Loading...
HomeMy WebLinkAboutNCC243889_ESC Approval Submitted_20241220 1 ro C�3UNTy HEN DER5ON �!S HENDERSON COUNTY GOVERNMENT SITE DEVELOPMENT DEPARTMENT SOIL ERSOSION AND SEDIMENT CONTROL DIVISION Natalie J. Berry P.E. Deb Johnston, PE Director Assistant Engineer August 4, 2022 LETTER OF APPROVAL WITH CONDITIONS Max Quattlebaum, LLC Quattlebaum Properties F, LLC Robert Quattlebaum 636 Boxcar Street Hendersonville,NC 28793 Project Name: Quattlebaum Upward Rd Site Site Dev. Project ID: SESC 2022-06-01 SmartGov Permit No. SESC-2022-08-02 Acres Approved: 15.0 PIN: 9588-50-0103; 9587-49-8514; 9588-40-2114 County: Henderson City: Two parcels in HC; City of Hendersonville for 9588-40-2114 Address: 0 Upward Rd(35.297184, -82.402481) River Basin: French Broad River Basin Stream Class: Dunn Creek, Segment 6-55-8-1-1, Class C Submitted By: Matthew Campbell Date Rcvd by HC: June 7, 2022 Plan Type: New Date Rcvd by HC: August 1, 2022 Plan Type: Revised Dear Robert Quattlebaum, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Conditions Quattlebaum Upward Rd Site August 4,2022 Page 2 of 3 deq.nc.gov/NCG01. Please direct questions about the eNOl form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Aigelq Director/Project Engineer Soil Erosion& Sedimentation Control Office Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Matthew Campbell, Summit Engineering Group Stan Aiken PE, DEQ—Asheville 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Conditions Quattlebaum Upward Rd Site August 4,2022 Page 3 of 3 MODIFICATIONS • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. • A DRIVEWAY PERMIT REQUIRED FROM THE JURISDICTION HAVING AUTHORITY (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF WAY, SUCH AS SIDEWALK, UTILITIES, ETC (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS DOCUMENT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER AND FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET D3.4 OF THE APPROVED DRAWING WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "QUATTLEBAUM UPWARD ROAD SITE IMPROVEMENTS"AND DATED JULY 29, 2022, IS REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL. • PRE-CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: Print Name and Title: Date: 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553