Loading...
HomeMy WebLinkAboutNCC243793_Site Plan or Location Map_20241211 110 .f., s if ___- ----- \,.,,.., -...II IMIIIIIIIIIIFAIWqf / / ( -. / ______.•winaggirn jHIIIII.IIIIIIIM / l l IA, 1:: littior, i ; ' / // / I / / / I / /�.itil F SITE / a 7 / / i/ / , / / / I lie*Sk,,1/00.-- , . VW/ I' Ncg,t,l,i \ I d�N _ * p- / / OPEN • ll I„ , r/ SPACE E I/ I 1!I! :, 11 EAENT�o' V l —_ m•u al EASE �T / \ y ,,, \ ��" Rough''dge TrailMLRo�gh Rid /\ •qq g�Trail / II. \ \SODDING I \ ' AREA< on /� N__ \ �1. ,.s�Irvner . / ` SPA 1 ( ( 49 N 57 • __ .,.. .... RAr,ERRaarr.xaarRlRa OPEN \ OW1I-.wa,sr xOTHER. \ w M, ,00L.earu�x:rvaces.w000 u, � \ w��RR amR amPervea _ oorvorLeaveeP _ orouE .= — xrve. aaowarxe \ I \ l — \ \IIIII \ _ ao grnwa:x ne ee _ _ 1 50 ° \ 20 \ \ cunRaw I=CONSTRUC IONIIE F 111.111IL `\ --- Th MATCHED CORRECT, —� \ \ \ LIMITS ty FMK / 1 Titi:K 1 I CONS FA riON 2- 69\ \ I 9 11 / / / cossrn ••^^'^•�• LIMITS Illimmai L°y 4" 51 1 s4C4w \ \ 4 / iii --- ------ ----- ---� \ I I 1 \�at Plan 6✓ m ., allik I \ _— / (,(/ \/m1 1 g) • • • I l 1 '• \\ CON LI ITSTION I 70 \ I I I \ 6Ea \ nlG�Imu AIL. °"Y,� Al 1. . I.I!.11�lk — 6 L s RUL —4ae AouwO:.MrnwraLv ro wnrra ronosmxor a' uav wesry rxs sao is I Lot PI n •N TION I \ \ 1 \_______ _____ , ncwsys rSOI comncr ,s xccoco.illE WO au X%11saeo_IR as I I IP'4I / LIMITS \w rxasoL gganR Emg:R wEExR a E�gwER \ f \ \ 4 I / / B„&G„ I 62 I \ 23 I \CIRWO, OF GOOD SOD > .mAPPEA E(�I //I� I'III� �...w- \IIPARCE�ID to4G1assrnineTr I 1 o Is / 2 \ \\ III��ulll �V'II I/uVIi I 000548 0 I II o 24 J 1 11 t:9"LIT ) / I� M I f�C 18,SLID 664 OEN ,aa orRSEReorM,. ) ) AI) I I SP'CE 40 �3 �I �� I� 25 / — A �, �E e111 3P n 36 II _ General Erosion Control Notes / QP """ otPlan \ — S I o "„ 3111675:7\ 26 o�w / / // r—C-- (_ / 1.Only the areas shown shall be disturbed. I / CR / \ \� — cv CON -UCTION / 2.All disturbed areas shall be grassed and ���/// IMITS mulched as soon as possible and maintained / &umll pemanem Dover IB estabtlened. / / ,'arfawha Trail < I / / hr / / / — — 27 , o / (// /// / SPP/aGt / / 4� / 1 N GROUND STABILIZATI❑N I� IrK--_ \ SITE AREA STABILIZATION EXCEPTIONS NAve DESCRIPTION TIME FRAME ( '.....\ \ / \ / PERIMETER 7 DAYS NONE DIKES, SWALES, V / \ DITCHES & • i ( i \ \ ( \ \\ \ \ \,„, n,,,,, SLOPES HIGH QUALITY 7 DAYS NONE \ \ \ \ `i 11JII \ \ / / IWATER ZONES / / I(HOW)SLOPES STEEPER 7 DAYS IF SLOPES ARE \\ \ ` \ ) / I \ \ I \ ( // 7--- / THAN 3:1 10' OR LESS IN //I / LENGTH AND ARE \ \ I / �— NOT STEEPER \ / A THAN 2,1, 14 / \ \ I / / \ \ \ I ' \ ` \ DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR / ` ` \ \ \\ \ \ FLATTER SLOPES GREATER \ \ 1 \ \ THAN 50' IN I \\\ LENGTH / /, \ \ //, I — , \ \ \ \ \ALL OTHER 14 DAYS NONE (EXCEPT ( \ \ —\ AREAS WITH FOR PERIMETERS / / \ \ I ' \ \ \ \ SLOPES FLATTER AND HOW ZONES) • I \ \\ \ \\`\ \ \ THAN 4:1 I/ Il • DATE: E: \ \ \ \ \ I I \ \ + MIN _I FENCE MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION PAGE 1 of 2 IIIIIIII,IIIIIIII,IIIIIIII 1 TOTAL DISTURBED ACREAGE 1,08 ACRES General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be LOT EROSION CONTROL PLAN THE WASHED STONE relocated on the lot to insure that the potential for sedimentation rune is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. LOTS 36, 37, 51, 60 P< 61 STEEL FENCE POSTi I - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all r6orvrv�Ew objectionable materials spilled,washed,or tracked onto public roadways.WIRE FENCE I N HARDWARE CLOTH Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure BETHE SDA PINES �FILTER FLTER wBURY WIRE FENCE. enic, that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations.AND HARDWARE FOR wasxse sroN>.,, q �:STEEL FENCE POST SET a,� Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent domlancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth INTO SOLID GROUND and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. CAT E S BUILDING, INC. oFILTER FABRIC NOTES: GROUND 1.Hardware cloth and ravel should overlay the silt fence at least 12 inches. g y Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SANDHILLS TOWNSHIPMOORED COUNTY dlso 2.Stone eoutlets e field should be placed on low elevation areas of cut fence repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. and SCALE: "_100' NOVEMBER2024 \\ MAINTENANCE: Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SCALE BURT WIRE FENCE AND eORV s of 1.Per NCG-01,inspect outlet at lest once a week and after each 1 inch or sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. too 0 50 100 200 400 HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. 2.Freshen stone when sediment accumulation exceeds 6 inches. 11 3.Keep mesh free of debris to provide adequate now. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all sooniouvlaw 4.Remove sediment when half of stone outlet is covered. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ..\NC-Enviro„,�„t,.Ljyry 5.Realece stone as needed to facilitate de-watering. ( IN FEET ) 1 inch = 100 ft. SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE NP-0106 LAST SAVBq!12/2024 8:4i5Al.PLOTrE0.12/2024 9:50PaeirTE0 LB.finis Gi1bab&LENAMF:\STAFF\DENNIS\D£NNIS WORK FILES\PROJECTS\EC NEW PROJECT\EC—EMPTY EMPTY—BETHESDAPINES\BETHESDAPINESEC—LOTS36.S7.51,60a61.DWG