HomeMy WebLinkAbout20241562 Ver 1_More Info Received_20241125CSX Mr. Matthew L Adkins, CHMM Sr. Manager Environmental Remediation November 25, 2024 District Engineer U.S. Army Corps of Engineers — Wilmington District 69 Darlington Avenue Wilmington, NC 28403 910-251-4811 Attention: Regulatory Division, NCPermit_Wetlandskusace.army.mil 1590 Marietta Blvd NW Atlanta, GA 30318 Phone (404) 350-5135 Matt Adkins(-,csx.com Poplar, NC Emergency Rebuild Subject: Supplemental Information for Pre -Construction Notification (PCN) — Nationwide Permit CSX Transportation, Inc. Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Subdivision, Milepost Z 142.5 to 166.0 Mitchell and Yancy Counties, North Carolina SAW-2024-02064 Chief Asheville Regulatory Field Office, Amanda Fuemmeler: CSX Transportation, Inc. (CSXT) is providing additional information for the emergency track rebuild project between Milepost (MP) Z 142.5 and Z 166.0 on the Blue Ridge Subdivision in North Carolina. CSXT is seeking an emergency permit for the work yet to be completed, and an after -the -fact permit for work already completed. The original application is supplemented with the attached additional information. Please note we have change the ending mile post from MP Z 165 to MP Z 166 due to an additional section of tracked washed out by flooding between these mile posts. CSXT values a good working relationship with the U.S. Army Corps of Engineers and requests that if you have any questions or concerns, please let us know. You may contact our environmental consultant Robin Hagerty with Clinchfield Consulting Group at (615) 584-6031 or rhagerty(kclinchfield.com. Thank you for your consideration of this matter. Sincerely, CSX Transportation, Inc. Matthew L. Adkins, CHMM Sr. Manager Environmental Remediation Attachments: Copy of PCB Supplemental Information Attachment A. Figured Attachment B. Photo Log Attachment C. WOTUS Report Attachment D. Protected Species Attachment E. Emails notifications Attachment F. Wild & Scenic Research Attachment G. OHW Determination Attachment H. BMPs Attachment I. Rendering & Plans — Rebuild rail Attachment J. Bridge Plans 11/18/24, 8:33 PM Submission Completed F11 DWR It.�l Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 4, 2023 Ver 4.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2196924 A. Processing Information If this is a courtesy copy, please fill in this with the submission date. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund, electric generation projects located at an existing or former electric generating facility, or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity?* Yes No Is this application for a project associated with emergency response/repairs from Hurricane Helene impacts to your project or property? Yes No Is this project connected with ARPAfunding?* Yes No County (or Counties) where the project is located: * https://edocs.deq.nc.gov/Forms/Form/Submit 1 /17 11/18/24, 8:33 PM Submission Completed Mitchell Yancey Is this a NCDMS Project* Yes No Click Yes, only if NCDMS is the applicant or co -applicant. DO NOT CHECK YES, UNLESS YOU ARE DMS OR CO -APPLICANT. Is this project a public transportation project?* Yes No This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project. 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps?* Yes No Nationwide Permit (NWP) Number: 14 - Linear transportation Nationwide Permit (NWP) Number: 03 - Maintenance Nationwide Permit (NWP) Number: 45 - Repair of Uplands Damaged Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): List all NW numbers you are applying for not on the drop down list. https://edocs.deq.nc.gov/Forms/Form/Submit 2/17 11/18/24, 8:33 PM Submission Completed 1 d. Type(s) of approval sought from the DWR: check all that apply 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application?* Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. Yes No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach document FILE TYPE MUST BE PDF 1 h. Is the project located in any of NC's twenty coastal counties?* Yes No 1 j. Is the project located in a designated trout watershed? * Yes No You must submit a copy of the appropriate Wildlife Resource Commission Office. Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency- Coordination/Trout.aspx B. Applicant Information 1 a. Who is the Primary Contact?* Matthew L Adkins https://edocs.deq.nc.gov/Forms/Form/Submit 3/17 11/18/24, 8:33 PM Submission Completed 1c. Primary Contact Phone:* 1 b. Primary Contact Email:* (xxx)xxx-xxxx Matt_Adkins@csx.com (404)350-5135 1 d. Who is applying for the permit?* Owner Applicant (other than owner) (Check all that apply) 1 e. Is there an Agent/Consultant for this project?* 1'� 11110r.7 2. Owner Information 2a. Name(s) on recorded deed: CSX Transportation, Inc. 2b. Deed book and page no.: 2c. Contact Person: (for Corporations) Matthew L Adkins 2d. Address* Street Address 1590 Marietta Blvd NW Address Line 2 City State / Province / Region Atlanta GA Postal / Zip Code Country 30318 USA 2e. Telephone Number:* (xxx)xxx-xxxx (404)350-5135 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address: * Matt_Adkins@csx.com https://edocs.deq.nc.gov/Forms/Form/Submit 4/17 11/18/24, 8:33 PM Submission Completed 4. Agent/Consultant (if applicable) 4a. Name:* Robin L Hagerty 4b. Business Name: (if applicable) Clinchfield Consulting Group 4c. Address Street Address 5310 Maryland Way Address Line 2 Ste 390 City State / Province / Region Brentwood TN Postal / Zip Code Country 37027 USA 4d. Telephone Number:* (615)584-6031 4e. Fax Number: (xxx)xxx-xxxx (xxx)xxx-xxxx 4f. Email Address: * rhagerty@clinchfield.com C. Project Information and Prior Project History 1. Project Information 1 a. Name of project:* CSXT Emergency Track Rebuild Post -Hurricane Helene, Blue Ridge Subdivision MP Z 142.5 to Z 165.0 1 b. Subdivision name: (if appropriate) https://edocs.deq.nc.gov/Forms/Form/Submit 5/17 11/18/24, 8:33 PM Submission Completed 1c. Nearest municipality / town-* Poplar, Relief, Green Mountain, Red Hill 2. Project Identification 2a. Property Identification Number: (tax PIN or parcel ID) CSXT Right of Way 2c. Project Address Street Address Address Line 2 City Postal / Zip Code 2d. Site coordinates in decimal degrees 2b. Property size: (in acres) 330 State / Province / Region Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: * Longitude: * 36.072456-82.417017 ex: 34.208504-77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Nolichucky River, N. Toe River, and associated tributaries. 3b. Water Resources Classification of nearest receiving water: Class B, Class C, Tr Surface Water Lookup 3c. What river basin(s) is your project located in?* French Broad https://edocs.deq.nc.gov/Forms/Form/Submit 6/17 11/18/24, 8:33 PM Submission Completed 3d. Please provide the 12-digit HUC in which the project is located.* 060101080205,060101080209,060101080601,& 060101080603 River Basin Lookup 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * SAW-2024-02064 - CSXT Emergency Track Rebuild Post -Hurricane Helene, Blue Ridge Sub Milepost Z 142.5 to Z 165.0, Mitchell and Yancey Counties in NC. This project is a linear transportation project as defined in United States Army Corps of Engineers (USACE) regulations and the Interstate Commerce Commission Termination Act. CSX Transportation Inc. (CSXT) proposes to rebuild the track infrastructure between Milepost (MP) Z 142.5 and MP Z 165.0 on the Blue Ridge Subdivision in North Carolina, restoring needed rail service after the catastrophic damage from Hurricane Helene flooding. The rebuild includes the track, roadbed, culverts, ditches, signals, and a bridge along this 22.5 miles of active CSXT ROW. The project starts at the Tennessee and North Carolina state line at Latitude 36.072456' / Longitude -82.417017°, near Poplar, Mitchell County, NC and ends at Latitude 36.017544' / Longitude 82.213283°, near Red Hill, Mitchell County, NC. General land use in the vicinity of the project varies widely from National Forest to small towns. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.29 acre 4g. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 30,000 In ft 4h. Explain the purpose of the proposed project: * The Project will rebuild the CSXT rail infrastructure in order to restore the needed rail service damaged as a result of the flooding after Hurricane Helene. The flooding resulted in a disruption of service on the Blue Ridge Subdivision, particularly from MP Z 142.5 to Z 165.0 in NC, where rail infrastructure was damaged to such an extent that trains cannot pass through this area. This rail line is a critical connection between Chicago and the southeast coastal ports; therefore, the purpose of the Project cannot be met with the no build option. https://edocs.deq.nc.gov/Forms/Form/Submit 7/17 11/18/24, 8:33 PM Submission Completed 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: 1. Rebuild the track including culverts within the Nolichucky River gorge between the NC/TN state line and Poplar, NC. (MP Z 142.5 to MP Z 147.9) 2. Rebuild the rail bridge near Poplar, NC. (MP Z 147.9) 3. Replace damaged culverts under the track south of the Poplar Bridge. (MP Z 147.9 to MP Z 165.0) 4. Rebuild damaged track south of the Poplar Bridge along the Nolichucky and North Toe Rivers. (MP Z 147.9 to MP Z 165.0) 5. Recover rail, ties, and other on -track material (OTM) washed into the Nolichucky and North Toe Rivers. (MP Z 142.5 to MP Z 165.0) The equipment used will be typical for site grading, drilling, and construction projects along, over, and in streams. A very large crane will be required at the Poplar Bridge. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? * Yes Comments: No Initial delineation completed for accessible areas Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary Approved Corps AID Number: Example: SAW-2017-99999 Not Verified Unknown N/A 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: multiple employees Clinchfield Consulting Group Report has not been completed 6. Future Project Plans 6a. Is this a phased project?* Yes We https://edocs.deq.nc.gov/Forms/Form/Submit 8/17 11/18/24, 8:33 PM Submission Completed Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre - construction notification. No other NWPs, Regional General Permits, or Individual permits will be used or are intended to be used within the State of NC to authorize the proposed project. The work in the gorge continues (MP Z 140.0 to Z 142.5) into Tennessee and is being permitted separately by the USACE Nashville District and TDEC. We have not determined which (if any) culvert crossing streams will not require pre -construction notifications. Additional storm damage repair work is occurring south of Red Hill (MP Z 165.0), but currently the permit stops at MP Z 165.0. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2a. Site 2a1 Reason* 2b. Impact 2c. Type of W. * 2d. W. name* 2e. 2f. Type of 2g. #* M M type* M Forested Jurisdicition* Impact M area W1 Fill P NON-NCWAM Wetland 1 No Corps 0.290 TYPES (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.290 2g. Total Wetland Impact 0.290 https://edocs.deq.nc.gov/Forms/Form/Submit 9/17 11/18/24, 8:33 PM Submission Completed 2i. Comments: Major emphasis is to replace damaged areas 'in kind' without additional mitigation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact* ('> 3b.lmpact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (') 3f. Type of Jurisdiction 3g. S. width* 3h. Impact length S1 Track Rebuild- Permane Rip Rap Fill Nolichucky River Perennial Corps 230 20,000 Gorge nt Average (linear (feet) feet) S2 Bridge Temporar Workpad/Cau Nolichucky River Perennial Corps 230 2,540 Replacement y seway Average (linear (feet) feet) S3 Culvert Permane Culvert tributaries to Perennial Corps 3 0 Replacements nt North Toe Average (linear River/Nolichucky (feet) feet) S4 Track Rebuild- Permane Rip Rap Fill North Toe Perennial Corps 200 5,000 South nt River/Nolichucky Average (linear (feet) feet) ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 25,000 3i. Total temporary stream impacts: 2,540 3i. Total stream and ditch impacts: 27 https://edocs.deq.nc.gov/Forms/Form/Submit 10/17 11/18/24, 8:33 PM Submission Completed 3j. Comments: For Impact S3 - Damaged culverts will be replaced 'in kind', therefore, no additional impacts are proposed. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: * 1. Use the Rail Pile Wall will minimize impacts below OHW by allowing the wall to replace the slope further into the river in areas where the rail embankment would be more at risk during a flood event or where the toe of the embankment slope would intrude into the River beyond CSX ROW and/or where the roadbed was pre -storm. 2. Use temporary rail work bridge instead of culvert stream crossings. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: * 1. Limit equipment in the streams to only where necessary for track and embankment recovery, toe access reconstruction, and drilling rail pile wall. 2. In consultation with appropriate agencies, threatened and endangered species such as the Appalachian Elk Toe Mussel historical populations will be identified and avoided as much as possible. 3. Field determine OHW mark in the Nolichucky River. 4. Follow USFS stabilization BMPs, as applicable. 5. Use available materials within CSXT ROW and locally sources material to rebuild toe. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Mitigation requirements, if any, have not yet been determined. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. https://edocs.deq.nc.gov/Forms/Form/Submit 11/17 11/18/24, 8:33 PM Submission Completed F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Not within watersheds designated by the NC Riparian Buffer Protection Rule. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* Yes No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? * Yes No N/A - project disturbs < 1 acre Hint: projects that have vested rights, exemptions, or grandfathering from state or locally implemented Stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer no to this question. 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters. Stormwater Management Plan Antidegradation Calculations https://edocs.deq.nc.gov/Forms/Form/Submit 12117 11/18/24, 8:33 PM Submission Completed Comments: To be published, if needed. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. The project is restoring the rail infrastructure damaged in the flooding that resulted from Hurricane Helene; therefore, should not result in additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A https://edocs.deq.nc.gov/Forms/Form/Submit 13/17 11/18/24, 8:33 PM Submission Completed 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes No Unknown What Federal Agency is involved? USFS, USFWS 5e. Is this a DOT project located within Division's 1-8?* Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? * Yes No 5g. Does this project involve bridge maintenance or removal?* Yes No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* USFWS IPaC 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * Yes No https://edocs.deq.nc.gov/Forms/Form/Submit 14/17 11/18/24, 8:33 PM Submission Completed 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * National Register of Historic Places Mapper 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8b. If yes, explain how project meets FEMA requirements: Replacing existing culvert in -kind or larger. Raising rail bridge low cord at Popular by -2'. Rebuilding rail bed washed out during flood event. 8c. What source(s) did you use to make the floodplain determination? * FEMA's National Flood Hazard Layer Viewer https://edocs.deq.nc.gov/Forms/Form/Submit 15/17 11/18/24, 8:33 PM Submission Completed Miscellaneous Comments Emergency Response to recover rail materials from public waterways and rebuild rail damaged as a result of the flooding from Hurricane Helene. Additional information will be provided as more information becomes available. Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 0_Z 142.5 to 165.0_BlueRidge, NC—PCN 2024-11-18-coverltr.pdf 2_CSXT ROW-STRs MP 142 to 165.pdf 3_Photopgs_NC_r.pdf 4_IPaC_ Explore Location resources Z 142.5 to 165.0 11-15-2024.pdf 6—Rail Pile Walls.pdf 7—Bridge at Popular.pdf 8_BlueRidgeSub NC - Access —Borrow Plan.pdf 5_Emails.pdf File must be PDF or KMZ Signature By checking the box and signing below, I certify that: 127.97KB 11.03MB 1.87MB 752.11 KB 7.27MB 14.88MB 5.17MB 1.02MB • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • 1 have given true, accurate, and complete information on this form; • 1 agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • 1 agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • 1 intend to electronically sign and submit the PCN form. https://edocs.deq.nc.gov/Forms/Form/Submit 16/17 11/18/24, 8:33 PM Submission Completed Full Name:* Matthew Adkins Signature* Date 11 /18/2024 https://edocs.deq.nc.gov/Forms/Form/Submit 17/17 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Additional Information -- Emergency Permit Nationwide Permit (NWP) Pre -Construction Notification (PCN) CSX Transportation, Inc. -- CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub MP Z 142.5 to Z 166.0 -- Mitchell and Yancey Counties, North Carolina SAW-2024-02064 -- PCN Rev 1 November 25, 2024 Section 1.0 Name, Location, and Description of Project or Activity This project is a linear transportation project as defined in United States Army Corps of Engineers (USACE) regulations and the Interstate Commerce Commission Termination Act.' CSX Transportation Inc. (CSXT) proposes to rebuild the track infrastructure between Milepost (MP) Z 142.5 and Z 166.0 on the Blue Ridge Subdivision in North Carolina. The project entails restoring needed rail service after the catastrophic damage from Hurricane Helene flooding. Rebuilding includes the track, roadbed, culverts, ditches, signals, and a bridge along this 22.5 miles of active CSXT right-of-way (ROW). The project began in October 2024 and will be completed by summer 2025. The project is located in Mitchell and Yancey Counties. The project starts at the Tennessee and North Carolina state line at Latitude 36.072456' / Longitude-82.4170171, near Poplar, Mitchell County, NC and ends at Latitude 36.017544' / Longitude 82.213283°, near Red Hill, Mitchell County, NC. The waterbodies within the project area include Nolichucky River, North Toe River, Lost Cove, Norris Branch, Flat Branch, Sam's Branch, Shop Branch, Cooper Branch, Pigeonroost Creek, Brummett Creek, Warrick Branch, Raccoon Creek, Big Rock Creek, Whitson Branch, Hollow Poplar Creek, and Cane River and their tributaries. General land use in the vicinity of the project varies widely from National Forest to small towns. The construction will require authorization pursuant to Section 404 of the Federal Clean Water Act, 33 U.S.C. § 1344 from the United States Army Corps of Engineers (USACE) for the crossings of areas preliminarily identified as waters of the U.S. (WOTUS) and subject to USACE confirmation. Initial notification of the emergency nature of the project was emailed to the USACE and State -level regulatory agencies on September 30, 2024, specifically about the loss of the rail bridge near Poplar (MP Z 147.9). The flooding started on September 26 due to rainfall from Hurricane Helene coming on shore and moving inland. Additional emergency notifications were emailed to the USACE Asheville Field Office and North Carolina Department of Environmental Quality (NC DEQ) on October 10, 2024, for the current project length (MP Z 142.5 to Z 166.0) to include the loss of roadbed and track. No correspondence was received until November 1 when the USACE replied. A Preconstruction Notification was submitted to the USACE Wilmington District on November 18 using the NC Department of Environmental Quality (NCDEQ) eDocs website. This document is intended to provide additional supporting documentation as part of the PCN submittal. Clinchfield Consulting Group (Clinchfield) conducted an assessment of WOTUS (including wetlands) within the project area during multiple site visits in October and November 2024. The report from the investigation will be included as Attachment C. If required, a supplemental WOTUS report will be issued for the proposed borrow areas. Note: Due to safety issues, delineation of the CSXT ROW from the Big Wall (MP Z 143.5) to the end of the railbed downstream of the Poplar Bridge (MP Z 147.6) was not possible. The delineation was completed in this section using drone images. CSXT will only make the necessary minimum impacts to WOTUS required to allow for the construction of an adequate roadbed to rebuild the track and allow for access along the ROW. Anticipated Nationwide Permits that may apply for this project include NWP 3 - Maintenance, NWP 13 - Bank Stabilization, NWP 14 - Linear Transportation Project, and NWP 45 - Repair of Uplands Damaged by Discrete Events. This notification requests authorization to continue construction of the on -going emergency CSXT track rebuild. Sections 2.0 and 3.0 illustrate how this project meets the NWP General Conditions. As a result of the extensive flooding, much of the track and associated roadbed was washed into the Nolichucky River (MP Z 142.5 to Z 147.9). The remainder of the project footprint (MP Z 147.9 to Z 166.0) had more typical flood damage with areas of lost track, erosion of rail embankment, and damage to culverts. Construction is currently underway to reconstruct 1 Certain state and local approvals and conflicting requirements are preempted as applied to rail facilities operating in interstate commerce, under the Interstate Commerce Commission Termination Act of 1995 ("ICCTA"), 49 U.S.C. §10501 and Federal Railway Safety Act of 1970 ("FRSA"), 49 U.S.C. § 20101. CSXT does not waive and expressly preserves any claims or defenses related to such ICCTA or FRSA preemption related to subject matter of this request. Page 1 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC the roadbed, replace culverts and bridge, and reinstall tracks. The project is divided into five types of work for ease of discussion and currently requires a mixture of after -the -fact and emergency permits. 1. Rebuilding damaged track, including damaged culverts, within the Nolichucky River gorge between the NC/TN state line and the rail bridge at Poplar (MP Z 142.5 to MP Z 147.9) 2. Rebuilding the rail bridge near Poplar (MP Z 147.9) 3. Replacing damaged culverts under track south of the Poplar Rail Bridge (MP Z 147.9 to MP Z 166.0) 4. Rebuilding damaged track south of Poplar Rail Bridge along the Nolichucky and North Toe Rivers (outside of gorge) (MP Z 147.9 to MP Z 166.0) 5. Recovering rail, ties, and other on -track material (OTM) washed into the Nolichucky and North Toe Rivers (MP Z 142.5 to MP Z 166.0) Restoration Timeline Spring 2025 September �24 — Damage Assessment _ Rail Traffic Retur Fall 2024 Summer 2025 Timeline subject 1. change I REV11114 The Project will rebuild the CSXT rail infrastructure in order to restore the needed rail service damaged as a result of the flooding after Hurricane Helene. The flooding resulted in a disruption of service on the Blue Ridge Subdivision, particularly from MP Z 142.5 to Z 166.0 in North Carolina, where rail infrastructure was damaged to such an extent that trains cannot pass through this area. Because of the geographic and environmental constraints, the alternatives are the Build or No Build options with modifications to the build option to reduce impacts. This rail line is a critical connection between Chicago and the southeast coastal ports; therefore, the purpose of the Project cannot be met with the no build option. Section 1- Detailed Description of Proposed Impacts 1. Roadbed Rebuild in the Gorge. This includes the restoration of the roadbed or repair of uplands damaged by a discrete event including culvert replacements, as needed. The railroad corridor through the gorge is parallel to the Nolichucky River on the southern bank, within Yancey County. CSX plans to restore the roadbed, previously considered upland areas, damaged during Hurricane Helene (using authorization under NWP45). The length of roadbed directly adjacent to the Nolichucky River is approximately 23,700 linear feet. This excluded the length behind the concrete wall and a section away from the river. er 11; i a Photo 1 - Toe Access and Rail Pile Wall (in TN) Toe access is the first step in safely getting equipment into the gorge to remove rail debris, to create the rail pile wall, and to start restoring the roadbed. The goal is to keep these impacts within the original footprint of the rail embankment and within CSX ROW. Through this section of track, CSXT ROW is 100 feet wide or 50 feet from centerline of the track on both sides. Where the toe access must be outside of the CSXT ROW, these impacts will be temporary. Temporary toe access will be removed, and the material will be added Page 2 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC to the rail embankment or re -used in another location. If the rail embankment needs to exceed the limits of CSXT ROW, the intrusion will be coordinated with the regulatory agencies as part of the permitting process as well as the property owner (most likely USFS) to acquire additional ROW or other agreements. From the toe access, the rail pile wall will be used in specific locations to assist in rebuilding the rail embankment. In areas that do not require the rail pile wall, the embankment will be built above the toe access. Photo 2 - Rail Embankment being rebuilt (in TN) Construction to rebuild the original embankment footprint may be authorized under NWP45 - Repair of Uplands Damaged by Discrete Events. The permit authorized discharge of dredged or fill material into WOTUS for activities associated with restoration of upland areas damaged by a discrete event including bank stabilization. Construction outside of the original embankment footprint may be authorized under NWP14 - Linear Transportation Project. In addition, to replacing previously serviceable culverts, NWP 14 authorizes temporary structures, fills, and work and stream impacts necessary to construct the linear transportation project. If necessary, CSXT proposes to complete the culvert replacements within the gorge under NWP 3 - Maintenance. In addition, to replacing serviceable culverts, NWP 3 authorizes removal of accumulated sediment/debris within 200 feet of the structure and temporary structures, fills, and work necessary to conduct the maintenance activity. Table 1 listed the streams within the gorge where it is anticipated that culverts may need maintenance, repair, or restoration. The level of effort required has not yet been determined, due to access issues. Table 1: Culverts within the Nolichucky Gorge with Permanent Streams Impacts Coordinates w/in NCDEQ Stream Impact Dredge or Feature ID ROW Classification Anticipated Action (AC/LF)* Discharge (CY) STR-2 36.07136,-82.41096 n/a TBD TBD TBD STR-3 36.07093,-82.40244 Class C TBD TBD TBD (Lost Cove) STR-4 36.07139,-82.39904 n/a TBD TBD TBD STR-5 36.07533,-82.40024 n/a TBD TBD TBD Page 3 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Feature ID Coordinates w/in ROW NCDEQ Classification Anticipated Action Stream Impact (AC/LF) Dredge or Discharge (CY) STR-6 36.07661,-82.38683 n/a TBD TBD TBD STR-7 (Norris Branch) 36.07016,-82.37935 Class C TBD TBD TBD STR-8 36.07106,-82.37502 n/a TBD TBD TBD STR-9 36.07419,-82.37186 n/a TBD TBD TBD STR-10 36.07761,-82.36140 n/a TBD TBD TBD STR-11 36.07914,-82.35773 n/a TBD TBD TBD * Impacts are the difference between pre -flood encapsulation and emergency replacement encapsulation and the addition of riprap inlet/outlet protection as needed. In addition to these activities, A. The ballast curb wall or the 'big wall' near MP Z 143.5 to Z 143.9 will be raised by at least 2 feet to accommodate the 2 feet raise of the low chord at both the Stateline Bridge (MP Z 142.5) and Poplar Bridge (MP Z 147.9). This work will be completed above the OHW away from the Nolichucky River. B. Modifications are proposed at the culvert at MP Z 145.8 at both the inlet and outlet ends to better support the raised rail bed. Inlet Outlet Plans have not been completed for these two additional areas. 2. Bridge Rebuild. The Project will replace the bridge over Str-1, Nolichucky River. The spans were lifted off the foundations and washed off downstream during the flood event. Based on the amount of damage, the five existing piers will be covered with a Fiber Reinforced Polymer Composite Pier Wrap, two new hammerhead piers with Page 4 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC cheekwalls and micropile foundations will be added, five new deck plate girder (DPG) spans will be used, and three existing bridge spans will be reused. The 60% plan set for the rail bridge at Popular are in Attachment J. The permanent below ordinary high-water mark (OHW) impacts will be the two new instream piers. Temporary impacts include the forms required to create the two piers outside of the flow of the stream. To meet current design standards and standard of care, the bridge was designed for the low chord to be two feet higher than the previous structure. HDR is the designer of record for both the work and permanent bridges near MP Z 147.9. Nolichucky River (Stream 1) is a Class C water. See Attachment F for research on wild and scenic rivers (to be published). CSX proposed to complete the bridge replacement within the gorge under NWP 3 - Maintenance. In addition, to replacing serviceable bridges, NWP 3 authorizes temporary structures, fill, and work, necessary to conduct the maintenance activity. Another option is the NWP 14 - Linear Transportation Project, since the bridge is an integral part of the rail line rebuild. Table 2 lists the permanent bridge impacts. Table 2: Permanent Bridge Impacts near MP Z 147.9 Permanent Size of Bridge Permanent Stream Dredge or Discharge Feature Impact Deck Impact (AC/LF)* (C1) Str-1 (Nolichucky 539.6' long x 0.013 ac 2 new Piers NA River) 18' wide No additional length * Impact is difference between pre -flood and replacement bridge. Table 3 lists the temporary impacts required for the restoration of the rail bridge (MP Z 147.9). A temporary stream crossing using two 8' diameter by 170' in length culverts was placed on bedrock with temporary headwalls and topped with cellular concrete in Hollow Poplar Creek. The temporary crossing is designed to overtop in high flow conditions with minimal damage to the surrounding work areas and for ease of removal. The culverts, headwalls, and high flow channel were designed for a 5-year storm event. The crossing is part of the temporary work area. Hollow Popular Creek (Stream 46) is a Class C water and is classified as a Trout stream. The temporary below OHW impacts include the culverts, their bedding stone, headwall, and the concrete on top. The temporary work areas around the temporary stream crossing serve as a staging area for the permanent bridge repairs and reconstruction; for assembling and use of the crane; and repair and/or salvage of the bridge spans. Three bridge spans will be re -used and three will be salvaged. Due to erosion after the flooding event, material was placed below OHW in a small portion of the temporary work area. We are still researching to determine the volume of the fill temporarily placed. The temporary crossing and temporary work areas will be removed after the permanent bridge is installed and the bridge spans are removed from the Nolichucky River. The rail bridge will take an estimated six months to build. Therefore, the temporary structures are expected to be in place for less than one year. The area will be restored to pre -storm contours and stabilized using stabilization BMPs including the Forest Service specified seed mix and cover after consultation with the USFS. A temporary ford is being utilized as a low-water, bed -rock crossing in the Nolichucky River. The ford is temporary and is expected to be actively used for less than 12 months. The Ford is located on privately owner property (outside of USFS). CSXT has an agreement with the property owner for access. The banks along the River will be restored to pre -disturbance contours and stabilized using the stabilization BMPs including the Forest Service specified seed mix and/or cover or rip -rap after consultation with the USFS and the property owner. No material was dredged and no fill was placed in creating the ford. A temporary work bridge over the Nolichucky River will allow construction travel to cross the river without the ford or a temporary culvert stream crossing. CSX felt based on the stream flows and recreational activities, a culvert crossing would be impracticable at this location. The 90% plan set for the temporary work bridge is in Attachment J. Temporary impacts include the four temporary piers and the timber cribbing to separate the new piers from the stream while being created. The temporary work bridge is expected to be in place for less than one Page 5 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC year and was designed for a two year storm event. It will be removed after the rail bridge is completed. The area will be restored to pre -disturbance contours and stabilized using stabilization BMPs including the Forest Service specified seed mix and cover after consultation with the USFS and the property owner. No material was dredged in preparation for the piers. Photo 3 - Ford near Temporary Work Bridge Foundations CSX is proposing to use an after -the -fact NWP3 permit to authorize the temporary impacts associated with reconstructing the rail bridge near Poplar. If the temporary impacts are too far away from the rail bridge, an after - the -fact NWP14 permit is another option. Table 3: Temporary Impacts near Poplar Bridge between MP Z 147.7 and Z 148.3 Temporary emporary Feature Size Stream Impact Actions Impact (AC/LF)* Str-46 (Hollow Temporary Stream B'dia x 1701 TBD Discharged CY below OHW Poplar Creek) Crossing Culverts _ Str-1 (Nolichucky Work Area TBD TBD Discharged CY below OHW River) _ Str-1 (Nolichucky Ford TBD TBD No dredging or discharge below OHW River) Str-1 (Nolichucky 153' wide x 20' Bridge Foundation 0.006 ac Discharge — 50 cy below OHW River) wide bridge Str-1 (Nolichucky 539.6' long x 0.013 ac Bridge Foundation Discharge 100 cy below OHW River) 18' wide Bridge <50 LF The temporary stream crossing and work area near Poplar rail bridge were completed to access the bridge spans in the water around November 7. The ford area was developed around November 6 to allow access to the opposite bank without installing a temporary stream crossing. The foundation for the temporary work bridge was started around November 6 to allow for access to the opposite bank without ford or culverts temporary crossing with the in -stream forms to isolate the concrete from the Nolichucky River being removed around November 24. The work bridge is expected to be completed by the end of the year. 3. Culvert Replacements South Poplar. As part of the design build process, the replacement culverts will be placed under the roadbed, as needed. Existing culverts will be replaced, left in place, or slip lined as appropriate. Riprap Page 6 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC energy dissipators may be added at the inlet and/or outlets ends, as needed - this has not yet been determined. Table 4 listed the know stream crossings within CSX ROW from MP Z 148 to MP Z 165.0. Table 4: Culverts in Streams Impacts Coordinates w/n NCDEQ Stream Impact Dredge or Feature ID Anticipated Action ROW Class (AC/LF)* Discharge (CY) STR-12 36.07740,-82.34529 n/a TBD TBD TBD STR-13 36.07203,-82.34381 n/a TBD TBD TBD STR-14 36.07156,-82.34369 n/a TBD TBD TBD STR-15 36.06370,-82.33970 n/a TBD TBD TBD STR-16 36.05797,-82.33760 Class TBD TBD TBD (Flat Branch) STR-17 36.04949,-82.33578 Class C TBD TBD TBD (Sam's Branch) STR-18 36.04450,-82.33521 n/a TBD TBD TBD STR-19 36.04073,-82.33574 n/a TBD TBD TBD STR-20 36.03780,-82.33767 Class C TBD TBD TBD (Shop Branch) STR-21 36.03339,-82.33820 n/a TBD TBD TBD STR-22 36.02613,-82.31836 n/a TBD TBD TBD STR-23 36.03074,-82.31385 n/a TBD TBD TBD STR-24 36.03179,-82.31426 n/a TBD TBD TBD STR-25 36.03476,-82.31435 n/a TBD TBD TBD STR-26 36.03612,-82.31371 n/a TBD TBD TBD STR-27 36.03876,-82.31232 Class C; Tr TBD TBD TBD (Cooper Branch) STR-28 36.04100,-82.30795 n/a TBD TBD TBD STR-29 36.04590,-82.29885 Class C; Tr TBD TBD TBD (PigeonroostCreek) STR-30 36.04557,-82.29837 n/a TBD TBD TBD STR-31 36.03972,-82.29791 Class C; Tr TBD TBD TBD (Brummett Creek) STR-33 36.03407,-82.29372 n/a TBD TBD TBD STR-34 36.02855,-82.28773 Class C; Tr TBD TBD TBD (Warrick Branch) STR-35 36.02580,-82.27942 n/a TBD TBD TBD STR-36 36.02303,-82.27593 Class C; Tr TBD TBD TBD (Raccoon Creek) STR-37 36.01738,-82.26789 n/a TBD TBD TBD STR-38 36.01433,-82.26711 Class C; Tr TBD TBD TBD (Big Rock Creek) STR-39 36.00901,-82.27259 n/a TBD TBD TBD STR-40 36.00283,-82.25346 n/a TBD TBD TBD Page 7 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Coordinates w/n NCDEQ Stream Impact Dredge or Feature ID Anticipated Action ROW Class (AC/LF)* Discharge (CY) STR-41 36.00665,-82.25455 n/a TBD TBD TBD STR-42 36.00942,-82.25111 n/a TBD TBD TBD STR-43 36.00828,-82.24625 Class C; Tr TBD TBD TBD (Whitson Branch) STR-44 36.01357,-82.22849 n/a TBD TBD TBD STR-45 36.01733,-82.21598 n/a TBD TBD TBD STR-47 36.02676,-82.32674 Class C; Tr TBD TBD TBD (Cane River) STR-49 36.01313,-82.26840 n/a TBD TBD TBD STR-SO 36.00303,-82.27218 n/a TBD TBD TBD * Impacts are the difference between pre -flood encapsulation and emergency replacement encapsulation and the addition of riprap inlet/outlet protection as needed. We anticipate the majority of the culvert replacements will be exempt from permitting requirements regulated by the USACE and NC DEQ. 4. Roadbed Rebuild south of Poplar. In several areas south of Popular (MP Z 147.9 to MP Z 166), the flooding event undercut the rail embankment adjacent to either the Nolichucky and/or the North Toe Rivers. These areas are being surveyed to determine their length and the amount of stone needed to rebuild and/or protect the rail embankment. We anticipated that the majority of the roadbed repairs will be conducted under NWP 45. Table 5 will list these locations and length of impacts. Table 5: Bank Stabilization Permanent Dredge or Discharge NCDEQ Height to Feature Coordinates Stream (total & per foot in CY) Class OHW (Feet) Impact (LF) TBD Class B TBD TBD TBD (NolicSTR- River) STR-48 TBD Class B; Tr TBD TBD TBD (North Toe River) S. Recovery of rail, ties, and other OTM. During Hurricane Helene, rail, track panels, rail ties, and other railroad materials (OTM) were washed off the rail embankment and into areas along the rivers and upland areas downstream. CSX is in the process of recovering this property. It is a dangerous operation. In some cases, the material can be reclaimed without working in the OHW, while in the majority of cases, toe access is required to recover the rail material and the harder recovery will require equipment in the rivers. Section 2 - General Description of Construction Methods. The following construction method will be used when working around the streams found within the project area to avoid adverse stream impacts. The equipment being used in the stream or along the stream bank is a mixture of specialized equipment and construction equipment used in stream restoration work. The equipment is being inspected daily. 1. Rail Material Recovery: CSXT and their contractors will be working below OHW in the Nolichucky River and North Toe River when necessary to recover rail, ties, and other on -track materials (OTM). The rail material may be anywhere within the rivers above or below OHW. Where possible the material will be removed with equipment located on the bank or toe access (above OHW, if practicable). Where it is not possible, equipment may have to work in the stream or walk equipment across the stream to safely remove the material. When equipment must enter the stream as part of recovery, in -stream material may have to be shifted to create a path or a level work area. During this process, other material in the river will not be hammered, removed for Page 8 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC re -use, and bedrock will not be impacted. After the rail material is removed, the area will be restored, as practicable, as the equipment is moved back out of the stream. During this operation, the equipment will only be in the stream when actively working to recover rail material. 2. Rebuilding Track in the Gorge: CSXT track was significantly damaged in the gorge from the flooding event associated with Hurricane Helene. A rendering of how the roadbed will be reconstructed is included in Attachment I for both the section of track where a rail pile wall is required and the remaining sections of track. A photo log for MP Z 141 to Z 145 (Attachment B) documents rebuilding the roadbed in Tennessee and initial work in North Carolina. Photo 4 - Example of locations where rail embankment was 'damaged' in NC a. Toe Access: Toe access is the first step in gaining access in the NC section of the gorge and allowing CSX to remove track, ties, and OTM from the river and to drill the toe pile walls. It also serves as the starting point to rebuild the rail embankment. Figure 1 below and in Attachment A shows the area of toe access. _ - -- s CSXT and their contractors will build toe access starting below .� ordinary high water (OHW) in CSX ROW along the bank of the r Yam, s Nolichucky River. To extent practicable, toe access will be built * ' to match the pre-existing rail embankment to allow equipment access where the railroad roadbed was inaccessible. The toe "'�''' " - access is necessary for equipment to safely enter the gorge where the rail bed was damaged due to the flooding associated with Hurricane Helene. The toe access will be placed on the rail side embankment along the edge of the inland rail side slope. Photo 5 - Toe Access Stone with a driving surface will be used to form the toe access along CSX ROW where the rail embankment was prior to the flood. This is how CSX will start restoring the upland areas damaged during Hurricane Helene (NWP45) with minor dredging of mainly the previous rail embankment stone within the CSX ROW and/or no more than 10 feet beyond the CSX Page 9 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC ROW. Below OHW material used will focus on angular rock assumed to be part of the original rail embankment and will not impact bedrock in the Nolichucky River. The amount of material required to build the 12-15 feet wide toe access approximately two feet above the water surface will vary based on the post -flood site conditions. b. Rail Pile Wall: CSXT and their contractors will need to work below OHW in the Nolichucky River on the rail side of the river. The work includes clearing overburden, moving material, and creating work platforms to allow for drilling of the proposed rail pile wall and continuing to build the rail embankment. The term Toe Pile Wall or Rail Pile Wall are equivalent for this project. Figure 1 and Attachment A shows the proposed location of rail pile walls. Attachment F includes a rendering of the construction of the Rail Pile Wall and the cross-section for the rail embankment using the rail pile wall. The utilization of the rail pile wall in critical locations along the project area will minimize impacts to the Nolichucky River and minimize impacts to the track from future flooding. Because access through the gorge on the NC side is still unsafe in locations, the exact locations of the rail pile walls have not been established. CSX or their agent will provide this information to the USACE as their locations are determined. The concrete wall near MP Z 143.5 (Big Wall) provides a similar purpose as the rail pile wall. This permanent structure/retaining wall provides a stable toe for the roadbed. The main concrete structure was not damaged during the flood event, but extensions on top of the wall were damaged. The area does not have toe access, but it separates the rail embankment from the Nolichucky River, allowing the material that washed behind the wall can be rebuilt outside of the OHW footprint. c. Roadbed: The roadbed will be reconstructed using stone and other onsite and borrow material. roadbed. In locations, the pre -flood rail embankment can be delineated based on the angular roadbed material on the rail side of the river. A mixture of large and medium stones will be placed on top of the toe access and behind the rail pile wall progressing the rail embankment above OHW. Very large stones will be placed along the toe of the slope for additional stabilization. Where possible these stones will be shifted from nearby locations along the rail embankment. Once the base reaches the appropriate height, sub -ballast and then ballast will be placed, followed by the ties, rail and other OTM. Near MP Z 144, a section of the roadbed was not damaged as significantly as others, most likely because it is not directly adjacent to the Nolichucky River. In addition to the roadbed required for the rail to be reconstructed, temporary bump outs will be included in the rail embankment. This will allow locations during construction where vehicles can turn around or pull off. Where possible, the temporary bump outs will be located within CSX ROW. If not within CSX ROW, they will be removed and the material re -used. If within CSX ROW, but outside of the original roadbed footprint, their temporary or permanent status will be coordinated with the regulatory agencies. d. Culverts: Where the roadbed and its associated culverts were damaged or completely washed out, CSXT and their contractor' will replace culverts. The culverts in streams are listed in Tables 1 for the gorge area. CSX brought standard sized culverts as part of their emergency response that were used to replace damaged or missing culverts. The replacement culverts were installed in the dry, by placing them when no or minimum flow was occurring or diverting flow around the work area. Culverts will be installed as per NCDEQ requirements for embeddedness. e. Material Being Used in the Gorge: CSXT plans to use available materials within CSX ROW and other locally sourced material to rebuild the rail embankment and toe access. CSX is proposing using material from multiple sources focusing on materials within CSX ROW near the work area for the toe access and initial embankment. CSXT estimated rebuilding the roadbed within the gorge will require an estimated 1 million cubic yards of material. 1) The first source is material from the inland side of CSX ROW. This material within CSX ROW was in upland areas before the embankment was washed away during the flood event. The initial overburden will be removed and used in construction of the toe access. After the rail pile wall is installed, the contractor will chip & run the inland bank to remove large rocks to start construction of the embankment. Page 10 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC rigure ie. uverview or r oe nmoanxmenr ana Kan rue watts r,ocarions Warr i j Page 11 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Figure 1B. Overview of Overview of Toe Embankment and Rail Pile Walls Locations (Part 2) and Temporary Access near Poplar Bridge Page 12 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC 2) The second source is material from the river side of CSX ROW. The stones along the river side of the CSX ROW that are mainly original rail embankment (angular stones) are the only areas that CSX plans to borrow below OHW. From the rivers side, the material will be from below or above OHW within CSX ROW and material below OHW no more than 10 feet beyond CSX ROW. This material will be reshaped into toe access or for use mainly along the toe of the reconstructed embankment. 3) The remaining material, which CSXT is proposing to use, is a mixture of original rail embankment and river stone that was deposited in upland areas (above OHW) after the flood event. A portion of this stone will be from flood deposits in TN and some will be from flood deposits in NC. CSX is in the process of surveying the areas with deposits of material in NC to verify whether there is enough material in the identified areas to make borrowing operations efficient and to verify ownership of the property. Once an area is confirmed as usable, CSX will work with the property owner to gain permission to use the borrow material and will work with both the owner and the regulatory agencies to develop a restoration plan for the upland area (above OHW) that will remain after the borrow operation are complete. Borrow areas: Borrow areas have been identified (Figure 5) where flood waters washed material (rock) that might be able to be savaged and re -used to reconstruct the rail infrastructure. The borrow areas will only be used if they are within CSX ROW or in locations where CSX has permission from the property owner to remove the stone. Once approved, these areas will be delineated to identify WOTUS (Attachment C) and to determine the ordinary high water (OHW) mark (Attachment E). Rock and other usable materials will be recovered from these locations outside of WOTUS and above OHW. Restoration plans for the borrow areas will be developed in conjunction with the property owners. These plans can be provided to the USACE, as needed, once property owner negotiations have been completed and plans have been developed. Materials from borrow areas along the river will be transported by off -road trucks along the partially restored railbed embankment to continue the process of rebuilding the rail embankment. The alternative to haul the needed material using on -road dump trucks was discounted because of the limited access within the gorge, CSX felt they could not get quarried stone into the area fast enough. There were safety concerns about adding more on -road dump truck traffic to the existing overused roadway network. In addition, the closest route from area quarries to the work areas in North Carolina involves crossing through mountain passes using narrow, curvy, and steep roads. As of November 13, 2024, three on -road dump truck drivers have lost control of their vehicles; two were killed. There was also some discussion about potential impacts to the Appalachian elktoe if material from outside of the river were used. CSXT has requested USFWS identify any known or historic population locations, so these areas can be marked, and extra care can be taken in these areas when recovering rail, ties, or other on -track -materials from the river. The sub -ballast and ballast will be brought from approved CSXT quarries and placed above OHW. 3. Bridge: CSXT and their contractors will reconstruct the Poplar Bridge. The low chord on the rail bridge near Poplar (MP Z 147.9) over Nolichucky River will be raised by two feet, which will result in the roadbed in the gorge being raised two feet. The wet concrete will be segregated from any flowing water when the two supplement piers are formed. Concrete trucks were not allowed to clean equipment within the project area. The reconstruction work will be completed in the dry. 4. Rebuilding Track south of the Rail Bridge at Poplar: In several areas south of Popular (MP Z 147.9 to MP Z 166), were damaged due to flooding. These areas are being surveyed to amount of impact and potential solutions. Work in the area will range from none due to no damage to completely rebuilding the rail embankment. Work below OHW in this section beyond the rail material recovery will include culvert replacements, bank stabilization, and roadbed reconstruction. CSX or their agent will provide this information to the USACE as their locations are determined. Stone from local quarries will be used for the rail work outside of the gorge. Page 13 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC a. Culverts: Where the roadbed and its associated culverts were damaged or completely washed out, CSXT and their contractor' will replace culverts. The culverts in streams south of the gorge are listed in Table 4. CSX brought standard sized culverts as part of their emergency response that were used to replace damaged or missing culverts. The replacement culverts were installed in the dry, by placing them when no or minimum flow was occurring or diverting flow around the work area. Culverts will be installed as per NCDEQ requirements for embeddedness. b. Bank Stabilization: Where the river side of a rail embankment was eroded during the flood event, quarried stone will be used to rebuild or provide additional stabilization. The locations, lengths, and volume of material to be placed below OHW will be added to Table 5. The material used for bank stabilization will be of a size to reduce its potential to be eroded during a flood or other high water event. 5. Blasting. At this time, CSXT does not plan on using blasting to create material to rebuild the rail embankment. If blasting is proposed, CSX or their agent will provide this information to the USACE as their locations are determined. A small charge was used to improve access on the north abutment of the rail bridge at MP Z 147.9 on USFS property above OHW within 100 feet of the Nolichucky River. 6. Best Management Practices (BMPs). Throughout the construction process, BMPs will be used. The list of agreed upon BMPs is in Attachment H. 7. Ordinary High Water Elevation. To determine if impacts are below or above Ordinary High Water (OHW), CSXT Subconsultant EnviroScience completed a survey along the North Toe and Nolichucky Rivers within the project area to field verify if they could use physical characteristic to determine the OHW mark. The evaluation of river substrate composition found a few locations that appeared to have the required components for determination of OHWM after the major flooding event. The field indicators were limited due to the impacts from Hurricane Helene floodwaters, which severely scoured river substrates and the riparian buffer and caused significant realignment of substrates and historical erosional and depositional areas. The report indicated the OHWM was 24 inches above the existing water surface elevation in the Nolichucky River (both inside and outside of the gorge) in North Carolina and 36 inches above the existing water surface elevation in the North Toe River. Attachment G. Section 2.0 Direct and Indirect Adverse Environmental Effects There will be direct environmental impacts to streams due to the roadbed reconstruction, bridge replacement, culvert replacements, and bank stabilization. The fill is necessary to accommodate the roadbed required for the proposed track per CSXT standards. Existing/pre-flood damaged drainage patterns do not appear to be altered. Impacts to protected species (Appalachian Elktoe) are not anticipated based on damaged from the storm event and the current scope of the proposed project. Refer to Section 4, General Condition 18. Recreational Use. Because of the rail material in the Nolichucky River, CSXT requested that the Nolichucky River be closed to the public until the rail material is removed. The USFS made the decision to not issue commercial licenses to guide/rafting companies working until the area is deemed safe, but they cannot close the Nolichucky River to private citizens. CSXT posted signs to advise the public of the unsafe conditions in the Nolichucky River. This is a temporary impact to the recreational public using the gorge. Though the area can be used year-round. According to USFS the area is most utilized by the recreational public in the Summer. CSXT plans to remove the majority of the debris as long as they can safely access the river using their planned toe access within approximately six to eight months. Figure 3 in Attachment A shows the location of the adjacent USFS owned property. Page 14 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Photo 6 - Signage Warning of Unsafe Conditions. Section 3.0 Avoidance and Minimization CSXT will minimize the impacts to WOTUS by placing the minimum amount of fill necessary to restore the track and its drainage structures. The use of the Rail Pile Wall will minimize impacts below ordinary high water by allowing the wall to replace the slope further into the river in areas where the rail embankment would be more at risk during a flood event or where the toe of the embankment slope would intrude into the River beyond CSX ROW and/or where the roadbed was located prior to the flooding event. Required embankment slope if Rail Pile Wall not installed. River Figure 1. Cross -Section of Rail Pile Wall Potential impacts to water quality will be reduced by implementing best management practices in accordance with the requirements of the Federal Clean Water Act, 33 U.S.C. § 1251 et seq. A Stormwater Pollution Prevention Plan (SWPPP) will be created along with the submission of the Notice of Intent for coverage under the North Carolina NPDES Construction General Permit, NCG250000, will be competed once adequate data has been collected. The BMPs in Attachment— form the majority of the erosion and sediment control measures. Following minimization and avoidance in accordance with 40 C.F.R. Part 230 and 33 C.F.R. Part 325, minimal impacts to WOTUS are necessary to meet the project's purpose and need of restoring the rail line after the damage caused by Page 15 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Hurricane Helene. Avoidance of WOTUS features was not achievable while maintaining the necessary specifications needed to meet CSXT operation and safety standards. Section 4.0 General Conditions 1. Navigation - The Nolichucky River within North Carolina is not designated as a navigable water, per conversations with the USACE Asheville field office. The proposed project will rebuild the railbed where it was previously located prior to the catastrophic floods following Hurricane Helene. No adverse impact to navigation within the Nolichucky River will occur as a result of the project. 2. Aquatic Life Movements - The proposed project includes several culvert and bridge crossings of tributaries to the Nolichucky River. The permanent crossings will be constructed to maintain low flows to sustain the movement of aquatic species between the Nolichucky River, North Toe River, and their tributaries. 3. Spawning Areas - The project would not affect important spawning areas; however, Best Management Practices (BMPs) will be implemented to control erosion and sedimentation that could affect offsite aquatic habitat. 4. Migratory Bird Breeding Areas - The project would not affect areas that could potentially serve as breeding areas for migratory birds. 5. Shellfish Beds - The project site does not contain shellfish beds; therefore, this condition is not applicable. 6. Suitable Material - The proposed activity would not involve the use of unsuitable material. Native/original material will be used where possible. Imported fill will be free of toxic pollutants. 7. Water Supply Intakes - The project will not affect water supply intakes. 8. Adverse Effects from Impoundments - The project site does not propose impoundments; therefore, this condition is not applicable. 9. Management of Water Flows - The proposed activity would not adversely affect water flows in the vicinity of the project. 10. Fills Within 100-Year Floodplains - The proposed project is located directly adjacent to a Special Flood Hazard Area (Zone AE) of the Nolichucky River and North Toe River; as well as crossing over the Special Flood Hazard Area (Zone AE) of Big Rock Creek (FEMA Panels 3710081400K, 3710081500K, 3710081600K, 3710082400K, 3710082500K, 3710083300K, 3710083400K, 3710084300K, and 3710084400K, all effective 6/2/2009). In the Nolichucky River the Zone AE designation stops in NC before entering the Gorge at the Rail Bridge (MP Z 147.9) and resumes downstream of the rail bridge at MP Z 140.0. The gorge is Zone A. Because the rail embankment is being restored back as much as possible within the pre -flood footprint, its restoration should not impact the Zone A floodplain. The low chord on the rail bridge near Poplar (MP Z 147.9) is being raised two feet. 11. Eguinment - The proposed project will require equipment typical of site grading, drilling, and construction projects along or in a stream. Specialized equipment is being used to assist with drilling the rail pipe wall. 12. Soil Erosion and Sediment Controls - Best Management Practices will be utilized following CSXT standards supplemented as needed by the North Carolina Erosion and Sediment Control Planning and Design Manual and USFS guidance, as appropriate. 13. Removal of Temporary Fills - Temporary fill will occur in multiple locations throughout this segment of the project. They include toe access beyond the proposed railroad embankment, areas where the access is temporarily widened to allow for pull-out or turn around points, and the temporary impacts to reconstruct the rail bridge and its temporary work bridge. All temporary fills will be removed in their entirety and original contours re-established and stabilized using stabilization BMPs including the Forest Service specified seed mix and cover after consultation with the USFS. 14. Proper Maintenance -The proposed project will be properly maintained to protect public safety. 15. Single and Complete Project -The proposed project is likely to include several separate crossings of WOTUS, each of which will be considered a single and complete project per 33 CFR 330.2(i). Page 16 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC 16. Wild and Scenic Rivers - The Nolichucky River has not been designated as a wild and scenic river or a wild and scenic study river. The Nolichucky River from Poplar NC downstream to the rail bridge at Unaka Springs TN is listed on the Nationwide Rivers Inventory (NRI) as one of the free -flowing river segments in the US that are believed to possess one or more 'outstandingly remarkable' natural or cultural values judged to be at least regionally significate and as such is a potential candidate for inclusion in the National Wild and Scenic River System. In 1993, the Nolichucky River was listed with Outstandingly Remarkable natural or cultural Values (ORV) for scenic, recreational, and geologic.z This preconstruction notification has been prepared to comply with the requirement to submit a PCN for work in the vicinity of a wild and scenic river. 17. Tribal Rights - The project as proposed is not expected to affect Tribal fishing, hunting, or water rights. 18. Endangered Species - Impacts to endangered species are not anticipated by the project, see Section 2.0. Clinchfield reviewed the U.S. Fish & Wildlife (USFWS) on-line database for "Natural Resources of Concern." The IPaC Report (Attachment D) identified five (5) federally listed species that should be considered in an effect's analysis, plus one (1) candidate species. (Table 3). Table 6. Federally Endangered and Threatened Species Identified by IPaC Review Name Federal General Habitat Type Status Mammals Gray Bat LE Hibernates primarily in caves. Prefer forested areas near the entrances Myotisgrisescens to cave roosts. Roost nearly exclusively in caves throughout the year. Indiana Bat LE Hibernates primarily in caves. Most nursey colonies are behind loose Myotis sodalis bark of dead or dying trees or in tree cavities. Northern Long-eared Bat LE Hibernates primarily in caves. Most nursery colonies are in cavities or Myotis septentrionalis beneath loose bark in trees or snags in upland forests, with roost entrances generally below or within the tree canopy. Clams Appalachian Elktoe LE The elktoe lives in relatively shallow, medium-sized creeks and rivers Alasmidonta raveneliana with cool, clean, well -oxygenated, moderate- to fast -flowing water. The species is most often found in riffles, runs, and shallow flowing pools with stable, relatively silt -free, coarse sand and gravel substrate associated with cobble, boulders, and/or bedrock. Stability of the substrate appears to be critical to the Appalachian elktoe, and the species is seldom found in stream reaches with accumulations of silt or shifting sand, gravel, or cobble. Insects Monarch Butterfly C In the spring and summer, often found in open fields and meadows with Danaus plexippus milkweed. Flowering Plants Virginia Spiraea LT Virginia spiraea is found along scoured banks of high gradient streams Spiraea virginiana or on meander scrolls, point bars, natural levees, and braided features of lower stream reaches. This species prefers soils that are sandy, silty, or clay and elevation range is 1000- 2400 feet. If the roots are exposed, they will give rise to upright stems. C - Candidate for Listing, Substantial information exists in USFWS files on biological vulnerability to support proposals to list as endangered or threatened. LT - Species for which a final rule has been published in the Federal Register to list the species as threatened. Species is legally protected by the Endangered Species Act. LE - Species for which a final rule has been published in the Federal Register to list the species as endangered. Species is legally protected by the Endangered Species Act. PE - Species for which a draft rule has been proposed to list the species as endangered. SAT - Species listed due to 'Similarity of Appearance (Threatened)" 2 https://www.nl2s.gov/sub/subjects/rivers/nationwide-rivers-inventoiy.htm Page 17 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC EXPN- Experimental population, non -essential. A population that has been established within its historical range undersection 106f) of the ESA to aid recovery of the species. The Service has determined a non -essential population is not necessary for the continued existence of the species. The IPaC Report indicated that there is designated critical habitat for the Indiana bat; however, it does not overlap with the Project Review Area. The IPaC Report indicated that there is designated critical habitat for the Appalachian elktoe, which does overlap with the Project Review Area. The remaining species do not have critical habitat established. During the field review, Clinchfield biologists evaluated the site for habitat for the federally listed species. Based on general observations, the Project Review Area does contain suitable habitat for the Appalachian elktoe, Virginia spiraea, Indiana bat, and northern long-eared bat. In consultation with appropriate agencies, threatened and endangered species such as the Appalachian Elk Toe Mussel historical populations will be identified, documented, and avoided as much as possible. If impacts are determined from construction an after -the -fact mitigation plan will be developed in consultation with appropriate agencies. If tree clearing is required, it will be minimal and occur in accordance with the time of year restriction. The following species were reviewed in more detail: a. LE -Gray Bat: No caves were identified during the survey; therefore, no impacts to the gray bat are anticipated. The closest known cave3 with suitable habitat is located approximately 4 miles northwest of the Project Review Area. b. LE - Indiana Bat and Northern Long-eared Bat: The Project Review Area includes trees with loose and exfoliating bark that could provide summer roosting habitat for the Indiana Bat or Northern Long-eared Bat. Per the time of year (TOY) restriction from the USFWS Indiana Bat and Northern Long-eared Bat Survey guidelines, trees can be cleared between October 1 and March 31 without further consultation with USFWS. (Attachment D). Due to trees damaged as a result of the flood event, CSXT does not anticipate significant tree cutting. CSXT will attempt to identify and cut any potential bat habitat trees on or before March 31. c. LE - Appalachian Elktoe: The Project Review Area contains suitable habitat for the Appalachian elktoe, primarily in the Nolichucky River. The other tributary streams located in the Project Review Area are high gradient streams that generally would not provide suitable habitat for this species. The proposed activity is not intended to disturb areas within the Nolichucky River that historically provided suitable habitat for the Appalachian elktoe. The rebuild work is limited to the shoreline and adjacent riverbank that were eroded away during the Hurricane Helene flooding event. Due to the close proximity to the Nolichucky River, indirect impacts due to sedimentation could affect the Appalachian elktoe. Direct impacts to the mussel species may occur when CSXT is in the river recovering rail material. CSXT has requested USFWS identify any known or historic population locations, so these areas can be marked, and extra care can be taken in these areas when recovering rail, ties, or other on -track -materials from the river. d. C - Monarch Butterfly: Some areas within the Project Review Area contain suitable habitat for the monarch butterfly. However, the monarch is a candidate species and not yet listed or proposed for listing. There are generally no Section 7 requirements for candidate species. Coordination with USFWS is not anticipated, due to the relatively minor impacts to potential habitat areas. e. LT -Virginia Spiraea: The Project Review Area may contain suitable habitat for the Virginia spiraea; however significant disturbances have occurred due to the flooding associated with Hurricane Helene within the proposed project area. Much of the native vegetation was removed within the project area; therefore, impacts to the Virginia spiraea are not anticipated. 19. Historic Properties - There are no National Register of Historic Places listed properties or sites within the project corridor or within 0.5-miles of the project corridor. The original Clinchfield rail line was built in 1909. Though the area 3 Tennessee Bat Population and White -nose Syndrome Monitoring Report for 2020-2021, TN Wildlife Resources Agency Technical Report 20-6 Page 18 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC historically has had a railroad in this area, the railroad material is continuously maintained and replaced as appropriate. Typical roadbed construction. Notice the culvert headwall comtructed of native stone to the toregruunu. Photos above taken from Building the Clinchfield by James A. Goforth and show typical railbed composition at the time of construction. Page 19 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC 20. Discovery of Previously Unknown Remains and Artifacts - If any previously unknown remains or artifacts are discovered during construction activities, CSXT will notify the USACE of what has been found and to the maximum extent practicable, stop activities that would adversely affect those remains and/or artifacts. 21. Designated Critical Resource Waters -The streams with a NC DEQ stream classification are listed in Table 7. Table 7 - NC DEQ stream classifications NWI NCDEQ Feature ID Coordinates w/n ROW Classification Classification STR-1 36.07178,-82.41367 R3UB1H Class B Nolichuc River* STR-3 36.07093,-82.40244 R5UBH Class C Lost Cove STR-7 36.07016,-82.37935 RSUBH Class C Norris Branch STR-16 36.05797,-82.33760 RSUBH Class C (Flat Branch) STR-17 36.04949,-82.33578 R5UBH Class C Sam's Branch STR-20 36.03780,-82.33767 R5UBH Class C (Shop Branch STR-27 36.03876,-82.31232 R3UB1H Class C; Tr (Cooper Branch STR-29 36.04590,-82.29885 PF01A Class C; Tr (Pi eonroost Creek STR-31 36.03972,-82.29791 PF01A Class C; Tr Brummett Creek STR-34 36.02855,-82.28773 R3UB1H Class C; Tr Warrick Branch STR-36 36.02303,-82.27593 R3UB1H Class C; Tr Raccoon Creek STR-38 36.01433,-82.26711 R3UB1H Class C; Tr (Big Rock Creek STR-43 36.00828,-82.24625 R3UB1H Class C; Tr Whitson Branch STR-46 36.08363,-82.35036 PF01A Class C; Tr Hollow Poplar Creek STR-47 36.02676,-82.32674 R3UB1H Class C; Tr Cane River STR-48 36.02525,-82.31826 R3UB1H Class B; Tr North Toe River* * These rivers are listed as having Outstandingly Remarkable natural or cultural Values (ORV), see Attachment F. Class C are waters protected for uses such as aquatic life propagation, survival and maintenance of biological integrity (including fishing and fish), wildlife, secondary contact recreation, and agriculture. Secondary contact recreation means wading, boating, other uses not involving human body contact with water, and activities involving human body contact with water where such activities take place on an infrequent, unorganized, or incidental basis. Class B are waters protected for all Class C uses in addition to primary contact recreation. Primary contact recreation means swimming, diving, water skiing, and similar uses involving human body contact with water where such activities take place in an organized manner or on a frequent basis. Class Tr is a supplemental classification intended to protect freshwaters that have conditions that sustain and allow for natural trout propagation and survival and for year-round maintenance of stocked trout. This classification is not the same as the NC Wildlife Resources Commission's Designated Public Mountain Trout Waters designation. The receiving waters downstream for the construction site should not exceed 50 NTUs; for trout waters its 10 NTUs. 22. Mitigation - The project is being designed to minimize permanent and temporary impacts to WOTUS to the greatest practicable extent. However, due to the extreme nature of the damage to the rail infrastructure, unavoidable impacts Page 20 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC to WOTUS are anticipated above the mitigation threshold. Therefore, CSXT will re-evaluate mitigation requirements that meet the applicable provisions of 33 CFR part 332 once impacts to aquatic resources have been quantified. 23. Safety of Impoundment Structures - The project site does not propose impoundments; therefore, this condition is not applicable. 24. Water Quality - This preconstruction notification has been submitted to the NC DEQ for Section 401 Water Quality Certification, as well as the USACE Wilmington District. 25. Coastal Zone Management - The proposed project is not located in the Coastal Zone Management area. 26. Regional and Case -By -Case Conditions - This proposed project will comply with state and regional conditions, as required. 27. Use of Multiple Nationwide Permits - USACE has indication that multiple Nationwide Permits may be used based on the impacts occurring in each section. CSXT understands that a single and complete project may not exceed the acreage limit of the NWP with the highest specified acreage limit. 28. Transfer of Nationwide Permit Verifications - Transfer of permit coverage is not anticipated. 29. Compliance Certification - A compliance certification will be returned to the USACE once the project has been completed. 30. Activities Affecting Structures or Works Built by the United States - There are no structures or works built by the United States within the project. 31. Pre -Construction Notification - The PCN Form and required components of the PCN are included in this submittal. Section 5.0 North Carlina General Conditions NWP 3 - Water Quality General Certification #4239 NWP 13 - Water Quality General Certification #4245 NWP 14 - Water Quality General Certification #4246 NWP45 - Water Quality General Certification #4268 1. The permittee shall report to the DWR Regional Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the permittee became aware of the non-compliance circumstances. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) CSXT has a standing weekly call with regulators, including NC DWR to coordinate on -going work and will use this call to discuss any potential noncompliance or potential violation. 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts); or beyond the thresholds established for use of this General Certification and Nationwide Permit. 15A NCAC 02H .0506; 15A NCAC 02H .0507(c). Impacts to WOTUS are defined in this additional information or will he provided when final designs for the emergency track reconstruction are completed. No additional impacts to WOTUS will occur. 3. All activities shall be in compliance with any applicable State Regulated Riparian Buffer Rules in Chapter 2B of Title 15A in the North Carolina Administrative Code. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) NA The project is not located a watershed with State Regulated Riparian Buffers. Page 21 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC 4. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall in corporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North Caroline Department of Transportation Sediment and Erosion Control Manual. All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor -owned or leased borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and implementation shall comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS-1, WS-II, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the sedimentation and erosion control designs shall comply with the requirements set forth in 15A NCAC 0413.0124, Design Standards in Sensitive Watersheds. 15A NCAC 02H .0506(b)(2); 15A NCAC 02H .0507(c); 15A NCACO213.0200; 15A NCAC 02B .0231. CSXT has implemented the BMPs outlined in this additional information document. All equipment used by CSXT and their contractors will be properly maintained. 5. Sediment and erosion control measures shall not be installed in wetland or waters except within the footprint of temporary or permanent impacts otherwise authorized by this Certification. If placed within authorized impact areas, then placement of such measures shall not be conducted in a manner that results in dis-equilibrium of any wetlands, streambeds, or stream banks. Any silt fence installed within wetlands shall be removed from wetlands and the natural grade restored within two (2) months of the date that DEMLR or locally delegated program has released the specific area within the project to ensure wetland standards are maintained upon completion of the project. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCACO2B .0200; 15A NCAC 0213.0231. Sediment and erosion control measures will not be installed in wetlands or waters, except where temporary or permanent impacts are anticipated and to prevent sedimentation impacts to downstream waters. 6. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) The project includes this in the Stabilization BMPs. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 0213.0200; 15A NCAC 02B .0231 The project will be permitted under NPDES Construction Stormwater Permit Number NCG250000. The documentation will include the required inspections and maintenance, self -monitoring, record keeping and reporting requirements. The erosion & sediment control plan will be standard erosion control measures and the project BMPs. Page 22 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC 8. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC Department of Transportation Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 0213.0200 The project includes this in the Erosion Control BMPs. 9. If activities must occur during periods of high biological activity (e.g. sea turtle nesting, fish spawning, or bird nesting), then biological monitoring may be required at the request of other state or federal agencies and coordinated with these activities. All moratoriums on construction activities established by the NC Wildlife Resources Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries (DMF), or National Marine Fisheries Service (NMFS) shall be implemented. Exceptions to this condition require written approval by the resource agency responsible for the given moratorium. Work within a designated trout watershed of North Carolina (as identified by the Wilmington District of the US Army Corps of Engineers), or identified state or federal endangered or threatened species habitat, shall be coordinated with the appropriate WRC, USFWS, NMFS, and/or DMF personnel. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 0413.0125 The USACE has been coordinating with NC WRC and the information and procedures that NC WRC requests for work near trout waters will be followed. 10. In -stream structures installed to mimic natural channel geomorphology such as cross -vanes, sills, step -pool structures, etc. shall be designed and installed in such a manner that allow for continued aquatic life movement. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) The project does not include in -stream structures. 11. Culverts shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. The dimension, pattern, and profile of the stream above and below a pipe or culvert shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. If the width of the culvert is wider than the stream channel, the culvert shall include multiple boxes/pipes, baffles, benches and/or sills to maintain the natural width of the stream channel. If multiple culverts/pipes/barrels are used, low flows shall be accommodated in one culvert/pipe and additional culverts/pipes shall be installed such that they receive only flows above bankfull. Placement of culverts and other structures in streams shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low flow passage of water and aquatic life. If the culvert outlet is submerged within a pool or scour hole and designed to provide for aquatic passage, then culvert burial into the streambed is not required. For structures less than 72" in diameter/width, and topographic constraints indicate culvert slopes of greater than 2.5% culvert burial is not required, provided that all alternative options for flattening the slope have been investigated and aquatic life movement/connectivity has been provided when possible (e.g. rock ladders, cross - vanes, sills, baffles etc.). Notification, including supporting documentation to include a location map of the culvert, culvert profile drawings, and slope calculations, shall be provided to DWR 30 calendar days prior to the installation of the culvert. When bedrock is present in culvert locations, culvert burial is not required, provided that there is sufficient documentation of the presence of bedrock. Notification, including supporting documentation such as a location map of the culvert, geotechnical reports, photographs, etc. shall be provided to DWR a minimum of 30 calendar days prior Page 23 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC to the installation of the culvert. If bedrock is discovered during construction, then DWR shall be notified by phone or email within 24 hours of discovery. Installation of culverts in wetlands shall ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. When roadways, causeways, or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges shall be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native woody vegetation and other soft stream bank stabilization techniques shall be used where practicable instead of rip -rap or other bank hardening methods. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c). The culvert replacements proposed for this project will comply with this requirement. 12. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site -appropriate means to the maximum extent practicable (e.g. grassed swales, pre -formed scour holes, vegetated buffers, etc.) before entering the stream. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) The bridge at MP Z 147.9 near Poplar will be re -constructed using, where possible, the existing bridge spans that were displaced due to the flood. No new bridges will be constructed. 13. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0231 The project includes this in the BMPs. 14. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200 The project includes this in the BMPs. 15. All proposed and approved temporary fill and culverts shall be removed and the impacted area shall be returned to natural conditions within 60 calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile. All temporarily impacted sites shall be restored and stabilized with native vegetation. 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c) The project includes this in the BMPs. 16. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this General Certification. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) Temporary impacts as proposed for this project will comply with the requirements of this general condition. 17. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All rip -rap shall be placed such that the original streambed elevation and streambank contours are restored and maintained and shall consist of clean rock or masonry material free of debris or toxic pollutants. Placement of rip -rap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area or be Page 24 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC installed in a manner that precludes aquatic life passage. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) Impacts proposed will include all required riprap aprons and protection included. 18. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to prevent movement by wave, current action, or stream flows, and shall consist of clean rock or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0201 Classes of rock proposed to be used during construction have been listed above and will be placed in such a way as to prevent movement due to typical river flows following installation. 19. Rip -rap groins proposed in accordance with 15A NCAC 07H .1401 (NC Division of Coastal Management General Permit for construction of Wooden and Rip -rap Groins in Estuarine and Public Trust Waters) shall meet all the specific conditions for design and construction specified in 15A NCAC 07H .1405 Citation: 15A NCAC 02H .0507(c); 15A NCAC 07H .1400 et seq. This condition is not applicable for this project. 20. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200 Equipment will be inspected daily. To the maximum extent practicable, fueling, lubrication, and general equipment maintenance shall be performed in a manner to prevent contamination of surface waters by fuels and oils. 21. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance and compaction. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0231 Temporary timber mats Car equivalent) will be used when heavy equipment is working in wetlands. For this project, any wetlands in a work area are anticipated to be impacted. 22. In accordance with 143-215.85(b), the permittee shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. 15A NCAC 02H .0507(c); N.C.G.S 143-215.85(b) CSXT will report any petroleum spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters, and any petroleum spill less than 25gallons that cannot be cleaned up within 24 hours. 23. The permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303 (d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) CSXT and Clinchfield as their agent will conduct all activities in a manner consistent with State water quality standards and any other appropriate requirements of State and Federal Law. 24. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this General Certification. A copy of this General Certification shall be available at the project site during the construction and maintenance of this project, Page 25 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC A copy of the appropriate general certification will be available at the project site during construction. Section 5.0 North Carlina Activity Specific Conditions NWP 3 - Water Quality General Certification #4239 NWP 13 - Water Quality General Certification #4245 1. For all dam removal projects meeting the definition under G.S. 143-215.25 and requirements under G.S. 143-215.27 of a professionally supervised dam removal, the applicant shall provide documentation that any sediment that may be released has similar or lower level of contamination than sediment sampled from downstream of the dam in accordance with Session Law 2017-145. 15A NCAC 02H .0506; 15A NCAC 02H .0507(c); 15A NCAC 0213.0200; 15A NCACO213.0502 This project does not involve dam removal. NWP 14 - Water Quality General Certification #4246 1. If this Water Quality Certification is used to access residential, commercial or industrial building sites, then all parcels owned by the permittee that are part of the single and complete project authorized by this Certification must be buildable without additional impacts to streams or wetlands. 15A NCAC 02H .0502(a);15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This project will not be used to access residential, commercial or industrial building sites. 2. For road construction purposes, this Certification shall only be utilized from natural high ground to natural high ground. 15A NCAC 02H .0502(a);15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This project will rebuild existing linear transportation infrastructure. 3. Deed notifications or similar mechanisms shall be placed on all lots/parcels with retained jurisdictional wetlands, waters, and state regulated riparian buffers within the project boundaries in order to assure compliance with NC Water Quality Certification Rules (15A NCAC 02H .0500), NC Isolated Wetland Rules (15A NCAC 02H .1300), and/or State Regulated Riparian Buffer Rules (15A NCAC 02B .0200). These mechanisms shall be put in place at the time of recording of the property or individual parcels, whichever is appropriate. 15A NCAC 02H .0502(a);15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This conditions is pre-empted. NWP45 - Water Quality General Certification #4268 1. None Page 26 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment A Figures •Z138 Low Gap :1Xy ShaIIowford Riverview kiv!i rliii r� Unak S 120S LSZS Borrow Area Ago. MP Z 142.5 State Line Bridge 1 It Laurel Ridge Legend Q CSX_Mileposts r J CSX Right of Way 0 Borrow Areas P�J� Start of Nolichucky Gorge P�'" End of Nolichucky Gorge Borrow Area MP Z 140 Start of Rebuild Borrow Area 1 VA Qzg n4p o i a ~°2,� 144•Z145 Z 143 01 Lost Cove Fla<i. �'• Mountain Flattop Deer Ridge 0 Spivey Gap Beauty Spot Gap Y1 9fr 4527ft Beauty Soo t 197 197 Valhalia Dome MP Z 147.9 1 Un Poplar Bridge ' Mounta�in p z9 U 1 Whiteoak Flats Sugarloaf A) N �: -�r � �lw ''Y- �a� •-• •fir FOou,n, W. 4 , -, / f . CLIENT: CSXT Emergency Track Rebuild MP Z 140 to 165 Blue Ridge Subdivision Unieoi County, TN Figure No. Consulting Group Mitchell and Yancey Counties, NC SCALE: AS SHOWN DATE: 11/25/2024 PROJECT NO: 71001-115.06 Clinchfield Consulting Group DRAWN BY: CHECKED BY: SHEET NO: 1 OF 1 240 Stoneridge Dr, Suite 203 Project Overview Map Columbia, SC 29210 J. Ramage RLH SOURCE: CSXT, ESRI Shepard Mc �. ' 1, � ► A'o ' . i i Jr• -% f k� A4 22( 41, Honeycutt ,y.;r /Z 09 m �bA:a& v �Peppers o Z9 111% kil '0.1�' ; M P Z 165 Z9110T,',���� End of Rebuild Z9 20 '0 Confluence of , j> ��� 0 00 North Toe River and Cane River Ilk *Ww-41 00L wwo Sid Hill A 110 bit / 9. �+' �` �• Bailey Hill Fes. r � , ♦ ( ' 1r i Cane Mountain Site Location Overview CSXT Blue Ridge Subdivision Track Rebuild TN/NC State Line to 165.0 Yancey and Mitchell County, NC Legend L _ � CSX Right -of -Way • CSX Mileposts • Stream Location Points Nolichucky White Water Rapids ♦ Put -in ORapid ♦ Take-out Scale:1:27,700 0 2,000 4,000 Feet css Consulting Group Job No. 71001.115.06.02 Drawn By: JR Reviewed Bv: BK Date: 11/22/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfeld Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. Site Location Overview CSXT Blue Ridge Subdivision Track Rebuild TN/NC State Line to 165.0 Yancey and Mitchell County, NC Legend L _ � CSX Right -of -Way • CSX Mileposts • Stream Location Points Nolichucky White Water Rapids ♦ Put -in ORapid ♦ Take-out Scale:1:27,700 0 2,000 4,000 Feet css Consulting Group Job No. 71001.115.06.02 Drawn By: JR Reviewed Bv: BK Date: 11 /22/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfeld Project Number 71001.115.06.02. Clinchfeld assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. ST -34 STR-35 .. M lk - 4 STRR AAS. 3aWnt, STR-49 STR-3 ;R-3) 2 43 way 4( 162 z -A! *,# STIR-43 I 4L m r 0' ol W, 00 Arze , ; 0 ST-R-50 ---"STR-40 7 Z 167 4d- /an lflllli� I , ILI %. 0. IW P* . I f M r It 11 .7 Green M o u n led- W. Roses Al� Toledo I BrushCreek JF 'Cre -,Z 170 on Bulz Unaka Mounta �s \11/ 1 Ela t t Op N (LQc Mountain 1 Pum / Pa \ MOU) oo Ilk Cane Mountain X Green Consulting Group 240 Stoneridge Dr, Suite 203 Columbia, SC 29210 „24 ft 023 ma Legend r — - - — J CSXT Right —of —Way Yancey County Parcels Mitchell County Parcels • CSX Mileposts 0 375 750 1,500 Feet Scale: 1:7,000 2' 34 ft \ m� Los\Cove Figure 3-1. Adjacent USFS Property CSXT Blue Ridge Track Rebuild NC MP Z 142.5 to 165.0 Yancey and Mitchell County, NC (Reviewed (Date: 11 /13/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfield Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. IEU Bulz Unaka QM unta �s a op Mt Mountain 1 Pum / Pa \ MOU) oo Ilk Cane Mountain Green (M , t 4k" * Ib " Consulting Group 240 Stoneridge Dr, Suite 203 Columbia, SC 29210 RN Legend r — - - — J CSXT Right —of —Way Yancey County Parcels Mitchell County Parcels • CSX Mileposts 0 375 750 1,500 Feet Scale: 1:7,000 2739P 2645 j Figure 3-2. Adjacent USFS Property CSXT Blue Ridge Track Rebuild NC MP Z 142.5 to 165.0 Yancey and Mitchell County, NC Job No. 71001.115.06.02 Drawn By: JR Reviewed By: Date: 11 /13/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfield Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. Consulting Group 240 Stoneridge Dr, Suite 203 Columbia, SC 29210 am@ 2633f / /4 Legend r CSXT Right —of —Way Yancey County Parcels Mitchell County Parcels • CSX Mileposts 0 375 750 1,500 Feet Scale: 1:7,000 m1 ---------- - �2401 ft Figure 3-3. Adjacent USFS Property CSXT Blue Ridge Track Rebuild NC MP Z 142.5 to 165.0 Yancey and Mitchell County, NC (Reviewed (Date: 11 /13/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfield Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. I o Is7 Bulz Un � amour t J Flattop Mountain 1 Pum / \ Pa Moui oo Ilk Cane Mountain Green 0R Consulting Group 240 Stoneridge Dr, Suite 203 Columbia, SC 29210 023 34,72 ft Legend r CSXT Right —of —Way Yancey County Parcels Mitchell County Parcels • CSX Mileposts 0 375 750 1,500 Feet Scale: 1:7,000 W IN ME Figure 3-4. Adjacent USFS Property CSXT Blue Ridge Track Rebuild NC MP Z 142.5 to 165.0 Yancey and Mitchell County, NC (Reviewed (Date: 11 /13/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfield Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. I o Is7 ;on ain Bu Unaka Mounta Flattop M Mountain 1 Pum Pa .. `� Mou Cane Mountain C083 Green Consulting Group 240 Stoneridge Dr, Suite 203 Columbia, SC 29210 Legend r — — i — — CSXT Right_of_Way Yancey County Parcels Mitchell County Parcels o CSX Mileposts 0 375 750 1,500 Feet Scale: 1.7,000 4,\ Figure 3-5. Adjacent USFS Property CSXT Blue Ridge Track Rebuild NC MID Z 142.5 to 165.0 Yancey and Mitchell County, NC I Reviewed I Date: 11 /13/2024 Notes/Disclaimer. This map shown here has been created with all due and reasonable care and is strictly for use with Clinchfield Project Number 71001.115.06.02. Clinchfield assumes no liability, direct, or indirect, whatsoever for any third party or unintended use. ■B ■o tab' CSX BLUE RIDGE ACCESS PLAN (CHESTOA TO LOST COVE) �* w CHESTOA MATERIAL RECOVERY AND RAMP ACCESS _ 4 LEGEND CSX BLUE RIDGE RAILROAD CHESTOA EMBANKMENT RESTORATION AREA AND RAMP ACCESS MILEPOST TENNESSEE NORTH CAROLINA EMBANKMENT RESTORATION AREA CSX - EMBANKMENT RESTORATION AREA 'f r - CSX BLUE RIDGE ACCESS PLAN (LOST COVE TO POPLAR) NORTH CAROLINA. CSX EMBANKMENT ------RESTORATION AREA LEGEND CSX BLUE RIDGE RAILROAD MILEPOST CSX EMBANKMENT RESTORATION AREA �w CSX POPLAR +� EMBANKMENT BRIDGE RESTORATION AREA RESTORATION ANDS, TEMPORARY '} BRIDGE ~ a,_ CSX ° 1 ter -5r<a_* CSX f— EMBANKMENT y ` 's,;:< ------------- EMBANKMENT RESTORATION AREA CSX CSX " a4 it RESTORATION' AREA ,,%� EMBANKMENT EMBANKMENT : ' RESTORATION AREA RESTORATION AREA % LOST COVE EMBANKMENT RECOVERY AREA RESTORATION AREA NORTH X C •. Y:6 r NOLICHUCKY RIVER T it TOE RAIL PILE WALL r� C } �j ,ram EMBANKMENT 4\' I. 7� TEMPORARY ACCESS ESTORATION AREA { r' RAMP AND TOE FILL �! a FOR RAIL PILE / w v INSTALLATION Ar r � r, . i ti e OCATION MAP LOST COVE EMBANKMENT RESTORATION AREA NORTH csx EMBANKMENT RESTORATION AREA I NOLICHUCKY RIVER CSX BLUE RIDGE RAILROAD -12 EMBANKMENT RESTORATION AREA , r CSX BLUE RIDGE RAILROAD J nC ri lNL.. �MB MENT ESTO TION AREA 4. n ��;t �t'-w�,; :...� -i .' \�. ,��•..Y {tea -- \�; �.�",;y��` w` ' /`j�#�'- �I� :; . �.•'-..ti NOLICHUCKY RIVERTO 4\ �. �a � � •�, '� ,�, �� � Via. �, � `, -A OZAA4 AI "P>Z-140, .. ` x'•a�I ir, 1. 1Op 1� 1•o Pi moist Cove o�l'ar EMBANKMENT RESTORATION AREA r 1 � p� •.,At3' �. ..'I#�. �. � � �.�.. ♦; v F� r ." �� .,.7 �., ""!j NORTH �S s p T` .+�A `�� AM CSX EMBANKMENT �` •1 s . z RESTORATION AREA t'.'� rr r,y;� x r,J ,� .,ir u , •� nip ., i :- .. /�. err y,.. 4. / � �11 � .� • _ `,c � y /*.n� , j�, n w`... > •� ./gyp 1 •t'- Z._y ,� �+ • `� �, �� � s:+� — AP � Y. amp' � 3r�. �' \ �• �� �'t.., �}'11 iMt• k j ., L�i� .,� -K. : �.7�i^`" 1, .. i � .a f } AL W NOLICHUCKY RIVER CSX BLUE RIDGE RAILROAD EMBANKMENT RESTORATION AREA � 1 rSM • � x �� ' �• �a i' 4 .� � s i CSX EMBANKMENT RESTORATION AREA CSX BLUE RIDGE RAILROAD F t _ •� y iv t4.clo 1 Z-140,Oil`� 1� JIM RP -ist Cove Pi oRPar A r CSX EMBANKMENT RESTORATION AREA EMBANKMENT RESTORATION AREA NORTH. i .. S f fi •_ ! ♦. • ' + , "; /. " TEMPORARY LAYDOWN AND CRANE ACCESS 4 f w r Y �i• NOLICHUCKY RIVER. ` ' s • w,a M 4 ST2t AL —ST9 �� s t T!t w• r� i + ! •� � x ' t ST3 ,�,i/ 40e .. �► •� � M� TEMPORARYCULVERTTO r• t * r i� • . ♦ v SUPPORT BRIDGE' �*4 < , M ��. ,4 CP5 = ST5 . CONSTRUCTION + yw « iE r # CP4 = ST4 —STS f , • .' ,* tea; ROCK REMOVAL TO HELP ROCK REMOVAL WHICH .a +`10 ��x w �+�s� f Zx`a �• n WITH ROAD IMPROVEMENTS REQUIRES LIMITED DRILL i AND SHOOT �. —ST7 w Fi z , ,,� ; • a ! f CSX BRIDGE AT MP Z 147.90 CP6 = ST6 " ' r CP3` Z it lob IF. - • ' Y y► ♦ " ` • 1� •,� a CP2 cpl t 4�- d4 LOCA710N. MAP r ' i EXISTING FOREST SERVICES y ROAD WITH IMPROVEMENTS , { >, of 7 a i ♦ t5 r + ANKMENT STOCKPILE �` • ;'` ► :� ■ -ist Cove gar . r • y � `� ` •1� " � �, sip► • . or Vb 44 .(1 ♦ s ♦ ,• +� SCALE IN FEET D If '):, v 4LEGEND • : r " 20' WIDE c '• ;t CONSTRUCTION ACCESS D n I i n v i 0 !* ^' � * '` . .% - ' t ` . + ' r • _ STAGING AREA L; r TEMPORARY CAUSEWAY LOW * CAUSEWAY WATER CROSSING "} S <� 'i { r ' . �,., •+r . �' CRANE PAD w r „ Ai • } EXISTING GIRDER 8'-0" DIA. STEEL o s ' ;�.• ~Z•' . PIPE CULVERT 40'-0" WIDE BOOM 10 n 0 i 0 c 0 0 c 0, o+ 0 3 3 a CONTROL POINTS — CRANE PAD CONTROL POINT NORTHING EASTING DESCRIPTION CP1 865499.299 1010285.537 STAKE IN FIELD CP2 865605.229 1010253.410 STAKE IN FIELD CP3 865839.182 1010147.850 STAKE IN FIELD CP4 865968.177 1010162.562 STAKE IN FIELD CP5 865981.918 1010193.154 STAKE IN FIELD CP6 865718.519 1010312.001 STAKE IN FIELD CONTROL POINTS — STAGING CONTROL POINT NORTHING EASTING DESCRIPTION ST1 866323.383 1010090.710 STAKE IN FIELD ST2 866311.931 1010011.131 STAKE IN FIELD ST3 866141.558 1010069.889 STAKE IN FIELD ST4 865968.177 1010162.562 STAKE IN FIELD ST5 865981.918 1 1010193.154 STAKE IN FIELD ST6 865718.519 1010312.001 STAKE IN FIELD ST7 865738,179 1010313.738 STAKE IN FIELD ST8 866065.852 1010249.507 STAKE IN FIELD ST9 866197.606 1010182,821 STAKE IN FIELD CSX POPLAR 3aFE 1 LAYDOWN AREA ♦ w•„rj All, MESSAGE �{ � 7►:- �a BOARD L C + 1 ENGINEERING DEPARTMENT �'j "� r `•. '�' �r,a • '� � �� -� � 0 �� �� JACKSONVILLE, FLORIDA • •;� +I� \CSX TEMPORARY WORK BRIDGE (80 TON RATED) REVISIONS CAUSEWAY Q MP Z 147.90 CROSSING NOLICHUCKY RIVER A EMBANKMENTSTOCKPILE II KAYAK THREE SPAN /CAUSEWAY n (CSX OWNED/LEASED OR KAYAK MESSAGE SITE PLAN \ 1 OF 2) APPROVED BORROW) MESSAGE BOARD ♦ • « MITCHELL COUNTY POPLAR, NC a •R •• BOARD 41&_ ZONE: SOUTHERN WEST .SUBDIVISION: BLUE RIDGE U L' • - 1, l HDRENGINEERING,INC. SCALE: AS SHOWN VAL. SEC. DRAWING NO. NOTE N 111 ,: 9999 CARVER ROADSUITE210 �'�� A• , . }, ��� DATE: 1 1 /5/2024 CINCINNATI, OHI045242 S - 513-984-7500 DESIGN: NBH V— Z 147.90-C-03 1 SHEETHTHREE PS AN CAUSEWAY CUA EWAY CONTROL PLAN POINT (2SOF 2). 90% PLAN SET - NOT FOR FABRICATION FILE: Z 147.90-C-SP01.dgn CHECKED: XXX Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC VIM • 111'1 i Photo Logs CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG fh� � Photograph 2: View of damaged track along the Nolichucky River, downstream of MP Z 147.9 JNKk Ir CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG �'. • r,. _ 4(�};r _ =Y Photograph 5: View of washed-out rail bridge and track damaged near Poplar in Nolichucky River, MP Z 147.9. M Photograph 6: View of damaged track in Nolichucky River south of Poplar rail bridge. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG 1 Ai H. Photograph 7: View of remaining foundations and bridge span in Nolichucky River, MP Z 147.9. AQ Photograph 8: View of debris in Hollow Poplar Creek near Poplar Rail Bridge, MP Z 147.9. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG i_ d r P� -• lr Photograph 9: View of damaged track along Nolichucky River south of Poplar rail bridge. \ A. Photograph 10: View of sediment collected on track. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG wr _ al } ' , Photograph 11: View of damaged track along south of Poplar rail bridge. ' 1 ! .. ter.' i' h- < � •. Photograph 12: View of undamaged track south of Poplar rail bridge. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancv Counties. NC 7.4 lip, �+J r Photograph 13: View of undamaged track along North Toe River near MP Z 157.2. v -4r-+ I .W •�- it y S1-��I rib �. s:;G -. 1r ( ✓.r 0 IJ i-q'l � l f t I LJ I• I • ',(� 'Li� ,sa f• j . � i1� r �. '` v+� �` sir lk ♦ ��. Mwe 1 UITMOM, for.,1 / . • / ' 1 1 • • • CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC T')TTf-%rrf-'% T ter+ i> E 012/milsTrue 30 " _ Photograph 16: View of debris on track and bank erosion along the North Toe River near MP Z 163.6. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG Date & Time: Wed, Nov 13. 2024 at 13 14:09 EST Position: +036.014302` 082.225572 (±63,3ft) Attitude: 2173ft (±39.4ft) f zimdth/ ag--2165--m 11 dF—TF-ue-H—+Y -- - e ation ArI91����,.�•- r- Hori on Angte: +02.4 ^` 1 • �>> ':, +^�� �. `� � "yam - �. _ - h�. r CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 Rail Pile Wall I !4-AF Photograph 20: Progressing rail embankment (not to grade) in TN with rounded river stone on slope and toe of new embankment (from above OHW borrow area. Backfilled rail pile wall without of BFR on toe. Near MP Z 142 a l ry 1 J r Photograph 21: Specialized piece of equipment used to drill rail piles below OHW. Toe access State Line Bridge CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 r .",I - - MW t--7. Photograph 25: Closer view of gravel point from Photo 24. Stone not removed just push down when driven over, below OHW. Near MP Z 143. CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 —, Lost Cove (in culvert) _ w - - ►ram f _ Photograph 27: View of "Big Wall" with ballast covered sand baron opposite bank. Near MP Z 143.5. CSA7 Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 s +7 Y� Photograph 28. Access road behind 'Big Wall' filled from scrapping material from land side of ROW, above OHW. Wall to be raised to match bridges. Near MP Z 143.7. - Photograph 29: Rail bed with minimal/no damage during storm event. Section of trees between rail and Nolichucky River. Track removed in panels. MP Z 144.2 CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 Photograph 29: Rail bed with minimal damage during storm event. This section diverts away from Nolichucky River. Land slides on opposite bank. Near MP Z 144.5 Photograph 31: Sand/gravel bar in edge of Nolichucky River, debris removed and driven on to access rail debris, below OHW. Near MP Z 144.1 CSXT Emergency Track Rebuild Post -Hurricane Helene Blue Ridge Sub Milepost Z 142.5 to Z 165.0 Mitchell and Yancy Counties, NC PHOTO LOG from MP Z 141 to Z 145 r Possibly original .A7i _ �, w,' embankment toe. Material want to move against toe. Below OHW. Photograph 32: Toe access from scrapping off land side of CSX ROW near MP Z 145. Large angular rocks along toe along with rail debris. Photos CSX Z 147.9 Poplar NC Friday, September 27, 2024 17.15 PM Figure 1 BRIDGE LOOKING SOUTH Figure 2 BRIDGE LOOKING NORTH Figure 3 AERIAL VIEW OF BRIDGE AND SPANS Figure 4 AERIAL VIEW OF SPAN S (90 FT EXPECTED) 1 • '-�Ti Y�y li _ \ , a t' :�= �=�' �.S � � r �' `-r �-_ �_ �� � '+ r- - ►, •may � J /, - � � t: -- �F f ,�: r „�� . � �,, —�_. s_ �--._ `- Figure 7 SPANS AND BRIDGE LOOKING DOWNSTREAM Figure 8 SPAN] (90 FT SPAN) CLOSEUP Figure 10 SPANS 1, 2 AND 3 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment C WOTUS Report To Be Published Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment D Threatened and Endangered Species 11/15/24, 12:24 PM IPaC IPaC: Explore Location resources U.S. Fish & Wildlife Service IPaC resource list This report is an automatically generated list of species and other resources such as critical habitat (collectively referred to as trust resources) under the U.S. Fish and Wildlife Service's (USFWS)jurisdiction that are known or expected to be on or near the project area referenced below. The list may also include trust resources that occur outside of the project area, but that could potentially be directly or indirectly affected by activities in the project area. However, determining the likelihood and extent of effects a project may have on trust resources typically requires gathering additional site -specific (e.g., vegetation/species surveys) and project -specific (e.g., magnitude and timing of proposed activities) information. Below is a summary of the project information you provided and contact information for the USFWS office(s) with jurisdiction in the defined project area. Please read the introduction to each section that follows (Endangered Species, Migratory Birds, USFWS Facilities, and NWI Wetlands) for additional information applicable to the trust resources addressed in that section. - \ Ir N Location 0\0000 Mitchell and Yancey counties, North Carolina Cv�v Local offices Tennessee Ecological Services Field Office 1. (931) 528-6481 JJJ (931) 528-7075 446 Neal Street Cookeville, TN 38501-4027 Asheville Ecological Services Field Office �. (828) 258-3939 �® (828) 258-5330 https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 1/15 11/15/24, 12:24 PM IPaC: Explore Location resources 160 Zillicoa Street, Suite B Asheville, NC 28801-1082 �o� Foy G 0 https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 2/15 11/15/24, 12:24 PM IPaC: Explore Location resources Endangered species This resource list is for informational purposes only and does not constitute an analysis of project level impacts. The primary information used to generate this list is the known or expected range of each species. Additional areas of influence (AOI) for species are also considered. An AOI includes areas outside of the species range if the species could be indirectly affected by activities in that area (e.g., placing a dam upstream of a fish population even if that fish does not occur at the dam site, may indirectly impact the species by reducing or eliminating water flow downstream). Because species can move, and site conditions can change, the species on this list are not guaranteed to be found on or near the project area. To fully determine any potential effects to species, additional site -specific and project -specific information is often required. Section 7 of the Endangered Species Act requires Federal agencies to "request of the Secretary information whether any species which is listed or proposed to be listed may be present in the area of such proposed action" for any project that is conducted, permitted, funded, or licensed by any Federal agency. A letter from the local office and a species list which fulfills this requirement can only be obtained by requesting an official species list from either the Regulatory Review section in IPaC (see directions below) or from the local field office directly. % %rok v For project evaluations that require USFWS concurrence/review, please return to the IPaC website and request an official species list by doing the following: 1. Draw the project location and click CONTINUE. 2. Click DEFINE PROJECT. 3. Log in (if directed to do so). 4. Provide a name and description for your project. 5. Click REQUEST SPECIES LIST. Listed speciesl and their critical habitats are managed by the Ecological Services Program of the U.S. Fish and Wildlife Service (USFWS) and the fisheries division of the National Oceanic and Atmospheric Administration (NOAA Fisheries). Species and critical habitats under the sole responsibility of NOAA Fisheries are not shown on this list. Please contact NOAA Fisheries for species under their jurisdiction. 1. Species listed under the Endangered Species Act are threatened or endangered; IPaC also shows species that are candidates, or proposed, for listing. See the listing status page for more information. IPaC only shows species that are regulated by USFWS (see FAQ). 2. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. The following species are potentially affected by activities in this location: Mammals NAME STATUS https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 3/15 11/15/24, 12:24 PM IPaC: Explore Location resources Gray Bat Myotis grisescens Endangered Wherever found No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/6329 Indiana Bat Myotis sodalis Endangered Wherever found There is final critical habitat for this species. Your location does not overlap the critical habitat. https.//ecos.fws.gov/ecp/species/5949 Northern Long-eared Bat Myotis septentrionalis Endangered Wherever found No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/9045 -4 Tricolored Bat Perimyods subflavus Proposed Endangered Wherever found No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/10515 Reptiles NAME STATUS Bog Turtle Glyptemys muhlenbergii '� SAT No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/6962 Clams NAME STATUS Appalachian Elktoe Alasmidonta raveneliana Endangered Wherever found There is final critical habitat for this species. Your location overlaps the critical habitat. httpL//ecos.fws.gov/ecp/species/5039 Insects NAME Monarch Butterfly Danaus plexippus Wherever found No critical habitat has been designated for this species httpL//ecos.fws.gov/ecp/species/9743 Flowering Plants STATUS Candidate https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 4/15 11/15/24, 12:24 PM IPaC: Explore Location resources NAME STATUS Small Whorled Pogonia Isotria medeoloides Threatened No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/1890 Virginia Spiraea Spiraea virginiana Wherever found No critical habitat has been designated for this species. https://ecos.fws.gov/ecp/species/1728 Lichens NAME Rock Gnome Lichen Gymnoderma lineare Wherever found No critical habitat has been designated for this species. httpL//ecos.fws.gov/ecp/species/3933 Critical habitats Threatened STATUS Endangered Potential effects to critical habitat(s) in this location must be analyzed along with the endangered species themselves. i V!_1% %-0 This location overlaps the critical habitat for the following species: NAME TYPE Appalachian Elktoe Alasmidonta raveneliana Final https://ec ss.fws.gov/ecp/species/5039#crithab Bald & Golden Eagles Bald and golden eagles are protected under the Bald and Golden Eagle Protection Act' and the Migratory Bird Treaty Act2. Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats3, should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". Additional information can be found using the following links: • Eagle Management https://www.fws.gQv//program/eagle-management • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/collections/avoiding-and-minimizing-incidental-take-migratory-birds https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 5/15 11/15/24, 12:24 PM IPaC: Explore Location resources • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/documents/nationwide-standard-conservation-measures.pdf Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/media/supplemental-information-migratory-birds-and-bald-and-golden-eagles- may-occur-project-action There are likely bald eagles present in your project area. For additional information on bald eagles, refer to Bald Eagle Nesting and Sensitivity to Human Activity_ For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. NAME Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https.//ecos.fws.gov/ecp/species/1626 BREEDING SEASON Breeds Sep 1 to Aug 31 Golden Eagle Aquila chrysaetos Breeds elsewhere This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https://ecos.fws.gov/ecp/species/1680 Probability of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence ( ) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 6/15 11/15/24, 12:24 PM IPaC: Explore Location resources 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. To see a bar's probability of presence score, simply hover your mouse cursor over the bar. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. To see a bar's survey effort range, simply hover your mouse cursor over the bar. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. J10 probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle Non -BCC Vulnerable Golden Eagle Non -BCC Vulnerable What does IPaC use to generate the potential presence of bald and golden eagles in my specified location? The potential for eagle presence is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 1Okm grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply). To see a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs of bald and golden eagles in my specified location? https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 7/15 11/15/24, 12:24 PM IPaC: Explore Location resources The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCC) and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Please contact your local Fish and Wildlife Service Field Office if you have questions. Migratory birds Certain birds are protected under the Migratory Bird Treaty Act' and the Bald and Golden Eagle Protection Act2. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats3 should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. Additional information can be found using the following links: • Eagle Management https://www.fws.gov//program/eagle-management • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/collections/avoiding-and-minimizing-incidental-take-migratory-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures. pdf • Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/media/supplemental-information-migratory-birds-and-bald-and-golden-eagles- may-occur-project-action The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 8/15 11/15/24, 12:24 PM IPaC: Explore Location resources are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. NAME Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https://ecos.fws.gov/ecp/species/1626 Canada Warbler Cardellina canadensis This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. BREEDING SEASON Breeds Sep 1 to Aug 31 Breeds May 20 to Au:0)\ Cerulean Warbler Setophaga cerulea Breeds Apr 27 to jul 20 This is a Bird of Conservation Concern (BCC) throughout its range in the .'Illv continental USA and Alaska. httpL//ecos.fws.gov/ecp/species/2974 Chimney Swift Chaetura pelagica This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Eastern Whip -poor -will Antrostomus vociferus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Golden Eagle Aquila chrysaetos This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. httpL//ecos.fws.gov/ecp/species/1680 Breeds Mar 15 to Aug 25 Breeds May 1 to Aug 20 Breeds elsewhere Golden -winged Warbler Vermivora chrysoptera Breeds May 1 to Jul 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/8745 Kentucky Warbler Geothlypis formosa Breeds Apr 20 to Aug 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 9/15 11/15/24, 12:24 PM Prairie Warbler Setophaga discolor IPaC: Explore Location resources Breeds May 1 to Jul 31 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 to Sep 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Rusty Blackbird Euphagus carolinus Breeds elsewhere This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA Wood Thrush Hylocichla mustelina Breeds May 10 to Aug 31 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Probability of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence () _10 � ) "I Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. To see a bar's probability of presence score, simply hover your mouse cursor over the bar. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 10/15 11/15/24, 12:24 PM IPaC: Explore Location resources Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. To see a bar's survey effort range, simply hover your mouse cursor over the bar. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Eagle 1 1 I I 1 I I I I I I I 1 1 1 1 1 1 1 I I I 1 1 1 1 —I i i ]-+++ -.-1++ --.--+ Non -BCC ,�i�r� . Vulnerable 400 Canada Warbler I I �. ++++ ++++ ++-I-+ ++--- BCC Rangewide (CON) Cerulean Warbler P+ + -- ---- ---- ---- ---- ---- BCC Rangewide (CON) Chimney Swift I I + ++ + ++ —�—+ �++— +++ ---+ BCC Rangewide r/ (CON) Eastern Whip -poor —+ + « + — — — — — — — — — — — — ------ ---- will BCC Rangewide (CON) Golden Eagle — _ ____ Non -BCC Vulnerable Golden -winged ++++ ++­ — 4- — I I I I I — +- +-.--.-+ Warbler BCC Rangewide (CON) Kentucky Warbler ­++ 4.4 — --+— —4 1 BCC Rangewide (CON) Prairie Warbler ++++ ++++ ++++ +++I ++—+ + +++ +++4- —+—+ + -- --++ ---� BCC Rangewide (CON) https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 11/15 11/15/24, 12:24 PM IPaC: Explore Location resources Red-headed Woodpecker BCC Rangewide (CON) Rusty Blackbird BCC - BCR Wood Thrush BCC Rangewide (CON) iiI-+ ++++ ++++ ++II IIII IIII t++1 ---- + --ii -- --+ +1+- --+1 ---� ++++ ++++ ++++ +++I 1,III I I I I I I I I , , , I —+++ $+++ —+++ ---+ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be 4�1\1 advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCC) and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey., banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey., banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year- round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 12/15 11/15/24, 12:24 PM IPaC: Explore Location resources What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects ..a For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study_ and the nanotag studies or contact Caleb Spiegel or Pam Loring. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occuro Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 13/15 11/15/24, 12:24 PM IPaC: Explore Location resources Facilities Wildlife refuges and fish hatcheries Refuge and fish hatchery information is not available at this time Wetlands in the National Wetlands Inventory (NWI) Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. Please note that the NWI data being shown may be out of date. We are currently working to update our NWI data set. We recommend you verify these results with a site visit to determine the actual extent of wetlands on site. This location overlaps the following wetlands: FRESHWATER FORESTED/SHRUB WETLAND PF01A RIVERINE R3UB1 H R5UBH R3UBH A full description for each wetland code can be found at the National Wetlands Inventory website NOTE: This initial screening does not replace an on -site delineation to determine whether wetlands occur. Additional information on the NWI data is provided below. Data limitations The Service's objective of mapping wetlands and deepwater habitats is to produce reconnaissance level information on the location, type and size of these resources. The maps are prepared from the analysis of high altitude imagery. Wetlands are identified based on vegetation, visible hydrology and geography. A margin of error is inherent in the use of imagery; thus, detailed on -the -ground inspection of any particular site may result in revision of the wetland boundaries or classification established through image analysis. The accuracy of image interpretation depends on the quality of the imagery, the experience of the image analysts, the amount and quality of the collateral data and the amount of ground truth verification work conducted. Metadata should be consulted to determine the date of the source imagery used and any mapping problems. Wetlands or other mapped features may have changed since the date of the imagery or field work. There may be occasional differences in polygon boundaries or classifications between the information depicted on the map and the actual conditions on site. https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 14/15 11/15/24, 12:24 PM Data exclusions IPaC: Explore Location resources Certain wetland habitats are excluded from the National mapping program because of the limitations of aerial imagery as the primary data source used to detect wetlands. These habitats include seagrasses or submerged aquatic vegetation that are found in the intertidal and subtidal zones of estuaries and nearshore coastal waters. Some deepwater reef communities (coral or tuberficid worm reefs) have also been excluded from the inventory. These habitats, because of their depth, go undetected by aerial imagery. Data precautions Federal, state, and local regulatory agencies with jurisdiction over wetlands may define and describe wetlands in a different manner than that used in this inventory. There is no attempt, in either the design or products of this inventory, to define the limits of proprietary jurisdiction of any Federal, state, or local government or to establish the geographical scope of the regulatory programs of government agencies. Persons intending to engage in activities involving modifications within or adjacent to wetland areas should seek the advice of appropriate Federal, state, or local agencies concerning specified agency regulatory programs and proprietary jurisdictions that may affect such activities. �o� Foy 1�0 \S10000 0<\ 0 https://ipac.ecosphere.fws.gov/location/WR5X5LKGIRG7XBLPIVVKMBAIZI/resources 15/15 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment E Email Notifications Cole Reagan From: Scott Glover Sent: Thursday, October 10, 2024 11:10 AM To: AshevilleNCREG@usace.army.mil; andrew.w.moore@deq.nc.gov Cc: Cole Reagan Subject: CSXT Milepost Z 148.0 to Z 165.0 - Blue Ridge Sub - Hurricane Helene Emergency Track Rebuild To Whom it May Concern: On behalf of CSX Transportation, Inc. (CSXT), Clinchfield Consulting Group (Clinchfield) is providing this notification for emergency track rebuild in the aftermath of Hurricane Helene. The section of track begins at approximate Engineering Milepost (MP) Z 148.0 (36.080840/-82.349270), which is north of Poplar in Mitchell County, NC. The section of track continues east and south through Mitchell County, NC and ends southeast of Red Hill, in Mitchell County, NC at the approximate MP Z 165.0 (36.017580/-82.213520). Due to the extensive flooding, much of the track and associated roadbed have been washed out. Construction is currently underway and will involve complete roadbed reconstruction, culvert replacements, and reinstallation of track. Let us know if you have questions or need additional information at this time. Scott Glover Natural Resources 615.663.3863 sglover@clinchfield.com Clinchfield.com Consulting Group CONFIDENTIALITY NOTICE: The information contained in this e-mail is confidential. It is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any copying, dissemination and/or distribution of this communication is strictly prohibited. If you received this communication in error, please notify us immediately by phone and return the original message to the above address Outlook CSXT Milepost Z 142.5 - TN/NC Border - Notification for Emergency Bridge Replacement From Scott Glover <sglover@clinchfield.com> Date Mon 9/30/2024 9:46 AM To NashvilleRegulatory@usace.army.mil <NashvilleRegulatory@usace.army.mil>; AshevilleNCREG@usace.army.mil <AshevilleNCREG@usace.army.mil>; TDEC.Johnsoncity.EFO@tn.gov <TDEC.Johnsoncity.EFO@tn.gov>; andrew.w.moore@deq.nc.gov <andrew.w.moore@deq.nc.gov> Cc Cole Reagan <creagan@clinchfield.com> To Whom it May Concern: On behalf of CSX Transportation, Inc. (CSXT), Clinchfield Consulting Group (Clinchfield) is providing notification for emergency bridge replacement following the recent rains from Hurricane Helene. The bridge is located at CSXT Milepost Z 142.5 (36.072651/-82.417150) which is south of Erwin in Unicoi County, TN on the Tennessee/North Carolina border. Due to the extensive flooding, the bridge has been washed out. CSXT is in the process of mobilizing equipment and materials to reconstruct the bridge. A temporary causeway will be required to recover the spans and to rebuild the bridge. Let us know if you have questions or need additional information at this time. Scott Glover Natural Resources 615.663.3863 sglover@clinchfield.com CT INCTIFIFID M Clinchfield.com Consulting Group CONFIDENTIALITY NOTICE: The information contained in this e-mail is confidential. It is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any copying, dissemination and/or distribution of this communication is strictly prohibited. If you received this communication in error, please notify us immediately by phone and return the original message to the above address Cole Reagan From: Scott Glover Sent: Monday, September 30, 2024 9:45 AM To: AshevilleNCREG@usace.army.mil; andrew.w.moore@deq.nc.gov Cc: Cole Reagan; Matt Adkins - CSX Transportation, Inc. (Matt_Adkins@CSX.com) Subject: CSXT Milepost Z 147.9 - Poplar, NC - Notification for Emergency Bridge Replacement To Whom it May Concern: On behalf of CSX Transportation, Inc. (CSXT), Clinchfield Consulting Group (Clinchfield) is providing notification for emergency bridge replacement following the recent rains from Hurricane Helene. The bridge is located at CSXT Milepost Z 147.9 (36.082674/-82.350610) which is just north of Poplar, in Mitchell County, North Carolina. Due to the extensive flooding, the bridge has been washed out. CSXT is in the process of mobilizing equipment and materials to reconstruct the bridge. A temporary causeway will be required to recover the spans and to rebuild the bridge. Let us know if you have questions or need additional information at this time. Scott Glover Natural Resources 615.663.3863 sglover@clinchfield.com Clinchfield.com Consulting Group CONFIDENTIALITY NOTICE: The information contained in this e-mail is confidential. It is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any copying, dissemination and/or distribution of this communication is strictly prohibited. If you received this communication in error, please notify us immediately by phone and return the original message to the above address From: Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil> Sent: Friday, November 1, 2024 11:08 AM To: Scott Glover <sglover clinchfield.com> Cc: Ehorn, Casey H CIV USARMY CELRN (USA) <Casey.H.Ehorn@usace.army.mil>; Davis, Brooke A CIV (USA) <Brooke.A.Davis@usace.army.mil>; Anderson, Mitchell L CIV USARMY CESAW (USA) <Mitchell.L.Anderson@usace.army. mil>; Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil> Subject: FW: LRN-2024-00760 : CSXT Milepost Z 142.5 - TN/NC Border - Notification for Emergency Bridge Replacement Good afternoon, Based on this morning's conversation regarding the CSX bridge replacement on the TN/NC border, it appears that work may be planned that may not be considered exempt from 404 permitting and could emergency review and authorization from the Wilmington District. Ms. Brooke Davis and Mr. Mitchell Anderson from my Asheville Office are cc'd and are the appropriate POCs action in this area and stand ready to work with CSX to further discuss any permitting that may be required. Please do not hesitate to reach out to them with questions. We will work with CSX to expedite any required actions. V/r Tommy E. Fennel Chief, Regulatory Division Wilmington District U.S. Army Corps of Engineers 910-251-4952 (office) 910-616-0895 (cell) [rrs.usace.army. miI]rrs.usace.army. miI RRSSYSTEM Streamline the Permitting process with the REGULATORY Regulatory Reques[ System (RRS) —your new REQUEST online platform for permit applications. [rrs.usace.army.mil] USACE RRS Promo 90-sec (youtube.com) Thank you in advance for completing our on-line Regulatory Service Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. We value your comments and appreciate you taking the time to complete a survey each time you have an interaction with our office. ,11E,RE HIRING brooke.a.davis@usace.army. miI From: Scott Glover <sglover@clinchfield.com> Sent: Friday, November 1, 2024 1:46 PM To: Davis, Brooke A CIV (USA)<Brooke.A.Davis@usace.army.mil>; Anderson, Mitchell L CIV USARMY CESAW (USA) <Mitchell.L.Anderson@usace.army.mil> Cc: Fennel, Tommy E CIV USARMY CESAW (USA)<Tommy.E.Fennel@usace.army.mil>; Robin Hagerty <rhagerty@clinchfield.com>; Cole Reagan <creagan@clinchfield.com>; Brendon Kelly <bkelly@clinchfield.com>; Stan Rudzinski <srudzinski@clinchfield.com> Subject: [Non-DoD Source] RE: LRN-2024-00760 : CSXT Milepost Z 142.5 - TN/NC Border - Notification for Emergency Bridge Replacement Good Afternoon: The Nashville District has stated that the Nolichucky is a Section 10 Water and is requiring a Section 10 Permit. Mr. Ehorn is requesting we fill out the proposed natural disaster mitigation and flood recovery permit. He stated that it is not in effect yet - but we could use as a guide to proceed forward with the Blue Ridge Sub repair project. I wanted to reach out to you and ask if you will be requiring the same for the NC section of track. Thanks Scott Glover Natural Resources `� 615.663.3863 H sglover@ clinch fie ld.com Clinchfield.com Tf-"r1FT 17 Consulting Group M■ CONFIDENTIALITY NOTICE: The information contained in this e-mail is confidential. It is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any copying, dissemination and/or distribution of this communication is strictly prohibited. If you received this communication in error, please notify us immediately by phone and return the original message to the above address Outlook RE: LRN-2024-00760 : CSXT Milepost Z 142.5 - TN/NC Border - Notification for Emergency Bridge Replacement From Davis, Brooke A CIV (USA) <Brooke.A.Davis@usace.army.mil> Date Fri 11/1/2024 1:36 PM To Scott Glover <sglover@clinchfield.com>; Anderson, Mitchell L CIV USARMY CESAW (USA) < Mitchell.L.Anderson@usace.army.mil > Cc Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil>; Robin Hagerty <rhagerty@clinchfield.com>; Cole Reagan <creagan@clinchfield.com>; Brendon Kelly <bkelly@clinchfield.com>; Stan Rudzinski <srudzinski@clinchfield.com> 2 attachments (413 KB) FINAL FactSheet_WNCFlood Response_20CT2024 (1).pdf, PostHelene_PermittingQuickGuide.pdf, Good Afternoon Scott, For informational purposes, the reach of the Nolichucky in North Carolina is not a designated Section 10 water, and the referenced natural disaster mitigation and flood recovery permit is a Regional General Permit for Tennessee only. As far as the activities that are exempt under Section 404(f) of the Clean Water Act are concerned, they remain the same in both Tennessee and North Carolina (i.e. debris removal, replacing damaged structures in the same character, size and location, etc.). With regard to bridge replacement projects or the like, if a causeway, instream diversion, etc. would need to be installed within the water, these types of activities would constitute new fill (even if it temporary) into waters of the U.S., and would require a permit. We are under emergency permitting procedures, and are providing two options so as to not slow the repair process, as follows: 1. Emergency Permitting process: Submit a request with the information indicated on the attached QuickGuide and we will determine if the project is an emergency. If the project is determined to qualify as an emergency, we will verify the permit within 48 hours. 2. After -the -Fact Permitting process: Once the work is complete, you may submit and after -the -fact Pre - Construction Notification to this office (and the Division of Water Resources for the 401 WQC, if the work does not fit under the general certification). If you know of numerous areas along the corridor that would require new fill within waters of the U.S., it may be easier for all involved if you provided those in one submittal and we can have a blanket letter for all -just a thought. As I stated previously, I have attached our reference guides for emergency permitting procedures to this email. Please do not hesitate to contact me if you have questions or concerns. Sincerely, Brooke Brooke Davis Biologist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Office: 828-271-7980, ext. 4232 Cell: 828-507-0005 Edit --0 Cancel re Forward Jn Reply all Ip Duplicate event Ol loin ®Busy 15 minutes before QCatagonze dPrivate EJ Scheduling poll - This event has passed. X Tracking e0 SAW-NC-CSX Site Visit a mm O chat Organizer © Thull/162020300AM-11:00AM Robin Hagerty Sass, Tmodo, 11p/2026at ]:39AM QQ Microsoft Teams Meeting: htt//maps.appgoo.gKZHz5rKFUjGgBWA?g st-Outm_campaign=ac-im Attendees hi //maps.app.gmegUCZHz5rKFIJIGZg8WA?g st—R utm campaign=ac-im A1110o:l NC Meeting location, Thursday, loam ET A amandapneeeusace.asmy... wgoired Please forward t0 appropriate team members. pedlsed1 Atthis locationwewi thave an initial safety briefing, discuss the project, determine what areas arefo bevisited, andconsolhote D Davis Brooke A CRI(uSQ vehicles. Opt losal "Dultoe;,11d:7 Due to safety issues, access along CSXT ROW requires an amend. Therefore, we will be moving the this area as a group. High clearance SW or rucks are recommended for lrsversing the roadbed. Matt Adkins, CHMM 10 aryiretl PPE required during the site visit includes: Hard hat, steel or composite toed boob, safety vest, safety glasses, and hearing lance Burroe protection. Please let me know if you don't have any of these items and wewill bring some extras with us. P a uhed Robin Hagerty, Clinch ield Consulting Group �k Cole Reagan f Fryuiretl 615-584 W31 boom tompkinsuG w.00v Fryuiretl •Ehom, Casey H CIV u5A0... Clausal matthewAllbed2i usda.gov Microsoft Teams Need Help= Oplunal • iamesowenitlasda.gov Join the meeting now 0i Outlook CSXT Handouts From Robin Hagerty <rhagerty@clinchfield.com> Date Fri 11/15/2024 9:01 AM To Amanda J Fuemmeler <Amanda.Jones@usace.army.mil>; Ehorn, Casey H CIV USARMY CELRN (USA) <Casey.H.Ehorn@usace.army.mil>; Franklin Colyer <Franklin.Colyer@tn.gov> Cc Brannan, Mary A CIV USARMY CELRN (USA)<mary.a.brannan@usace.army.mil>; Moore, Andrew W <andrew.w.moore@deq.nc.gov>; Tompkins, Bryan <bryan_tompkins@fws.gov> LRN-2024-00760 SAW-2004-02064 N R2406.088 Attached is a link to the hard copies provided and information discussed during the meeting with CSXT and agencies, Nov. 13 (TN) and Nov 14 (NC). Changes have not been made based on discussion. These documents are for information only. We will be incorporating them into the permit applications. 2024-11-13 OnSite Mtg-Regulatory Agencies-FOU 1.pdf I know you sometimes have issues accessing outside sites, please let me know if there is another way to send a 98MB file... Thanks, Robin Robin Hagerty, CPESC Client Relations & Project Delivery CLINCHFIELD Consulting Group 615.584.6031 rhageh@clinchfield.com Clinchfield.com J - Outlook SAW-2024-02064 On -Going Work Update From Robin Hagerty <rhagerty@clinchfield.com> Date Sun 11/17/2024 9:09 AM To Amanda J Fuemmeler <Amanda.Jones@usace.army.mil> Cc Matt Adkins, CHMM <matt_adkins@csx.com>; J. Cody Owen <james.owen@usda.gov>; Moore, Andrew W <andrew.w.moore@deq.nc.gov> Bcc Jake Metcalf - CSXT (Jacob_Metcalf@csx.com) <Jacob_Metcalf@csx.com>; Hamadani, Nabil <nabil.hamadani@hdrinc.com>; Sparks, Ed <Ed_Sparks@csx.com>; Amanda DeCesare (CSX) <Amanda_DeCesare@csx.com>; Lance Rasnake <Irasnake@clinchfield.com>; Hensley, Rebecca <Rebecca_Hensley@csx.com>; Cole Reagan <creagan@clinchfield.com> Amanda, As we discussed during the site visit on Thursday, project to keep the communication open. we are providing you with information about the For SAW-2024-02064, the CSXT Emergency Track Rebuild Post -Hurricane Helene, Blue Ridge Sub Milepost Z 142.5 to Z 165.0, Poplar, Mitchell County, NC The applicant is: Matthew L. Adkins, CSX Transportation Inc., He is Snr Manager Environmental Rededication, 1590 Marietta Blvd NW, Atlanta, GA 30318. The authorized Agent is: Clinchfield Consulting Group (Robin L Hagerty) at 5310 Maryland Way, Ste. 390, Brentwood, TN 37027. If we keep the impacted length in the same application, it starts at the Tennessee and North Carolina state line at Latitude 36.072456' / Longitude-82.417017°, near Poplar, Mitchell County, NC and ends at Latitude 36.017544' / Longitude 82.213283°, near Red Hill, Mitchell County, NC The attached link includes is a series of maps illustrating CSXT ROW along the Blue Ridge Subdivision from the North Carolina State Line with Tennessee at MP Z 142.5 to the end of the requested emergency authorization at MP Z 165.0. On top of this map, we have started to indicate where streams cross CSXT ROW. We are working to refine this map to include what work is completed and being completed in each segment and what NWPs are anticipated at potenitally jusditional locations. CSXT ROW-STRs MP 142 to 165 2.pdf From MP Z 142.5 to MP Z 147.9 (Gorge) CSXT and their contractors are working below OHW in the Nolichucky River on the rail side of the river. The work includes clearing overburden, moving material, and creating work platforms to allow for drilling of the proposed toe pile wall and continuing to build the rail embankment. The equipment being used is a mixture of specialized equipment and construction equipment used in stream restoration work. The equipment is being inspected daily. The utilization of the toe pile wall in select locations along the project area will minimize impacts to the Nolichucky River and minimize impacts to the track from future flooding. CSXT is using available materials within railroad ROW and locally sourced material to rebuild the rail embankment and toe access. Material within CSXT ROW being recovered along the Nolichucky River is above the estimated ordinary high water (estimated at 18" above surface water on 11/13/24 near MP Z 147.9). The Nolichucky River is a Class B stream. The attached link includes photos of the site in areas for the rail pile wall, the typical view of the rail pile wall section for the rail bed, and rail pile wall locations. Rail Pile Walls.pdf We discussed using NWP 14, NWP3, and NWP45 with their emergency components for this segment of the project including the bridges discussed below. This segment of the Nolichucky River (from Poplar NC downstream to the rail bridge at Unaka Springs TN) is listed on the Nationwide Rivers Inventory (NRI) as one of the free -flowing river segments in the US that are believed to possess one or more `outstandingly remarkable' natural or cultural values judged to be at least regionally significate and as such is a potential candidate for inclusion in the National Wild and Scenic River System. In 1993, the Nolichucky River was listed with Outstandingly Remarkable natural or cultural Values (ORV) for scenic, recreational, and geologic.[1] From MP Z 147.9 Crossing Nolichucky River CSXT and their contractors are working below OHW in the Nolichucky River at the bridge crossing near Poplar, NC. The work includes clearing overburden, moving material, and creating work platforms to allow for crane assembly and the proposed bridge work. The equipment being used is a mixture of specialized equipment and construction equipment used in stream restoration work. The equipment is being inspected daily. A temporary stream crossing using two 8' diameter culverts was placed on bedrock with temporary headwalls and topped with cellular concrete in Hollow Poplar Creek. The temporary crossing is designed to overtop in high flow conditions with minimal damage to the surrounding work areas and for ease of removal. The crossing is part of the temporary work area. Hollow Popular Creek is a Class C water and is classified as a Trout stream The tempoary work areas around the temporary stream crossing serve as a staging area for the permanent bridge repairs and reconstruction; for assembling and use of the crane; and repair and/or salvage of the bridge spans. Three bridge spans will be re -used and three will be salvaged. The tempoary crossing and temporary work areas will be removed after the permanent bridge is installed and the bridge spans are removed from the Nolichucky River. The area will be restored to pre -storm contours and stabilized using USFS BMPs included Forest Service specified seed mix and cover. A temporary ford is being utilized to cross the Nolichucky River on bedrock until the work bridge is installed. The attached link includes photos of these areas, the work bridge plan set, and sheets from the permanent bridge plan set. Bridge at Popular.pdf Where found: CSXT and their contractors are working below OHW in the Nolichucky River and North Toe River, when necessary to recover rail, ties, and other on -track material (OTM). The segment of the North Toe River (from US 19E bridge north of Ingalls to the confluence with Cane and Notlichucky Rivers) was listed in 1982 with Outstandingly Remarkable natural or cultural Values (ORV) for scenic, recreational, geologic, fish, and wildlife on the Nationwide Rivers Inventory (NRI) and as such is a potential candidate for inclusion in the National Wild and Scenic River System. [ 1 ] [1] https://www.nps.gov/subjects/rivers/nationwide-rivers-inventory.htm Please reach out as you need more information. We will incorporate this information in our permit application(s). Thanks, Robin Robin Hagerty, CPESC 615.584.6031 Client Relations & Project Delivery rhagerty0clinchfield.com Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment F Wild & Scenic Research To Be Published Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment G Ordinary High Water Determination EXCELLENCE IN ANY ENVIRONMENT 11 /25/2024 Matthew Adkins, CHMM Senior Manager Environmental Remediation, PSH&E CSX Transportation 1590 Marietta Blvd NW Atlanta, GA 30318 RE: Nolichucky and North Toe River Ordinary High Water Mark (OHWM) Survey. Dear Mr. Adkins, On November 14 and 22, 2024, EnviroScience, Inc. performed a survey for the Ordinary High Water Mark (OHWM) of the Nolichucky River and North Toe River. The survey was completed over 4.7 miles from the first CSX railroad bridge upstream of Erwin, TN to approximately two miles upstream of the NC/TN state line, 0.4 miles of the river at Poplar, NC, and on the Toe River just upstream of the confluence with Cane River. The total survey area was approximately 5.2 miles. The OHWM survey followed the US Army Corps of Engineers' National Ordinary High Water Mark Field Delineation Manual for Rivers and Streams (Interim Version), November2022. However, field indicators were limited due to the impacts from Hurricane Helene floodwaters, which severely scoured river substrates and the riparian buffer and caused significant realignment of substrates and historical erosional and depositional areas. These impacts also limited the locations where OHWM could be measured. The OHWM on the Nolichucky was measured to be 24 inches above the river level on the day of the site visit (November 14), at which time the USGS gage height at Embreeville, TN was approximately 1.5 feet for reference. The OHWM on the Toe River was measured to be 36 inches above the river level on November 22, 2024. There are no active stream gauges on the North Toe River and the measurement was taken at normal to low flow conditions. Determination of the OHWM was based on vegetation density and the demarcation of well -established and/or woody vegetation. Other indicators used were the presence of undercut banks and bank angle. See table below and the attached photo log and maps for additional details and location information. EnviroScience TM 5070 Stow Road Stow, Ohio 44224 Nolichucky River OHWM Table 1, of OHWM Survey Area locations Survey Location River State OHWM inches Latitude Longitude 1 Nolichucky TN 24 36.089057 -82.425023 2 Nolichucky NC 24 36.071563 -82.412646 3 Nolichucky NC 24 36.074423 -82.399533 4 Nolichucky NC 24 36.084741 -82.351880 5 North Toe NC 36 36.028802 -82.326589 Please contact me anytime at 330-688-0111 or dczayka(aD_enviroscienceinc.com if you have any questions or comments about this report. Thank you. Respectfully, Dave Czayka Senior Director of Regional Operations EnviroScience Page 2 of 7 `� Excellence In Any Environment Nolichucky River OHWM Nolichucky River Ordinary High Water Mark Survey Photo Log and Map .o EnviroScience Page 3 of 7 `� Excellence In Any Environment Nolichucky River OHWM Photo 1: OHWM Survey location 2; visual assessment of right bank from left bank (facing downstream), mid - river view. Photo 2: OHWM Survey Location 2; visual assessment of right bank from left bank (facing downstream), near view, note woody vegetation boundary, vegetation density, and undercut bank. EnviroScience Page 4 of 7 `� Excellence In Any Environment Nolichucky River OHWM Photo 3: OHWM Survey Location 2; on left bank (facing downstream). Photo 4: OHWM Survey Location 3; on left bank (facing downstream), note remnant woody vegetation in background and waterline in foreground. p EnviroScience Page 5 of 7 `� Excellence In Any Environment Nolichucky River OHWM Photo 5: OHWM Survey Location 4; on left bank (facing downstream). Photo 6: OHWM Survey location 5 at Poplar, NC near upstream boundary of survey area; on right bank (facing downstream). pEnviroScience Page 6 of 7 Excellence In Any Environment Nolichucky River OHWM Photo 7: OHWM Survey location 6 on North Toe River, upstream of confluence with Cane River on left bank (facing downstream). .o EnviroScience Page 7 of 7 `� Excellence In Any Environment i ,i.,(.�i-9 e+A t y t- 1 1/ Survey Location 1 ' of Survey Loc 'OV ♦, '�' 4 ..� . r..:Ml �, ,�` / t '* 9.t'• 1 mi l ' 1., t.. 1 f' p. Now, Al mw 1 - - ',,�,�i-1'=�1 _ �.�%° - y '�. ram~ _ �'qy► '�1 .,... t y_• �l,tt.--'� - ��',. ..fir/ :` AA Survey Location 5 36.02880213. - '.t.i • 1 ''E'•-j'•� Y p. '�`� •:�� 1 ,` � ��.:. ; i. �/.. ,', / fit- �`�µ ,�: �. -.. r... o _ ,..� .- �,� ,, '� - .pan �- ' "`•jJ, _ r �� r � • .r-L.44 Jam' � `!�"�f k'L�� / <!d . S, 'K. is. ` S �i►iel �.+iF 0 1 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment H Best Management Practices (BMPs) CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 165.0, Mitchell and Yancey Counties, NC Best Management Practices (BMPs) 1. CSXT WILL LIMIT EQUIPMENT IN THE STREAMS TO ONLY WHERE NECESSARY FOR TRACK AND EMBANKMENT RECOVERY WITH WORK BELOW OHW TO INSTALL TOE ACCESS AND RAIL PILE WALLS (WHICH MAY INCLUDE WORK WITHIN THE STREAM). 2. EQUIPMENT USED BELOW OHW WILL BE CONSISTENT WITH STREAM RESTORATION PRACTICES AND INSPECTED DAILY. 3. WITHIN THE GORGE, CSX IS USING AVAILABLE MATERIAL WITHIN THE RAILROAD ROW AND LOCALLY SOURCES MATERIALS THAT INCLUDE MATERIAL THAT MAY HAVE BEEN PART OF THE ORIGINAL RAIL EMBANKMENT TO REBUILD TO RAIL EMBANKMENT. 4. THE WORK BRIDGE INSTALLATION IS NECESSARY TO MINIMIZE CONSTRUCTION IMPACTS TO THE NOLICHUCKY RIVER. 5. RAIL PILE WALL IS BEING CONSTRUCTED WHERE NEEDED TO MINIMIZE EMBANKMENT IMPACTS TO THE NOLICHUCKY RIVER AND TO HARDEN THE NEW TOE TO MINIMIZE FUTURE IMPACTS DUE TO FLOODING. 6. IN CONSULTATION WITH APPROPRIATE AGENCIES, HISTORICAL POPULATIONS OF THREATENED AND ENDANGERED SPECIES SUCH AS THE APPALACHIAN ELK TOE MUSSEL WILL BE IDENTIFIED, DOCUMENTED, AND AVOIDED AS MUCH AS POSSIBLE. II�YNIID[1011ONILI111fiv/I111110amIUTIINN 111010101WATiTjIF."A8R201I9"DMINA1.V9.11►11ILTiT/1111110will) u104IN0:011:y1 MARCH 31. 8. THE OHW MARK WILL BE NOTED IN THE FIELD ONCE AGREED UPON BY THE REGULATORY AGENCIES ALONG THE NORTH TOE AND NOLICHUCKY RIVERS WITHIN THE CSX FOOTPRINT. 9. CSXT WILL NOTIFY THE REGULATORY AGENCIES OF THE LOCATION WHERE EQUIPMENT IS IN THE RIVER AS RECOVERY AND REMOVAL OF RAIL MATERIALS OCCURS BELOW OHW. 10. IF ANY PREVIOUSLY UNKNOWN HISTORICAL REMAINS OR ARTIFACTS ARE DISCOVERED DURING CONSTRUCTION ACTIVITIES, CSXT WILL NOTIFY THE USACE OF WHAT WAS FOUND AND TO MAXIMUM EXTEND PRACTICABLE, STOP ACTIVITIES THAT WOULD ADVERSELY AFFECT THE REMAINS OR ARTIFACTS. 11. CSXT WILL NOTIFY LOCAL OFFICIALS IF REMAINS ARE FOUND FROM THE MOST RECENT FLOOD EVENT. PERSONAL PROPERTY WITH AN ASSUME VALUE WILL ALSO BE TURNED OVER TO LOCAL OFFICIALS. 12. TEMPORARY FILL AND CULVERTS WILL BE REMOVED AND IMPACTED AREA RESTORED WITHIN 60 CALENDAR DAYS OF NO LONGER BEING REQUIRED. 13. CSXT ENGAGED A PRIVATE WHITEWATER RAPIDS EXPERT TO PROVIDE RECONNAISSANCE AND CONSULTATION. 14. CSXT REQUESTED THAT THE NOLICHUCKY RIVER BE CLOSED TO THE PUBLIC WITHIN THE GORGE UNTIL THE MAJORITY OF THE RAIL MATERIAL IS REMOVED DUE TO ITS HAZARDOUS CONDITIONS. 15. CSXT POSTED SIGNS TO ADVISE THE PUBLIC OF THE UNSAFE CONDITIONS IN THE NOLICHUCKY RIVER. CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 165.0, Mitchell and Yancey Counties, NC Erosion Control BMPS. 1. CSX DISTURBED SOIL WILL BE STABILIZED USING APPROPRIATE TEMPORARY AND/OR PERMANENT SEED MIXTURES COVERED WITH MULCH WITHIN 7 CALENDARS AFTER CEASING LAND DISTURBANCE UNLESS THE PROPERTY OWNER DIRECTS OTHERWISE. 2. AN ONSITE RAIN GAUGE WILL BE MAINTAINED NEAR THE STATELINE BRIDGE, AT THE POPULAR BRIDGE, AND AT A SELECTED LOCATION BETWEEN MP Z 148 AND Z 165 WITH RAINFALL RECORDED DAILY DURING WORKDAYS. 3. E&SC MEASURES WILL BE INSPECTED AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAIN EVENT OF 1 INCH OR GREATER IN 24 HOURS. 4. AREAS DISTURBED DURING RESTORATION OF TRACK WILL BE MINIMIZED TO THE AREA NECESSARY TO COMPLETE THE WORK. 5. CULVERTS WILL BE REPLACED IN THE DRY BY EITHER PUMPING FLOW AROUND THE WORK AREA OR INSTALLING THE CULVERT WHEN NO FLOW. DEWATERING BMP WILL BE USED TO KEEP WORK AREA DRY, AS NEEDED. 6. CULVERTS WILL BE INSTALLED PER THE DESIGN TABLE, INCLUDING EMBEDMENT, SLOPE, INVERTS, 7. CULVERTS SHOULD BE EMBEDDED ONE FOOT IF THE DIAMETER IS GREATER THAN 48 INCHES AND 20% OF THE CULVERT DIAMETER IF THE DIAMETER IS LESS THAN OR EQUAL TO 48 INCHES TO ALLOW LOW FLOE PASSAGE OF WATER AND AQUATIC LIFE. 8. IF A CULVERT IS INSTALLED ON BEDROCK, EMBEDMENT IS NOT REQUIRED. THE EXISTENCE OF THE BEDROCK MUST BE DOCUMENTED. 9. IF A CULVERT OUTLET IS SUBMERGED WITHIN A POOL OR SCOUR HOLE AND DESIGNED FOR AQUATIC PASSAGE, EMBEDMENT IS NOT REQUIRED. THE CULVERT OUTLET MUST BE DOCUMENTED. 10.CSXT WILL NOTIFY DWR REGIONAL OFFICE TO REPORT ANY NONCOMPLIANCE WITH, AND/OR ANY VIOLATION OF STREAM OR WETLAND STANDARDS WITHIN 24 HOURS. 11.SUFFICIENT MATERIALS REQUIRED FOR STABILIZATION AND/OR REPAIR OF EROSION CONTROL MEASURES WILL BE KEPT ON THE ACTIVE SITE AT ALL TIMES. 12. APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES ARE REQUIRED FOR BORROW AREAS. 13.CSXAND ITS CONTRACTORS WILL FOLLOW STANDARD GOODHOUSEKEEPING BMPS, INCLUDING DAILY INSPECTION OF EQUIPMENT FOR LEAKS, DESIGNATED CONCRETE CLEANOUT AREA(S), TRASH COLLECTION, SANITARY FACILITIES FOR WORKERS, FUELING, SPILL KITS, AND MATERIAL STORAGE. Stabilization BMPS. 1. SOIL DISTURBED BY CSXT WILL BE STABILIZED USING APPROPRIATE BMPS INCLUDING THE USFS RECOMMENDED SEED MIXTURES. 2. BASED ON USFS RECOMMENDATION, THE PERMANENT SEED MIXTURE WILL BE THE SOUTHERN APPALACHIAN ECOTYPE SEED - CNF MIX 2 - MESIC SITES SOLD BY ROUNDSTONE NATIVE SEED COMPANY. 3. PLANTING INVASIVE SPECIES IS PROHIBITED. THIS INCLUDES MANY TRADITIONALLY USED STABILIZATION SPECIES SUCH AS TALL FESCUE (SCHEDONORUSARUNDINACEUS), ORCHARD CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 165.0, Mitchell and Yancey Counties, NC GRASS (DACTYLIS GLOMERATA), CROWN VETCH (CORONILLA VARIA), AND SEVERAL SPECIES OF NON-NATIVE "CLOVER" IN THE GENERA KUMMEROWIA, LESPEDEZA, LOTUS, MELILOTUS, AND TRIFOLIUM. PROHIBITED SPECIES HAVE BEEN IDENTIFIED BY LISTS OF NON-NATIVE INVASIVE PLANT SPECIES PRODUCED BY THE USFS (HTTP: [/WWW.INVASIVE.ORG/SOUTH/PLANTS.HTML) AND THE STATE OF TENNESSEE (HTTP: [/WWW.TNEPPC.ORG/INVASIVE PLANTS). 4. FOR RAPID TEMPORARY COVER, A NON-INVASIVE, NON -PERSISTENT TEMPORARY SEED CAN BE ADDED TO THE MIX SUCH AS ANNUAL RYE (LOLIUM MULTIFLORUM), OATS (AVENA SATIVA), WINTER WHEAT (TRITICUM AESTIVUM), BARLEY (HORDEUM VULGARE), CEREAL RYE (SECALE CEREAL), AND BROWN TOP MILLET (PANICUM RAMOSUM/UROCHLOA RAMOSA). S. SEED MIXES WILL BE COVERED USING A MULCH OF ONSITE BRUSH, PINE NEEDLES, WOOD CHIPS, OR WEED -FREE HAY, IF AVAILABLE. 6. ON SLOPES STEEPER THAN 3H:1V OR TALLER THAN 10 FEET IN HEIGHT, EROSION CONTROL MATTING WILL BE PLACED IN ADDITION TO THE MULCH AND STAKED WITH BIODEGRADABLE STAKES (NOT METAL STAKES). 7. THE USE OF MONOFILAMENTTYPE EROSION CONTROL NETTING, BLANKET, OR MATTING IS PROHIBITED. 8. APPLICATION OF FERTILIZER SHALL BE IN COMPLIANCE WITH MANUFACTURER'S RECOMMENDATIONS AND SITE CONDITIONS. Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment I Plans and Renderings - Rebuild Rail go 10 r Aw 0 dip & a 40 s, Avg atOF 914 do OR 6w 4F 741 IL .1k so few 4F Ot so14C.O. -b lip -floo, a 40 00% 0 •V. 4R .- IP r A - - • 0 i. -4 % % r. • AV It OFT 0 Ab SAO 0. W. Idb 0 o 10 db ib % 0 46 ft a I 1 14% IP iL let *lush v-s .0 Ilk 4' 01, 4h Ire I A —A 14- 40 IP 1, IN, IL 49 —7k 14. Isis. M!W* V, 4k- Ink g-- In. hNA qb Nb & `7 VO ft. S .4 RX, VAN. zi. 4r f# RS- IWO Jo. w 4%. -ij - - ; vs. IL f. -4 .07 0 71%, 44 -W WIT, -kK vv K,- - it Z, Imillr. W* 41t Aw le 71 �- IL 0 A, & 15, to % ft6,% -4b Ilk, 14, .01 Z. V A, tie Oto- % '01 It o 4T er bo. 14 :a� -Ad W&S a 0 !M Rd ,do ---qq k_d •. ''. S i • � ...� 4w lip who k. we If. ' i I . 4 4.1 AD 10 e If 414 TO 46 je 1.4 •.. f` tom' •x♦ - �Ay %K;7 r • .�• �• 'ff.� •••..' a � � � .� ` ,I � '• � -� � • 1. '` • • 1t I "• • � ,� , ,• • • .� .` ' '� � •.� �� • Nr � � ` �•I � ' r '+• ` �, _;wi / • 1►' •"�' ^ i • �' ~ . • - - , • , '� ( 1. , • ... • ` •- • i. ,•� • • �•. , . ' J • - +�-. ' `_ 1► ' • ' �� 2r r ' f i , %1 ' • •. • �• • ,J 1. , •' • •�+ r• • • , �, �'•� '� - ,� , •i• I ,. •• R • - - 1 110*7 '. ' • on lb 10 ' �. � . � •�a K' •�°'�• • 'fit ��C `� � i� •�• � �•' �• • � a.• y •• �•,• . " ♦ �~ �� `� •,, � . di � • - Ji► �.;•� es ' t ti W. , •M 14 At 14� Ole Ak- I �Ne lmzft ' . • � �=1 � i . �� •� 1 � - ,��++� _ .ems �i: ' � ." 'i .� 1 •L -it• tom} �► e - •'�y. �V" „►, ,, t••• •, t.r}' _' - �„ t. -n' L• 1 . • ~ ♦ . • � • . �► ♦ � •ate• a � '. � ' � • - • ' ° i � l4 � rr ' _ �'�. � 1t1 4� � _ - '0 �'� �-�.� �� - � ^ � _ ., ► tl►M � : . i .1� � .•. ;' � _ • '-? w••/ � `.try. _ �`� " • ./,. �•l.' 1 ` t 'r ' 1:" •" � - � _ ` � - ^' qpWft yr' ; ► .. ^ - ` _- .Y •r1 - �` _ _ ._ y •� ~ 1 • . �•4 r ._ �_ • f .. �a, _ ar �(' - •�.. Ile All 416, �, it f, ` ` ~. � �•�•' .� r.•i-j" .. �' J ' • ♦ •. _ - • <i� �' `� � � �� _ 1- `\. '� �. IZZof f < < . K i • M� •~. ��. . - _ _ ,�. . y�:fi l j-��' .� A. '�'t♦ ` • •3y. .�. ♦ � • ` t �' '� � - . �, j,'• ,�:✓ Ir\- •,-_1♦�1:-�.•r ;� •�'+ ,.�- •' * � • Ole ', h .. • �) • � 1 �/{ ` • �` 4 1•, - •� �' •♦. l '•►e! ._ 1%�Q r. ` `• t .' `.�11` - a -� � � � `• a� 'i7 . �• ,�'� • � . � . i _ � ` �y .'r - •" , ! - `fit- - + f'' ` - I , . ' r 1r /• '_ ` `�\� � •` ,� �� fit"' '� -♦ • • r` `1_� - e i f _ ,+. ✓� .. is �• • !T • r1 • - � -� •�i� �- '.• •a � '-b - 4• `y. +� ve • ..1 • � •1�. 1• t ''•�4 / -w s- �� � - '/.`'i 1 ��� •' ; - ♦ ► ` tit e - "� .' a _•• ♦ - 4 .A.. _-1 �. �, �• v �•---r - • _..�'- _ • +-tom • �' �. , �' r•"y1\I • }� •Jf y • ♦ ,z• rw� a' \ter .•1 t �� �_ ,���.��� 9• i '. ; A.ywt ` -a • I " I • ' 1.r•�. /,�� ! ►- ! �' ter' • +•�, t ` - • Or its.' . • _ - t _ �•� r t Vn'e �.,, - . • . r+ .I� P► ' ' - �T •. !w - '• r, 16 ` '` ;, f• •1<� -a�� •��!•` �'.� • ` .. " ' Vie. ti� r �' ^'�`A . ' 1 - - �• � !1"''. 1p J vi .e FG, N _ 1•va • a- " ''� •tom'• Ar Alb 44 Av Ir Or jW Ak Of 'Pill . , �' � �• � `fit ' / 1 - r - L\5F 2 -- R L I I I- L7 i1vim r;$ A 0I9IONZKON1IM:a1111_\I M W E w i 00 L / • I • 1•I AV ; jo dip Ilk lb do ar wo a ♦ • • ` • ►` l�•� • J1 �•v.r� •WIK1r `i • • ►r t•' �! •� +` • • jrs� f. y` f` ; �• i•' , { rill IL Wft so Jq 41. le fm t 16 40 40. ~ ... ` .., � : b 'rya ,��, ♦` � '.� • ': ? ~• �, t . '` • _ " ..' ,, !":� � ,. . �,,. ,Jt�` � • .gyp,► y� : � r/ � . I � t' ' •' `� � • i ♦lam � • ! I • `` ` � .. � JIN- . � � a • Q. `•� �~•• ' • � • i/ l . ' �i� ,1 '� � ••- �-. -s'•` ,� � -"ems ' a � \ _ •�� � 40, 491 .. - � • •• a '.. � . �, ,`' � � � - -VARW �1>•►r..�` - 1•!•J ' .lam , - .. � • f - Mir NOW dr to- • !- i ' ►- .Ir Y� • Z• J•f .1 ••�� ,� _ 4. •, ___ � -. � i �•._ '•�''--#tik" t�.1 .�y-. •` _ •�:` �+•' �, iR ,r •� I �, • t - ♦ ► ' - � • '' �f•• ` • j '� _ - 1"� � ` .. 1 - � - - ' 1• - _ - -�. Y r.-, -_ ��' � tom,,;. � '� a�1•:i,.. • a f l - ♦• .i'•;'' ♦ -� .- _ _ _ � ', ��. �► e - .-. .C.Yr'.r .� ,. _ ,1 �. •, .�- w: '1 may, �' -�� .. . - ` � ..'�, � - w �,.; '�� � �� r , I 1 t _ ` • _ _ ���\ _ ` � � � - �. �� -war 'r _ � .r I. `jc+' � • � • ' _ _ �?� �� �4 y - ,�" ,;A �'•�- , _ ♦" � i.' 1 � • "Se '^' �• y , • '' . _ - � _t`a` _ • hP-a '�+ s � \ • Ir 346 - , . . c A / ;' fit. i ! y ' s,, _ ► ... :�,... :! i ' i� � -'�� �.Ilk � it • ''�� . � �� 4 - '� �� .. - 1 _ , qt Ai IN AZI VA I •r ! i • fib•, . W •-�` ' `� _ .y �� "- - ' • `r``�,�'! - r 14W aw , . j4Nit w',fa " r1 • , ' W. III , ' r J /.•t� r t - `'�� `" -� _ 7M .ter• •,'` n _ -Y i•. Vs v Is# r ` v i .low Wj!!!F1 0 W 7__� W 1 g it Jp 42 lb 4q"_ ca If TA Ir J • �r� •„l � � � •� • f,.•. , • - , � ` 1. IN Is Aw 10 .01 Ilk- 94 ..•.rid � .� � • ������ - -y � -.•� of �i�. ••, � :• •1 • . V � ' •� •/- •r ' . - t � �. •r. � �� � • • I. • IL IA 0 w • • .� ., .y. �J4 !�, • ' ..� i v , i• i ce, • ~ _ ' r • i • � . .i 1 a A • i � w Ok Olt 01 10 , AT e4k z Ap lb Pi "WIN. lot- 'Ir AI p ♦ f ♦ �``,47,AL • ti •- _ ` ` JF vo oI dk i r • - • ` ' i � j �:'�'•! .0 • • •. " + •1 _�L'• l �� i • .� . �. { � . • a 7 � � _ `� .., - ",► �•�1_- � •+=ram ,..t"=J_ - ' 4- . j�C � - �` ` •• •a �� ••' ! '•ofit ' ``, _ •. •l • i +� `� =1\ + :.. ` . , • `'�`.•i ,,, .,��11• r •.. i .• _ - ti fw �• t►�r� s _4� ii.. r�.. ,�_ '�'��n- _ i • �'� • �• �•f ; _ _ �r '�• - ► , ' i • , , T _ t _ _ -_"-- ,J•_: ticp►t�.y =1. y+mod -�r -. t'���`•'. .. , / Nd- 10 � V � • \ C`. , - _' � r - < ! : ,, - `� .' • J,. "--'�. - "^� �'-••ate • � _ ._` � • , �• 1 • r 4 rq� ~ . I �• •�r-' 1 tv _ �'4 `'•• ' �► ti \ v r,r, �„- •41- "% s• � ~ �►� � y � _ � i � ''�� l • � • � 'r �,'. ( -'ram `, - � - s _ �- - _ - � �..- r7�. L"� r • a =�_ ` � � , _ ` ^`� - mk Now No IA lk Alk ,I lop it ir IL PI ep 4AW4 Iri a�� `'fir` - v � _ � � � [[ • , - �J - - - " - • - _ �►'. ��,`�� ! A • `.4I� •„ �. • � •�, , h <••' ,ram •• _ - ♦�ti � ` __ • _- i r� ''., � .► - •r � 'i, .- , _�1 .tea~a • `• • ' • 1: _ .{(`�� % • 7 . � � - T ly_ �►' � t �. •f • ✓ .1 9 y �, •• a R. � ' . - / _ r_ -'•R'y' 'us - by `. r � i J* • Ci� • do T • r ' i 44 it �� I ••f'N,;• , � • � ' .� :;ice P '1 A ,..s.... •— .tom t' IR • It �;. � s -a, f � • Rl!!!M: 2 -W. F' r r » • }�. - L It Not • r • Alm to it Of 1110 or 41 40 jo 40 low Ylor a • -; `_ ,�•� , f � r' , ;' T L� � � r •� ram- � '. 1 •,• •� 1 � • . .� • :Y; y r• ,� • �;� r •1► r. • 1 • � ti . L • . :�y jj • � �► �'' � i .� ,' , � M '`, � T "ice .. � � ; •'K'' .-i,�•1`� • rj, r�•t � • • :♦'.� � •• ;�� •� rL ir/ •tom .. �' „.Z � '` "� - re ,� ! • �,. t. ti •1 �•• 16 IS, go ' • ' — IoL 44 WR f t'� r • •tom �r`�6'+ . L• • • � ., � � � _ ' • � ^ems- '!d. y `�. _ � � • ll t • r r/'ri�►.'�1 `i}�' •�!' ♦ j •� ` �' r L.�� . , . _ a� .,•w► .r1 �F a __ • ► _ •'w �_ •••' _• . 'y .,�• J' 1 .1 , % t '� , ` .�� - A� r� l. .1• Sr �'� '•, •rt(1 _ _ 'C'• _ , r- • . 4, rA10' - • : t •dlk�' - i♦ • 'i ' , � � ! ` � y_ � -♦ice ��+' /...- - ' ;. �'-.�• 1 - ^ �" �' ' - � .•i. �� ` �, � • 1l.I Vpp + I • �i i • t '�1rY d. 1 - •.. `"� . - t " ` `,fit `` X '. - _ - .{ ♦ - - -r •i..ly- ,I. � • •� - �. •r - ^� •+s ��` mow. _ Sl - � .' - - ,►. - .':!"w t� r a�l f4 2A IW lh 40 06 • • s N i. t •,. • - - - -- v • •� ' '� � L�:•.,. •c .� - - - � •' .1 _ , .�.. ••. ..�,' • - .r it "- r - y i `f �js ! . /+• i�• • � : � ' • 1; ".. ,bVOL- s 71 tb cp POA LA OIL 446 �• I f+ l l� I f t •` i 1 • . ' - � • � i •► . ` • •�ly!,.'a � �'^ ' '• �� � 'I �i• - w vp Leo. is • • !• •• r ••� f ��i�V' 4• y 1 - ZOO If �~- •• r fir` � � •t .t >„�.•'r / -- y '�.•' � E t' - I _ ~~ • �.e IWO ' Ilk S x pi� 1 '• mot 1 ` r^ WWI 4 Cr le N ME I TO 6" 1 Adlbk Lill Will = IMUCI 0011110 IN NAM 0 12141 AA I a 0 1 WATI 0 1 DAIMWW�m Pffi � q _ pvk-411 • • r' r • A• , ` • .40 �i� ► r 1 . ' .1 • -1 • OP IMP 'a lb jr-o "low IF •Spa U • . ♦ J �. . i. i f. • r • • V • • • i • 4. . 0 • Y ••iice��• ' � ; • � ' , � / � � �• • � . � •� !. � �!• •� , ' • • . • 1 , l ` • •I - � � � � �'. • •'� • � i\, • ► •y - j'1 , �i • . , � / .. • ; �• i -,. r • ice • • , - • ��•• •� - .4c • • - . f •Y ir .411 lo IL IF ow* of • '• y� ♦1' t '� y� �" � " � `• tit . • ! 10, It Ab 41 -A Ns lb Ja '; �C a \, •~��• •11 'ram" •• ♦►/1 � w • ` ! ~• �.I � ti ��. � •a. t � -- -AN t fl' . t•• • � , � • t • It , ,•ram: i 7 • , • ''� I• , /mil*• / _. - t - . • ' , _ _ .!, �^ • s`,a'` 00 — �! • i Jvl T � v !' 1 .tom �: '�i� �. 12• -0000 f_+ , � • � •� 4N , � ? .,r' • ter• ' � � " i ,{ � - '�' , ` � � �- � ` •! �/ o o o t•" / ♦ ij �,, • '/� !a • ' 1, �.• { Ol♦, ' - _ - �! ! • • , - �'� .. ,, �_. ' ice. �. _ ., w _ OP of I All* . — 'rf �� ► _ `�� ` I , '•'� ��,.. r1. • , r w • S `'� �I• - a ' ' \ •- - - ;, r • r, � t - I�R�A S ,,1 , \.1 r .. "w 'i- a� ( �1 J � � sj, 1 � •�'I 'L Of 464, •� ` 1Ir t. • 1 a� 4f �•� ref �` , , lo OP lap •�' {� , ! , <. �`' �.�•' _ ,i I � •� / .��f] fir'• It a t 41, o / 11 • �," +� 0 W__ IA 7 r . a. ' ,. 1 t• �. • r • f. Nk IF ,fir M i/ j f I t _ +�••� • '' • 7 '� �• ••'• • •�� ,/,•' , '• ;f ,.1 � •' t•r ',ti�� - -� ark - •} `�-• s Ilk r rt r • I Pl! IA: m w�-r` firr f r fA r w � . PiLeWaLL kA— b ROCK BLUFF C C �C C x SUBBALLAST BALLAST \ ROCK BLUFF A \\ i n \ Y \ \ BALLAST Y \ 7 \ \\ SUBBALLAST E FILL 0 D YI7 CL TRACK r /—DETAIL B j 10" DIA. ROCK SOCKETED PILE SUPPORT (TYP.) CL ROCK SOCKET 15'-0" (MAXIMUM) A 30'-0" (MINIMUM) PLAN SCALE: 3/8" = 1'-0" CL TRACK 30'-0" (MINIMU 15'-0" (MAXIMUM) I I SECTION A j SCALE: - I I CL ROCK SOCKET oil LARGE SIZED ROCK _/ EXISTING ROCK FACE ° (TYP.) NOTES 1 . 10" DIAMETER ROCK SOCKET HOLES WITH 5 FOOT OF RAIL EMBEDDED IN ROCK. 2. TOTAL LENGTH OF RAIL PILE IS ALWAYS 15 FEET. 3. BATTER RAIL PILE TOWARD TRACK 1/4" PER FOOT. p 4. CENTER RAIL PILE IN HOLE WITH BALL OF RAIL TOWARDS RIVER AND FILL HOLE WITH GROUT. 5. USE 115 LB. RAIL OR LARGER. 6. 0 USE 4000 PSI NON -SHRINK GROUT, DRY MIX IN HOLE. c 0 7. DUE TO VARYING WATER LEVEL ELEVATIONS, ADJUST HOLE/PILE o LOCATION TO KEEP HOLE DRY. LOCATION TO BE COORDINATED AND APPROVED BY SITE ENGINEER. c q 8. HOLES WILL BE INITIALLY MARKED BY THE SITE ENGINEER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN HOLE MARKS APPROPRIATELY DURING CONSTRUCTION. i a 9. CONTRACTOR SHALL DRILL HOLES IN A CONTINUOUS MANNER. SKIPPING OF HOLES WITHOUT ENGINEER'S APPROVAL IS NOT PERMITTED. 10. ALL DRILLED ROCK SOCKET HOLES SHALL BE STUFFED WITH il J RAIL AND GROUTED ON THE SAME DAY. ELEVATION SCALE: 3/8" — 1'—O CONSTRUCTION TOLERANCES: PILE ROCK SOCKET LOCATION: PARALLEL TO TRACK: ± 6" PERPENDICULAR TO TRACK: ± 18" PILE ROCK SOCKET DIMENSIONS: DIAMETER: ± 1 Y2" LENGTH: ± 3" RAIL LENGTH: ± 8" PILE BATTER: ± 1/8" PER FOOT FROM VERTICAL NEGATIVE BATTER ON PILES WILL BE CAUSE FOR REJECTION 2 �1 SOCKETED PILE 5 LB RAIL MIN CENTER THE RAIL IN THE HOLE. GROUT VOID AROUND THE RAIL TO TOP OF HOLE. CL 2" DIA. HANDLING HOLE 1/4 S 12 0 1 I R7 \ o \ ln CENTER THE RAIL IN THE HOLE. GROUT VOID AROUND THE RAIL TO TOP OF HOLE. RAIL PILE _ 2" DIA. HANDLING HOLE TRACK EMBANKMENT RIVER DETAIL B SCALE: 3" = 1'-O" AFE A51721 FILL TOP OF BEDROCK (VARIES) RAIL PILE _ DRILL HOLE DIA. x 5'-0" INTO BEDROCK s Z 142.5 1p ? ��, �e �, & Lost Cove 1" Z 147.9 PiLeWaLL kA— b ROCK BLUFF C C �C C x SUBBALLAST BALLAST \ ROCK BLUFF A \\ i n \ Y \ \ BALLAST Y \ 7 \ \\ SUBBALLAST E FILL 0 D YI7 CL TRACK r /—DETAIL B j 10" DIA. ROCK SOCKETED PILE SUPPORT (TYP.) CL ROCK SOCKET 15'-0" (MAXIMUM) A 30'-0" (MINIMUM) PLAN SCALE: 3/8" = 1'-0" CL TRACK 30'-0" (MINIMU 15'-0" (MAXIMUM) I I SECTION A j SCALE: - I I CL ROCK SOCKET oil LARGE SIZED ROCK _/ EXISTING ROCK FACE ° (TYP.) NOTES 1 . 10" DIAMETER ROCK SOCKET HOLES WITH 5 FOOT OF RAIL EMBEDDED IN ROCK. 2. TOTAL LENGTH OF RAIL PILE IS ALWAYS 15 FEET. 3. BATTER RAIL PILE TOWARD TRACK 1/4" PER FOOT. p 4. CENTER RAIL PILE IN HOLE WITH BALL OF RAIL TOWARDS RIVER AND FILL HOLE WITH GROUT. 5. USE 115 LB. RAIL OR LARGER. 6. 0 USE 4000 PSI NON -SHRINK GROUT, DRY MIX IN HOLE. c 0 7. DUE TO VARYING WATER LEVEL ELEVATIONS, ADJUST HOLE/PILE o LOCATION TO KEEP HOLE DRY. LOCATION TO BE COORDINATED AND APPROVED BY SITE ENGINEER. c q 8. HOLES WILL BE INITIALLY MARKED BY THE SITE ENGINEER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN HOLE MARKS APPROPRIATELY DURING CONSTRUCTION. i a 9. CONTRACTOR SHALL DRILL HOLES IN A CONTINUOUS MANNER. SKIPPING OF HOLES WITHOUT ENGINEER'S APPROVAL IS NOT PERMITTED. 10. ALL DRILLED ROCK SOCKET HOLES SHALL BE STUFFED WITH il J RAIL AND GROUTED ON THE SAME DAY. ELEVATION SCALE: 3/8" — 1'—O CONSTRUCTION TOLERANCES: PILE ROCK SOCKET LOCATION: PARALLEL TO TRACK: ± 6" PERPENDICULAR TO TRACK: ± 18" PILE ROCK SOCKET DIMENSIONS: DIAMETER: ± 1 Y2" LENGTH: ± 3" RAIL LENGTH: ± 8" PILE BATTER: ± 1/8" PER FOOT FROM VERTICAL NEGATIVE BATTER ON PILES WILL BE CAUSE FOR REJECTION 2 �1 SOCKETED PILE 5 LB RAIL MIN CENTER THE RAIL IN THE HOLE. GROUT VOID AROUND THE RAIL TO TOP OF HOLE. CL 2" DIA. HANDLING HOLE 1/4 S 12 0 1 I R7 \ o \ ln CENTER THE RAIL IN THE HOLE. GROUT VOID AROUND THE RAIL TO TOP OF HOLE. RAIL PILE _ 2" DIA. HANDLING HOLE TRACK EMBANKMENT RIVER DETAIL B SCALE: 3" = 1'-O" AFE A51721 FILL TOP OF BEDROCK (VARIES) RAIL PILE _ DRILL HOLE DIA. x 5'-0" INTO BEDROCK s Z 142.5 1p ? ��, �e �, & Lost Cove 1" Z 147.9 Supporting Information - NWP PCN CSXT Emergency Rebuild Post -Hurricane Helene MP Z 142.5 to MP Z 166.0, Mitchell and Yancey Counties, NC Attachment j Construction Plans - Rebuild Bridge and Temporary Work Bridge 3ndge Fiepla Ahl A'A vAh 0 5 Staging Area and Access INDEX OF DRAWINGS DRAWING NO. DESCRIPTION Z 147.90-C-01 THREE SPAN CAUSEWAY TITLE SHEET Z 147.90-C-02 THREE SPAN CAUSEWAY GENERAL NOTES Z 147.90-C-03 THREE SPAN CAUSEWAY SITE PLAN (1 OF 2) Z 147.90-C-04 THREE SPAN CAUSEWAY SITE PLAN (2 OF 2) Z 147.90-C-05 THREE SPAN CAUSEWAY GENERAL PLAN AND ELEVATION Z 147.90-C-06 THREE SPAN CAUSEWAY TYPICAL SECTIONS Z 147.90-C-07 THREE CAUSEWAY STEEL DETAILS Z 147.90-C-08 THREE SPAN CAUSEWAY CONSTUCTION PHASING CSXT CAUSEWAY AT MP Z 147.90 CROSSING NOLICHUCKY RIVER POPLAR, NC ACCESS FOR BRIDGE RECONSTRUCTION �S,() 197 0 \ \ P A hollow Poplor G SStO �i11 i ynlirhuck>` V�i—�—� �o BRIDGE AT MP Z 147.90 CAUSEWAY AT ! Poplar MP Z 147.90 i LATITUDE: 36'04'56.5" N LOCATION MAP LONGITUDE: 82'21'01.0" W SCALE: NTS AFE A51721 CONSTRUCTION NOTES CONTROL OF WORK: ALL WORK INVOLVED IN THE CONSTRUCTION OF THE RAILWAY STRUCTURE SHALL BE PERFORMED SATISFACTORY TO THE ENGINEER AND CSXT. ALL METHODS OF HANDLING WORK AFFECTING THE SAFETY OF RAIL OPERATIONS MUST BE APPROVED BY THE RAILWAY ENGINEER BEFORE PROCEEDING WITH THAT PORTION OF THE WORK. RAIL TRAFFIC SHALL AT ALL TIMES BE MAINTAINED AND PROTECTED. CONSTRUCTION REQUIREMENTS: ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT AREMA "MANUAL FOR RAILWAY ENGINEERING" AND THE SPECIFICATIONS FOR THIS CONTRACT. THE CONTRACTOR SHALL NOT INTERFERE WITH OR PERFORM ANY CONSTRUCTION ON OR NEAR OPERATING TRACKS WITHOUT THE RAILROAD'S PERMISSION. WHEN THE CONTRACTOR IS WORKING NEAR ANY TRACK, HE WILL BE REQUIRED TO HAVE A FLAGMAN FROM THE RAILROAD ON DUTY. DIMENSIONS SHALL NOT BE SCALED FROM THE CONTRACT PLANS FOR CONSTRUCTION PURPOSES. SCALES ARE SHOWN FOR INFORMATION ONLY. NO CONSTRUCTION JOINTS, EXCEPT THOSE SHOWN ON THE PLANS, WILL BE ALLOWED UNLESS APPROVED BY THE ENGINEER. n RAILROAD RESPONSIBILITY 1. BEFORE ORDERING ANY MATERIAL, THE RAILROAD SHALL MAKE A DETAILED FIELD INSPECTION OF THE SITE VERIFYING ALL PERTINENT DIMENSIONS AND ELEVATIONS AND LOCATION OF PROPOSED BRIDGE. ANY VARIATIONS IN DIMENSIONS OR ELEVATIONS FROM THOSE SHOWN ON THE PLANS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER. x 2. VERIFY THE LOCATION, RELOCATION, ABANDONMENT, AND/OR TEMPORARY SUPPORT OF ALL UTILITIES v AFFECTED BY THE CONSTRUCTION OF THE STRUCTURE AND EMBANKMENT AND COORDINATE THESE ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES, AGENCIES, AND/OR AUTHORITIES. n 3. APPLY FOR AND OBTAIN ANY CONSTRUCTION PERMITS NECESSARY TO PERFORM THE WORK. 4. RESTORE ALL AREAS THROUGHOUT THE LENGTH OF THE BRIDGE TO ORIGINAL CONDITION OR BETTER, AND = AS REQUIRED BY RELEVANT PERMITS. CONTRACTOR RESPONSIBILITY i 1. COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE RAILROAD. n r 2. BEFORE ORDERING ANY MATERIAL, THE CONTRACTOR SHALL MAKE A DETAILED FIELD INSPECTION OF THE Y SITE VERIFYING ALL PERTINENT DIMENSIONS AND ELEVATIONS AND LOCATION OF PROPOSED BRIDGE. ANY VARIATIONS IN DIMENSIONS OR ELEVATIONS FROM THOSE SHOWN ON THE PLANS SHALL BE REPORTED n IMMEDIATELY TO CSXT. Y 3. VERIFY THE LOCATION, RELOCATION, ABANDONMENT, AND/OR TEMPORARY SUPPORT OF ALL UTILITIES AFFECTED BY THE CONSTRUCTION OF THE STRUCTURE AND EMBANKMENT AND COORDINATE THESE ACTIVITIES 1 WITH THE APPROPRIATE UTILITY COMPANIES, AGENCIES, AND/OR AUTHORITIES. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE WHICH MIGHT OCCUR DUE TO CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE ANY AND ALL UTILITIES. n 4. APPLY FOR AND OBTAIN ANY CONSTRUCTION PERMITS NECESSARY TO PERFORM THE WORK. 5. PROVIDE THE RAILROAD WITH A DETAILED CONSTRUCTION PLAN DETAILING THE ACTIVITY, SCHEDULE AND PROCEDURE FOR EACH ASPECT OF THE WORK. CONSTRUCTION SHALL NOT BEGIN UNTIL THE CONSTRUCTION PLAN HAS BEEN APPROVED BY THE RAILROAD. 0 6. PROVIDE ALL TEMPORARY SHORING AND/OR BRACING AS REQUIRED TO SUPPORT AND PROTECT THE z EXISTING AND PROPOSED EMBANKMENTS AND BRIDGE ABUTMENTS AFFECTED BY THE WORK. PROVIDE THE n RAILROAD WITH DETAILS, DESIGN AND PROCEDURES FOR ALL TEMPORARY SHORING AND/OR BRACING. D 7. COORDINATE WITH TRACK CONTRACTOR ON INSTALLATION OF THE BALLAST, TIES, RAIL AND OTM FOR PROPOSED TRACK. c 8. PROVIDE AND REPLACE ALL FILL MATERIAL PER CSXT. rn 9. RESTORE ALL AREAS THROUGHOUT THE LENGTH OF THE BRIDGE TO ORIGINAL CONDITION OR BETTER, AND AS REQUIRED BY RELEVANT PERMITS. MATERIALS i n STRUCTURAL STEEL: 1. ALL STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO THE REQUIREMENTS OF ASTM A709, GRADE 50 OR 50W. HOWEVER, ENGINEER APPROVAL SHALL BE OBTAINED PRIOR TO USING GRADE 50W r STRUCTURAL STEEL AT A BRIDGE SITE WITH THE FOLLOWING CHARACTERISTICS: A. ENVIRONMENT: i. BRIDGES IN COASTAL REGIONS IN CLOSE PROXIMITY OR CONTACT WITH SEA WATERS. ii. INDUSTRIAL AREAS WHERE CONCENTRATED CHEMICAL FUMES MAY DRIFT DIRECTLY ONTO THE STRUCTURE. B. LOCATIONS: i. GRADE SEPARATIONS IN "TUNNEL -LIKE" CONDITIONS SUBJECTED TO SALT SPRAYING ii. LOW LEVEL WATER CROSSINGS: TEN FEET OR LESS OVER STAGNANT, SHELTERED WATER OR EIGHT FEET OR LESS OVER MOVING WATER MEASURED TO THE NORMAL POOL ELEVATION. Y I BOLTS 0 i 1. BOLTED CONNECTIONS SHALL BE MADE WITH 7/8" DIA. BOLTS, UNLESS NOTED OTHERWISE. BOLTS SHALL CONFORM TO ASTM F3125, GRADE A325, HIGH STRENGTH, TYPE 1 BOLTS WHEN USING STRUCTURAL STEEL CONFORMING TO ASTM A709 GRADE 50 T2 AND TYPE 3 BOLTS WHEN USING STRUCTURAL STEEL CONFORMING TO ASTM A709 GRADE 50W T2. ALL 7/8" DIA. BOLTS SHALL BE TIGHTENED TO A MINIMUM TENSION PER BOLT OF 39,000 LBS. 900 J 2. BOLTS TIGHTENED USING THE CALIBRATED WRENCH METHOD SHALL HAVE THE WRENCH CALIBRATED TO A MINIMUM OF 41,000 LBS. STRUCTURAL STEEL: STRUCTURAL STEEL PLATES AND SHAPES - ASTM A709 GR. 50/50W. HSS SHAPE - ASTM A500 GR. C OR ASTM A1065 GR. 50W. MISC. EMBEDDED STEEL SHAPES AND PLATES SHALL CONFORM TO ASTM A709 GRADE 36, OR GRADE 50. SHEAR STUDS SHALL BE LOW CARBON STEEL ASTM A108/A29 GRADE C1010 TO C1020. STRUCTURAL BOLTS: BOLTS SHALL BE 7/8" DIAMETER HIGH STRENGTH BOLTS, UNLESS NOTED OTHERWISE, CONFORMING TO ASTM F3125, GRADE A325. 7/8" DIA. BOLTS SHALL BE TIGHTENED TO A MINIMUM TENSION PER BOLT OF 39,000 LBS. THREADED RODS: THREADED RODS SHALL BE GALVANIZED AND CONFORM TO ASTM F1554, GRADE 105. CONCRETE: CONCRETE MUST HAVE A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI AT 28 DAYS IN ACCORDANCE WITH CSX STANDARD SPECIFICATIONS, SECTION 070105 - CONCRETE. CONCRETE WATER REPELLENT AND CURING COMPOUND: CONCRETE WATER REPELLENT AND CURING COMPOUND SHALL MEET THE REQUIREMENTS OF CSX STANDARD SPECIFICATIONS, SECTION 070530 - WATER REPELLENT. WATERPROOFING: WATERPROOFING SHALL CONFORM WITH CSX STANDARD SPECIFICATIONS, SECTION 070525 - BRIDGE WATERPROOFING. STRUCTURAL STEEL NOTES GENERAL: PRIOR TO FABRICATION, CONTRACTOR/FABRICATOR SHALL SUBMIT THE FOLLOWING FOR APPROVAL BY THE ENGINEER -OF -RECORD: 1. SHOP DRAWINGS INDICATING MATERIALS, SIZES, CONNECTIONS, ANCHORS, AND COATING. 2. PRODUCT DATA, INCLUDING MANUFACTURER'S CATALOG SHEETS ON PRE -MANUFACTURED ITEMS. FABRICATION: 1. FABRICATION OF ALL STEEL MEMBERS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AREMA MANUAL FOR RAILWAY ENGINEERING, CHAPTER 15, PART 3 - FABRICATION. 2. SHOP ASSEMBLY OF ALL STRUCTURAL STEEL IS REQUIRED TO ENSURE PROPER FIT AND ALIGNMENT OF THE STEEL MEMBERS. ALL MEMBERS SHALL BE MATCH MARKED WITH THE USE OF STEEL PUNCHES. 3. ALL STEEL MATERIAL THAT REQUIRES CUTTING SHALL BE CUT WITH EITHER A MECHANICALLY GUIDED BURNER OR A CUT-OFF SAW. AT NO TIME WILL FREEHAND FLAME CUTTING OR FREEHAND SAWING WITH A HANDHELD SAW OR MECHANICALLY OPERATED HANDHELD SAW BE ALLOWED. THE SURFACES SHALL NOT BE ROUGHER THAN ASME 846.1 SURFACE TEXTURE OF 1000. 4. PLUMB AND TRUE VERTICAL AND HORIZONTAL MEMBERS TO TOLERANCE OF +/- 1/8" IN 10 FT. 5. ROLLED BEAM MEMBERS SHALL BE FABRICATED WITH THE NATURAL CAMBER UP. DELIVERY, STORAGE, AND HANDLING: 1. TAG OR MARK MISCELLANEOUS STEEL (INCLUDING ANCHOR RODS, CONCRETE ANCHORS, SLEEVES, AND SHIM PLATES) FOR EASE OF IDENTIFICATION AT PROJECT SITE. 2. CONTRACTOR IS RESPONSIBLE FOR SAFELY TRANSPORTING, STORING, AND HANDLING ALL MATERIALS. ALL MATERIALS SHALL BE PROTECTED FROM DAMAGE DURING ALL PHASES OF CONSTRUCTION. STEEL BRIDGE ERECTION: BRIDGE ERECTION SHALL COMPLY WITH AREMA CHAPTER 15, PART: 4 "ERECTION". THE CONTRACTOR SHALL SUBMIT THREE (3) COPIES OF CONSTRUCTION SEQUENCE AND PROCEDURES FOR APPROVAL TO CSXT. STRUCTURAL STEEL: 1. FABRICATE DETAILS AND CONNECTION ASSEMBLIES IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS, WITH PROJECTING CORNERS CLIPPED AND FILLER PIECES WELDED FLUSH. 2. FIT WORK TOGETHER IN FABRICATION SHOP AND DELIVER COMPLETE OR IN PARTS, READY TO BE SET IN PLACE OR ASSEMBLED IN THE FIELD. 3. ALL MATERIAL SHALL BE STRAIGHT AND FREE FROM SHARP KINKS OR BENDS. ANY STEEL MATERIAL EXHIBITING SUCH DEFICIENCIES SHALL BE CAUSE FOR THE REJECTION OF THE MATERIAL. STRAIGHTENING OF THE MATERIAL SHALL NOT BE ACCEPTABLE. BOLTS: 1. ANY BOLTS THAT REQUIRE REMOVAL AFTER BEING TIGHTENED TO THEIR PROOF LOAD SHALL BE DISCARDED AND A NEW BOLT INSTALLED. 2. ALL SHOP BOLT HOLES SHALL BE SUB -DRILLED AND REAMED OR DRILLED FROM THE SOLID. AT NO TIME ARE HOLES TO BE SUB -PUNCHED AND REAMED OR PUNCHED FULL SIZE. ALL HOLES SHALL BE 1/16" LARGER THAN THE SPECIFIED BOLT SIZE UNLESS NOTED OTHERWISE. 3. ALL BOLT HOLES THAT REQUIRE FIELD DRILLING SHALL BE DRILLED FROM THE SOLID. AT NO TIME ARE HOLES TO BE TORCH CUT OR PRODUCED BY OTHER MEANS AND METHODS. OVERSIZING HOLES FOR FIELD FIT UP SHALL BE DONE BY REAMING USING A TAPERED SHANK, FLUTED REAMER. REAMER DIAMETER SHALL BE 1/16" LARGER THAN THE SPECIFIED BOLT DIAMETER. HOLES, NEW OR ENLARGING, MADE BY USE OF CUTTING TORCH IS CAUSE FOR REJECTION OF ENTIRE MEMBER. WELDING: 1. WELDING SHALL CONFORM TO THE CURRENT AMERICAN WELDING SOCIETY (AWS) BRIDGE WELDING CODE D1.5 AND AREMA MANUAL FOR RAILWAY ENGINEERING. ALL WELD METAL SHALL MEET OR EXCEED THE BASE METAL IN STRENGTH AND CORROSION RESISTANCE. 2. WELDS ARE TO BE SHOP WELDS UNLESS NOTED OTHERWISE. WELD SIZES SHALL BE AS SHOWN ON THE DRAWINGS. 3. ALL WELDING SHALL BE COMPLETED USING SHIELDED METAL ARC WELDING (SMAW) OR FLUX -CORED ARC WELDING (FCAW) PROCESSES. 4. SMAW WELDING PROCESS SHALL USE E7018 LOW HYDROGEN ELECTRODES CONFORMING TO THE REQUIREMENTS OF AWS D1.5, SECTION 5, PART A5.5, "SPECIFICATIONS FOR LOW ALLOY STEEL COVERED ARC WELDING ELECTRODES." 5. FCAW WELDING PROCESS SHALL USE E71T-8-H16 SELF SHIELDED ELECTRODES CONFORMING TO THE REQUIREMENTS OF AWS A5.29, "SPECIFICATION FOR LOW -ALLOY STEEL ELECTRODES FOR FLUX CORED ARC WELDING." 6. THERE SHALL BE THOROUGH FUSION BETWEEN WELD METAL AND BASE METAL AND BETWEEN SUCCESSIVE PASSES OF THE WELD. ALL CRATERS SHALL BE FILLED TO THE FULL CROSS SECTION OF THE WELD. 7. QUALIFY WELDING OPERATORS IN ACCORDANCE WITH AWS D1.5. QUALIFICATION TESTS SHALL BE RUN BY A RECOGNIZED TESTING LABORATORY APPROVED BY THE ENGINEER -OF -RECORD AT CONTRACTOR'S EXPENSE. PRIOR TO WELDING, EACH WELDER SHALL BE QUALIFIED IN ACCORDANCE WITH AWS REQUIREMENTS DURING A PERIOD OF ONE (1) YEAR PRIOR TO WORK ON THE BRIDGE. THE FABRICATOR SHALL FURNISH THE ENGINEER -OF -RECORD WITH AN AWS CERTIFICATE FOR EACH WELDER, COVERING THEIR ABILITY TO MAKE A COMPLETE AND SATISFACTORY WELD OF EACH KIND TO BE USED ON THE PROJECT. 8. ARC AND GAS WELDING SHALL CONFORM TO THE REQUIREMENTS OF THE AWS AND AISC SPECIFICATIONS. SURFACES TO BE WELDED SHALL BE FREE FROM LOOSE SCALE, RUST, GREASE, PAINT, AND OTHER FOREIGN MATERIAL, EXCEPT MILL SCALE WHICH WILL WITHSTAND VIGOROUS WIRE BRUSHING MAY REMAIN. NO WELDING SHALL BE DONE WHEN BASE METAL TEMPERATURE IS LOWER THAN O'F. 9. GRIND EXPOSED EDGES OF WELDS TO 1/8" MINIMUM RADIUS. GRIND BURRS, JAGGED EDGES, AND SURFACE DEFECTS SMOOTH. 10.PREPARE WELDS AND ADJACENT AREAS SO THERE IS: A. NO UNDERCUTTING OR REVERSE RIDGES ON WELD BEAD. B. NO WELD SPATTER ON OR ADJACENT TO WELD OR OTHER AREA TO BE PAINTED OR COATED. C. NO SHARP PEAKS OR RIDGES ALONG WELD BEAD. D. GRIND EMBEDDED PIECES OF ELECTRODE OR WIRE FLUSH WITH ADJACENT SURFACE OF WELD BEAD. 11.ON-SITE PROTECTION AND USE OF ELECTRODE HEATING UNITS SHALL CONFORM TO THE CURRENT AWS D1.5 SPECIFICATIONS. COATING STRUCTURAL STEEL AND FINISHES 1. ALL SURFACE PREPARATION AND SHOP COATINGS SHALL BE COMPLETED IN ACCORDANCE WITH CSX STANDARD SPECIFICATIONS, SECTION 070245 - STRUCTURAL COATING. 2. WALKWAY ASSEMBLIES, HANDRAIL POSTS, HANDRAIL, BOLTS, NUTS AND THREADED RODS SHALL BE HOT -DIPPED GALVANIZED IN ACCORDANCE WITH CSX STANDARD SPECIFICATIONS, SECTION 070245 - STRUCTURAL COATING. 3. FIELD TOUCH UP GALVANIZING THAT IS DAMAGED DURING HANDLING OR INSTALLATION USING A ZINC BASED PAI NT. MICROPILE PILE DRIVING NOTES PILES SHALL BE INSTALLED PER XXX AFE A51721 CONTROL POINTS - CAUSEWAY BOX PIER LOCATION CONTROL POINT NORTHING EASTING ELEVATION DESCRIPTION NORTH 863791.436 1011156.970 STAKE IN FIELD PIER 1 (SOUTH EAST 863791.018 1011157.540 STAKE IN FIELD APPROACH) SOUTH 863790.447 1011157.123 STAKE IN FIELD WEST 863790.865 1011156.552 STAKE IN FIELD NORTH 863850.726 1011147.771 STAKE IN FIELD PIER 2 EAST 863850.309 1011148.341 STAKE IN FIELD SOUTH 863849.738 1011147.924 STAKE IN FIELD WEST 863850.155 1011147.353 STAKE IN FIELD NORTH 863883.336 1011142.711 STAKE IN FIELD EAST 863882.919 1011143.282 STAKE IN FIELD PIER 3 SOUTH 863882.348 1011142.865 STAKE IN FIELD WEST 863882.765 1011142.294 STAKE IN FIELD NORTH 863942.627 1011133.512 STAKE IN FIELD PIER 4 (NORTH EAST 863942.209 1011134.083 STAKE IN FIELD APPROACH) SOUTH 863941.639 1011133,666 STAKE IN FIELD WEST 863942.056 1011133.095 STAKE IN FIELD MICROPILE LOCATIONS - CAUSEWAY LOCATION PILE NORTHING EASTING ELEVATION DESCRIPTION 1 8637+90.18 1011152.118 STAKE IN FIELD PIER 1 2 863791.706 1011161.975 STAKE IN FIELD 3 8638+49.47 1011142.919 STAKE IN FIELD PIER 2 4 863850.997 1011152.776 STAKE IN FIELD PIER 3 5 8638+82.08 1011137.859 STAKE IN FIELD 6 863883.607 1011147.717 STAKE IN FIELD 7 8639+41.37 1011128.661 STAKE IN FIELD PIER 4 8 863942.897 1011138.518 STAKE IN FIELD SURVEY CONTROL POINTS - CAUSEWAY CONTROL POINT NORTHING EASTING ELEVATION DESCRIPTION 31051 863882.842 1011142.788 1971.736 PAINT ON ROCK 31052 863849.532 1011147,956 1971.916 PAINT ON ROCK V i n 0 c MICROPILE E- N/E POINT- 3 i a U it S z J CL MICROPILE BOX PIER MICROPILE j NORTH I - Q_Ir9 _-_-___-_-_ -_-------------- ___________ 9.��5 _ --ri - - -�-- 1 •. --ri - --t� II - II o l p II I yI o II o I II II JI j I II I 0, 0 O 1 0 I � I -- ---- ' �=l, o y o o li o II II " ,I=� IL latsllr �FiF�=lj=i I 1 I O, O II III o l o II I II k II I I I I I I I I I I II ' II I I p 'I�FIO'P=ok'o'lj--o�====�_0 10 JI�I G II II IIG Io II1 ro1+41+�=f II II IIG II o, II�+I�OI''I�� 10 II _LII I I II II I__k_ I I I -4 I I II II I I I-4A I II WEST J \- EAST \ -MICROPILE -SOUTH N/E POINT BOX PIER POINT KEY MAP SCALE: N.T.S. PIER 4 SHOWN. OTHER PIERS SIMILAR i 4 (NORTH APPROACH) PILE 7 PILE 8 PIER 3 PILE 5 -PILE 6 31051 PIER 2 -PILE 4 PILE 3 PIER 1 (SOUTH APPROACH) - PILE 1 T.de 90% PLAN SET - NOT FOR FABRICATION 31052 d -CSX THREE SPAN CAUSEWAY FOR BRIDGE AT MP Z 147.90 PILE 2 0 15 30 SCALE IN FEET LEGEND _ 20' WIDE CONSTRUCTION ACCESS _ CAUSEWAY C� ENGINEERING DEPARTMENT JACKSONVILLE, FLORIDA REVISIONS CAUSEWAY @ MP Z 147.90 CROSSING NOLICHUCKY RIVER THREE SPAN CAUSEWAY SITE PLAN (2 OF 2) MITCHELL COUNTY POPLAR, NC ZONE SOUTHERN WEST SUBDIVISION: BLUE RIDGE HDR MDSU21 SCALE: SHOWN VAL. SEC. DRAWING N0. CARVER 9989 CARVER ROAD SUITE 2'10 1 DATE: 1 1 /6/2024 513-98CINCI-". OH1045242 513-984-7500 DESIGN: NBH V- Z 147.90-C-04 DRAWN: RGD FILE: Z 147.90-C-SP02.dgn CHECKED: XXX TO ELKTON BACKWALL LAGGING (TIMBER CRANE MAT (TYP. ® EACH END PIER 153'-0" (CAUSEWAY OUT TO 60'-0" (OUT TO OUT BEAM SPAN F BEAM SPAN WITH PADEYE LIFTING LUGS TO SPARTANBURG BOX PIER I I ��l11111111111111111111111111111111111111�1111111111111111111111111 M& Ion �Iiui�iiai ii aflmiil ,{ � low woe 11111111 1111Rik �. Ong Ills Nos WA &.3c diffilmic-261 "Hi1111111111111111111111111111111111111111111111111111fi11111ii111 Y (TYP.) n � TIMBER DECK WITH TIMBER CURBS Y HP14x102 BACKWALL PILE (AT EACH END PIER) (TYP.) J x n 15'-0" I z N D I z I � I n J I PLAN — CAUSEWAY SCALE: 3/8" = 1'-0" SINGLE SPAN SHOWN FOR CLARITY, SEE KEY PLAN FOR REQUIRED SPANS 153'-0" (CAUSEWAY OUT TO OUT) 60'-0" (OUT TO OUT BEAM SPAN) 30'-0" BEAM SPAN WITH PADEYE LIFTING LUGS (TIMBER DECK NOT SHOWN FOR CLARITY) BEAM SPAN WITH PADEYE LIFTING LUGS LTHROUGH BOLT (TYP.) 15' -0" 0 0 rn BOX PIER (TYP.) o I � I i _ a i b 8" DIA. x 3'-0" SCH. 20 BLOCKOUT " 1 %4" DIA. x 5'-0" LONG, FULLY THREADED, DYWIDAG ROD (TYP.) APPROXIMATE EXISTING GROUND LINE PIPE (FOR MICRQPILE) (TYP.) n i i ELEVATION — CAUSEWAY O SCALE: 3/8" = 1'-0" n SINGLE SPAN SHOWN FOR CLARITY, SEE KEY PLAN FOR REQUIRED SPANS R TIMBER CRIBBING AND BACKWALL PILES/LAGGING NOT SHOWN 153'-0" (CAUSEWAY OUT TO OUT) 60'-0" 33'-0" 60'-0" CPAN 1 'PAN 9 'PAN _� KEY PLAN — CAUSEWAY SCALE: 1/8" = 1'-0" NOTE 1. SEE SITE PLAN FOR MICRQPILE LOCATION TABLE. —BOX PIER (TYP.) CL BOX PIER PADEYE LIFTING LUG SPACING I I I 0 0 a i � r-----t-1-----� AFE A51721 5'-0" TIMBER DECK TIE THROUGH BOLT (TYP.)-] HP14x102 (BEAM SPAN) W36x135 x 16'-0" j (FLOORBEAM) I Y FIELD DRILLED f HOLE SPACING n x v q v n Z D 1 n iJ Y j W36x135 x 6'-0" (ST FL'Y2x5 x 1'-0" D PLATE) CONNECTION 2-W36x135 x 15'-0" (BOX PIER SIDE) n W36x135 x 4'-111/2" (BOX PIER END) N X D jj WELD NUT FOR DYWID/ f) ROD TO BOTTOM FLANC (TYP. ALL FOUR CORNER' TIMBER CF C J a D U _ a_w� I �� x�o I O} � mom 7 1 - I n n 5'-0" TIMBER SPIKE (TYP.) TIMBER CURB (TYP.) ---[- O I O L7/8" DIA. H.S. BOLT (TYP.) I (TYP.) j 5/16 5'-9%„ 4'-5/B„ 60. 5-9%„ I 1 6'-0" 8'-0„ 3'-93/e" 1'-93/6„ 2 -5y/6„ 7,-6�/6„ 2,-59/6„ 1'-9316„ C 1 Y4" DIA. x 5'-0" LONG, 3 FULLY THREADED, i DYWIDAG ROD (TYP.) a U TYPICAL SECTION - CAUSEWAY SCALE: 1" = 1'-0" L4x4xY2 x 2'-8" (CONNECTION ANGLE) (TYP.) I I I _1_1I1-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_I_ - ------------ -_1_- TIMBER DECK TIE TIMBER CURB (TYP.) TIMBER SPIKE (TYP.) THROUGH BOLT (TYP.)7 1„} BUTT JOINT N I HP14x102 (BEAM SPANS (TYP.3 - W36x135 x 16'-0" (FLOORBEAM) I N W36x135 x 6'-0" (STRINGER) O O 7/8" DIA. H.S. BOLT (TYP.) 0 I m o N rtl/2x5 x -0" (CONNECTION PLATE) (TYP.) 1 n n x 5'-0" LONG, READIED, ROD (TYP.) m V. W36x135 x 15'-0" (BOX PIER SIDE) 11 n ______________R._____T_______________ 10 1 V n � p I 0I1 IQ 1 I �--L4x4xY2 x 2'-8" O i (CONNECTION i -- 8" DIA. x 3'-0' pp 1 i ANGLE) (TYP.)li SCH. 20 BLOCKOUT n PIPE (FOR MICROPILE) I I II 01______________________1_________ _____J 0 I 1 m I N WELD NUT FOR DYWIDAG W36x135 x 4'-11Y2" ROD TO BOTTOM FLANGE (BOX PIER END) TIMBER CRIBBING (TYP. ALL FOUR CORNERS) 1 Y4" DIA. x 5'-0" LONG, 5'-0" FULLY THR DE, DYWIDAG ROD (TYP•) END VIEW SCALE: 1 " = 1'-0" 8" DIA. x 3'-0" SCH. 20 BLOCKOUT PIPE (FOR MICROPILE) (TYP.) NOTES 11 1 u L44 xx3'4 x 4'-1 1 YO" GUIDE ANGLE 11 1 u ( ) (TYP.) 1. OVERSIZED 11/e" DIA. HOLES FOR ALL 7 /e" DIA. H.S. ANCHOR ii-E---------- BOLTS. W36x135 x 4'-111/2" (BOX PIER END) (TYP.) 2. 1-Y4" DIA. HOLES FOR 11/4" DIA. DYWIDAG RODS. 1 I II W36x135 x 6'-0" (STRINGER) 11 11 1 I 3. TWO 2" DIA. LIFTING HOLES, PLACE AS SHOWN, FOR ALL 1 O ii ©I I ROLLED STEEL COMPONENTS. AFE A51721 it i li W36x135 x 16'-0" (FLOORBEAM) w m i 10 11 p I j1 I 1 11 11 II II II II i 11 II II _i II p �1 p II j1 II 1 -__©i l I I __r_====___= I p �I p I j1 I 1 11 II II II II II j II II II it I p 1 p i i II II i II II p I i p- p I II II 11 1 1 O 11 O 11 I 1 11 I I I it I 11 I � 1 11 it 1 11 1 11 11 I 11 �/e" DIA. H.S. BOLT (TYP.) ii i l I I� __ i_ =i'--- --'L-' - j1 -- 11 I is-- -___ ---_______________________________________________ -___~ __ -__--- --- -=-fir ----P------ --- 1r Yr 7-- _1_-_ 2'-6Y8" 9'-113/4„ j I I 15'-0" SECTION A SCALE: 1" = 1'-0', Iwo O O , W36x135 x 15'-0" (BOX PIER SIDE) 2'-6Y8" J 4) D Y jj 9'-1113i6" (SPAN 1 AND SPAN 3) 6'-6" (SPAN 2) 10'-O3/1s" (SPAN 1 AND SPAN 3) 6'-6" (SPAN 2) 11/2" DIA. x 1'-21/2" LONG SCH. 40 PIPE (TYP.) 5" ! 15 EQ. SPA. = 59'-0" (SPAN 1 AND SPAN 3) 4-HP14x102 60'-0" (SPAN 1 AND SPAN 3) 33'-0" (SPAN 2) 4 EQ. SPA. = 40'-0" (SPAN 1 AND SPAN 2 EQ. SPA. = 20'-0" (SPAN 2) —2 STIFFENER PLATES (TYP.) CL 11/2" DIA. SCH. 40 PIPE FOR THROUGH BOLT (TYP.) 8 EQ. SPA. = 32'-0" (SPAN 2) 60'-0" AND 33'-0" BEAM SPANS SCALE: 1" = 1'-0" 16'-0" 6'-0" 4'-0" 6'-0" PADEYE LIFTING LUG SPACING 0 0 0 0 0 0 b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o W36x135 5'-9'/6" i 4'-5/s" 5'-9�/s" FIELD DRILLED HOLE I I SPACING 93/16„ 73/4„ 8„ 1 ,-99/ s„ 8„ 7�4„ 6�/s» 6�/8» 7�4,. 8„ 1 ,-99/ s„ 8„ 734„ 9�/ s„ 4„ 4„ j I I I I I I PADEYE LIFTING LUG (TYP.)i. I I I I I I i I i I O I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I I j I I I I I I I I i I I 2" DIA. LIFTING HOLE (PLACE AS SHOWN) (TYP.) I I 1 Ye" DIA. HOLE FOR I 7/8" DIA. H.S. BOLT (TYP.) I I I I I I I j I I I I I I I I I I I I I j I I I I I I I I I I I I I I I I I I I I I j j I I I I I I I I j j I I I I I I I I I j I I I I I I j I I I I I I I I I I I I j j I I I I niza i zs I I I I W36x135 ■welel771 "-A I■ SCALE: 1" = 1'-0" 5'-0" 5'-0" 5'-0" PADEYE LIFTING LUG r t t SPACING O j O W36x135 ---------------- -_-_ o-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_o_-_-_o-_-_-� _-_-_ — _-_ — _ 13/4" DIA. HOLE FOR 11/4" DIA. DYWIDAG ROD (TYP. EACH END) �3"I 14'-6" 43" 13/4" DIA. HOLE SPACING 1 /6" DIA. HOLE FOR 7/8" DIA. H.S. BOLT (TYP.) 0 2Y2" 8/2„ 8„ 1,-9/2„ 8„ 6'-101/2„ PADEYE LIFTING LUG (TYP.)no I 8" 1'-916" 8" 81//" 2y2„ 4„ 3�6» -------------------------------- I n n i----------------------------------------------------------------------------------^a ro 2" DIA. LIFTING HOLE -- (PLACE AS SHOWN) (TYP.) --------------------------------------------------------------------- - - - - - - - - ------------------------------------� i I o I 11/16" DIA. HOLE FOR 2/8" DIA. H.S. BOLT (TYP.) n 10 D �_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_'_-_ _ -_ _. j 00 j ----------------------------------------------------------------------------------------------------------------------� 0 0 o I W36x135 9„ 13'-61/2" 9» rn WELD NUT FOR DYWIDAG ROD TO BOTTOM FLANGE (TYP.) 0 BOX PIER SIDE i SCALE: 1" = 1'-0" a U J 90% PLAN SET - NOT FOR (TYP.) 4'-11" STIFFENER PADEYE LIFTING LUG (TYP.) SPACING 2 STIFFENER I `PLATES (TYP.) 6" ! 3" 6'-0" W36x135 O O 0 0 O O O O O O O O 2" . , 1'-3" . 8" . 1'-10" , 8" , 1'-3" 2" DIA. LIFTING HOLE (PLACE AS SHOWN) (TYP.) I I I I I I I I I I I I I I I I I I I I JCL 1 /s" DIA. HOLE FOR 7/e" DIA. H.S. BOLT (TYP.) I I I I I I I I I I I I I I W36x135 STRINGER SCALE: 1" = 1'-O" I 1 (TYP.) i �'s I I 60� j HP14x102 (TYP.) j j 4'-5" j 3" I I CL 11Y2" DIA. SCH. 40 PIPE FOR THROUGH BOLT (TYP.) L4x4x3/4 x 4'-111/2" 7"-{ GUIDE ANGLE R3/4 SCALE: 11/2" = 1'-0" 1 Y2" CLIP (TYP.) STIFFENER PLATE �2„ SCALE: 1 Y2" = 1'-0" 1 j j j 11/16" DIA. HOLE FOR 7/e" DIA. H.S. BOLT (TYP.) I I ! I I I 2�/2„ I 21/2„ I I I I I I I M - 0 /2 0 I I I I I I W36035 CONNECTION PLATE SCALE: 11/2" = 1'-O" 4'-11 /2" 2'-0" 1'-O" PADEYE LIFTING LUG SPACING - - —0------------------------------- - 53/4" W36035 4'-0" N 3 1/2„ 3'-51/2„ 3 /2„ ro-CPADEYE LIFTING LUG (TYP.) n COPE (TYP.) I I ---------- ----------------------------i% " DIA. LIFTING 2 HOLE PLACE = AS SHOWN) (TYP.)— --------------------------------Q N CL 1'/6" DIA. j Lna II HOLE FOR 7/s" DIA. I AFE A51721 H.S.OLT (T -------- --- I I L W36x135 REVISIONS 21/2„ 4'-6Y2„ i 2Y2» BOX PIER END SCALE: 1" = 1'-0" q 11/16" DIA. HOLE FOR 21/2" 7/8" DIA. H.S. BOLT (TYP.) 2Y��L4x4xY2 N I 00 -1l p o I i it � I i ' o I I i N CONNECTION ANGLE SCALE: 1" = 1'-O" TRENCH SHIELD (TYP.) PHASE 1 1. INSTALL TRENCH SHIELD FOR ALL PIERS IN WATER. CONTRACTOR SHALL SUBMIT FOR FOR REVIEW PRIOR TO INSTALLATION. PHASE 3 1. PLACE BOX PIER ON TIMBER CRIBBING. 2. LEVEL BOX PIER WITH DYWIDAGS. 3. FILL BOX PIER AND TIMBER CRIBBING WITH 5000 PSI CONCRETE. 14'-0" 7x9 x 14'-0" TIMBER TIE CONNECTION PLATE (BOLT OR SCREW TOGETHER AS • SHOWN) (TYP. EACH CORNER) TIMBER CRIBBING SCALE: /2" = 1'-0" STACK AS REQUIRED BY FIELD CONDITIONS 3'-0" MAX HEIGHT FOR EACH BOX PIER LOCATION —7x9 x 3'-10" TIMBER TIE (TYP. EACH END) x a SANDBAG (TYP.) PHASE 2 1. BUILD TIMBER CRIBBING, AS REQUIRED, FOR EACH BOX PIER LOCATION. 2. INSTALL TIMBER CRIBBING AT EACH BOX PIER LOCATION, LEVEL WITH CLEAN SAND. 3. PLACE SAND AND SANDBAGS AROUND EACH TIMBER CRIBBING BOX FOR STABILIZATION. 4. PUMP WATER OUT OF TIMBER CRIBBING BOX AND CLEAN ROCK BED. MICROPILE� I PHASE 4 1. USE 8" DIA. x 3'-0" SCH. 20 BLOCKOUT PIPES TO LOCATE, DRILL AND INSTALL TWO MICROPILES AT EACH BOX PIER. STRING PHASE 5 1. INSTALL STRINGERS AND FLOORBEAMS AT EACH BOX PIER. 2. INSTALL BOTH BEAM SPANS PER CAUSEWAY SPAN. 3. INSTALL TIMBER DECK. AFE A51721 ;PAN (TYP.) CSXT BRIDGE AT MP Z 147.90 CROSSING NOLICHUCKY RIVER POPLAR, NC BRIDGE RECONSTRUCTION CD Of 0 x N N W N !n J J W _H Z O d Of of Ld U !n O U Q U !n E 0 a Ld- Poplar rn v 0 F c� i 0 rn a N r OO o AFE A51721 0 -O HDR ENGINEERING, INC. / 9999CARVER ROAD SUITE 210 ENGINEERING DEPARTMENT CINCINNATI, OHIO 45242 O 513-984-7500 �� JACKSONVILLE, FLORIDA C O o APPROVED FOR REVISIONS BRIDGE © MP Z KY RIVER CROSSING j CSX TRANSPORTATION INC. NOLICHUCKY RIVER 01 BY Y TITLE SHEET 3 HDR ENGINEERING INC. MITCHELL COUNTY POPLAR, NC i (CINCINNATI, OH) NABIL B. HAMADANI ZONE SOUTHERN WEST SUBDIVISION: BLUE RIDGE BY. SCALE: AS SHOWN w ENGINEER'S NAME DATE: 11/8/2024 VAL. SEC. DRAWING No. z DATE- 11/8/2024 DESIGN: XXX V— Z 147.90-01 60% PLAN SET- NOT FOR CONSTRUCTION FILE: Z 147.90 GT01.dgn CDRAWN: xxx HECKED: XXX W 1 t ' BRIDGE AT MP Z 147.90 LATITUDE: 36°04'S6.5" N LOCATION MAP LONGITUDE: 82°21'01.0" W SCALE: NTS TO ERWIN, TN (DECREASING MILEPOST) FFBW STA. XXX+XX.XX 44'-0" (� BRG. TO q BRG.) CAST -IN -PLACE SPAN 1 WINGWALL li w - BWP1 � Y p U M (31 Cj-_-_-_-_-_-_-_- CAST- I N- P LACE j BACKWALL rz CAST -IN -PLACE ABUTMENT 0 WINGWALL 93'-0" BRG. TO (� BRG. SPAN 2 BWP2 PIER 1 EXISTING TPG REHABILITATION SPAN (TYP.) 93'-0" BRG. TO q BRG. SPAN 3 BWP3 PIER 2 CAST -IN -PLACE CAP WITH CHEEKWALLS (TYP.) 528'-6" (FFBW TO FFBW) 93'-0" 44'-0" 44'-0" (CL BRG. TO � BRG.) (CL BRG. TO (� BRG.) BRG. TO CL SPAN 4 SPAN 5 SPAN 6 BWP4 BWP5 BWP6 J PIER 3 %y PIER 4 PIER 5 PIER FOUNDATION MUD MAT FRAME (TYP.) NEW HAMMERHEAD PIER WITH CHEEKWALLS AND MICROPILE FOUNDATION PLAN CSX STD. 2843 (MODIFIED) BEAM SPAN (TYP.) SCALE: 1" = 20'-0" D TO SPARTANBURG, SC (INCREASING MILEPOST) FFBW STA. XXX+XX.XX 44'-0" 44'-0" (rE BRG. TO BRG.) BRG. TO q BRG.) SPAN 7 SPAN 8 = c� CAST-1 PLACE WIN ALL w BWP9 BWP7 wCD v ` O Y � Q CAST -IN -PLACE J BACKWALL BWP8 PIER 6 PIER ABUTMENT 8 NEW HAMMERHEAD PIER WITH CHEEKWALLS AND MCROPILE FOUNDATION CAST -IN -PLACE CSX STANDARD 2843 WINGWALL SLOPE PROTECTION (TYP.) FFBW FFBW STA. XXX+XX.XX STA. XXX+XX.XX z 528'-6" (FFBW TO FFBW) i CAST -IN -PLACE BACKWALL 46'-01/2" (NEW DPG) 95'-0" (EXISTING TPG) 95'-0" (EXISTING TPG) 95'-0" (EXISTING TPG) 46'-OY2" (NEW DPG) 46'-01/2" (NEW DPG) 46'-01/2" (NEW DPG) 46'-OY2" (NEW DPG) SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7 SPAN 8 CAST -IN -PLACE PROPOSED T/R 4" GAP CSX STD. SLOPE BACKWALL A HANDRAIL (TYP.) EXISTING TPG REHABILITATION SPAN (TYP.) PROTECTION (TYP.) r 2000 (TYP.)2000 D - FXD. EXp, EXP. FXD. EXP. FXD. EXP. FXD. EXP. � w EXP. FXD, EXP. FXD. EXP. FXD. FXD. LJ — — Z r-'-----�i----- ----------------------------------------------- ------- -- 'i -----------------�Ld -------- ------- ------------------ -- ------------------------ - ------ — r---`i Z p i r--- _ — — — — — / ^� a _ Q PROPOSED — -CAST-IN-PLACE CAP -) \_--- — --� ----- r----- a � �— �y LOW CHORD ��� WITH CHEEKWALLS TYP. —N� ORDINARY HIGH WATER �� �� ��� w ABUTMENT 0 PIER 1 ELEV. 1987.65 PIER 2 PIER 3 PIER 4 PIER 5 PIER 6 PIER 7 ABUTMENT 8 w x 11950 APPROX. EXISTING GROUND LINE 1950 NEW HAMMERHEAD PIER o CSX STD. 2843 (MODIFIED) BEAM SPAN (TYP.) WITH CHEEKWALLS AND NEW HAMMERHEAD PIER MICROPILE FOUNDATION PIER FOUNDATION MUD MAT FRAME (TYP.) WTH ji Y AND *ELEVATION SCALE PROVIDED FOR VISUAL PURPOSES ONLY MICROPI{ EEKWALLS FOUNDATION D AND IS NOT INTENDED FOR USE DURING CONSTRUCTION. ELEVATION v WORK POINTS - BRIDGE CONTROL POINT NORTHING EASTING ELEVATION DESCRIPTION BWP1 865884.879 1009937.222 1986.330 CL BRIDGE @ FF NEW BACKWALL @ ABUTMENT 0 BWP2 865848.572 1009968.128 1985.089 CL BRIDGE @ CL SPAN JOINT @ EXISTING PIER 1 BWP3 865775.848 1010030.033 1985.365 CL BRIDGE @ CL SPAN JOINT @ EXISTING PIER 2 CL BRIDGE @ CL SPAN BWC4 865703.128 1010091.935 1985.898 JOINT @ EXISTING PIER 3 CL BRIDGE @ CL SPAN BWP5 865630.407 1010153.838 1986.397 JOINT @ EXISTING PIER 4 BWP6 865594.253 1010184.613 __ CL BRIDGE @ CL SPAN JOINT @ NEW PIER 5 BWP7 865558.096 1010215.391 1986.852 CL BRIDGE @ CL SPAN JOINT @ EXISTING PIER 6 CL BRIDGE @ CL SPAN BWP8 865521.923 1010246.183 __ JOINT @ NEW PIER 7 CL BRIDGE @ FF NEW BWP9 865484.959 1010276.369 1987.010 BACKWALL @ ABUTMENT 8 SCALE: 1" = 20'-0" SKEW NOT SHOWN FOR CLARITY AFE A51721 18'-0" I CL BRIDGE = I I CL TRACK j9'-0" 9'-0" I i I 16'-4" (OUT TO OUT DECK) I I J cn 8,_2„ 8._2. Q Of i N HANDRAIL (TYP.) �AREMA CLEARANCE ENVELOPE I w N O � O V) w RECONSTRUCTED BACKWALL N 3 m 0 a '' Of MODIFIED SOLE PLATE (TYP.) TOP OF DECK o MODIFIED MASONRY PLATE (TYP.) • I' • • II • STD.(MODIFIED)2843STEEL BEAM N RECONSTRUCTED WINGWALL •lu' 'ii' SPAN o o MODIFIED SHOCK PAD (TYP.) • u • • II • • it 1" THICK STEEL DECK (TYP.) I Q 11 u o - • II • - • II • - N Ld J Q TOP OF RECONSTRUCTED CAP ,e 0 I TOP OF x 119/e" 119/e" EXISTING CAP 1'-11 1W" 1'-1 1 Y8" 1'-11 Y8" 1'-111/ RECONSTRUCTED CAP w 9'-75/8„ c rn v 0 !n H 0 rn EXISTING ABUTMENT a N 00 ABUTMENT O AFE A51721 o 1'-0" ENGINEERING DEPARTMENT (LOOKING AT FRONTT FACE, BACKSTATION) AT FRONT rj� o ` JACKSONVILLE, FLORIDA L c REVISIONS BRIDGE © MP Z 147.90 CROSSING NOLICHUCKY RIVER Y TYPICAL SECTION (1 OF 7) 3 MITCHELL COUNTY POPLAR, NC i j ZONE SOUTHERN WEST SUBDIVISION: BLUE RIDGE SCALE: AS SHOWN VAL. SEC. DRAWING NO. W RVER RIO4524 TE 210 ���%. CARVEERINO,INC. DATE: 1 1 /8/2024 z w 60% PLAN SET- NOT FOR CONSTRUCTION CINCINNATI, OHI045242 CINCIN 513-984-7500 DESIGN: XXX V—Z 147.90-09 DRAWN: XXX Ell FILE: Z 147.90-TS01.dgn CHECKED: XXX 4) c rn v y n n t nl0 O BRIDGE ELEVATIONS PIER/ABUT SPAN STATION T/R ELEVATIONS A B C D ABUT 0 1 1 +00.00 1993.30 1992.63 1991.13 1988.79 1988.33 1 1+44.00 1993.49 1992.82 1991.32 1988.98 1987.09 PIER 1 2 1 +46.99 1993.50 1992.83 1991.32 1987.65 1987.09 2 2+39.99 1993.77 1993.10 1991.60 1987.93 1987.37 PIER 2 3 2+42.49 1993.78 1993.11 1991.60 1987.93 1987.37 PIER 3 3 3+35.49 1994.30 1993.63 1992.13 1988.46 1987.90 4 3+37.99 1994.31 1993.65 1992.13 1988.46 1987.90 4 4+30.99 1994.80 1994.13 1992.63 1988.96 1988.40 PIER 4 5 4+33.98 1994.81 1994.15 1992.63 1990.29 1988.40 5 4+77.98 1995.03 1994.36 1992.86 1990.52 1990.06 PIER 5 6 4+81.46 1995.04 1994.38 1992.86 1990.52 1990.06 6 5+25.46 1995.25 1994.59 1993.09 1990.74 1990.28 PIER 6 7 5+28.94 1995.26 1994.59 1993.09 1990.74 1990.28 PIER 7 7 5+72.94 1995.33 1994.67 1993.17 1990.82 1990.37 8 5+76.47 1995.34 1994.67 1993.17 1990.82 1990.37 ABUT 8 8 6+20.47 1995.41 1994.75 1993.25 1990.90 1990.44 TOP OF TIE TOP OF DECK PROPOSED T/R ELEV. A"ELEV. "B" �;. - I I I I I I I I PROPOSED COMPONENTS - SPAN 1 ABUT 0, SPAN 5 PIER 5 & SPANS 6-8 NAME HEIGHT RAIL 8" TIE 7" BALLAST 11" STEEL DECK 1" GIRDER 2'-3 1 /8" BEARING 5 1/2" TOTAL 4'-11 5/8" PROPOSED COMPONENTS - SPANS 2-4 TIMBER DECK NAME HEIGHT RAIL 8" TIE 7" BALLAST 6" TIMBER DECK 6" STRINGER 11 3/4" FLOORBEAM 2'-1 1/2" TPG FLANGE TO FLOORBEAM FLANGE 5 13/16" BEARING 6 3/4" TOTAL 6'-4 13/16" TOP OF BEARING ELEV. "C" PROPOSED COMPONENTS - SPAN 1 PIER 1 & SPAN 5 PIER 4 NAME HEIGHT RAIL 8" TIE 7" BALLAST 11" STEEL DECK 1" GIRDER 2'-3 1 /8" GRILLAGE 1'-5 3/16" BEARING 5 1/2" TOTAL 6'-4 13/16" PROPOSED COMPONENTS - SPANS 2-4 STEEL DECK NAME HEIGHT RAIL 8" TIE 7" BALLAST 11" STEEL DECK 1" STRINGER 11 3/4" FLOORBEAM 2'-1 1/2" TPG FLANGE TO FLOORBEAM FLANGE 5 13/16" BEARING 6 3/4" TOTAL 6'-4 13/16" TOP OF CAP ELEV. "D" - - -- -- -- - - - - - - - - - - - - - - - - - - - - - - - - -- _:--------ti I I I I I I ELEVATIONS DIAGRAM (1 OF 2� SCALE: N.T.S. ELEVATIONS DIAGRAM (2 OF 2) SCALE: N.T.S. DPOSED T/R AFE A51721 TO ERWIN, TN (DECREASING MILEPOST) V ABUTMENT 0 TROL POINT BWP1 Ci0CJ - PIER 1 CONTROL POINT BWP2 MICRO -PILE LOCATIONS LOCATION MICRO -PILE NORTHING EASTING PIER 5 Pi 865604.447 1010184.305 P2 865600.503 1010183.638 P3 865596.559 1010182.971 P4 865592.615 1010182.304 P5 865588.671 1010181.636 P6 865584.727 1010180.969 P7 865603.780 1010188.249 P8 865599.836 1010187.582 P9 865595.892 1010186.915 P10 865591.948 1010186.248 P 1 1 865588.004 1010185.580 P12 865584.060 1010184.913 PIER 7 P13 865532.080 1010245.973 P14 865528.143 1010245.264 P15 865524.206 1010244.560 P16 865520.269 1010243.854 P17 865516.332 1010243.147 P18 865512.394 1010242.440 P19 865531.373 1010249.911 P20 865527.436 1010249.204 P 21 865523.499 1010248.497 P22 865519.562 1010247.791 P23 865515.625 1010247.084 P24 865511.688 1010246.378 PIER 2 CONTROL POINT BWP3 -------------------- TO SPARTANBURG, SC FFBW ABUTMENT 8 (INCREASING MILEPOST) CONTROL POINT BWP9 PIER 3 PIER 4 PIER 6 CONTROL POINT BWP4 CONTROL POINT BWPS CONTROL POINT BWP7 w U Y � U � Q 0] If ----------------------------------------------- -_-_-_-_-_---_-_--___-_-_-_-_-_- -,_ -_- J-_HAMMERHEAI� '-__ --------_`�'CiPIER FOUNDTION MUD MAT FRAME (TYP.) HAMMERHEAD PIER 5 PIER 7 CONTROL POINT BWP6 CONTROL POINT BWP8 c MUD MAT FRAME PIER 5 FOUNDATION DETAIL SCALE: /4" = 1'-0" NOTES 1. SEE PIER FOUNDATION MUD MAT FRAME SHEET FOR MUD MAT FRAME DETAILS. 2. SEE GENERAL PLAN AND ELEVATION SHEET FOR WORK POINTS - BRIDGE TABLE. FOUNDATION LAYOUT SCALE: 1" = 20'-0" MUD MAT FRAME PIER 7 FOUNDATION DETAIL SCALE: 1/4" = 1'-O" AFE A51721