HomeMy WebLinkAboutNCC192108_NOT Supporting Documents_20250429 _-t„c STATE op'°
''��o_ 3 ^O,Py
JOSH STEIN �-
Governor 'i 1 I a
D.REID WILSON 4 "Ottrx V „ :_
Secretary `a` *+ °/
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Director Environmental Quality
March 5, 2025
LETTER OF APPROVAL
The University of North Carolina Chapel Hill
Attn: Christi Hurt, Chief of Staff
200 East Cameron Ave.
Chapel Hill,NC 27599
RE: Project Name: Odum Village Student Apartment Complex Demolition
Acres Approved: 17.0 acres
Project ID: ORANG-2019-004
County: Orange,
City: Chapel Hill
Address: Hibbard Drive
River Basin: Cape Fear,
Stream Classification: Jordan Reservoir Watershed
Submitted By: KCI Associates of NC
Date Received by LQS: March 4, 2025
Plan Type: Revised(Express)
Dear Ms. Christi Hurt:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3)years following the date of approval,if
no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the
eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept
on file at the job site:
Q' North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
NORM cAHO INA�
�/ Raleigh Regional Office 1 1628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
Department of Environmental auny 919.791.4200
Letter of Approval
University of North Carolina Chapel Hill
February 4, 2020
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project,it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of
the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure compliance
with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules, including the applicant's eventual receipt of other
environmental permits,authorizations or certifications that may be required for the project. In addition,
local city or county ordinances or rules may also apply to this land-disturbing activity. This approval
does not supersede any other permit, authorization, certification, or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. This permit allows for a land-disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be
a violation of this permit and would require a revised plan and additional application fee.In addition,
it would be helpful if you notify this office of the proposed starting date for this project. Please notify
us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
fp.:04".
Graham Parrish, PE,
Express Engineer
Land Quality Section
cc: Brian J.Kraynak,PE(brian.kraynak@kci.com)—Electronic Copy
Regional Office file