Loading...
HomeMy WebLinkAboutNCC221956_Modification Review_20250311 Action History(UTC-05:00) Submit by Anonymous User 3/7/2025 9:51:21 AM(ADD TO FILE Submittal) Approve by bethany.georgoulias 3/11/2025 8:38:35 AM(Construction COC ADD TO FILE Review-NCC221956) 0 Received copy of Charlotte approval letter from T. Dameron on 3/11/2025(will be added to the file). • The task was assigned to bethany.georgoulias.The due date is: March 12,2025 5:00 PM 3/7/2025 9:51:22 AM Ago Permit for DEQMODIFICATION Construction0i00 0000 Certificate of NCC221956 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Initial Permit Fee Status Initial Payment Received PAID 5/24/2022 (N/A prior to Oct 2020) (N/A prior to Oct 2020) 2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status May be blank if N/A May be blank if N/A May be blank if N/A 2023 Annual Fee Status 2024 Annual Fee Status 2025 Annual Fee Status PAID PAID May be blank if N/A May be blank if N/A May be blank if N/A Information associated with this permit: Project Name 3201 Rotary Drive Address 3201 Rotary Drive,Charlotte, NC County Mecklenburg Latitude 35.2743 Longitude -80.8309 Permittee Listed TEP OPCO, LLC(dba Tower Engineering Professionals) Legally Responsible Scott Brantley Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2022-1956 E&SC Plan ID LDGP-2022-000111 Original NOI Tracking 91794 No.* Date COC Issued* Effective Date at Submittal 04/01/2024 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Closed-Out Lots/Outparcels in E&SC Plan Modification* ) Additional Lots/Outparcels Approved-E&SC Revised J Other Revision(s)to E&SC Plan 0 Legally Responsible Individual and/or Site Contact Has Changed 0 Multiple Reasons(List Below) 0 Other(Describe Below) Reason for Modification Supporting Doc Name (OTHER ESC REVIS) Reviewer Reference Only(Not Visible on Starting Form) Additional Description/Explanation More information(e.g.,if lots are being added,please include specific lot numbers.) The project SOW for this location has changed from just tree clearing to graveling the cleared area and an installation of a retention pond. During phase 1 of the grading work the pond will be utilized as a sediment basin, and in phase 2 it will be converted into a dry detention pond. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) APPROVE D-LDC-2023-00083.pdf 28.32MB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? This pertains to funding distributed by the N.C.Division of Water Infrastructure(DWI)only. No Yes Is this project funded with N.C.Session Law 2023-134 Section 12.2 Earmark funds? No Yes North Carolina General Statute 143-215.613(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature //�� Pt W"-OwowetGIY Type Name* Trent Dameron Title* Project Lead Organization* TEP, OPCO LLC Date* 03/07/2025 Email Address* thdameron@tepgroup.net Email for confirmation Telephone Number* 9196616351 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email sbrantley@tepgroup.net (Optional) Additional email for confirmation Original Permittee sbrantley@tepgroup.net Email Original Site Contact sbrantley@tepgroup.net Email Review Date 03/11/2025 Rescinded Since Submitted? Current Effective Date Current Expiration Date Permit Version 4/1/2024 3/31/2029 2.00