and Wilmington Districts to conduct regulated activities below the ordinary high water elevation of navigable waters under Section 10 of the Rivers and Harbors Act of 1899 and for the discharge of dredged and fill material into Waters of the United States under Section 404 of the Clean Water Act (CWA) for the MVP Southgate Amendment Project (Amendment Project). In addition to the USACE Individual Permit application, Mountain Valley will be requesting CWA § 401 Water Quality Certification (WQC) from the Virginia Department of Environmental Quality (VA DEQ) and North Carolina Department of Environmental Quality for portions of the Amendment Project located within their respective jurisdiction .2 3 Due to the large volume of materials included in this submission and for the convenience of Virginia Marine Resources Commission (VMRC) staff, Mountain Valley has consolidated materials relevant to the VMRC permit request in this attachment. 2.0 Permit Request The Amendment Project is seeking authorization to encroach in and on State-owned subaqueous bottoms pursuant to Chapter 12, Subtitle III, of Title 28.2 of the Code of Virginia and the Utility Line Encroachments general permit (4 VAC 20-1410). Streams with a drainage basin of greater than five square miles or a mean annual flow greater than five cubic feet per second are considered navigable -in - fact until evidence is presented proving non -navigability and require authorization from the VMRC. In the course of preparing this multi -agency permit application, Mountain Valley has conducted a detailed evaluation of every stream and wetland associated with the Amendment Project to identify opportunities to avoid and minimize aquatic impacts where appropriate and practicable. As a result of that analysis, Mountain Valley identified a total of seven streams with a drainage area of over five square miles that would be crossed on the Amendment Project. Four of these streams will be crossed utilizing open -cut techniques and will be permitted under the VA DEQ Virginia Water Protection (VWP) permit (Table 1). Mountain Valley is requesting approval for the use of trenchless crossing methods for the three remaining streams that are subject to VMRC jurisdiction, as identified in Table 2 below. These three streams will be crossed using a trenchless crossing method, which would avoid or minimize instream impacts to subaqueous bottomlands, thereby eliminating direct impacts to the aquatic environment at the location of the crossing and reducing downstream sediment impacts. Mountain Valley is proposing to use the horizontal directional drill (HDD) method for crossing the Sandy River, which will require pumping drilling fluids through the pilot hole while completing this crossing. The conventional bore ' Mountain Valley is a joint venture between EQT; NextEra Energy, Inc.; Consolidated Edison, Inc.; AltaGas Ltd.; and RGC Resources, Inc. 2 Additional detailed Amendment Project information can be found in Section 1.0 of the Individual Permit application narrative. 3 Mountain Valley reserves all rights to amend, withdraw, or supplement the VMRC Permit Request or any of its Attachments (including the Attachments thereto), and/or to object to, contest, or hold out as optional/ unnecessary any permit, request, approval, or certification applied for, denied, or received pursuant to the VMRC Permit Request or its Attachments, pursuant to any Presidential Executive Order or any governmental action taken as a result of or related to any Presidential Executive Order. Mountain Valley Pipeline, LLC MVP Southgate Amendment Project VMRC Permit Request crossing method is proposed for Cherrystone Creek and the Banister River, which will use a screw auger to install the drill pipe. Small quantities of water, bentonite, or polymer -based lubricant may be applied during the conventional bore crossings to increase the likelihood of success. For all trenchless crossing methods, any additives will be non -toxic, non -petroleum based, and NSF-60 compliant to meet FERC requirements. All three crossings will be completed in accordance with the FERC Wetland and Waterbody Construction and Mitigation Procedures, the project -specific Erosion and Sediment Control Plan (ESCP), and the Spill Prevention, Control, and Countermeasure Plan. Mountain Valley is proposing the following crossing methods for streams that have a drainage area greater than five square miles. Table 1. Proposed VWP Permit Stream Crossings with Drainage Areas Greater than Five Square Miles Drainage Area Pipeline Linear Feet of Proposed Milepost Impact ID Stream (square miles) Crossing Resource in Crossing Length feet Works ace Method S-A004 Little Cherrystone 5.11 20 99 Dry -Ditch 0.7 Creek Open -Cut 5.3 S-A021 White Oak Creek 15.94 30 91 Dry -Ditch 15.72 21 77 Open -Cut Dry -Ditch Open -Cut 5.4 S-A022 White Oak Creek 23.6 S-B029 Trotters Creek 5.01 14 76 Dry -Ditch Open -Cut Table 2. Proposed VMRC Permit Stream Crossings with Drainage Areas Greater than Five Square Miles Pipeline Linear Feet of Proposed Drainage Area Milepost Impact ID Stream Crossing Resource in Crossing (square miles) Length feet Workspace Method 2.0 S-A008 Cherrystone 36.62 28 87 Conventional Creek 5.3 S-A020 Banister River 68.62 46 84 Conventional Bore 18.2 S-A063 Sandy River 102.60 84 50 HDD Mountain Valley Pipeline, LLC MVP Southgate Amendment Project VMRC Permit Request 3.0 Description of Trenchless Crossing Methods Proposed for VMRC Jurisdictional Streams The trenchless crossing methods Mountain Valley proposes to use for the three streams that require a VMRC permit (Table 2 above) are described in Section 5.1.1 of the Individual Permit application narrative. For convenience, those descriptions are reproduced below. 3.1 Horizontal Directional Drill HDD is a method that allows for trenchless construction across an area by pre -drilling a pilot (or guide) hole below the depth of a conventional pipeline and then pulling the pipeline through the pre -drilled borehole. The HDD method has been in use since the 1970s to install pipelines across rivers and at shore approaches to eliminate pipeline exposure from erosion and scour. Pipelines up to 60 inches in diameter have been successfully installed using this method. The length of pipeline that can be installed by HDD depends upon soil conditions and pipe diameters and is limited by available technology and equipment design capacity limits A steerable drill assembly is used to drill the pilot hole using a combination of tracking wires and bit sensors to maintain the drill path determined during the design phase. Once the pilot hole is completed, it is enlarged using reaming tools to provide access for the pipe. The reaming tools are attached to the drill string at the exit point of the pilot hole and then rotated and drawn back to the drilling rig, thus progressively enlarging the pilot hole with each pass. During this process, drilling fluid is continuously pumped under high pressure into the hole to remove cuttings and maintain the integrity of the hole. Drilling fluid typically consists of bentonite clay, drilling additives, and water. Once the hole has been sufficiently enlarged, a prefabricated segment of pipe is attached behind the reaming tool on the exit side of the crossing and pulled back through the drill hole to the drill rig, completing the crossing. Although the HDD method is a proven technology for pipe installation, the potential exists for an HDD installation to fail. Reasons for failure include encountering soil conditions not conducive to boring, caving of the borehole, losing the drill string in the borehole, loss of drilling fluid return or inadvertent return (IR) to surface, and pullback refusal. Specific geology —such as karst, fractures, or fissures —and the presence of subsurface preferential groundwater flow paths can increase the potential for an IR to occur. However, no mapped karst terrain is known to exist at any VMRC jurisdictional crossings. Proximity to public drinking water sources, private wells, and mining activities (both active and abandoned) also should be considered during the HDD feasibility analysis. Many of these potential failures, such as cave- ins, pullback refusal, and unstable rock, may be avoided or mitigated by making appropriate adjustments to the operation of the HDD equipment or HDD location. However, impacts on aquatic resources, water supplies, and sensitive species in the event of a loss of drilling mud and/or IR are possible. In addition to the potential for an IR, the minimum bend radius of the pipe must also be considered in the design. Commonly accepted industry practice for initial HDD feasibility analyses is to use a minimum allowable bending radius of 100 times the pipe's outer diameter, or 3,000 feet, for Mountain Valley's proposed 30-inch diameter pipeline. In practice, this radius can be reduced if a detailed engineering analysis determines the associated stresses the pipe string would be subjected to are acceptable. Using a tighter bend radius may be warranted to accommodate various factors, including differences in elevation between the entry and exit points, desired clearance below the resource being crossed, desired entry and exit angles, and changes in subsurface geology. In addition, the bend radius will affect the catenary, or the curve formed where the pipe is hanging at the pullback point. Topography, bend radius, Mountain Valley Pipeline, LLC MVP Southgate Amendment Project VMRC Permit Request and entry/exit angles are all factors that determine the catenary height from the ground and whether HDD is a practicable crossing method. A bend radius as aggressive as 2,000 feet may be acceptable with respect to the material strength of the pipe proposed to be used on this project. However, as the bend radius is reduced, there is a corresponding increase in the risk of bore failure. The terrain crossed by the Amendment Project does not require the use of bending radii so small, as most of the crossings are in relatively flat terrain. Mountain Valley has included HDD in its site -specific analysis of appropriate crossing methods. 3.2 Conventional Bore Conventional bore is a technique commonly used in pipeline construction to avoid impacting a sensitive resource, road crossing, or railroad crossing. When using a conventional bore, the pipe is installed beneath the waterbody or wetland, thereby avoiding open trenching across waterbodies and wetlands and avoiding the aquatic impacts associated with working directly within waterbodies and wetlands. Conventional bores allow for uninterrupted existing streamflow and undisturbed wetland vegetation, thereby minimizing impacts to aquatic resources, preserving wetland and wildlife habitat, and minimizing areas of permanent wetland conversion. The conventional bore method, or auger bore, requires the excavation of launching and receiving pits located in workspace in uplands on each side of the feature being crossed. The bore -pit excavations are sloped or shored to comply with all local, state, and federal safety regulations. Prior to construction, wetlands and waterbodies adjacent to each work site are protected using erosion and sediment control devices and BMPs appropriate to the specific site. Bore pits produce spoil piles from the excavated material to create the pit, which is monitored and managed until the bore is complete and the bore pits are backfilled. The volume of spoil generated during boring operations is generally comparable to that generated during open -cut crossings —although the pits may be deeper, an open trench is longer. The cuttings from the bore may also be stockpiled on -site and are used to backfill the bore pits. Any spoil remaining is spread evenly over the right-of-way (ROW) or hauled away. Bore -pit dewatering may be required and, if so, is accomplished in accordance with the Amendment Project's applicable ESCP and FERC requirements. Bore -pit dewatering may be required 24 hours per day. The specific need for, and amount of, dewatering required for any given waterbody or wetland crossing can vary over short periods of time due to recent precipitation and other factors. It cannot be determined until each individual trench or bore -pit excavation begins. In general, construction activities will occur six days per week from 7:00 a.m. to 7:00 p.m. or daylight hours, except where the pipeline would be installed using HDD and conventional bore methods, which require around -the -clock operations and typically will last a few days to a few weeks. Conventional boring's major advantage over some other boring technologies is that the drill pipe is installed as the boring is advanced, and the line pipe is installed immediately behind the bore pipe once the boring is completed, leaving no unsupported hole that could potentially collapse. Because the borehole is continuously supported by pipe throughout the process, the risk of bore collapse is minimal. Conventional boring typically requires the least amount of areal footprint (workspace) of the mechanical trenchless technologies because drilling fluid tanks and mud -mixing systems are not required. Cuttings (spoil) generated by boring operations may be stockpiled temporarily at the site but would ultimately be reused as backfill in the pipeline ROW or transported offsite to an appropriate disposal site. Unlike some bore methods that use drilling fluids under pressure as a slurry to convey cuttings to the surface, a conventional bore conveys cuttings to the surface mechanically using a screw auger. Because a Mountain Valley Pipeline, LLC MVP Southgate Amendment Project VMRC Permit Request conventional bore does not convey cuttings using a high-pressure drilling fluid slurry, this method avoids the potential for an IR during the crossing. However, in some situations, particularly in longer bores or in bores through mixed ground or clay, small quantities of water, bentonite, or polymer -based lubricant may be applied to the cutting head and exterior of the casing to reduce friction and increase the likelihood of success of the crossing. Any lubricants used will be non -petrochemical based, non -hazardous, and NSF-60 compliant. 4.0 Additional Information The following additional information is provided to facilitate VMRC's review of this request. • The USACE Norfolk District Standard JPA Form included in the package is reproduced for convenience in Attachment C-1 hereto. • A table of proposed VMRC stream -crossing methods included in this request can be found in Table 2 (Section 2.0). • A location map of VMRC stream impacts included in this request can be found in Attachment C-2. • Stream Impact Plans and Cross Sections can be found in Attachment C-3. • The Inadvertent Return Plan can be found in Attachment C-4. • Adjacent Property Owner Mapping and Property Owner Information can be found in Attachment C-5. Mountain Valley Pipeline, LLC ATTACHMENTS Attachment C-1 USACE Norfolk District Standard JPA Form Attachment C-2 VMRC Stream Impact Map Attachment C-3 Stream Impact Plans and Cross Sections Attachment C-4 Inadvertent Return Plan Attachment C-5 Adjacent Property Owner Map and Property Owner Information ATTACHMENT C-1- USACE NORFOLK DISTRICT STANDARD JPA FORM STANDARD JOINT PERMIT APPLICATION United States Army Corps of Engineers (USACE) - Norfolk District 803 Front Street, ATTN: CENAO-WR-R Norfolk, Virginia 23510-1011 Phone: (757) 201-7652, Fax: (757) 201-7678 Website: httr)://www.nao.usace.army.mil/Missions/ReQulatory.asox Virginia Marine Resources Commission (VMRC) Habitat Management Division 380 Fenwick Road, Building 96 Fort Monroe, VA 23651 Phone: (757) 247-2200, Fax: (757) 247-8062 Website: htto://www.mrc.virginia.gov/hmac/hmoverview.shtm WEDFl� Virginia Department of Environmental Quality (DEQ) Virginia Water Protection Permit Program Post Office Box 1105 Richmond, Virginia 23218 Phone: (804) 698-4000 Websites: http://www.deg.virginia.gov/ httr)://www.deg.virainia.gov/Locations.aspx The following instructions and information are designed to assist you in applying for permits from federal, state, and local regulatory agencies for work in waters and/or wetlands within the Commonwealth of Virginia. The intent is to provide general information on the permit process, not to act as a complete legal and technical reference. Refer to the applicable laws, regulations, and/or guidance materials of each agency for a complete understanding of each agency's application requirements. JOINT PERMIT APPLICATION PROCESS The Joint Permit Application (JPA) process and Standard JPA form are used by the United States Army Corps of Engineers (USACE), the Virginia Marine Resources Commission (VMRC), the Virginia Department of Environmental Quality (DEQ), and the Local Wetlands Boards (LWB) for permitting purposes involving water, wetlands, and dune/beach resources, including water supply and water withdrawals projects (as defined in DEQ Regulation 9 VAC 25-210). The Tidewater Joint Permit Application form is used for proposed private or commercial aquaculture projects and most commercial and noncommercial projects in tidal waters, tidal wetlands, and coastal primary sand dunes and beaches in Virginia that require the review and/or authorization by the LWB, the VMRC, the DEQ, and/or the USACE. The Tidewater JPA may be downloaded from the same web page on which the Standard JPA is located: http://www.nao.usace.army.mil/Missions/Regulatory/JPA.aspx. If using the Tidewater JPA, follow the instructions provided with that form. Please note that some health departments and local agencies, such as local building officials and erosion and sediment control authorities, do not use the Joint Permit Application process or forms and may have different informational requirements. The applicant is responsible for contacting these agencies for information regarding those permitting requirements. REGULATORY AUTHORITIES OF PARTICIPATING AGENCIES: The USACE regulates activities in waters of the United States, including wetlands, under Section 404 of the Clean Water Act (33 U.S.C. §1344), Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403), and Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 U.S.C. §1413). The VMRC regulates activities on state-owned submerged lands, tidal wetlands, and dunes/beaches under Code of Virginia Title 28.2, Chapters 12, 13, and 14. The DEQ regulates activities in state surface waters and wetlands under Section 401 of the Clean Water Act (33 U.S.C. §1341), under State Water Control Law (Code of Virginia Title 62.1), and Virginia Administrative Code Regulations 9VAC25-210 et seq., 9VAC25-660 et seq., 9VAC25-670 et seq., 9VAC25-680 et seq., and 9VAC25-690 et seq. The LWBs regulate activities in tidal wetlands and dunes/beaches under Code of Virginia Title 28.2, Chapters 13 and 14. LOCAL WETLANDS BOARD CONTACT INFORMATION: Links to LWB information on the Web can be found at http://ccrm.vims.edu/permits_web/guidance/local_wetlands_boards.html. USACE FIELD OFFICE INFORMATION AND DEQ REGIONAL OFFICE INFORMATION: Answers to technical questions and detailed information about specific aspects of the various permit programs may be obtained from the USACE field office in your project area (please refer to the Contact Information on the Regulatory web page at: htti3://www.nao.usace.army.mil/Missions/Regulatory.asi3 or call 757-201-7652), or from the DEQ regional office in your project area (please refer to http://www.deg.virginia.gov/Locations.aspx or call 804-698-4000). Applicants may also seek assistance with completing the informational requirements and/or submittals from private consulting and/or engineering firms for hire. CHESAPEAKE BAY PRESERVATION ACT INFORMATION: Development within the 84 Counties, Cities, and Towns of "Tidewater Virginia" (as defined in §62.1-44.15:68 of the Code of Virginia) is subject to the requirements of the Chesapeake Bay Preservation Application Revised: August 2023 Act. If your project is located in a Bay Act locality and will involve activities, including land disturbance or removal of vegetation, within a designated Resource Protection Area (RPA), these actions will require approval from your local government and completion of Appendix C. The individual localities, not the DEQ, USACE, or Local Wetlands Boards, are responsible for enforcing Bay Act requirements and, therefore, local approval for any activity in an RPA is not granted through this JPA process. Each Tidewater locality has adopted a program based on the Chesapeake Bay Preservation Act and the Chesapeake Bay Preservation Area Designation & Management Regulations. The Act and regulations require Bay Act local governments to administer specific criteria for the use, development and redevelopment of land within locally designated Chesapeake Bay Preservation Areas. Since the requirements of the Bay Act may affect the ultimate design and construction of projects, applicants should contact their local government as early in the process as possible, in order to ensure that these requirements are considered early in the permitting process, and to avoid unnecessary and costly delays. Individual localities will request information regarding existing vegetation within the RPA as well as a description and site drawings of any proposed activity within the RPA. This information will be used by local staff charged with ensuring compliance with the Bay Act during the local approval process. Any use, development and redevelopment or land disturbance within the RPA must receive local approval PRIOR to the initiation of any land disturbance. To determine if your project is located in a Bay Act locality (see map on page 31 or http://www.deg.virg inia.gov/Prop rams/Water/ChesapeakeBaV/ChesapeakeBayPreservationAct/LocalGovernmentOrdinances.asip learn more about Bay Act requirements, or find local government contacts, please visit the Virginia Department of Environmental Quality at http://www.deg.virginia.gov/ProgramsM/ater/ChesapeakeBaV/ChesapeakeBaVPreservationAct.aspx. HOW TO APPLY Sections A through D below provide a general list of information and drawings that are required, depending on the type of project being proposed. Prepare all required drawings or sketches as detailed in the lists provided in Appendix D (Drawings) and according to the sample drawings provided in Appendix D. Application materials should be submitted to VMRC: 1. If by mail or courier, use the address on page 1. 2. If by electronic mail, address the package to: JPA. Perm its(cDmrc.virginia.gov. The application must be provided in the .pdf format. When completing this form, use the legal name of the applicant, agent, and/or property owner. For DEQ application purposes, legal name means the full legal name of an individual, business, or other organization. For an individual, the legal name is the first name, middle initial, last name, and suffix. For an entity authorized to do business in Virginia, the legal name is the exact name set forth in the entity's articles of incorporation, organization or trust, or formation agreement, as applicable. Also provide the name registered with the State Corporation Commission, if required to register. DEQ issues a permit or grants coverage to the so -named individual or business, who becomes the 'permittee'. Correspondence from some agencies, including permits, authorizations, and/or coverage, may be provided via electronic mail. If the applicant and/or agent wish(es) to receive their permit via electronic mail, please remember to include an e-mail address at the requested place in the application. A. APPLICATIONS FOR PROJECTS INVOLVING IMPACTS TO TIDAL WATERS, WETLANDS, AND DUNES/BEACHES (INCLUDING SHORELINE STABILIZATION, PIERS, MARINAS, BEACH NOURISHMENT, BOATHOUSES, BOAT LIFTS, BREAKWATERS, AQUACULTURE ACTIVITIES, DREDGING, ETC.) SHOULD INCLUDE THE FOLLOWING: All applicable portions of Sections 1 through 26 of the JPA, including necessary attachments, information required for projects located in CBPA localities as required in Appendix C (a map of CBPA localities can be found on page 31). Adjacent Property Owner's Acknowledgement Forms('), as detailed in Appendix A or the name and address of the adjacent landowners. An analysis of the functions of wetlands proposed to be impacted may be required by DEQ. (3). A set of 8'/z x 11 inch drawings. If you cannot include all of your project site on one page at a scale no smaller than 1" = 200', you must submit a set of 8'/2 x 11 inch match -line drawings and a set of large -sized drawings at a scale no smaller than 1 "= 200'. If oversized drawings are used, attach five copies of the oversized drawings to your application. In order for projects requiring LWB authorization to be considered complete, applications must include the following information (per Virginia Code 28.2-1302): "The permit application shall include the following: the name and address of the applicant; a detailed description of the proposed activities, a map, drawn to an appropriate and uniform scale, showing the area of wetlands directly affected, the location of the proposed work thereon, the area of existing and proposed fill and excavation, the location, width, depth and length of any proposed channel and disposal area, and the location of all existing and proposed structures, sewage collection and treatment facilities, utility installations, roadways, and other related appurtenances of facilities, including those on the adjacent uplands, a description of the type of equipment to be used and the means of access to the activity site, the names and addresses of record of adjacent land and known claimants of water rights in or adjacent to the wetland of whom the applicant has notice; an estimate of cost; the primary purpose of the project; and secondary purpose of the proposed project; a complete description of measures to be taken during and after alteration to reduce detrimental offsite effects, the completion date of the proposed work, project, or structure, and such additional materials and documentation as the wetlands board may require." B. APPLICATIONS FOR PROJECTS INVOLVING IMPACTS TO NONTIDAL WATERS AND/OR WETLANDS AND: 1) WHERE AUTHORIZATION UNDERSTATE PROGRAM GENERAL PERMIT (SPGP) IS REQUESTED: Application Revised: August 2023 Programmatic general permits may be issued by the USACE in situations where a state, regional, or local authority has a regulatory program in place that provides similar review and regulation of activities in waters as does the USACE. In such cases, the programmatic general permit allows the state, region, or locality to provide the federal authorization, thus avoiding unnecessary duplication of effort by multiple regulatory authorities. In Virginia, DEQ provides authorization for certain activities regulated by the USACE through the State Program General Permit (SPGP). DEQ's authorization under the SPGP is a separate action from that providing coverage under any Virginia Water Protection permit. Certain Residential/Commercial/Institutional Development activities and Linear Transportation activities will be considered for coverage under the current SPGP. Details about the current SPGP can be found at http://www.nao.usace.army.mil/Missions/Regulatory/RBregional.asr) . Mark the "SPGP" checkbox on page 7 of this application. All applicable portions of Sections 1 through 26 of the JPA, including necessary attachments. A conceptual compensatory mitigation plan(z). A copy of the confirmed jurisdictional determination or confirmed delineation, including a waters and wetlands boundary map and data sheets('). All information required for projects located in CBPA localities as required in Appendix C (a map of CBPA localities can be found on page 31). A copy of the FEMA flood insurance rate map or FEMA-approved local floodplain map for the project site (not applicable to <0.1 acre and < 300 linear feet projects by either USACE or DEQ). r A set of 8'/2 x 11 inch drawings. If you cannot include all of your project site on one page at a scale no smaller than 1" _ 200', you must submit a set of 8'/z x 11 inch match -line drawings and a set of large -sized drawings at a scale no smaller than 1"= 200'. If oversized drawings are used, attach five copies of the oversized drawings to your application. 2) WHERE NO SPGP IS REQUESTED: All applicable portions of Sections 1 through 26 of the JPA, including necessary attachments. A conceptual compensatory mitigation plan(2). A copy of the confirmed jurisdictional determination or confirmed delineation, including a waters and wetlands boundary map and data sheets('). All information required for projects located in CBPA localities as required in Appendix C (a map of CBPA localities can be found on page 31), and a copy of the FEMA flood insurance rate map or FEMA-approved local floodplain map for the project site. An analysis of the functions of wetlands proposed to be impacted may be required by DEQ (4). A set of 8 % x 11 inch drawings. If you cannot include all of your project site on one page at a scale no smaller than 1" _ 200', you must submit a set of 8'/z x 11 inch match -line drawings and a set of large -sized drawings at a scale no smaller than 1"= 200'. If oversized drawings are used, attach five copies of the oversized drawings to your application. C. APPLICATIONS FOR PROJECTS INVOLVING SURFACE WATER WITHDRAWALS or FERC LICENSE OR RELICENSE ASSOCIATED WITH A SURFACE WATER WITHDRAWAL: Mark the "DEQ Reapplication" checkbox on page 7 of this application and provide the current/existing permit number. All applicable portions of Sections 1 through 26 of the JPA, including necessary attachments. All applicable portions of Part A and B above if the project involves wetland and/or stream impacts. Copy of any pre -application review panel documentation and summary of the issues raised For new or expanded surface water withdrawals proposing to withdraw 90 million gallons a month or greater, a summary of the steps taken to seek public input as required by 9VAC25-210-320 and an identification of the issues raised during the course of the public information meeting process. D. ANY APPLICATIONS USING THE JPA FORM AS A PRE -CONSTRUCTION NOTIFICATION (PCN) FOR A USACE NATIONWIDE PERMIT: ❖ Mark the "PCN" checkbox on page 7 of this application and insert the number of the intended Nationwide permit. If you fail to mark this box, the PCN will be deemed incomplete and the USACE 45-day time clock will not start. ❖ All applicable portions of Sections 1 through 26 of the JPA, including necessary attachments and all information required for projects located in CBPA localities as required in Appendix C (a map of CBPA localities can be found on page 31). A set of 8 % x 11 inch drawings. If you cannot include all of your project site on one page at a scale no smaller than 1" _ 200', you must submit a set of 8'/z x 11 inch match -line drawings and a set of large -sized drawings at a scale no smaller than 1"= 200'. If oversized drawings are used, attach five copies of the oversized drawings to your application. WHAT HAPPENS NEXT Upon receipt of an application, VMRC will assign a permit application number to the JPA and will then distribute a copy of the application and any plan copies submitted to the other regulatory agencies that are involved in the JPA process. All agencies will conduct separate but concurrent reviews of your project. Please be aware that each agency must issue a separate permit (or a notification that no permit is required). Note that in some cases, DEQ may be taking an action on behalf of the USACE, such as when the State Program General Permit (SPGP) applies. Make sure that you have received all necessary authorizations, or documentation that no permit is required, from each agency prior to beginning the proposed work. Application Revised: August 2023 During the JPA review process, site inspections may be necessary to evaluate a proposed project. Failure to allow an authorized representative of a regulatory agency to enter the property, or to take photographs of conditions at the project site, may result in either the withdrawal or denial of your permit application. For certain federal and state permit applications, a public notice is published in a newspaper having circulation in the project area, is mailed to adjacent and/or riparian property owners, and/or is posted on the agency's web page. The public may comment on the project during a designated comment period, if applicable, which varies depending upon the type of permit being applied for and the issuing agency. In certain circumstances, the project may be heard by a governing board, such as a Local Wetlands Board, the State Water Control Board, or VMRC in cases where a locality does not have a wetlands board. You may be responsible for bearing the costs for advertisement of public notices. Public hearings that are held by VMRC occur at their regularly scheduled monthly commission meetings under the following situations: Protested applications for VMRC permits which cannot be resolved; projects costing over $500,000 involving encroachment over state- owned subaqueous land; and all projects affecting tidal wetlands and dunes/beaches in localities without a LWB. All interested parties will be officially notified regarding the date and time of the hearing and Commission meeting procedures. The Commission will usually make a decision on the project at the meeting unless a decision for continuance is made. If a proposed project is approved, a permit or similar agency correspondence is sent to the applicant. In some cases, notarized signatures, as well as processing fees and royalties, are required before the permit is validated. If the project is denied, the applicant will be notified in writing. PERMIT APPLICATION OR OTHER FEES DO NOT send any fees with the JPA. VMRC is not responsible for accounting for fees required by other agencies. Please consult agency websites or contact agencies directly for current fee information and submittal instructions. USACE: Permit application fees are required for USACE Individual (Standard) permits. A USACE project manager will contact you regarding the proper fee and submittal requirements. DEQ: Permit application fees required for Virginia Water Protection permits — while detailed in 9VAC25-20 — are conveyed to the applicant by the applicable DEQ office (http://www.deg.virginia.gov/Locations.asr)x). Complete the Permit Application Fee Form and submit it per the instructions listed on the form. Instructions for submitting any other fees will be provided to the applicant by DEQ staff. VMRC: An application fee of $300 may be required for projects impacting tidal wetlands, beaches and/or dunes when VMRC acts as the LWB. VMRC will notify the applicant in writing if the fee is required. Permit fees involving subaqueous lands are $25.00 for projects costing $10,000 or less and $100 for projects costing more than $10,000. Royalties may also be required for some projects. The proper permit fee and any required royalty is paid at the time of permit issuance by VMRC. VMRC staff will send the permittee a letter notifying him/her of the proper permit fees and submittal requirements. LWB: Permit fees vary by locality. Contact the LWB for your project area or their locality website for fee information and submittal requirements. Contact information for LWB may be found at http://ccrm.vims.edu/permits web/guidance/local wetlands boards.html. INFORMATION REGARDING THREATENED OR ENDANGERED SPECIES In order to find preliminary information regarding federal or state threatened or endangered species on your project site, you may contact the following four agencies: United States Fish and Wildlife Service NOAA Fisheries Greater Atlantic Region Fisheries Office 6669 Short Lane National Marine Fisheries Service Gloucester, Virginia 23061 55 Great Republic Drive Voice: (804) 693-6694 Gloucester, MA 01930 Fax: (804) 693-9032 Voice: (978) 281-9300 http://virginiafieldoffice.fws.gov/ https://www.greateratlantic.fisheries.noaa.gov/contact us/index.ht ml Project Review Coordinator Virginia Department of Game and Inland Fisheries Virginia Department of Conservation and Recreation Environmental Services Section Natural Heritage Division 4010 West Broad Street 217 Governor Street Richmond, Virginia 23230-1104 Richmond, Virginia 23219 (804) 367-1000 Voice: (804) 786-7951 http://www.dgif.virginia.gov/wildlife/ Fax: (804) 371-2674 http://www.dcr.virginia.gov/natural heritage/index.shtml INFORMATION REGARDING FEMA-MAPPED FLOODPLAINS You may obtain "Online Hazard Maps" for FEMA-mapped floodplains by visiting htti3s://hazards.fema.gov/femaportal/wi)s/portal. Local governments also keep paper copies of FEMA maps on hand. Application Revised: August 2023 FOOTNOTES (1) Adjacent Property Owner Notification: When determining whether to grant or deny any permit for the use of state-owned submerged lands, the VMRC must consider, among other things, effects of a proposed project on adjacent or nearby properties. Discussing the proposed project with these property owners can be done on your own using the forms in Appendix A of this package. Local Wetlands Boards (LWB) must also consider the effects on adjacent properties and notify adjoining property owners of the required public hearings for all applications. The completed forms will assist VMRC and LWB in processing the application. The forms in Appendix A may be photocopied if more copies are needed. This information will not be used by DEQ to meet the requirements of notifying riparian land owners. (2) Compensatory mitigation plans. Conceptual compensatory mitigation plans, when required, should include all information stipulated in Sections 80 B and 116 F of DEQ Regulation 9VAC25-210 for Virginia Water Protection individual permit applicants, or in Sections 60 B and/or 70 of DEQ Regulations 9VAC25-660, 9VAC25-670, 9VAC25-680, or 9VAC25-690 for Virginia Water Protection general permit coverage applicants. Regulations may be obtained from DEQ's web site at http://www.deg.virginia.gov/Programs/WaterMetiandsStreams.aspx. Information on wetland and stream compensatory mitigation is available at http://www.deg.virginia.gov/Programs/WaterANetlandsStreams/Mitigation.asr)x. The SPGP applicant is required to provide a conceptual mitigation plan in accordance with the current SPGP (http://www.nao.usace.army.mil/Missions/Regulatory/RBregional.asr)x). Final compensatory mitigation plans will be required prior to commencement of impacts to waters and/or wetlands on your project site. If no mitigation is planned, submit a detailed statement as to why no mitigation is planned. For projects requiring a LWB or VMRC tidal wetlands permit, please consult the VMRC Wetlands Mitigation -Compensation Policy and Supplemental Guidelines: 4 VAC 20-390 at http://www.mrc.virginia.gov/regulations/regindex.shtm. (3) Wetland and waters boundary delineation map: Wetlands/waters delineations must be performed using the USACE "Wetland Delineation Manual, Technical Report Y-87-1, January 1987, Final Report" (Federal Manual) and if applicable, the current version of the Regional Supplement to the Corps of Engineers Wetlands Delineation Manual (Atlantic and Gulf Coastal Plain Region or Eastern Mountains and Piedmont Region. The SPGP applicant is required to provide a Corps -confirmed jurisdictional determination or Corps - confirmed delineation approved for use with a permit application, in accordance with the current SPGP (http://www.nao.usace.army.mil/Missions/Regulatory/RBregional.aspx). Contact the appropriate USACE District office or field office to obtain a delineation confirmation by referencing the Contact Information on the Regulatory web page at: http://www.nao.usace.army.miI/Missions/Regulatory.asr) or call the Regulator of the Day (ROD) at 757-201-7652. If a USACE confirmation is not available at the time of application, it must be submitted as soon as it becomes available during the DEQ permit review. For DEQ application purposes, the requirements for delineations apply to all applications, regardless of the amount of impacts. The information to be submitted is detailed in 9VAC25-210-80 B 1 h and is the same regardless of the type of VWP permit being sought. (4) An analysis of the functions of wetlands, when required for DEQ permitting purposes, shall assess water quality or habitat metrics and shall be coordinated with DEQ in advance of conducting the analysis. For DEQ permitting purposes, please refer to the requirements in 9VAC25-210-80 C, which are the same regardless of the type of VWP permit being sought. Application Revised: August 2023 TABLE OF CONTENTS Section 1: Applicant, Agent, Property Owner, and Contractor Information....................................................... Section 2: Project Location Information..................................................................................................... Section 3: Description of Project, Purposes, Need, Use(s), and Alternatives.................................................... Section4: Project Costs....................................................................................................................... Section5: Public Notification................................................................................................................. Section 6: Threatened and Endangered Species Information....................................................................... Section 7: Historic Resources Information................................................................................................ Section 8: Wetlands, Waters, and Dunes/Beaches Impact Information........................................................... Section 9: Applicant, Agent, Property Owner and Contractor Certifications...................................................... Section 10: Private Piers, Marginal Wharves, and Uncovered Boatlifts............................................................. Section 11: Boathouses, Gazebos, Covered Boat Lifts, and Other Roofed Structures Over Waterways .................. Section 12: Marinas and Commercial, Governmental, and Community Piers ..................................................... Section 13: Free Standing Mooring Piles, Osprey Nesting Poles, Mooring Buoys, and Dolphins ............................ Section14: Boat Ramps......................................................................................................................... Section 15: Tidal/Nontidal Shoreline Stabilization Structures......................................................................... Section16: Beach Nourishment............................................................................................................... Section 17: Dredging, Mining, and Excavating............................................................................................ Section 18: Fill and Other Structures in Wetlands or Waters, or on Dunes/Beaches............................................ Section 19: Nontidal Stream Channel Modifications for Restoration or Enhancement, or Temporary or Permanent Relocations......................................................................................................................... Section20: Utility Crossings.................................................................................................................... Section21: Road Crossings.................................................................................................................... Section 22: Impoundments, Dams, and Stormwater Management Facilities...................................................... Section 23: Outfalls Not Associated with Proposed Water Withdrawal Activities .................................................. Section 24: Intakes, Outfalls, and Water Control Structures............................................................................ Section 25: Water Withdrawal Use(s), Need, and Alternatives........................................................................ Section 26: Public Comments/Issues for Major Water Withdrawals or Interbasin Transfers .................................. Appendix A: Adjacent Property Owner's Acknowledgement Forms................................................................... AppendixB:................................................................................................... Appendix C: Chesapeake Bay Preservation Act Information............................................................................ AppendixD: Sample Drawings................................................................................................................... ..... 18 ..... 19 ...... 20 ..... 20 ...... 21 ..... 22 ...... 24 ..... 26 ..... 27 29 ..... 30 ..... 32 Application Revised: August 2023 6 APPLICANTS PLEASE PRINT OR TYPE ALL ANSWERS. If a question does not apply to your project, please print N/A (not applicable) in the space provided. If additional space is needed, attach extra 8 % x 11 inch sheets of paper. Check all that apply ❑ Pre -Construction Notification FJSPGP ❑DEQ Reapplication [:]Receiving federal funds ❑ (PCN) NWP # r]PASDO-PGP SELF VERIFICATION Existing permit number: Agency providing funding: (For Nationwide Permits ONLY- No DEQ- VWP permit writer will be assigned) (Replaces Regional Permit 17 (RP-17)) coordination,PREVIOUS ACTIONS RELATED TO THE PROPOSED WORK (include all federal, state, and local pre application applications whether issued, withdrawn, or .- Historical information for past permit submittals can be found online with VMRC - https://webapps.mrc.virginia.gov/public/habitat/ - or VIMS - http://ccrm.vims.edu/perms/newperm its. html Agency Action / Activity Permit/Project number, Date of Action If denied, give reason for denial including any non -reporting Nationwide permits previously used (e.g., NWP 13) See Section 1.2 and Table 9 in the attached application 1. APPLICANT, AGENT, PROPERTY OWNER, AND CONTRACTOR INFORMATION The .. ..Apply .. ..person/people/company(ies) that intend(s) to undertake the activity. or ..company,.. companyThe agent is the person Corporationname that is registered with the State Legal Name(s) of Applicant(s) Agent (if applicable) Mountain Valley Pipeline, LLC Burns & McDonnell Engineering Company, Inc. Mailing address Mailing address 2200 Energy Drive 1431 Opus PI City State ZIP Code City State ZIP Code Canonsburg PA 15317 Downers Grove IL 60515 Phone number w/area code Fax Phone number w/area code Fax 724-873-1378 (331) 218-3688 Mobile E-mail Mobile E-mail jeffrey.klinefelter@egt.com Imferry@burnsmcd.com State Corporation Commission Name and ID number (if State Corporation Commission Name and ID number (if applicable) Mountain Valley Pipeline, LLC T0586216 applicable) Burns & McDonnell F1049420 Certain permits or permit authorizations may be provided via electronic mail. If the applicant wishes to receive their permit via electronic mail, please provide an e-mail address here: jeffrey.klinefelter(a�egt.com Application Revised: August 2023 1. APPLICANT, AGENT, PROPERTY OWNER, AND CONTRACTOR Property owner(s) legal name, if different from applicant See Table 8 INFORMATION (Continued) Contractor, if known N/A Mailing address Mailing address City State ZIP code City State ZIP code Phone number w/area code Fax Phone number w/area code Fax Mobile E-mail Mobile E-mail State Corporation Commission Name and ID number (if applicable) State Corporation Commission Name ID number (if applicable) PROJECT2. • • •- • (Attach a copy of a detailed map, such as a USGS topographic map or street map showing the site location and project boundary, area if the SPGP box is checked. Street Address (911 address if available) City/County/ZIP Code See Section 1.4, Table 6, and Table 8 See Section 1.4, Table 6, and Table 8 Subdivision Lot/Block/Parcel # Name of water body(ies) within project boundaries and drainage area (acres or square miles). See Table 1, Table 2, Table 3, and Table 7 Tributary(ies) to: Basin: See Table 7 Sub -basin: See Table 7 (Example: Basin: James River Sub -basin: Middle James River) Special Standards (based on DEQ Water Quality Standards 9VAC25-260 et seq.): See Section 4.2 in attached application Project type (check one) Single user (private, non-commercial, residential) X Multi-user (community, commercial, industrial, government) Surface water withdrawal Latitude and longitude at center of project site (decimal degrees): See Section 1.4 (Example: 37.33164/-77.68200) USGS topographic map name: See Figure 2 8-digit USGS Hydrologic Unit Code (HUC) for your project site (See http://cfpub.epa.gov/surf/locate/index.cfm ): See Table 7 If known, indicate the 10-digit and 12-digit USGS HUCs (see http://consapps.dcr.virginia.gov/htdocs/maps/HU Explorer.htm) MVP Southgate Amendment Project Name of your project (Example: Water Creek driveway crossing) Is there an access road to the project? [AYes E]No. If yes, check all that apply: Qpublic0private ©improved Runimproved Total size of the project area (in acres): 466 acres in Virginia Application Revised: August 2023 Provide driving directions to your site, giving distances from the best and nearest visible landmarks or major intersections: See Section 1.4 and Section 1.7 in the attached application Does your project site cross boundaries of two or more localities (i.e., cities/counties/towns)? UV YesU No If so, name those localities: See Table 6 3. DESCRIPTION OF THE PROJECT, PROJECT PRIMARY AND SECONDARY PURPOSES, PROJECT NEED, INTENDED USE(S), AND ALTERNATIVES CONSIDERED (Attach additional sheets if necessary) ■ The purpose and need must include any new development or expansion of an existing land use and/or proposed future use of residual land. ■ Describe the physical alteration of surface waters, including the use of pilings (#, materials), vibratory hammers, explosives, and hydraulic dredging, when applicable, and whether or not tree clearing will occur (include the area in square feet and time of year). ■ Include a description of alternatives considered and measures taken to avoid or minimize impacts to surface waters, including wetlands, to the maximum extent practicable. Include factors such as, but not limited to, alternative construction technologies, layout design, locations, local land infrastructure alternative project and alternative use regulations, and existing ■ For utility crossings, include both alternative routes and alternative construction methodologies considered ■ For surface water withdrawals, public surface water supply withdrawals, or projects that will alter in stream flows, include the water supply issues that form the basis of the proposed project. See Section 1.2 and Section 1.4 for Project description and location. See Section 2 for Project purpose, need, and uses. See Section 3 for the Project's alternative analysis. See Section 5 and Table 14 and Table 15 for information on wetland and waterbody crossing methods and a description of impact avoidance, minimization, and compensation. Date of proposed commencement of work (MM/DD/YYYY) Date of proposed completion of work (MM/DD/YYYY) 1 1 •11/30/2027 you submitting this application at the direction of any state, Has any work commenced or has any portion of the project for local, or federal agency? Yes No which you are seeking a permit been completed? Yes V No If you answered "yes" to either question above, give details stating when the work was completed and/or when it commenced, who performed the work, and which agency (if any) directed you to submit this application. In addition, you will need to clearly differentiate between completed work and proposed work on your project drawings. Are you aware of any unresolved violations of environmental law or litigation involving the property? Yes V No pleaseAre explain) Application Revised: August 2023 Approximate cost of the entire project, including materials and labor: $ 524,137,766 Approximate cost of only the portion of the project affecting state waters (channelward of mean low water in tidal areas and below ordinary high water mark in nontidal areas): $ >500,000 5. PUBLIC NOTIFICATION (Attach additional sheets if necessary) Complete information for all property owners adjacent to the project site and across the waterway, if the waterway is less than 500 feet in width. If your project is located within a cove, you will need to provide names and mailing addresses for all property owners within the cove. If you own the adjacent lot, provide the requested information for the first adjacent parcel beyond your property line. Per Army Regulation (AR 25-51) outgoing correspondence must be addressed to a person or business. Failure to provide this information may result in a delay in the processing of your application by VMRC. Property owner's name Mailing address See Table 8 Name of newspaper having general circulation in the area of the project: See Section 6.0 Address and phone number (including area code) of newHave adjacent property owners been notified with forms in Appendix A? -Yes No (attach copies of distributed forr spaper provide any information concerning the potential for your project to impact state and/or federally threatened and endangered species (listed or proposed). Attach correspondence from agencies and/or reference materials that address potential impacts, such as database search results or confirmed waters and wetlands delineation/jurisdictional determination. Include information when applicable regarding the location of the project in Endangered Species Act -designated or -critical habitats. Contact information for the U.S. Fish and Wildlife Service, National Oceanic and Atmospheric Administration, Virginia Dept. of Game and Inland Fisheries, and the Virginia Dept. of Conservation and Recreation -Division of Natural Heritage can be found on page 4 of this package. Note: Historic properties include but are not limited to archeological sites, battlefields, Civil War earthworks, graveyards, buildings, bridges, canals, etc. Prospective permittees should be aware that section 110k of the NHPA (16 U.S.C. 470h-2(k)) prevents the USACE from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the USACE, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. Are any historic properties located within or adjacent to the project site? V Yes No Uncertain If Yes, please provide a map showing the location of the historic property within or adjacent to the project site. Are there any buildings or structures 50 years old or older located on the project site? V Yes No Uncertain If Yes, please provide a map showing the location of these buildings or structures on the project site. Is your project located within a historic district? Yes I/ No Uncertain If Yes. please indicate which district: See Section 1.8.3 and Section 4.4.6 Application Revised: August 2023 10 Has a survey to locate archeological sites and/or historic structures been carried out on the property? V. Yes No Uncertain If Yes, please provide the following information: Date of Survey: See Section 1.8.3 and Section 4.4.6 Name of firm: TRC Is there a report on file with the Virginia Department of Historic Resources? V Yes No _Uncertain Title of Cultural Resources Management (CRM) report: See Section 1.8.3 and Section 4.4.6 Was any historic property located? V Yes No —Uncertain IMPACT8. WETLANDS, WATERS, AND DUNES/BEACHES •- • Report each impact site in a separate column. If needed, attach additional sheets using a similar table format. Please ensure that the associated project drawings clearly depict the location and footprint of each numbered impact site. For dredging, mining, and excavating projects, use Section 17. Impact site Impact site Impact site Impact site Impact site number number number number number 1 2 3 4 5 Impact description (use Within VA DEQ all that apply): 401 WQC VMP F=fill Application, See EX=excavation Table A-1, Table S=Structure A-2 within T=tidal Attachment A NT=non-tidal TE=temporary PE=permanent PR=perennial IN=intermittent SB=subaqueous bottom DB=dune/beach IS=hydrologically isolated V=vegetated NV=non-vegetated MC=Mechanized Clearing of PFO (Example: F, NT, PE, V) Latitude / Longitude (in decimal degrees) Wetland/waters impact area (square feet / acres) Dune/beach impact area (square feet) Stream dimensions at impact site (length and average width in linear feet, and area in square feet) Volume of fill below Mean High Water or Ordinary High Water (cubic yards) Application Revised: August 2023 11 IMPACT•- • Cowardin classification of Within VA DEQ impacted wetland/water 401 WQC VMP or geomorphological Application, See classification of stream Table A-1, Table Example wetland: PFO; A-2 within Example stream: `C' channel Attachment A and if tidal, whether vegetated or non -vegetated wetlands per Section 28.2- 1300 of the Code of Virginia Average stream flow at site (flow rate under normal rainfall conditions in cubic feet per second) and method of deriving it (gage, estimate, etc. Contributing drainage area in acres or square miles (VMRC cannot complete review without this information) DEQ classification of impacted resource(s): Estuarine Class II Non -tidal waters Class III Mountainous zone waters Class IV Stockable trout waters Class V Natural trout waters Class VI Wetlands Class VII httr)s://Iaw.lis.virginia.gov For DEQ permitting purposes, also submit as part of this section a wetland and waters boundary delineation map — see (3) in the Footnotes section in the form instructions. For DEQ permitting purposes, also submit as part of this section a written disclosure of all wetlands, open water, or streams that are located within the proposed project or compensation areas that are also under a deed restriction, conservation easement, restrictive covenant, or other land -use protective instrument. READ ALL OF THE FOLLOWING CAREFULLYBEFORE SIGNING PRIVACY ACT STATEMENT: The Department of the Army permit program is authorized by Section 10 of the Rivers and Harbors Act of 1899, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act of 1972. These laws require that individuals obtain permits that authorize structures and work in or affecting navigable waters of the United States, the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for the purpose of dumping it into ocean waters prior to undertaking the activity. Information provided in the Joint Permit Application will be used in the permit review process and is a matter of public record once the application is filed. Disclosure of the requested information is voluntary, but it may not be possible to evaluate the permit application or to issue a permit if the information requested is not provided. CERTIFICATION: I am hereby applying for permits typically issued by the DEQ, VMRC, USACE, and/or Local Wetlands Boards for the activities I have described herein. I agree to allow the duly authorized representatives of any regulatory or advisory agency to enter upon the premises of the project site at reasonable times to inspect and photograph site conditions, both in reviewing a proposal to issue a permit and after permit issuance to determine compliance with the permit. In addition, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Application Revised: August 2023 12 Is/Are the Applicant(s) and Owner(s) the samel0 YesQ No Legal name & title of Applicant Second applicant's legal name & title, if applicable Jeffrey Klinefelter, VP, MVP Construction & Engineering Applica t r Second applicant's signature Date �� Date Property owner's legal name, if different from Applicant Second property owners legal name, if applicable See Table 8 Property owner's signature, if different from Applicant Second property owners signature Date Date CERTIFICATION OF AUTHORIZATION TO ALLOW AGENTS TO ACT ON APPLICANT'S S' BEHALF IF APPLICABLE I (we ) , Mountain Valley Pipeline, LLC (and) N/A APPLICANT'S LEGAL NAME(S) - complete the second blank if more than one Applicant hereby certify that I (we) have authorized Lori Ferry (and) N/A AGENT'S NAME(S) - complete the second blank if more than one Agent to act on my (our) behalf and take all actions necessary to the processing, issuance, and acceptance of this permit and any and all standard and special conditions attached I (we) hereby certify that the information submitted in this application is true and accurate to the best of my (our) knowledge. Applic t e Second applicant's signature, if applicable / N/A Date Date N/A Agent's signature a d title Second agent's signature and title, if applicable N/A Date Date N/A CONTRACTOR ACKNOWLEDGEMENT IF APPLICABLE I (we), N/A (and) N/A APPLICANT'S LEGAL NAME(S) - complete the second blank if more than one Applicant have contracted N/A (and) N/A CONTRACTOR'S NAME(S) - complete the second blank if more than one Contractor to perform the work described in this Joint Permit Application, signed and dated N/A I (we) will read and abide by all conditions as set forth in all federal, state, and local permits as required for this project. I (we) understand that failure to follow the conditions of the permits may constitute a violation of applicable federal, state, and local statutes and that we will be liable for any civil and/or criminal penalties imposed by these statutes. In addition, I (we) agree to make available a copy of any permit to any regulatory representative visiting the project site to ensure permit compliance. If I (we) fail to provide the applicable permit upon request, I (we) understand that the representative will have the option of stopping our operation until it has been determined that we have a property signed and executed permit and are in full compliance with all of the terms and conditions. Contractor's name or name of firm (printed/typed) Contractor's or firm's mailing address N/A N/A Contractor's signature and title Contractor's license number Date N/A N/A N/A Applicant's signature Second applicant's signature, if applicable N/A N/A Date Date N/A N/A Application Revised August 2023 13 srpP END OF GENERAL INFORMATION The following sections are activity -specific. Fill out only the sections that apply to your particular project. MARGINAL10. PRIVATE PIERS, .-VES, AND UNCOVERED BOAT LIFTS YRtil they have ebtainsd_ al' np-GessaFy state and IeGal Noto; iftho 2_RQ1*Q.F;Q "AP" tQ 2ny OfthO on the �Regional Re.rm peFmits. pr-o&poGtivo ponmi#490 it 17 G-her__kU_st' then thehc s"GWFe(s) does Intatat thin tanin s iand r-andifign questions prGposed inat d..-....OREIn .-...18F f8F the a ..I0..afl R_.-. +.. h8 G- 6i d,-.Fe d e .-.I,-.+.-.. high te high (inelbiding all ehannelwaFd wetlands) eF eFdii9aFy wateF eFdii9aFy wateF (ineluding all ehannelwaFd wetlands). Inelusien depth data On the is highly in ef seunding Depth epiginal clRA submittal FeeeRgmended epdepte expedite peffi9it typieally takeR 10 feet iRffements feF less than 200 feet 20 feet evalbiatien. seundings E feF aFe at wateFways wide and than 200 feet Rlease inelude the date tinge the takeig, neFeFflents wateFways gFeateF the data wide. and Figeaswements weFe Iew MHW, hew the taken tape, whetheF was eelleeted at n9ean wateF (MLVV) eF and seundings wepe (e.g., Fange Number of vessels to be moored at the pier or wharf: N/A Do you have an existing pier on your property? Yes No If yes, will it be removed? Yes No Is your lot platted to the mean low water shoreline? Yes No In the spaces provided below, give the type (e.g., sail, power, skiff, etc.), size, and registration number of the vessel(s) to be moored TYPE LENGTH WIDTH DRAFT REGISTRATION # N/A N/A N/A N/A N/A 11. BOATHOUSES, GAZEBOS, COVERED BOAT LIFTS, AND OTHER ROOFED STRUCTURES OVER WATERWAYS Number of vessels to be moored at the proposed structure: Will the sides of the structure be enclosed? Yes No Area covered by the roof structure square feet In the spaces provided below, give the type (e.g., sail, power, skiff, etc.), size, and registration number of the vessel(s) to be moored TYPE LENGTH WIDTH DRAFT REGISTRATION # N/A N/A N/A N/A N/A Application Revised: August 2023 14 12. MARINAS AND COMMERCIAL,GOVERNMENTAL,• Have you obtained the Virginia Department of Health's approval for sanitary facilities? Yes No You will need to obtain this authorization or a variance before a VMRC permit will be issued. N/A Will petroleum products or other hazardous materials be stored or handled at the facility? Yes No If your answer is yes, please attach your spill contingency plan. N/A Will the facility be equipped to off-load sewage from boats? Yes No N/A EXISTING: wet slips: dry storage: N/A PROPOSED: wet slips: dry storage: N/A 13. FREE STANDING MOORING PILES, OSPREY NESTING POLES, MOORING BUOYS, AND DOLPHINS (not associated with piers) Type and number of mooring(s) proposed: Number of vessels to be moored: N/A N/A In the spaces provided below, give the type (e.g., sail, power, skiff, etc.), size, and registration number of the vessel(s) to be moored TYPE LENGTH WIDTH DRAFT REGISTRATION # N/A N/A N/A N/A N/A Give the name and complete mailing address(es) of the owner(s) of the vessel(s) if not owned by applicant (attach extra sheets if needed): N/A Do you plan to reach the mooring from your own upland property? Yes No If "no," explain how you intend to access the mooring. N/A 14. BOAT RAMPS Will excavation be required to construct the boat ramp? Yes No. If "yes," will any of the excavation occur below the plane of the ordinary high water mark/mean high water line or in wetlands? Yes No. If "yes," you will need to fill out Section 17 for this excavation. Where will you dispose of the excavated material? N/A What type of design and materials will be used to construct the ramp (open pile design with salt treated lumber, concrete slab on gravel bedding, etc.)? N/A Location of nearest public boat ramp N/A Driving distance to that public ramp N/A miles Will other structures be constructed concurrent with the boat ramp installation? Yes No N/A If "yes," please fill out the appropriate sections of this application associated with those other activities. Application Revised: August 2023 15 TIDAL/NONTIDAL SHORELINE STABILIZATION STRUCTURES (INCLUDING BULKHEADS AND ASSOCIATED BACKFILL, RIPRAP REVETMENTS AND ASSOCIATED BACKFILL, MARSH TOE STABILIZATION, GROINS, JETTIES, AND available15. BREAKWATERS, ETC.) Information on non structural, vegetative alternatives (i.e., Living Shoreline) for shoreline stabilization is Is any portion of the project maintenance or replacement of an existing and currently serviceable structure? Yes No If yes, give length of existing structure: N/A linear feet If your maintenance project entails replacement of a bulkhead, is it possible to construct the replacement bulkhead within 2 feet channelward of the existing bulkhead? N/A Yes No If not, please explain below: N/A Length of proposed structure, including returns: N/A linear feet Average channelward encroachment of the structure from Maximum channelward encroachment of the structure from Mean high water/ordinary high water mark: N/A feet Mean high water/ordinary high water mark: N/A feet Mean low water: N/A feet Mean low water: N/A feet Maximum channelward encroachment form the back edge of the N/A Maximum channelward encroachment from the back edge of the Dune feet Beach N/A feet Describe the type of construction including all materials to be used (including all fittings). Will filter cloth be used? Yes No N/A What is the source of the backfill material? N/A What is the composition of the backfill material? N/A If rock is to be used, give the average volume of material to be used for every linear foot of construction: cubic yards What is the volume of material to be placed below the plane of ordinary high water mark/mean high water? cubic yards For projects involving stone: Average weight of core material (bottom layers): N/A pounds per stone (Class ) Average weight of armor material (top layers): N/A pounds per stone (Class ) Are there similar shoreline stabilization structures in the vicinity of your project site? Yes No If so, describe the type(s) and location(s) of the structure(s): N/A If you are building a groin or jetty, will the channelward end of Has your project been reviewed by the Shoreline Erosion the structure be marked to show a hazard to navigation? Advisory Service (SEAS)? Yes No Yes No If yes, please attach a copy of their comments. N/A N/A NOURISHMENT16. BEACH Source of material and composition (percentage sand, silt, clay): Volume of material: N/A cubic yards N/A Area to be covered N/A square feet channelward of mean low water N/A square feet channelward of mean high water N/A square feet landward of mean low water N/A square feet channelward of mean high water Mode of transportation of material to the project site (truck, pipeline, etc.): N/A Application Revised: August 2023 16 Describe the type(s) of vegetation proposed for stabilization and the proposed planting plan, including schedule, spacing, monitoring, etc. Attach additional sheets if necessary. N/A 17. DREDGING, FILL OUT THE FOLLOWING TABLE FOR DREDGING PROJECTS NEW dredging MAINTENANCE dredging Hydraulic Mechanical (clamshell, Hydraulic Mechanical (clamshell, dragline, etc.) dragline, etc.) Cubic yards Square feet Cubic yards Square feet Cubic yards Square feet Cubic yards Square feet Vegetated wetlands N/A N/A N/A N/A N/A N/A N/A N/A Non -vegetated wetlands Subaqueousland Totals Is this a one-time dredging event? _Yes No If "no", how many dredging cycles are anticipated: N/A ( initial cycle in cu. yds.) ( subsequent cycles in cu. yds.) Composition of material (percentage sand, silt, clay, rock): Provide documentation (i.e., laboratory results or analytical reports) that dredged material from on -site areas is free of toxics. If not free of toxics, provide documentation of proper disposal (i.e., bill of lading from commercial supplier or disposal site). N/A Please include a dredged material management plan that includes specifics on how the dredged material will be handled and retained to prevent its entry into surface waters or wetlands. If on -site dewatering is proposed, please include plan view and cross - sectional drawings of the dewatering area and associated outfall. N/A Will the dredged material be used for any commercial purpose or beneficial use? Yes No If yes, please explain: N/A If this is a maintenance dredging project, what was the date that the dredging was last performed? N/A Permit number of original permit: N/A (It is important that you attach a copy of the original permit.) Application Revised: August 2023 17 For mining projects: On separate sheets of paper, explain the operation plans, including: 1) the frequency (e.g., every six weeks), duration (i.e., April through September), and volume (in cubic yards) to be removed per operation; 2) the temporary storage and handling methods of mined material, including the dimensions of the containment berm used for upland disposal of dredged material and the need (or no need) for a liner or impermeable material to prevent the leaching of any identified contaminants into ground water; 3) how equipment will access the mine site; and 4) verification that dredging: a) will not occur in water body segments that are currently on the effective Section 303(d) Total Maximum Daily Load (TMDL) priority list (available at http://www.deg.virginia.gov/Programs/WaterMaterQualitylnformationTMDLs/TMDL/TMDLDeveloi3ment/TMDLProgramPriorities.asr) x) or that have an approved TMDL; b) will not exacerbate any impairment; and c) will be consistent with any waste load allocation/limit/conditions imposed by an approved TMDL (see, "What's in my backyard" or subsequent spatial files at http://www.deg.virginia.qov/ConnectWithDEQNEGIS.asr)x to determine the extent of TMDL watersheds and impairment segments). Have you applied for a permit from the Virginia Department of Mines, Minerals and Energy? Yes No If Yes: Existing permit number: N/A Date permit issued: N/A Contributing drainage area: N/A square miles Average stream flow at site (flow rate under normal rainfall conditions): N/A cfs 18. FILL (not associated with .. OTHER ... OR WATERS, OR ON Source and composition of fill material (percentage sand, silt, clay, rock): N/A Provide documentation (i.e., laboratory results or analytical reports) that fill material from off -site locations is free of toxics. If not free of toxics, provide documentation of proper disposal (i.e., bill of lading from commercial supplier or disposal site). Documentation is not necessary for fill material obtained from on -site areas. Explain the purpose of the filling activity and the type of structure to be constructed over the filled area (if any): N/A Describe any structure that will be placed in wetlands/waters or on a beach dune and its purpose: N/A Will the structure be placed on pilings? Yes No N/A Total area occupied by any structure. N/A Square Feet How far will the structure be placed channelward from the back How far will the structure be placed channelward from the back edge of the dune? N/A feet edge of the beach? N/A feet 19. NONTIDAL STREAM CHANNEL MODIFICATIONS FOR RESTORATION OR ENHANCMENT, or TEMPORARY OR PERMANENT RELOCATIONS If proposed activities are being conducted for the purposes of compensatory mitigation, please attach separate sheets of paper providing all information required by the most recent version of the stream assessment methodology approved by the Norfolk District of the U. S. Army Corps of Engineers and the Virginia Department of Environmental Quality, in lieu of completing the questions below. Required information outlined by the methodology can be found at: http://www.nao.usace.army.miI/Missions/Regulatory/UnifiedStreamMethodologV.asl) or http://www.deg.virg inia.gov/Prog rams/WaterMetiandsStreams/Mitigation.aspx. For all projects proposing stream restoration provide a completed Natural Channel Design Review Checklist and Selected Morphological Characteristics form. These forms and the associated manual can be located at: https://www.fws.qov/chesar)eakebay/StreamReports/NCD%20Review%20Checklist/Natural%20Channel%20Design%20Checklist% 20Doc%20V2%20Final%2011-4-11.pdf Has the stream restoration project been designed by a local, state, or federal agency? Yes No. If yes, please include the name of the agency here: N/A Is the agency also providing funding for this project? Yes No Stream dimensions at impact site (length and average width in linear feet, and area in square feet): L: N/A (feet) AW: N/A (feet) Area: N/A (square feet) Contributing drainage area: N/A acres or N/A square miles Application Revised: August 2023 18 Existing average stream flow at site (flow rate under Proposed average stream flow at site after modifications (flow rate normal rainfall conditions): cfs under normal rainfall conditions): cfs Explain, in detail, the method to be used to stabilize the banks: N/A Explain the composition of the existing stream bed (percent cobble, rock, sand, etc.): N/A Will low -flow channels be maintained in the modified stream channel? Yes No. Describe how: N/A Will any structure(s) be placed in the stream to create riffles, pools, meanders, etc.? Yes No If yes, please explain: N/A 20. UTILITY CROSSINGS Type of crossing: overhead trenched V directionally -drilled Method of clearing corridor of vegetation (check all that apply): ® mechanized land clearing that disturbs the soil surface ® cutting vegetation above the soil surface Describe the materials to be used in the installation of the utility line (including gravel bedding for trenched installations, bentonite slurries used during direction -drilling, etc.) and a sequence of events to detail how the installation will be accomplished (including methods used for in -stream and dry crossings). See Section 1.3, Attachment G, and Attachment Will the proposed utility provide empty conduits for any additional utilities that may propose to co -locate at a later date? Yes */ No. For overhead crossings over navigable waterways (including all tidal waterways), please indicate the height of other overhead crossings or bridges over the waterway relative to mean high water, mean low water, or ordinary high water mark: N/A Nominal system voltage, if project involves power lines: N/A Total number of electrical circuits: N/A Application Revised: August 2023 19 I 11Tll ITY CROSSINrS /Cnntinuec Will there be an excess of excavated material? Yes V No If so, describe the method that will be undertaken to dispose of, and transport, the material to its permanent disposal location and give that location: Will any excess material be stockpiled in wetlands? V Yes No If so, will the stockpiled material be placed on filter fabric or some other type of impervious surface? Yes No Will permanent access roads be placed through wetlands/streams? Yes V No If yes, will the roads be (check one) EI at grade El above grade? Will the utility line through wetlands/waters be continually maintained (e.g. via mowing or herbicide)? Yes No If maintained, what is the maximum width? 30 feet :mAn cRr Have you conducted hydraulic studies to verify the adequacy of the culverts? Yes V No If so, please attach a copy of the hydraulic study/report. Virginia Department of Transportation (VDOT) standards require that the backwater for a 100 year storm not exceed 1 foot for all road, culvert, and bridge projects within FEMA-designated floodplains. Virginia Department of Environmental Quality (DEQ) requires pipes and culverts 24 inches or less in diameter to be countersunk three inches below the natural stream bed elevations, and pipes and culverts greater than 24 inches to be countersunk at least six inches below the natural stream bed elevations. Hydraulic capacity is determined based on the reduced capacity due to the countersunk position. Will the culverts be countersunk below the stream bottom? V Yes No. If no, explain: If the project entails a bridged crossing and there are similar crossings in the area, what is the vertical distance above mean high water, mean low water, or ordinary high water mark of those similar structures? N/A feet above N/A For all bridges proposed over navigable waterways (including all tidal water bodies), you will be required to contact the U. S. Coast Guard to determine if a permit is required of their agency. On separate sheets of paper, describe the materials to be used, the method of construction (including the use of cofferdams), the sequence of construction events, and if bedrock conditions may be encountered. Include cross -sections and profile plans of the culvert crossings including wing walls or rip rap. See Section 1.3, Section 5.1, Attachment G, and Attachment I 22. IMPOUNDMENTS,DAMS, ORMWATER MANAGEMENT FACILITIES If the impoundment or dam is a component Will the proposed impoundment, dam, or stormwater management facility be used for agricultural purposes (e.g., in the operation of a farm)? For DEQ permitting purposes, a farm is considered to be a property or operation that produces goods for market. Yes No What type of materials will be used in the construction (earth, concrete, rock, etc.)? N/A What is the source of these materials? N/A Provide the dimensions of proposed impoundment, dam, or stormwater management facility, including the height and width of all structures. N/A Storage capacity* of impoundment: N/A acre-feet Surface area** of impoundment: N/A acres *should be given for the normal pool of recreational or farm ponds, or **should be given for the normal pool of recreational or farm ponds, or design pool for stormwater management ponds or reservoirs (the design pool for stormwater management ponds or reservoirs (the elevation the pond will be at for the design storm, e.g., 10-year, 24-hour elevation the pond will be at for the design storm, e.g., 10-year, 24-hour storm) storm) Application Revised: August 2023 20 22. IMPOUNDMENTS, DAMS, AND STORMWATER• Is the proposed project excluded from the Virginia Dam Safety Regulations? Yes No Uncertain If not excluded, does your proposed project comply with the Virginia Dam Safety Regulations? Yes No Uncertain Does the proposed design include a vegetation management area per §10.1-609.2? Yes No Uncertain If your answer to these questions is no or uncertain, you should contact the Virginia Department of Conservation and Recreation's Dam Safety Program at (804) 371-6095, or reference the regulations on the Web at http://www. dcr. virginia. gov/dam safety and floodplains/index. shtml For stormwater management and flood control facilities: Design storm event: N/A year storm Retention time: N/A hours Current average flow (flow rate under normal rainfall conditions): N/A cfs Method used to derive average flow: N/A Proposed peak outflow for the design storm provided above: N/A cfs Has the facility been designed as an Enhanced Extended Detention Basin or an Extended Detention Basin in accordance with the Minimum Standard 3.07 of the Virginia Stormwater Management Handbook, Volume I (published by the Virginia Department of Conservation and Recreation, 1999), or in accordance with the latest version of this handbook? Yes No Will the impoundment structure be designed to pass a minimum flow at all times? Yes No If so, please give the minimum rate of flow: N/A cfs What is the drainage area upstream of the proposed impoundment? N/A square miles How much of your proposed impoundment structure will be located on the stream bed? square feet What is the area of vegetated wetlands that will be excavated and/or back -flooded by the impoundment? square feet What is the area and length of streambed that will be excavated and/or back -flooded by the impoundment? square feet linear feet Are fish ladders being proposed to accommodate the passage of fish? Yes No Type and size of pipe(s): Daily rate of discharge: N/A - See Section 4.1.4 N/A - See Section 4.1.4 mgd If the discharge will be thermally -altered, provide the maximum temperature: N/A - See Section 4.1.4 Contributing drainage area: "/"- see section 4.1.4 square miles Average daily stream flow at site: N/A - see section 4.1.4 cfs Have you received a Virginia Discharge Elimination System (VPDES) permit for the proposed project? Yes No. If yes, please provide the VPDES permit number: N/A - See Section 4.1.4 If no, is there a permit action pending? Yes No. If pending, what is the facility name? N/A - See Section 4.1.4 Application Revised: August 2023 21 The following sections are typically related to surface water withdrawal activities; Federal Energy Regulatory Commission license projects; or impacts likely to require instream flow limits. Examples of such projects include, but are not limited to, reservoirs, irrigation projects, power generation facilities, and public water supply facilities that may or may not have associated features, such as dams, intake pipes, outfall structures, berms, etc. If completing these sections, enter "N/A" in any section that does not apply to the project. For intakes: Type and size of pipe(s): N/A - See Section 4.1.4 Type and size of pump(s): N/A - See Section 4.1.4 Average and Maximum daily rate of withdrawal: N/A -See S—tim 4.1.4 and N/A -See Section 4.1.4 mgd Velocity of withdrawal: N/A - See Section 4.1.4 fps Screen mesh size: NSA -Se Sedic 4.1.4 inches / NIA -See S-1-4.1.4 mm If other sizing units, please specify: N/A - See Section 4.1.4 Contributing drainage area at withdrawal point(s): N/A- See Section 4.1.4 square miles Average daily stream flow at withdrawal point(s) (flow rate under normal rainfall conditions): N/A- See Section 4.1.4 cfs Method(s) used to derive average daily stream flow N/A - See Section 4.1.4 Average annual stream flow at withdrawal point(s): N/A - See Section 4.1.4 cfs Latitude and longitude of withdrawal point(s) (degrees, minutes, seconds): N/A - See Section 4.1.4 For outfalls: Type, size, and hydraulic capacity (under normal conditions) of plpe(S): N/A -See Section 4.1.4 and N/A - See Section 4.1.4 Daily rate of discharge: N/A - See Section 4.1.4 If the discharge will be thermally -altered, provide the maximum temperature: N/A - See Section 4.1.4 Contributing drainage area at discharge point(s): N/A- See Section 4.1.4 square miles mgd Average daily stream flow at discharge point(s) (flow rate under normal rainfall conditions): N/A- See Section4.1.4 cfs Method(s) used to derive average daily stream flow N/A - See Section 4.1.4 Latitude and longitude of discharge point(s) (degrees, minutes, seconds): N/A - See Section 4.1.4 For intakes and dams, use the table below to provide the median monthly stream flows in cubic feet per second (cfs) at the water intake or dam site (not at the stream gage; if there is not a gage at the intake or dam site, you will need to interpolate flows to the intake or dam site based upon the most closely related watershed in which there is an operational stream gage monitored by the United States Geologic Survey (USGS)). Median flow is the value at which half of the measurements are above and half of the measurements are below. Median is also sometimes referred to as the `50% exceedence flow'. The median flow generally must be calculated from USGS historical data. Please do not provide mean (average) flow. Month I Median flow (cfs) I Month Median flow (cfs) January N/A - See Section 4.1.4 July N/A - See Section 4.1.4 February August March September April October May November June December Application Revised: August 2023 22 Describe the stream flow gages used, USGS stream flow gage site number and site name (e.g., USGS 01671100 Little River near Doswell, VA), the type of calculations used (such as drainage area correction factors), and the period of record that was used to calculate the median flows provided in the table above. Generally, the period of record should span a minimum of 30 years. N/A - See Section 4.1.4 For interbasin transfer of water resources proposed from either the Chowan River, New River, Potomac River, Roanoke River, Big Sandy River, or Tennessee River basins to another river basin, provide the following information: Destination location (discharge point) of the transfer: 8-digit USGS Hydrologic Unit Code (HUC) (See http://cfpub.epa.gov/surf/locate/index.cfm): N/A known, indicate the 10-digit and 12-digit USGS HUCs (see http://consapps.dcr.virginia.gov/htdocs/maps/HUExplorer.htm): N/A - See Section 4.1.4 Latitude and Longitude: Provide any available historical low -flows at the intake or dam site. N/A N/A - See Section 4.1.4 If Describe how the proposed withdrawal at the intake or dam site will impact stream flows in terms of rates, volumes, frequency, etc. (e.g., percent of the flow to be withdrawn, percent of withdrawal returned to the original source, etc.). N/A Describe how the withdrawal of water will vary over time. For example, will the withdrawal vary by the time of year, by the time of day, or by the time of week? Examples of projects that should describe variable withdrawals include, but are not limited to: power plant cooling withdrawals that increase and decrease seasonally; golf course irrigation; municipal water supply; nurseries; ski resorts that use water for snowmaking; and resorts with weekend or seasonal variations. N/A Application Revised: August 2023 23 Provide the amount of water that will be lost due to consumptive use. For the purpose of this application, consumptive use means the withdrawal of surface waters without recycling of said waters to their source or basin of origin. Examples of consumptive uses are water that is evaporated in cooling towers or by other means in power plants; irrigation water (all types); residential water use that takes place outside of the home; and residential water use both inside and outside of homes for residences served by septic systems. Projects that propose a transfer of water from one river basin to another and/or localities that sell water to other jurisdictions, should document the portion of the withdrawal that is not returned to the originating watershed. Proposed monthly consumptive volume (million gallons): N/A Attach a map showing the location of the withdrawal and of the return of flow, and provide the amount of the return flow (million gallons). For withdrawals proposed on an impoundment, provide a description of flow or release control structures. Include type of structure, rate of flow, size, capacity, invert elevation of outfall pipes referenced to the normal pool elevation, and the mechanism used to control release. Provide a description of available water storage facilities. Include the volume, depth, normal pool elevation, unusable storage volume and dimensions. If applicable, stage -storage relationship at the impounding structure (the volume of water in the impoundment at varying stages of water depth) and volume or rate of withdrawals from the storage facility. N/A Describe the proposed use(s) and need for the surface water and information on how demand for surface water was determined. Golf courses must provide documentation to justify the amount of water withdrawal, such as the amount of acreage under irrigation, the acreage of fairways versus greens, type of turf grass, evapotranspiration, and irrigation efficiency. Agricultural users must supply documentation justifying their requested withdrawal amount, such as type of crop, livestock, or other agriculture animal, number of animals, watering needs, acres irrigated, inches of water applied, and frequency of application. Other users of withdrawals for purposes other than those described above must provide sufficient documentation to justify the requested withdrawal amounts. N/A Application Revised: August 2023 24 Provide the following information at the water intake or dam site. Specify the units of measurement (e.g., million gallons per day, gallons per minute, cubic feet per second, etc.). Proposed maximum instantaneous withdrawal N/A Proposed average daily withdrawal N/A Proposed maximum daily withdrawal N/A Proposed maximum monthly withdrawal N/A Proposed maximum annual withdrawal N/A Describe how the above withdrawals were calculated, including the relevant assumptions made in that calculation and the documentation or resources used to support the calculations, such as population projections, population growth rates, per -capita use, new uses, changes to service areas, and if applicable, evapotranspiration data and irrigation data. N/A For surface water withdrawals, public water supply withdrawals, and projects that will alter instream flows, provide information to establish the local water supply need. Attach additional sheets if needed. EXISTING PROJECTED Existing supply sources, yields, and demands: Projected demands over a minimum 30-year planning period: N/A N/A Peak day withdrawal: N/A Projected demands in local or regional water supply plan (9VAC25-780 et seq.) or demand for the project service area, if that is smaller in area: Average daily withdrawal: N/A N/A Safe yield: N/A Statistical population (growth) trends: N/A Lowest daily flow of record: N/A Types of water uses (residential, public water supply, commercial, industrial, agricultural): Projected demands by type of water use: N/A N/A Projected demands without water conservation measures: Existing water conservation measures and drought response plan, including what conditions trigger implementation: N/A Projected demands with long-term water conservation measures: N/A N/A For surface water withdrawals other than public water supply, provide information or documentation that demonstrates alternate sources of water are available for the proposed project during times of reduced instream flow. N/A Application Revised: August 2023 25 Provide information from the State Water Resources Plan (htti3://www.deci.virginia.gov/Programs/WaterMlaterSupplyWaterQuantityM/aterSupplyPiann ing/StateWaterResou rcesPlan.asl3 and the local or regional water supply plan that covers the area in which the proposed water withdrawal project is located (http://www.deg.virginia.gov/Portals/0/DEQM/ater/WaterSupplVPlanning/SWRP°/o20Final/App°/`20A°/`20Water%20SupplV%20Plans %20and%20Participating%20Localities.pdf). Include information from the plan that pertains to projected demand, analysis of alternatives, and water conservation measures. Discuss any discrepancies between the water supply plan and the proposed project. For projects that propose a transfer of water resources from the Chowan River, New River, Potomac River, Roanoke River, Big Sandy River, or Tennessee River basins to another river basin, information should be provided from the water supply plans for both the source and receiving basins. Attach additional sheets if needed. N/A Provide an alternatives analysis for the proposed water withdrawal project, including the required range of alternatives to be analyzed; a narrative outlining the opportunities and status of regional efforts undertaken; and the criteria used to evaluate each alternative. The analysis must address all of the criteria contained in 9VAC25-360. N/A Describe any existing, flow -dependent beneficial uses along the affected stream reach. Include both instream and offstream uses. Describe the stream flow necessary to protect existing beneficial uses, how the proposed withdrawal will impact existing beneficial uses, and any measures proposed to mitigate any adverse impacts that may arise. For projects that propose a transfer of water resources from the Chowan River, New River, Potomac River, Roanoke River, Big Sandy River, or Tennessee River basins to another river basin, this analysis should include both the source and receiving basins. For the purposes of this application, beneficial instream uses include, but are not limited to, the protection of fish and wildlife habitat; maintenance of waste assimilation; recreation; navigation; and cultural and aesthetic values. Offstream beneficial uses include, but are not limited to, domestic uses (including public water supply); agricultural uses; electric power generation; commercial uses; and industrial uses. N/A Describe the aquatic life known to be present along the affected stream reach. Describe aquatic life that may be impacted by the proposed water withdrawal. Include the species' habitat requirements. For projects that propose a transfer of water resources from either the Chowan River, New River, Potomac River, Roanoke River, Big Sandy River, or Tennessee River basins to another river basin, this analysis should include both the source and receiving basins. N/A Application Revised: August 2023 26 For new or expanded surface water supply projects, use separate sheets of paper to summarize the steps taken to seek public input per 9VAC25-210-320, and identify the issues raised during the public information process. For transfer of water resources proposed from either the Chowan River, New River, Potomac River, Roanoke River, Big Sandy River, or Tennessee River basins to another river basin, if public input was not required per 9VAC25-210-320, summarize on separate sheets of paper any coordination and/or notice provided to the public, local/state government, and interested parties in the affected river basins and identify any issues raised. Application Revised: August 2023 27 APPENDIX A Adjacent Property Owner's Acknowledgement Form I, , own land next to/ across the water from/ in the same cove (print adjacent property owner's name) as the land of (print applicant's name) I have reviewed the applicant's project drawings dated (date of drawings) necessary federal, state, and local permits. I have no comment regarding the proposal I do not object to the proposal I object to the proposal to be submitted for all The applicant has agreed to contact me for additional comments if the proposal changes prior to construction of the project. (Before signing this form, please be sure that you have checked the appropriate option above) Adjacent property owner's signature Date NOTE: IF YOU OBJECT TO THE PROPOSAL, THE REASON(S) YOU OPPOSE THE PROJECT MUST BE SUBMITTED TO VMRC IN WRITING. AN OBJECTION WILL NOT NECESSARILY RESULT IN A DENIAL OF A PERMIT FOR THE PROPOSED WORK. HOWEVER, VALID COMPLAINTS WILL BE GIVEN FULL CONSIDERATION DURING THE PERMIT REVIEW PROCESS. Application Revised: August 2023 28 APPENDIX A Adjacent Property Owner's Acknowledgement Form own land next to/ across the water from/ in the same cove (print adjacent property owner's name) as the land of (print applicant's name) I have reviewed the applicant's project drawings dated (date of drawings) necessary federal, state, and local permits. I have no comment regarding the proposal I do not object to the proposal I object to the proposal to be submitted for all The applicant has agreed to contact me for additional comments if the proposal changes prior to construction of the project. (Before signing this form, please be sure that you have checked the appropriate option above) Adjacent property owner's signature Date NOTE: IF YOU OBJECT TO THE PROPOSAL, THE REASON(S) YOU OPPOSE THE PROJECT MUST BE SUBMITTED TO VMRC IN WRITING. AN OBJECTION WILL NOT NECESSARILY RESULT IN A DENIAL OF A PERMIT FOR THE PROPOSED WORK. HOWEVER, VALID COMPLAINTS WILL BE GIVEN FULL CONSIDERATION DURING THE PERMIT REVIEW PROCESS. Application Revised: August 2023 29 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT 23-SPGP-PASDO SELF -VERIFICATION FORM CATEGORY A PIER STRUCTURES Expires: August21, 2028 Please review the 23-SPGP-PASDO before completing this form. This can only be used for proposed PRIVATE USE structures that comply with the terms and conditions of the 23-SPGP-PASDO located on the Corps website: https://www.nao.usace.army.miI/Missions/Regulatory/RBregionali . 1. Has the permittee reviewed the 23-SPGP-PASDO and verified that the proposed structures are in compliance with all the terms, conditions, and limitations of 23-SPGP-PASDO? ❑ YES ❑ NO 2. Are the proposed structures for private use only? ❑ YES ❑ NO 3. To avoid adverse effects to navigation, do the proposed structures extend no more than one- fourth of the distance across the waterway measured from either mean high water (MHW) to MHW (including all channelward wetlands) or ordinary high water (OHW) to OHW (including all channelward wetlands)? ❑ YES ❑ NO 4. If the proposed structures cross wetland vegetation, are they an open -pile design that has a maximum width of five (5) feet and a minimum height of four (4) feet between the decking and the wetland substrate? ❑ YES ❑ NO ❑ N/A 5. Do the proposed structures include no more than two (2) lifts and no more than two (2) boat slips? ❑ YES ❑ NO ❑ N/A 6. Is the open -sided roof structure designed to shelter a boat no more than 700 square feet and/or is the open -sided roof structure or gazebo structure designed to shelter a pier no more than 400 square feet? ❑ YES ❑ NO ❑ N/A 7. Are all piles associated with the proposed structure non -steel, no more than 12" in diameter, and will there be no more than 25 piles installed channelward of MHW? ❑ YES ❑ NO 8. When operationally feasible, is all work occurring behind cofferdams, turbidity curtains, or other methods used to control turbidity? ❑ YES ❑ NO 9. If the proposed structures are to be located within an anadromous fish use area, will the prospective permittee adhere to the anadromous fish use area time of year restriction (TOYR) prohibiting in - water work from occurring between February 15 through June 30 of any given year if 1) piles are to be installed with a cushioned impact hammer and there are fewer than 492 feet between the most channelward pile and mean low water (MLW) on the opposite shoreline; or 2) piles are to be installed with a vibratory hammer and there are fewer than 384 feet between the most channelward pile and MLW on the opposite shoreline? httr)s://services.dwr.virginia.gov/fwis/ . ❑ YES ❑ NO ❑ N/A 10. Is all work occurring outside of submerged aquatic vegetation (SAV) mapped by the Virginia Institute of Marine Sciences' (VIMS) most recent survey year and 5-year composite? https:Hmoboack.vims.edu/sav/savwabmap/ ❑ YES ❑ NO 11. Has the permittee ensured the construction of the proposed structures will not affect federally listed threatened or endangered species or designated critical habitat? NOAA PRD: https://www.fisheries.noaa.gov/new-england-mid-atlantic/consultations/section-7- consultations-greater-atlantic-region ; and US Fish and Wildlife Service: https:Hipac.ecosphere.fvvs.gov/ ❑ YES ❑ NO 30 12. Will the proposed structures be located outside of the following waterbodies: Broad Creek in Middlesex County, Fisherman's Cove in Norfolk, or the Salt Ponds in Hampton? ❑ YES ❑ NO 13. Is your project located outside of the Section 408 Review Area boundaries for civil works projects (e.g. federal navigation channels, flood risk management projects, or aquatic ecosystem restoration projects) as depicted on the "Norfolk District Section 408 Review Layer" in the Norfolk District Section 408 Map? https://www.nao.usace.army.mi1/408Review/ ❑ YES ❑ NO 14. Is your project located outside of any federal property? Federal property can be located on the "NAO Real Estate Data — CWLDM Land Parcel Area" layer on the Norfolk District Section 408 Map? https://www.nao.usace.army.mi1/408Review/ . ❑ YES ❑ NO 15. Will the proposed structures be located outside of any Designated Trout Waters? https://services.dwr.virginia.gov/fwis/ ❑ YES ❑ NO 16. If the proposed structures include floatation units, will the floating sections be braced so they will not rest on the bottom during periods of low water? ❑ YES ❑ NO ❑ N/A 17. Does the permittee recognize this form does not authorize any dredging or filling of waters of the United States (including wetlands) and does not imply that future dredging proposals or any other structures will be approved by the Corps? ❑ YES ❑ NO If you have answered "NO" to any of the questions above, then the Category A Self -Verification of the 23-SPGP-PASDO does NOT apply, and you are required to obtain written authorization from the Corps prior to performing the work. If you answered "YES" (or "N/A, where applicable) to all of the questions above, you are in compliance with the Category A Self -Verification of the 23-SPGP-PASDO. Please sign below and submit this self - verification form with your completed Joint Permit Application (JPA). This signed form serves as your letter of authorization from the Corps. You WILL NOT receive any other written authorization from the Corps; however, you MAY NOT proceed with construction until you have obtained all other necessary state and local permits. By signing below, I certify that I have read and understand all conditions of the Army Corps of Engineers Norfolk District Regulatory Branch 23-SPGP-PASDO, dated August 22, 2023.1 accept all of the terms and conditions of the permit, including the limits of federal liability contained in the 23-SPGP-PASDO enclosure. I acknowledge that structures authorized under this permit may be exposed to waves caused by passing vessels. The permittee is solely responsible for the integrity of the permitted structures and any resulting wave damage to such structures or moored vessels. I accept that the United States is not liable in any way for such damage and that the permittee will not seek to involve the United States in any actions or claims regarding such damage. Proposed work location: Signature of Property Owner(s) or Agent Date VMRC Number 31 APPENDIX C Chesapeake Bay Preservation Act Information Please answer the following questions to determine if your project is subject to the requirements of the Bay Act Regulations: Is your project located within Tidewater Virginia? Yes V No (See map on page 31) - If the answer is "no", the Bay Act requirements do not apply; if "yes", then please continue to question #2. Please indicate if the project proposes to impact any of the following Resource Protection Area (RPA) features: Tidal wetlands, Nontidal wetlands connected by surface flow and contiguous to tidal wetlands or water bodies with perennial flow, Tidal shores, Other lands considered by the local government to meet the provisions of subsection A of 9VAC25-830-80 and to be necessary to protect the quality of state waters (contact the local government for specific information), A buffer area not less than 100 feet in width located adjacent to and landward of the components listed above, and along both sides of any water body with perennial flow. If the answer to question #1 was "yes" and any of the features listed under question #2 will be impacted, compliance with the Chesapeake Bay Preservation Area Designation and Management Regulations is required. The Chesapeake Bay Preservation Area Designation and Management Regulations are enforced through locally adopted ordinances based on the Chesapeake Bay Preservation Act (CBPA) program. Compliance with state and local CBPA requirements mandates the submission of a Water Quality Impact Assessment (WQ/A) for the review and approval of the local government. Contact the appropriate local government office to determine if a WQIA is required for the proposed activity(ies). The individual localities, not the DEQ, USACE, or the Local Wetlands Boards, are responsible for enforcing the CBPA requirements and, therefore, local permits for land disturbance are not issued through this JPA process. Approval of this wetlands permit does not constitute compliance with the CBPA regulations nor does it guarantee that the local government will grant approval for encroachments into the RPA that may result from this project. Notes for all protects in RPAs Development, redevelopment, construction, land disturbance, or placement of fill within the RPA features listed above requires the approval of the locality and may require an exception or variance from the local Bay Act ordinance. Please contact the appropriate local government to determine the types of development or land uses that are permitted within RPAs. Pursuant to 9VAC25-830-110, on -site delineation of the RPA is required for all projects in CBPAs. Because USGS maps are not always indicative of actual "in -field" conditions, they may not be used to determine the site -specific boundaries of the RPA. Notes for shoreline erosion control protects in RPAs Re-establishment of woody vegetation in the buffer will be required by the locality to mitigate for the removal or disturbance of buffer vegetation associated with your proposed project. Please contact the local government to determine the mitigation requirements for impacts to the 100-foot RPA buffer. Pursuant to 9VAC25-830-140 5 a (4) of the Virginia Administrative Code, shoreline erosion projects are a permitted modification to RPAs provided that the project is based on the "best technical advice" and complies with applicable permit conditions. In accordance with 9VAC25-830-140 1 of the Virginia Administrative Code, the locality will use the information provided in this Appendix, in the project drawings, in this permit application, and as required by the locality, to make a determination that: 1. Any proposed shoreline erosion control measure is necessary and consistent with the nature of the erosion occurring on the site, and the measures have employed the "best available technical advice" 2. Indigenous vegetation will be preserved to the maximum extent practicable 3. Proposed land disturbance has been minimized 4. Appropriate mitigation plantings will provide the required water quality functions of the buffer (9VAC25-830-140 3) 5. The project is consistent with the locality's comprehensive plan 6. Access to the project will be provided with the minimum disturbance necessary. Application Revised: August 2023 32 TIDEWATER V R GINLA 'Fa s Chun Mgron rf AR GTON Alexandria FAIRFAX PRINCE WILLIAM Fredg ksbur9 � _[ HING // OR YLV CAROLINE �6 Colonial izhts S Petersb Application Revised: August 2023 ,0�' ESSEX N KIN L i GEOXE SURRY ISLE OF WIG P a Suffolk C 33 APPENDIX D Sample Drawings On the following pages, you will find lists of information required on drawings, as well as sample drawings in plan and cross -sectional views. While the lists attempt to capture all required information for drawings, please verify your submittal with the applicable agency regulations. For DEQ drawing definitions and requirements, see Sections 10 and 80 of 9VAC25-210; and in Section 60 of the general permit regulations 9VAC25-660, 9VAC25-670, 9VAC25-680, and 9VAC25-690. Please be advised that some Local Wetlands Boards (LWB) require you to have a licensed engineer certify the drawings. You should contact your LWB to determine their specific requirements. Failure to include all necessary information on your drawings may mean that your application is not considered complete by one or more agencies. All projects will require the submittal of plan view and cross -sectional view drawings. Drawings should be drawn to a scale no smaller than 1 inch = 200 feet. The number of sets of drawings to be submitted is detailed in the HOW TO APPLY section starting on page 2 of this package. Drawings can be computer -generated or hand -drawn. The sample drawings demonstrate the general format necessary, but for ease of viewing, not all of the required information is shown in the sample drawings. Plan view drawings should contain the following general informational items Name of project North arrow Scale Waterway name, if designated Existing topographic or bathymetric contours Proposed topographic or bathymetric contours Width of waterway from the mean high water level to the mean high water level (tidal areas), or the ordinary high water mark to the ordinary high water mark (nontidal areas) Direction of flood and ebb (tidal areas), and/or direction of flow in nontidal areas (if applicable) Mean low water level and mean high water level (tidal areas), or ordinary high water mark (nontidal areas) Landward limit of the dune or beach at the site Limits of proposed impacts to surface waters, such as fill areas, riprap scour protection placement, and dredged areas; the amount of such impacts in square feet and acres; and the latitude/longitude (decimal degrees) at each impact site r All delineated wetlands and all surface waters on the site, including the Cowardin classification (i.e., emergent, scrub -shrub, or forested) for those surface waters and waterway name, if designated AND Plan view drawings should also contain the following specific informational items if they apply to the project Resource Impact/Protection-Specific Items: Limits of: existing, non -delineated wetlands, open water, or streams, including submerged aquatic vegetation (SAV), riffle/pool complexes, or bars; Chesapeake Bay Preservation Act Resource Protection Area(s) (RPA), including the 100-foot buffer; proposed clearing within the RPA buffer; and any areas that are under a deed restriction, conservation easement, restrictive covenant, or other land use protective instrument (i.e., protected areas) Location and type of existing vegetation within the 100-foot RPA buffer and location of proposed wetland planting areas (as restoration for temporary impacts or mitigation for permanent impacts) Historic/cultural resources Threatened/Endangered resources Structure/Project-Specific Items: Existing and proposed structures, labeled as `existing' and 'proposed', and their dimensions. These items may include pier(s), including L-heads, T-heads, platforms, and/or decks; roof(s) on roofed structures located over waterways, including boathouses; gasoline storage tanks and/or structures for collecting and handling hazardous material, including settling tanks for travel lift washdown water, paint chips, etc.; return walls; tie-ins to existing bulkhead(s) or riprap; utility line easement(s); utility line/road right(s)-of-way; aerial transmission line structure(s), including towers, poles, platforms, etc.; onsite or offsite dredged material disposal areas, including location of all berms, spillways, erosion and sediment control measures, outfall pipes, and aprons; temporary stockpiles of excavated material; temporary construction access facilities; risers and/or emergency spillways, labeled with their proposed invert elevations; design pool/normal pool for stormwater management ponds/impoundments/reservoirs; intakes and/or outfalls, including splash aprons, relative to mean high water, mean low water, or ordinary high water mark(s); anchoring devices and weights (mooring buoys), including the total swing radius Channelward encroachment of proposed structure(s) from mean high water and mean low water, or from ordinary high water mark For piers that cover'/ or more of the waterway width: depth soundings, taken at the mean low water level (tidal areas) or the ordinary high water mark (nontidal areas) Distance(s) between structure(s) (piers, boathouses, catwalks, etc.) and mooring pile(s) Minimum distance between dredge cut and vegetated wetlands Latitude and longitude of all mooring structures, in degrees, minutes, and seconds End points and turning points along proposed bulkhead(s), labeled as such Application Revised: August 2023 34 APPENDIX D (continued) For bulkheads, measurements from each end point and each turning point along proposed bulkhead(s) to two fixed points of reference (labeled as such) r Structure or method used to contain fill (hay bales, silt fences, etc.) Dimensions of impoundment, dam, or stormwater management facility and area of any vegetative management areas Cross -sectional view drawings, and when required profile view* drawings, should contain the following General Informational items: Name of project North arrow Scale Waterway name r Mean low water and mean high water lines (tidal areas), and/or ordinary high water mark (nontidal areas) Direction of flood and ebb (tidal areas), and/or direction of flow in nontidal areas (if applicable) Existing contours of the bottom (depths relative to mean low water or ordinary high water mark) and the bank itself Existing contours of the dune or beach Existing and proposed elevations Location of all existing and proposed structures Limits of proposed impacts to surface waters, such as fill areas, riprap scour protection placement, and dredged areas; the amount of such impacts in square feet and acres; and the latitude/longitude (decimal degrees) at each impact site AND Cross -sectional view drawings, and when required profile view* drawings, should also contain the following specific informational items if they apply to the project: Resource impact/protection-specific Items: Limits of: existing, non -delineated wetlands, open water, or streams, including submerged aquatic vegetation (SAV), riffle/pool complexes, or bars; Chesapeake Bay Preservation Act Resource Protection Area(s) (RPA), including the 100-foot buffer; and proposed clearing within the RPA buffer Riprap scour protection Proposed wetland planting areas, relative to mean high water and mean low water (tidal areas), or ordinary high water mark (nontidal areas) Depth of buried toe of riprap or marsh toe stabilization Base width, top width, and slope of stone/concrete stabilization structures Structure/Project-Specific Items: Existing and proposed structures, labeled as `existing' and 'proposed', and their dimensions. These items may include fill areas, labeled with square footage(s) or acreage(s) over vegetated wetlands and subaqueous bottom; berms, spillways, erosion and sediment control measures, outfall pipes, and aprons at onsite or offsite dredged material disposal area(s); bank grades; deadmen, sheeting, knee braces, etc., as used in the construction of bulkheads; filter cloth; weep holes; intakes and/or outfalls, including splash aprons, relative to mean high water, mean low water, or ordinary high water mark; risers and/or emergency spillways; low - flow channels; culverts, including their proposed invert elevations and diameters; anchoring systems for aquaculture structures; type of chain used to secure mooring buoys to subaqueous bottom For dredge projects, proposed contours of the bottom (depth relative to mean low water or ordinary water level) Bottom width of proposed dredge cut, projected side slope of cut, and estimated top width of cut Ponding depth of onsite or offsite dredged material disposal area Minimum distance between pier decking and vegetated wetland substrate (a.k.a. the "mud line") Water depth below mean low water at the end of proposed boat ramps Depth of penetration of pilings and/or sheeting (bulkheads) Elevation of any proposed fill (including backfill) Structure or method used to contain fill (hay bales, silt fences, etc.) Design pool/normal pool elevation for stormwater management facilities/impoundments/reservoirs Vertical distance from the water surface (relative to mean high water or ordinary high water mark) for all aerial crossings (bridges or overhead utility lines) over navigable water bodies Depth below bottom of water body for submarine utility crossings Dimensions of impoundment, dam, or stormwater management facility through a cross-section of the structure(s); bottom elevation(s) of basin created; depth of pool; and depth(s) to structure(s) on the bottom. * Profile drawing or drawings with the information noted in Appendix D may be required by DEQ on a case -by -case basis to demonstrate minimization of impacts. When required, any application that proposes piping or culverting stream flows shall provide a longitudinal profile of the pipe or culvert position and stream bed thalweg, or shall provide spot elevations of the stream thalweg at the beginning and end of the pipe or culvert, extending to a minimum of 10 feet beyond the limits of proposed impact. Application Revised: August 2023 35 d0 UMMI A MINM O U7 dHOINDL um -lmf3r�ieai 0-co b tL o _ L cowapnll6uo 11 }' N m \1 > U U = O N J 0 a r� a p E C M U' "6 « NO J J 6�J� CL O w ' C co co u7 \ l` 11 N 7 -G c0 v' z n o C II /-.., VJNIMb2i4 3-]dNVS �u3xs so a3aam la�am [Z\ m U O O U / p = Ln a[aEo N W N V7 N / ,6l L a om c o m U 0 0 ° a N `m a o m a Q / U a U m ° > U � M ?�. N 3 O y% `aa a^ N = M u CD / a c6 0 N � �zmmN o > �ss6 N u a m U cc a) N ON C) Z a U L� 3 0 CO 'N'\,,,((( IIMb2i4 3-]dNVS ae :uaxs A wM kwe uNNm aa d a E m ° a N on = I m � C N a u N U X W o m O � � E ° m m E a � N - � N L O m O onN O t @ U U O i O O > Q 7 N O h cc CO O N a a; } m N 71, C N 9 — N + Q N N N co 'I II r N O 47 cD � a E O u @ J O U J J U „8 ,L JNIMb7(l d-ldVWS sdwea leog MIG ao =uaas A MMIN NW kwomm o 'UMMIM&M O N O + C) N jp C � N C N O O a � � zN V) I I II I ° � E o O in N N E a x X i Q m a a U w m _ Q w Q a a a u U a N au¢ : III O U c o N _II N IIII U �� C c6 a JNIMVZJU d-IdMS sasnoyleog am AD U3*0 dD M3WMN 'AidH H33213 32i00d Zi lauuey0 jo a6p3 -axeaiae T C N @ N N @ @a � L O c N 6 a`m a o 0 � a � a � N LJ N x w Q `lV w V) N 4nAA-lA —MHW— O J a -o 0 Q O L> �a 7 = L O -O Q L > = 7 C 7 O V7 O Y N O U A C @ C -6 O U F_ N Q m N Y ON } a Y o Y O U } a } N ONIMH214 3TdWHS saMe4M IeulML-A'S N33HO0 131NlVd qq3- - pool z r lauuey0 to 86p3 O O O N M C U W U7 � @ O = a c b N � O m 120, N N M � 7 N I �M O C O .0 I o > �oa4 O a >asnoH 33ug a s.luLo!lddd J m a a f pu3 Ol 888 'H'S'A OOZ alno2l of '3M A '-L33B dD HEMN :ALWM C 76 2 J � a a� UMMU r y O V7 c w N > N � -6 N m a N m � @ a L 0 @ aL a Q m Q v7 A) a m c N x W N U C N ONIMH2i4 TldAVS nd alenud '3M AO U3318 dD HEMN :ALNW7 :dMNAL a.ue ;om2LVx :1Ngfladv lauuey0 10 a6p3 L m � � L � L N 47 tT O U > @ a Y ins �� ❑L U •• 'L 7 p Ln O O Q� C ❑ N a1N u7N O � @ m cc00 Q +++ N J X X x N N N O a N g > J � E m a w a O LO N 07 @ 9 O L @ N L 7 @ O 0 D N N N � - N — — �aa N ONIAAVN(I d-IdAVS ■ ■ ►♦ice_♦♦i♦i♦♦i♦i♦i� ` - - • ►♦�=IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ♦-IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII " Marinas M -ineS A MOM ;&Moo :ate 4m MAIMA lemma .�. W II Q O 2 ) J a N U W J ` 7 O }U U� xa �� Wmc JNIMb210 d-ldVWS SJOILAAAeaJa I � � LC1 I m N M � (D O } O M O N } O + Y aui-1 fi]jadoid J = 9 N O N N O O 3-IdMS N a CO N a 0 X U GD p m a :2M Q-17711510 1�11M =uMnL C a ho N O �AYI1f8LV11 `J � � TIF = J I � � I 7 O U � U @ U a W J - O O ON N } O 6 II a M U O O X @ M @ � a U U J @ O Y a N U O U N m N 9 x� U 7 II O a U X 9 y N N (a� N a N O 0 C) UU m C N W JNIMb2ia d-IdMS Illhlueg pa]eiuossV pue speaLpling Ira :03"6 n A mmorw tea, :aHsxum -AVARGMAI :5 t a m lMrWdV a fl- Y Cn c6 C _ U Q — o a a 6 N a a _' b La; '9£ N U � Q ti c \ u a aI m > m y o a a U 7 M O J J �G a Q ON a. Y N [ c0 a ❑ U N � a� a as JQ2 0 Z_ E a a) 0 m a � J Ln RS y 7 9 O a) N O J 9 No. J(nN a.NE 4 spuel]aM/sJa]eM 5ulpl j awa n :aans as Akmda aue� uuew I&SIMOA N N um 'AVAPMM 1 U Arinnaar m m U U 70 0) U M U a a E U Q« c y t a Lf) U a u U a a I a Q �I 9) a 0S .6 is .00E � m � CL a mm � C 1 C a7 ^ _ S V > N N u N a7 U ^/ ) M p K O c N 6 O O 9 a � m m E a � z a 005 Q m N 'D aui] 41jadoid Z Q- a) a o zr ONIMb2i4 3-IdMS 07 N a m 47 a c6 =co I a m° M N o c .__ 0 I ~ 2 a1 - O Q II z ccu U m W O U / -U U N A a7 o N / t m m= m u m " z fn LL > 9 9 E N ;6 2 0 .N U / N � m � t / m c C7 cc Q a- Cc6 LD h W / N a) a L� �H2i4 ��dWHS O a) � a :uw ao :aans as n a_ m 'Ifff°daw a 9 a p N a7 -a C m N 6 3 U C O m E a m N m w o = LL n O 6 L O a c a a a m N N I OL O a wU N Q a z a O -U M U �T W�/� �m V! Y a 7 Om U a o C IU Z m a7 O � � m m @ `JNIMVNCI d1dAVS m N suogeagpow Iauuey0 weals ILPRUON ;,&04mm N ;Uftml. 7 LT Q W O L � O • Z � N N O� N L O L O LI m L II > II L II O U LL -0 ZQ EUOOZO _ •N m a rn 4 = m � Q O O O O > N `e° z a � U N ^ U ui ql-k5o Q @ _O 9 20 O N N J @ O 0 � a � a c xX LL JNIMb2i4 3-]dNVS A '03M d0 alp N 6uReneax3/6uiulVl/6uI6pa G 5 ep O<e 9 d - 5.0' I /V ea to _ -4.5' m m -4.0' m m a U c o s -4.0' z OO -4.0' a � xw a _3.8' Q a� l v lbeDre r\0-Z' Areed m z a Ul O N> 0 O m u> > N N 5 a N N ` y L () 7 j 7 U U C £ Q O `1 U U L 7 L U O -U LO O a L O Q � 3 F C = L ' O u « E L L > N L U Q Vl O = Il3 /J O @ E E w -U c6 N .� a N a N iiJ O O in 4 Ln � 9 7 O N U O LO L U NLA O a L 9 N O_ -6 Q t -U Im- O L a O c 3 IM so ;mw ao umnm :JNWIIOI �IIN uw#crlU m ;uwi.ar w Q � � aa�o � N � L E a N U ° of m Q X a e W 9 U O a -0 E m z V z y0 - v E < LO i 9 t � a a a z m a L Q � U U7 O- 9U U N O U L U O r` -d 9 L L N N -O N -O = VI LL LAN F O 6 N N O O- N "6 U a 9 9 OL O L L L v7 O U ONIA/Mi4 3-IdIRV7S Aa U.'MS m ■mmnN .urrna 7 F'0' Y,17w131Ys —Flood LLNr�fldd►' 11odsu Lil Pues ION 2 �laa�0 AaliN C O Ln C p1 O C � m c x W N M N W (0'0) MAW (0'Z) MHW M nl (o'n.) xulq I- 15E9 N o b n (o'o L+) A—q, dol O M ueaf--N ognN a6 E) 'adold a�u eA 'g-AlAA « a �o auuapisay � a O O d L O Ul d 3 9NIMV2JU 3-]dWVS JOAI2j awnH 9 Sail MHOIII m 1 a O C �O a a@ O n� 2I aN a N 404 a 3 a Q peON ssaood lueld a @ O Q' N O O 4 3IdWVS ]1S Ile31n 0 N p O Ul + O �>>. E = J a c u @ 3 a 9 C a @ O u a) O u7 J @ u O J O a lelul :3" a -inNs A ■aorta -awma -atM L �AYA N uM/JrNdr nddV N = Z5 N N C) N x LLJ I 1 a O LL a O C 3 c a I @ N 9 _ O [ N O N > N 0 3 _N u7 9 O N L a u Q £ L a -o in > II 30 O_ O @ N9 O N L 3 d _ m C @ @ O v JNIMV2i Q3-]dWVS II!J�lae9 PalelDOSSV )g luawlaAON dejdiN aim m umm jo s SAMAu� =v o c -�aajo lids Q ai � m u 0L9 alno2l c of Aenn0nu4 O U O d N N U [6 a U = ¢ m L(J Q h p i O > 6 z N M > X L O ¢ m c co i ONIMVNG TldAVS aim eo 93" :0 tuN�"noo dr � 9 _ UNWO 01Nar o 4 o o a c £ a � z mm C I ¢ @ a m > o a m a a c —m m N gi a o a a C u > 0 L O N J d N a a O 9 N O � _ U O � Q j m _ Q N u N m M Z Q u O Z I( � t w a a N a N Y C l0 � aU U � 9 I m M -O 4 C C @ O7 N 0 N I N W Z U N O N cc -C O U a N Z -0 > ¢ @ a N m N a @ ONIMVNG TldAVS z Uoil97l1iq LIS aol ySJeW aim m umm Jo MOM UM000 hweWL MAMM :Iffej v �JaaJz) Suamo " 0 L 9 alnoN 01 Aenn8nU4 L O N S N a n � O � _ U_ @ d U O a m m N a N / a 2 a a z / � a a � 9 M E x O 0 u Q N am J U OU \ 3 = O @ N�cCU 9NIAAVNG d-IdAVS/ aim 91M1N N000 �1�10 13UM 2 I1dd0' J L Q 9 O C Q N N N N 9 O @ N @ d O Ln N N a N a a D a g) O N 9 N a N - - 3 a = m a z O_ i � s w _a U Ln N i c a a O O W r Um ja :ma a foww _ ;,, m Y ,bb aNnwNoi o tUG uwwnMx > 0 a UNIJflddr a � a .— � 9E U m c U a m U V 2 O OZ a)c o o M a� a U 3 a Q a i U M N uu p � nnol j �aa�U f�yl�e0ow N _ in C U Cl I C U C) a1 � C J a -0 7 « 0- M , m ¢ C1 O a` z� a N ONIMVHa 3-1dMS SOIJINJOV aimpoenoV Selo, :2m :ms ja a &CNNw ;l1Nlm ;ananNai U N 6 uwur� a c sallonnaao� � m � � C1 N N C: .Q o m U > \ O Y 6 / UI O (0 T y0 O N N o a �U t6 O � N i N < N J Ln o� H a) a m N O U 0- ILL_ M I O G Z �£ Q O a a m M N � O ` J 5 I 09 L ,S6 aj � ONIMH214 3TdAVS 1/�ayy � mpapyl aaar Y a c a N N = M U a ° O c a) ° Qf U L U a O 7 M ,7 N a V O v O U N ° > M N Cl L Q a c O U a ° U O M 7 L O M N M� > N 0 0 = a_ � O T c a O O r a o Q N z O H U w In In In O a r a U O N Eo N O M 7 M w I 9 a ii N J_ o 9 I Q Q N U N W a O O O I 0 0 O � N z Qf WOO Id awned :2MU 10 :mia .0 ha N N =MIND] pan L A a lmmm3LVM 0) -o UN#"ar 0 LI v n m a £ U a a 00 I a V) J_ Q LLJ Q O J ILL 7 LLJ z L_O r w a a (n a m � a L N N C al N N � = 0 7 a7 m 'a J Y co O a) LL m a) U O 1« Z is ONIMH214 3-idms aLL1NAL O O O u O O 1a =L191S m l MN O O O N HONMa�dNlIU3ULVM�sxouLrNwrartiar M M am A -13MS 1N O /Y IcIHSNM VAw =AVAMLVN M :Dwrwo @ O N a r 0 M O LO U M c U T E a W Vn a a L �a o m O a m E `a c M JNIMb2ia d-IdMS s6uiss-3 Aiwin :;m 10 =Lfllf � lmMN -'AlIMM ldNlIuo N UNAMVN � N 'dNrXMdV U � Uo N 9 N O Q 'Go £ 0 p O @ U C ' @ C J N O � « U > O1 J fn « N N � > O a` H O T , L Priest m o Creek nM Flow = m T I I � O7 U7 C MHO Y L E ,5'LZ — m L N j i N N N ul N @ N U N @ U U N E O a) U N -6 o 2 W > C S N>o - � a o ❑ N u U ) N 9` Q o N@ 0 9 Ol JNIMb2ia d-ldVWS oz alto 10=L9151N IONM -AlPM10� �dNNNIINII U1A Vd rAW �A U U LL C (Y L N @ m � > aU � W 01 m L N N u > > O - N d > O N JNIMb2ia d-ldVWS ATTACHMENT C-2- VMRC STREAM IMPACT MAP ATTACHMENT C-3- STREAM IMPACT PLANS AND CROSS SECTIONS I \ Z > 0wz w LU ww Z I .w . ` w I >> Q , . \ Q p \a \ \ of \. S WZ ZD I Of LLI Z 3 O ` \• ` 3808 03SOdO8d ON3 L6+901 a > 'tiLS I / I NNV8 d0 d01 08+901 (800V-S) WHO WV31l1S ON3 9L+901 Z NNV8 d0 301 bL+901 I� / I I I NNV8 d0 301 84+901 U n I (800V-S) Lij I I I WMHO WV381S N1038 Lb+901 NNV8 d0 d01 0+901 ' II it I I I o I C I /I ,o'SZ v5� I — 01 OV-M) ONVl13M ON3 69+901 4 / I \ ( l l OV-M) o \ (INVIAM N1038 9f+901 o� \ \ I I 3808 \ \ \ \ F I 03SOdONd N1038 9Z+901 c ~ co a •�\\ / U) w wl �I w�° J � ZI .o q a` ` / Z O w m� \\ / 3 a I ¢a I w l o �Dw\ o� w a l p �r�w a \,� \ w w I M Zl z, . :z I ua ui w a a . m a �I w I0'SZ I O 0 �i II III O D + D D W D z O Y w ¢ J ~ O W LL I d w ¢ Z O a U' Y¢ Q� H z w Z a Q m Vl,m �zw OH LL JC=7wO0 OLU az'Tz LL, LLi Lu 2 O p Q¢ Q `n g<m¢o pz¢v¢im z O W� W� z z X -W ~ O ¢w ¢O W Ow �w-cc woW,, �amww¢a ~ Z J W LL ¢ O D Q W Z¢ Z3, LU H LU X LL Z Z Lu ¢ m z Z y -0Z apz2�1w 0�0 z> <w 7: W rpU w pCD� z z r W a W O w ZOO Z p M F J Z�aO m H ZOm�O DSO W O 7 J a' W D U Z W Cw7tn¢a��m ou w LU w 0 �a- D az> D H J z w V wawaz LL CD z00 a?LU(°Q G� Co LO .` z0w0Q UQ0J C� a U a �wt a paa U) o Z o L a > z o 3 a o � —W � o Iz - N -p- + N N N m co m O ,n 0 0 0 a a a = D T of Y W i _ O LO z p 0 ¢ z W LLj O z U LLJ �+ U J O cr O = 0 a Q U 0 0 \ ,+ / I 0 F U O / N �� I ON >Z 0 Ors =wr ,j ww Z > F- �cn I Z M O m 0 Z \ \\ W I �ZD ui 1 O \ ar O \ \ to I aCL LLI \w\\�\ I m\ �, \ w I INW \ Q �a- I \` I I 3808 03SOdONd ON3 £6+LLZ ,oez �r NNVB d0 d01 LL+LLZ \ _ I WMHO WV3N1S ON3(£L+LLZ I d0 301 OL+LLZ INNVO + 2 � \\I / / I cnr r NNV8 d0 301 6Z+LLZ a — — — (OZOV-S) m HMHO VW38IS N1038 LZ+LLZ o'ol I o'sz o'el \ ,o'sz T j NNV8 d0 d01 OZ+LLZ ' 3808 03SOdONd N1038 40+LLZ \ I 1m\ \ \ �w (D£LOV-m) ONNVl13M ON3 Z9+9LZ LU U) \ \ \ > U a \I� Y LU J I LU r z J I TI U ,0'SZ L7 W w a zl w �> wl of aI p ffO W a ^g� r w w ¢ I �I ¢ o M y I w o z �r co �� to �� al W I w J� 13 I El \ \ O \ \ ' w LL W o of, 0 m \ +i 'o Lu \ c7 �a (7 z O\ \ W, \ TI l I I l y w LU Z) o w a m a o w O E ro � w p a p z z a w of 0 w N m w o I of LL I fr\LU o J \ LL LL� LU \� \ Q <m CD 0, \� +i a CD 0\ \ CL \OI X \ w 0 \ +,g l O t0 0 LO + r- r N m W Z Z O Y W Q LU r O W a w Q K r -Z 0 a -= Or z0 LL U' Y¢ Q H z w Z a Lmu �zW�o LL J6w00 OLLZOz J 2 Z W Z r O W W Z r O w x d r U Q Q o ���m❑ U���� tWj OO�a(n � W yO� z W x w¢ z r w z >' -wR 5:) LL v O p Q w z¢ Z K 3Lu O X LL Z Z Q LL m Z 82.2 wr�r Z,, aLu zwa'�_ O w z LL O W X W W 0 z> O O Or o W Q r r O w Z z r W O W O W Z O O Z0r Q M J z v)� m H z o m O 0 LU Z) uo<zo HW w a- o U w oo N 0 d Z > H J V wmwa: ��a � � 0�zo0 ui az�=Q O Z U) w Q g&<U) ac)c�0 _ °t a a + Oaa U) o N a > z z Q 0 'W V/ W 0 ~ �/TVS z w 3 y o3 o • 1 O Lo N N N N N N Om ro m 0 0 0 0 0 0 < < w O a a a x Ltd 0 0 0 cn w o w of O LO _ z c o Q O z W O U + 3'.+ U p J z a W d a m o N O U a N d o x1wI� O�W3 ri ofOg £ 30 Z 133HS 33S 3NIIHOIVW q I I I I I I� .I I 'I e zI u p i a I o . UaI I Z Q JI �� W w i Y. -. z JI Loll z J a WI a N I ¢I a NI I �I I ¢I ^�� J J I 3m � ... I I £ 30 Z 133HS 33S 3NIIHOIVW NONNI 0 Elm no mmlllmm�11 OMNI 1�mmimms O O O O O O O O O O o t0 t0 t0 t0 t0 if1 i11 i11 i11 i11 V U FoF w --3II a � %rzJtC�mzZ�o< p�� � y mew � �d 8� =UJ y�OF K� Wp H ri jg8Zy fli jz, NG� < z Eli i<z�aa zdVl 8a LLm ddo?il. �za-�d Nrc� w ���J� o=ova og <yF�wCC�.t �os���oi ���z (3 rc QQ<a$m �WiN3w@m m � o 4i11 y`ww FiFb as a s uriiw'�>Z3cmm N�o pFmoFgq - w>iS �t1�iI 7 O W Z Z 3 Z_ z O w < ] ZCC Za!Za d U U J� yC�l� m LL U! w0 p= mU ¢ O m w Z �� W�YZULL I C W�f K m�v4�w�<S��9 �Oy��GI 8 ��� Y NZVjO�WU(/13� �U- md wu w.a a m�a �Sz�Juai � ��� � mcoiocrc mw`57�1 �w ipms�ii^�,omC�a�d��S Q�S Fz�m��a ,�z���8c� Frca ?3 73CZ_ZC m &� � �g jw F�7�F 8 PZ 2-z,--, -o,og Rz;Lg� 69'. �I ��� wed < @ o p�, < w -z a c u o vain g �c�=ziLw�� o�S <$o i�a �3 0 3 Orc jm cU U z a3i�� z m< o o ? �3o'�i�mg �< rc pwo a m� w -I FwN o d� 3 t3Wz�.pF3;. C�.7 $�Y p c�.�gFina(i�VOH`a wj�o m gggh � mo��n Fy?i:i jrcw <� afiHj33 L<im'�"�7Fo�i�o FW-�i rzogm Eo�nSrz"&o a 8. 33�Vav�0 Igo iigt v-883 �381 &���Q �z25 ����n °d io��3���$$ ��w _ � n W W W ZO ^ 0 11; 4L7 5 R o!o z o a w� 0C9z ¢�� a w w 4.0 LLz0 �Na O p O 9 d < OJ J Na .f i ¢ J ;=a a a F: z220 m Z O Fr Ow X.:0 = < Z °' Za j22 Nffo z o O LJ YOz jUH o N xRE mz< M Z11 N O lil I` \O w r �j �LLLW O<OZN LL d' J v� W-x W? N (J UJ r W g Z d W J w O O U a o �����LLoa O O N O K �z�o •• W LLO a �I,OjN --0eo WO �=ao 0 NWw CUUJUJUdJ�U�Noa� WOO Z.,OUjO 8z Ua0 rn ��daaari3a UOwlnOfriO nx � O o U N wa- + w r T a o a Z >tj �N ~ J c Z W + w a m d ; rn z as of W ¢ N LL } ~ W O J C¢7 /`z d U} � WE Z O a a O a > 1 z z� < a O W �a u + � a z � loa oa + C: w 1iis o -_ 2 uj a l O I 1 Ijj z Z 0 Z �' �J O IWi W � U) }} W W F F N N N N N WO c,4 M.=.i O O O N (�(n a. Z> a In z In o 0 0 W N d H N W N o 0 o N O O N T _III p W w i W Y o o 8- J y 2 J z 0 L) fn N Z W O Z U _ >+ Q U W d J < m w O O v 0 O = U (L < U v) O K d o r WO > N w Z\ r � aIa mwm 0 K� 9 7 N 6 Z�Z Q Q�y O. U� K Xa0 N w J r Z K rZ9 U 20 Z p Q £ 30 £ 133HS 33S 3NIlHOlVW ii n o`rg n n n n on 0v Iwwa w £ 30 £ 133HS 33S 3NIlHOlVW m o ro o _0 aO o \0 0 a NowjN azw =~m 5 6 g ■ei.e■■e■■i■\i.e. ■\ie\ie.ie..e.r � � N az0 z z0 ■■■ee\ee■\■e.i,i Il z a ¢ ai0i z w F F ■..e..ei.\e.i + 0 0 a t i M o o w � N ..........ia I I x u\u.r I r U"' zoo w ■i.e■■), I wo0Of-"00 z7dw as w cd ■\eiit' 0 U 0 ZQZQ ~ z z O �Lwi O_�J fW wJ N U UJ I I o X�w J z worooa�oa �z0 I iI II III III 'a Om wN4aoa v�4 vz~iF Z�aoFO0zXr c~i0w+ Lw~zJz�� a NOH0006O0 UU UOJUQUN x z rOr.Wwrwrto_.w_.o 0_n3<Uriowomoo 0 I m � a Z s�;I II o Of + I I. N Io C } z o a z > w O N 1 Z w z + V azw � a wa m N � a � IlI O a o O > Q _ Z O O of >= a N a z + a o Z LL g � � Z ~•' K'If m G Q N z 3. m Q > J N a Z it tz oa a Q > J + W I �I o 1 Q 1 T �1vT" g I rn 0_ I I + I I + �a a - _ m � Lu T I LLJ £ d0 I 133HS 33S 3NIlHOlVW o 0 0 0 0 0 0 0 0 0 0 J I c0 c0 t0 t0 t0 N N N N N V £ 30 l 133HS 33S 3NIlHOlVW _ U O W 6 Z CJ wOz I < i ZZK pH Nt j 6 O 8 m � 1 C gFz` 0> O q<�OHZ pi WK Z� o � FK< Nzo ��s ��s �d S =3 a°d o0%� jp z'% oawm $ j �murnzcU � � a c3.i F—R . .Nm�P8d .0 � � w Z yayk� cyr� a}E`� i:iZ F rcrc za og`�Z rraN O Wzw3iw o to NO VZy�.--Z� Fl a tI 2w2 W}Z3}�<$ ?OZ K $� >a> �_` a� O��S xen W OEM �v� F N N N M W N � 0� NF <�[>m WZO C m �.TN W Z- Www O9K O O O z ow m 7 �3�3ao rza=a 8 wLLmwo �7�i om oz 20 Q I� O ~ 0 0 o O �7 w�Yzoa t o w rc FE �d37g- o �nw rc o�w x @zvim N Z V) ma °dN j-I rcw n a Szo�♦5 m�a zJy 7 � �: �coipc 3e5. v v v N �z Y zap as w] mrc .i�ip0 $o�&z w oorc 92spprcpp c ut m a c p o f o z �i cx F'-'w W V ioRmsN �o �arc3 w �d Wri$i� J o z� wa in 9'0 8 aov d o 73a z _ �+ > p?- n N.W cz rcg $ 2 oW� �p rc�pi zW p a w w w w �3 wwozyzcam 1>oW>Y Z` 'a(,}g�`�"�'�go�Zzpp 8 �w'zmoy� rc po�3og�Nz �ing� o o w 11� Om�O <�€`aW �NOF zm$�LL' 1 �WwNO RO <y,0 IFC N Q Q G00 n n n U) Y `_ OK �N <OULL' Ow0 Z n3 C� K_ W m < p O p� iL 1 ��s<��g o Ohl Zo§pm�� 81 Wz a� � $���20� �� la F=y N o _ oI F� 9a (�S� t 3 z K '�r.F`f o $ I`z5 $`� � � a (� W -mI (/� - F m aU6 < 001 �q<qg�g Ol .-.5m� ��.91-81iIy FO�-p -Uph a OWJ <OF� y� o5 UpQ_ �y < m Q O D F F NW t�9NJ3 H F KZ JOOWOO_j��� Z< <m0 Yh Fmz2 FW NU' �®LJ LLi LLm O J J � N cG ? Z30 3sn�� �sa3 & ��is�oissg n rn j U _ ¢ w d ¢ m O ci ri a vi m ao w o 0 0_ = d U O n U a VI d 0 z J z W W o 0 W ti O a a 3NRAW3dOH 06+996 V£90V-S tl3Ntl AONVS ON3 99+BSB N31VM d0 3003 99+996 Vf90V-s a3nla AONVS io »+996 N31VM d0 3003 ZO+996 Vf90V-S N3NN AONVS NI038 ZO+BSB 3NIl AW3dONd 00+BSB ,04 X XIM > N O ZWO r O iaan mQw O KW pp 7 N 6 Z OZ Q ¢LLa U¢ K ax K N W J H W d' H Z J U N K Z O ¢ 1. 3�� a m . w z^+ini ao� w w w 0. mg$ n o 0 0 0 0 0 0 0 0 0 0 7�w wo o nn�� rio`rg ow 0. � ON 00 ow 0. � ON oN ow O oo pia �� w z M�MM f 1 + ~a ��z ;=a ' _� b I III , 5� 010 0 z I ,I gs�� dr III oa�YOZ-o=a� I / + W ¢ Z a U O W U N a III m )o"- o pW a 4 b• �I I I �LL����W��� N C7 UJ I I O JCHW �* z�F��Woil �z�o r N ..0" QWW8Novi oWoto0 - ■...'�i 'I I wNFv�voZ~F UMc~iCZ, �.■.■■. I �W ?zF-ojo�� ofag mama.. I I gg ■ ■...■ oo Www Orz jc6�i ~zWZ �za ■■ ono �o o o ■■� - I n-zwoXooq >R8W8 UN a I —90. 1 ■..ii 4' 1 ■mama.■ O ■mama.■ + muumuu■ I � N w a a ■meMEM I I Z `\ \ ■:m I m w r 0w¢ C O � � z > \ o 0 y Z w V m w a Z a m N O O Q W Z I I I o of W U >_ \\� I k 0. O ol;¢=z a/ \ y o w ¢ \\\ I o Q N J o \\ Mumma I I 1n° m /\ a= a ` ON MMMMM 1 O IL U) mono + a m � � o in mama. I o mama. ,I I o z = I IIOf :::■� �I I I o _ 0 ....� m mama. Y ■mama. _ � � W ■...■ + a mama. + - ...�. ■..1� U o I o �� ...:.....� I I I W mama.. + £ 30 Z 133HS 33S 3NIlHXVW £ 30 Z 133HS 33S 3NIlHXVW U Z. tt yyyy II J i �j0p p&Q} Q}p}A ��o�(ap�`xJmc a� i�"' p < O~2 S� Sy��j� 84O �ppKPj9�K�d NZO OW! .0% a Z--4y za Omu�io fl � 2� a c�i�a N ZSaiw3 @boa m� .Z Z Z o wy Wigs(}]3g .ri"22'[pW�}Z<3��$Wi1pNA�Z �O$�irc<g�d' 1o�>Zrc> QS�fi N U Wf/1Zw�a ��' ZONW NF<RZm OOaU �Orr�33 �1= 03U0 O<�OO��W OLL W�M.=.vW r N N N w 7 OW ? Z Oa FE W 33 aOW 8 WOW W]C N_Z mZ $ S �$� M ��� w�Yz�a c w j rc -PO IMg CLCL C F I N 3e5 <33 ((�� ma °dN --II rci a� a W prc♦Sm zma �Jy ���A m$oorc� Ma O W < I, D �m'iz Y zap as A rc 5'Oo $o$&z w edg E�mp Om z N d to Z to o 0 0 cZQj N€ m a c (�o c� i mzOi c F�-'w W iomsN �o �arc3w�d Wri$i� J o z� wa in o�e1 �ovai d o 73a z _ > p?- §ZoW cz rcg $ 2 owl �p rc�pi zW p N w w w w �3 wwozyzca W. 1c>W>Y� Z` 'a(,} g�`�"�'� go� Z zpp 8 �w'zmoj� z p.s3-.H8,z Engp po o ZO �� W ; Om�OA <Z€`awZ �NOF �m$mO LL' 1 ��wNO RO `ypj0 IFC N Q Q G00 LJ n n U) 4w01 Z]a, KK Zz f d_3 pO� K WyrmZ` p iL 1 40 �01 <~�g Cg $w ZOOmaLLO�� yOj�S W djm $O€�_• <� FZy N Q oF�9a (�S�t3 zK�j '�r.F`f o $�`z5 $`�<z�r'jU�F`a (�W W. (/� aj U1 F m cLU �ULL' 46--UF �3 mI^z x8j 1,LL .FO�Wp OZr0 p0} o <OF� y� o� UpQ_ �y < m O O F F <NW i.0iUJ3 F WFF KZ JOOWOO_j��� Z< <m0 YYh Fm�2 F� NU'�®LJLLi LLm O J J N cG ? Z30 3sn�� �sa3 0 W& �oissg n rn j U _ ¢ w d ¢ m O ci ri a vi m ao w O O ` = d U O K U ¢ CA d LNIOd LX3 OOH £S+BL6 W z W a a M W N a BSOV-S NV31lLS l0 tB+ZLB '. 0 z O � N H z NIEMEN NOMINEE MIMI III 11 Milli MENNEN NOMINEE Ong ATTACHMENT C-4- INADVERTENT RETURN PLAN ICI Mountain Valley Lir MVP Southgate Amendment Project Inadvertent Return Plan Revised April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan TABLE OF CONTENTS 1.0 OVERVIEW....................................................................................................................................1 2.0 PERSONNEL AND RESPONSIBILITIES.....................................................................................1 3.0 PRE -CONSTRUCTION ACTIVITIES........................................................................................... 2 3.1 Training...............................................................................................................................2 3.2 Site Inspection..................................................................................................................... 3 3.3 Landowner Notification Procedures................................................................................... 3 3.4 Agency Notification Procedures......................................................................................... 3 4.0 DOCUMENTATION......................................................................................................................4 5.0 DRILLING FLUID MANAGEMENT............................................................................................ 5 5.1 Drilling Fluid Additives...................................................................................................... 5 5.2 Drilling Fluid Physical Properties....................................................................................... 6 5.3 Drilling Fluid Disposal....................................................................................................... 7 6.0 HDD OPERATIONAL CONDITIONS AND RESPONSE ACTIONS .......................................... 7 6.1 Drilling Procedures............................................................................................................. 7 6.2 Monitoring and Pedestrian Surveys.................................................................................... 8 6.2.1 Drilling Fluid Monitoring Protocol..................................................................................... 8 7.0 RESPONDING TO INADVERTENT RELEASES......................................................................10 7.1 Terrestrial Release Procedures.......................................................................................... 11 7.2 Aquatic Release Procedures.............................................................................................. 11 7.3 Wetland Release Procedures............................................................................................. 12 7.4 Accessing Releases Off Right -of -Way and in Inaccessible Areas .................................... 13 8.0 RESTORATION............................................................................................................................13 9.0 CONTINGENCY PLANNING.....................................................................................................13 9.1 Alternate Crossing Measures............................................................................................ 13 9.2 Abandonment....................................................................................................................13 10.0 REFERENCES..............................................................................................................................14 i April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 1.0 OVERVIEW Horizontal Directional Drilling ("HDD") is a trenchless excavation method that is accomplished in three phases. The first phase consists of drilling a small diameter pilot hole along a designed directional path. The second phase consists of enlarging the pilot hole to a diameter suitable for the installation of the pipe. The third phase consists of pulling the pipe into the enlarged hole. HDD is accomplished using a specialized horizontal drilling rig with ancillary tools and equipment. A properly executed HDD crossing will allow for the pipeline to be installed in a minimally invasive manner. The HDD method is proposed for the MVP Southgate Amendment Project ("Amendment Project") crossing in Virginia of the Sandy River in Pittsylvania County and North Carolina of the Dan River in Rockingham County. Mountain Valley is still evaluating crossing methods, and additional HDDs may be proposed based on feedback from field surveys and stakeholders. The inadvertent return (" IR") of drilling lubricant is a potential concern when HDD methods are utilized. The HDD procedure for these crossings will utilize drilling lubricants, such as bentonite or similar commonly used products. In general, IRs can occur because of existing rock fractures, low -density soils, or unconsolidated geology. There is a potential for IRs to directly impact surface and ground waters via existing or enhanced fracture zones or if there is a release upland that flows over the ground into wetlands or streams. The purpose of this IR Plan is to: • Minimize the potential for an IR associated with horizontal directional drilling activities. • Provide for the timely detection of an IR. • Protect areas that are considered environmentally sensitive (streams, wetlands, other biological resources, cultural resources). • Provide an organized, timely, and "minimum -impact" response in the event of an IR. Provide that all appropriate notifications are made to the Virginia Department of Environmental Quality ("VA DEQ"), North Carolina Department of Environmental Quality ("NC DEQ"), and other appropriate regulatory agencies and that documentation is completed. • Provide an alternative crossing method if the HDD is deemed unsuccessful. Table 1 Proposed HDD Locations Crossing Pipeline Approximate Approximate Total Subsurface Material Name Diameter Entry Milepost Exit Milepost Length (inches) (feet) Sandy River 30 18.2 17.85 2,260 TBD" Dan River 30 30.6 31.0 2,109 Fine-grained silty sand/ Sandstone/Limestone Information to be provided when available. April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 2.0 PERSONNEL AND RESPONSIBILITIES The actions in this IR Plan are to be implemented by the following personnel Construction Project Manager — A Construction Project Manager ("CM") has authority over all aspects of the fieldwork during construction. The Chief Inspector reports directly to the CM, and the CM has final approval over all field decisions for the Amendment Project. Chief Inspector — Mountain Valley will designate a Chief Inspector ("Cl") for the Amendment Project. The Cl has overarching authority over all inspection activities occurring throughout the Amendment Proi ect and works directly with the contractor. Environmental Inspector — Mountain Valley will designate a minimum of one Environmental Inspector ("EI") to monitor HDD activities. The EI(s) will monitor the HDD alignment for IRs and other signs of environmental impact (such as sinkhole development or subsidence over the alignment). The EI is in the same peer group as all other inspectors and reports directly to the Cl. The EI has the authority to stop any activities that are out of compliance with the Federal Energy Regulatory Commission ("FERC") certificate (if applicable), other applicable permits, or landowner requirements. Additionally, the EI can order corrective action HDD Superintendent — The HDD contractor's senior representative on -site is the HDD Superintendent. It is the HDD Superintendent's responsibility to implement this IR Plan on the contractor's behalf The HDD Superintendent must be familiar with all aspects of the drilling activities, the contents of this IR Plan and the conditions of approval under which the activity is permitted. The HDD Superintendent will maintain a copy of this IR Plan on all drill sites and distribute, as appropriate, to construction personnel. The HDD Superintendent ensures that workers are properly trained and familiar with the necessary response procedures to implement should there be an inadvertent release. HDD Operator — The HDD Operator is employed by the HDD contractor to operate the drilling rig, driller, and fluid pumps. The HDD Operator is responsible for monitoring circulation through entry and exit locations as well as annular pressures during the drilling of the pilot hole. Should circulation loss or higher than expected annular pressures occur, the HDD Operator must communicate the relevant details of this event to the HDD Superintendent and HDD contractor field crews as well as the on -site Amendment Project inspection staff. The HDD Operator is responsible for stopping or changing the drilling program in the event of observed or anticipated IRs. HDD Contractor Personnel — During HDD installation, field crews and Mountain Valley's field representatives will be responsible for monitoring the HDD alignment. Field crews will coordinate with the EI and are responsible for timely notifications and responses to observed releases in accordance with this IR Plan. The EI ultimately must sign off on corrective action plans mitigating releases. Permit Coordinator — Company individual(s) that is accountable for all permit approvals and communication with respective agencies for the Amendment Project. April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 3.0 PRE -CONSTRUCTION ACTIVITIES Prior to the implementation of the HDD, Mountain Valley and the contractor will identify the potential for inadvertent releases at the HDD location. The review will include a visual review of entry and exit points and the entire HDD drill path. The contractor will review the Amendment Project's HDD Geotechnical Investigations Report, which may include descriptions of subsurface conditions, laboratory testing, design recommendations, and construction recommendations. In addition, private water supplies within 150 feet, if identified, will be protected by implementing the following measures: • The drilling contractor will review the site conditions prior to the start of work. • Construction limits will be clearly marked. • Barriers will be erected between the bore site and nearby sensitive resources prior to drilling as per the Amendment Project -specific Erosion and Sediment Control Plan. • On -site briefings will be conducted for the workers to identify and locate sensitive resources at the site. • Provide that all field personnel understand their responsibility for timely reporting of IRs. • Maintaining necessary response equipment on -site and in good working order. The primary areas of concern for IRs occur at the entrance and exit points, where the drilling equipment is generally at their shallowest depths. The likelihood of an IR decreases as the depth of the pipe increases. To minimize the potential extent of impacts from an IR, HDD operations will be continuously monitored to look for observable IR conditions or lowered pressure readings on the drilling equipment. Early detection is essential to minimizing the area of potential impact. No oil or gas wells were identified within 0.25 mile of the Amendment Project areas based on a review of Virginia and North Carolina databases (NC DEQ 2024; U.S. Geological Survey ["USGS"] 2024b; Virginia Department of Mines, Minerals and Energy 2024). 3.1 Training Prior to the start of construction, the Site Supervisor/Foreman will ensure that the crew members receive training on the following: • The provisions of this IR Plan. • Inspection procedures for IR prevention and containment equipment materials. Contractor/crew obligation to immediately stop the drilling operation upon first evidence of the occurrence of an IR and to immediately report any IRs to the EI and Environmental Coordinator. • Contractor/crew member responsibilities in the event of an IR. • Operation of release prevention and control equipment and the location of release control materials, as necessary and appropriate. • Protocols for communication with agency representatives who might be on -site during the clean- up effort. 2 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan • Copies of this IR plan and the contractor's site -specific IR plan will always be maintained at the HDD entry and exit sites in a visible and accessible location. 3.2 Site Inspection Mountain Valley will inspect each drill path prior to construction. Any site -specific condition(s) that impedes the ability to conduct the visual and pedestrian field inspection of any portion of a drill path will be identified, and a site -specific modification to the proposed inspection routine will be developed for that location. Mountain Valley will incorporate modifications into site -specific HDD crossing plans, as applicable, prior to construction and communicate these modifications to HDD contractors as part of the initial environmental training. If necessary, Mountain Valley will also file updated HDD crossing plans within its implementation plan or a variance request should modifications be required outside of certificated workspace areas. Appropriate monitoring and reporting protocols include: • If circulation is lost or an annular fluid pressure increase is observed that is not within the normal pressure variations, the HDD Operator will immediately notify the HDD Superintendent and field crews of the event and the approximate position of the tooling; • Where it is possible to safely do so, field crew personnel will visually inspect the ground surface near the cutting head location; • If an inadvertent release is observed, the following chain of command and associated procedures should be implemented: o Field crew will immediately notify the HDD Operator; o The HDD Operator will stop pumping drilling fluid and notify the HDD Superintendent, EI and Cl; o The CFEI notifies the CM and Permit Coordinator, and they formulate a response; o The Permit Coordinator will notify the appropriate regulatory authorities (see Section 3.4) as necessary, relaying relevant details of the event, the proposed response, and required documentation within 24 hours; o The Permit Coordinator will immediately notify the applicable state agency, VA DEQ, or NC DEQ (see Section 3.4) of any inadvertent drilling fluid returns within wetlands, waterbodies, or regulated wetland adjacent areas and; o The Permit Coordinator will prepare a report summarizing the incident, the response, and the outcome. 3.3 Landowner Notification Procedures Mountain Valley will notify landowners (via mail, phone, or direct contact) where HDD activities will occur a minimum of 48 hours prior to the commencement of drilling. In addition, Mountain Valley will request written access permission for limited pedestrian surveys outside of the approved workspace areas to facilitate monitoring of the HDD activities and identification of and response to potential IRs. 3.4 Agency Notification Procedures The Permit Coordinator will notify the appropriate regulatory authorities of the event as soon as possible and within 24 hours of identification of the release to coordinate site -specific response procedures. April 2025 M Mountain Valley '71PIPELINE MVP Southgate Amendment Project: Ms. Megan Neylon, Permitting Manager, 304-841-2086 Mr. Cory Chalmers, Permitting Specialist, 304-627-8173 Include the following information: Inadvertent Return Plan • Time the spill was first identified • Description of where the spill occurred — Amendment Project Milepost/Station • Latitude and longitude of the spill • Size of spill and control measures in place • Name of affected water resource (if known/applicable) • Photographs of spill area and corrective measures — when available (Do not wait to notify Mountain Valley until pictures are available. Photo documentation should begin immediately upon detection and continue throughout the duration of the clean-up). Regulatory authorities that will be contacted by the environmental team in the event of a release include the following: (1) FERC (all releases) First Call: Terry Turpin, 202-502-8700 Alternate if there is no response from the first call: FERC Enforcement Hotline, 888-889-8030 (2) Virginia Department of Environmental Quality (for releases in Virginia) First Call: L. Allen Linkenhoker (Pollution Response Coordinator Sr., PREP), 540-613-0819 Alternate if there is no response from the first call: VA DEQ Spill Hotline, 800-468-8892 (3) North Carolina Department of Environmental Quality (for releases in North Carolina) First Call: Richard Rogers, 919-707-9014 Alternate if there is no response from first call: NC DEQ Spill Hotline, 800-858-0368 4.0 DOCUMENTATION A copy of this IR Plan will be provided within the environmental compliance binders that are developed for construction, and copies will also be kept at each HDD location as well as at the contractor field offices. Additional documentation that will be maintained by Mountain Valley for each HDD location and includes, but is not limited to, the following: • Records of employee training detailing when training was conducted, material covered, and employees in attendance. This training may coincide with the overall environmental training for the Amendment Project; • Logs of HDD visual and pedestrian monitoring events — these may coincide with the daily environmental inspection reports; 4 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan • Drilling fluid composition —the contractor will maintain a log of drilling fluid physical properties such as mud weight, viscosity, sand content, and pH during drilling activities; and • Records of communication with landowners and applicable regulatory agencies that occur during HDD activities. These records may include inquiries and comments as well as Mountain Valley response actions. 5.0 DRILLING FLUID MANAGEMENT During the HDD process, drilling fluid is maintained in drilling pits within the construction work area and used for continuous pumping into the boring. Drilling fluid is typically a slurry composed of water and bentonite clay, usually approximately 95 percent fresh water, intended to maintain the stability of the drilling hole, lubricate the drilling head, and reduce soil friction. Bentonite clay (sodium montmorillonite) is naturally occurring and extremely hydrophilic; it can absorb up to ten times its weight in water. The HDD Contractor strives to maintain the integrity of the fluid by continuously sampling, testing, and recording its properties throughout drilling operations. Analysis of samples allows for adjustments to be made to the slurry which helps maintain the most efficient drilling fluid flow adaptable to various geological conditions. Bentonite is not hazardous nor is it toxic to aquatic ecosystems. The formulation of drilling fluids and their engineering properties are specified and tested to ensure their suitability for the given subsurface conditions encountered along the alignment and at each individual HDD location. If alternative types of drilling fluids are needed, Mountain Valley will use only non -hazardous and non -petrochemical -based products that are also on the NSF60 list. The slurry is designed to: • Stabilize the hole against collapse; • Lubricate, cool, and clean the cutters; • Transport cuttings by suspension and flow to entry and exit points; and • Reduce soil friction and required pull loads during pilot hole, reaming, and carrier pipe installation. 5.1 Drilling Fluid Additives Small amounts of additives (typically less than one percent) may be mixed with the drilling fluids to improve drilling performance or in response to excessive fluid loss. If any additives are necessary, the Mountain Valley will utilize only water-soluble and non -hazardous substances. The following is a narrative of the drilling fluids, materials, and additives that may be incorporated into a unique drill, depending upon subsurface and other conditions. Anticipated or Typical Drilling Mud Ingredients (1) Water — This is the largest component. It may be used in its natural state, or salts may be added to change filtrate reactivity with the formation. (2) Weighting Agents — These are added to control down -hole fluid pressure. Sodium barite is the most common agent. April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan (3) Clay — Most commonly, bentonite is used to provide viscosity and create a filter cake on the borehole wall to control fluid loss. Clay can be replaced by organic colloids such as biopolymers, cellulose polymers, or starch. (4) Polymers — These are used to reduce filtration, stabilize clays, flocculate drilled solids, and increase cuttings -carrying capacity. Cellulosic, polyacrylic, and natural gum polymers are used to help maintain hole stability and minimize dispersion of the drill cuttings. (5) Thinners — These are added to the mud to reduce its resistance to flow. They are typically plant tannins, polyphosphates, lignitic materials, and lignosulfonates. (6) Surfactants — These agents serve as emulsifiers, foamers and defoamers, wetting agents, detergents, lubricators, and corrosion inhibitors. (7) Inorganic chemicals — A variety of inorganic chemicals are added to mud to carry out various functions. Typical chemicals: calcium hydroxide, sodium hydroxide, and potassium hydroxide (caustic soda and caustic potash) are used to increase mud pH; sodium carbonate (soda ash) to remove hardness, sodium chloride for inhibition and sodium chloride to increase salinity and density. (8) Bridging Materials — Calcium carbonate or cellulose fibers are added to build up a filler cake on the borehole wall and help reduce filtrate loss. (9) Lost Circulation Materials — These are used to block large openings in the borehole. These include walnut shells, mica, xanthan, and cellulose There are several manufacturers that focus on products specifically for deep well drilling and/or shallow HDDs as they are similar processes. HDD contractors typically have preferred manufacturers that they use depending on the specifics of each drill location. Manufacture substitutions for like -in -kind products are acceptable; however, proprietary blends will be avoided, and no materials will be allowed on -site without current Material Safety Data Sheets being approved in advance. Specific Material Safety Data Sheets for products selected by the HDD contractor(s) must be submitted to Mountain Valley and, if requested, to FERC for approval prior to use. 5.2 Drilling Fluid Physical Properties The contractor shall submit a daily log at the end of each day. Mountain Valley shall provide the current version of the requested form, which shall include, at a minimum, the total length of drill or ream, average penetration rate, average mud flow rate, annular pressure, and basic mud properties (i.e., pH, funnel viscosity, density, and sand content). Mud samples and drill statistics shall be recorded a minimum of three (3) times per shift with no less than two (2) hours between each record. If a Mud Engineer is on site, the daily log shall also include rheometer readings to determine plastic viscosity and yield point as well as gel strength. The Mud Engineer shall also supply filter press data in the form of API fluid loss and filter cake thickness. These measurements do not need to meet the three (3) times per shift quota. 6 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 5.3 Drilling Fluid Disposal Disposal of excess drilling fluid will be the responsibility of the selected HDD contractor. Prior to beginning HDD operations, the contractor will be required to submit their proposed drilling fluid disposal procedures to Mountain Valley for approval. In some instances, a list of approved disposal sites will be provided to the contractor. Mountain Valley will review these procedures and verify that they comply with all environmental regulations, right-of-way and workspace agreements, and permit requirements. Should, after the removal of cutting, bentonite slurry remain, it may be reused (recycled) in the active HDD process. The method of disposal applied to each crossing will be dependent upon applicable regulations. Potential disposal methods include transportation to a remote disposal site and land farming on the construction right-of-way or adjacent property. Land farming involves distributing the excess drilling fluid evenly over an open area and mechanically incorporating it into the soil. Where land farming is employed, the condition of the land farming site will be governed by Mountain Valley's standard clean-up and site restoration specifications and FERC's Upland Erosion Control, Revegetation and Maintenance Plan. 6.0 HDD OPERATIONAL CONDITIONS AND RESPONSE ACTIONS 6.1 Drilling Procedures Drilling pressures will be closely monitored so they do not exceed those needed to penetrate the formation. Pressure levels will be monitored continuously by the HDD Operator. Pressure levels will be set at a minimum level to reduce the risk of IRs. Cutters and reamers will be pulled back into previously drilled sections after each joint of pipe is added. Mountain Valley's HDD contractor will provide and maintain the following during the drilling process: instrumentation, which will accurately measure the torsional loads and the drilling fluid discharge rate and pressure, in addition to mud pump pressure monitoring. Additionally, Mountain Valley's HDD contractor will provide a means of measuring and monitoring annular pressure during pilot hole operations. Annular pressure monitoring will be required during reaming as well, depending on whether pressure -sensitive situations were discovered during the pilot process. Mountain Valley will have access to instruments and their readings at all times. Entry and exit pits will be enclosed by sediment barriers as specified in the Amendment Project -specific Erosion and Sediment Control Plan and straw bales. A spill kit will be on -site and used if an IR occurs. Except as noted below, a vacuum truck will be readily available on -site prior to and during all drilling operations. Per the Amendment Project's Spill Prevention, Control, and Countermeasure plan, containment materials (straw, fabric filter fence, sandbags, spill kits, boom, turbidity curtain, etc.) will be staged on -site at a location where they are readily available and easily mobilized for immediate use in the event of an IR. Filter fence or filter sock will be installed between the bore sites and the edge of water sources prior to drilling. The Site Supervisor and EI will verify that: • All equipment and vehicles are inspected and maintained daily to prevent leaks of hazardous materials. • Spill kits and spill containment materials are available on -site at all times, and the equipment is in good working order. April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan • Equipment required to contain and clean up an IR is available at the bore sites during drilling activities. NOTE: It is the drilling contractor's responsibility to provide any IR containment materials that are necessary to respond to the release of drill fluids. The materials listed in this IR Plan are not to be considered inclusive and may require additional equipment depending on site conditions. If the site of the IR is not able to be accessed by a vacuum truck, a pump with sufficient power to convey the released drill fluid to a containment area will be used instead. Along with the pump, an adequate amount of hose, several filter bags, straw bales, sandbags, and an 18-inch fabric filter fence (or compost filter sock) will be kept on -site to create a containment area on site. Water containing mud, silt, drilling fluid, or other materials from equipment washing or other activities will not be allowed to enter a lake, flowing stream, or any other water source. 6.2 Monitoring and Pedestrian Surveys 6.2.1 Drilling Fluid Monitoring Protocol The drilling fluid monitoring protocol to be applied will vary depending on the following operational conditions. • Condition 1: Full Circulation • Condition 2: Loss of Circulation • Condition 3: IRs 6.2.1.1 Monitoring Protocol for Condition 1 —Full Circulation When HDD operations are in progress and full drilling fluid circulation is being maintained at one or both of the HDD endpoints, the following monitoring protocol will be implemented. • Utilization of an annular pressure monitoring tool during pilot hole operations • The presence of drilling fluid returns at one or both of the HDD endpoints will be periodically documented. • Land -based portions of the drilled alignment will be regularly walked, visually inspected, and documented by the HDD contractor and EI to achieve early detection of inadvertent releases of drilling fluid as well as surface heaving and settlement. This will occur throughout the daytime and will continue to occur whenever nighttime operations are being undertaken. Waterways will be visually inspected from the banks for a visible drilling fluid plume. • Constant communication between experienced driller and mud system operator to assist in the observation of fluid loss. • Proper mud pumping volume and pressures are to be managed for the ground conditions encountered. • Swabbing of the borehole to assist in cuttings removal and maintaining circulation when drilling conditions allow. • Proper mud properties are to be maintained for the conditions encountered. A drilling fluid specialist may be consulted if any changes to mud properties are required. o Mud properties that will be monitored include mud weight, viscosity, sand content, and pH. 8 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan o The monitoring of mud properties will occur every 3 hours during drilling operations. o A drilling fluid specialist will be consulted if the following scenarios are encountered: ■ if there is a fluid spike in the annular pressure tool during pilot hole drilling; ■ if cuttings are not being removed from the hole during pilot hole drilling and/or reaming; ■ if there is a total loss of drilling fluid circulation; or ■ if high torque or pullback forces are encountered during any of the drilling phases. Electronic monitoring of the mud tank level will be utilized. Drilling fluid products present at the job site will be documented. If an IR is detected during routine monitoring, the monitoring protocol associated with Condition 3 will immediately be implemented. 6.2.1.2 Monitoring Protocol for Condition 2 — Loss of Circulation When HDD operations are in progress and drilling fluid circulation to the HDD endpoints is lost or severely diminished, the following monitoring protocol will be implemented. It should be noted that lost circulation is common and anticipated during HDD installation and does not necessarily indicate that drilling fluid is inadvertently returning to a point on the surface. • Mountain Valley and its HDD contractor will implement a protocol of conducting terrestrial walks along accessible drill pathway locations to monitor for surface returns whenever a loss of downhole pressure is detected. At a minimum, accessible locations will be monitored once per hour when operating under Condition 2. For less accessible locations an aerial drone or marine craft may be utilized to conduct monitoring for surface returns. • Mountain Valley's EI will notify the Environmental Project Manager that drilling fluid circulation to the HDD endpoints has been lost or severely diminished. • Mountain Valley's EIs and HDD inspectors will document steps taken by the HDD contractor to restore circulation. Should the contractor fail to comply with the requirements of the HDD Specification, the Mountain Valley's EIs and HDD inspectors will notify the Environmental Project Manager and the Amendment Project Manager so that appropriate actions can be taken. • If circulation is regained, Mountain Valley's EI will inform the Environmental Project Manager and resume the monitoring protocol associated with Condition 1. • If circulation is not re-established, Mountain Valley's EI will increase the frequency of visual inspection along the drilled path alignment as appropriate. Additionally, Mountain Valley's EI will document periods of contractor downtime (during which no drilling fluid is pumped) and the contractor's drilling fluid pumping rate in case it should become necessary to estimate lost circulation volumes. 6.2.1.3 Monitoring Protocol for Condition 3 — Inadvertent Returns If an IR of drilling fluids is detected, the following monitoring protocol will be implemented. Mountain Valley's EI will inform the Construction Project Manager that an inadvertent drilling fluid return has occurred and provide documentation with respect to the location, magnitude, and potential impact of the return. April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan • If the IR occurs on land, Mountain Valley's EI will document steps taken by the HDD contractor to contain and collect the return. Should the contractor fail to comply with the requirements of the HDD Specification, Mountain Valley's EI will notify the Construction Project Manager so that appropriate actions can be taken. • If the IR occurs in a waterway, Mountain Valley, in consultation with appropriate parties, will determine if the return poses a threat to the environment or public health and safety. • If it is determined that the return does not pose a threat to the environment or public health and safety, HDD operations will continue. Mountain Valley's EI will monitor and document the IR as well as periods of contractor downtime and the contractor's drilling fluid pumping rate in case it should become necessary to estimate IR volumes. • If it is determined that the return does pose a threat to the environment or public health and safety, drilling operations will be suspended until containment measures can be implemented by the contractor. Documentation of any containment measures employed will be provided by Mountain Valley's EL Once adequate containment measures are in place, the contractor will be permitted to resume drilling operations subject to the condition that drilling operations will again be suspended immediately should the containment measures fail. Mountain Valley's EI will periodically monitor and document both the IR and the effectiveness of the containment measures. Periods of contractor downtime and the contractor's drilling fluid pumping rate will also be documented in case it should become necessary to estimate IR volumes. Upon completion of the HDD installation, Mountain Valley will ensure that the inadvertent drilling fluid returns are cleaned up to the satisfaction of governing agencies and any affected parties. 7.0 RESPONDING TO INADVERTENT RELEASES Throughout the HDD process there is a loss of drilling fluid into the geologic formation through which the drill passes. In some cases, the drilling fluid may be forced to the surface, resulting in what is commonly referred to as an IR. Therefore, while the intent of the HDD method is to avoid surface disturbance, surface disturbance may occur when there is an IR of drilling fluid. It is extremely important to note that a loss of drilling fluid into the formation is not necessarily an indication that an IR has occurred or is about to occur. It is normal to lose a significant amount of fluid into the formation without ever having an IR. In fact, in very soft ground formations or highly fractured formations, it is normal to lose all the drill fluid pumped into the borehole without an IR occurring. Drill fluid pumping rates can be as high as 750 gallons per minute. An IR cannot occur unless drill fluid escapes from the borehole into the formation. Hence, preventing and managing such escapes will, in turn, prevent and manage IRs. Drilling fluid releases are typically caused by pressurization of the drill hole beyond the containment capability of the overburden soil material. In some cases, an IR of drilling fluid can be caused by existing conditions in the geologic materials (e.g., fractures), even if the downhole pressures are low. Drill fluid pressures are generally the highest during the pilot hole process, and hence, it is this process that presents the greatest risk for an IR. If an IR occurs during the pilot hole, it opens a path through the ground formation for drill fluid to escape during the subsequent processes. Hence, IRs are likely at the same location during the hole opening and pullback process. Similarly, if the pilot hole process can be completed without an IR, then it is likely that the entire installation can also be completed without an IR. 10 April 2025 M Mountain Vall'71PIPELIey Inadvertent Return Plan Mountain Valley will conduct IR response activities in accordance with applicable regulatory requirements and will seek environmental and cultural resource clearances/approvals as necessary prior to the commencement of response activities. Additionally, Mountain Valley will conduct IR response activities in accordance with the standards and restrictions described within Resource Reports 1 and 2 for activities within uplands and wetlands/waterbodies, respectively. Therefore, Mountain Valley does not anticipate additional restrictions for equipment use and clearing to access and clean up IRs that may occur. Considerations for managing IRs are described below. 7.1 Terrestrial Release Procedures • Stop work immediately. • The bore stem will be pulled back to relieve pressure on the IR. • Isolate the area with hay bales, sandbags, filter sock, or silt fencing to surround and contain the drilling mud. • Determine and document the following to the extent reasonably possible: o Quantity (gallons) of material released o Distance (feet) to the nearest waterbody o Name of the waterbody affected, if any. • Immediately contact the appropriate parties as listed in the "Required Notifications" section at the end of this document. • A mobile vacuum truck (or pump if in an inaccessible area) will be used to pump the drilling mud from the contained area and into either a return pit or (if using a pump) into a filter bag surrounded by an 18-inch fabric filter fence or compost filter sock. • Once excess drilling mud is removed, the area will be seeded and/or replanted using species similar to those in the adjacent area or allowed to re -grow from existing vegetation. • When there is no visible indication of flow at the IR location, the IR will be considered stabilized. After the IR is stabilized, document the IR from discovery through post -cleanup conditions with photographs and prepare an IR incident report describing the time, place, actions taken to remediate IR, and measures implemented to prevent recurrence. The incident report will be provided to the Environmental Coordinator within 24 hours of the occurrence. 7.2 Aquatic Release Procedures • Stop work immediately. • The bore stem will be pulled back to relieve pressure on the IR. • Isolate the area with hay bales, sandbags (cofferdam), plastic sheeting, filter sock, silt fence, or other appropriate containment structure to surround and contain the IR; • Immediately contact the appropriate parties as listed in the "Required Notifications" section at the end of this document. • Utilize clean water pumps to establish a pump to convey upstream flow around the IR; • Turbidity curtains may be deployed (depending on site conditions at the time of IR); • Determine and document the following to the extent reasonably possible: o Quantity (gallons) of the IR o Quantity (gallons) that was released into the waterbody 11 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan o Distance (feet) the material traveled down the waterbody o Name of the affected waterbody • A mobile vacuum truck (or pump if in an inaccessible area) will be used to pump the drilling mud from the contained area and into either a return pit or (if using a pump) into a filter bag surrounded by an 18-inch fabric filter fence or compost filter sock. • Drilling mud will be collected and typically recycled through the drilling mud reclaimer, reused, or disposed of at a licensed disposal facility. • When there is no visible indication of flow at the IR location, the IR will be considered stabilized. After the IR is stabilized, document the IR from discovery through post -cleanup conditions with photographs and prepare an IR incident report describing the time, place, actions taken to remediate IR, and measures implemented to prevent recurrence. The incident report will be provided to the Environmental Coordinator within 24 hours of the occurrence. If an IR impacts a private drinking water supply, Mountain Valley will supply a temporary drinking water supply in accordance with the Amendment Project's Water Resources Identification and Testing Plan immediately after the problem is discovered. The temporary water would be supplied until testing confirms that the water quality of the water supply returns to baseline. Additional long-term measures will be employed in accordance with the Water Resources Identification and Testing Plan if necessary, including the installation of permanent treatment, connection to a secondary water source, or establishment of a new on -site source. 7.3 Wetland Release Procedures Mountain Valley intends the final designs of the HDDs to minimize the potential for inadvertent releases at resource crossing locations. However, inadvertent releases are still possible. Should one occur, the following measures will be employed: (1) Estimate the amount of release to conclude if containment structures would effectively contain the release. (2) Implement necessary containment measures to contain and recover the slurry unless one of the following conditions is present: a. The sensitivity of wetland areas may result in containment and recovery efforts causing additional disturbance due to the travel of equipment and personnel, possibly offsetting any benefit gained from containing and removing the slurry. b. Should the amount of the slurry be too small to allow practical collection from the affected area, the fluid will be diluted with fresh water or allowed to dry and dissipate naturally. (3) Suspend drilling operations if the release cannot be controlled or contained until appropriate containment can be installed. (4) Remove contained fluids by either a vacuum truck or by pumping them to a location where a vacuum truck can access them. (5) Conduct final clean-up once HDD installation is complete 12 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 7.4 Accessing Releases Off Right -of -Way and in Inaccessible Areas Prior to the commencement of HDD activities, Mountain Valley will attempt to acquire written permission from landowners crossed by the HDDs to allow for pedestrian monitoring and/or IR clean-up activities. The permission will allow for biological and cultural resource surveys as necessary as well as for limited equipment access for clean-up/restoration should an IR to surface or within a wetland/ waterbody occur. Should an IR occur outside of approved workspaces or require a workspace variance for access to allow for clean-up/restoration, Mountain Valley will obtain the necessary environmental and/or cultural clearances and submit a request for variance to FERC for review and approval prior to the initiation of any activity outside of those approved workspaces. 8.0 RESTORATION Mountain Valley will restore areas affected by IRs to pre -construction conditions and surface elevations to the extent practicable. Upland areas will be restored through standard right-of-way restoration procedures as detailed within Resource Report 3 of the Environmental Report and applicable regulatory clearances and approvals. Restoration of wetlands and waterbodies will be conducted in accordance with the procedures identified within Resource Report 2 of the Environmental Report, as well as applicable regulatory clearances and approvals. 9.0 CONTINGENCY PLANNING 9.1 Alternate Crossing Measures If the HDD installation is unsuccessful and Mountain Valley determines abandonment of the HDD is necessary, Mountain Valley's proposed alternative is to use the IR Plan. The IR Plan includes the implementation of an open -cut wet or dry ditch crossing method (scenario dependent). This alternative crossing method would require FERC and other environmental permitting approvals. 9.2 Abandonment Should an HDD fail, and the drill hole needs to be abandoned to allow for a secondary attempt or an alternative construction method, Mountain Valley will, if necessary, seal the drill hole with grout to a point approximately five feet from the surface. The remainder of the annulus will be filled with soil and compacted as necessary to meet the density of the surrounding soil. Abandonment procedures will be completed in accordance with applicable regulatory requirements. 13 April 2025 M Mountain Valley PIPELINE Inadvertent Return Plan 10.0 REFERENCES This IR Plan was adapted from the following websites: U.S. Geological Survey. 2024a. Geologic Units by Geographic Area. Pittsylvania, Virginia and Rockingham County, North Carolina. Available at: https://mrdata.us sg gov/.geologv/state/geog= units.html. Accessed August 2024. North Carolina Department of Environmental Quality. 2024. NC Mineral Resources —An Overview. Available at: https://www.deg.nc.gov/about/divisions/energy-mineral-land-resources/north-carolina- , ecological-survey/mineral-resources/mineral-resources-faq. Accessed August 2024. Virginia Department of Mines, Minerals and Energy. 2024. Division of Gas and Oil Data Information System. Available at: hiips://www.energy.virginia.gov/dgoinguiEy/fnnmain.gWx. n�ia.._o�v/d._oininguiry/fnnmain.gWx. Accessed August 2024. 14 April 2025 ATTACHMENT C-5 -ADJACENT PROPERTY OWNER MAP AND PROPERTY OWNER INFORMATION ƒ E 7 « R 2 2 - N co r z > co {/ k7 ® — — — — — — — / / / / / ¥ 2 \ ) } § § § § / ƒ / } ° ° ° ° ° ° � � � � � � � � 0 ZY z \ g \ \ \ E k § z 0 0 z ) 6 § CD H IZT N CD CD CD CD CD CD CD CD CCOD kCD CD CD CD \ \ \ } j j / / \ \ u ) \ j \ \ \ \ \ ) 5 & p 0 0 ? ? ? 2 2 \ \ \ \ \ ( ( ( j & & & & & & & & j j \ \ \ j j j \ / \awl 5 ± \ J g CT — — / It 00 a / / § § � a Q / / : \ \ 0 G \ \ } co G £ \ 3 ; J } / \ \ \ \ J / ( \ / _0 0\ / 2 ) \ / °cz \ e u ¥ _ { � / TALL r y d, r n u ul A0aa3 6pJeH PU IIIW Ru°IS —r (t I ` ca w ae s E a a a > O m N 3 F o U d Q a m Ia O ) z U > a ¢ a � o a z _ Lick-S -z s . tp t a o W zl — H L u Of D- Z a 0 ~ m LL J U LLB O Q a 4 f - A�l, w co U i Q' LO d0 LL Z J J H Lu O a 6 = a ~ Lu Z Juj o H _ • • I w u i� oeu3�ui�erwoa ni �a ia� d i ,i su�adr..ew w s e �s