HomeMy WebLinkAboutNCC250523_NOI Application_20250219 Action History(UTC-05:00)
Submit by Anonymous User 2/18/2025 8:23:03 AM (NCG01 NOI Submission)
Approve by Brooklyn.Broussard 2/18/2025 8:56:02 AM (Review-NOI 243625 H.L. Miller Park Greenway SP-24-01)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 21,2025 5:00
PM 2/18/2025 8:23:16 AM
• The task was assigned to Brooklyn.Broussard by round robin distribution 2/18/2025 8:23:16 AM
Submit by Tev.Holloman 2/19/2025 12:41:00 PM (Payment Verification for NCC250523)
•Tim Watson Engineering
• The task was assigned to DEMLR NCG01 Payment Team.The due date is:April 1,2025 5:00 PM
2/18/2025 8:56:18 AM
• Tev.Holloman assigned the task to Tev.Holloman 2/19/2025 12:40:15 PM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
Previous Rejected NOI No.
243575
Prior Reviewer Name
Brooklyn Broussard
1a. Project Name*
H.L. Miller Park Greenway SP-24-01
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c.Parcel ID Number(s)(PIN)
List all PINs associated with this project.
1841507602
1841509382
1841509980
2.County*
Wake
3.Highway or Street Address*
401 Elm Avenue
Street name only is acceptable if no address number assigned yet
4.City or Township*
Wake Forest
5.State* NC
6.Zip Code* 27587
7. Latitude* Enter the latitude in decimal degrees
35.9755
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-78.5077
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 02/24/2025
Estimated Construction Project Start Date
10. Date to End* 11/21/2025
Estimated Construction Project End Date
11.SIC(Primary)*
Other(9999)
Standard Industrial Classification for Development
12.Acres to be 2.93
disturbed* (including off-site borrow and waste areas)
13.Total site area 2.93
(acres)*
14. Post-construction 0.90
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-WAKE-2025-H.L. Miller Park Greenway SP-24-01
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Spring Branch
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.
27-23-4-1
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17a.Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
17b.Is this project funded with N.C.Session Law 2023-134 Section 12.2 Earmark funds?
No
Yes
This question was added on 12/12/2024 and will not be answered in applications submitted prior to that date.The reviewer has an option to indicate.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Town of Wake Forest
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Kip
If Corporation,enter Registered Agent First Name
3. Last Name* Padgett
If Corporation,enter Registered Agent Last Name
3b.Title Town Manager
4. Permitee E-mail Address*
kpadgett@wakeforestnc.gov
5. Permittee Telephone No.*
919-435-9510
6. Permittee Mailing Address*
Street Address
301 S. Brooks St
Address Line 2
City State/Province/Region
Wake Forest INC
Postal/Zip Code Country
27587-2932 us
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
301 S. Brooks St
Address Line 2
City State/Province/Region
Wake Forest NC
Postal/Zip Code Country
27587-2932 us
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Government-Municipal
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Bryan
2. Primary Site Contact-Last Name*
Mol
3.Title
4.Site Contact E-mail Address*
bmol@jmthompson.com
5.Site Contact Telephone No.*
910-915-7536
6.Organization Name
J.M.Thompson
7.Site Contact Mailing Address*
Street Address
P.O. Box 33066
Address Line 2
City State/Province/Region
Raleigh North Carolina
Postal/Zip Code Country
27636 United States
8.Consultant Name
(Optional)
Caleb Lowman
First and Last name
9.Consultant E-mail
caleb.lowman@kimley-horn.com
This person will be copied on all correspondence.
10.Consultant Telephone No.
919-677-2108
11. Billing E-mail
(For Annual Fee correspondence)
kpadgett@wakeforestnc.gov
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
919-435-9510
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 11/19/2024
Approved*
2. E&SC Plan Project WAKE-2025-00199
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Raleigh (RRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan Letter of Approval-Tuesday, November 19,2024
Approval letter or 250.46K6
1049 AM.pdf
Grading Permit
Must be PDF format
6.Signed FRO Financial Responsibility/Ownership Form
H.L. Miller Park Signed FRO.pdf 96.68KB
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
MillerPark_Vicinity_Map.pdf 1019.19KB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification H.L. Miller Park_NOI_NCDEQ_2.17.25.pdf 78.18KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
G'�O�aaywr
Type Name* Kip Padgett
Title Town Manager
Organization Legally Responsible Entity
Town of Wake Forest
Date* 02/18/2025
F. Tracking and COC Info
NOI Tracking No. 243625
NC Reference No. NCG01-2025-0523
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed
from workflow if eNOI approved)
Certificate of NCC250523
Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC250523-2025
Invoice Due Date 3/20/2025
Initial Fee $ 120.00
Fee increased to$120,effective October 3,2023
Invoice Status OPEN