HomeMy WebLinkAboutNC0025437_Report_20250430Town of Rich Square
109 N. Main Street * P.O. Box 336
Rich Square, NC 27869
Tel: 252-539-2315
Fax: 252-539-3945
townrichsquare@outlook can
April 25, 2025
Raleigh Regional Supervisor
Water Quality Regional Operations Section
1628 Mail Service Center
Raleigh, NC 27699-1628
Re: SPECIAL ORDER BY CONSENT (SOC)
EMC SOC WQ S24-002
Rich Square WWTP
NPDES Permit NCO025437
Northampton County
Dear Sir or Madam:
RECEIVED
Artt 3 0 1015
NCDEQ/DW11/1VPDES
Attached please find the Town of Rich Square's Second Quarterly Report due April 30, 2025, as
per the provisions of the Special Order of Consent (SOC) Schedule Table on Page 6 of said
Order.
Please advise if there are any questions or additional information requested.
Thank you for your attention to this matter.
Sincerely,
/lx �
Victoria Newcombe
Mayor
Town of Rich Square
cc: Compliance & Expedited Unit
NC DWR-NPDES Permitting Section
1617 Mail Service Center
Raleigh, NC 27699-1617
ENGINEERING
SERVICES, PA
1202 Benson Road
Suite 200
P.O. Box 1849
Garner, NC 27529
Telephone:
919.662.7272
Fax:
919.662.7320
PROGRESS MEETING
WWTP IMPROVEMENTS
TOWN OF RICH SQUARE, N.C.
April 10, 2025
NCDEQ Project #SRP-W-ARP-0276
ES Project #202301-CA
MINUTES OF MEETING
ATTENDANCE LIST
Name
Representing
Telephone
Victoria Newcombe
Mayor
Town of Rich Square
(910) 539-2315
Reginald White
Town Commissioner
Town of Rich Square
(910) 539-2315
Jeff Long
Public Works/WWTP
Operator
Town of Rich Square
(910) 539-2315
mob: (252) 308-2984
Kim Cole
NCDE - DWI
252 402-5796
Bill Freed
Site Superintendent
Enviro-Tech Unlimited
Contract-2
(25Z) 564-7995
Chandler Price
Engineering Services PA
in: 919 608-7303
Brian Cox, P.E.
Engineering Services, PA
(919) 662-7272
Minutes of the meeting are as follows:
1. Bill Freed provided an update on the work completed and the status of the
remaining work.
2. The bar screen equipment is installed and is ready for a start-up date. A
backflow preventer needs to be installed on the wash water service. The
backflow preventer change order has been submitted and is under review.
3. Jeff will check with the county to see if there are any specific requirements for
the new backflow installation.
4. The manual bar screen will be installed next week.
5. The proposed concrete pad may not be required and will be review on site.
6. Aerators #3, 6 and 8 are installed in the lagoon and are in the process of getting
electrical wiring installed. New wire and junction boxes are being installed.
7. The aerators #1 and 2 VFD equipment will be installed in the next week or two.
8. Existing aerators #4, 5 and 7 has wiring issues that will be addressed at the site
visit.
9. The chemical feed pumps will be installed by Tuesday, next week.
10. Reimbursement request #1 has been submitted for approval. Kim will check the
status.
A COMMITMENT
TO EXCELLENCE"
Minutes of Progress Meeting April 10, 2025 Page 2
11. The Mayor has talked with Ms. Kern, at DWI, about getting the accounts updated for
the reimbursement payment deposits.
12. A draft change order will be submitted to Kim for approval on the backflow and
existing aerator improvements.
13. Contract-1, with Merrell Bros, is 100% complete.
14. At the WWTP site, it was determined that aerator #4 needs a new junction box at the
bank for the aerator power cord connection. Aerator #5 has a power cord issue at the
motor. Aerator #7 could be replaced with the old aerator #6 and a new motor. Jeff
was going to check to see if there was a spare 3 hp motor at his shop.
15. Bill will submit a change order for the additional work for the aerator improvement
items listed above.
16. The Contractor shall be solely responsible for maintaining a safe work environment
for his crews and the public. The Contractor shall not allow alcohol, illegal drugs, or
other unsafe practices at the work site.
17. The Contractor is totally responsible for the scheduling, directing, and performance
of the project.
Copies of these minutes will be distributed to all attendees. Please review the minutes
and let me know if you have any comments.
Sincerely,
4&X
Brian G. Cox, P.E.
Engineering Services, P.A.
cc: All Attendees
109 N Main Street Town Of Rich Square Phone: 252-539-2315
P.0 Box 336 Fax: 252-539-3945
Rich Square, NC 27869 Website: riclisquarenc.org
April 24, 2025
Raleigh Regional Supervisor
Water Quality Regional Operations Section
1628 Mail Service Center
Raleigh, NC 27669-1628
Re: Special Order by Consent (SOC)
EMC SOC WQ S24-002
Rich Square WWTP
NPDES Permit NCO025437
Dear Sir or Ma'am,
As of the last report, the Town held a progress meeting on the W WTP Improvements.
Please see the included minutes of the meeting held on April 10, 2025.
The Town is working with Richard Davis, Wastewater Specialist with North Carolina
Rural water Association (NCRWA) to assist us with the wastewater Treatment Plant Evaluation
report and any other assistance that NCRWA will be able to assist us with.
I am working on getting a quote for a metal carport to be permanently installed over the
chemical feed barrels and the chemical feed pumps at the W WTP to help protect against the
weather and to help with the longevity of the equipment. The contractor has installed four new
chemical feed pumps at the W WTP and my crew has been trained on how to use the equipment.
Currently we have six aerators working right now and we are waiting on parts for the other two
aerators. The mechanical bar -screen has been installed at the influent. Waste debris is being
placed into a dumpster and is properly being disposed of. The sludge in the first lagoon has
already been removed by the contractor.
As to the scheduled activities we are hoping that we will be able to have most of them
completed for the next report.
Sincerely,
Town of Rich Square
AftIf Leaps
Town of Rich Square- Rich Square WWTP
EMC SOC WQ S24-002
Tahle 1. Rvent Schednle
Scheduled Activity
Completion Date
Date
due on or before
Completed
Treatment Unit Investigation: Written report due
No later than 90 days after SOC
effective date
In Process
Solids Management Plan: Written report due
No later than 180 days after SOC effective
date
In Process
Completion of Headworks, Floating Aerator and
No later than 180 days after SOC effective
Chemical Feed reference materials.
date
In Process
Bid Date - Receipt of Bids from Contractors
June 1.2025
8/8/2024
Award Contract to Selected Contractor- Issue Notice
July 1, 2025
9/5/2024 Award
to Proceed (NTP)
1/16/2025 NTP
Mobilize and Begin Construction and Operations
Within 180 days of issuance of
1/27/2025
Notice to Proceed
Mobilization
Complete Headwork improvements (bar screen, mechanical bar
screen, and compactor), Targeted Sludge Removal from Lagoon,
Floating Aerator Improvements and Chemical Feed System
No later than 360 days after SOC effective
in Process
Improvements
date
Complete Contract-1 (Biosolids Removal) Construction and
January 31. 2026
Operations
3/20/25
Complete Contract-2 (WWTP Equipment Replacement) Construction
January 31, 2026
and Operations
in Process
Achieve compliance with NPDES final effluent
May 1, 2026
limits
in Process
0
Way
�'� !9 t 114 Oakmont Drive, Greenville, NC 27858
�ry Main 252.756.6208 ° Fax 252,756,0633
y�t
—ANALYTICAL www.waypolntanalydrAI-C*M
00197
Town of Rich Square
Jeff Long Project 197 - Rich Square WW
PO Box 336 Information
Rich Square , NC 27869
Report Number : 25.098-0911
REPORT OPANAL YSIS
Report Date : 04/16/2025
Received : 04/08/2025
Lab No : 78591 Matrix: Aqueous
Sample ID : Influent Sampled: 4/8/2025 10:55
Test Results Units MOL OF Date/Time By Analytical
Analyzed Method
Biochemical Oxygen Demand (5-day)
Total Suspended Solids
100 mg/L 40
864 mg/L 50.0
1 04/08/25 14:48 ANSI 5210E-2016
1 04/09/25 08:20 IMMS 2540D-2020
Lab No : 78592 Matrix: Aqueous
Sample ID : Effluent Sampled: 4/8/2025 11:15
Test Results Units MOL DF Date/Time By Analytical
Analyzed Method
Ammonia Nitrogen
4.83
mg/L
0.02
1 04/14/25 16:00 BLV
350.1
Biochemical Oxygen Demand (5-day)
85
mg/L
20
1 04/08/25 15:54 ANSI
521OB-2016
Fecal Coliform
>6000 bS
cfu/100mL
SOD
1 04/08J25 15:11 AAM
9222D-2015
Total Suspended Solids
45.5
mg/L
12.5
1 04/09/25 08:20 IMMS
254OD-2020
Qualifiers/ B Analyte detected In blank
Definitions L Limit Exceeded
DF Dilution Factor
MQL Method Quantitation Limit
Page 3 of 5
#«d zeks-
Town of Rich Square- Rich Square WWTP
EMC SOC WQ S24-002
Tnhle 1 e F.vnnf Srhnduln
Scheduled Activity
Completion Date
Date
due on or before
Completed
Treatment Unit Investigation: Written report due
No later than 90 days after SOC
effective date
In Process
Solids Management Plan: Written report due
No later than 180 days after SOC effective
date
In Process
Completion of Headworks, Floating Aerator and
No later than 180 days after SOC effective
Chemical Feed reference materials.
date
In Process
Bid Date - Receipt of Bids from Contractors
June I. 2025
8/8/2024
Award Contract to Selected Contractor- Issue Notice
July 1, 2025
9/5/2024 Award
to Proceed (NTP)
1/16/2025 NTP
Mobilize and Begin Construction and Operations
Within 180 days of issuance of
1/27/2025
Notice to Proceed
Mobilization
Complete Headwork Improvements (bar screen, mechanical bar
screen, and compactor), Targeted Sludge Removal from lagoon,
Floating Aerator Improvements and Chemical Feed System
No later than 360 days after SOC effective
In Process
Improvements
date
Complete Contract -I (Biosolids Removal) Construction and
January 31, 2026
Operations
3/20/25
Complete Contract-2 (WWTP Equipment Replacement) Construction
January 31, 2026
and Operations
In Process
Achieve compliance with NPDES final effluent
May I, 2026
limits
In Process
0
e r, -.,, . 7 114 Oakmont Drive, Greenville., NEC 2785E
p[�/� �� " Maln 252,756.6208 ° Fax 252,756.003
j� �/ m www.waypolntanalytiral.com
ANALYTICAL
00197
Town of Rich Square
Jeff Long Project 197 - Rich Square WW
PO Box 336 Information
Rich Square , NC 27869
Report Number: 25.098.0911.
REFOR7OFANALYSIS
Report Date : 04/16/2025
Received : 04/08/2025
Lab No; ' 78591
Matrix: Aqueous
Sample ID :Influent
Sampled: 4/8/202510:55
Test
Results
Units
MOL
OF Date/Time By Analytical
Analyzed Method
Biochemical Oxygen Demand (5-day)
100
mg/L
40
1 04/08/25 14:48 ANSS 5210E-2016
Total Suspended Solids
864
mg/L
50.0
1 04/09/25 08:20 IMMS 2540D-2020
Lab No : 78592
Matrix: Aqueous
Sample ID : Ef0uent
Sampled: 4/8/2025 11:15
Test
Results
Units
MOL
OF Date/Time By Analytical
Analysed Method
Ammonia Nitrogen
4.83
mg/L
0.02
1 04/14/25 16:00 BLV 350.1
Biochemical Oxygen Demand (5-day)
85
mg/L
20
1 04/08/25 15:54 AN51 5210E-2016
Fecal Collform
>6000 65
cfu/100mL
100
1 041OB/25 15:11 AAM 9222D-2015
Total Suspended Solids
43.5
mg/L
12.5
1 04/09/25 08:20 IMMS 2540D-2020
Qualifiers/ B Analyte detected In blank
Definitions L Limit Exceeded
DF Dilution Factor
MQL Method Quantltatlon Limit
Page 3 0£ 5