Loading...
HomeMy WebLinkAboutNCS000554_Fact sheet binder_20241106 DEQ / DEMLR FACT SHEET FOR NPDES INDUSTRIAL INDIVIDUAL STORMWATER PERMIT DEVELOPMENT Basic Information for Permit Issuance and Renewals: Permit Writer/Date Brianna Young 10/21/2024 Permit Number NCS000554 Owner/Facility Name Duke Energy Carolinas,LLC/Buck Combustion Turbine Combined Cycle Station SIC(NAICS)Code/Category 4911 (221112)/Electric power generation(fossil fuel as Basin Name/Sub-basin number Yadkin Pee-Dee/03-07-04 Receiving Stream/HUC Yadkin River(including upper portion of High Rock Lake below normal operating level)/030401030105 Stream Classification/Stream Segment WS-V/ 12- 108.5 Is the stream impaired on 303 d list]? See Section 2 below Any TMDLs? No Any threatened and/or endangered species? Yes; See Section 2 below Any compliance concerns? See Section 2 below Any permit mods since lastpermit? See Section 1 below New expiration date 11/30/2029 Comments on Draft Permit? See Section 6 below Section 1. Facility Activities and Process: The Buck Combined Turbine Cycle Station(CTCC) is a natural gas fired electric generation station that began operation in 2011 and generates 620 megawatts of power. This facility is located on the same property as the former Buck Steam Station coal-fired power plant (demolition completed in 2019; site remediation completed in April 2021; stormwater permit NCS000578). The CTCC is approximately 2,000 feet south and upland of the former Buck Steam Station and northwest of the ash settling basin. Off-spec coal ash that cannot be processed in the onsite STAR unit is hauled off-site to Roanoke Cement for processing. A public hearing was held with the 2018 permit issuance for NCS000554 in conjunction with NCS000578. The site currently has two (2)primary combustion turbine units, one secondary heat recovery steam generator unit, and a 230 W and 110 W regional substation facility. The site also contains a switchyard used by Energy Delivery as a standalone switchyard. It is not used by Buck CTCC. The drainage area has outfalls SW001 and SW002. The switchyard was previously the primary switchyard for the demolished coal-fired steam station. Per the permit renewal application, since the last permit renewal, the old Buck Steam Station Powerhouse and associated facilities have been demolished(removal of outfalls SW005, SW007, SWO11, SW015, SW016, SW023, SW025, SW027, SW032, SW034, SW035, SW038, SW039, SW058, SW065, SW066, SW067, SW069, SW070, SW071, and SW072). The area in the vicinity of the old steam station powerhouse has been cleaned up and industrial activity in those areas has been eliminated (removal or plugging of outfalls SW003, SW048, SW056, SW078, SW079, SW080 and SW081). The area in the vicinity of the old steam station powerhouse, railroad and access road has been cleaned up and industrial activity in those areas have been eliminated(removal of outfalls SW073 and SW077). Page 1 of 12 The permit renewal application states Duke Energy wishes to rescind stormwater permit NCS000578 and move the remaining outfalls into stormwater permit NCS000554. Duke Energy also has NPDES wastewater permit NC0004774 for the site. Outfall SW001: Outfall SW001 (CC) Drainage area consists of two (2) gas turbine buildings, two (2)heat recovery steam buildings, stream turbine building, water treatment building, auxiliary boiler building, cooling tower, two (2) chiller buildings, administration/control/warehouse building, raw water treatment facility, large transformers, power distribution center, emergency diesel generator, three (3) large water tanks, ammonia AST, bulk fuel oil storage containers, tanker unloading stations, oil storage building, switchyard, clarifier, overground natural gas pipelines, and a retention pond. Discharge is from the pond and manually controlled. Potential pollutants include: mineral oil, lube oil, diesel, kerosene, gasoline, ammonia, raw water treatment chemicals (sodium hypochlorite, ferric sulfate, caustic), and cooling tower treatment chemicals (sodium hypochlorite, microbiocide). Outfall SW002: Drainage area consists of a switchyard. Per the previous permit application: Units 5 and 6 switchyard, a small paved area beneath Units 8 and 9 precipitators, and open drains to a 15,000-gallon-capacity oil trap tank. Significant materials included mineral oil. Outfall SW003: Drainage area consists of a trailer,parking areas, well house, and ash haul road. Outfall SW004: Drainage area consists of the ash haul road. Outfall SW075: Drainage area consists of laydown yard, trailers, construction storage yard warehouse, construction material laydown, outage laydown, ash haul road, and a retention pond. Discharge is from the pond and manually controlled. Potential pollutants include: mineral oil, ammonia, and raw water chemical treatment. Additional outfalls: Outfalls 001 and 002 belong to a standalone switchyard for Units 5 and 6 and were part of the former coal plant(NCS000578). Per a conversation with DEMLR staff Jerry Eplin and Mike Lawyer(on 4/10/2024), permit coverage is not needed as the switchyard is not connected to the gas-powered plant. Outfalls SW003, SW048, SW056, SW078, and SW079 have been removed or plugged and no longer discharge. Outfalls SW005, SW007, SWO11, SW015, SW016, SW023, SW025, SW027, SW032, SW034, SW035, SW038, SW039, SW058, SW065, SW066, SW067, SW069, SW070, SW071, and SW072 have been removed and no longer discharge. Outfalls SW073 and SW077 no longer have industrial activity in their drainage areas. SW080 and SW081 were not marked on renewal application site map. These outfalls were previously identified as not permitted in last permit. Page 2 of 12 Why Industrial Sites with Stormwater are Subject to a Permit: Federal NPDES regulations define stormwater discharge associated with industrial activity in 40 CFR §122.26 (b)(14) as: "the discharge from any conveyance that is used for collecting and conveying storm water and that is directly related to manufacturing,processing or raw materials storage areas at an industrial plant. The term does not include discharges from facilities or activities excluded from the NPDES program under this part 122. For the categories of industries identified in this section, the term includes, but is not limited to, storm water [sic] discharges from industrial plant yards; immediate access roads and rail lines used or traveled by carriers of raw materials, manufactured products, waste material, or byproducts used or created by the facility; material handling sites; refuse sites; sites used for the application or disposal of process waste waters (as defined at part 401 of this chapter); sites used for the storage and maintenance of material handling equipment; sites used for residual treatment, storage, or disposal; shipping and receiving areas; manufacturing buildings; storage areas (including tank farms) for raw materials, and intermediate and final products; and areas where industrial activity has taken place in the past and significant materials remain and are exposed to storm water. For the purposes of this paragraph, material handling activities include storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product, byproduct or waste product. The term excludes areas located on plant lands separate from the plant's industrial activities, such as office buildings and accompanying parking lots as long as the drainage from the excluded areas is not mixed with storm water [sic] drained from the above described areas." Section 2. Monitoring Information and Compliance History: • October 2018 to March 2024, benchmarks exceeded for: o SW001: No benchmark exceedances o SW075: TSS 5x, Silver Ix, Copper 6x, Lead Ix, Zinc 2x, Mercury 5x o SW002: No monitoring data provided(new outfall) o SW003: Outfall has been removed; no monitoring data provided o SW048: Outfall has been removed; no monitoring data provided o SW056: Outfall has been removed; no monitoring data provided o SW073: No longer contains industrial activity; no monitoring data provided o SW077: No longer contains industrial activity; no monitoring data provided o SW078: Outfall has been removed; no monitoring data provided o SW079: Outfall has been removed; no monitoring data provided • Per letter dated 5/30/2019, outfall SW001 of NCS000578 was in Tier 3 status for zinc • Per letter dated 7/22/2020, outfalls SW002 and SW077 of NCS000578 were in Tier 3 status for copper Page 3 of 12 303(d) listing: ADKIN RIVER(including upper portion of High Rock 12-(108.5)bi WS-V 369. FW Acres (Lake below normal operating level) 1318 From mouth of Grants Creek to Buck Steam Statio PARAMETER i IR CATEGORY CRITERIA STATUS REASON FOR RATING 303D YEAR Turbidity(50 NTU,AL,FW miles) F57JExoeeding Criteria 1 1 2013 PCB Fish Tissue Advisory{Advisory, FC,NC} 0 Exceedin Criteria DHHS Fish Consumption Advisory 241d ADKIN RIVER(including upper portion of High Rock 12-(108.5)b2 WS-V 3,078.5 FW Acres Lake below normal operating level) 13315 From Buck Steam Plant to a line across High Rack Lake from the downstream side of mouth of Crane reek to the downstream side of mouth of Swearing Creek PARAMETER IR CATEGORY CRITERIA STATUS REASON FOR RATING 303D YEAR PCB Fish Tissue Advisory(Advisory, FC,NC] Fs7kxoeeding Criteria 6HHS Fish Consumption Advisory I 2414 YADKIN RIVER (including upper portion of High Rock 12-(108.5)b3 WS-V 735.9 FiNAcres Lake below normal operating level) 13355 From Buck Steam Plant to Swearing Creek Arm of High Rack Lake PARAMETER IR CATEGORY CRITERIA STATUS REASON FOR RATING 303D YEAR pH (9.D,AL,FW) 0 Exceed i ng Criteria 2D18 Chlorophyll a(40 µdl,AL,NC) 0 Exceedin Criteria 2D48 PCB Fish Tissue Advisory(Advisory,FC,NC) 0 Exceedin Criteria 6HHS Fish Consumption Advisory71 241d Threatened/Endangered Species: Threatened/endangered species in the nearby vicinity of the facility include the Bald Eagle (Haliaeetus Leucocephalus; NC status: T; Federal status: T) and Carolina Birdfood-trefoil (Acmispon helleri; NC status: T). Section 3. Proposed Monitoring for Stormwater Discharges: The Division considered potential pollutants from past and present industrial activities (coal-fired electric generation, natural gas electric generation, and ash removal) and data was submitted for October 2018 to March 2024. Quantitative sampling included SW001 and SWO02: pH, TSS, O&G, total nitrogen, total ammonia, copper, mercury, selenium, zinc, and PCBs; SW075: pH, TSS, antimony, arsenic, boron, beryllium, cadmium, chromium, copper, nickel, lead, mercury, selenium, silver, thallium, and zinc. Parameters are based on potential pollutants in the drainage area, sampling results, and in some cases, dependent upon future activities (e.g., ash removal through the drainage area). Below is a table of the proposed monitoring for each outfall at the Buck Combined Cycle site. Page 4 of 12 Outfall SW001 Quarterly monitoring Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness (TSS) indicator. Quarterly monitoring pH BASIS: Pollutant indicator Quarterly monitoring Total Rainfall BASIS: Discharge potential indicator Quarterly monitoring Non-Polar Oil &Grease BASIS: Standard monitoring parameter; Potential pollutant from lubricants; Method 1664 SGT-HEM targets petroleum-based O&G Quarterly monitoring Monthly Oil Usage BASIS: Standard monitoring parameter; Potential pollutant from drainage area Quarterly monitoring COD BASIS: Discharge potential indicator Quarterly monitoring BASIS: Potential pollutant from drainage area; Draft permit allows an exemption if the company provides information on: ammonia spill prevention procedures; how stormwater will be evaluated for ammonia Ammonia Nitrogen contamination prior to release; and how the facility will handle or dispose of any contaminated stormwater. DEQ must approve the exemption in writing if measures are adequate to minimize risk of discharge. However, if a significant spill (reportable quantity) of ammonia occurs, the exemption expires. Quarterly monitoring BASIS: Potential pollutant from drainage area; Draft permit allows an exemption if the company provides information on: ammonia spill prevention procedures; how stormwater will be evaluated for ammonia Total Nitrogen contamination prior to release; and how the facility will handle or dispose of any contaminated stormwater. DEQ must approve the exemption in writing if measures are adequate to minimize risk of discharge. However, if a significant spill (reportable quantity) of ammonia occurs, the exemption expires. Page 5 of 12 Outfall SWO02 Quarterly monitoring Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness (TSS) indicator. Quarterly monitoring pH BASIS: Pollutant indicator Quarterly monitoring Total Rainfall BASIS: Discharge potential indicator Quarterly monitoring Non-Polar Oil &Grease BASIS: Standard monitoring parameter; Potential pollutant from lubricants; Method 1664 SGT-HEM targets petroleum-based O&G Quarterly monitoring Monthly Oil Usage BASIS: Standard monitoring parameter; Potential pollutant from drainage area Page 6 of 12 Outfalls SW003, SW004, and SW075 Quarterly monitoring Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness (TSS) indicator. These outfalls may be impacted by hauling coal ash from the ash pond. Quarterly monitoring H BASIS: Pollutant indicator and important to interpreting toxicity potential p of metals. Quarterly monitoring Total Rainfall BASIS: Discharge potential indicator Quarterly monitoring Non-Polar Oil &Grease BASIS: Standard monitoring parameter; Potential pollutant from lubricants; Method 1664 SGT-HEM targets petroleum-based O&G Quarterly monitoring Monthly Oil Usage BASIS: Standard monitoring parameter; Potential pollutant from drainage area Quarterly monitoring Total Antimony BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Arsenic BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Beryllium BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Boron BASIS: Coal combustion waste (CCW) constituent/coal tracer. Quarterly monitoring Total Cadmium BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Chromium BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Copper BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Lead BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Mercury BASIS: Coal combustion waste (CCW) constituents. Page 7 of 12 Outfalls SW003, SW004, and SW075 (cont.) Quarterly monitoring Total Nickel BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Selenium BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Silver BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Thallium BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Zinc BASIS: Coal combustion waste (CCW) constituents. Quarterly monitoring Total Hardness BASIS: Monitoring for hardness dependent metals is required Stormwater Benchmarks and Tiered Response: Rather than limits,North Carolina NPDES Stormwater permits contain benchmark concentrations. Stormwater benchmarks are numerical action levels for stormwater monitoring. Benchmarks are not effluent limits, and benchmark exceedances are not permit violations. Benchmarks provide facilities a tool for assessing the significance of pollutants in stormwater discharges and the effectiveness of best management practices (BMPs). Benchmark concentrations are intended as guidelines for the facility's development and implementation of the Stormwater Pollution Prevention Plan(SWPPP). Benchmark exceedances require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater BMPs in a tiered program. The permit establishes a tiered approach to specify actions the permittee must take in response to analytical results above benchmark concentrations. The tiered structure of the permit provides the permittee and DEMLR wide flexibility to address issues that may arise with one or more parameters and/or outfalls. Metals benchmarks are calculated to mimic acute water quality standards and with the guidance of DWR. NC DWR follows established federal procedures for calculating acute standards when developing the benchmarks. Just like the acute standards, metals benchmarks normally reflect one half of the calculated Final Acute Value (the "1/2 FAV"). In most cases, translation into total recoverable values is based on an assumed hardness of 25 mg/L and a total suspended solids (TSS) concentration of 10 mg/L. Acute standards protect aquatic life from negative impacts of short-term exposure to higher levels of chemicals where the discharge enters a waterbody. The Stormwater Permitting Program applies this approach because of the ephemeral nature of rainfall events. The Division may evaluate results to determine if a smaller suite of parameters for some outfalls is adequate to characterize potential pollution or BMP effectiveness. For example, one or more metals or other parameters may serve as an adequate tracer for the presence of ash pollution during disturbance or ash removal in specific drainage areas at this site. For parameters that do not have a stormwater Page 8 of 12 benchmark, the Division may develop a benchmark value if appropriate toxicity data become available or if rising trends in concentrations suggest a persistent source. A summary of the benchmarks in the draft permit, and their basis, is below: Parameter Benchmark Basis Total Suspended 100 mg/L National Urban Runoff Program(NURP) Study, 1983 Solids TSS H 6 s.u. —9 s.u. NC Water Quality Standard(Range) Non-Polar Oil & Review of other state's daily maximum benchmark Grease 15 mg/L concentration for this more targeted O&G;NC WQS that EPA Method 1664 does not allow oil sheen in waters (SGT-HEM) COD 120 mg/L BPJ; Generally found at levels 4x BOD5 in domestic wastewaters Total Nitrogen 30 mg/L TKN +Nitrate+Nitrite Benchmarks (Expressed in mg/L of N Ammonia Nitrogen At 7.5 s.u. pH and summer(26°C) temperature from (Summer) 5.6 mg/L Wasteload Allocation document for the coastal plain region worst-case scenario Ammonia Nitrogen At 7.5 s.u. pH and winter(14°C) temperature from (Winter) 15 mg/L Wasteload Allocation document for the coastal plain region worst-case scenario Antimony Total 340 /L Acute Aquatic Criterion, 1/2 FAV Arsenic Total 340 /L Acute Aquatic Criterion, 1/2 FAV Beryllium Total 65 /L Acute Aquatic Criterion, 1/2 FAV Boron 34,000 µg/L CCW/Coal constituent;Narrative National Recommended Water Quality Criterion Cadmium Total 3 /L Acute Aquatic Criterion, '/2 FAV 1/2 FAV; Based on (Cr III+Cr VI) acute thresholds and Chromium(Total) 905 µg/L assumption that industrial activities here are not a source of hexavalent chromium Copper Total 10 /L Acute Aquatic Criterion, 1/2 FAV Lead Total 75 /L Acute Aquatic Criterion, 1/2 FAV Mercury (Total) 12 ng/L Chronic 02B standard Nickel Total 335 /L Acute Aquatic Criterion, 1/2 FAV Selenium(Total) 5 µg/L 1/2 FAV,NC-specific, based on 1986 Study on Se impacts in NC Silver Total 0.3 /L Acute Aquatic Criterion, 1/2 FAV Thallium Total 2,000 /L Based on EPA Safe Drinking Water Act MCL Zinc Total 126 /L Acute Aquatic Criterion, 1/2 FAV Stormwater Pollution Prevention Plan: The proposed permit conditions reflect the EPA and NC's pollution prevention approach to stormwater permitting. The Division's maintains that implementation of Best Management Practices (BMPs) and traditional stormwater management practices that control the source of pollutants meets the definition of Best Available Technology (BAT) and Best Conventional Pollutant Control Technology(BCT). The permit conditions are not numeric effluent limitations but are designed to be flexible requirements for implementing site-specific plans to minimize and control Page 9 of 12 pollutants in stormwater discharges associated with the industrial activity. Title 40 Code of Federal Regulations (CFR) §122.44(k)(2) authorizes the use of BMPs in lieu of numeric effluent limitations in NPDES permits when the agency finds numeric effluent limitations to be infeasible. The agency may also impose BMP requirements which are "reasonably necessary" to carry out the purposes of the Act under the authority of 40 CFR 122.44(k)(3). The conditions proposed in this draft permit are included under the authority of both of these regulatory provisions. In essence, the pollution prevention and BMP requirements operate as limitations on effluent discharges that reflect the application of BAT/BCT. Mercury Monitoring Requirements: The proposed permit requires mercury to be measured in stormwater samples by EPA Method 1631E, which can detect levels as low as 0.5 ng/l. This requirement is consistent with federal rule-making that requires NPDES permittees to monitor discharges with sufficiently sensitive test procedures approved under 40 CFR §136. Modifications to 40 CFR §122.44(i) require a method that has a minimum level (ML) at or below the effluent limit (not applicable here), or the lowest minimum level (ML) of EPA approved analytical methods for the measured parameter. Based on results, Method 1631E will be required to quantify levels in these discharges. NC DEMLR understands that this method is more costly and requires a more intensive sampling protocol than most other parameters. Flexibility in Tier Responses: Tier Two actions provide an opportunity for the permittee to propose an alternative monitoring plan for approval by the Region: • Alternatively, in lieu of steps 2 and 3, the permittee may, after two consecutive exceedances, exercise the option of contacting the DEMLR Regional Engineer as provided below in Tier Three. The Regional Engineer may direct the response actions on the part of the permittee as provided in Tier Three, including reduced or additional sampling parameters or frequency. • If pursuing the alternative above after two consecutive exceedances, the permittee may propose an alternative monitoring plan for approval by the Regional Engineer. The permit therefore allows the permittee to petition the Regional Office for monitoring changes sooner than Tier Three (upon any four benchmark exceedances) and gives guidance on one option to take. For example, the permittee may request that mercury only be monitored semi-annually under the tiers, or that only parameters over the benchmark be monitored more frequently. In this way, changes to the monitoring scheme for any outfall could be handled outside of a permit modification. Other Proposed Requirements: • It is standard for Stormwater Pollution Prevention Plan(SWPPP)requirements to include an annual certification that stormwater outfalls have been evaluated for the presence of non- stormwater discharges, and if any are identified, how those discharges are permitted or otherwise authorized. • Requirement to submit a request for permit modification if the facility identifies or creates any new outfalls, removes outfalls, or alters any drainage area that changes potential pollutants. • The Division expects the permittee to apply best professional judgment and consider the safety of its personnel in fulfilling sampling obligations under the permit. • Federal regulations require electronic submittal of all discharge monitoring reports (DMRs). If a state does not establish a system to receive such submittals, then permittees must submit DMRs electronically to the EPA. • Quarterly QualitativeNisual Monitoring to assure regular observation of outfalls throughout year. Page 10 of 12 Section 4. Changes from previous permit to draft: • Regulatory citations added • Monitoring increased from semi-annually to quarterly for all parameters (qualitative and quantitative) • "No discharge" clarifications made • Feasibility study requirement removed per updated stormwater program requirements • Annual online SWPPP certification requirement removed per updated stormwater program requirements • eDMR requirement updated • Boilerplate language moved into body of the permit; boilerplate no longer attached • Outfall-specific monitoring been implemented to reflect industrial activity and potential pollutants specific to each discharge area • Language on coal ash has been added throughout Part B as coal ash hauling occurs onsite o Language pulled from NCS000578 • Monitoring for total copper removed from SW001 as this is not a potential pollutant of concern at the facility o Included in the pervious permit as receiving waters were identified as impaired for copper and there was a potential wastewater contribution from a previously unidentified ash basin toe drain connection. These are no longer concerns. • Monitoring for COD added for SW001 due to the presence of chemicals stored onsite • Outfalls SW002, SW003, and SWO04 added based on information provided during the permit renewal process • Monitoring for Outfall SW075 added o Outfall is from NCS000578 and being added to NCS000554 per permittee's request o NCS000578 will be rescinded upon issuance of NCS000554 • Benchmarks updated for parameters per guidance from DWR Standards group on stormwater benchmarks Section 5. Changes from draft to final: • None Section 6. Discussions with the Facility and Regional Office: • Initial contact with facility: 1/3/2024 • Initial contact with Regional Office: 1/3/2024 • Draft sent to CO peer review: 5/22/2024 • Draft sent to Regional Office: 6/26/2024 • Final permit sent for supervisor signature: 10/25/2024 Page 11 of 12 Section 7. Comments received on draft permit: • Joyce Dishmon (Duke Energy; via email 7/22/2024): Duke Energy respectfully submits comments on the draft NPDES Permit NCSOOOS54 received on June 26, 2024. An updated Site Map is attached. Please update the site map in the permit file. • Ray Whitner (PWS; via email 7/25/2024): I appreciate the opportunity to review the subject draft NPDES permit and have included my response below in bold to satisfy the new paperless standards. I concur with issuance of the above permit as I have no appreciable expertise in implementation of the Clean Water Act requirements and have minimal understanding of the information provided. As a result, I have no basis for opposing the permit. • Jerry Eplin (DEMLR MRO; via email 10/9/2024): I reviewed the NCS000554 draft permit and saw no issues with it. Page 12 of 12 musbury Post Publisher's Affidavit of Publication STATE OF NORTH CAROLINA Ho.1046704 ROWAN COUNTY NORTH CAROLIHA ENVIROMENT Before the undersigned, a NotaryPublic of said county and COMMISSION IN ENT TO ISSUE CDMMISSiOH INTENT t0 ISSUE state, duly commissioned, qualified, and authorized by law to administer oaths, personally appeared JCHN CARR,who HPOES STORMWATER DISCHARGE being first duly sworn, deposes and says that he is PUB- PERMITS LISHER of the SALISBURY POST,published,issued and en- The North Carolina Environmen- tered as second class mail in the city of Salisbury,in Rowan tal Management Commission County, North Carolina, that he is authorized to make this water dschargeoses to pe mi(s io the affidavit and sworn statement,that the notice or other legal person(s) listed below. Public advertisement, a true copy of which was attached hereto, comment or objection to the draft permits is invited. Written com- was published in the SALISBURY POST, on the following ments regarding the proposed dates: permit will be accepted until 3Q days after the publish date of this notice and considered in the final 06/30/24 determination regarding permit issuance and permit provisions. The Director of the NC Division of Energy, Mineral, and Land Resources (DEMLR) may hold a and that the said newspaper in which such notice, paper public hearing should there be a document or legal advertisement was published at the time significant degree of public inter- est. Please mail comments and/ of each and every such publication, a newspaper meeting or information requests to DEMLR all the requirements and qualifications of Section 1-597 of ttig612 Mail Service Center, Ra- the General Statutes of North Carolina, and was a qualified ,o newspaper within the meaning of Section 1-597 of the Gen- g 2 Duke Energy Carolinas, LLC O eral Statutes of North Carolina, [1385 Dukeville Road, Salisbury, c� NC] has requested renewal and Q modification of permit NCS000554 for the Buck Combustion Turbine At a C05t Of $130 t Combined Cycle Station in Rowan ,p County.This facility discharges to Account#: 311828 the Yadkin River in the Yadkin Pee- Tagline: SP-Stormwater Oischa Dee River Basin. Purchase Order#: Interested persons may vis- it DEMLR at 512 N. Salisbury / J street, Raleigh, NC 27604 to re- view information on file.Additional information on NPDES permits and this notice may be found on our website: https://deq.nc.gov/ (signature of person making affidavit) about/divisions/energy-miner- a I-and-I and-re sou rces/stormwa- ter/stormwate r-programistormwa- ter-public-notices,or by contacting BriannaYoung at brianna.young@ Sworn and subscribed before me on 07/01/24. deq.nc.govorstsao7-3647. Publish Salisbury Post:06130124. Notary Public My commission expires 05/02/2026 Young, Brianna A From: Eplin,Jerry W Sent: Wednesday, October 9, 2024 4:37 PM To: Young, Brianna A Subject: RE: Follow up on Stormwater Issues Brianna: reviewed the NCS000554 draft permit and saw no issues with it. Regards, Jerry W. Eplin, PE Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: lerry.eplin(a�deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 D E Qx&7,A- , Q�p�{q� gnmriiisl q�allYy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent: Monday, September 30, 2024 1:41 PM To: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Subject: RE: Follow up on Stormwater Issues Hi Jerry, NCS000321— Nothing needed from WSRO at this time NCS000329— Nothing needed from WSRO at this time NCS000330— Nothing needed from WSRO at this time NCS000554—The draft permit was submitted for PN but I haven't received any comments (if any)from WSRO on the draft permit yet Thanks, Brianna 1 Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Eplin,Jerry W<ierry.eplin@deq.nc.gov> Sent: Friday, September 27, 2024 5:01 PM To:Young, Brianna A<13rianna.Young@deq.nc.gov> Subject: Follow up on Stormwater Issues Hi Brianna: I am getting caught back up on the Stormwater issues, after Kathryn's departure. Can you tell me whether you are waiting on MRO for anything related to the following? Young Brianna Stormwater Discharge, Individual Renewal NCS000321 Lubrizol Advar Young Brianna Stormwater Discharge, Individual Renewal NCS000329 ATI Specialty Young Brianna Stormwater Discharge, Individual Renewal NCS000330 ATI Specialty Young Brianna Stormwater Discharge, Individual Renewal with major NCS000554 Buck Combus Jerry W. Eplin, PE Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: jerry.eplin(a�deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 ie .... .... ... .... {}��,,21i51Fi11<��F n,�ronniriii�I{kil liYy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2 DUKE Buck Combined Cycle Station 1385 Dukeville Road ENERGY. Salisbury,NC 28146 July 22, 2024 Ms. Brianna Young Industrial Stormwater Permit Coordinator Stormwater Program NC DEQ/Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, NC 27699-1612 Subject: Draft Comments-General Permit NCS000554 Buck Combined Cycle Rowan County Dear Ms.Young: Duke Energy Carolinas, LLC. (Duke Energy) respectfully submits comments on the draft NPDES Permit NCS000554 received on June 26, 2024. 1. An updated Site Map is attached. Please update the site map in the permit file. Should you have any questions regarding this submittal or require additional information, please let me know. Thank you, ' �1oyZe Dishmon EHS—Permitting and Compliance Attachment Cc: Dale Wooten, EHS Charles Sammons,Superintendent of Operations li 5 t ' l I I r r* -- Id�� f r n _ wrlw-- — � q�. ~'raj-,`-„'---,- i ..�. � � � � __ - - � _ _- _ Rnrk Lrak ,w yr I Ci - — _ go AIN Co I,I I vr\_f l v +I ~ 'I1�)ya({ /l I I er POWER PLAKT •� q�, � . S Q� l // .�''^✓- r7.5 fGZ;;-1-1..1 ` I,�I •�+-� I 5 _ *�'.+ y !{�---� /:♦(/J{r�J 1 ASH 6A81N-_—• •I.� � �/� � '..�' lt, `�r / Il WASTE BOUNDAR'i •— ,I I. � l _ :_. _! `9 BUCK STEAM LI ,i ''\ • ira ! a } I i I J F Trxtl PARCEL ME rn i 5 SOURCE: 2016 USGS TOPOGRAPHIC MAP,SALISBURY&SOUTHMONT QUADRANGLE,OBTAJNED FROM THE US'GS STORE AT DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH I ' CJSROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200{I51AD63). t�DUKE FIGURE14 'ENERGY SITE LOCATIGN MAP , SEEP MANAGEMENT PLAN BUCK STEAM STATION -• SALISBURY.NORTH CAROLINA crr:wawmo arAwac�cuc x.rsc er.a.aoaw wr:v.74'9 o 'lb ROOD AM 3000 y�, fJ'FCl3b Qr'A MLIifF ft r.h474'7d:d - �V�� �➢CIi01.00 OY.iMIl2P 6fC:6L^4.dM Compliance Inspection Report Permit:NCS000554 Effective: 08/01/18 Expiration: 07/31/23 Owner: Duke Energy Progress LLC SOC: Effective: Expiration: Facility: Buck Combustion Turbine Combined Cycle Sta County: Rowan 1385 Dukeville Rd Region: Mooresville Salisbury NC 28146 Contact Person:Mark McGary Title: Phone: 980-373-7898 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 02/28/2024 Entry Time 10:OOAM Exit Time: 01:OOPM Primary Inspector:Jerry W Eplin Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000554 Owner-Facility:Duke Energy Progress LLC Inspection Date: 02/28/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: DEMLR conducted a compliance evaluation inspection in relation to the permit renewal request. Mooresville Regional Office (MRO) personnel, Jerry Eplin and Shannon Leonard, inspected the facility on February 28, 2024. Note that with the renewal request, the facility is also requesting to rescind the stormwater permit for the former Buck Steam Station site, which is immediately adjacent to this Combined Cycle Station. Part of that request is that at least one outfall, SW-075, be merged into the permit for NCS000554. The facility was found to have compliant records available for review. Training has been performed on at least an annual basis. Plan review is occurring at least annually. Required monitoring is being performed. In general, MRO is supportive of the request to renew the permit and to merge SW-075 into this permit. However, a switchyard, which the facility maintains is a standalone switchyard not requiring a stormwater discharge permit, still exists on the former Buck Steam Station property. MRO recommends additional discussion on this topic prior to rescinding the Buck Steam Station permit and prior to renewing the Combined Cycle permit. Furthermore, it was found that haul roads and the Buck Tie Switchyard, not previously included in the NCS000554 facility permit, should be added to the NCS000554 permit. MRO recommends requesting an updated drainage area map, showing all outfalls that should be covered under NCS000554 including those associated with the haul roads and the Buck Tie Switchyard facility. Page 2 of 3 Permit: NCS000554 Owner-Facility:Duke Energy Progress LLC Inspection Date: 02/28/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3 Young, Brianna A From: Whitner, Raymond A Sent: Thursday,July 25, 2024 7:59 PM To: Young, Brianna A Cc: Cook, Clinton Subject: Draft NPDES Permit NCS000554 (Buck Combustion Turbine Combined Cycle Station) Dear Ms.Young: I appreciate the opportunity to review the subject draft NPDES permit and have included my response below in bold to satisfy the new paperless standards. I concur with issuance of the above permit as I have no appreciable expertise in implementation of the Clean Water Act requirements and have minimal understanding of the information provided. As a result, I have no basis for opposing the permit. If you have any questions or need any additional information, please let me know. Sincerely, Ray Whitner Raymond A.WhUner,III Assistant Regional Engineer Division of Water Resources- Public Water Supply Section e-04r D North Carolina Department of Environmental Quality E . 704 235 2132 office n,a� wr:••k �a,,,m� 9$0 447 0215 cell 704 663 6040 fax Raym on d.Ulf h itn er@Pd eq.n c.g ov Moofesvlllel Reg ion M Office 610 East Center Avenue, Suite 301 Mooresville, NC 20115 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 1 (L� DUKE Buck Combined Cycle Plant 1385 Dukeville Road EN ERG 1 Salisbury, NC 28146 April 24, 2024 81k, Brianna Young Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/DEMLR 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Stormwater Permit Amendment--NCS000578 and NCS000554 Buck Combined Cycle and Buck Steam Station Rowan County Dear Ms. Young, Duke Energy Carolinas, LLC (Duke) respectfully submits the amendment request for the referenced permits for your review and process. Permit NCS000578 Based upon a site visit and review by Jerry Eplin, Duke requests the rescission of NCS000578. and the inclusion of SW075 in permitNCS000554. Demolition of the coal steam station was completed in 2019 with the site remediation completed in April 2021. The switchyard associated with the former coal station is a stand-alone switchyard and not associated with Buck Combined Cycle. The switchyard is not tied to any generators/energy and has been added to Transmission's Asset Management. The switchyard infrastructure is maintained by this management team and is covered under their SPCC Plan. Outfall SW075 is an industrial outfall that served a dual-purpose during the operation of the coal steam station but currently the only industrial activity associated with this outfall is the drainage area from the warehouse and ash haul road. The attached updated drainage map shows the requested new location of outfall SW075. Permit NCS000554 Duke is requesting the addition of outfall SW002. This outfall is for the drainage area associated with Buck Tic Switchyard. The sampling location requested is due to the stormwater flows under the road and then sheet flows to the Yadkin River tributary. Ash Haul Road Duke was required to obtain a Certificate of Coverage, COC, from the United States Department of Agriculture to haul ash from Duke's Buck Station to Roanoke Cement due to Fire Ant Quarantine Zones, see attached. The Certificate of Coverage requires Duke to remove the loose ash from the exterior of the trucks and the trucks be covered prior to leaving the ash basin. Duke requests that this site-specific requirement from USDA be considered in the determination for requirement of stormwater outfalls for ash hauling. Duke identified outfalls along the ash haul road, SWO03 and SW004. Based upon the requirements in the COC with USDA,Duke is requesting that outfall SWO03 and outfall SWO04 not be included in the permit and the representative outfall for the ash haul road be either SW075 or SW002. Drainage area for outfall SWO03 includes an office trailer, well house, and parking lots. Outfall SWO03 is on the opposite side of the road from outfall SWO02(Buck Tie Switchyard)and is a separate outfall. The industrial activity would be ash hauling at outfall SW003. Due to the locations of outfalls SWO02 and SWO03, Duke requests that outfall SWO03 not be included in the permit with outfall SWO02 being representative of both drainage areas. Drainage area for outfall SWO04 consists of a steep vegetated slope that collects at a culvert. The only industrial activity is ash hauling. The terrain at outfall SWO04 presents safety concerns during sampling events. If you have any questions, please contact Joyce Dishmon at 336-394-5524 or atjoyce.dishinon@duke-energy.com. "I certify, tinder penalty of law, that this document and all attachments were prepared under nay direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submined is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possihility of fines and imprisonment for knowing violations. " Sincerely, Kristopher Eisenrieth GM II - Regulated Station Attachments cc: Jerry Eplin, PE,NC DEMLR Dale Wooten, EHS Joyce Dishmon, SME—Water Permitting USPS Tracking: 7019 0140 0001 0794 0524/9590 9402 0001 0794 0524 According to the PapeivioO Redaction Acl W 1995,no persons ore required to fesprind to a collection of information unless if UMB APPROVED Msplays a valid OMfa control nunit}er. The valid OMB conlm number far this inFirrinabnn rnllr cline is 0575-Dt784.The lime 057940541008810129! required to complete this Inforrnalion collel:bon is estimated to avoiagr 1,25 hours per msponso,including the time for 019(1102,571031 D103171 reviewing insiructions,searching e_xiwinq data 5ouicf—,gatliering and maintainfrig the dal-o neeilwf,and completing and 03 2 210 33 7i0346103G3) reviewing the collection of information [l:iti9 UNITED STATES DEPARTMENT OF AGRICULTURE ANIMAL AND PLANT HEALTH INSPECTJON SERVICE COMPLIANCE AGREEMENT PLANT PROTECTION AND QUARANTINE 1.NAF1C AND MAIL:NC ADi7RFSS[1F PERSON OR FIRM. 2 LIGATION' Duke fneigys Burk.Sltttiur•Ki+s Eisunrleth 1565 Dukawiie Rd 1385 Duiceville Rd Salisbury, NC 28146 Salisbury.NC 28146 courtly: ROWAN 3. REGULATED ARTICLES) SoilrCcal Asn:Usea Soii' oal Ash Mnvrn9 Equipment 4, APPLICABLE FFOERAL QUARANTINE(S)OR REGULATIONS: Imported Fti(e Aol Federall70FR 3O1.a1) Imported Fite Ant.NC(02 NCAG 48A C700) 5.INVE AC313EE TO THE tOLLOVVIN(-,- All equipment.vAl be cleaned of any loose,noncompaied soil and plant material before leaving the quarantine area 1.The rovement of regulated arlirlec nrtginating in IN,regulated areas that are destined for non-regulated areas will he arcannpanied by a cerVieaies of permit oolained from the North Carolina Department of Agriculture and Consumur Services(NGDA&CS)or Uniled Slates Department of Agriculture. Animal and'#aril Hcdilll tnspecli0n Service-Plant Protection and Quarantine(USDA,APHIS.PPQ).Specific localiers or regulated anti nor,-regulated areas should be obtained from tree NCDA&CS.Plant Industry Division(1.800.206 9333).2.All contaminated equipment and machinery sha:l be cleaneu before it is moved from a quarantined work site,3 Prcpnsed or existirg soil and sand pit locations In the regulated areas wlfl be appreved by a federal ai state regulatory ofifc'rrI prior In any excavaltun 4.A cedirmale or permit must accompany the movement of soil samples from the impoited fire and quarantined areas, Stipulations:See Attachment. 6 TURF 7.TITLE 8.DATE SIGNED (- i — AGREEMENT NO. fhe affixing of the signature below will Va:idate this agreementwhich shall remain In effect until cancelled,but may he revised as necessary or revoked for noncompliance. 4558 10. DATE OF AGREEMENT' 35149;2022 11 PPC7,t3P OFFICJAL 1NA.-AE AND TITLE) 12 ADDRESS Joseph H"KWilh,Slale Plant HeMth DireCtr:r USDA-APHIS-PPQ 13 SIG 920 Main Campus Drive Ste 150 9ea2022 06 22 14:C2459-04'00' Raleigh.NC2760ti M&PH BECKWITH pDitlly signed by 14.State Agency Official(N me and Titt 15 ADDRESS NCDA&CS Plant Industry Owswsn 16 ',IGWTIIRE !!]1050 Mail Service(;enter Raleigh.NC 27699 PPQ FORM 519 Frevious editions t}efure 2010 are obsolete SEE'2017. Stipulations for Compliance Agreement between Duke Energy and USDA-APHIS-PPQ This agreement allows the movement of Coal Ash from the Duke Energy Buck Station (1385 Dukeville Rd., Salisbury,NC 28146)to Roanoke Cement (6701 Catawba Rd., Troutville,VA 24175) &Belews Creek Landfill(3191 Pine Hall Rd., Walnut Cove,NC 27052). Duke Energy agrees that: 1. Only Coal Ash from the Duke Energy Buck Station site will be transported. 2. All Coal Ash moved from the site must go directly to the final sites for treatment and/or disposal. 3. All trucks used for transport will be covered in some manner to prevent spillage of Coal Ash. 4. Loose Coal Ash/Soil on the outside of the truck will be removed prior to departure. 5. NCDA&CS will be notified at 919-707-3742 if any operational procedures need to be changed. Kris Eisenrieth Duke Energy's Buck Station 1385 Dukeville Road Salisbury,NC 28146 . Outfall Coordinates N 3''• SW075 -80°22'23.335"W 35'42'44.111"N t Combined Cycle SWO01 -80°22'38.805"W 35°42'29.752"N SWO02 -80°22'42.379"W 35°42'31.537"N SWO03 -80°22'42.903"W 35°42'32.177"N SW004-80°22'45.273"W 35°42'39.908"N ,�• - QF V _ tt,L, SW075iyt 't Legend c Outfalls r , L Existing Outfall '"�, i '� �_� Potential Outfall " SW004 F ' : , r Industrial Stormwater Haul - ! Surface Ar-41 ea Drained: Drainage Areas ` t - Combined Cycle SWO01 N • ,� ��// ,. ®SW075 Drainage Area Haul Road Area � swops I' Surface Area Buck Tie Switch Yard Mn Industrial Activilty N Surface Area Drained:38.47 acres No Industrial Activity Drained: 10.84 acres -6 x E 0 0 - Buck Tie Switch Yard , Notes: surface area Per existing USDA permit, all trucks must y _ Drained: 1s.2s acres be swept off and covered prior to leaving in the ash basin. `w SW003 ' m - E S W 002 N 7 ' v Combined o Gycle SW001 N - Z 7 Combined Cycle'SW001 Surface Area c 'Drained: 21.93 acres 0 E - Figure 1 Industrial Stormwater Permit Y I :. Drainage Map ti Buck Steam Station Duke Energy Rowan County, North Carolina y 0 150 300 600 ERM\� J ; Feet LL Source: Esri-World Topographic Map; NAD 1983 StatePlane North Carolina FIPS 3200 Feet 1 Outfall Coordinates SW075 -80°22'23.335"W 35'42'44.111"N Combined Cycle SWO01 -80°22'38.805"W 35°42'29.752"N SWO02 -80°22'42.379"W 35°42'31.537"N SWO03 -80°22'42.903"W 35°42'32.177"N SWO04-80°22'45.273"W 35°42'39.908"N veo cd R d r 4li t-&X i'ry` c 3 ry v Wfard Miles �CI 4 r � Legend Outfalls Existing Outfall M swooa a", 7, � ; Potential Outfall �, J j 1 Haul Industrial Stormwater Surface Area Drained:" :7 Drainage Areas z.7a acres Combined Cycle SWO01 o SW075 Drainage Area ~ swops i 0 Haul Road Area o NodndustrialI tivity Surface Area ` 0 Buck Tie Switch Yard VI —r ce'Area� Drained: 38.47 acres i �� �, ��� No Industrial Activity w Drained: 10.84 acres i E � o Buck Tie Switch Yard Notes: J Surface Area Per existing USDA permit, all trucks must Drained: 15.25 acres �- in a be swept off and covered prior to leaving 0 the ash basin. 4 SW O03 3 $' Y'SWO02 in . a - Combined o+' Cycle SW001 N X Z Combined Cycle SW003 u, - 7 Surface Area o. Drained: acres r ,yf6, ; . -E Figure 1 E y Industrial Stormwater Permit F Drainage Map Buck Steam Station Duke Energy - Rowan County, North Carolina 300 ERM 600 {. Source: Esri-World Topographic Map; NAD 1983 State Plane North Carolina FIPS 3200 Feet Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Friday, April 26, 2024 9:17 AM To: Young, Brianna A; Eplin, Jerry W Cc: Wooten, Dale; Newcomb, Dana H Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Attachments: 554 Map.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I have attached Buck Combined Cycles'Amended Drainage Map for NCS000554. Please let me know if you have questions/comments or need additional information. Regards, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From: Dishmon,Joyce Martin Sent:Thursday,April 25, 2024 8:35 AM To:Young, Brianna A<Brianna.Young@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Brianna, I have included information on the requirements by United States Dept of Agriculture for your consideration. This information is included in the permit amendment letter. Ash Haul Road Duke was required to obtain a Certificate of Coverage,COC,from the United States Department of Agriculture to haul ash from Duke's Buck Station to Roanoke Cement due to Fire Ant Quarantine Zones,see attached. The Certificate of Coverage requires Duke to remove the loose ash from the exterior of the trucks and the trucks be covered prior to leaving the ash basin. Duke requests that this site-specific requirement from USDA be considered in the determination for requirement of stormwater outfalls for ash hauling. i Duke identified outfalls along the ash haul road,SW003 and SW004. Based upon the requirements in the COC with USDA, Duke is requesting that outfall SWO03 and outfall SW004 not be included in the permit and the representative outfall for the ash haul road be either SW075 or SW002. Hard copy file will be placed in the mail today. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent:Wednesday,April 24, 2024 11:19 AM To: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning Joyce, Just following up on our previous correspondence. Have you completed the updated site map? I have not seen it come through yet. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com> Sent:Tuesday, April 16, 2024 1:35 PM To:Young, Brianna A<Brianna.Young@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc.gov> Cc: Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 2 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, We are working on an updated drainage area map. We have a meeting with the consultant to complete the map tomorrow. The updated map will assist in answering your questions. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From: Young, Brianna A<Brianna.Young@deg.nc.gov> Sent:Tuesday, April 16, 2024 1:30 PM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION! STOP. • expecting and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do not click links, open attachments or enter your ID or password. Good afternoon Joyce, After some internal discussions, I have a few follow up questions. • Could you provide an updated drainage map, clarifying the activities that occur in each drainage area? • Please clarify where the coal ash hauling is occurring across the site (identify the haul roads). • There appear to be two outfalls at the end of the haul road (see red circle below). Please confirm the presence and outfall coordinates. • Is the switchyard (see blue circle below) connected to the combined cycle station, or an independent switchyard? 3 • v . i 4 � ti • • F' I y � i x • y Thank you, Brianna Young, MS (she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/ Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Young, Brianna A Sent: Wednesday, April 10, 2024 1:05 PM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com>; Eplin, Jerry W<jerry.eplin@deg.nc.gov> Cc: Wooten, Dale <Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Hello Joyce, Thank you for providing this information. I will reach out with any additional questions once I've had a chance to review everything. Thank you, Brianna Young, MS (she/her) Industrial Individual Permits Coordinator 4 Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent:Tuesday, April 9, 2024 8:15 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<ierry.eplin@deq.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: FW: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I am forwarding answers to you questions below. I have included items from the site visit on 2/28/24. After you have had a chance to review the information, please send some dates you would be available for either a Teams call or office/site visit. Thank you for your assistance. Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 Please review answers in blue. From:Young, Brianna A Sent:Wednesday,January 3, 2024 9:32 AM To: Cahoon, Steve<Steve.Cahoon@duke-energy.com>; Wooten, Dale<Dale.Wooten@duke-energy.com> Cc: kris.eisenreith@duke-energy.com; Bednarcik,Jessica L<Jessica.Bed narcik@duke-energy.com> Subject: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning, I am working on renewing the individual stormwater permit for the Buck Combustion Turbine Combined Cycle Station (NCS000554). I need additional information in order to 1) confirm that the information I have is correct and 2)make sure the permit adequately serves the needs of the facility. Please provide the following: 5 • Confirmation on when the coal ash plant was fully decommissioned; Demolition was completed in 2019; Site remediation was completed in April 2021. • Confirmation on whether coal ash from clean-up operations is being hauled through any permitted stormwater drainage areas; - Off-spec coal ash that cannot be processed in the onsite STAR unit is hauled off-site to Roanoke Cement for processing. The site Environmental Field Support and I walked down the area and determined the area impacted. The area would make its way to outfall SW075. We reviewed the area with Jerry Eplin and proposed a new sampling location for SW075. It is a different location that was identified in the permit application and captures both flows from the haul road and warehouse/laydown area. Please see attached Google Earth Map. I am working on an updated drainage area map to submit as an amendment to the application file. • Confirmation on the status of outfall SW002 and what occurs in this drainage area (i.e. Is this the Buck Tie Station or a switchyard for Units 5 and 6); - SW002 is from the switchyard for Units 5 and 6. The former coal plant has been removed and site has been remediated. Per the attached email, the switchyard from the former coal station is not connected to any generators and has been transferred to the Asset Management Team. Buck Steam Station has asked for SW000578 to be closed based upon no industrial activity. • The renewal application provided monitoring data for two SW001 outfalls. Please confirm which outfall is which; - The data table for SW001 Combined Cycle, see attached, is for NCS000554. • Provide more information regarding outfalls SW001 and SW002 identified near the Energy Delivery property on the previously provided site map; - These outfalls are associated with the former coal fired station which has been removed and site remediated. These outfalls are associated with NXS000578 which Duke is requested that this permit be rescinded and SW075 moved to permit NCS000554. • An electronic spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the current permit; - Are you requesting data for both permits? SW001 is an attached. • Verification that the information in the renewal application is still complete and correct; and—the changes to the permit will include coal ash haul road drainage area which currently drains and is sampled at outfall SW075 • An explanation of any operational changes since the renewal application was submitted. — There have been no operational changes since the permit application was submitted. Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s) for the facility. Please review the facility information to make sure it is correct. Information can be updated using the links provided below, where applicable: • Facility/Company name or ownership: Name/Ownership Change Form • Owner Affiliation(Legally responsible person; i.e., someone with the company who is designated to represent the company per signatory requirements or another authorized representative): Permit Contact Update Request Form • Delegation of Signature Authority (DOSA): Permit Contact Update Request Form • Billing contact: Permit Contact Update Request Form • Permit contact: Permit Contact Update Request Form • Facility contact: Permit Contact Update Request Form • Facility address only: Email Bethany og ulias • Stormwater outfall information: Email Bethany Geor og ulias • Visit the eDMR Six Steps website and complete Steps 1 and 2 • Pay outstanding permit fees: Stormwater ePayment website Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day comment period. During this time we will be able to address any comments or concerns you have. During the 6 same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public notice. Once all comments and concerns are addressed, you may be issued a final permit. Please contact me if you have any questions. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deq.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL ADDRESS 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, INC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 7 Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Thursday, April 25, 2024 8:35 AM To: Young, Brianna A; Eplin, Jerry W Cc: Wooten, Dale; Newcomb, Dana H Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Attachments: USDA - Certificate of Coverage.pdf, Stormwater Permit Amendment NCS000578 and NCS000554 04242024.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Brianna, I have included information on the requirements by United States Dept of Agriculture for your consideration. This information is included in the permit amendment letter. Ash Haul Road Duke was required to obtain a Certificate of Coverage,COC,from the United States Department of Agriculture to haul ash from Duke's Buck Station to Roanoke Cement due to Fire Ant Quarantine Zones,see attached. The Certificate of Coverage requires Duke to remove the loose ash from the exterior of the trucks and the trucks be covered prior to leaving the ash basin. Duke requests that this site-specific requirement from USDA be considered in the determination for requirement of stormwater outfalls for ash hauling. Duke identified outfalls along the ash haul road,SWO03 and SW004. Based upon the requirements in the COC with USDA, Duke is requesting that outfall SWO03 and outfall SWO04 not be included in the permit and the representative outfall for the ash haul road be either SW075 or SW002. Hard copy file will be placed in the mail today. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent:Wednesday,April 24, 2024 11:19 AM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com>; Eplin,Jerry W<jerry.eplin@deq.nc.gov> 1 According to the Paperwork Reduction Act of 1995,no persons are required to respond to a collection of information unless it OMB APPROVED displays a valid OMB control number. The valid OMS control number for this information collection is 0579-0054,The time 0579-00541D08810129/ required to complete this information collection is estimated to average 1.25 hours per response,including the time for 01 9810 25 7/031 010 3 1 7/ reviewing instructions,searching existing data sources,gathering and maintaining the data needed,and completing and 0322/0337/0346/0363/ reviewing the collection of information. 0369 UNITED STATES DEPARTMENT OF AGRICULTURE ANIMAL AND PLANT HEALTH INSPECTION SERVICE COMPLIANCE AGREEMENT PLANT PROTECTION AND QUARANTINE 1.NAME AND MAILING ADDRESS OF PERSON OR FIRM: 2,LOCATION- Duke Energy's Buck Station-Kris Eisenrleth 1365 Dukeville Rd 1365 Dukeville Rd Salisbury, NC 28146 Salisbury,NC 28146 County: ROWAN 3. REGULATED ARTICLE(S): SoillCcal Ash;Used Soil/Coal Ash-Moving Equipment 4. APPLICABLE FEDERAL QUARANTINE(S)OR REGULATIONS: Imported Fire Ant:Federal(7CFR 301.81);Imported Fire Ant.NC(02 NCAC 48A.0700) S.INVE AGREE TO THE FOLLOWING: All equipment will be cleaned of any loose,noncompated soil and plant material before leaving the quarantine area. 1.The movement of regulated articles originating in the regulated areas that are destined for non-regulated areas will be accompanied by a certificate or permit obtained from the North Carolina Department of Agriculture and Consumer Services(NCDA&CS)or United States Department of Agriculture, Animal and Plant Health Inspection Service-Plant Protection and Quarantine(USDA,APHIS,PPQ).Specific locations or regulated and non-regulated areas should be obtained from the NCDA&CS,Plant Industry Division(1-800-206-9333),2.All contaminated equipment and machinery shall be cleaned before it is moved from a quarantined work site.3.Proposed or existing soil and sand pit locations in the regulated areas will be approved by a federal or state regulatory official prior to any excavation.4.A certificate or permit must accompany the movement of soil samples from the imported fire ant quarantined areas, Stipulations:Sae Attachment. 6, TU E 7.TITLE 8,DATE SIGNED ( Pit T—T 51 m z a 9. A REEM NT NO. The affixing of the signature below will validate this agreement which shall remain in effect until cancelled,but may be revised as necessary or revoked for noncompliance. 4558 10. DATE OF AGREEMENT 95/09/2022 11.PPQ/CEP OFFICIAL,(NAME AND TITLE.) 12. ADDRESS Joseph Beckwith,State Plant Health Director USDA-APHIS-PPQ 13.SIGNATURE 920 Main Campus Drive Ste,150 Raleigh,NC 27606 14.State Agency Official(Nand TIN 15 ADDRESS NCDA&CS Plant industry Divsion 16,SIGNATURE 1060 Mail Service Center Raleigh,NC 27699 PPQ FORM 519 Previous editions before 2010 are obsolete SEP 2012 Stipulations for Compliance Agreement between Duke Energy and USDA-APHIS-PPQ This agreement allows the movement of Coal Ash from the Duke Energy Buck Station(1385 Dukeville Rd., Salisbury, NC 28146) to Roanoke Cement (6701 Catawba Rd., Troutville, VA 24175) &Belews Creek Landfill (3191 Pine Hall Rd., Walnut Cove, NC 27052). Duke Energy agrees that: 1. Only Coal Ash from the Duke Energy Buck Station site will be transported. 2. All Coal Ash moved from the site must go directly to the final sites for treatment and/or disposal. 3. All trucks used for transport will be covered in some manner to prevent spillage of Coal Ash. 4. Loose Coal Ash/Soil on the outside of the truck will be removed prior to departure. 5. NCDA&CS will be notified at 919-707-3742 if any operational procedures need to be changed. Kris Eisenrieth Duke Energy's Buck Station 1385 Dukeville Road Salisbury, NC 28146 r� DUKE Buck Combined Cycle Plant 1385 Dukevilfe Road ENERGY. Salisbury,NC 28146 April 24, 2024 Brianna Young Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/DEMLR 1612 Mail Service Center Raleigh,NC 27699-1612 Re: Stormwater Permit Amendment—NCS000578 and NCS000554 Buck Combined Cycle and Buck Steam Station Rowan County Dear Ms. Young, Duke Energy Carolinas, LLC (Duke) respectfully submits the amendment request for the referenced permits for your review and process. Permit NCS000578 Based upon a site visit and review by.ferry Eplin, Duke requests the rescission of NCS000578. and the inclusion of SW075 in permit NCS000554. Demolition of the coal steam station was completed in 2019 with the site remediation completed in April 2021. The switchyard associated with the former coal station is a stand-alone switchyard and not associated with Buck Combined Cycle. The switchyard is not tied to any generators/energy and has been added to Transmission's Asset Management. The switchyard infrastructure is maintained by this management team and is covered under their SPCC Plan. Outfall SW075 is an industrial outfall that served a dual-purpose during the operation of the coal steam station but currently the only industrial activity associated with this outfall is the drainage area from the warehouse and ash haul road. The attached updated drainage map shows the requested new location of outfall SW075. Permit NCS000554 Duke is requesting the addition of outfall SW002. This outfall is for the drainage area associated with Buck Tic Switchyard. The sampling location requested is due to the stormwater flows under the road and then sheet flows to the Yadkin River tributary. Ash Haul Road Duke was required to obtain a Certificate of Coverage, COC, from the United States Department of Agriculture to haul ash from Duke's Buck Station to Roanoke Cement due to Fire Ant Quarantine Zones, see attached. The Certificate of Coverage requires Duke to remove the loose ash from the exterior of the trucks and the trucks be covered prior to leaving the ash basin. Duke requests that this site-specific requirement from USDA be considered in the determination for requirement of stormwater outfalls for ash hauling. Duke identified outfalls along the ash haul road, SW003 and SW004. Based upon the requirements in the COC with USDA,Duke is requesting that outfall SWO03 and outfall SW004 not be included in the permit and the representative outfall for the ash haul road be either SW075 or SW002. Drainage area for outfall SW003 includes an office trailer, well house, and parking lots. Outfall SW003 is on the opposite side of the road from outfall SW002(Buck Tie Switchyard)and is a separate outfall. The industrial activity would be ash hauling at outfall SW003. Due to the locations of outfalls SW002 and SW003, Duke requests that outfall SW003 not be included in the permit with outfall SW002 being representative of both drainage areas. Drainage area for outfall SW004 consists of a steep vegetated slope that collects at a culvert. The only industrial activity is ash hauling. The terrain at outfall SW004 presents safety concerns during sampling events. If you have any questions,please contact Joyce Dishmon at 336-394-5524 or atjoyce.dishmon@duke-energy.com. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualifiedpersonnelproperly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sincerely, Kristopher Eisenrieth GM II -Regulated Station Attachments cc: Jerry Eplin, PE,NC DEMLR Dale Wooten, EHS Joyce Dishmon, SME—Water Permitting USPS Tracking: 7019 0140 0001 0794 0524/9590 9402 0001 0794 0524 Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning Joyce, Just following up on our previous correspondence. Have you completed the updated site map? I have not seen it come through yet. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brlanna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent:Tuesday, April 16, 2024 1:35 PM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, We are working on an updated drainage area map. We have a meeting with the consultant to complete the map tomorrow. The updated map will assist in answering your questions. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent:Tuesday, April 16, 2024 1:30 PM 2 To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com>; Eplin,Jerry W<jerry.eplin@deq.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 STOP.CAUTION! EXTERNAL SENDER *** ASSESS.VERIFYH Were • expecting and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do not click links, open attachments or enter your ID or password. Good afternoon Joyce, After some internal discussions, I have a few follow up questions. • Could you provide an updated drainage map, clarifying the activities that occur in each drainage area? • Please clarify where the coal ash hauling is occurring across the site (identify the haul roads). • There appear to be two outfalls at the end of the haul road (see red circle below). Please confirm the presence and outfall coordinates. • Is the switchyard (see blue circle below) connected to the combined cycle station, or an independent switchyard? f lips S t a � a Y �. ,. l' It- -, r Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647(office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 3 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Young, Brianna A Sent: Wednesday,April 10, 2024 1:05 PM To: Dishmon,Joyce Martin<Joyce.Dishmon @duke-energy.com>; Eplin,Jerry W<jerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Hello Joyce, Thank you for providing this information. I will reach out with any additional questions once I've had a chance to review everything. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647(office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com> Sent:Tuesday, April 9, 2024 8:15 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<]erry.eplin@deq.nc.gov> Cc: Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: FW: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I am forwarding answers to you questions below. I have included items from the site visit on 2/28/24. After you have had a chance to review the information, please send some dates you would be available for either a Teams call or office/site visit. Thank you for your assistance. Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive 4 Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 Please review answers in blue. From: Young, Brianna A Sent: Wednesday,January 3, 2024 9:32 AM To: Cahoon, Steve<Steve.Cahoon@duke-energy.com>; Wooten, Dale<Dale.Wooten@duke-energy.com> Cc: kris.eisenreith@duke-energy.com; Bednarcik,Jessica L<Jessica.Bed narcik@duke-energy.com> Subject: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning, I am working on renewing the individual stormwater permit for the Buck Combustion Turbine Combined Cycle Station (NCS000554). I need additional information in order to 1) confirm that the information I have is correct and 2)make sure the permit adequately serves the needs of the facility. Please provide the following: • Confirmation on when the coal ash plant was fully decommissioned; Demolition was completed in 2019; Site remediation was completed in April 2021. • Confirmation on whether coal ash from clean-up operations is being hauled through any permitted stormwater drainage areas; - Off-spec coal ash that cannot be processed in the onsite STAR unit is hauled off-site to Roanoke Cement for processing. The site Environmental Field Support and I walked down the area and determined the area impacted. The area would make its way to outfall SW075. We reviewed the area with Jerry Eplin and proposed a new sampling location for SW075. It is a different location that was identified in the permit application and captures both flows from the haul road and warehouse/laydown area. Please see attached Google Earth Map. I am working on an updated drainage area map to submit as an amendment to the application file. • Confirmation on the status of outfall SWO02 and what occurs in this drainage area (i.e. Is this the Buck Tie Station or a switchyard for Units 5 and 6); - SWO02 is from the switchyard for Units 5 and 6. The former coal plant has been removed and site has been remediated. Per the attached email, the switchyard from the former coal station is not connected to any generators and has been transferred to the Asset Management Team. Buck Steam Station has asked for SW000578 to be closed based upon no industrial activity. • The renewal application provided monitoring data for two SW001 outfalls. Please confirm which outfall is which; - The data table for SW001 Combined Cycle, see attached, is for NCS000554. • Provide more information regarding outfalls SW001 and SWO02 identified near the Energy Delivery property on the previously provided site map; - These outfalls are associated with the former coal fired station which has been removed and site remediated. These outfalls are associated with NXS000578 which Duke is requested that this permit be rescinded and SW075 moved to permit NCS000554. • An electronic spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the current permit; - Are you requesting data for both permits? SW001 is an attached. • Verification that the information in the renewal application is still complete and correct; and— the changes to the permit will include coal ash haul road drainage area which currently drains and is sampled at outfall SW075 • An explanation of any operational changes since the renewal application was submitted. — There have been no operational changes since the permit application was submitted. Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s) 5 for the facility. Please review the facility information to make sure it is correct. Information can be updated using the links provided below, where applicable: • Facility/Company name or ownership: Name/Ownership Change Form • Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to represent the company per signatory requirements or another authorized representative): Permit Contact Update Request Form • Delegation of Signature Authority (DOSA): Permit Contact Update Request Form • Billing contact: Permit Contact Update Request Form • Permit contact: Permit Contact Update Request Form • Facility contact: Permit Contact Update Request Form • Facility address only: Email Bethany og ulias • Stormwater outfall information: Email Bethany Georgoulias • Visit the eDMR Six Steps website and complete Steps 1 and 2 • Pay outstanding permit fees: Stormwater ePayment website Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day comment period. During this time we will be able to address any comments or concerns you have. During the same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public notice. Once all comments and concerns are addressed, you may be issued a final permit. Please contact me if you have any questions. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) PLEASE NOTE NEW EMAIL ADDRESS 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 6 Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Tuesday, May 7, 2024 8:08 AM To: Young, Brianna A Cc: Wooten, Dale; Newcomb, Dana H Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, The stormwater culverts for SWO02 and SWO03 are located as noted on the updated drainage map. The Corners noted were locations where stop signs are located and identified in the first walkdown. Please let me know if you need additional information. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent: Monday, May 6, 2024 3:16 PM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Hi Joyce, After reviewing the information you sent, I do have one follow-up question. In the site map you provided,were outfalls SWO03 and SWO04 marked in the correct places? I would like to confirm as Jerry had noted that two outfalls existed at the end of the road marked Corner#1 (see red circle below), but in the updated site map provided, outfalls SWO03 and SWO04 are marked in different locations. i • - 4 0` 1 y - r 1 S W 004 Haul Rnad Surface Area Grained: ? 2.74 acres y No Industnal,Activi / �Surfaae' reams wined:10.Sd acres - - r+ �J. � uck Tie Switch Yard Surtace Area - drained: 15.25 acres SW003 f S W O02 C.—hi ned Cycle SW 001 Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/ Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) 2 Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Young, Brianna A Sent: Friday,April 26, 2024 1:06 PM To: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com>; Eplin,Jerry W<jerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Thank you for this information,Joyce. I'll reach back out with any questions once I've had a chance to review everything. Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Friday,April 26, 2024 9:17 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc. ov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I have attached Buck Combined Cycles'Amended Drainage Map for NCS000554. Please let me know if you have questions/comments or need additional information. Regards, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 3 From: Dishmon,Joyce Martin Sent:Thursday,April 25, 2024 8:35 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc. ov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Brianna, I have included information on the requirements by United States Dept of Agriculture for your consideration. This information is included in the permit amendment letter. Ash Haul Road Duke was required to obtain a Certificate of Coverage,COC,from the United States Department of Agriculture to haul ash from Duke's Buck Station to Roanoke Cement due to Fire Ant Quarantine Zones,see attached. The Certificate of Coverage requires Duke to remove the loose ash from the exterior of the trucks and the trucks be covered prior to leaving the ash basin. Duke requests that this site-specific requirement from USDA be considered in the determination for requirement of stormwater outfalls for ash hauling. Duke identified outfalls along the ash haul road,SW003 and SW004. Based upon the requirements in the COC with USDA, Duke is requesting that outfall SW003 and outfall SW004 not be included in the permit and the representative outfall for the ash haul road be either SW075 or SW002. Hard copy file will be placed in the mail today. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent:Wednesday,April 24, 2024 11:19 AM To: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning Joyce, Just following up on our previous correspondence. Have you completed the updated site map? I have not seen it come through yet. Thank you, 4 Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Youns@deg.nc.sov(e-mail preferred) 919-707-3647(office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent:Tuesday, April 16, 2024 1:35 PM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc. ov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, We are working on an updated drainage area map. We have a meeting with the consultant to complete the map tomorrow. The updated map will assist in answering your questions. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From:Young, Brianna A<Brianna.Young@deg.nc.gov> Sent:Tuesday, April 16, 2024 1:30 PM To: Dishmon,Joyce Martin <Joyce.Dishmon @duke-energy.com>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION! STOP. • expecting 'and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do not click links, open attachments or enter your ID or password. Good afternoon Joyce, 5 After some internal discussions, I have a few follow up questions. • Could you provide an updated drainage map, clarifying the activities that occur in each drainage area? • Please clarify where the coal ash hauling is occurring across the site (identify the haul roads). • There appear to be two outfalls at the end of the haul road (see red circle below). Please confirm the presence and outfall coordinates. • Is the switchyard (see blue circle below) connected to the combined cycle station, or an independent switchyard? a _ i ■ t I 1 4�J y s Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address:S12 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Young, Brianna A Sent:Wednesday,April 10, 2024 1:05 PM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Cc: Wooten, Dale<Dale.Wooten@dukeDale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@dukeDana.Newcomb@duke-energycom> Subject: RE: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 6 Hello Joyce, Thank you for providing this information. I will reach out with any additional questions once I've had a chance to review everything. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.aov(e-mail preferred) 919-707-3647(office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dishmon,Joyce Martin <Joyice.Dishmon@duke-energy.com> Sent:Tuesday, April 9, 2024 8:15 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc.�ov> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: FW: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I am forwarding answers to you questions below. I have included items from the site visit on 2/28/24. After you have had a chance to review the information, please send some dates you would be available for either a Teams call or office/site visit. Thank you for your assistance. Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 Please review answers in blue. From:Young, Brianna A Sent: Wednesday,January 3, 2024 9:32 AM To: Cahoon, Steve<Steve.Cahoon@duke-energy.com>; Wooten, Dale<Dale.Wooten@duke-energy.com> Cc: kris.eisenreith@duke-energy.com; Bednarcik,Jessica L<Jessica.Bed narcik@duke-energy.com> Subject: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning, I am working on renewing the individual stormwater permit for the Buck Combustion Turbine Combined Cycle Station (NCS000554). I need additional information in order to 1) confirm that the information I have is correct and 2)make sure the permit adequately serves the needs of the facility. Please provide the following: • Confirmation on when the coal ash plant was fully decommissioned; Demolition was completed in 2019; Site remediation was completed in April 2021. • Confirmation on whether coal ash from clean-up operations is being hauled through any permitted stormwater drainage areas; - Off-spec coal ash that cannot be processed in the onsite STAR unit is hauled off-site to Roanoke Cement for processing. The site Environmental Field Support and I walked down the area and determined the area impacted. The area would make its way to outfall SW075. We reviewed the area with Jerry Eplin and proposed a new sampling location for SW075. It is a different location that was identified in the permit application and captures both flows from the haul road and warehouse/laydown area. Please see attached Google Earth Map. I am working on an updated drainage area map to submit as an amendment to the application file. • Confirmation on the status of outfall SWO02 and what occurs in this drainage area (i.e. Is this the Buck Tie Station or a switchyard for Units 5 and 6); - SWO02 is from the switchyard for Units 5 and 6. The former coal plant has been removed and site has been remediated. Per the attached email, the switchyard from the former coal station is not connected to any generators and has been transferred to the Asset Management Team. Buck Steam Station has asked for SW000578 to be closed based upon no industrial activity. • The renewal application provided monitoring data for two SW001 outfalls. Please confirm which outfall is which; - The data table for SW001 Combined Cycle, see attached, is for NCS000554. • Provide more information regarding outfalls SWO01 and SWO02 identified near the Energy Delivery property on the previously provided site map; - These outfalls are associated with the former coal fired station which has been removed and site remediated. These outfalls are associated with NXS000578 which Duke is requested that this permit be rescinded and SW075 moved to permit NCS000554. • An electronic spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the current permit; - Are you requesting data for both permits? SW001 is an attached. • Verification that the information in the renewal application is still complete and correct; and—the changes to the permit will include coal ash haul road drainage area which currently drains and is sampled at outfall SW075 • An explanation of any operational changes since the renewal application was submitted. — There have been no operational changes since the permit application was submitted. Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s) for the facility. Please review the facility information to make sure it is correct. Information can be updated using the links provided below, where applicable: • Facility/Company name or ownership: Name/Ownership Change Form • Owner Affiliation(Legally responsible person; i.e., someone with the company who is designated to represent the company per signatory requirements or another authorized representative): Permit Contact Update Request Form • Delegation of Signature Authority (DOSA): Permit Contact Update Request Form • Billing contact: Permit Contact Update Request Form 8 • Permit contact: Permit Contact Update Request Form • Facility contact: Permit Contact Update Request Form • Facility address only: Email Bethany og ulias • Stormwater outfall information: Email Bethany Georgoulias • Visit the eDMR Six Steps website and complete Steps 1 and 2 • Pay outstanding permit fees: Stormwater ePgMent website Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day comment period. During this time we will be able to address any comments or concerns you have. During the same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public notice. Once all comments and concerns are addressed, you may be issued a final permit. Please contact me if you have any questions. Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deq.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL ADDRESS 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 9 Young, Brianna A From: Eplin,Jerry W Sent: Monday, May 6, 2024 9:04 AM To: Young, Brianna A Subject: RE: Buck CC Station (NSC000554) My notes indicated an additional outfall, near SW004, but on the other side of the road. The SW002 and SW003 Look correct—one outfall on each side of the road. I recommend confirming the same for the other road. They may be correct, and my notes may be incorrect, but I think it is worth confirming. Jerry W. Eplin, PE Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: jerry.eplin(a�deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 D,E Qft'A- R4PP07nM01 6114yfO H mmatI ada" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From:Young, Brianna A<Brianna.Young@deq.nc.gov> Sent: Monday,April 29, 2024 9:09 AM To: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Subject: Buck CC Station (NSC000554) Hello Jerry, I received additional information from Duke about the outfalls for the Buck Combined Cycle Station (NCS000554) and wanted to confirm something with you. Duke identified 2 new outfalls (marked SW003 and SW004 in map below) on their site. 1 S11 OO Haul Road :t W. Surface Area Drained: 2.74 acres , yyy rNo.Industrial.Activity '" ,}}•" •{Surface.-Area' wired: M64-acres _ 'r Surface - + Drained• 15. f SW DG 1-woo, However,you had previously identified two outfalls (one on either side of the road) at Corner#1 in the map below. ■ o 6 # I X J The 2 new outfalls you identified are in different locations than the 2 new outfalls they identified. Do you agree that the outfalls SWO03 and SWO04 Duke identified are appropriate sampling points, or should I get further confirmation from Duke? Thanks, Brianna 2 Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred) 919-707-3647(office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Tuesday, April 9, 2024 8:15 AM To: Young, Brianna A; Eplin, Jerry W Cc: Wooten, Dale; Newcomb, Dana H Subject: FW: [EXTERNAL] RE: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Attachments: Buck Steam Station - NCS000578; Buck_Combined Cycle-Analytical Summary - SW001.pdf, NCS000554 - DEMLR Discussion.pdf, Buck_Outfall 075_Analytical Summary.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Brianna, I am forwarding answers to you questions below. I have included items from the site visit on 2/28/24. After you have had a chance to review the information, please send some dates you would be available for either a Teams call or office/site visit. Thank you for your assistance. Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 Please review answers in blue. From:Young, Brianna A Sent: Wednesday,January 3, 2024 9:32 AM To: Cahoon, Steve<Steve.Cahoon@duke-energy.com>; Wooten, Dale<Dale.Wooten@duke-energy.com> Cc: kris.eisenreith@duke-energy.com; Bednarcik,Jessica L<Jessica.Bed narcik@duke-energy.com> Subject: Buck Combustion Turbine Combined Cycle Station stormwater permit NCS000554 Good morning, I am working on renewing the individual stormwater permit for the Buck Combustion Turbine Combined Cycle Station (NCS000554). I need additional information in order to 1) confirm that the information I have is correct and 2)make sure the permit adequately serves the needs of the facility. Please provide the following: • Confirmation on when the coal ash plant was fully decommissioned; Demolition was completed in 2019; Site remediation was completed in April 2021. • Confirmation on whether coal ash from clean-up operations is being hauled through any permitted stormwater drainage areas; - Off-spec coal ash that cannot be processed in the onsite STAR unit is 1 hauled off-site to Roanoke Cement for processing. The site Environmental Field Support and I walked down the area and determined the area impacted. The area would make its way to outfall SW075. We reviewed the area with Jerry Eplin and proposed a new sampling location for SW075. It is a different location that was identified in the permit application and captures both flows from the haul road and warehouse/laydown area. Please see attached Google Earth Map. I am working on an updated drainage area map to submit as an amendment to the application file. • Confirmation on the status of outfall SW002 and what occurs in this drainage area (i.e. Is this the Buck Tie Station or a switchyard for Units 5 and 6); - SW002 is from the switchyard for Units 5 and 6. The former coal plant has been removed and site has been remediated. Per the attached email, the switchyard from the former coal station is not connected to any generators and has been transferred to the Asset Management Team. Buck Steam Station has asked for SW000578 to be closed based upon no industrial activity. • The renewal application provided monitoring data for two SW001 outfalls. Please confirm which outfall is which; - The data table for SW001 Combined Cycle, see attached, is for NCS000554. • Provide more information regarding outfalls SW001 and SW002 identified near the Energy Delivery property on the previously provided site map; - These outfalls are associated with the former coal fired station which has been removed and site remediated. These outfalls are associated with NXS000578 which Duke is requested that this permit be rescinded and SW075 moved to permit NCS000554. • An electronic spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the current permit; - Are you requesting data for both permits? SW001 is an attached. • Verification that the information in the renewal application is still complete and correct; and— the changes to the permit will include coal ash haul road drainage area which currently drains and is sampled at outfall SW075 • An explanation of any operational changes since the renewal application was submitted. — There have been no operational changes since the permit application was submitted. Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s) for the facility. Please review the facility information to make sure it is correct. Information can be updated using the links provided below, where applicable: • Facility/Company name or ownership: Name/Ownership Change Form • Owner Affiliation(Legally responsible person; i.e., someone with the company who is designated to represent the company per signatory requirements or another authorized representative): Permit Contact Update Request Form • Delegation of Signature Authority (DOSA): Permit Contact Update Request Form • Billing contact: Permit Contact Update Request Form • Permit contact: Permit Contact Update Request Form • Facility contact: Permit Contact Update Request Form • Facility address only: Email Bethany oulias • Stormwater outfall information: Email Bethany Geor og ulias • Visit the eDMR Six Steps website and complete Steps 1 and 2 • Pay outstanding permit fees: Stormwater ePUment website Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day comment period. During this time we will be able to address any comments or concerns you have. During the same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public notice. Once all comments and concerns are addressed, you may be issued a final permit. Please contact me if you have any questions. 2 Thank you, Brianna Young, MS(she/her) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@deg.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL ADDRESS 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 Buck Combined Cycle NCS000554- Stormwater Outfall SWO01 Monitoring 0 a �aZ\` eta° ���o �e\O yea Units inches SU mg/L mg/L mg/L mg/L mg/L Benchmark NA 6.0-9.0 100 0.010 15 8.4 30 SWRetPond to Yadkin R. Frequency SA SA SA SA SA SA SA Date 10/10/2018 0.42 6.3 10 0.00364 <4.3 <0.02 <0.1 compliant 1/29/2019 0.18 7.3 15 0.00467 <5.0 <0.02 0.18 compliant 11/12/2019 0.49 7.8 6.6 0.00182 <5.0 <0.02 0.23 compliant 1/24/2020 1.36 7.2 15 0.00460 <5.0 <0.02 0.88 compliant 8/31/2020 2.23 7.7 7.7 0.00149 <5.0 <0.02 0.30 compliant 1/25/2021 0.36 7.0 <2.5 0.00262 <5.0 <0.02 0.23 compliant 7/8/2021 0.31 7.9 3.9 <0.005 <4.9 0.423 0.94 compliant 2/4/2022 0.27 7.0 6.5 0.00316 <4.8 <0.02 0.18 compliant 9/30/2022 1.3 7.1 9.5 0.00204 <4.8 <0.10 <0.5 compliant 2/17/2023 0.30 6.5 6.8 0.00296 <5.0 <0.50 <0.10 compliant 11/21/2023 1.26 8.4 <2.5 <0.002 <2.4 <0.25 0.27 compliant 3/6/2024 1 0.55 8.5 4.6 0.00245 <2.5 <0.25 1.3 compliant SU -standard units SA-semi-annual mg/L- milligrams per liter SA-QCA semi-annual or quarterly during during coal or ash transport ug/L- micrograms per liter Disc-discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value- Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three Tier I (3) consecutive results are below benchmark value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3) consecutive results are below benchmark value. Tier III Four exceedancesof during monitoringperiod and implement corrective • • ' within 30 days of •r fourth exceedance. protocols evaluated and potentially modified by NCDENR. Other Notes: Buck - Stormwater Outfall SW075 Monitoring 1 aO � a� a�� e�`a °� \� ♦ e\ `�\ \L\ \A10 °� o'`a 5�\ e\ �A\ Say \ el � Parameter �° �'� �° y� Qt �o �e La Lr Lo `j. �e QO ye .fir .�,.° `S` Comments/ Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 30"CMP to Yadkin R. - Draining ash haul routes Benchmark NA 6.0-9.0 100 0.0003 0.34 NE 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 NE 0.126 NE Frequency* SA-QCA SA-QCA SA-QCA SA-QCA I SA-QCA SA-QCA SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA * monthly when in Tier status. Date 10/11/2018 2.96 8.1 5300 0.000324 0.00864 <0.05 <0.020 <0.001 0.148 0.336 0.109 0.123 <0.001 0.00133 0.00119 0.543 2180 Tier I (TSS, Cu, Zn, Ag, Pb) Hg>12 11-2018 No Flow 12/20/2018 1.61 7.2 15 <0.0002 0.00139 <0.05 <0.001 <0.001 0.00382 1 0.00338 0.00225 <0.001 <0.001 <0.001 <0.0002 0.039 4.19a,g Tier 1 (1 compliance ("c") for TSS, Cu, Zn,Ag, Pb) 1-3/2019 No Flow 4/12/2019 0.52 7.8 1300 <0.0002 0.00224 <0.05 <0.001 <0.001 0.0421 1 0.0985 0.0230 0.0323 <0.001 <0.001 0.000369 0.147 148a�g Tier I (TSS, Cu, Zn)(2nd c: Ag, Pb), Hg>12 5-10/2019 No Flow no flow 11/12/2019 0.49 7.5 470 <0.0002 0.00168 <0.05 <0.001 <0.001 0.0128 1 0.0318 0.00689 0.00973 <0.001 <0.001 <0.0002 0.064 25.1a„g Tier 11 (TSS, Cu),Tier I (1st c: Zn), Hg>12 12/2019 No Flow no flow 1/24/2020 1.36 1 7.5 <0.0002 <0.001 <0.05 <0.001 <0.001 0.0129 1 0.00526 1 0.00810 1 <0.001 <0.001 <0.0002 0.051 28.5 Tier III (TSS, Cu), Tier I (2nd c: Zn), Hg>12 02/2020 No Flow no flow 3/3/2020 0.16 1 7.7 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00119 1 <0.001 I <0.001 I <0.001 <0.001 <0.0002 0.014 1.91 Tier III (1st c: TSS & Cu) 04/2020 No Flow no flow 5/27/2020 0.81 7.7 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 1.23avg Tier III (2nd c: TSS & Cu) 6/16/2020 1.89 7.3 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00470 0.00276 0.00425 <0.001 <0.001 <0.0002 0.023 6.52avg Tier III (Cu, 3rd c:TSS) 7/2020 No Flow no flow 8/31/2020 2.23 7.4 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00558 0.00308 0.00648 <0.001 <0.001 <0.0002 0.029 14.5 Tier III (Cu,TSS), Hg>12 9/17/2020 1.69 7.9 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.006 2.67avg Tier I II (1st c: Cu &TSS) 10/28/2020 0.28 7.5 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.005 2.44 Tier III (2nd c: Cu &TSS) 11/11/2020 0.39 7.7 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00115 <0.001 <0.001 <0.001 <0.001 <0.0002 0.010 5.39 Tier III (3rd c: Cu &TSS) 12/14/2020 1.16 7.2 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00402 0.00195 0.00224 <0.001 <0.001 <0.0002 0.020 11.1 Tier III (4th c: Cu &TSS) 1/25/2021 0.36 7.5 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.020 1.71avg Tier III (5th c: Cu &TSS) 2/11/2021 0.45 6.1 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.008 0.713a g Tier III (6th c: Cu &TSS) 3/16/2021 0.55 7.4 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00282 1 1 fill 0.00178 0.00256 <0.001 <0.001 <0.0002 0.028 6.51avg Tier III (7th c: Cu &TSS) 4-6/2021 No Flow no flow 7/8/2021 0.31 7.5 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 I VIVIR0.00102 <0.001 <0.001 <0.001 <0.0002 0.024 3.29a�g Tier III (8th c: Cu &TSS) 8/2021 No Flow no flow 9/21/2021 0.96 7.3 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 1 0.00221 <0.001 <0.001 <0.001 <0.0002 0.018 1.72avg Tier III (9th c: Cu &TSS) 10-12/2021 No Flow no flow 01/2022 No Flow no flow 2/23/2022 0.27 7.1 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 2.11avg Tier III (10th c: Cu &TSS) 3/16/2022 0.62 6.5 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 2.72avg Tier III (11th c: Cu &TSS) Buck - Stormwater Outfall SW075 Monitoring �5\ ay ON ea a� ova ,�o A1° �° �a� a� ko� A, 110 'Il a`c JyQ PLO `\P ,�° oP .�� \c. \�'N Q'p\ o°� o� c�` �\ §J\ Pacjm= °tea Q °tea S�Je Q�ye Q> Q� 061, eo L°QQ � `.eaa P��� ���e �'�a� 1��c. � Notes `ec Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 30"CMP to Yadkin R. - Draining ash haul routes Benchmark NA 6.0-9.0 100 1 0.0003 0.34 NE 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 1 NE 0.126 NE Frequency* SA-QCA SA-QCA SA-QCA SA-QCA I SA-QCA SA-QCA SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA * monthly when in Tier status. Date 4-8/2022 No Flow no flow 9/30/2022 1.30 7.4 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.009 2.05a,g Tier III (12th c: Cu &TSS) 11 10-12/2022 Composite sample was collected during event and not a grab sample 01/2023 No Flow no flow 2/17/2023 0.30 E <0.0003 <0.001 <0.05 <0.001 <0.001 I <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 2.01avg Tier III (13th c: Cu &TSS) 03-12/2023 No Flow no flow 1/25/2024 0.65 7.9 <0.0003 <0.001 <0.05 <0.001 <0.001 0.00118 i <0.001 <0.001 <0.001 <0.001 <0.0002 0.045 7.0Oavg Tier III (14th c: Cu &TSS) 2/2024 No Flow no flow 3/6/2024 0.55 7.6 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.015 3.50a_g Tier III (15th c: Cu &TSS) SU -standard units <- not detected at the following level SA-semi-annual mg/L- milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter NE- not established Disc-discontinued ng/L- nanograms per liter PCB- polychlorinated biphenyls ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value -Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three (3) consecutive results are below Tier I benchmark value. Tier II Two consecutive exceedances of benchmark value - evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three (3)consecutive results are below benchmark value. Tier III Four exceedances of benchmark value during monitoring period- evaluate causes and implement corrective actions. Notify NCDENR within 30 days of receiving results for fourth exceedance. Sampling protocols evaluated and potentially modified by NCDENR. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Monday, March 11, 2024 1:48 PM To: Eplin,Jerry W Cc: Wooten, Dale; Keener, David A Subject: Buck Steam Station - NCS000578 Jerry, I reached out to Duke Energy's Transmission Asset Management Team to discuss the switchyard that is associated with the former Buck Coal Steam Station. The switchyard has been transferred to the Asset Management Team which manages the SPCC and annual inspection for this infrastructure. The switchyard infrastructure for the former coal steam station is not connected to any generators. The Stormwater outfalls for the former coal steam station, except SW075, were removed during demolition and site remediation. Per our conversation, Duke is asking that permit NCS000578 be rescinded and outfall SW075 be added to permit NCS000554 Buck Combined Cycle. Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 INDUSTRIAL ACTIVITY �. - _ - �» �- . - . . � S 60,75 � Z \ Dukeyll �. Co ne| # ` m #% ' ® / � ~ . jBuck Tie ' y- C� NC S §, E§ p fall' r � . % IL � . ,ƒ , % \ & / - • \ '�� . � . � Young, Brianna A From: Eplin,Jerry W Sent: Thursday, March 28, 2024 9:05 AM To: Lawyer, Mike;Young, Brianna A Subject: Buck Steam Station and Combined Cycle Station The Buck Steam Station is covered under NCS000578. The Steam Station is an old coal burning facility that has been demolished and no longer exists. The owner has applied to rescind that permit. The Combined Cycle Station is covered under NCS000554. They have applied to renew it, but they want to transfer one outfall(SW075) from the Steam Station to the Combined Cycle Station permit. That is the only outfall from NCS00058 that they believe still has industrial activity. inspected the facility. In addition to the drainage area to SW075,they have a switchyard,which has 2 oil water separators,that is on the property of the old Steam Station. It is still in use, as a general switchyard, not specifically connected to any one facility. The applicant believes this is a "stand alone" switchyard that doesn't require a permit. I am not extremely familiar with the"stand alone switchyard" issue, but since it is all basically one big property, I'm not sure we can say it is "stand alone". Furthermore,there is a larger switchyard that doesn't appear to have been previously covered by stormwater- - the"Buck Tie" switchyard. It also has oil water separators. Furthermore,there are roads that traverse the property that are used for hauling that should have their outfalls included in the SW000554 permit. My general recommendation would be for us to request additional information from the applicant. Ask for an outfall location/drainage area map, showing all outfalls, including the outfalls for all oil-containing switchyards, and all haul roads, on the property. It makes sense to me that the Steam Station permit be rescinded—my understanding is that the reason there were two separate permits is because they knew the steam station would eventually be done away with. It makes sense that we would combine all industrial outfalls under one permit. But you will have to decide about the outfalls related to what they are calling the "stand alone" switchyard. In the photo below,the blue square is a switchyard with no oil containing equipment. The red square is the"stand alone" switchyard. The green square is the Buck Tie switchyard. The light blue thick lines show the haul roads. The pink shaded area is the outfall that they want to move to NCS000554. The dark blue shaded area is the current NCS000554 permitted area. wanted to set up a meeting with you two to discuss, but that has just been impossible on my end this week, and I'm on vacation next week, so I wanted to provide you the info that I have so that you can act as you see fit. Regards, i i . . �• � - -- - - fir, �„�... �:•�'_r t r 1 R r W _ AP r Jerry W. Eplin, Acting Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email:jerry.eplin@deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 z - - -7 D,E Qft,A- Doppelnirid of Enwo mrn dal{Wahlry Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 �a —SVV075 a Dukeville _ AK Buck Stearn'Statin NGS000554 Outfall { A NCG20 aownstpe m Outfall f �r _ - 4 rl R e e . � *;.,.��y� •SK- ,1 ,a�'.h fee• eee- !.._- Legend • � . Outfalls � ® Active Outfall Property of Energy Delivery - � .. + c 4 ® Non Industrial Outfalljt - 3 *Outfall no longer receiving flow from industrial activity " �! Abandoned Outfall a s � e� * Combined Cycle SWO01 Drainage Basin t SW075 Drainage Basin e i . �r: r - - v Impervious Surfacely �- _ r � r� Impervious surfaces are surfaces where }.;, s stormwater runs off at rates significantly higher than background rates—e.g.,predevelopment levels.They include paved areas, _ building roofs, parking lots,and roadways. - IF ' (Source: Application Form 2F Item 4.1) ' C • ` R �'' • Industrial Stormwater Drainage Data Impervious Surface Area Total Surface Area Drained it•. t j ;' ` 4 . Basin ID/Outfall (acres) (acres) ' r, M� 6 _ - , l l Combined Cycle 4 7 � , ;` � � - SWO01 10.8 18.9 SW075 13.38 36.3 a dd _ r" s , s. 3� - r _ 4 ; OIL) i Stantec �:% - _• _.- e e e e - • • • • 534 Industrial Park Bluefi ad Bluefield,VA 2 o05 1 www.cardno.com e e ee Young, Brianna A From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Tuesday, February 13, 2024 9:47 AM To: Eplin,Jerry W Cc: Wooten, Dale; Leonard, Shannon; Young, Brianna A; Winston, Cynthia C Subject: RE: [External] Buck Combined Cycle Station - Stormwater Permit Review Attachments: Current Outfalls.pdf, attachment 4 Sw drainage map.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Jerry, Attachment 4 is the Drainage Map submitted with NCS000554 and NCS000578 permit renewal. Buck requested closure of NCS000578 (Buck Steam Station) due to the demolition of the old steam station and removal of industrial activity. The current map attachment shows the current outfalls in NCS000554 (Buck Combined Cycle). Buck is requesting relocation of outfall SW075 to move the sampling location closer to the source discharge but to a location that collects runoff from industrial activity in the drainage area. Can we set the site visit for 2/28/24 at 10:00 am? Thank you for meeting with us. If you have any questions/comments or need additional information, please let me know. Regards, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 From: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Sent:Thursday, February 8, 2024 9:45 AM To: Dishmon,Joyce Martin <Joyce.Dishmon@duke-energy.com> Cc:Wooten, Dale<Dale.Wooten@duke-energy.com>; Leonard, Shannon <shannon.leonard@deq.nc.gov>;Young, Brianna A<Brianna.Young@deq.nc.gov> Subject: RE: [External] Buck Combined Cycle Station -Stormwater Permit Review •N! EXTERNAL SENDER *** STOP. ASSESS.VERIFYH Were you •- and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do not click links, open attachments or enter your ID or password. Feb 21, 28, or March 6'. Do any of those work? Additionally, if you can provide drainage area maps showing the current and proposed outfalls, in advance,that would be helpful. i Regards, Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: ierry.eplin(a�deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 E NQM i i CAla.I" � u.vuaar.ns a bw�rartmy+ruq uu�i�y Q ; Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Dishmon,Joyce Martin <Joyice.Dishmon@duke-energy.com> Sent:Thursday, February 8, 2024 8:21 AM To:Young, Brianna A<Brianna.Young@deg.nc.gov>; Eplin,Jerry W<jerry.eplin@deg.nc. ov> Cc: Wooten, Dale<Dale.Wooten@duke-energV.com> Subject: [External] Buck Combined Cycle Station -Stormwater Permit Review CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Jerry, Buck Combined Cycle is in the process of updating the renewal permit application NCS00554 and NCS000578. We would like to schedule a site visit to review the site and the potential changes to the discharge outfalls. Can you provide some dates that you would fit your schedule for a site visit? Please let me know if you have questions or require additional information. Thank you, Joyce Dishmon Duke Energy Permitting&Compliance 864 South Edgewood Drive Eden, NC 27288 Cell—336-394-5524 Office—336-623-0238 2 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 Roy Cooper,Governor ■ ■■■ ■■ 0 INC DEPARTMENT OF D.Reid Wilson,Secretary E ■ ■■u■■ NATURAL AND CULTURAL RESOURCES ■ ■■■ Misty Buchanan Deputy Director,Natural Heritage Program N CN H DE-24316 December 13, 2023 Brianna Young NCDEQ 512 North Salisbury Street Raleigh, NC 27604 RE: NCS000554; NCS000554 Dear Brianna Young: The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. These results are presented in the attached 'Documented Occurrences' tables and map. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one-mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one-mile radius of the project area, if any, are also included in this report. If a Federally-listed species is documented within the project area or indicated within a one-mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: https://www.fws.gov/offices/Di rectory_/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or an occurrence of a Federally-listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact the NCNHP at natural.heritage�)dncr.nc.gov. Sincerely, NC Natural Heritage Program DEPAR71MEN7 OF NATURAL AND CULTURAL RESOURCES fl 121 W.JONES STREET,RALEIGH.NC 27603 • 16S1 MAIL SERVICE CENTER,RALEIGH.Nc 27699 OFC 919.707.9120 • FAX 919.707,9121 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Intersecting the Project Area NCS000554 Project No. NCS000554 December 13, 2023 NCNHDE-24316 No Element Occurrences are Documented within the Project Area There are no documented element occurrences (of medium to very high accuracy) that intersect with the project area. Please note, however, that although the NCNHP database does not show records for rare species within the project area, it does not necessarily mean that they are not present; it may simply mean that the area has not been surveyed. The use of Natural Heritage Program data should not be substituted for actual field surveys if needed, particularly if the project area contains suitable habitat for rare species. If rare species are found, the NCNHP would appreciate receiving this information so that we may update our database. No Natural Areas are Documented within the Project Area Managed Areas Documented Within Project Area Managed Area Name Owne Three Rivers Land Trust Easement Three Rivers Land Trust Private NOTE: If the proposed project intersects with a conservation/managed area, please contact the landowner directly for additional information. If the project intersects with a Dedicated Nature Preserve (DNP), Registered Natural Heritage Area(RHA),or Federally-listed species, NCNHP staff may provide additional correspondence regarding the project. Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/help. Data query generated on December 13,2023;source: NCNHP, Fall (October)2023. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 5 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One-mile Radius of the Project Area NCS000554 Project No. NCS000554 December 13, 2023 NCNHDE-24316 Element Occurrences Documented Within a One-mile Radius of the Project Area Taxonomic EO ID Scientific Namen Common Name Last Element Accuracy Federal State Global State Group Observation Occurrence Status Status Rank Rank A Date Rank �k- Animal 24023 Waterbird Colony Waterbird Colony 2008-06-12 A 3-Medium --- --- GNR S3 Assemblage Animal 17845 Waterbird Colony Waterbird Colony 2004 B 3-Medium --- --- GNR S3 Assemblage Bird 36388 Haliaeetus Bald Eagle 2015-04 E 2-High Bald/Golden Threatened G5 S3B,S3 leucocephalus Eagle N Protection Act Vascular Plant 14621 Acmispon helleri Carolina Birdfoot- 1949-09-09 H 3-Medium --- Threatened G5T3 S3 trefoil Natural Areas Documented Within a One-mile Radius of the Project Area Site Name Representational Rating Collective Rating Leonard Road Slopes R5 (General) C4 (Moderate) High Rock Reservoir Wetlands R5 (General) C5 (General) Managed Areas Documented Within a One-mile Radius of the Project Area Managed Area Name wner Owner Typ Davidson County - Yadkin River Park Davidson County Local Government Davidson County Open Space Davidson County Local Government NC Department of Transportation Mitigation Site NC Department of Transportation State Yadkin River Game Land NC Wildlife Resources Commission State Yadkin River Game Land NC Wildlife Resources Commission State NC Land and Water Fund Conservation Agreement NC DNCR, INC Land and Water Fund State NC Land and Water Fund Project NC DNCR, INC Land and Water Fund State NC Agricultural Development and Farmland NC Department of Agriculture State Preservation Trust Fund Easement Three Rivers Land Trust Easement Three Rivers Land Trust Private Three Rivers Land Trust Easement Three Rivers Land Trust Private Three Rivers Land Trust Easement Three Rivers Land Trust Private Three Rivers Land Trust Easement Three Rivers Land Trust Private Page 3 of 5 Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/help. Data query generated on December 13,2023;source: NCNHP, Fall (October)2023. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 4 of 5 DUKE Duke Energy Buck Combined Cycle ENERGY, 1385 Dukeville Road Salisbury, NC 282146 RE�Ce/]y eD °. APR 10 2023 March 22, 2023 DEMLR,"" Water Program Ms. Brianna Young NC DEMLR Stormwater Program 1612 Mail Service Center Raleigh,NC 27699-1612 Subject: Duke Energy Carolinas, LLC. Buck Steam Station and Buck Combined Cycle NPDES Industrial Stormwater Permits NCS000578 and NCS000554 NPDES Form 2F Composite Sampling Results Dear Ms. Young: Duke Energy Carolinas, LLC is submitting herewith, updated EPA form 217's with the required composite sampling data for Outfalls SWOOICC and SWO075, as required by the renewal process for stormwater permits NCS000578 and NCS000554. Composite data was taken on December 15, 2022; however, the analytical results were not available prior to the required submittal date of the renewal application. Attached are the updated EPA form 2F's for Outfall SWOOICC and Outfall SW075. Should you have any questions please contact Mr. Steve Cahoon at steve.cahoon@duke-energy.com or at(919)-546-7457 or Mr. Dale Wooten at daie.wooten@duke-energy.com or(704)-630-3086. -I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualiftedpersonnelproperly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " Sincerely, K is Eisenrieth General Manager Buck Combined Cycle Attachments: Form 2F Outfall 001 CC Form 2F Outfall 075 Mailed by LISPS: 7019 0140 0001 0794 0692 Return Receipt USPS: 9590 9402 5350 9154 1987 36 United States Office of Water EPA Form 3510-2F Environmental Protection Agency Washington,D.C. Revised March 2019 Water Permits Division I' ApplicationEPA Form 2F Stormwater Discharges Associated with Industrial Activity NPDES Permitting Program Note: Complete this form and Form 1 if you are a new or existing facility whose discharge is composed entirely of stormwater associated with industrial activity, excluding discharges from construction activity under 40 CFR 122.26(b)(14)(x)or(b)(15). If your discharge is composed of stormwater and non-stormwater, you must complete Forms 1 and 2F,and you must complete Form 2C,21), or 2E, as appropriate. See the"Instructions" inside for further details. Paperwork Reduction Act Notice The U.S. Environmental Protection Agency estimates the average burden to collect and complete Form 2F to be 28.1 hours. The estimate includes time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data,and completing and reviewing the collection of information. Send comments about the burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Chief, Information Policy Branch (PM-223), U.S. Environmental Protection Agency, 1200 Pennsylvania Avenue,NW, Washington, DC 20460, and to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17'h Street,NW, Washington, DC 20503, marked"Attention: Desk Officer for EPA." FORM 2F—INSTRUCTIONS General Instructions Where to File Your Completed Form Who Must Complete Form 2F? Submit your completed application package(Forms 1 and 2F plus You must complete Form 2F if you answered"Yes"to Item 1.2.5 on any other applicable forms)to your NPDES permitting authority. Form 1-4hat is,you are a new or existing facility and your Consult Exhibit 1-1 of Form 1's"General Instructions"to identify discharge is composed entirely of stormwater associated with your NPDES permitting authority. industrial activity(excluding discharges from construction activity Public Availability of Submitted Information under 40 CFR 122.26(b)(14)(x)or(b)(15))orcomposed of The U.S.Environmental Protection Agency(EPA)will make stormwater and non-stormwater and are seeking coverage under information from NPDES permit application forms available to the an individual National Pollutant Discharge Elimination System (NPDES)permit.Note that applicants in the latter category must public for inspection and copying upon request.You may not claim also complete Forms 2C,2D,or 2E,as applicable.See inset any information on Form 2F(or related attachments)as confidential. below. You may make a claim of confidentiality for any information that you submit to EPA that goes beyond the information required by Form Notes 2F.Note that NPDES permitting authorities will deny claims for • Form 2F must be completed by any operator of treating any effluent data(estimated or actual)as confidential.If you a facility that discharges stormwater associated do not assert a claim of confidentiality at the time you submit your with industrial activity or the operator of any information to the NPDES permitting authority,EPA may make the stormwater discharger that EPA is evaluating for information available to the public without further notice to you.EPA designation as a significant contributor of will handle claims of confidentiality in accordance with the Agency's pollutants to waters of the United States,or as business confidentiality regulations in Part 2 of Title 40 of the Code contributing to a violation of a water quality of Federal Regulations(CFR), standard. Completion of Forms • For discharges composed entirely of Print or type in the specified areas only.If you do not have enough stormwater,the operator must complete space on the form to answer a question,you may continue on Form 2F in conjunction with Form 1. additional sheets,as necessary,using a format consistent with the • For discharges of stormwater combined with form. process wastewater,the operator must Provide your EPA Identification Number from the Facility Registry complete and submit Form 2F,Form 1,and Form 2C.Process wastewater is water that Service,NPDES permit number,and facility name at the top of each comes into direct contact with or results from page of Form 2F and any attachments.If your facility is new(i.e., the production or use of any raw material, not yet constructed),write or type"New Facility"in the space intermediate product,finished product, provided for the EPA Identification Number an NPDES permit byproduct,waste product,or wastewater. number.If you do not know your EPA Identification Number,contact your NPDES permitting authority.See Exhibit 1-1 of Form 1's • For discharges of stormwater combined with "General Instructions"for contact information.Additionally,for nonprooess wastewater,the operator must Tables A through D,provide the applicable outfall number at the top complete Form 2F,Form 1,and Form 2E. of each page. Nonprooess wastewater includes noncontact cooling water and sanitary wastes that are not Do not leave any response areas blank unless the form directs you regulated by effluent guidelines,except to skip them.If the form directs you to respond to an item that does discharges by educational,medical,or not apply to your facility or activity,enter"NA"for"not applicable"to commercial chemical laboratories. show that you considered the item and determined a response was • For new discharges of stormwater associated not necessary for your facility. with industrial activity that will be combined with The NPDES permitting authority will consider your application other new non-stormwater discharges,the complete when it and any supplementary material are received and operator must submit Form 2F,Form 1,and completed according to the authority's satisfaction.The NPDES Form 2D. permitting authority will judge the completeness of any application independently of the status of any other permit application or permit for the same facility or activity, Definitions The legal definitions of all key terms used in these instructions and Form 2F are in the"Glossary"at the end of the"General Instructions"in Form 1. 2F-1 FORM 21F—INSTRUCTIONS CONTINUED Line-by-Line Instructions Section 3.Site Drainage Map Section 1.Outfall Location Item 3.1 Attach a site drainage map showing the topography of the Item 1.1. Identify each of the facility's outfalls by number. For each facility.If a topographic map is unavailable,you may provide an outfall,specify the latitude and longitude to the nearest 15 seconds outline of drainage areas served by the outfall(s)covered in the and name of the receiving water. Latitude and longitude application.The site map must include the following information: coordinates may be obtained in a variety of ways,including use of Each of its drainage and discharge structures. hand held devices(e.g.,a GPS enabled smartphone),internet . The drainage area of each stormwater outfall. mapping tools(e.g., https:llmynasadata.larc.nasa.gov/latitudelongitude-finder/), Paved areas and buildings within the drainage area of each geographic information systems(e.g.,ArcView),or paper maps stormwater outfall;each past or present area used for outdoor from trusted sources(e.g.,U.S. Geological Survey or USGS).The storage or disposal of significant materials;each existing location of each outfall(i.e.,where the coordinates are collected) structural control measure to reduce pollutants in stormwater shall be the location where collected and concentrated stormwater runoff;materials loading and access areas;and areas where flows are discharged from the facility such that the first receiving pesticides, herbicides,soil conditioners,and fertilizers are water body into which the discharge flows,either directly or applied. through a separate storm sewer system,is a water of the United Each hazardous waste treatment,storage,or disposal facility States. If you need further guidance in responding to Item 1.1,refer (including each area not required to have a Resource to http://www.epa.gov/geospatial/latitudelonqqude-data-standard. Conservation and Recovery Act permit and is used for Note: In EPA's stormwater permits,'outfalls'are referred to as accumulating hazardous waste for less than 90 days under 40 CFR 262.34). "discharge points." • Each well where fluids from the facility are injected Note that space has been provided on the form for six outfalls. If underground. you have more than this number,type your information on a separate sheet of paper in a format similar to that of the form. Springs and other surface water bodies that receive stormwater Make sure you note the EPA Identification Number,NPDES permit discharges from the facility. number,and facility name at the top of the page and indicate the When you have completed and attached your site map to Form 2F, specific item of the form to which you are responding—Item 1.1 in answer"Yes"to Item 3.1. this case.In other sections of the form,you will be asked to provide Section 4.Pollutant Sources information by outfall number(Sections 2,4,5,and 7). Item 4.1.List all outfalls discharging stormwater. Provide an Section 2.Improvements estimate of the impervious surface area drained by the outfall. Item 2.1.Indicate if you are required by any federal,state,or local Specify units of measure.(impervious surfaces are surfaces where authority to meet an implementation schedule for constructing, stormwater runs off at rates significantly higher than background upgrading,or operating wastewater treatment equipment or rates—e.g.,predevelopment levels.They include paved areas, practices or any other environmental programs that could affect the building roofs, parking lots,and roadways.) discharges described in this application.The requirements include, Provide an estimate of the total surface area(impervious and but are not limited to,permit conditions,administrative enforcement pervious areas)drained by each outfall(within a mile radius of the orders,enforcement compliance schedule letters,stipulations, facility).You may use the site map developed under Item 3.1 to court orders,and grant or loan conditions. If yes,continue to item estimate the total area drained by each outfall.For areas under 2.2. If no,skip to Section 3. 5 acres,consult your NPDES permitting authority to determine Item 2.2.Briefly identify and describe each applicable project(e.g., whether the area should be reported to the nearest tenth of an acre consent decree,enforcement order,or permit condition).For each or nearest quarter of an acre. condition,specify the affected outfall number(s),the source(s)of Item 4.2.Provide a narrative description of the following: the discharge,the required final compliance date,and the projected final compliance date. Significant materials that in three years prior to the submittal of this application have been treated,stored,or disposed of in a Item 2.3.OPTIONAL ITEM. Indicate if you have attached any manner to allow exposure to stormwater. sheets describing any additional water pollution control programs • Method of treatment,storage,or disposal of such materials. (or other environmental projects that could affect your discharges) that you may now have underway or planned. If you attach 0 Materials management practices employed,in the three years additional sheets,indicate in the attachment whether each program prior to the submittal of this application,to minimize contact by is actually underway or is planned,and indicate your actual or these materials with stormwater runoff. planned schedule for construction. Be sure to note your EPA a Materials loading and access areas. Identification Number,NPDES permit number,and facility name at The location, manner,and frequency in which pesticides, the top of any attached pages, herbicides,soil conditioners,and fertilizers are applied. You should identify your significant materials by chemical name, 2 F-2 ti FORM 2F—INSTRUCTIONS CONTINUED form(e.g.,powder,liquid,etc.),and type of container or treatment Tables A,B,C,and D unit.Indicate any materials treated,stored,or disposed of Items 7.2 to 7.17.These items require you to collect and report data together.The term"significant materials"includes,but is not in Tables A through D,at the end of Form 2F,for the parameters and limited to:raw materials;fuels;materials such as solvents, pollutants listed in Exhibits 2F-2,2F-3,and 2F-4(at the end of the detergents,and plastic pellets;finished materials such as metallic instructions).The instructions for completing Tables A through D are products;raw materials used in food processing or production; table-specific,as are the criteria for determining who should hazardous substances designated under Section 101(14)of the complete them. Comprehensive Environmental Response,Compensation,and Liability Act;any chemical the facility is required to report pursuant Important note:Read the"General Instructions for Reporting, to Section 313 of Title III of the Superfund Amendments and Sampling,and Analysis"below before completing Items 7.2 to 7.17. Reauthorization Act;and fertilizers;pesticides;and waste products Item 7.2 and Table A.All applicants must complete Table A. If the such as ashes,slag,and sludge that have the potential to be discharge is an existing discharge and your discharge is composed released with stormwater discharges. exclusively of stormwater(i.e.,no process or nonprocess Item 4.3.For each ouffall,list the location and type of existing wastewater)then you only need to provide monitoring data for oil and structural and non-structural control measure(s)to reduce grease,total phosphorus,total Kjeldahl nitrogen,and total nitrogen. pollutants in stormwater runoff.Structural controls include Indicate"NA"for"not applicable"in the columns for all other structures that enclose materials handling or storage areas; parameters.Answer"Yes"to Item 7.2 once you have completed this structures that cover materials;and berms,dikes,or diversion task. ditches around manufacturing,production,storage,or treatment Item 7.3 and Table B.Indicate whether the facility is subject to an units and retention ponds.Spill prevention plans,employee effluent limitations guideline(ELG)(see 40 CFR Subchapter N to training,visual inspections,preventive maintenance,and determine which pollutants are limited in ELGs)or if the facility is housekeeping measures are examples of non-structural controls. subject to effluent limitations in an NPDES permit for its process wastewater or stormwater(if the facility is operating under an existing Describe the treatment,including the schedule and type of NPDES permit).If yes,continue to Item 7.4.If no,skip to Item 7.5. maintenance activities performed,and the ultimate disposal of any solid or fluid wastes other than by discharge, For each structural Note:Stormwater discharges from certain industrial sources or control identified,indicate the type of treatment the stormwater activities have specific ELGs for which they must comply.These receives using the codes in Exhibit 2F-1,at the end of the stormwater-specific ELGs include: instructions.For each non-structural control identified,indicate Regulated Discharge 40 CFR Section "Not Applicable"in the"Codes from Exhibit 2F-1"Column. Discharges resulting from spraydown or intentional Part 429,Subpart I Section 5.Non-Stormwater Discharges wetting of logs at wet deck storage areas Item 5.1.Provide a certification that all ouffalls that should contain Runoff from phosphate fertilizer manufacturing facilities Part 418,Subpart A that comes into contact with any raw materials,finished stormwater discharges associated with industrial activity have product,byproducts or waste products(SIC 2874) been tested or evaluated for the presence of non-stormwater Runoff from asphalt emulsion facilities Part 443,Subpart A discharges.Tests for such non-stormwater discharges can include Runoff from material storage piles at cement Part 411,Subpart C smoke tests,fluorometric dye tests,analysis of accurate manufacturing facilities schematics,and others. Mine dewatering discharges at crushed stone, Part 436,Subparts B, construction sand and gravel,or industrial sand mining C,and D Item 5.2.Include a description of the method used,the date of any facilities testing,and the onsite drainage points that were directly observed Runoff from hazardous waste and non-hazardous waste Part 445,Subparts A during a test used to support the certification in Item 5.1.All non- landfills and B stormwater discharges must be identifed in a Form 2C,2D,or 2E. Runoff from coal storage piles at steam electric Part 423 See"Who Must Complete Form 2F?"above for more information. generating facilities Section 6.Significant Leaks or Spills Runoff containing urea from airfield pavement deicing at Part 449 existing and new primary airports with 1,000 or more Item 6.1.Describe any significant leaks or spills of toxic or annual non-propeller aircraft departures hazardous pollutants at the facility within the three years prior to Item 7.4.In Table B,list all pollutants that are limited in an ELG to the submittal of this application.Include the approximate date and which the facility is subject and all pollutants listed in the facility's location of the spill or leak and the type and amount of material NPDES permit for its process wastewater(if the facility is operating released. under an existing NPDES permit)and provide quantitative data for Section 7.Discharge Information each pollutant(provide actual data for existing dischargers and Item 7.1.Answer whether you are a new source or new discharge, estimated data for new sources and new dischargers). If a pollutant Contact your NPDES permitting authority to determine if you are a in Exhibits 2F-2 or 2F-3 is indirectly limited by an ELG through an new source or new discharge. indicator(e.g.,use of total suspended solids as an indicator to control the discharge of iron and aluminum),you must provide data for the pollutant in Table B.Complete one table for each outfall. Answer"Yes"to Item 7.4 once you have completed this task. 2 F-3 FORM 2F—INSTRUCTIONS CONTINUED Item 7.5 and Table C.Table C requires you to address the Item 7.11. Provide quantitative data in Table C for those pollutants pollutants in Exhibits 2F-2,2F-3,and 2F-4 for each outfall. in Exhibit 2F-3 that you expect to be discharged in concentrations Pollutants in each of these exhibits are addressed differently. of 10 ppb or greater(provide actual data for existing dischargers Indicate whether you know or have reason to believe any pollutants and estimated data for new sources and new dischargers).Answer in Exhibit 2F-2 are present in the discharge. If yes,continue to Item "Yes"to Item 7.11 once you have completed this task. 7.6. If no,skip to Item 7.7. Item 7.12.Indicate whether you expect acrolein, acrylonitrile,2,4- dinitrophenol,or 2-methyl-4,6-dinitrophenol to be discharged in Item 7.6.For each outfall,list all pollutants in Exhibit 2F-2 that you concentrations of 100 ppb or greater. If yes,continue to Item 7.13. know or have reason to believe are present in the discharge in If no,skip to Item 7.14. Table C(except pollutants previously listed in Table B that are limited directly or indirectly by an ELG)and either report quantitative Item 7.13.Provide quantitative data in Table C for the pollutants data or briefly describe the reasons the pollutant is expected to be identified in Item 7.12 that you expect to be discharged in discharged.Answer"Yes"to Item 7.6 once you have completed this concentrations of 100 ppb or greater(provide actual data for task. existing dischargers and estimated data for new sources and new Item 7.7.This item asks if you qualify as a"small business."If so, dischargers).Answer"Yes"to Item 7.13 once you have completedthis task. you are exempt from the reporting requirements for the organic toxic pollutants listed in Exhibit 2F-3. Item 7.14.For any pollutants you expect to be present in the You can qualify as a small business in two ways:(1)If your facility is discharge at concentrations less than 10 ppb(or less than 100 ppb a coal mine and if your probable total annual production is less than for the above four pollutants),either submit quantitative data or 100,000 tons per year,you may submit past production data or briefly describe the reasons the pollutant is expected to be estimated future production(such as a schedule of estimated total discharged in Table C.Answer"Yes"to Item 7.14 once you have production under 30 CFR 795.14(c))instead of conducting analyses completed this task. for the organic toxic pollutants;(2)If your facility is not a coal mine Item 7.15.Indicate whether you know or have reason to believe and if your gross total annual sales for the most recent three years any pollutants in Exhibit 21`4 are present in the discharge. If yes, average less than$100,000 per year(in second quarter 1980 continue to Item 7.16. If no,skip to Item 7.17. dollars),you may submit sales data for those years instead of Item 7.16.For each outfall,list any pollutant in Exhibit 217-4 that conducting analyses for the organic toxic pollutants.The production you know or believe to be present in the discharge in Table C and or sales data must be for the facility that is the source of the explain why you believe it to be present. No analysis is required, discharge.The data should not be limited to production or sales for but if you have analytical data,you must report it.Answer"Yes"to the process or processes that contribute to the discharge,unless Item 7,16 once you have completed this task, those are the only processes at your facility. For sales data, in situations involving intra-corporate transfer of goods and services, Note:Under40 CFR 117.12(a)(2),certain discharges of hazardous the transfer price per unit should approximate market prices for substances(listed in Exhibit 2F-5)may be exempted from the requirements of those goods and services as closely as possible. Sales figures for CWA Section 311.which establishes reporting requirements,civil penalties, years after 1980 should be indexed to the second quarter of 1980 by and liability for cleanup costs for spills of oil and hazardous substances.A using the gross national product price deflator(second quarter of discharge of a particular substance can be exempted if the origin,source,and 1980=100).This index is available online from the U.S. Department amount of the discharged substances are identified in the NPDES permit application or in the permit,if the permit contains a requirement for treatment of Commerce,Bureau of Economic Analysis at of the discharge,and if the treatment is in place.If you would like to apply for http:Ilwww.bea.govinatlonallndf/SNTables.pdf, an exemption from the requirements of CWA Section 311,attach additional sheets of paper to your application,setting forth the following information: If you qualify as a small business according to the criteria above, answer"Yes"to Item 7.7 and ski to Item 7.18.Otherwise,answer 1. The substance and the amount of each substance that might be p discharged. "No"and Continue to Item 7.8. 2. The origin and source of the discharge of the substance. Item 7.8.Indicate whether you know or have reason to believe any 3. The treatment to be provided for the discharge by: pollutants in Exhibit 2F-3 are present in the discharge. If yes, a. An onsite treatment system separate from any treatment system treating your normal discharge; continue to Item 7.9. If no,Skip t0 Item 7.10. b. A treatment system designed to treat your normal discharge and that Item 7.9.For each outfall,list all pollutants in Exhibit 2F-3 that you is additionally capable of treating the amount of the substance identified under paragraph 1 above;or know or have reason to believe are present in the discharge in c. Any combination of the above. Table C(except pollutants previously listed in Table B).Answer "Yes"to Item 7.9 once you have completed this task. See 40 CFR 117.12(a)(2)and(c)or contact your NPDES permitting authority for further information on exclusions from CWA Section 311. item 7.10.Indicate whether you expect any of the pollutants from Exhibit 2F-3 to be discharged in concentrations of 10 parts per Item 7.17 and Table D.Provide data for the storm event(s)that billion(ppb)or greater. If yes,continue to Item 7.11. If no,skip to resulted in the maximum daily discharges for the flow weighted Item 7.12. composite sample in Table D. If sampling is conducted during more than one storm event,you only need to report the information 2F-4 FORD 217—INSTRUCTIONS CONTINUED requested on Table D for the storm event(s)that resulted in any Section 10.Checklist and Certification Statement maximum pollutant concentration reported on Tables A through C. Item 10.1.Review the checklist provided on the application.In Provide flow measurements or estimates of the flow rate,as well as Column 1,mark the sections of Form 2F that you have completed the total amount of discharge for the storm event(s)sampled,the and are submitting with your application.For each section in method of flow measurement,or estimation.Provide the data and Column 2,indicate whether you are submitting attachments. duration of the storm event(s)sampled,rainfall measurements,or Item 10.2.The Clean Water Act(CWA)provides for severe estimates of the storm event that generated the sampled runoff and penalties for submitting false information on this application form. the duration between the storm event sampled and the end of the Section 309(c)(2)of the CWA provides that,"Any person who previous measurable(greater than 0.1 inch rainfall)storm event. knowingly makes any false material statement,representation,or Answer"Yes"to Item 7.17 once you have completed this task. certification in any application, ,..shall upon conviction be punished Used or Manufactured Toxics by a fine of not more than$10,000 or by imprisonment for not more Item 7.18.Review Exhibits 2F-2 through 2F-4 and determine if you than six months or both." currently use or manufacture any of the pollutants listed as FEDERAL REGULATIONS AT 40 CFR 122.22 REQUIRE THIS intermediate or final products or byproducts.If so,answer"Yes." APPLICATION TO BE SIGNED AS FOLLOWS: You should also answer"Yes"if you know or have reason to believe that 2,3,7,8-tetrachloro-dibenzo-p-dioxin(TCDD)is A. For a corporation,by a responsible corporate officer.For the discharged or if you use or manufacture 2,4,5-tdchlorphenoxy purpose of this section,a responsible corporate officer means: acetic acid(2,4,5-T);2-(2,4,5-tdchlorophenoxy)propanoic acid (1)a president,secretary,treasurer,or vice-president of the (Silvex,2,4,5-TP);2-(2,4,5-tdchlorophenoxy)ethyl,2,2- corporation in charge of a principal business function,or any dichloropropionate(Erbon);0,0-dimethyl 0-(2,4,5-trichlorphenyl) other person who performs similar policy-or decision-making phosphorothioate(Ronnel);2,4,5-trichlorophenol(TCP);or functions for the corporation,or(2)the manager of one or hexachlorophene(HCP).If your answer to Item 7.18 is"No,"skip to more manufacturing,production,or operating facilities, Section 8. provided the manager is authorized to make management decisions which govern the operation of the regulated facility Item 7.19.List all of the toxic pollutants identified under Item 7.18, including having the explicit or implicit duty of making major including TCDD. Note that the NPDES permitting authority may capital investment recommendations,and initiating and waive or modify the requirement if you demonstrate that it would be directing other comprehensive measures to assure long term unduly burdensome to identify each toxic pollutant and the NPDES environmental compliance with environmental laws and permitting authority has adequate information to issue your permit. regulations;the manager can ensure that the necessary You may not claim any information submitted in response to Item systems are established or actions taken to gather complete 7.18 as confidential;however,you do not have to distinguish and accurate information for permit application requirements; between use or production of the pollutants or list the amounts. and where authority to sign documents has been assigned or Section 8.Biological Toxicity Testing Data delegated to the manager in accordance with corporate Item 8.1.Answer whether you know of or have reason to believe procedures. that biological toxicity testing has been conducted of your B. For a partnership or sole proprietorship,by a general partner wastewater treatment,including engineering reports or pilot plant or the proprietor,respectively. studies.If no,skip to Section 9.Otherwise,continue. C. For a municipality,state,federal,or other public facility,by Item 8.2.List any tests of which you are aware and their purposes. either a principal executive officer or ranking elected official. For purposes of this section,a principal executive officer of a Section 9.Contract Analysis Information federal agency includes:(1)The chief executive officer of the Item 9.1.Indicate if any of the analyses performed in Section 7 agency,or(2)a senior executive officer having responsibility were performed by a contract laboratory or consulting firm.If no, for the overall operations of a principal geographic unit of the skip to Section 10.If yes,continue to Item 9.2. agency(e.g.,Regional Administrators of EPA). Item 9.2.Provide the name,address,phone number,and pollutants END analyzed by the laboratory or consulting firm(s)in the spaces Submit your completed Form 1,Form 2F,and provided. all associated attachments (and any other required NPDES application forms) to your NPDES permitting authority. 2F-5 General Instructions for Reporting,Sampling,and Analysis Important note:Read these instructions before completing Tables byproducts,and any previous analyses known to you of your A through C and Section 7 of Form 2F. effluent or similar effluent. General Items Sampling Complete the applicable tables for each outfall at your facility. Be The collection of the samples for the reported analyses should be sure to note the EPA Identification Number,NPDES permit supervised by a person experienced in performing sampling of number,facility name,and applicable outfall number at the top of industrial wastewater or stormwater discharges.You may contact each table page and any associated attachments. your NPDES permitting authority for detailed guidance on sampling You may report some or all of the required data by attaching techniques and for answers to specific questions.See Exhibit 1-1 of separate sheets of paper instead of completing Tables A through C Form 1 for contact information.Any specific requirements in the for each of your outfalls so long as the sheets contain all of the analytical methods—for example,sample containers,sample required information and are similar in format to Tables A through preservation,holding times,and the collection of duplicate C.For example,you may be able to print a report in a compatible samples—must be followed. format from the data system used in your gas chromatography/ The time when you sample should be representative of your normal mass spectrometry(GC/MS)analysis completed under Table B. operation,to the extent feasible,with all processes that contribute If you are an existing discharger,you are required to report actual wastewater in normal operation,and with your treatment system quantitative data.See"Use of Historic Data"below for use of operating properly with no system upsets.Collect samples from the historic data.If you are a new source or discharge,you may supply center of the flow channel,where turbulence is at a maximum,at a estimated data along with the source of each estimate.If you have site specified in your present NPDES permit,or at any site adequate quantitative data available,however,you must provide it.Base for the collection of a representative sample. estimates on available,in-house or contractor engineering reports, Grab samples must be taken in the first 30 minutes of discharge(or or any other studies performed on the proposed facility.Use the as soon thereafter as practicable)for pH,temperature,cyanide,total following codes to report your source information in the"Source of phenols,residual chlorine,oil and grease,fecal ooliform(including Information"column: E.coli)and enterococci(previously known as fecal streptococcus at Data Source Code 40 CFR 122.26(d)(2)(iii)(A)(3)),and volatile organic compounds. En ineerin reports 1 You are not required to analyze a flow-weighted composite for these Actual data from pilot plants 1 parameters. Estimates from other engineering 2 For all other pollutants,both a grab sample collected during the first reports 30 minutes(or as soon thereafter as practicable)of the discharge Data from other similar plants 3 and a flow-weighted composite sample must be analyzed.However, Best professional estimates 4 a minimum of one grab sample may be taken for effluents from Others 5 and specify on holding ponds or other impoundments with a retention period of the table greater than 24 hours. No later than 24 months after your facility commences to discharge,you must complete and submit sampling and analysis All samples must be collected from the discharge resulting from a data for the pollutants and parameters in Tables A through C. storm event that is greater than 0.1 inches and at least 72 hours However,you need not report results for tests you have already from the previously measurable(greater than 0.1 inch rainfall)storm performed and reported under the discharge monitoring event.Where feasible,the variance in the duration of the event and requirements of your NPDES permit. the total rainfall of the event should not exceed 50 percent from the Table A requires you to report at least one analysis for each average or median rainfall event in that area. pollutant listed.Tables B and C require you to report analytical data A grab sample must be taken during the first 30 minutes of the in two ways.For some pollutants addressed in Tables B and C,if discharge(or as soon thereafter as practicable),and a flow- you know or have reason to know that the pollutant is present in weighted composite must be taken for the entire event or for the first your discharge,you may be required to list the pollutant and test three hours of the event. (sample and analyze)and report the levels of the pollutants in your Grab and composite samples are defined as follows: discharge.For all other pollutants addressed in Tables B and C, you must list the pollutant if you know or have reason to know that Grab sample:An individual sample of at least 100 milliliters the pollutant is present in the discharge,and either report collected during the first 30 minutes(or as soon thereafter as quantitative data for the pollutant or briefly describe the reasons practicable)of the discharge.This sample is to be analyzed the pollutant is expected to be discharged.(See Items 7.2 through separately from the composite sample. 7.17 of the instructions for completing Tables A through C.).Base Flow-weighted composite sample:A flow-weighted composite your determination that a pollutant is/will be present in your sample may be taken with a continuous sampler that proportions the discharge on your knowledge of the facility's raw materials, amount of sample collected with the flow rate or as a combination of material management practices,maintenance chemicals,history of a minimum of three sample aliquots taken in each hour of discharge spills and releases,intermediate and final products and 2F-6 General Instructions for Reporting,Sampling,and Analysis Continued for the entire event or for the first three hours of the event,with All reporting of values for metals must be in terms of"total each aliquot being at least 100 milliliters and collected with a recoverable metal"unless: minimum period of 15 minutes between aliquot collections.The 0 An applicable,promulgated ELG specifies the limitation for the composite must be flow proportional;the time interval between metal in dissolved,valent,or total form; either each aliquot or the volume of each aliquot must be proportional to either the stream(effluent)flow at the time of • All approved analytical methods for the metal inherently sampling or the total stream(effluent)flow since the collection of measure only its dissolved form(e.g.,hexavalent chromium); the previous aliquot.Aliquots may be collected manually or or automatically.Where GC/MS volatile organic analysis is required, . The NPDES permitting authority has determined that in aliquots must be combined in the laboratory immediately before establishing case-by-case limitations it is necessary to express analysis.Only one analysis for the composite sample is required. the limitations of the metal in dissolved,valent,or total form to Use of Historical Data carry out the provisions of the CWA. Existing data may be used,if available,in lieu of sampling If you measure only one grab sample and one flow-weighted conducted solely for the purposes of this application,provided it is composite sample for a given outfall,complete only the"Maximum representative of the present discharge and was collected within Daily Discharge"columns in the tables and enter"1"in the"Number 3 years of the application due date.If you sample for a listed of Storm Events Sampled"column.The NPDES permitting authority pollutant on a monthly or more frequent basis,summarize the data may require you to conduct additional analyses to further collected within one year of the application for the pollutant(s)at characterize your discharges. issue. If you measure more than one value for a grab sample or a flow- Among the factors that would cause the data to be weighted composite sample for a given outfall and those values are unrepresentative are significant changes in production level; representative of your discharge,you must report them.You must changes in raw materials,processes,or final products;and describe your method of testing and analysis. changes in stormwater treatment.The NPDES permitting authority The"Average Daily Discharge"column on Tables A to C is not may request additional information,including current quantitative compulsory but should be filled out if data are available.To data,if they determine it to be necessary to assess your complete the"Average Daily Discharge"column,determine the discharges.The NPDES permitting authority may allow or establish average of all values within the last year and report the appropriate site-specific sampling procedures or requirements concentration and mass.Report the total number of storm events including sampling locations,the season in which the sampling sampled under the"Number of Storm Events Sampled"column. takes place,the minimum duration between the previous measurable storm event and the storm event sampled,the Substantially Identical Outfalls minimum or maximum level of precipitation required for an If you have two or more substantially identical outfalls,you may appropriate storm event,the form of precipitation sampled(snow request permission from your NPDES permitting authority to sample melt or rainfall),protocols for collecting samples under 40 CFR 1361 and analyze only one outfall and submit the results of the analysis and additional time for submitting data on a case-by-case basis. for all substantially identical outfalls.If your request is granted, Reporting submit the following information on a separate sheet attached to the Report sampling results for all pollutants in Tables A through C as application form:the identity of the outfall you did test and an concentration and mass,with the exception of flow,temperature, explanation of how it is substantially identical to the outfall(s)that pH,color,and fecal coliform organisms. you did not test. Flow,temperature,pH,color,and fecal coliform organisms must Analysis be reported as million gallons per day(mgd),degrees Celsius Except as specified below,all required quantitative data shall be (°C),standard units,color units,and most probable number per collected in accordance with sufficiently sensitive analytical methods 100 milliliters(MPN1100 mL),respectively.Use the following approved under 40 CFR 136 or required under 40 CFR chapter I, abbreviations in the columns requiring'units"in Tables A through subchapter N or 0.A method is"sufficiently sensitive"when: C. • The method minimum level(ML)is at or below the level of the Concentration Mass applicable water quality criterion for the measured pollutant or m=parts per million Ibs=pounds pollutant parameter. IL=milligrams per liter ton=tons(English tons The method ML is above the water quality criterion,but the b=parts per billion mq=milli rams amount of the pollutant or pollutant parameter in the facility's IL=mia rams per liter g=grams discharge is high enough that the method detects and MPN most probable number per kq=kilograms quantifies the level of the pollutant or pollutant parameter in the 100 milliliters T=tonnes metric tons discharge. 2F-7 General Instructions for Reporting,Sampling,and Analysis Continued • The method has the lowest ML of the analytical methods select a different method from the remaining EPA-approved approved under 40 CFR 136 or required under 40 CFR methods that is sufficiently sensitive consistent with 40 CFR chapter I,subchapter N or 0,for the measured pollutant or 122.21(e)(3)(i).Where no other EPA-approved methods exist,you pollutant parameter. must select a method consistent with 40 CFR 122.21(e)(3)(ii). Consistent with 40 CFR 136,you may provide matrix-or sample- When there is no analytical method that has been approved under specific MLs rather than the published levels.Further,where you 40 CFR 136;required under 40 CFR chapter I,subchapter N or 0, can demonstrate that,despite a good faith effort to use a method and is not otherwise required by the NPDES permitting authority, that would otherwise meet the definition of"sufficiently sensitive," you may use any suitable method but shall provide a description of the analytical results are not consistent with the quality assurance the method.When selecting a suitable method,other factors such (QA)/quality control(QC)specifications for that method,then the as a method's precision,accuracy,or resolution,may be considered NPDES permitting authority may determine that the method is not when assessing the performance of the method. performing adequately and the NPDES permitting authority should 2F-8 o Exhibit 217-1.Codes for Treatment Units and Disposal of Wastes Not Discharged 1. PHYSICAL TREATMENT PROCESSES 1—A.................Ammonia stripping 1—M................Grit removal 1-13.................Dialysis 1—N................Microstraining 1—C................Diatomaceous earth filtration 1-0................Mixing 1—D................Distillation 1—P................Moving bed filters 1—E.................Electrodialysis 1—Q................Multimedia filtration 1—F.................Evaporation 1—R................Rapid sand filtration 1—G................Flocculation 1—S................Reverse osmosis(hyperfiltration) 1—H................Flotation 1—T................Screening 1-1..................Foam fractionation 1—U................Sedimentation(settling) 1—J.................Freezing 1—V................Slow sand filtration 1—K.................Gas-phase separation 1—W...............Solvent extraction 1—L.................Grinding(comminutors) 1—X................Sorption 2. CHEMICAL TREATMENT PROCESSES 2—A.................Carbon adsorption 2—G................Disinfection(ozone) 2-13.................Chemical oxidation 2—H................Disinfection(other) 2—C................Chemical precipitation 2-1..................Electrochemical treatment 2—D................Coagulation 2—J.................Ion exchange 2—E.................Dechlorination 2—K................Neutralization 2—F.................Disinfection(chlorine) 2—L.................Reduction 3. BIOLOGICAL TREATMENT PROCESSES 3—A.................Activated sludge 3—E................Pre-aeration 3-13.................Aerated lagoons 3—F................Spray irrigationlland application 3—C................Anaerobic treatment 3—G................Stabilization ponds 3—D................Nitrification—denitrification 3—H................Trickling filtration 4. WASTEWATER DISPOSAL PROCESSES 4—A.................Discharge to surface Water 4—C................Reuseirecycle of treated effluent 4-13.................Ocean discharge through outfall 4—D................Underground injection 5. SLUDGE TREATMENT AND DISPOSAL PROCESSES 5—A.................Aerobic digestion 5—M................Heat drying 5-13.................Anaerobic digestion 5—N................Heat treatment 5—C................Belt filtration 5-0................Incineration 5-1)................Centrifugation 5—P................Land application 5—E.................Chemical conditioning 5—Q................Landfill 5—F.................Chlorine treatment 5—R................Pressure filtration 5—G................Composting 5—S................Pyrolysis 5—H................Drying beds 5—T................Sludge lagoons 5-1..................Elutriation 5—U................Vacuum filtration 5—J.................Flotation thickening 5—V................Vibration 5—K.................Freezing 5—W...............Wet oxidation 5—L.................Gravity thickening 2F-9 Exhibit 2F-2.Conventional and Nonconventional Pollutants(40 CFR 122.21,Appendix D,Table IV) Bromide Chlorine,total residual Color Fecal coliform Fluoride Nitrate-nitrite Nitrogen,total organic(as N) Oil and grease Phosphorus(as P),total Radioactivity(as alpha,total;beta,total;radium,total;and radium 226,total) Sulfate(as SO4) Sulfide(as S) Sulfite(as SO3) Surfactants Aluminum,total Barium,total Boron,total Cobalt,total Iron,total Magnesium,total Molybdenum,total Manganese,total Tin,total Titanium,total 2F-10 + L Exhibit 2F-3.Toxic Pollutants(40 CFR 122.21,Appendix D,Tables II and III) Toxic Pollutants and Total Phenol Antimony,total Copper,total Silver,total Arsenic,total Lead,total Thallium,total Beryllium,total Mercury,total Zinc,total Cadmium,total Nickel,total Cyanide,total Chromium,total Selenium,total Phenols,total GCIMS Fraction—Volatile Compounds Acrolein Dichlorobromomethane 1,1,2,2-tetrachloroethane Acrylonitrile 1,1-dichloroethane Tetrachloroethylene Benzene 1,2-dichloroethane Toluene Bromoform 1,1-dichloroethylene 1,2-trans-dichloroethylene Carbon tetrachloride 1,2-dichloropropane 1,1,1-tdchlorcethane Chlorobenzene 1,3-dichloropropylene 1,1,2-tichloroethane Chlorodibromomethane Ethylbenzene Trichloroethylene Chlomethane Methyl bromide Vinyl chloride 2-Chloroethylvinyl ether Methyl chloride Chloroform Methylene chloride GCIMS Fraction—Acid Compounds 2-chlorophenol 2,4-dinitrophenol Pentachlorophenol 2,4-dichlorophenol 2-nitrophenol Phenol 2,4-dimethylphenol 4-nitrophenol 2,4,6-tdchlorophenol 4,6-dinitm-o-cresol P-chloro-m-cresol GCIMS Fraction—Base/Neutral Compounds Acenaphthene 4-chlorophenyl phenyl ether Hexachlorobenzene Acenaphthylene Chrysene Hexachlorobutadiene Anthracene Dibenzo(a,h)anthracene Hexachlorocyclopentadiene Benzidine 1,2-dichlorobenzene Hexachloroethane Benzo(a)anthracene 1,3-dichlorobenzene Indeno(1,2,3-cd)pyrene Benzo(a)pyrene 1,4-dichlorobenzene Isophorone 3,4-benzofluoranthene 3,3-dichlorobenzidine Naphthalene Benzo(ghi)perylene Diethyl phthalate Nitrobenzene Benzo(k)fluoranthene Dimethyl phthalate N-nitrosodimethylamine Bis(2-chloroethoxy)methane Di-n-butyl phthalate N-nitrosodi-n-propylamine Bis(2-chloroethyl)ether 2,4-dinitrotoluene N-nitrosodiphenylamine Bis(2-chloroisopropyl)ether 2,6-dinitrotoluene Phenanthrene Bis(2-ethylhexyl)phthalate Di-n-octyl phthalate Pyrene 4-bromophenyl phenyl ether 1,2-diphenylhydrazine(as azobenzene) 1,2,4-tdchlorobenzene Butyl benzyl phthalate Fluoranthene 2-chloronaphthalene Fluorene GCIMS Fraction—Pesticides Aldrin Dieldrin PCB-1254 a-BHC a-endosulfan PCB-1221 R-BHC R-endosulfan PCB-1232 y-BHC Endosulfan sulfate PCB-1248 6-BHC Endrin PCB-1260 Chlordane Endrin aldehyde PCB-1016 4,4'-DDT Heptachlor Toxaphene 4,4'-DDE Heptachlor epoxide 4,4'-DDD PCB-1242 2F-11 Exhibit 2F4.Certain Hazardous Substances and Asbestos(40 CFR 122.21,Appendix D,Table V) Toxic Pollutant Asbestos Hazardous Substances Acetaldehyde Dintrobenzene Naphthenic acid Allyl alcohol Diquat Nitrotoluene Allyl chloride Disulfoton Parathion Amyl acetate Diuron Phenolsulfonate Aniline Epichlorohydrin Phosgene Benzonitrile Ethion Propargite Benzyl chloride Ethylene diamine Propylene oxide Butyl acetate Ethylene dibromide Pyrethrins Butylamine Formaldehyde Quinoline Caplan Furfural Resorcinol Carbar l Guthion Strontium Carbofuran Isoprene Strychnine Carbon disulfide Isopropanolamine Styrene Chlorpyrifos Kelthane 2,4,5-T(2,4,5-tdchlorophenoxyacetic acid) Coumaphos Kepone TDE(tetrachlorodiphenyl ethane) Cresol Malathion 2,4,5-TP[2-(2,4,5-tdchlorophenoxy) propancic acid] Crotonaldehyde Mercaptodimethur Trichlorofon Cyclohexane Methoxychlor Triethanolamine 2,4-D(2,4-dichlorophenoxyacefic acid) Methyl mercaptan Triethylamine Diazinon Methyl methacrylate Trimethylamine Dicamba Methyl parathion Uranium Dichlobenil Mevinphos Vanadium Dichlone Mexacarbate Vinyl acetate 2,2-dichloropropionic acid Monoethyl amine Xylene Dichlorvos Monomethyl amine Xylenol Diethyl amine Naled Zirconium Dimethyl amine 2F-12 - r Exhibit 2F-5.Hazardous Substances 1.Acetaldehyde 73.Caplan 144.Ferrous sulfate 2.Acetic acid 74.Carbaryl 145.Formaldehyde 3.Acetic anhydride 75.Carbofuran 146.Formic add 4.Acetone cyanohydrin 76.Carton disulfide 147.Fumadc add S.Acetyl bromide 77.Carbon tetrachloride 148.Furfural 6.Acetyl chloride 78.Chlordane 149.Guthion 7.Acrolein 79.Chlorine 150.Heptachlor 8.AcrAonitrile 80.Chlorobenzene 151.Hexachlorocydopentadiene 9.Adipic add 81.Chloroform 152.Hydrochloric add 10.Aldrin 82.Chlcropyrifos 153.Hydrofluoric add 11.Allyl alcohol 83.Chlorosulfonic add 154.Hydrogen cyanide 12.Ally!chloride 84.Chromic acetate 155.Hydrogen sulfide 13.Aluminum sulfate 85.Chromic acid 156.Isoprene 14.Ammonia 86.Chromic sulfate 157.Isopropanolamine dodecylbenzenesulfonate 15.Ammonium acetate 87.Chromous chloride 158.Keithane 16.Ammonium benzoate 88.Cobaltous bromide 159.Kepone 17.Ammonium bicarbonate 89.Cobaltous formate 160.Lead acetate 18.Ammonium bichromate 90.Cobaltous sulfamate 161.Lead arsenate 19.Ammonium bifluoride 91.Coumaphos 162.Lead chloride 20.Ammonium bisulfde 92.Cresol 163.Lead fiuoborate 21.Ammonium carbamate 93.Crotonaldehyde 164.Lead fluorite 22.Ammonium carbonate 94.Cupric acetate 165.Lead iodide 23.Ammonium chloride 95.Cupric acetoarsenite 166.Lead nitrate 24.Ammonium chromate 96.Cupric chloride 167.Lead stearate 25.Ammonium citrate 97.Cupric nitrate 168.Lead sulfate 26.Ammonium fluoroborate 98.Cupric oxalate 169.Lead sulfide 27.Ammonium fluoride 99.Cupric sulfate 170.Lead thiocyanate 28.Ammonium hydroxide 100.Cupric sulfate ammoniated 171.Lindane 29.Ammonium oxalate 101.Cupric tartrate 172.Lithium chromate 30.Ammonium silicofluoride 102.Cyanogen chloride 173.Malathion 31.Ammonium sulfamate 103.Cydohexane 174.Maleic add 32.Ammonium sulfide 104.2,4-D add(2,4-dichlorophenoxyacetic add) 175.Maleic anhydride 33.Ammonium sulfite 105.2,4-D esters(2,4-dichlorophenoxyacetic add esters) 176.Mercaptodimethur 34.Ammonium tartrate 106.DDT 177.Mercuric cyanide 35.Ammonium thiocyanate 107.Di&non 178.Mercuric nitrate 36.Ammonium thiosulfate 108.Dicamba 179.Mercuric sulfate 37.Amyl acetate 109.Dichlobenil 180.Mercudc thiocyanate 38.Aniline 110.Dichlone 181.Mercurous nitrate 39.Antimony penaachloride 111.Dichlorobenzene 182.Methoxychlor 40.Antimony potassium tartrate 112.Dichloropropane 183.Methyl mercaptan 41.Antimony tribromide 113.Dichloropropene 184.Methyl methacrylate 42.Antimony trichlodde 114.Dichloropropene-dichloprompane mix 185.Methyl parathion 43.Antimony Muodde 115.2,2-dichloropropionic add 186.Mevinphos 44.Antimony trioxide 116.Dichlorvos 187.Mexacarbate 45.Arsenic disulfide 117.Dieldrin 188.Monoethylamine 46.Arsenic pentoxide 118.Diethylamine 189.Monomethylamine 47.Arsenic hichlodde 119.Dimethylamine 190.Naled 48.Arsenic trioxide 120.Dinitrobenzene 191.Naphthalene 49.Arsenic tsulfide 121.Dinitrophenol 192.Naphthenic acid 50.Barium cyanide 122.Dinitrotoluene 193.Nickel ammonium sulfate 51.Benzene 123.Diquat 194.Nickel chloride 52.Benzoic add 124.Disulfoton 195.Nickel hydroxide 53.Benzonitrile 125.Diuron 196.Nickel nitrate 54.Benzoyl chloride 126.Dodecylbenzesulfonic add 197.Nickel sulfate 55.Benzyl chloride 127.Endosulfan 198.Nitric add 56.Beryllium chloride 128.Endrin 199.Nitrobenzene 57.Beryllium fluoride 129.Epichlorohydrin 200.Nitrogen dioxide 58.Beryllium nitrate 130.Ethion 201.Nitrophenol 59.Butylacetate 131.Ethylbenzene 202.Nitrotoluene 60.n-butylphthalate 132.Ethylenediamine 203.Paraforrnaldehyde 61.Butylamine 133.Ethylene dibromide 204.Parathion 62.Butyric add 134.Ethylene dichloride 205.Pentachlorophenol 63.Cadmium acetate 135.Ethylene diaminetetracetic add(EDTA) 206.Phenol 64.Cadmium bromide 136.Feric ammonium citrate 207.Phosgene 65.Cadmium chloride 137.Ferric ammonium oxalate 208.Phosphoric add 66.Calcium arsenate 138.Ferric chloride 209.Phosphorus 67.Calcium arsenate 139.Ferric fluoride 210.Phosphorus oxychloride 68.Calcium carbide 140.Ferric nitrate 211.Phosphorus pentasuifide 69.Calcium chromate 141.Ferric sulfate 212.Phosphorus tdchloride 70.Calcium cyanide 142.Ferrous ammonium sulfate 213.Polychlorinated biphenyls(PCB) 71.Calcium dodecylbenzenesulfonate 143.Ferrous chloride 214.Potassium arsenate 72.Calcium hypochlorite 215.Potassium arsenite 2F-13 Exhibit 2F-5.Hazardous Substances 216.Potassium bichromate 245.Sodium phosphate(dibasic) 271.Uranyl acetate 217.Potassium chromate 246.Sodium phosphate(tribasic) 272.Uranyl nitrate 218.Potassium cyanide 247.Sodium selenite 273.Vanadium penoxide 219.Potassium hydroxide 248.Strontium chromate 274.Vanadyl sulfate 220.Potassium permanganate 249.Strychnine 275.Vinyl acetate 221.Propargite 250.Styrene 276.Vinodene chloride 222.Propionic acid 251.Sulfuric acid 277.Xy!ene 223.Propionic anhydride 252.Sulfur monochloride 278.Xy!enol 224.Propylene oxide 253.2,4,5-T acid(2,4,5-tdchlorophenoxyacetic acid) 279.Zinc acetate 225.Pyrethrins 254.2,4,5-T amines(2,4,5-trichlorophenoxy acetic acid 280.Zinc ammonium chloride 226.Quinoline amines) 281.Zinc borate 227.Resorcinol 255.2,4,5-T esters(2,4,5-trichlorophenoxy acetic acid 282.Zinc bromide 228.Selenium oxide esters) 283.Zinc carbonate 229.Silver nitrate 256.2,4,5-T salts(2,4,5-trichlorophenoxy acetic acid 284.Zinc chloride 230.Sodium salts) 285.Zinc cyanide 231.Sodium arsenate 257.2,4,5-TP acid(2,4,5-trichlorophenoxy propanoic 286.Zinc fluoride 232.Sodium arsenite acid) 287.Zinc formate 233.Sodium bichromate 258.2,4,5-TP acid esters(2,4,5-trichlorophenoxy 288.Zinc hydrosulfite 234.Sodium bifluoride propanoic acid esters) 289.Zinc nitrate 235.Sodium bisulfate 259.TDE(tetrachlorodipheny ethane) 290.Zinc phenolsulfonate 236.Sodium chromate 260.Tetraethyl lead 291.Zinc phosphide 237.Sodium cyanide 261.Tetraethyl pyrophosphate 292.Zinc silicofluoride 238.Sodium dodecylbenzenesulfonate 262.Thallium sulfate 293.Zinc sulfate 239.Sodium fluoride 263.Toluene 294.Zirconium nitrate 240.Sodium hydrosulfide 264.Toxaphene 295.Zirconium potassium fluoride 241.Sodium hydroxide 265.Trichlorofon 296.Zirconium sulfate 242.Sodium hypochlorite 266.Tdchloroethylene 297.Zirconium tetrachloride 243.Sodium methylate 267.Trichlorophenol 244.Sodium nitrite 268.Triethanolamine dodecydbenzenesulfonate 269.Triethylamine 270.Trimethylamine 2F-14 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040.0004 Form U.S Environmental Protection Agency 2F vEPA Application for NPDES Permit to Discharge Wastewater NPDES STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY SECTIONOUTFALL LOCATIONi 1.1 Provide information on each of the facilib,Is outfalls in the table below Ottffall gecehrf g War Name Latltude Lon itude :. :�::,•; 001CC Yadkin River 35e 42 30++ N 80 22 40" W 075 Yadkin River 35e 42' 49" N 80e 22' 22" W / +— II e I u • / u 146— SECTION 2.IMPROVEMENTS +0 CFR 122.21(g)(6)) 2.1 Are you presently required by any federal,state,or local authority to meet an implementation schedule for constructing, upgrading,or operating wastewater treatment equipment or practices or any other environmental programs that could affect the discharges described in this application? ❑ Yes ❑ No 4 SKIP to Section 3. 2.2 Briefly identify each applicable project in the table below. ,Bdef Id"hicattan and Aifea�bed Outfalts ' not Comp n-- llaDates DescrTptton,oProJ•ct (tistositall punters Soarce(sj of DiOta a fi. Regufred t'.ro�•cted -d a► ,:. E,: 2.3 Have you attached sheets describing any additional water pollution control programs(or other environmental projects that may affect your discharges)that you now have underway or planned?(Optional Item) ❑ Yes ❑ No EPA Form 3510-2F(Revised 3-19) Page 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03i05119 NCD043678429 NCO004774 Buck Combined Cycle OMB No.2040-0004 SECTION31' 1 a� 3.1 Have you attached a site drainage map containing all required information to this application?(See instructions for g; G ro specific guidance.) to '` M Q ® Yes ❑ No SECTION 4.POLLUTANT SOURCES 4.1 Provide information on the facility's pollutant sources in the table below. Outfall Impervious Surface Area Total Surface Area Drained Number (within a mile radius of the facility) (within a mile radius of the facility) specify units specify units 001CC 10-5 acres 18.9 acres specify units specify units 075 13A acres 36.3 acres specify units specify units specify units specify units specify units specify units specify units specify units 4.2 Provide a narrative description of the facility's significant material in the space below. (See instructions for content requirements.) Outfall 001CC-tube oil,diesel fuel,mineral oil,ammonia,raw water treatment chemicals,cooling tower treatment Uchemicals. oOutfall 075-laydown yard,trailers,construction storage warehouse,construction material laydown,outage laydown. See the attached stormwater permit renewal application narrative for a more detailed description. 0 a 4.3 Provide the location and a description of existing structural and non-structural control measures to reduce pollutants in stormwater runoff. See instructions forspecificguidance.) Stormwater Treatment Codes Outfall from Number Control Measures and Treatment Exhibit 2F-1 list 001CC retention pond 1-U 075 retention pond 1-U EPA Form 3510-21'(Revised 3-19) Page 2 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05119 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 SECTION !N STORMWATER A 1 5.1 1 certify under penalty of law that the outfall(s) covered by this application have been tested or evaluated for the presence of non-stormwater discharges. Moreover, 1 certify that the outfalls identified as having non-stormwater discharges are described in either an accompanying NPDES Form 2C, 2D, or 2E application. Name(print or type first and last name) Official title Kris Eisenrieth Gm lI Regulated Stations-Buck Combined Cycle Signature Date signed 4D 5.2 Provide the testing information requested in the table below. U Onsite Drainage Points Outrall Number Description of Testing Method Used Date(s)of Testing Directly Observed During Test `w �a 001CC Visual 10/D1/2020 overland discharge path 0 w c 075 Visual 3/25/2020 overland discharge path 0 z SECTION OR 1 t 6.1 Describe any significant leaks or spills of toxic or hazardous pollutants in the last three years. N None `0 N SC �6 J C U C 4� SECTION !' ! I See the instructions to determine the pollutants and parameters you are required to monitor and, in turn,the tables you must o com lete. Not all applicants need to complete each table. b 7.1 Is this a new source or new discharge? 0 ❑ Yes 3 See instructions regarding submission of ❑ No 4 See instructions regarding submission of c 7estimated data. actual data. m Tables A,B,C,and D N 7.2 Have you completed Table A for each outfall? Yes ❑ No EPA Form 3510-2F(Revised 3-19) Page 3 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 7.3 Is the facility subject to an effluent limitation guideline(ELG)or effluent limitations in an NPDES permit for its process wastewater? ❑✓ Yes ❑ No 4 SKIP to Item 7.5. 7.4 Have you completed Table B by providing quantitative data for those pollutants that are(1)limited either directly or indirectly in an ELG and/or(2)subject to effluent limitations in an NPDES permit for the facility's process wastewater? © Yes ❑ No 7.5 Do you know or have reason to believe any pollutants in Exhibit 217-2 are present in the discharge? ❑✓ Yes ❑ No 4 SKIP to Item 7.7. 7.6 Have you listed all pollutants in Exhibit 2F-2 that you know or have reason to believe are present in the discharge and provided quantitative data or an explanation for those pollutants in Table C? ❑✓ Yes ❑ No 7.7 Do you qualify for a small business exemption under the criteria specified in the Instructions? ❑ Yes->SKIP to Item 7.18. ✓❑ No 7.8 Do you know or have reason to believe any pollutants in Exhibit 2F-3 are present in the discharge? ❑� Yes ❑ No 4 SKIP to Item 7.10. 7.9 Have you listed all pollutants in Exhibit 2F-3 that you know or have reason to believe are present in the discharge in c Table C? ❑✓ Yes ❑ No o; 7.10 Do you expect any of the pollutants in Exhibit 2F-3 to be discharged in concentrations of 10 ppb or greater? € ❑ Yes ❑✓ No 4 SKIP to Item 7.12. 40 9 7.11 Have you provided quantitative data in Table C for those pollutants in Exhibit 2F-3 that you expect to be discharged in LM concentrations of 10 ppb or greater? cc ❑✓ Yes ❑ No 7.12 Do you expect acrolein,acrylonitrile,2,4-dinitrophenol,or 2-methyl4,6-dinitrophenol to be discharged in concentrations of 100 ppb or greater? ❑ Yes ❑✓ No 4 SKIP to Item 7.14. 7.13 Have you provided quantitative data in Table C for the pollutants identified in Item 7.12 that you expect to be discharged in concentrations of 100 ppb or greater? ❑ Yes ❑✓ No 7.14 Have you provided quantitative data or an explanation in Table C for pollutants you expect to be present in the discharge at concentrations less than 10 ppb(or less than 100 ppb for the pollutants identified in Item 7.12)? ❑ Yes No 7.15 Do you know or have reason to believe any pollutants in Exhibit 2F-4 are present in the discharge? ❑ Yes ❑✓ No>SKIP to Item 7.17. 7.16 Have you listed pollutants in Exhibit 2F-4 that you know or believe to be present in the discharge and provided an explanation in Table C? ❑ Yes ❑✓ No 7.17 Have you provided information for the storm event(s)sampled in Table D? ❑✓ Yes ❑ No EPA Form 3510-2F(Revised 3-19) Page 4 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NCOOD4774 Buck Combined Cycle OMB No.2040-0004 Used or Manufactured Toxics c 7.18 Is any pollutant listed on Exhibits 2F-2 through 2F-4 a substance or a component of a substance used or C manufactured as an intermediate or final product or byproduct? 0 ❑ Yes ❑ No 4 SKIP to Section 8. a 7.19 List the pollutants below,including TCDD if applicable. 1. 4. 7. CD 2. 5. 8. An 3. 6. 9. SECTiON 8.BIOLOGICAL • DATA i 8.1 Do you have any knowledge or reason to believe that any biological test for acute or chronic toxicity has been made on any of your discharges or on a receiving water in relation to your discharge within the last three years? ❑✓ Yes ❑ No 4 SKIP to Section 9. Ln 8.2 Identify the tests and their purposes below. Test(s) Purpose ofTest(s) Submitted to NPDES Date Submitted x Permitting Authority? 0 ~ Chronic Toxicity Outfall 001A Whole Effluent Toxicity [D Yes ❑ No 09/22/2022 U o Chronic Toxicity Outfall 007 Whole Effluent Toxicity ❑/ Yes ❑ No 12/05/2022 0 m ❑ Yes ❑ No SECTION • •• • i 9.1 Were any of the analyses reported in Section 7(on Tables A through C)performed by a contract laboratory or consulting firm? 0 Yes ❑ No 4 SKIP to Section 10. 9.2 Provide information for each contract laboratory or consulting firm below. Laboratory Number 1 Laboratory N umber 2 Laboratory Number 3 Name of laboratory/firm Pace Analytical Services- puke Energy Laboratory Duke Energy wa Huntersville NC Laboratory ca 0 c Laboratory address 9800 Kincey Avenue Suite 100 13339 Hagers Ferry Rd 13339 Hagers Ferry Rd ? Huntersville NC 28078 Huntersville NC 280078 Huntersville NC 280078 R C Q U R o Phone number U (704)875-9092 (980)875-5245 (980)875-5245 Pollutant(s)analyzed Total Kjedahl Nitrogen, Bromide,Fluoride,Sulfate, Molybdenum,Nickel, Ammonia,Phosphorus,COD, Aluminum,Barium,Boron, Selenium,Arsenic, BOD,Oil and Grease,pH,PCB's Iron,Magnesium,Manganese, Thallium,Total Zinc,Antimony,Arsenic, Suspended Solids Beryllium,Cadmium, Chromium,Copper,Lead EPA Form 3510-2F(Revised 3-19) Page 5 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105119 NCD043678929 NC0004774 Buck Combined Cycle OMB No.204M004 SECTION i 1 10.1 In Column 1 below,mark the sections of Form 2F that you have completed and are submitting with your application. For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority.Note that not all applicants are required to complete all sections or provide attachments. Column 1 Column 2 ✓❑ Section 1 ❑ wt attachments(e.g.,responses for additional outfalls) ❑ Section 2 ❑ wl attachments ✓❑ Section 3 ❑ wl site drainage map ✓❑ Section 4 ❑ wl attachments El Section 5 ❑ wl attachments 0 Section 6 ❑ wl attachments w ❑✓ Section 7 ❑✓ Table A ❑ wl small business exemption request ro p Table B ❑ wl analytical results as an attachment 0 0 Table C ✓❑ Table D CD U ❑✓ Section 8 ❑ wlattachments ca y ✓ Section 9 ❑ wlattachments(e.g.,responses for additional contact laboratories or firms) Y ❑✓ Section 10 ❑ 10.2 Certification Statement I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name(print or type first and last name) Official title 4ro4jek7- t 52nrtik2'i GM Buck Combined Cycle Signature Date signed EPA Form 3510.21'(Revised 3-19) Page 6 EPA identification Number NPDES Permit Number Facility Name Outfail Number Form Approved 03105/19 NCDO43678929 NC0004774 Buck Combined Cycle 075 OMB No.2040-0004 TABLE • •NAL AND NON CONVENTIONAL •+' +1 You must provide the results of at least one anall sis for every pollutant in this table.Complete ana table for each outfall.See instructions for additional details andrequirements. Maximum,DailyRischarge Average:DatlyiDlsclta[ge i �IScu�ceYof (spediy u0s) A. { isdfjl units) - iNOn6eF oftamt :In'orma on Pollutant or Parameter Giab,Sampfe Taken FIoWtghfed :drab Sample Taken' ?FlotnrWatghted Everrts�Sarrt�led Cnaw iotiniewr pU ng;Filst .ptl�ilt8 F1rst r dische ers only;use' Cohtpbalte, T Cc 30 Miriuta _:_. — ._ .. :30 Minutes' diort5)cbdss: (nstiu" 1 Oil and grease <4.9 mg/L <4.9 mg/L 1 2. Biochemical oxygen demand(BODs) 2.1 mg/L 2.7 mg/L 2.1 mg/L 2.7 mg/L 1 >3. Chemical oxygen demand(COD) <25 mg/L 27.5 mg/L <25 mg/L 27.5 mg/L 1 4. Total suspended solids(TSS) 16 mg/L 28 mg/L 16 mg/L 28 mg/L 1 5. Total phosphorus 0.091 mg/L 0.2 mg/L 0.091 mg/L 0.2 mg/L 1 6. Total Kjeldahl nitrogen(TKN) <0.5 mg/L 1.3 mg/L <0.5 mg/L 1.3 mg/L 1 7. Total nitrogen(as N) <O.05 mg/L 1.5 mg/L 0.05 mg/L 1.5 mg/L 1 pH(minimum) 7.2 STU 7.2 STU 1 8: pH(maximum) 7.4 STU 7.4 STU 1 I Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 7 } r re This page intentionally left blank. EPA Identification Number NPDES Permit Number Facility Name Oulfall Number Form Approved 03I05/19 NCD043678929 NC0004774 Buck Combined Cycle 075 OMB No.2040-0004 TABLE • •NAL AND NON CONVENTIONAL '• 41 •t List each pollutant that is limited in an effluent limitation guideline(ELG)that the facility is subject to or any pollutant listed in the facility's NPDES permit for its process wastewater(if the facility is operating under an existing NPDES permit).Complete one table for each outfall.See the instructions for additional details and requirements. Maxin ift'Mily,Discharge Avefte-D lly;1111 harge: Source s units s ar<Ifs {�utrberof:Stoim Information' Pollutant and CAS-Number(lfavailable) ' Grab.,Sample Taken'. Grab Sample Taken (new .sotuoehsew Durlgg Ftrst, - Floik�WetgNtetl Dttrtttg,Ftrsi F{ovwlNetghted `Events°Sa`mpled d�sdiargers only;use Composite ComposEte 30 Minutes 3Minutes cones in,instruclidns) Arsenic <S ug/L <1 ug/L <1 ug/L <1 ug/L 1 Copper 8.58 ug/L 7.68 ug/L 8.58 ug/L 7.68 ug/L 1 Selenium <1 ug/L <1 ug/L <1 ug/L <1 ug/L 1 Mercury 1.8 ng/L 12.5 ng/L 1.8 ng/L 12.5 ng/L 1 Chromium <1 ug/L 2.72 ug/L <1 ug/L 2.72 ug/L 1 Nickel 1.02 ug/L 1.56 ug/L 1.02 ug/L 1.56 ug/L 1 Antimony <1 ug/L <1 ug/L <1 ug/L <1 ug/L 1 Aluminum 0,372 mg/L 6.8 mg/L 0.372 mg/L 6.8 mg/L 1 Fluoride <1 mg/L <0.1 mg/L <1 mg/L <0.1 mg/L 1 Thallium <0.2 ug/L <0.2 ug/L <0.2 ug/L <0.2 ug/L 1 Beryllium <1 ug/L <1 ug/L <1 ug/L <1 ug/L 1 Lead <1 ug/L 1.75 ug/L <1 ug/L 1.75 ug/L 1 Sulfates 40 mg/L 12 mg/L 40 mg/L 12 mg/L 1 Barium 0.025 mg/L 0.024 mg/L 0.025 mg/L 0,024 mg/L 1 Manganese 0.121 mg/L 0.076 mg/L 0.121 mg/L 0.076 mg/L 1 Zinc 0.005 mg/L 0.018 mg/L 0.005 mg/L 0.018 mg/L 1 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 9 y . LL This page intentionally left blank. K EPA Identification Number NPDES Permit Number Facility Name Outtall Number Form Approved 03/05/19 NCD043678929 N00004774 Buck Combined Cycle 075 OMB No.2040-0004 TABLE C.TOXIC POLLUTANTS, CERTAIN HAZARDOUS SUBSTANCES,AND ASBESTOS(40 CFR 122.26(c)(1)(i)(E)(4)and 40 CFR 122.21(g)(7)(vi)(B)and(vii))' List each pollutant shown in Exhibits 2F-2,2F-3,and 2F-4 that you know or have reason to believe is present.Complete one table for each outfall.See the instructions for additional details and requirements. MaximumtQalhl Rlscbargen; #verage Daiiy�R(sc arge Sourcel`of units ' ..�s unifs -.. _ .. _ 0 Oh Po[lutarit'apd CA8..Number(i(apai(at ); Glrati mpie Taken r ,.» t3rab�SamplepUken r(ne+G:rturc tew Flow Welgtlfetghtsdven aTnpled Dgrl0B'Fi�sf Durtiig First disdtaers one,tfse,: :,. Comp 40'M osite Composite :30Miniutes idutas '` .. .. , codesin�iatiuctionsj Molybdenum 5.98 ug/L 4.70 ug/L 5.98 ug/L 4.70 ug/L 1 PCB's <0.5 ug/L <0.42 ug/L <0.5 ug/L <0.42 ug/L 1 Silver <0.3 ug/L <0.3 ug/L <0.3 ug/L <0.3 ug/L 1 Magnesium 12.1 mg/L 3.25 mg/L 12.1 mg/L 3.25 mg/L 1 Boron <0.05 mg/L <0.05 mg/L <O.OS mg/L <0.05 mg/L 1 Bromide <1 ug/L <0.1 mg/L <1 ug/L <0.1 mg/L 1 Nitrate/Nitrite <0.04 mg/L 0.22 mg/L <0.04 mg/L 0.22 mg/L 1 Iron 0.817 mg/L 6.89 mg/L 0.817 mg/L 6.89 mg/L 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 11 MMh This page intentionally left blank. EPA Identification Number NPOES Permit Number Facility name Outiall Number Form Approved 03105/19 ' NCD043678929 NC0004774 Buck Combined Cycle 075 OMB No.2040-0004 STORMTABLE D. •• • Provide data for the storm event(s)that resulted in the maximum daily discharges for the flow-weighted composite sample. Number of Hours Between Total Rainfall During Maximum Flow Rate Duration of Storm Event Beginning of Storm Measured and Total Flow from Rain Event Date of Storm Event (in hours) Storm Event End of Previous Measurable Rain During Rain Event (in gallons or specify units) {in inches) Event (in gpm or speafy units} 12/15/2022 15 0.72 192 3 2700 Provide a description of the method of flow measurement or estimate. Calculation,storm duration x flow X 60 minutes in an hour EPA Form 3510-2F(Revised 3-19) Page 13 DUKE Duke Energy ( ` j Buck Combined Cycle E N E RGY® 1385 Dukeville Road Salisbury,NC 28146 January 24, 2023 Ms. Suzanne McCoy NC DEMLR Stormwater Program 1612 Mail Service Center Raleigh,NC 27699-1612 Subject: Duke Energy Carolinas, LLC. Buck Steam Station and Buck Combined Cycle RECEIVEDy NPDES Industrial Stormwater Permits NCS000578 and NCS000554 Recension, Renewal and Modification Request 1AN 0 r`t"s LRa=WA&Program Dear Ms. McCoy: - Duke Energy Carolinas, LLC is submitting herewith, a request to rescind NPDES Stormwater permit NCS000578, and submitting supplemental information in support of renewing and modifying NPDES Stormwater permit NCS000554. Both subject NPDES permits expire on July 31, 2023. Duke Energy is requesting several changes summarized below. I) Requests recension of Permit NCS000578, this permit was issued to the Buck Steam Station. The Buck Steam Station has been demolished and all industrial activity associated with it has ceased, including closure of the coal pile. All stormwater outfalls associated with the steam station, have been eliminated. The outfalls have either been plugged or removed. This includes outfalls SW- 001, SW-002, SW-003, SW-048, SW-056, SW-073, SW-077, SW-078, SW-079, SW-080 and SW-081. The Outfalls associated with the powerhouse have also been eliminated,that includes outfalls SW-005, SW-007, SW-011, SW-015, SW-016,SW-023, SW-025, SW-027, SW-032, SW-034, SW-035, SW-038, SW-039, SW-058, SW-065, SW-066, SW-067, SW-069, SW-070, SW-071, and SW-072. The only outfalls left,from the steam station, that are included in NCS000578 are outfalls SW-001, SW-002, and SW-075. SW-001 and SW-002 are associated with the Buck Switchyard and Outfall SW-075 is associated with a laydown area, located near the Combined Cycle Plant (NCS000554). Outfalls SW-001 and SW-002, currently permitted in NCS000578, are both outfalls associated with a switchyard that was the primary switchyard for the demolished coal-fired steam station. The switchyard is still in use by Energy Delivery as a standalone switchyard. It is not used by the Buck Combined Cycle Station. The Combined Cycle Station has its own switchyard, the Buck Tie Station, Duke Energy believes that the switchyard formerly associated with the demolished coal-fired steam station meets all requirements in an email from Bethany Georgoulias of the Division of Energy,Mineral and Land Resources (Attachment 10) outlining the requirements for coverage under the NPDES Stormwater Program.The email lists three requirements for a switchyard to be covered under an NPDES industrial SW permit: Ms. Suzanne McCoy Permit NCS000578 and Permit NCS000554 Renewal and Modification Request January 24, 2023 1) A switchyard had been regulated under an NPDES permit or legacy materials from those activities present in the drainage area would be subject. This includes the situations where switchyard runoff comingles with runoff from other areas of a power plant that is covered under an NPDES Permit. 2) A switchyard could also be designated if there is a water quality problem, or it is deemed a significant contributor of pollutants. This is done by agency designation. 3) If a switchyard is considered an integral part of the power plant that is under an NPDES permit,that area is essentially co-located and part of the industrial activity,and it would be subject to the permit. The demolished coal-fired station switchyard that now operates independently of the Buck Combined Cycle Station does not meet any of the requirements to be regulated under an NPDES permit since the coal-fired station has been demolished. Therefore,Duke Energy requests Outfalls SW-001 and SW-002 be removed from coverage under an NPDES industrial SW permit. 2) That NCS000554 be modified to include Outfall SW-075. Duke also requests to move the sampling location of Outfall SW-075 from its current location. The sample location is currently located approximately 1,600 ft from the retention pond and is difficult to sample, generally because of low flow. The new sample location would be located near the discharge flume of the retention pond to allow for ease of sampling and opportunity for higher flow. Attached is the renewal application and modification package for the Buck Combined Cycle Permit (NCS000554) and supplementary information. Should you have any questions please contact Mr. Steve Cahoon at steve.cahoon@duke-energy.com or at (919)-546-7457 or Mr. Dale Wooten at dale.wooten@duke-energy.com or(704)-630-3086. Sincerely, Kris Eisenrieth General Manager Buck Combined Cycle Attachments: Renewal Application Supplemental Information Buck Station Stormwater Permit Renewal Application Attachment 1 EPA Form 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle Station OMB No.2040-0004 Form U.S.Environmental Protection Agency 1 �'l�EPA Application for NPDES Permit to Discharge Wastewater NPDES GENERAL INFORMATION SECTION • -D .i 1.1 Applicants Not Required to Submit Form'l Is the facility a new or existing publicly owned Is the facility a new or existing treatment works 1.1.1 treatment works? 1.1.2 treating domestic sewage? If yes,STOP.Do NOT complete No If yes,STOP.Do NOT No Form 1.Complete Form 2A. complete Form 1.Complete Form 2S. 1.2 Applicants Required to Submit Form 1 1.2.1 Is the facility a concentrated animal feeding 1.2.2 Is the facility an existing manufacturing, operation or a concentrated aquatic animal commercial,mining,or silvicultural facility that is n. production facility? currently discharging process wastewater? o ❑ Yes 4 Complete Form 1 0✓ No ❑✓ Yes 4 Complete Form 0 No z and Form 2B. 1 and Form 2C. 1.2.3 Is the facility a new manufacturing,commercial, 1.2.4 Is the facility a new or existing manufacturing, = mining,or silvicultural facility that has not yet commercial,mining,or silvicultural facility that commenced to discharge? discharges only nonprocess wastewater? Ei Yes-> Complete Form 1 No Yes 4 Complete Form No and Form 2D. 1 and Form 2E. 1.2.5 Is the facility a new or existing facility whose discharge is composed entirely of stormwater a associated with industrial activity or whose discharge is composed of both stormwater and non-stormwater? ✓� Yes 4 Complete Form 1 ❑ No and Form 2F unless exempted by 40 CFR 122.26(b)(14)(x)or (b)(15). SECTIONADDRESS, s • i 2.1 Fa6lIftykitne Buck Combined Cycle Station `0 2.2 EPA Identification Number O NCD043678929 J -O 2.3 Facility Contact Name(first and last) Title Phone number Steve Cahoon Lead Environmental Specialist (919)546-7457 Q c Email address steve.cahoon@duke-energy.com a d 2.4 Facility Mailing Address zStreet or P.O.box 1385 Dukeville Rd City or town State ZIP code Salisbury NC 28146 EPA Form 3510.1(revised 3-19) Page 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle Station OMB No.2040-0004 " 2.5 Facility Location Street,route number,or other specific identifier Q 0 1385 Dukeville Rd a) ___ g County name County code(if known) Rowan 0 City or town State ZIP code o Salisbury NC 28146 SECTIONAND NAICS CODES41 3.1 SIC Codes) Description(op6enal) 4911 Electric Power Generation as m v 0 c� c� z 3.2 NAICS Code(s) Description(optional) �o c 221112 Electric Power Generation,fossil fuel(gas) U SECTION OPERATOR INFORMATION(40 4.1 Name of Operator Duke Energy Carolinas,Inc. 0 4.2 Is the name you listed in Item 4.1 also the owner? R ❑✓ Yes ❑ No 4.3 Operator Status 0 1! ❑ Public—federal ❑ Public—state Other public(specify)utility o ❑ Private ❑ Other(specify) 4.4 Phone Number of Operator (704)630-3015 4.5 Operator Address r Street or P.O.Box �o 526 S.Church St City or town State ZIP code o v Charlotte NC 28202 ;, Email address of operator O kris.eisenreith@duke-energy.com SECTION1 1 +1 C 5.1 Is the facility located on Indian Land? _' ❑Yes ❑✓ No EPA Form 3510-1(revised 3-19) Page 2 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 N00004774 Buck Combined Cycle Station OMB No.2040-0004 SECTION 's • 41 6.1 F.z sting Environmental Permits(check all fhat apply and print or type-the corresponding permit number for each) m NPDES(discharges to surface m RCRA(hazardous wastes) ❑ UIC(underground injection of c water) fluids) NC0004774 NCD043678929 W a ❑✓ PSD(air emissions) ❑ Nonattainment program(CAA) ❑ NESHAPs(CAA) Cn .7 03786T37 .e ❑ Ocean dumping(MPRSA) ❑ Dredge or fill(CWA Section 404) ❑ Other(specify) SECTION1 7.1 Have you attached a topographic map containing all required information to this application?(See instructions for CL specific requirements.) ❑✓ Yes ❑No ❑CAFO—Not Applicable(See requirements in Form 26.) SECTION • OF 41 8.1 Describe the nature of your business. Electric Power Generation d c ca m 0 w ea z SECTION •• • 41 9.1 Does your facility use cooling water? a ❑✓ Yes ❑ No 4 SKIP to Item 10.1. 9.2 Identify the source of cooling water.(Note that facilities that use a coaling water intake structure as described at a,2 40 CFR 125,Subparts I and J may have additional application requirements at 40 CFR 122.21(r).Consult with your o Y NPDES permitting authority to determine what specific information needs to be submitted and when.) v Yadkin River 10.1 Do you intend to request or renew one or more of the variances authorized at 40 CFR 122.21(m)?(Check all that apply.Consult with your NPDES permitting authority to determine what information needs to be submitted and when.) ❑ Fundamentally different factors(CWA ❑ Water quality related effluent limitations(CWA Section Section 301(n)) 302(b)(2)) ❑ Non-conventional pollutants(CWA ❑ Thermal discharges(CWA Section 316(a)) Section 301(c)and(g)) ❑✓ Not applicable EPA Form 3510-1(revised 3-19) Page 3 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD04BG78929 NC0004774 Buck Cornbined Cycle Station OMB No.2040-0004 SECTION 11.CHECKLIST AND CERTIFICATION STATEMENT 1 11.1 In Column 1 below,mark the sections of Form 1 that you have completed and are submitting with your application. For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note that not all applicants are required to provide attachments. Column 1 Column 2 ❑✓ Section 1:Activities Requiring an NPDES Permit ❑ wl attachments ❑✓ Section 2:Name, Mailing Address,and Location ❑ wl attachments ❑✓ Section 3:SIC Codes ❑ wl attachments 0 Section 4:Operator Information ❑ wl attachments ❑✓ Section 5: Indian Land ❑ wl attachments 0 Section 6: Existing Environmental Permits ❑ w!attachments d wl topographic 9 ❑� Section 7: Map ❑✓ ma ❑ wl additional attachments ❑✓ Section 8:Nature of Business ❑ wl attachments ❑✓ Section 9:Cooling Water Intake Structures ❑ wl attachments m a ❑ Section 10:Variance Requests ❑ wl attachments c ❑� Section 11: Checklist and Certification Statement ❑ wl attachments x m 11.2 Certification Statement s U 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief, true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name(print or type first and last name) Official title Kris Eisenreith General Manager II-Regulated Stations Signature Date signed EPA Form 3510-1(revised 3-19) Page 4 Buck Station Stormwater Permit Renewal Application Attachment 2 EPA Form 2F EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.204N004 Form U.S Environmental Protection Agency 2F vEPA Application for NPDES Permit to Discharge Wastewater NPDES STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY SECTIONOUTFALL LOCATIONrt 1.1 Provide information on each of the c1lib s ouffalls in the table below Outfall Receiving Water Name Latitude Longitude Number 001CC Yadkin River 35' 42' 30" N 80, 22' 40" W c 0 075 Yadkin River 35° 42 49" N so* 22' 22" W 0 O I p O ! N SECTION 2. IMPROVEMENTS I 2.1 Are you presently required by any federal,state,or local authority to meet an implementation schedule for constructing, upgrading,or operating wastewater treatment equipment or practices or any other environmental programs that could affect the discharges described in this application? ❑ Yes ❑✓ No 4 SKIP to Section 3, 2.2 Briefly identify each applicable project in the table below. Brief Identification and Affected Outfalls Final Compliance Dates Description of Project gist outfall numbers) Source(s)of Discharge Required Projected d E 0 E 2.3 Have you attached sheets describing any additional water pollution control programs(or other environmental projects that may affect your discharges)that you now have underway or planned?(Optional Item) ❑ Yes ❑ No EPA Form 3510-21'(Revised 3-19) Page 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 3.1 Have you attached a site drainage map containing all required information to this application?(See instructions for CD M_c specific guidance.) c ® Yes ❑ No SECTIONPOLLUTANT SOURCES4t 4.1 Provide information on the facility's pollutant sources in the table below. Outfall Impervious Surface Area Total Surface Area Drained Number (within a mile radius of the faaliiy) (within a mile radius of the facirdy) specify units specify units 07S 13.4 acres 36.3 acres specify units specify units 001 CC 10.8 acres 18.9 acres specify units specify units specify units specify units specify units specify units specify units specify units 4.2 Provide a narrative description of the facility's significant material in the space below.(See instructions for content requirements.) m Outfall 075-Laydown yard,trailers,construction storage yard warehouse,construction material laydown,outage � laydown. oOutfall 001 CC-lube oil,diesel fuel,mineral oil,ammonia,raw water treatment chemicals,and cooling tower y treatment chemicals. See the attached stormwater permit renewal application narrative for a more detailed description. 0 a 4.3 Provide the location and a description of existing structural and non-structural control measures to reduce pollutants in stormwater runoff. See instructions forspecificguidance.) Stormwater Treatment Codes Outfall from Number Control Measures and Treatment Exhibit 2F-1 gist) 075 retention pond 1-U 001 CC retention pond 1-U EPA Form 3510-2F(Revised 3-19) Page 2 EPA Idenfification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCO043678929 NCOOD4774 Buck Combined Cycle OMB No,2040-0004 SECTION •N STORMWATER 1 5.1 t certify under penalty of law that the outfall(s) covered by this application have been tested or evaluated for the presence of non-stormwater discharges. Moreover, l certify that the outfalls identified as having non-stormwater discharges are described in either an accompanying NPDES Form 2C, 2D, or 2E application. Name(print or type first and last name) Official title Kris Eisenrieth General Manager,Buck Combined Cycle Signature Date signed rn 5.2 Provide the testing information requested in the table below. Outfall Onsite Drainage Points o . Number Description of Testing Method Used Date(s)of Testing Directly Observed During Test 075 Visual 10/01/2020 overland discharge path 0 c 001 CC Visual 3/25/2020 overland discharge path 0 SECTIONOR 1 6.1 Describe any significant leaks or spills of toxic or hazardous pollutants in the last three years. N None `0 ur d c �a u in SECTIONDISCHARGE INFORMATION1 See the instructions to determine the pollutants and parameters you are required to monitor and,in turn,the tables you must o complete. Not all applicants need to complete each table. E7.1 Is this a new source or new discharge? ❑ Yes 4 See instructions regarding submission of ❑ No 4 See instructions regarding submission of CDestimated data. actual data. Tables A,B,C,and D Mn7.2 Have you completed Table A for each outfall? 0 ❑ Yes ❑ No EPA Form 3510-2F(Revised 3.19) Page 3 EPA Identification Number NPDES Perm t Number Facility Name Forth Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 7.3 Is the facility subject to an effluent limitation guideline(ELG)or effluent limitations in an NPDES permit for its process wastewater? 0 Yes ❑ No 4 SKIP to Item 7.5. 7.4 Have you completed Table B by providing quantitative data for those pollutants that are(1)limited either directly or indirectly in an ELG and/or(2)subject to effluent limitations in an NPDES permit for the facility's process wastewater? ❑✓ Yes ❑ No 7.5 Do you know or have reason to believe any pollutants in Exhibit 2F-2 are present in the discharge? ❑✓ Yes ❑ No 4 SKIP to Item 7.7. 7.6 Have you listed all pollutants in Exhibit 2F-2 that you know or have reason to believe are present in the discharge and provided quantitative data or an explanation for those pollutants in Table C? ❑✓ Yes ❑ No 7.7 Do you qualify for a small business exemption under the criteria specified in the Instructions? ❑ Yes 4SKIP to Item 7.18. ✓❑ No 7.8 Do you know or have reason to believe any pollutants in Exhibit 2F-3 are present in the discharge? ❑2 Yes ❑ No 4 SKIP to Item 7.10. M 7.9 Have you listed all pollutants in Exhibit 2F-3 that you know or have reason to believe are present in the discharge in Table C? 0 ❑✓ Yes ❑ No 0 7.10 Do you expect any of the pollutants in Exhibit 2F-3 to be discharged in concentrations of 10 ppb or greater? ❑ Yes ❑✓ No 4 SKIP to Item 7.12. _= 7.11 Have you provided quantitative data in Table C for those pollutants in Exhibit 2F-3 that you expect to be discharged in concentrations of 10 ppb or greater? c ❑✓ Yes ❑ No 7.12 Do you expect acrolein,acrylonitrile,2,4-dinitrophenol,or 2-methyl-4,6-dinitrophenol to be discharged in concentrations of 100 ppb or greater? ❑ Yes ❑✓ No 4 SKIP to Item 7.14. 7.13 Have you provided quantitative data in Table C for the pollutants identified in Item 7.12 that you expect to be discharged in concentrations of 100 ppb or greater? ❑ Yes ❑✓ No 7.14 Have you provided quantitative data or an explanation in Table C for pollutants you expect to be present in the discharge at concentrations less than 10 ppb(or less than 100 ppb for the pollutants identified in Item 7.12)? ❑ Yes ❑✓ No 7.15 Do you know or have reason to believe any pollutants in Exhibit 2F4 are present in the discharge? ❑ Yes ❑✓ No 4 SKIP to Item 7.17. 7.16 Have you listed pollutants in Exhibit 2F4 that you know or believe to be present in the discharge and provided an explanation in Table C? ❑ Yes ❑✓ No 7.17 Have you provided information for the storm event(s)sampled in Table D? ❑✓ Yes ❑ No EPA Form 3510-2F(Revised 3-19) Page 4 EPA Identification Number NPOES Permit Number Facility Name Form Approved 03105/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 .p Used or Manufactured Toxics 7.18 Is any pollutant listed on Exhibits 217-2 through 2F-4 a substance or a component of a substance used or 0 manufactured as an intermediate or final product or byproduct? ❑ Yes ❑✓ No 4 SKIP to Section 8. o . a. 7.19 List the pollutants below,including TCDD if applicable. 1. 4. 7. d R 2. 5. 8. 0 3. 6. 9. SECTION 8.BIOLOGICAL TOXICITY TESTING DATA(40 CFR 122.21(g)(1 1)) 8.1 Do you have any knowledge or reason to believe that any biological test for acute or chronic toxicity has been made on any of your discharges or on a receiving water in relation to your discharge within the last three years? O ❑✓ Yes ❑ No 4 SKIP to Section 9. }. 8.2 Identify the tests and their purposes below. Test(s) Purpose of Test(s) Submitted to NPOES Date Submitted ac Oen4iiWng Authority? 0 ~ Chronic Toxicity Outfall 001A Whole Effluent Toxicity ❑✓ Yes ❑ No 09/22/2022 0 Chronic Toxicity Outfall 007 Whole Effluent Toxicity ❑✓ Yes ❑ No 12/05/2022 m ❑ Yes ❑ No SECTION -.CONTRACT ANALYSIS INFORMATION 9.1 Were any of the analyses reported in Section 7(on Tables A through C)performed by a contract laboratory or consulting firm? ❑✓ Yes ❑ No 4 SKIP to Section 10. 9.2 Provide information for each contract laboratory or consulting firm below. Laboratory Number t Laboratory Number 2 Laboratory Number 3 Name of laboratory/firm Pace Analytical Services- Pace Analytical Services- Duke Energy wo Asheville NC Huntersville INC Laboratory 0 c -ca Laboratory address 2225 Riverside Drive 9800 Kincey Avenue Suite 100 13339 Hagers Ferry RD 'o Asheville NC 28804 Huntersville NC 28078 Huntersville INC 28078 ea c Q L c Phone number v (828)254-7176 (704)875-9092 (980)875-5245 Pollutant(s)analyzed total kjeldahl nitrogen, BOD,Oil and Grease,pH copper,total nitrogen, ammonia,phosphorus,COD T55 See attached for Outfall 075 Contract Analysis Information EPA Form 3510-21'(Revised 3-19) Page 5 EPA IdentifEoation Number NPDFS Permit Number Facility Name Form Approved 03/05/19 NCD043678929 NC0004774 Buck Combined Cycle OMB No.2040-0004 SECTION1 CHECKLIST AND CERTIFICATIONi . 10.1 In Column 1 below,mark the sections of Form 2F that you have completed and are submitting with your application. For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note that not all applicants are required to com fete all sections or provide attachments. Column 1 Column 2 ❑✓ Section 1 ❑ wl attachments(e.g.,responses for additional outfalls) ❑ Section 2 ❑ wl attachments ✓❑ Section 3 ❑,r wl site drainage map 0 Section 4 El wl attachments 0 Section 5 ❑ w/attachments s El Section 6 ❑ w/attachments ✓❑ Section 7 ❑ Table A ❑ wl small business exemption request 0 Table B 0 wl analytical results as an attachment ✓ Table C 0 Table D a ❑✓ Section 8 ❑ wlattachments LA ✓ Section 9 Elwlattachments(e.g.,responses for additional contact laboratories or firms) x ❑✓ Section 10 ❑ 10.2 Certification Statement I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name(print or type first and last name) Official title Kris Eisenreith General Manager,Buck Combined Cycle Signature Date signed / EPA Form 3510-2F(Revised 3-19) Page 6 EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03l05I19 NCD043678929 NC0004774 Buck Combined Cycle CC 001 OMB No.2040-0004 TABLE • • I NON CONVENTIONALPARAMETERS 1 You must provide the results of at least one anal sis for every pollutant in this table.Complete one table for each outfa[I.See instructions for additional details and requirements. `Maximum Daily Discharge Average Daily Discharge Source of (specify units) (spe*units) Number of Storm Information Pollutant or Parameter Grab,Sample Taken Grab Sample Taken (new sourcelnew FlouwWelghted FlovwWelghted Events Sampled Composite Composite During First During First dischargers cnl)r use codes in instructions 30 Minutes -__ .; 30 Minutes ... .., . :_ ) 1. Oil and grease <4.9 mg/I <4.9 mg/I 1 2. Biochemical oxygen demand(BOD5) 9.0 mg/L 9.0 mg/L 1 3. Chemical oxygen demand(COD) <25 mg/I <25 mg/I 1 4. Total suspended solids(TSS) 9.8 mg/I 9.8 mg/I 1 5. Total phosphorus <0.05 mg/I <0.05 mg/I 1 6. Total Neldahl nitrogen(TKN) 0.57 mg/I 0.57 mg/I 1 7. Total nitrogen(as N) 0.57 mg/I :jEjf7.1 57 mg/1 1 pH(minimum) 7.1 STU STU 1 8. pH(maximum) 8.4 STU 8.4 STU 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 7 EPA Identification Number NPDES Permit Number FaciI4 Name Outfall Number Form Approved 03/05119 NCD043678929 NC0004774 Buck Combined Cycle CC 001 71 OMB No.2040.0004 TABLE B.CERTAIN CONVENTIONAL AND NON CONVENTIONAL POLLUTANTS(40 CFR 122.26(c)(1)(i)(E)(4)and 40 CFR 122.21(g)(7)(vi)(A)), List each pollutant that is limited in an effluent limitation guideline(ELG)that the facility is subject to or any pollutant listed in the facility's NPDES permit for its process wastewater(if the facility is operating under an existing NPDES permit).Complete one table for each outfall.See the instructions for additional details and requirements. Maximum Daily Discharge Average Daily Discharge Source of s e' units (sped units Number of Storm Information Pollutant and CAS Number(if available) Grab Sample Taken Flow-Weighted Flow-Weighte Grab Sample Taken (new sourcetnew During First During First d Events Sampled dischargers onlT use 30 Minutes Composite 30 Minutes Composite codes in instructions) Ammonia <0.1 mg/1 <0.1 mg/1 1 Nitrate/Nitrite <0.04 mg/I <0.04 mg/1 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 9 EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03105/19 NCD043678929 NCOOO4774 Buck Combined Cycle CC 001 7 OMB No.2040-0004 TABLE C.TOXIC POLLUTANTS,CERTAIN HAZARDOUS SUBSTANCES,AND ASBESTOS(40 CFR 122.26(c)(11)(i)(E)(4)and 40 CFR 122.21(g)(7)(vi)(B)and(vii))' List each pollutant shown in Exhibits 2F-2,2F-3,and 217-4 that you know or have reason to believe is present.Complete one table for each outfall.See the instructions for additional details and requirements. Maximum Daily Discharge Average Daily Discharge Source of (sped units s eci units Number of Storm Information Pollutant and CAS Number(if available) :Grab Sample Taken Grab Sample Taken (new source/new During First Flo Composite Flow-Weighted During First Flow-Weighted Events Sampled dischargers only;use 30 Minutes Composite 30 Minutes Composite codes in instructions) Copper,Total Recoverable <2 ug/I <2ug/I 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-217(Revised 3-19) Page 11 EPA Identification Number NPDES Permit Number Facility name Outfall Number Form Approved 03105/19 NCD043678929 NC0004774 Buck Combined Cycle CC 001 OMB No.2040-0004 TABLE D.STORM EVENT INFORMATION�40 CFR 122.26(c)(1)(i)(E)(6)) Provide data for the storm event(s)that resulted in the maximum daily discharges for the flow-weighted composite sample. Total Rainfall Durin Number of Hours Between Maximum Flow Rate Duration of Storm.Event; g Beginning of Storm Measured and Total Flowfrom Rain Event Date of StonnEvent Storm;Event .During Rain Event (in hours) End of Previous Measurable Rain, (in gallons orspedy units) (in Inches) Event (In 9pm or specify units) 09/30/2022 12 1.30 432 NA NA Provide a description of the method of flow measurement or estimate. NA sampled from a flow controlled structure EPA Form 3510-21'(Revised 3.19) Page 13 Analytical Laboratory Information - Outfall 075 Section 9. Contract Laboratory Analysis Laboratory 1 Laboratory 2 Laboratory 3 Laboratory 4 Name of Duke Energy Laboratory Pace-Asheville Pace—Charlotte Pace—Columbia Laboratory/Firm Laboratory Address 13339 Hagers Ferry Rd 2225 Riverside Dr 9800 Kincey Ave. 106 Vantage Huntersville NC 28078 Asheville NC Suite 100 Point Drive 28804 Huntersville NC West Columbia, 28078 SC 29172 Phone Number 980.875.5245 828.254.7176 704.875.9092 803.791.9111 Pollutant(s)Analyzed aluminum, antimony, biological oxygen oil and grease, mercury arsenic, barium demand, chemical Polychlorinated beryllium, boron, oxygen demand, biphenyls bromide, cadmium, nitrate/nitrite, chromium, copper, phosphorus,total fluoride, iron, lead, kjeldahl nitrogen magnesium, manganese, molybdenum, nickel, selenium, silver, sulfates,thallium,total nitrogen,total suspended solids, zinc EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03/05/19 075 OMB No,2040-0004 TABLE A.CONVENTIONAL AND NON CONVENTIONAL +1 You must provide the results of at least one anal sis for every pollutant in this table.Complete one table for each outfall.See instructions for additional details and requirements. Maximum Daily Discharge Average Dally.Discharge Source of Flow-Weighted EventsrSampled of Storm Information (specify units) (specify unfits Pollutant or Parameter Grab Sample Taken Grab Sample Taken (new source/new FIow�Weighted During First During First dischargers only;use Composite•. " Composite 30 Minutes 30 Minutes codes In instructions} 1. Oil and grease <4.9 mg/1 <4.9 mg/1 1 2. Biochemical oxygen demand(BOD5) 2.1 mg/1 2.1 mg/1 1 3. Chemical oxygen demand(COD) <25 mg/I <25 mg/1 1 4. Total suspended solids(TSS) 16 mg/1 16 mg/1 1 5. Total phosphorus 0.091 mg/1 0.091 mg/1 1 6. Total Kjeldahl nitrogen(TKN) <0.5 mg/I <0.5 mg/1 1 7. Total nitrogen(as N) <0.05 mg/I 0.05 mg/1 i pH(minimum) 7.2 STU 7.2 STU 1 8. pH(maximum) 7.4 sru 7.4 sru 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 7 EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03A5119 075 OMB No.2040.0004 TABL E B.C ERTAI • •NAL AND •N CONVENT 10 NAL POLL UTANTSr CF R 122.26(c)(1)(i)(E)(4) • 41 • + List each pollutant that is limited in an effluent limitation guideline(ELG)that the facility is subject to or any pollutant listed in the facility's NPDES permit for its process wastewater(if the facility is operating under an existing NPDES permit).Complete one table for each outfall.See the instructions for additional details and requirements. Maximum Daily Discharge Average Daily Discharge Source of s units) (sp units Numberof.Storm Information Pollutant and CAS Number(if available) Grab Sample Taken Grab Sample Taken (new sourcelnew C During First Flomposit e ed During First Composite Flow-Weighted Events Sampled dischargers only,use: Composite 30 Minutes 30 Minutes codes in instructions)` Arsenic <1 ug/I <1 ug/I 1 Copper 8.58 ug/I 8.58 ug/I 1 Selenium <1 ug/I <1 ug/I 1 Mercury 1.8 ng/I 1.8 ng/I 1 Chromium <1 ug/I <1 ug/I 1 Nickel 1.02 ug/I 1.02 ug/I 1 Antimony <1 ug/I <1 ug/I 1 Aluminum 0.372 mg/I 0.372 mg/I 1 Fluoride <1 mg/I <1 mg/I 1 Thallium <0.2 ug/I <0.2 ug/I 1 Beryllium <1 ug/I <1 ug/I 1 Lead <1 ug/I <1 ug/I 1 Sulfates 40 mg/I 40 mg/I 1 Barium 0.025 mg/I 0.025 mg/I 1 Manganese 0.121 mg/I 0.121 mg/I 1 Zinc 0.005 mg/I 0.005 mg/I 1 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 9 EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03/05/19 075 :1 OMB No.2040-0004 List each pollutant shown in Exhibits 2F-2,2F-3,and 2174 that you know or have reason to believe is present Complete one table for each outfall.See the instructions for additional details and requirements. Maximum Daily Discharge Average Daily Discharge Source of (sped units (sped units {umber afStid n " Information Pollutant and CAS Number(if available) Grab Sample Taken Grab Sample Taken new sourceMew During First Flow-Weighted During first Flow-Weighted .Events Sampled. dischargers only,use 30 Minutes Composite 30 Minutes Composite codes in instructions) Molybdenum 5.98 ug/I 5.98 ug/I 1 PCB's <0.5 ug/I <0.5 ug/I 1 Silver <0.3 ug/I <0.3 ug/I 1 Beryllium <1 ug/I <1 ug/I 1 Boron <0.05 mg/I <0.05 mg/I 1 Bromide <1 ug/I <1 ug/I 1 Nitrate/Nitrite <0.04 mg/I <0.04 mg/I 1 Iron 0.817 mg/I 0.817 mg/I 1 Magnesium 12.1 mg/I 12.1 mg/I 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2F(Revised 3-19) Page 11 EPA identification Number NPDES Permit Number Facility name Outfall Number Form Approved 03105119 075 OMB No.2040-0004 TABLE •' •' • f Provide data for the storm event(s)that resulted in the maximum daily discharges for the flow-weighted composite sample. Numb r of Hours Between Duration of Storm Event Total Rainfall During Beginning of Storm Measured and Maximum Flow Rate Total Flow from Raln Event- Date of Storm Event Storm Event DuringRain Event (in hours) (in inches) End of Previous Measurable Rain (in gpm or specify units) Qn ga[bns orspedfyunlls� Event 09/30/2022 12 1.30 432 1.5 1,080 Provide a description of the method of flow measurement or estimate. Calculation,storm duration x flow X 60 minutes in an hour EPA Form 3510-2F(Revised 3-19) Page 13 Buck Station Stormwater Permit Renewal Application Attachment 3 Supplemental Information Form SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials SC 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas,process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. SC2 A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results,date sampled,and storm event data. SC 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, parameters surveyed, observations, and date monitoring conducted. SC 4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include information on these BMP's. SC 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes,changes in material handling practices, changes in material storage practices,and/or changes in the raw materials used by the facility. SC 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility(Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal,then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) Buck Station Stormwater Permit Renewal Application Attachment 4 Location and Drainage Maps ('Rl.�ards�! ski. �f. 1� � �• a • � S(I I. " i . J It fir utSLMr� �' • z: } r. ASH RAMN 1q G 17E BOUN03.DAPY P'! —Y- -•.— .� • _ - vice,a"miDow � • i � wa pia � ! - � - . _ it �Yan ` -Trading j I Ff 1417 I Ikdnr,lhri:- 4'II L' - SOURCE: _ ... s"rS.16 SA103UNY&`0L TKVONT pEJA�CANGLE,Ot:TAktD FROM THE Uw5 STORE AT ORMVING HA,BEEN MET VlfrH A PROJECTION OF NORTH f GARO2INASTATE PLANE COCRGINATE.V TEN FIP032w IKIOE3} FIGURE1-1 B ENEMY SITE LOCATION MAP SEEP MANAGEMENT PLAN BUCK STEAM STATION SALISBURY•NORTH CAROLINA >=•�.M,N J air rx i,c�: :uw•r:¢t.4:n:: �..r'c vur ---+ �ti®sr><wsar. oea ati:elia:a �:. •.� :yc -- cwaa�0+ tMt n(1 drf�117�'7r,S� ,v.. •/.'.Oflta 9'i1Ffr� rRf:u9q+rars w'w'wSYM11PA3C61p_t911] F9CC'iiMSM'ila�ILa[R ! VVUw 4' r' Nr r.. y!' q Mi T: ♦ �. F .t•' M -` 4 Y•s it � Y�� � t� d �' • S 01 - ,-.;N Q TMt� -:ti �S j,.4 ? h a�� J��,�t' r. •� �ELT •. rl�.,�-,.--//..s` { y3a.'}t, l,s .•N _ 4 . `. t t.. r ., '4'f�.`�5,r_ f ' - ..�i��.. .r�..•-.c,;,. t A.-_ a�. � ".: �* f� _ � o- 1�� yt - „r T, 1�4 f :.I + .'.,v `n .tr f' '►`�1• � � f _ c" � f to � *� 4 �•� ,.1�� y �� • t Industrial Stormwater Drainage Data Impervious Surface Area BasinID/Outfall (acres) Combined Cycle �',: ,►_ � ;� �tad =�„ � , k• R jF 11 t Combined Cycle . z I. y APT. � .1.3' •�.' ��s. — ..i i � 9i f .; tl, \ ,, ` 4 - N Not for design Data Source: Cardno UAS Survey Bock Steam Station Feburary 2021 Nearmap Imagery a 250 WO Feet ! Industrial �tormwater Drainage Map January 2022 ' - 0 so 100 Meters Buck Station Stormwater Permit Renewal Application Attachment 5 Summary of Analytical Monitoring BuckCombined Cycle NCS000554- Stormwater Outfall SWO01 Monitoring ay`C�, �t Leo 0 .o'`a♦ Quo LJ� aye' �°� to�2 ♦tea. ♦5�y ��� pie ♦Qd` ♦��, Q Units inches SU mg/L mg/L mg/L mg/L mg/L Benchmark NA 6.0-9.0 100 0.010 15 8.4 30 SWRetPond to Yadkin R. Frequency SA SA SA SA SA SA SA Date 10/10/2018 0.42 6.3 10 0.00364 <4.3 <0.02 <0.1 compliant 1/29/2019 0.18 7.3 15 0.00467 <5.0 <0.02 0.18 compliant 11/12/2019 0.49 7.8 6.6 0.00182 <5.0 <0.02 0.23 compliant 1/24/2020 1.36 7.2 15 0.00460 <5.0 <0.02 0.88 compliant 8/31/2020 2.23 7.7 7.7 0.00149 <5.0 <0.02 0.30 compliant 1/25/2021 0.36 7.0 <2.5 0.00262 <5.0 <0.02 0.23 compliant 7/8/2021 0.31 7.9 3.9 <0.005 <4.9 0.423 0.94 compliant 2/4/2022 0.27 7.0 6.5 0.00316 <4.8 <0.02 1 0.18 compliant 9/30/2022 1.3 7.1 9.5 0.00204 <4.8 <0.10 1 <0.5 compliant SU -standard units SA-semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc-discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three Tier I (3) consecutive results are below benchmark value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. • •. • - • • • • • • • • • 1 •. • '• • • protocols iet -o • �• - o� -• by ' Other Notes: BuckSteam Station NCS000578-Stormwater Outfall SWO01 Monitoring a50 o\ o e�2` �.p'L 1�4' ZP J,Ia `\� a� � �O r�ti r N. r tti r c, r cti r tti r c, \ L Al Poo Q�°° Pi°o Parameter Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L I ug/L ug/L Benchmark NA 6.0-9.01 100 0.010 0.056 _[_2.126-1 NE 15 1 <-Detect-> 12"CMP to Yadkin R. Frequency* SA SA SA SA SA SA SA SA SA * monthly when in Tier status. Date 10/11/2018 2.96 7.5 10 0.00900 0.00122 0.198 8.89avg 1 <4.4 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier I (Zn), (note:copper is close to benchmork) 11-2018 No Flow No flow 12/20/2018 1.61 7.1 <5 0.00230 0.00346 0.246 12.4 1 <4.4 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 1 <0.40 Tier II (Zn), Hg>12 1/29/2019 0.18 7.6 19 0.00540 0.00266 0.180 18.0a g 1 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier II (Zn), Hg>12 2-3/2019 No Flow No flow 4/12/2019 0.52 6.9 77 0.0166 0.00135 EaLl 22.3 1 <5.0 <0.40 <0.40 <0.40 <0.40 1 <0.40 <0.40 <0.40 Tier I(Cu),Tier III (Zn), Hg>12 need 30 day Tier III notice to NC 5-10/2019 No Flow No flow 11/12/2019 0.49 7.8 18 0.00761 <0.001 7.76 1 <5.0 <0.40 <0.40 <0.40 <0.40 1 <0.40 <0.40 <0.40 Tier I (1st compliance ("c")Cu),Tier III (Zn), 12/2019 No Flow No flow 1/24/2020 1.36 7.5 93 0.00916 <0.001 12.1avg 1 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier I (2nd c: Cu),Tier III (Zn), Hg>12 02/2020 No Flow No flow 3/3/2020 0.16 7.9 <2.5 0.00281 0.00179 2.17avg 1 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (Zn) 04/2020 No Flow No flow 5/27/2020 0.81 7.7 <2.5 0.00370 0.00120 v 3.26 1 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (Zn) 6/16/2020 1.89 6.9 3.1 0.00460 0.00122 3.35 1 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 1 <0.40 Tier III (Zn) 07/2020 No Flow No flow 8/31/2020 2.23 6.2 <2.5 0.00284 0.00143 0.125 2.29av9 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (1st c:Zn) 9/17/2020 1.69 7.8 <2.5 0.00391 <0.001 0.115 2.48 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (2nd c:Zn) 10/28/2020 0.28 7.7 5.4 0.00571 <0.001 3.97avg <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn) 11/11/2020 0.39 7.6 4.1 0.00490 <0.001 i 2.14avg <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn) 12/14/2020 1.16 7.3 41 0.00886 <0.001 0.104 11.9 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (1st c: Zn) 2/11/2021 0.45 6.8 4.5 0.00358 0,00130 (iii ?!. 2.47 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn) 3/16/2021 0.55 7.0 3.0 0.00223 0.00144 0.118 1.92 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (1st c:Zn) 4-8/2021 No Flow No flow 9/21/2021 0.96 1 7.0 1 <2.5 1 0.00591 1 <0.001 I C-!F54 1 2.14 1 <5.0 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier III (Zn) 10-12/2021 No Flow No flow 01-02/2022 No Flow No flow 3/23/2022 0.44 1 7.6 1 <2.5 1 0.00454 1 0.00212 1 Co 3 C_- 2.94avg 1 <5.0 1 <0.50 1 <0.50 1 <0.50 1 <0.50 1 <0.50 1 <O.SO 1 <0.50 Tier III (Zn) 4-12/2022 No Flow No flow SU-standard units SA-semi-annual mg/L-milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L-micrograms per liter Disc-discontinued ng/L-nanograms per liter ROS-representative outfall status Compliant no shading NFlow-no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3)consecutive results Tier I are below benchmark value. �tTier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. • •.^ • c • • • • •a • • a • f • 1 •. • • • • a protocols • • potentially Tier • • b. ! ' Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SWO02 Monitoring ay\ `yoti0 cti�,Ly `4 `yeti `y��� `4 `NY �o a� r�o r�o r�o r�o r�o r�o r�o P�oc P�oc, P�oc P�oc P�oc P�oc Ptoc o`er o`er oQQ ewe .00 �� �� Parameter Q C C h �` O Q Q Q Q Q Q Q Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L 21"CMP to Yadkin R. Benchmark NA 6.0-9.0 100 0.010 0.056 0.126 NE 15 <-Detect-> Frequency* SA SA SA SA SA SA SA SA SA * monthly when in Tier status. Date 10/11/2018 2.96 7.3 1 <5 1 0.0126 1 0.00373 1 0.227 2.34 1 <5.0 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier I (Cu,Zn) 11-2018 No Flow 12/20/2018 1.61 1 7.3 1 11 1 0.0131 1 0.00615 1 0.293 11.5 1 <4.5 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier II (Cu,Zn) 1-3/2019 No Flow 4/5/2019 0.98 7.7 9.2 0.00945 0.00204 1 0.438 3.41a g <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier II (Zn, 1st compliance("c"):Cu) 5-10/2019 No Flow No flow 11/12/2019 0.49 7.5 14 0.00856 0.00147_TJCI • 4.54 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (Zn,2nd c:Cu) 12/2019 No Flow No flow 1/24/2020 1.36 7.5 1 6.6 1 0.00694 <0.001 2.85 <5.0 1 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 1 <0.40 Tier III (Zn) 02/2020 No Flow No flow 3/3/2020 0.16 8.2 7.4 0.0119 0.00164 2.96 <5.0 <0.40 <0.40 <0.40 <0.40 c0.40 <0.40 <0.40 Tler III (Zn),Tier I Cu(next Cu >BM Is Tier III) 04/2020 No Flow No flow 5/27/2020 0.81 6.1 5.8 1 0.00831 0,001741 M19M2.86 11 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 1 <0.40 Tier III (Zn),Tier I (1st c:Cu- next Cu>BM=Tier III), Note: O&G detection close to bm 6/16/2020 1.89 1 7.1 8.9 0.00113 3.54 <5.0 <0.40 <0.40 1 <0.40 1 <0.40 <0.40 <0.40 1 <0.40 Tier III (Cu,Zn) 30 day notification needed for Cu 07/2020 No Flow No flow 8/31/2020 2.23 7.0 9.3 0.00116 5.44 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (Cu,Zn) 9/17/2020 1.69 7.0 4.3 0.00888 <0.001 2.85 <5.0 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Tier III (Zn, 1st c: Cu) 10/28/2020 0.28 7.6 <2.5 ' 0.00127 1 2.47 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Cu,Zn) 11/11/2020 0.39 7.5 22 0.00950 <0.001 0 2.10 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn, 1st c: Cu) 12/14/2020 1.16 7.2 22 1 1 <0.001 1 8.49 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn,Cu) 2/11/2021 0.45 7.1 3.4 OffI 0.00148 t 2.51 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn, Cu) 3/16/2021 0.55 1 7.3 12 0.00113 • 3.12 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 Tier III (Zn,Cu) 4-8/2021 No Flow No flow 9/21/2021 0.96 1 6.7 1 4.2 H 0.00624 1 <0.001 a`._ ,' 1.40 1 <5.0 1 <0.40 <0.40 1 <0.40 <0.40 1 <0.40 1 <0.40 <0.40 Tier III (Zn, 1st c:Cu) 10-12/2021 No Flow No flow 1-2/2022 No Flow No flow 3/23/2022 0.44 1 7.7 1 3.6 0.00816 1 0.00140 C_L t� 2.00 1 <5.0 1 <0.50 <0.50 1 <0.50 <0.50 1 <0.50 1 <0.50 1 <0.50 Tier III (Zn,2nd c:Cu) 4-12/2022 1 No Flow INo flow SU-standard units SA-semi-annual mg/L-milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L-micrograms per liter Disc-discontinued ng/L-nanograms per liter ROS-representative outfall status Compliant no shading NFlow-no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3)consecutive Tier I results are below benchmark value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. Four exceedancesof benchmark value during monitoringperiod-evaluate causes and implement corrective • • 1 days ofreceiving results for • •. •L,.Sampling protocols evaluate• and Tier IH potentially modified by ' Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SWO03 Monitoring ay a5o Say .110 �a� eJa` �O� ptip �titi �,5'L ��ti ��� ��o• boo ,`o 5e` NO�'y `0 `o`'y or\Oi or\o` or or or or or Parameter ,�o �� �o LoQ �e� ,��� �a O� QL� QL� QL� QL� q QL� q Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L 10"CMP to Yadkin R. Benchmark NA 6.0-9.0 100 0.010 0.056 0.126 NE 15 <-Detect-> Frequency* SA SA SA SA SA SA SA SA SA * monthly when in Tier status. Date 10/11/2018 2.96 1 7.5 130 0.0282 1 0.00980 1 0.143 697 <4.5 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 <0.40 1 <0.40 Tier I (TSS, Cu, Zn) Hg>12 11-2018 No Flow 12/20/2018 1.61 7.2 90 0.0370 1 0.0124 1 0.317 821 1 <4.4 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier II (Cu, Zn) Tier 11st compliance ("c")TSS, Hg >12 1-3/2019 No Flow 4/5/2019 0.98 1 8.1 490 0.0767 10.00413 1 0.230 1 454 1 <5.0 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 <0.40 <0.40 Tier I (TSS), Tier II (Cu,Zn), Hg>12. 5-12/2019 No Flow No flow 01-12/2020 No Flow No flow 1-12/2021 No Flow No flow 1-12/2022 No Flow No flow SU -standard units SA- semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc- discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until Tier I three (3)consecutive results are below benchmark value. Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are 'Tier II below benchmark value. Tier III Four exceedancesof benchmark value during monitoringp- • and implement Prrective actions. • ' within 30 days • for •urth exceedance. Samplingprotocols valuated and potentially modified by NCDENR. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW048 Monitoring `e4 \C�v Noi got poi Noc mot roc got oor or or or or or Parameter ,�o� Q� ,�o LoQ �e� ,(,S �e O� QL� Q�� QL� QL� Q�� QL� QL� Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L 15 Steel Pipe to Yadkin R. Benchmark NA 6.0-9.0 100 1 0.010 0.056 0.126 NE 15 <-Detect-> Frequency SA SA SA SA SA SA SA SA SA Date 2H2O18 no qualifying flow no flow 11-12O19 no qualifying flow no flow 21-12O19 no qualifying flow no flow 6/16/2020 1.89 1 7.7 1 410 1 0.0326 1 <0.001 1 0.041 4.53 1 <5.0 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier I (TSS, Cu) 7-8/2020 no qualifying flow no flow 9/17/2020 1.69 1 7.6 10 0.0111 1 <0.001 10.0119 5.91 1 <5.0 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 <0.40 Tier II (Cu),Tier I (1st c: TSS) 10-12/2020 no qualifying flow no flow 1-12/2021 no qualifying flow no flow 1-12/2022 no qualifying flow no flow SU -standard units SA-semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc- discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances Tier I One exceedance of benchmark value -Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three (3)consecutive results are below benchmark value. Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are Tier II below benchmark value. Tier III Four exceedancesof• - during monitoringperiod-evaluate causes an• implement co"i,4ective • • ' within 30 days ofreceiving result for • •.nce. Sampling protocols evaluated and potentially modified by NCDENR. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW056 Monitoring aye a �•1° a� �Ne \0 „y0, titi'1. tiy3 tiyo� �,yo� �a� ec o1 `fie �o� �o yes poi \oi `oi \°i \°c `o� \oc �aN�a`� �a`�JyQ ��`J� ° � Pjo`r Poor Poor Pion Poor Pion P�°r Parameter ,�o 9\ ,�o LoQ 5°� ,(.i` �e O� QL� Q�� QL� QL� QL0 14 Iq Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L I ug/L I ug/L ug/L ug/L Benchmark NA 6.0-9.0 100 0.010 0.056 0.126 NE 15 <-Detect-> to Yadkin R (alt. if submerged) Frequency SA SA SA SA SA SA SA SA SA Date 2H2O18 no qualifying flow no flow 1H2O19 no qualifying flow no flow 2H2O19 no qualifying flow no flow 1H2O20 no qualifying flow no flow 2H2O20 no qualifying flow no flow 1H2O21 no qualifying flow no flow 2H2O21 no qualifying flow no flow 1H2O22 no qualifying flow no flow 2H2O22 no qualifying flow no flow SU -standard units SA- semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc- discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Bxceedances Tier I One exceedance of benchmark value -Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3)consecutive results are below benchmark value. ,e Two consecutive exceedances of benchmark value- evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results ai•e -- below benchmark value. • -• • • • • • • •• ill • • r • • 1 •. • • • �. • • • • Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW073 Monitoring h` ,a eo\ a� �a� �0� �°a� ,l°�a� a\ \ � � o�a� eta � 1�° �a� \Q'e, �La\ \L\ 01�0 °� '`a \y�°1 `he, � °� t�``J a�` t°� Qe `fie a\ '<?�° �0�`J ,a��`J G�'L `GJ Parameter �o �� �o h� Qc �o Comments/Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 36"CMP to Yadkin R.-Draining ash haul routes Benchmark NA 6.0-9.0 100 1 0.0003 0.34 NE 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 NE 0.126 NE Frequency* SA-QCA SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA I SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA * monthly when in Tier status. Date 10/11/2018 2.96 1 7.9 1 5500 1 <0.0002 1 0.00606 <0.05 1 <0.020 1 <0.001 1 0.0840 1 0.191 0.0577 0.0690 <0.001 0.00 11 00.00113 0.414 1 522 Tier I (TSS,Cu, Zn) Hg>12 (note:Ni &Cr near benchmarks) 11-2018 No Flow 12/20/2018 1.61 8.2 35 <0.0002 0.00214 0.138 <0.001 <0.001 1 0.00695 0.0162 0.00926 <0.001 <0.001 <0.001 <0.0002 0.062 16.7 Tier II (Cu),Tier 11st compliance ("c")for TSS&Zn, Hg>12 1/29/2019 0.18 7.0 5.0 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 0.00104 1 <0.001 <0.001 <0.001 <0.0002 0.022 7.03 Tier II (1st C: Cu),Tier 12nd C:TSS&Zn 2-3/2019 No Flow 4/12/2019 0.52 7.1 370 <0.0002 0.00261 <0.05 <0.001 <0.001 0.00967 0.0162 0.00534 1 0.00765 <0.001 <0.001 0.000214 0.043 103 Tier II (Cu),Tier I (TSS), Hg>12 5-12/2019 No Flow no flow 1/24/2020 1.36 7.4 100 <0.0002 0.00111 <0.05 <0.001 <0.001 0.00677 0.00378 0.00437 <0.001 <0.001 <0.0002 0.039 24.8 Tier III (Cu), I ier I (1st c: ISS), Hg>11 ISS at benchmark Ilmlt 02-05/2020 No Flow no flow 6/16/2020 1.89 7.2 62 <0.0002 0.00133 <0.05 <0.001 <0.001 1 0.00504 0.00448 0.00398 <0.001 <0.001 <0.0002 0.054 9.81 Tier III (Cu),Tier I (2nd c:TSS) 7-8/2020 No Flow no flow 9/17/2020 1.69 7.3 79 1 <0.0002 0.00134 1 <0.05 <0.001 <0.001 0.00718 =• 0.00 1-2 0.00460 <0.001 <0.001 <0.0002 0.044 11.0 Tier III (Cu),Tier I (3rd c:TSS out of Tier Status) 10-11/2020 No Flow no flow 12/14/2020 1.16 1 7.5 240 1 <0.0002 0.00139 1 <0.05 <0.001 <0.001 0.0127 0.00530 1 0.00734 <0.001 <0.001 1 <0.0002 0.059 21.1 Tier III (Cu),Tier I (TSS next>BM=Tierlll), Hg>12 1-12/2021 No Flow no flow 1-12/2022 No Flow no flow SU -standard units <- not detected at the following level SA-semi-annual mg/L-milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L-micrograms per liter NE-not established Disc-discontinued ng/L-nanograms per liter PCB-polychlorinated biphenyls ROS-representative outfall status Compliant no shading NFlow-no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3)consecutive results are below Tier I benchmark value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. Four exceedancesof benchmark value during monitoringperiod and implement • • • 1 days • for •urth exceedance. Samplingprotocols evaluate• and potentially modified by Tier[it Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW075 Monitoring a�\ o♦� ♦ a♦ �a♦ a♦ a♦ ♦ ea5 a♦ tea♦ �°tea � '�° tea♦ a♦ ♦ �°` �°` o,�a a♦♦ eca A10� �o ♦ e� Lai \L` ��° °� ova 5�� �� ♦\� '�a♦ ��O �a \� \ J \ \`� \ to a♦� a♦� at\ o�� oc �♦`J c�`� o� Qe moo♦ a� .moo e��J ♦�`J c,\� i°J o` �, o'` �4 ei as ,ct oQ �o °a o °♦ ra �c e Parameter � Q � 5 p Q� Q� C, C., L � ♦, p 5 � 1, �` Comments/Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 30"CMP to Yadkin R. - Draining ash haul routes Benchmark NA 6.0-9.0 1 100 1 0.0003 0.34 NE 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 1 NE 0.126 NE Frequency* SA-QCA SA-QCA SA-QCA SA-QCA I SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA I SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA I SA-QCA SA-QCA SA-QCA * monthly when in Tier status. Date 10/11/2018 2.96 1 8.1 1 5300 1 0.000324 1 0.00864 1 <0.05 1 <0.020 1 <0.001 0.148 1 0.336 1 0.109 1 0.123 1 <0.001 1 0.00133 1 0.00119 1 0.543-1 2180 Tier I (TSS, Cu, Zn, Ag, Pb) Hg >12 11-2018 No Flow 12/20/2018 1.61 7.2 15 <0.0002 0.00139 <0.05 <0.001 <0.001 0.00382 1 0.00338 0.00225 <0.001 <0.001 <0.001 <0.0002 0.039 4.19a g Tier 1 (1 compliance ("c") for TSS, Cu, Zn, Ag, Pb) 1-3/2019 No Flow 4/12/2019 0.52 7.8 1300 <0.0002 0.00224 <0.05 <0.001 <0.001 0.0421 1 0.0985 0.0230 0.0323 <0.001 <0.001 0.000369 0.147 148a„g Tier I (TSS, Cu, Zn)(2nd c: Ag, Pb), Hg>12 5-10/2019 No How no flow 11/12/2019 0.49 7.5 470 <0.0002 0.00168 <0.05 <0.001 <0.001 0.0128 1 0.0318 0.00689 0.00973 <0.001 <0.001 <0.0002 0.064 25.1a g Tier II (TSS, Cu), Tier I (1st c: Zn), Hg>12 12/2019 No Flow no flow 1/24/2020 1.36 1 7.5 =o <0.0002 <0.001 <0.05 <0.001 <0.001 0.0129 �.� t 0.00526 0.00810 1 <0.001 <0.001 <0.0002 0.051 28.5 Tier III (TSS, Cu), Tier I (2nd c: Zn), Hg>12 02/2020 No Flow no flow 3/3/2020 0.16 1 7.7 20 <0.0002 1 <0.001 <0.05 <0.001 I <0.001 1 0.00119 1 0.00180 1 <0.001 <0.001 <0.001 <0.001 1 <0.0002 0.014 1.91 Tier III (1st c:TSS & Cu) 04/2020 No Flow no flow 5/27/2020 0.81 7.7 4.5 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 0.00117 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 1.23a g Tier III (2nd c: TSS & Cu) 6/16/2020 1.89 7.3 81 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00470 0.00276 0.00425 <0.001 <0.001 <0.0002 0.023 6.52a�g Tier III (Cu, 3rd c: TSS) 7/2020 No Flow no flow 8/31/2020 2.23 7.4 _ <0.0002 <0.001 <0.05 <0.001 <0.001 0.00558 ff)a� 0.00308 0.00648 <0.001 <0.001 <0.0002 0.029 14.5 Tier III (Cu, TSS), Hg>12 9/17/2020 1.69 7.9 3.1 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 0.00168 <0.001 <0.001 <0.001 <0.001 <0.0002 0.006 2.67a�g Tier III (1st c: Cu &TSS) 10/28/2020 0.28 7.5 4.1 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 0.00125 <0.001 <0.001 <0.001 <0.001 <0.0002 0.005 2.44 Tier III (2nd c: Cu &TSS) 11/11/2020 0.39 7.7 7.0 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00115 0.00454 <0.001 <0.001 <0.001 <0.001 <0.0002 0.010 5.39 Tier III (3rd c: Cu &TSS) 12/14/2020 1.16 7.2 29 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00402 0.00809 0.00195 0.00224 <0.001 <0.001 <0.0002 0.020 11.1 Tier III (4th c: Cu &TSS) 1/25/2021 0.36 7.5 9.6 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.020 1.71a,g Tier III (5th c: Cu &TSS) 2/11/2021 0.45 6.1 <2.5 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.0002 0.008 0.713a g Tier III (6th c: Cu &TSS) 3/16/2021 0.55 7.4 51 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00282 1 0.00958 0.00178 0.00256 <0.001 <0.001 <0.0002 0.028 6.51a g Tier III (7th c: Cu &TSS) 4-6/2021 No Flow no flow 7/8/2021 0.31 7.5 9.4 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 1 0.00207 0.00102 <0.001 <0.001 <0.001 <0.0002 0.024 3.29,,,g Tier III (8th c: Cu &TSS) 8/2021 No Flow no flow 9/21/2021 0.96 7.3 25 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 1 <0.002 0.00221 <0.001 <0.001 <0.001 <0.0002 0.018 1.72a,g Tier III (9th c: Cu &TSS) 10-12/2021 No Flow no flow 01/2022 No Flow no flow 2/23/2022 0.27 7.1 8 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.002 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 2.11avg Tier III (10th c: Cu &TSS) 3/16/2022 0.62 6.5 <5.1 <0.0003 <0.001 <0.05 <0.001 <0.001 <0.001 <0.002 <0.001 <0.001 <0.001 <0.001 <0.0002 <0.005 2.72z g Tier III (11th c: Cu &TSS) Buck - Stormwater Outfall SW075 Monitoring a�\ o♦� ♦ a♦ �a♦ a♦ a♦ eat a♦ ova♦ o'`a �o� ,�o tea♦ a♦ ♦ ,�o'` ,�o'` ova a♦♦ eta °� ♦ e� Lai \L\ \�° <°� o'�a � a� ♦\� '�a♦ �.�0 1 a \ o \ \5 o ` �` oParameter L ff c ♦� a ° ep Comments/Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 30"CMP to Yadkin R. - Draining ash haul routes Benchmark NA 6.0-9.0 100 0.0003 0.34 NE 1 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 NE 0.126 NE Frequency* SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA- CA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA * monthly when in Tier status. Date 4-8/2022 No Flow no flow 9/30/2022 1.30 7.4 13 1 <0.0003 <0.001 <0.05 1 <0.001 <0.001 <0.001 1 <0.002 <0.001 <0.001 <0.001 <0.001 <0.0002 0.009 2.05a�g Tier III (12th c: Cu &TSS) 10-12/2022 Composite sample was collected during event and not a grab sample SU - standard units < - not detected at the following level SA-semi-annual mg/L- milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter NE - not established Disc- discontinued ng/L- nanograms per liter PCB- polychlorinated biphenyls ROS - representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3) consecutive results are belo, Tier benchmark value. Tier II Two consecutive exceedances of benchmark value -evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3) consecutive results are below benchmark value. • dances of•ench-mark value during monitoring periodand implement corrective • • 1 days of •r fourth exceedance. • protocols evaluated and potentially modifill . .by ' Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW077 Monitoring aye yo a♦ ova�a`��a♦♦ SJy�e�`aaa `p� °tea♦ .```p\�o� � . •`�� \� •`�� \ .`� � �a ♦`� tea ova♦ 5� a♦ 'Ile A", �° e�"'ote a♦ ♦\�e A.° te♦ ° ♦ tea♦ \�°te a♦ `�\� ova` •`���5 .��� ��\,�o ����.� o'`a♦ � o'`a♦ �Je� cyan o�° eta♦ aa� riot o�Q e♦a� ra♦♦` . Parameter Q 5 p Q> C, C, C, ♦� ♦ p � �. Comments/Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 36"CMP to Yadkin R. - Draining ash haul routes Benchmark NA 6.0-9.0 100 0.0003 0.34 NE 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 NE 0.126 0.126 Frequency SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA SA-QCA Date 10/26/2018 1.98 1 7.2 1 240 <0.0002 0.00689 <0.05 <0.001 I <0.001 0.0116 1 0.0414 0.0158 1 0.0138 1 <0.001 I <0.001 1 <0.0002 1 0.266 1 52.8 Tier I (TSS, Cu, Zn) Hg>12 11-12/2018 No Flow no flow 1-3/2019 No Flow no flow 4/19/2019 0.11 8.2 5.8 <0.0002 0.00195 0.054 <0.001 <0.001 0.0216 1 0.0110 0.00410 0.00129 <0.001 0.00746 <0.0002 0.033 13.7a g Tier II (Cu), Tier I (1st compliance ("c"):Zn &TSS), Hg>12 5-12/2019 No Flow no flow 1/24/2020 1.36 7.5 230 <0.0002 <0.001 <0.05 <0.001 <0.001 0.0107 1 0.0233 0.00464 0.00839 <0.001 <0.001 <0.0002 0.052 28.9 Tier 11 (Cu - next>BM=Tier III),Tier I (TSS, 2nd c:Zn), Hg>12 02-05/2020 No Flow no flow 6/16/2020 1.89 7.6 560 <0.0002 0.00262 <0.05 <0.001 <0.001 0.0391 0.0288 0.0331 <0.001 <0.001 0.000436 0.335 24.7 Tier III (Cu),Tier II (TSS),Tier I (Zn), Hg>12 7-8/2020 No Flow no flow 9/17/2020 1.69 7.5 1 <0.0002 0.00120 1 <0.05 <0.001 <0.001 0.00946 �� I • 0.00813 0.00990 1 <0.001 <0.001 <0.0002 0.086 8.22 Tier III (Cu &TSS),Tier I (1st c: Zn) 10/2020 No Flow no flow 11/11/2020 0.39 7.6 71 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00564 1 0 0.00369 0.00511 <0.001 <0.001 <0.0002 0.170 7.88 Tier III (Cu, 1st c:TSS),Tier I (Zn), next Zn>bm is Tier III 12/14/2020 1.16 8.0 <0.0002 0.00119 <0.05 <0.001 <0.001 0.0119 1 0.00669 0.00898 <0.001 <0.001 <0.0002 0.048 19.Oa g Tier ill (Cu,TSS),Tier I (1st c: Zn), next Zn>bm is Tier III,Hg>12 2/11/2021 0.45 7.3 100 <0.0002 <0.001 <0.05 <0.001 <0.001 0.00527 1 0.00278 0.00408 <0.001 <0.001 <0.0002 0.020 12.4 Tier III (Cu, 1st c:TSS),Tier I (2nd c:Zn), next Zn>bm is Tier III, Hg>1 3-12/2021 No Flow no flow 1-12/2022 No Flow no flow SU -standard units <- not detected at the following level SA-semi-annual mg/L- milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter NE- not established Disc-discontinued ng/L- nanograms per liter PCB- polychlorinated biphenyls ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances Tier I One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3)consecutive results are below benchm', _value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. Four exceedancesof benchmark value during monitoringperiod and implement corrective • • ' within 3 1 days • for • •. protocols evaluat-• and potentially modified by Tier III Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW078 Monitoring ay e�\A10 ,�a� ��e� \O�C�\ jyotiro i4,Lti �4,,�'L �o o o or or or or�ot r r or a��' Parameter ,�o� QZ` ,�o� Lo �e ,�.�` O` QL QL QL QL QL QL QL Comments/ Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L to Yadkin R. Benchmark NA 1 6.0-9.01 100 0.010 0.056 0.126 NE 15 <-Detect-> Frequency* SA SA SA SA SA SA SA SA SA * monthly when in Tier status. Date 10/11/2018 2.96 7.2 25 1 0.0125 <0.001 0.0186 1 11.5 1 <4.5 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier I (Cu) 11-2018 No Flow 12/20/2018 1.61 8.4 1 74 0.0188 <0.001 0.0600 1 196 1 <4.4 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 1 <0.40 Tier 11 (Cu), Hg>12 1-12/2019 No Flow no flow during 2019 01-05/2020 No Flow no flow 6/20/2020 1.89 7.4 11 0.00396 1 <0.001 _ 0.009 3.87 <5.0 1 <0.40 1 <0.40 1 <0.40 <0.40 1 <0.40 <0.40 1 <0.40 Tier 11 (1st c: Cu) 7-12/2020 No Flow no flow 1-12/2021 No Flow no flow 1-12/2022 No Flow no flow SU -standard units SA-semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc- discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three Tier I (3) consecutive results are below benchmark value. Two consecutive exceedances of benchmark value -evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below Tier II benchmark value. • -•. • • • • • •• • • - • • • 1 •. • • • '•. • • • •ls evaluatedTier 1H and potentially modified by NCDENR. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW079 Monitoring - o`ayeJ ` e l roy� o Olt, �o 1eA, � ` ty o e Nor ro �a��a• ��`�JyQ QQ��`` `e�`J� `\��� i`���, ��e Pioc, P�oc. Pioc, P�oc, Pioc, Pioc P�oc, Parameter ,�o Q� ,�o Lo �e ,,.� �e O� QL� QL� QL� Q�� QL� QL� QL� Comments/Notes Units inches SU mg/L mg/L mg/L mg/L ng/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L to Yadkin R. Benchmark NA 6.0-9.0 100 1 0.010 0.056 0.126 NE 15 <-Detect-> Frequency SA SA SA SA SA SA SA SA SA Date 12/20/2018 1.61 1 7.5 1 40 0.0165 0.00271 0.198 216 1 <4.4 <0.40 <0.40 <0.40 1 <0.40 1 <0.40 <0.40 <0.40 Tier I (Cu, Zn) Hg>12 1-3/2019 no flow No flow 4/5/2019 0.98 1 7.6 1 190 0.0562 0.00409 0.237 46.2 1 <5.1 <0.40 <0.40 <0.40 1 <0.40 1 <0.40 <0.40 <0.40 Tier I (TSS), Tier II (Cu, Zn), Hg>12 5-12/2019 no flow No flow 1-12/2020 no flow No flow 1-12/2021 no flow No flow 1-12/2022 no flow No flow SU -standard units SA-semi-annual mg/L- milligrams per liter SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter Disc-discontinued ng/L- nanograms per liter ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances Tier I One exceedance of benchmark value- Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three (3) consecutive results are below benchmark value. Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are Tier II below benchmark value. Four exceedancesof during monitoring •d and implement co rrective acti•ns. Notify1 days of •r fourth exceedance. Tier III evaluated and potentially modified by NCDENR. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW080 Monitoring ay ��\ ea �a� o'`a '�° \� o`er Nam a� \'�° '�° °� ♦ \� ti� titi titi titi titi titi titi ova\` ��a \�° P�� `�\ �La\ �\`t G�\� � tea. �Jy� �Q4o •S� `J� •.�� •`� ��� `�� Qom\ °�� •`��. o� �\ die �°c. �°c. roc, t°c, toc, roc, �°c, Parameter �� °tea\ S�J�` Pt�e� Q�°ion �e�`` Gaa� Cr C.° �� �.°tea\ Po �e�°F ,�-, �.`�`c\� O�� Q�Q'P QCQ'P QCQ'P QC�P QGQ'P QGQ'P QG�P Comments/ Notes Units inches SU Jmg/L mg/L I mg/L mg/L mg/L I mg/L I mg/L mg/L I mg/L I mg/L mg/L mg/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L 12"CMP to Yadkin R. Benchmark NA 6.0-9.0 100 1 0.0003 0.34 1 NE 10.065 0.0031 0.9 0.010 10.33510.075 0.09 0.056 NE 0.126 15 <-Detect-> Frequency SA SA SA I SA I SA I SA I SA I SA I SA I SA I SA I SA SA SA SA SA SA SA Date 2H2O18 no qualifying flow no flow 1H2O19 no qualifying flow no flow 2H2O19 no qualifying flow no flow 1H2O20 no qualifying flow no flow 2H2O20 no qualifying flow no flow 1H2O21 no qualifying flow no flow 2H2O21 no qualifying flow no flow 1H2O22 no qualifying flow no flow 2H2O22 no qualifying flow no flow SU -standard units < - not detected at the following level SA-semi-annual mg/L- milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter NE- not established Disc-discontinued ng/L- nanograms per liter PCB- polychlorinated biphenyls ROS- representative outfall status Compliant no shading NFlow- no flow Tier Requirements for Benchmark Exceedances One exceedance of benchmark value-Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three(3) consecutive Tier I results are below benchmark value. Tier II Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3) consecutive results are below benchmark value. • • • • • • • • •• • • - • .e • Notify NCDENR within 30 days of •r fourth exceeclance. • protocols evaluated an• Tier Al. •• - • -r o R. Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck - Stormwater Outfall SW081 Monitoring ay 5°`` ♦ �a� '�a` a� a� ♦ p\ (o ti , 'L a �a °a •t,° ,.o �a� a� ` �o'` .�o'` ova p� oti titi ,�'' tip` tip` by do �a0 °'�a �'�o a� Q,� ,La` ��'� o\'�o °� �a �` 5� � ` yam` � °ty �ot� �o{'y °{y �ojy °ty a�� �� �5 �� �.` �. ��`O •`O �` ¢5 a�� � �,o �`J `�0� `.�O p Qc Qt Qt Qt `,`' Qt Qt Parameter �C°tea Q °tea �i�Ja P��Q Q�°{° <be Gaa� Cri° C.° � �eaa P� c�a�Q .�ra� 1`�° O�� QCQ' QCQ' QC�' QC QC QLQ' QCQ' Comments/Notes Units inches SU mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/Lj mg/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L I ug/L ug/L ug/L 12"CMP to Yadkin R. Benchmark NA 6.0-9.0 100 1 0.0003 0.34 NE 1 0.065 0.003 0.9 1 0.010 0.335 0.075 0.09 0.056 NE 10.126 15 <-Detect-> Frequency SA SA SA SA SA SA SA SA SA SA SA SA SA I SA SA SA SA SA Date 2H2O18 no qualifying flow no flow 11-12O19 no qualifying flow no flow 2H2O19 no qualifying flow no flow 11-12O20 no qualifying flow no flow 21-12O20 no qualifying flow no flow 11-12O21 no qualifying flow no flow 21-12O21 no qualifying flow no flow 11-12O22 no qualifying flow no flow 2H2O22 no qualifying flow no flow SU -standard units < - not detected at the following level SA-semi-annual mg/L- milligrams per liter NA- not applicable SA-QCA semi-annualor quarterly during during coal or ash transport ug/L- micrograms per liter NE - not established Disc- discontinued ng/L- nanograms per liter PCB- polychlorinated biphenyls ROS- representative outfall status Compliant no shading NFlow- no flow _Tier Requirements for Benchmark Exceedances One exceedance of benchmark value -Inspection and evaluate causes within two weeks after receiving results and implement corrective actions within two months. Monthly sampling frequency of outfall until three (3) consecutive results are belo, Tier I benchmark value. Two consecutive exceedances of benchmark value-evaluate causes within two weeks and implement corrective actions within two months. Sampling conducted monthly until three(3)consecutive results are below benchmark value. �fotiify NCDENR within 30 days of receiving, owl Other Notes: Mercury above 12 ng/L must be reported on the DMR but does not activate a Tier response Buck Station Stormwater Permit Renewal Application Attachment 6 Summary of Visual Monitoring DUKE (3 Stantec ENE R Facility Name: Buck Combined Cycle Individual NPDES Permit No. NCS000554 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: CTCC-001 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Date: Floating Suspended Color Odor Clarity Solids Solids Foam Oil Sheen Deposition Precipitation (in) 10/10/2018 Clear None 1 1 1 None None None 0.42 1/29/2019 Clear None 1 1 1 None None None 0.18 11/13/2019 Clear None 1 1 1 None None None 0.49 1/24/2020 Clear None 1 1 1 None None None 1.36 8/31/2020 Clear None 1 1 1 None None None 2.23 1/25/2021 Clear None 1 1 1 None None None 0.36 7/8/2021 Clear None 1 1 1 None None None 0.31 2/4/2022 Clear None 1 1 1 None None None 0.27 9/30/2022 Clear None 1 1 1 None None None 1.3 Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Suck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW001 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Date: Floating Suspended Color Odor Clarity Foam Oil Sheen Deposition Precipitation (in) Solids Solids 10/11/2018 Light/clear None 1 1 1 None None None 2.92 11/2018 No qualifying flow for the month of November 12/20/2018 Clear None 1 1 1 None None None 1.61 1/29/2019 Clear None 3 2 2 None None None 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Clear None 1 1 1 None None None 0.98 4/12/2019 Light brown None 2 1 2 None None None 0.52 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 Med red/brown Med to strong 3 1 1 None None None 0.49 chemical odor 12/23/2019 Light red None 3 1 1 None None None 0.57 1/24/2020 fled None 3 1 1 None None None 1,36 2/6/2020 Reddish brown None 4 1 1 None None None 3.75 3/3/2020 Clear None 1 1 1 None I None None 0.16 4/2020 No qualifying flow for the month of April Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW001 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Date: Floating Suspended Color Odor Clarity Foam Oil Sheen Deposition Precipitation(in) Solids Solids 5/19/2020 Cloudy white slight odor 2 1 1 Slight bubblesNone None 1.08 5/27/2020 Clear None 1 1 1 None None None 0.81 6/16/2020 Yellow/brown Strong odor 1 1 1 None None None 1.89 7/2020 No qualifying flow for the month of July 8/31/2020 Lt brown None 2 1 1 None None None 2.23 9/17/2020 Clear None 1 1 1 None None None 1.69 10/28/2020 Faint tan None 2 1 1 None None None 0.28 11/11/2020 Clear None 1 1 1 None None None 0.39 12/14/2020 Lt brown None 2 1 1 None None None 1.16 1/25/2021 No flow 0.36 2/11/2021 Slightly cloudy None 1 1 1 None None None 0.45 3/16/2021 Clear None 1 1 1 None None None 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 Clear None 1 I 1 I 1 I None I None None 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/21/2021 Yellow tint None 1 1 1 1 1 1 None I None None 0.96 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW001 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Date: Floating Suspended Color Odor Clarity Foam Oil Sheen Deposition Precipitation (in) Solids I Solids 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/23/2021 Slight tan None 2 1 1 1 1 1 None I None None 0.44 4/2022 No qualifying flow for the month of April 5/23/2022 Clear None 2 1 1 1 1 1 None I None None 1.48 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case 4 DUKE Stantec 71 ENERGY. Facility Name: Buck Steam Station individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO02 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Deposition Total Event Precipitation Color Odor Clarity Foam Oil Sheen (in) Solids Solids 10/11/2018 Clear None 1 1 1 None None None 2.92 11/2018 No qualifying flow for the month of November 12/20/2018 Clear None 1 1 2 2 None None None 1.61 1/29/2019 Clear None 2 2 2 None None None 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Clear None 1 1 1 1 1 None I None I None 0.98 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 Clear None 1 1 1 None None None 0.49 12/23/2019 Clear None 1 1 1 None None None 0.57 1/24/2020 Clear None 1 1 1 None None None 1.36 Lt Reddish 2/6/202D None 2 1 1 None None None 3.75 brown 3/3/2020 Clear None 1 1 1 1 1 None I None I None 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 Clear None 1 1 1 None None None 1.08 5/27/2020 Clear None 1 1 1 None None None 0.81 Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case � DUKE (10 Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO02 Summary of Stormwater Discharge Outfall (SDO)Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Deposition Total Event Precipitation Color Odor Clarity Foam Oil Sheen (in) Solids Solids 6/16/2020 Clear None 1 1 1 None None None 1.89 7/2020 No qualifying flow for the month of July 8/31/2020 Clear None 1 1 1 None None None 2.23 9/17/2020 Clear None 1 1 1 None None None 1.69 10/28/2020 Clear None 2 1 1 None None None 0.28 11/11/2020 Clear None 1 2 1 None None None 0.39 12/14/2020 Slight tan None 2 1 1 None None None 1.16 1/25/2021 No flow 0.36 2/11/2021 Slightly cloudy None 1 1 1 None None None 0.45 3/16/2021 Clear None 1 1 1 None None None 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 Clear None 1 1 1 1 1 None I None I None 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/21/2021 Clear None 1 1 1 1 1 None I None I None 0.96 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/23/2021 Clear None 2 1 1 1 1 None I None I None 0.44 Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case � DUKE Stantec ENE RGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO02 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Deposition Total Event Precipitation Color Odor Clarity Foam Oil Sheen (in) Solids Solids 5/23/2022 Clear None 2 1 1 None None None 1.48 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case � , DUKE Stantec ENERGY. Facility Name: Buck Stearn Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO03 Summary of Stormwater Discharge Outfall (SDO)Qualitative Monitoring Reports Discharge Assessment Total Event Precipitation Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Foam Oil Sheen (in) Solids Solids Light/slightly 10/11/2018 None 2 1 1 None None None 2.92 gray 11/2018 No qualifying flow for the month of November 12/20/2018 Light brown None 3 3 2 None I None None 1.61 1/29/2019 No flow 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Light brown None 3 3 1 2 1 None I None I None 0.98 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 Pipe inaccessible due to rip rap covering the outfall 0.49 12/23/2019 No flow 0.57 1/20/2020 No flaw 1.36 2/6/2020 No flow 3.75 3/3/2020 No flow 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 7/2020 No qualifying flow for the month of July Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCSOOOS78 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO03 Summary of Stormwater Discharge Outfall (SDO)Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Total Event Precipitation Deposition Color Odor Clarity Foam Oil Sheen (in) Solids I Solids 8/2020 No qualifying flow for the month of August 9/17/2020 No flow 1.69 11/20/20 No flow-outfall is blocked up 12/14/2020 No flow- pipe is blocked 1.16 1/25/2021 No flow- pipe is blocked 0.36 2/11/2021 No flow- pipe is blocked 0.45 3/16/2021 No flow- pipe is blocked 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No flow- pipe is blocked 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/21/2021 No flow-pipe is blocked 0.96 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/23/2021 No flow-pipe is blocked 0.44 4/2022 No qualifying flow for the month of April 5/23/2022 No flow- pipe is blocked 1.48 6/2022 No qualifying flow for the month of June Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5=Worst Case DUCE (: Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact, Dale Wooten Outfall Number: SWO03 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Deposition Total Event Precipitation Color Odor Clarity Foam Oil Sheen (in) Solids Solids 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW048 Summary of Stormwater Discharge Outfall (SDO)Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 12/20/2018 No flow from the outfall during rain event 1.61 1/29/2019 No flow 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the first quarter 2019 6/2019 No qualifying flow for the second quarter 2019 9/2019 No qualifying flow for the third quarter 2019 11/12/2019 No flow 0.49 12/23/2019 No flow 0.57 2/6/2020 No flow 3.75 4/2020 No qualifying flow for the month of April 5/19/2020 Cloudy None 2 1 1 None None None 1.08 white 6/16/2020 Brown None 3 1 1 None None None 1.89 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 Clear None 1 1 1 None None None 1.69 11/11/2020 No flow 0.39 12/14/2020 No flow 1.16 1/25/2021 No flow 0.36 2/11/2021 No flow 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5=Worst Case DUKE (10 Stantec ENE RGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW048 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Color Odor Clarity Solids Solids Foam Oil Sheen 5/3/2021 No flow 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March 4/2022 No qualifying flow for the month of April 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO56 Summary of Stormwater Discharge Out€all (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Floating Suspended Erosion/ Total Event Precipitation Deposition Color Odor Clarity Foam Oil Sheen (in) Solids Solids 12/20/2018 No flow from the outfall during rain event 1.61 1/29/2019 No flow 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the first quarter 2019 6/2019 No qualifying flow for the second quarter 2019 9/2019 No qualifying flow for the third quarter 2019 11/12/2019 No flow 0.49 12/23/2019 No flow 0.57 2/6/2020 No flow 3.75 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 No flow 1.69 11/11/2020 No flow 0.39 12/14/2020 No qualifying flow for the month December 1/25/2021 No flow 0.36 2/11/2021 No flow 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No qualifying flow for the month of May 6/2021 No qualifying flow for the month of June Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 = Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO56 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Floating Suspended Erosion/ Deposition Total Event Precipitation Odor Clarity Foam Oil Sheen (in) Solids Solids 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March 4/2022 No qualifying flow for the month of April 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 T Best Case and 5 =Worst Case <tDUKE Stantec 5 ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County. Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW073 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Foam Oil Sheen Precipitation (in) Solids Solids 10/11/2018 Orange/brown None 5 4 1 5 None None None 2.92 11/2018 No qualifying flow for the month of November 12/20/2018 Light brown None 3 2 2 None None None 1.61 1/29/2019 Clear None 2 2 1 None None None 0.18 2/12/2019 Light brown None 3 1 2 None None None 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Light brown None 2 2 1 1 None None None 0.98 4/12/2019 Brown/orange None 4 1 1 3 None None None 0.52 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 No flow 0.49 12/23/2019 Light red None 3 1 2 None None None 0.57 1/24/2020 Reddish-brown None 4 1 1 None None None 1.36 2/6/2020 Reddish brown None 3 1 1 None None None 3.75 3/3/2020 No flow 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 Cloudy white None 2 1 1 1 None I None None 1.08 5/27/2020 No flow 0.81 Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW073 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Color Odor Foam Oil Sheen Floating Suspended Erosion/Deposition Precipitation (in) Clarity Solids Solids 6/16/2020 Reddish brown None 1ity 1 1 1 None None None 1.89 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 Reddish brown None 4 1 1 1 None None None 1.69 11/11/2020 No flow 0.39 12/14/2020 Light brown None 3 2 1 1 None None None 1.16 1/25/2021 No flow 0.36 2/11/2021 No flow 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No flow 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March 4/2022 No qualifying flow for the month of April Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW073 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Solids Solids Foam Oil Sheen Precipitation (in) 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5= Worst Case DUKE Stantec ENERGY., Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW075 Summary of 5tormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Solids Solids Foam Oil Sheen Precipitation (in) 10/11/2018 Dark Brown None 5 4 5 None None None 2.92 11/2018 No qualifying flow for the month of November 12/20/2018 Light grey None 2 1 1 None None None 1.61 1/29/2019 Clear None 2 2 2 None None None 0.18 2/12/2019 Clear None 1 1 1 None None None 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Light brown None 2 1 1 None None None 0.98 4/12/2019 Brown/orange None 5 1 3 None None None 0.52 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 Clear None 1 1 1 None None None 0.49 12/23/2019 Med red/brown None 4 1 2 None None None 0.57 1/24/2020 Reddish-brawn None 4 1 1 None None None 1.36 2/6/2020 Reddish brown None 3 1 1 None None None 3.75 3/3/2020 Clear None 1 1 1 None I None None 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 Cloudy white None 3 1 2 None None None 1.08 5/27/2020 Clear None 1 1 1 None None None 0.81 Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5=Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW075 Summary of Stormwater Discharge Outfall (SDO)Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/Deposition Color Odor Clarity Foam Oil Sheen Precipitation (in) Solids Solids 6/16/2020 Reddish brown None 3 1 1 None None None 1.89 7/2020 No qualifying flow for the month of July 9/31/2020 Lt brown None 3 1 1 None None None 2.23 9/17/2020 Clear None 1 1 1 None None None 1.69 10/28/2020 Clear None 2 1 1 None None None 0.28 11/11/20201 Light red None 2 1 1 None None None 0.39 12/14/2020 Light brown None 3 1 1 None None None 1.16 1/25/2021 Clear None 1 1 1 None None None 0.36 2/11/2021 Clear None 1 1 1 None None None 0.45 3/16/2021 Tan None 2 1 1 None None None 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 Tan None 2 1 1 1 1 None I None I None 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flaw for the month of July 8/2021 No qualifying flow for the month of August 9/21/2021 Clear None 1 1 1 1 1 None I None I None 0.96 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/23/2022 Clear None 2 1 1 None None None 0.27 3/23/2021 Clear None 2 1 1 1 None None None 0.44 Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case � DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW075 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Solids Solids Foam Oil Sheen Precipitation (in) 4/2022 No qualifying flow for the month of April 5/23/2022 Muddy It brown 4 3 1 1 1 1 None I None None 1.48 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/30/2022 Clear None 1 1 1 1 1 None I None I None 1.3 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 Clear None 1 1 1 1 1 None I None I None 0.49 Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case r DUKE (3 Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW077 Summary of Stormwater Discharge Outfall {SDO} Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Precipitation Date: Floating Suspended Color odor Clarity Foam Oil Sheen Deposition (in) Solids Solids 10/26/2018 Medium brown None 3 1 2 None I None None 1.98 11/2018 No qualifying flow for the month of November 12/20/2018 Medium brown Slight odor 4 2 3 None None None 1.61 1/29/2019 Clear None 3 2 2 Yes None None 0.18 2/12/2019 Clear None 1 1 2 None None None 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Clear None 1 1 1 1 1 None I None None 0.98 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 No flow 0.49 12/23/2019 Med red/brown None 4 1 2 None None None 0.57 1/24/2020 park Reddish- None 5 1 1 None None None 1.36 brown 2/6/2020 Reddish brown None 4 1 1 None None None 3.75 3/3/2020 No flow 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 Reddish brown None 3 1 1 3 1 None I None None 1.08 Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW077 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Precipitation Date. Color Odor Clarity Floating Suspended Foam Oil Sheen Deposition (in) Solids Solids 5/27/2020 No flow 0.81 6/16/2020 Reddish brown None 5 1 1 None I None None 1.89 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 Reddish brown None 4 1 1 None None None 1.69 11/11/2020 Reddish brown None 3 1 1 None None None 0.39 12/14/2020 Light brown None 3 1 1 None None None 1.16 1/25/2021 No flow 0.36 2/11/2021 Light brown None 3 1 1 1 None I None None 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No flow 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case � DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW077 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Erosion/ Total Event Precipitation Date: Floating Suspended Color Odor Clarity Foam Oil Sheen Deposition (in) Solids I Solids 4/2022 No qualifying flow for the month of April 5/23/2022 Slightly muddy, None 3 1 2 None None None 1.48 It brown 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 Best Case and 5 =Worst Case DUKE (3 Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW078 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date. Floating Suspended Erosion/ Deposition Color Odor Clarity Foam Oil Sheen Precipitation (in) Solids Solids 10/11/2018 Lt.grayish None 2 1 1 None None None 2.92 11/2018 No qualifying flow for the month of November 12/20/2018 Light brown None 2 1 1 2 None I None None 1.61 1/29/2019 No flow 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the month of March 4/2019 No qualifying flow for the month of April 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 8/2019 No qualifying flow for the month of August 9/2019 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 No flow 0.49 12/23/2019 Light red/brown !None 3 1 1 !None None None 0.57 1/20/2020 No flow 1.36 2/6/2020 Lt Reddish None 3 1 1 None None None 3.75 brown 3/3/2020 No flow 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case DUKE (3 Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW078 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Floating Suspended Erosion/ Deposition Color Odor Clarity Foam Oil Sheen Precipitation (in) Solids Solids 5/27/2020 No flow 0.81 6/16/2020 Clear None 5 1 1 1 None I None None 1.89 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 No flow 1.69 11/11/2020 No flow 0.39 12/14/2020 No flow 1.16 1/25/2021 No flow 0.36 2/11/2021 No flow 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No flow 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY® Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW078 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Total Event Date: Deposition Floating Suspended Erosion/ on Color Odor Clarity Foam Oil Sheen Precipitation(in) Solids Solids 4/2022 No qualifying flow for the month of April 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and S=Worst Case DUKE Stantec ENERGYo Facility Name: Buck Stearn Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW079 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids I Solids 11/2018 No qualifying flow for the month of November 1/29/2019 No flow 0.18 2/12/2019 No flow 0.35 3/2019 No qualifying flow for the month of March 4/5/2019 Light grey None 2 i 1 None None None 0.98 5/2019 No qualifying flow for the month of May 6/2019 No qualifying flow for the month of June 7/2019 No qualifying flow for the month of July 9/2019 No qualifying flow for the month of August 9/2019 1 No qualifying flow for the month of September 10/2019 No qualifying flow for the month of October 11/12/2019 No flow 0.49 12/23/2019 Light None 2 1 1 None None None 0.57 red/brown 1/20/2020 No flow 1.36 2/6/2020 Clear None 1 1 1 None I None None 3.75 3/3/2020 No flow 0.16 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 5/27/2020 No flow 0.81 7/2020 No qualifying flaw for the month of July 8/2020 No qualifying flow for the month of August Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case DUKE Stantec ENERGY(. Facility Name: Buck Steam Station Individual NPDFS Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW079 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 9/17/2020 No flow 1.69 10/2020 No qualifying flow for the month of October 11/2020 No qualifying flow for the month of November 12/14/20201 No flow 1.16 1/25/2021 No flow 0.36 2/11/2021 No flow 0.45 3/16/2021 No flow 0.55 4/2021 No qualifying flow for the month of April 5/3/2021 No flow 1.36 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 11/2021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March t 22 No qualifying flow for the month of April 2022 No qualifying flow for the month of May 22 No qualifying flow for the month of June Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SW079 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1= Best Case and 5 =Worst Case 4 5 DUKE (3 Stantec ENERGY, Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO80 Summary of Storrnwater Discharge Outfall(SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/Deposition Total Event Precipitation (in) Solids Solids 3/2019 No qualifying flow for the first quarter 2019 6/2019 No qualifying flow for the second quarter 2019 9/2019 No qualifying flow for the third quarter 2019 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 No flow 1.69 12/2020 No qualifying flow for the month December 1/2021 No qualifying flow for the month of January 2/2021 No qualifying flow for the month of February 3/2021 No qualifying flow for the month of March 4/2021 No qualifying flow for the month of April 5/3/2021 No qualifying flow for the month of May 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 1112021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 = Worst Case � DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO80 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March 4/2022 No qualifying flow for the month of April 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5= Worst Case � DUKE (3 Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000578 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO81 Summary of Stormwater Discharge Out#all (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 3/2019 No qualifying flow for the first quarter 2019 6/2019 No qualifying flow for the second quarter 2019 9/2019 No qualifying flow for the third quarter 2019 4/2020 No qualifying flow for the month of April 5/19/2020 No flow 1.08 7/2020 No qualifying flow for the month of July 8/2020 No qualifying flow for the month of August 9/17/2020 No flow 1.69 12/2020 No qualifying flow for the month December 1/2021 No qualifying flow for the month of January 2/2021 No qualifying flow for the month of February 3/2021 No qualifying flow for the month of March 4/2021 No qualifying flow for the month of April 5/3/2021 No qualifying flow for the month of May 6/2021 No qualifying flow for the month of June 7/2021 No qualifying flow for the month of July 8/2021 No qualifying flow for the month of August 9/2021 No qualifying flow for the month of September 10/2021 No qualifying flow for the month of October 1112021 No qualifying flow for the month of November 12/2021 No qualifying flow for the month of December 1/2022 No qualifying flow for the month of January Notes: Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5 =Worst Case DUKE Stantec ENERGY. Facility Name: Buck Steam Station Individual NPDES Permit No. NCS000S78 County: Rowan Phone Number: 704-630-3086 Site Contact: Dale Wooten Outfall Number: SWO81 Summary of Stormwater Discharge Outfall (SDO) Qualitative Monitoring Reports Discharge Assessment Date: Color Odor Clarity Foam Oil Sheen Floating Suspended Erosion/ Deposition Total Event Precipitation (in) Solids Solids 2/2022 No qualifying flow for the month of February 3/2022 No qualifying flow for the month of March 4/2022 No qualifying flow for the month of April 5/23/2022 No qualifying flow for the month of May 6/2022 No qualifying flow for the month of June 7/2022 No qualifying flow for the month of July 8/2022 No qualifying flow for the month of August 9/2022 No qualifying flow for the month of September 10/2022 No qualifying flow for the month of October 11/2022 No qualifying flow for the month of November 12/2022 No qualifying flow for the month of December Notes:Value assessment of 1-5 for Clarity, Floating Solids and Suspended Solid. Values increasing upward by severity 1 = Best Case and 5=Worst Case Buck Station Stormwater Permit Renewal Application Attachment 7 Summary of BMP's BMP Summary Outfall 075 The area that drains to Outfall 0075 consists of a laydown yard,trailers,construction storage yard warehouse,construction material laydown,outage laydown. As much as possible,raw materials are stored in the warehouse. Any chemicals stored in this area are stored in the warehouse. Stormwater that discharges from Outfall 075 is collected in a 0.83-acre stormwater retention pond. The discharge of the pond is controlled manually. When the pond discharges,the stormwater enters a grassed swale and flows approximately 1,700 feet the outfall. The conveyed stormwater is then discharged to the Yadkin River. Outfall 001 Combined Cycle The area that drains to combined cycle Outfall 001, is this combined cycle station footprint. All roof drains and all stormwater runoff from external paved areas enters catch basins that discharge via subsurface piping into the stormwater detention pond located immediately west of the CTCC. All internal building floor drains discharge either directly into the station consolidated wastewater sump or into the oil/water separator that subsequently discharges into the sump. All transformer containments discharge into the stormwater detention pond. All other open containments, including tanker unloading stations,discharge directly into the detention pond. Most covered containments at the station are non-discharge containments. Much like stormwater that discharges through Outfall 075, stormwater that discharges from the Combined Cycle to Outfall 001 CC is collected in an approximately 1-acre stormwater detention pond. The discharge of the pond is controlled manually. Outfall 001 CC is located at the discharge of the stormwater retention pond. l.,DUKE ENERGY. Location: Buck CTCC Station SDO Narrative Description and BMP Summary Permit No.NCSOOOSS4 DutfalllD: SW001 Discharge 24'CMP Structure: � -- Location: 400 feet west-northwest of as turbine building. Latitude- 35'42'30"N,80"22'41"W Longitude: Drainage Area: 29.2 acres Percent 56% Impervious: '. rf Permit Monitoring Table: None �- y Industrial Drainage Area SWO01 is comprised of the Buck CC station plus the cooling Activities and tower, a clarifier, office buildings, and a detention pond. The drainage area is Description mostly paved roadways and building area but the runoff discharge is delayed by using a detention pond. Oil-filled electrical equipment including transformers is located within curbed concrete containment pads with manually operated drain valves.Lubricating system are located within the gas and steam turbine buildings that have isolated sumps should a spill occur.Natural gas pipelines run underground to provide fuel to the station. Bulk storage containers containing fuel oils are located around the site.Transfer operations for fuel oil occur near the bulk storage containers. Significant Mineral Oil: Mineral ail is stored in various transformers. The largest MaterialslPotenti al Pollutants, transformer contains 16,002 gallons of mineral oil, with the total mineral oil contained in all the electrical equipment being approximately 60,096 gallons_ Lube Oil: Lube oil is stored in lubricating systems within the two turbine buildings.The total lube oil contained within the two buildings is approximately 17,880 gallons. Fuel Oil: Diesel,kerosene, and gasoline are stored in bulk storage containers around the site.The total petroleum-based fuel oil is approximately 23,254 gallons. 1DUKE P ENERGY. Location: Buck CTCC Station SOO Narrative Description and BMP Summary Permit No.NCSCOOSS4 BMP Summary. De[iveryVehldes z:e'ys Develop;prgcedu,.re for the Inspection of all vehicles arriving on the plant site 1'iijensure overall integrity of_the body or container. Liquid$tage Tanks/Large:.Bufk Fuel StaragelAbeve Ground Tanks Prroo'�.de secondary containment with a secured valve in the closed • Develop and implement SPCC plan •. =Train'embld tes 10'spiil prevention and control. Fuel Oil Unloading leas • F0o*p!oWgre ferfuel transfer In SPCC based on Department of Transportation's(procedures. • An,n,oil-Ater separator Is part of the yard drainage around the generating equiprnerit Oil Beafing.Equipment • Provide:secondary containment with a secured valve in the closed 2posltion. • An oil-wsterseparatoris part of She yard drainage around the generating equipment • Train.:employees.in spill prevention,control,cleanup and proper materials management techniques. Vehicle Maintenance • Traln employees In spill prevention,control,cleanup and proper materials management techniques. • Spill kits are readily available for use. Location: Buck Steam Station SDO Narrative Description and BMP Summary Permit No. NCSOOOS78 O utfa I I ID S W-075 Discharge Structure 30"CMP Location 150 feet east of yard sump, outside of station fence Latitude- 35042'49"N Longitude: 80022'22"W No Photo Available Due to Access Drainage Area: 36.3 acres Percent 36.6% Impervious: Permit 2 Monitoring Table: Industrial Drainage Area SW075 is a large, partially vegetated area with paved and Activities and gravel Description: roads as well as former rail corridor areas. The drainage area is natural ground and sheet flows to SW075 and the Yakin River. It includes the former/closed location of the fuel storage tank. Significant Laydown yard, construction storage yard,warehouse, construction Materials/Potential material laydown and outage laydown. Pollutants: BMP Summary: Delivery Vehicles • Develop procedure for the inspection of all vehicles arriving on the plant site and ensure overall integrity of the body or container. Vehicle Maintenance •Train employees in spill prevention, control, cleanup and proper materials management techniques. •Spill kits are readily available for use. Buck Station Stormwater Permit Renewal Application Attachment 8 Significant Site Changes Narrative of Significant Site Changes The old Buck Steam Station Powerhouse and associated facilities have been demolished,with the demolition of the powerhouse,the outfalls associated with it have also been eliminated,that includes outfalls SW-005, SW-007, SW-011, SW-015, SW-016, SW-023, SW-025, SW-027, SW-032, SW-034, SW-035, SW-038, SW-039, SW-058, SW-065, SW-066, SW-067, SW-069, SW-070, SW-071,and SW-072. The area in the vicinity the old steam station powerhouse has been cleaned up and industrial activity in those areas have been eliminated. The stormwater outfalls in the vicinity of the old steam station including SW-003, SW-048, SW-056, SW-078, SW-079, SW-080 and SW-081 have been eliminated(pipe has been removed or plugged)such that there will not be a discharge from the outfalls. The area in the vicinity the old steam station powerhouse,railroad and access road has been cleaned up and industrial activity in those areas have been eliminated. Stormwater Outfalls SW- 073 and SW-077 are in the vicinity of the powerhouse railroad and access road,however since their drainage area has been cleaned-up,they no longer discharge stormwater associated with industrial activity. Outfalls SW-001 and SW-002 are outfalls associated with a switchyard that was used by the demolished coal-fired steam station. The switchyard is still onsite and used by Energy Delivery however, it functions as a standalone switchyard. It is located in the vicinity of the old steam station powerhouse and all industrial activity around the switchyard has been eliminated. The switchyard is hydraulically separate from the remaining power generating facility at the station site,the Buck Combined Cycle Station Buck Station Stormwater Permit Renewal Application Attachment 9 Certification of Development of SWPPP STORMWATER POLLUTION PREVENTION PLAN DEVELOPMENT AND IMPLEMENTATION CERTIFICATION North Carolina Division of Energy, Mineral; and Land Resources— Stormwater Program Facility Dame: Buck Combined Cycle Station Permit Number: NCSCO0554 Location Address: 1385 DukeAle Rd Salisbury NC 28146 County: Rowan "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to Permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature f`� '1 _ r - -\ Date I �Z-112 3 a Kris Eisenrieth General Manager II-Regulated Slations Print or type name of person signing above Title SPPP Certification 10/13 Buck Station Stormwater Permit Renewal Application Attachment 10 Email Bethany Georgoulias Regarding Industrial Permitting for Substations '6 S Dishmon, Joyce Martin 1 P Q� From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Sent: Wednesday, May 8, 2019 9.28 AM To: Dishmon,Joyce Martin: Lucas,Annette; Garcia, Lauren V Subject: RE: Stormwater Permitting Status of Switchyards *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** Joyce, The answer comes with a couple caveats that I wanted to explain thoroughly. Switchyards or substations by themselves are not "categorically"captured by the NPDES Stormwater program unless designated for some other reason. So, in cases where these yards are completely hydraulically separate(usually between the power plant and a different property),they were not necessarily subject to a permit. However,there are a few of scenarios where they could be considered subject to an NPDES permit. If a switchyard had industrial activities regulated by NPDES Stormwater,or legacy materials from those activities that still present in that drainage area,it would be subject. This includes the situations where switchyard runoff commingles with runoff from other areas of a power plant this is covered under an NPDES permit. A switchyard could also be designated, if there is a water quality problem or it is deemed a significant contributor of pollutants. This is done by agency designation (and it applies to most activities in general). Finally, if a switchyard is considered an integral part of the power plant that is under an NPDES permit,that area is essentially co-located and part of that industrial activity, and it would be subject to the permit. That is consistent with how EPA interprets what is included as that plant's industrial activity, as switchyards are included in the Industrial Fact Sheet series for Steam Electric Plants: INDUSTRIAL STORMNVATER FACE SHEET SERIES Sector 0 Stearn Electric Power Generating Facilities, Including Coal Handling Areas Table 2. BMPs for Potential Pollutant Sources at Steam Electric Generating Facilities, induding Coal Handling Areas(continued) Pollutant Source $MPS Qii bearing 0 Construct level grades and gravel surfaces to retard flows and limit the spread of spills equornent switdVards ❑ Collect stormwater runoff in pefirneter ditches. Un.+.6 -..5,....&w.. m n{....r+ ti —*,.J .n fn, —ihn Because i couldn't make the meeting you had with Annette,I didn't see the site plan or map to understand the situation you're asking about. Sometimes these switchyards are far removed from plant footprints,and other times they are more integrated,so Vd need more information to answer the question on the specific case. 1 Buck Station Stormwater Permit Renewal Application Attachment 11 Site Narrative GENERAL SITE INFORMATION The Buck Combustion Turbine Combined Cycle Plant (CTCC) is a natural gas fired, 620- megawatt electric generating station located in Rowan County approximately 3 miles east of Spencer, NC. The facility contains two primary combustion turbine units and one secondary heat recovery steam generator unit. The facility is located on a 643-acre property that formerly contained the Buck Steam Station, which has now been demolished. The property borders the southern shore of the Yadkin River in the upper reaches of high Rock Lake. The station is accessed from Dukeville Road off Long Ferry Road. Also located within the Buck CTCC property boundary is the Buck Tie Station. The Buck Tie Station is a large 230 kV and 110 kV regional substation facility located approximately 1,500 feet south and upgradient of the Yadkin River. This tie station is a separate facility and hydraulically unassociated with the Buck CTCC station from a stormwater permitting standpoint. The CTCC contains 2 industrial stormwater outfalls. Outfall SW-001 is associated with the 14- acre CTCC Power block, the stormwater from the power block area is routed to a stormwater retention pond that discharges to the Yadkin River through Outfall SW 001. Outfall SW 075 is associated with gravel roadway and gravel surface areas including a laydown area and a warehouse that discharges to the Yadkin River. The Buck Steam Station maintains an up-to-date Spill Prevention Control and Countermeasure (SPCC) Plan in place in accordance with the U.S. Environmental Protection Agency (USEPA) Oil Pollution Prevention Regulation 40 CFR Part 112. STORMWATER OUTFALLS AND DRAINAGE AREA DESCRIPTIONS Buck Combustion Turbine Combined Cycle Station has 2 identified active stormwater outfalls that discharge to surface waters. The outfall locations and contributing drainage area delineations are shown on the accompanying site plan drawing. All identified stormwater outfalls either discharge directly into the Yadkin River, or discharge onto the ground in close proximity to the river. A description of the contributing drainage area for each outfall is provided below. Included with the description is the approximate location coordinates of the outfalls, the approximate amount of impervious surface area within the drainage areas, a description of any significant materials and activities located within the drainage areas, the type of discharge conveyances, and a description of any discharge control measures. In addition to any significant materials particular to each drainage basin, herbicides are applied to selected areas at the Buck Steam Station to eliminate undesirable vegetation. Herbicides are generally used along railways, pipelines, and the perimeter fence. Herbicides are also applied, as needed, in the gravel parking lots, switchyard, laydown areas, yard sumps, transformers, trailers, and the intake structure. The discharge of herbicides are covered under the NPDES general permit NCG560000. Records are retained at the facility documenting the areas treated, and the type and amount of herbicides used. Outfall SW075 (Drainage Area 75) (currently included in NCS000578) Discharge Structure: 30-inch-diameter CMP Location: Approximately 150 feet east of yard sump, outside of station fence. Coordinates: 35" 42' 49" N 800 22' 22" W Drainage Area: 36.3 acres Impervious Area: 13.4 acres Area Description The drainage area for SW075 is comprised of a gravel roadway, gravel-surfaced areas surrounding part of a paved roadway, and grassed areas. The drainage area contains approximately 250 linear feet of gravel roadway. The area at the south end of the drainage area includes the maintenance yard and facility for the Buck site and is primarily a gravel lot. Significant Materials/Activities Mineral oil, ammonia, raw water chemical treatment Outfall 001 (currently included in NCS000554) Discharge Structure: 48 inch diameter CMP Coordinates: 35 42' 30" N 80 22'40" W Industrial Use Drainage Area: 18.9 Acres Approximate Impervious Area: 10.8 acres Accessibility: Accessible Area Description The industrial use area surrounding the CTCC facility covers approximately 14 Acres. This area is comprised primarily of building roofs with asphalt pavement or gravel surface areas surrounding the buildings. Included within this drainage area are some minor vegetated areas located east of the cooling tower and in the vicinity of the water treatment facility. The drainage area includes two gas turbine buildings, two heat recovery steam (HRSG) buildings, one stream turbine building, one water treatment building, one auxiliary boiler building, one cooling tower structure, two chiller buildings, one administration/control/warehouse building, a raw water treatment facility, several large transformers, a power distribution center, an emergency diesel generator, three large water tanks, one large ammonia tank, an oil/water separator, an oil storage building and the station consolidated wastewater sump. All roof drains and all stormwater runoff from external paved areas enters catch basins that discharge via subsurface piping into the stormwater detention pond located immediately west of the CTCC. All internal building floor drains discharge either directly into the station consolidated wastewater sump or into the oil/water separator that subsequently discharges into the sump. All transformer containments discharge into the detention pond. All other open containments, including tanker unloading stations, discharge directly into the detention pond. Most covered containments at the station are non-discharge containments. Significant Materials/Activities Lube Oil: Both Gas and turbine buildings contain one 4,500-gallon lube oil tank. The tanks are located within concrete containments. The steam turbine building contains one lube oil tank within concrete containment with an open drain to the oil/water separator. Diesel Fuel: The emergency diesel generator enclosure contains 550 gallons of diesel fuel located within a double-walled container integral with the generator. Mineral Oil: Various quantities of mineral oil are stored inside two gas turbine main step-up transformers, the two, gas turbine auxiliary transformers, the steam turbine main set-up transformer, and five excitation transformers. All of these transformers are located outside within locked-closed concrete containments that drain to the detention pond. Ammonia: One 20,000-gallon ammonia tank is located on the western side of the facility. The tank is located within an open concrete containment with a valved drain to the consolidated wastewater sump. A sloped and curbed concrete unloading pad is located adjacent to the tank and has a locked-closed valved drain to the consolidated detention pond. One 300-gallon ammonia tank is located inside the steam turbine Building. One 300-gallon ammonia tank is located inside the aux boiler Building. The tanks are within a concrete containment basin with an open drain to the oil/water seperator. Chemicals: The raw water treatment facility contains one sodium hypochlorite tan, one ferric sulfate tank,.and one caustic tank. The tank is located under a common shed within a dead end covered concrete containment basins. A sloped and curbed concrete chemical unloading pad is located adjacent to the shed and has an open drain to the detention pond. The cooling tower has an adjacent chemical fed skid that contains one sodium hypochlorite tank, one dispersant tank, one micro biocide tote, and one water treatment tote. The four containers are located under a common shed within a dead end covered concrete containment basins. A sloped and curbed concrete chemical unloading pad is located adjacent to the shed and has an open drain to the detention pond. The water treatment building is a fully enclosed structure that contains one sodium hypochlorite tank, one sodium bisulfite tank, one sodium hydroxide tank, one RO citric acid tote and one RO anti-scalant tote. All containers are located within dead end concrete containments. The building floor drains discharge into the consolidated wastewater sump. The Auxiliary Boiler Building is a fully enclosed structure that contains one 19% ammonia tote and one Eliminox tote. The containers are located within dead end concrete containments. The gas filter skid contains one condensate tank located within an open metal containment bin with an open drain to the consolidated wastewater sump. Two phosphate skids are enclosed in a building and located adjacent to the HRSG buildings. These containers are located within concrete containments with open drains to the consolidated wastewater sump. One small gas condensate tote is located on the east side of each HRSG building. Discharge Controls All stormwater runoff from the CTCC station (outfall 001) eventually discharges into a stormwater detention pond located immediately west of the facility. The pond outlet works are comprised of a 60-inch CMP riser and 48-inch CMP barrel. The pond is dewatered by a small diameter dewatering orifice at the bottom of the 60-inch riser. In the event of any chemical or petroleum release into the stormwater drainage system the small orifice can be quickly covered or blocked to contain the release within the detention pond. The discharge end of the 48-inch CMP is designated as Outfall 001. Stormwater discharging from SW001 enters a riprap lined channel that routes flow to an existing 24-inch CMP beneath the station access road. The discharge eventually enters the Yadkin River west of the CTCC. Buck Station Stormwater Permit Renewal Application Attachment 12 Recission Request Form FOR AGENCY USE ONLY Assigned to: ARO FRO MRO RRO WARO WIRO WSRO Division of Energy, Mineral, and Land Resources Land Quality Section National Pollutant Discharge Elimination System Rescission Request Form Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit. Directions: Print or type all entries on this application form. Send the original,signed application to: NCDEMLR Stormwater Program, 1612 Mail Service Center, Raleigh, INC 27699-1612. The submission of this form does not guarantee recission of your NPDES stormwater permit. Prior to the recission of your NPDES stormwater permit, a site inspection will be conducted. 1. Owner/Operator(to whom all permit correspondence will be mailed): Name of legal organizational entity: Legally responsible person as signed in Item(4)below: Duke Energy Carolinas, Inc Kris Eisenrieth Street address: City: State and zip code: 1385 Dukeville Rd Salisbury NC 28146 Telephone number: Email address: 704,630.3015 kris.eisenrieth@duke-energy.com 2. Industrial Facility(facility requesting rescission): Facility name: Buck Steam Station Street address: 1385 Dukeville Rd City: State: Zip Code: County: Salisbury NC 28146 Rowan Permit Number to which this request applies: NGS000578 3. Reason for rescission Request This is required information.Attach separate sheets if necessary. El Facility is closed or closing.All industrial activities have ceased such that no discharges of stormwater are contaminated by exposure to industrial activities or materials. Date closed/closing: March 19, 2018 Il Facility sold. Sold to: On date: I]Other(please explain): 4. Applicant Certification: North Carolina General Statute 143-215.613(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application,record, report, plan,or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). 1 hereby request exclusion from NPDES stormwater permitting. under penalty of law, I certify that: t] I, as an authorized representative, hereby request recission of coverage under the NPDES stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete,and accurate. Printed Name of Person Signing: Kris Eisenrieth Title: General Manager II - Regulated Stations z4 2oz3 (Signa ure of Applicant) (Date Signed) Mail the entire package to: DEMLR—Stormwater Program Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 Page 2 of 2 Buck Station Stormwater Permit Renewal Application Attachment 13 Fish Tissue Monitoring Results Fish Tissue Monitoring of the Yadkin River and High Rock lake Near Buck Combined Cycle Station (2018-2022) Buck Combined Cycle Station Salisbury, North Carolina NPDES Permit # NCO004774 Duke Energy Water Resources Huntersville, NC 28078 January 2023 DUKE ENERGY® Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Contents 1 Introduction and Background......................................................................................................1 2 Methods.....................................................................................................................................1 2.1 Study Site...........................................................................................................................................1 2.2 Field Collection..................................................................................................................................2 2.3 Laboratory Analysis...........................................................................................................................3 3 Results and Discussion................................................................................................................3 3.1 Arsenic...............................................................................................................................................4 3.2 Selenium............................................................................................................................................4 3.3 Mercury.............................................................................................................................................4 4 Summary....................................................................................................................................6 5 References.................................................................................................................................6 Tables Table 3-1. Numbers and total length ranges(mm)of different species of fish collected for element analyses in the three sampling areas of the Yadkin River and High Rock Lake during 2018-2022.3 Figures Figure 2-1. Sampling areas for monitoring trace elements in fish tissue within the Yadkin River and High RockLake..........................................................................................................................................2 Figure 3-1. Box plots of trace element analysis of fish muscle tissue for sunfish and black bass collected from three areas of the Yadkin River and High Rock Lake during 2018-2022. Boxes and whiskers show the 10th, 25th,50th,75th,and 90th percentiles. Individual outliers are represented by points.Values under each element are USEPA screening values for recreational anglers. ............5 Appendices Appendix A Arsenic,selenium,and mercury concentrations(fresh weight) in axial muscle of fish from the Yadkin River and High Rock Lake during 2018-2022 i Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station 1 Introduction and Background Duke Energy Carolinas(DEC)owns and operates the Buck Combined Cycle Station (Buck) located on the Yadkin River in Rowan County,Salisbury, North Carolina.The National Pollutant Discharge Elimination System (NPDES)Wastewater Permit for Buck(No. NC0004774,Section C.12) requires DEC to annually conduct trace elements (specifically arsenic,selenium,and mercury) monitoring in fish muscle tissue in accordance with a study plan approved by the North Carolina Department of Environmental Quality (NCDEQ). Monitoring is required due to the discharge of waters from a coal ash basin associated with the previous coal-fired steam plant at the site.A study plan was originally submitted and approved in 2013 (Duke Energy 2013),and an updated study plan was submitted and approved in 2019 (Duke Energy 2019). 2 Methods 2.1 Study Site Fish were collected from two areas on the Yadkin River and one in upper High Rock Lake (Figure 1-1)for trace element analysis of muscle tissue.Area UP was located at least 3.2 km upstream of the Buck ash basin discharge to serve as a reference to monitor background trace element concentrations in fish muscle tissue.Area DI was located between 0.8 km and 2.0 km downstream from the Buck ash basin discharge to monitor potential near-field uptake of trace elements in fish muscle tissue.Area DN was located in upper High Rock Lake, approximately 8.0 km downstream of the ash basin discharge,to monitor far-field uptake of trace elements in fish muscle tissue. 1 Fish Tissue Monitoring oft he Yadkin Rivera nd High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station N A UP Dll BUCK Dolma 002 COMBINED ourc�uam CYCI.E STATION F' fZ Trace Element Fishing Area A Duke Facility Outfall 0 25 5 Kilometers Buck Combined Cycle Station DUKE ENERGY. Figure 2-1. Sampling areas for monitoring trace elements in fish tissue within the Yadkin River and High Rock Lake. 2.2 Field Collection Fish were collected for trace element tissue monitoring following the appropriate Duke Energy procedures under Duke Energy's North Carolina Biological Laboratory Certification (Huntersville, NC certification 008). Fish were collected using boat electrofishing, identified to species, measured for total length to the nearest millimeter,weighed to the nearest gram, and marked with a unique tag identifier. Fish were then placed in a labeled (sample date, sample location,facility, etc.) bag on ice while in the field. Bags were sealed and transferred to a deep freezer at the end of the sampling day until processed for analysis. Sunfish (Lepomis) and black bass (Micropterus) were targeted for collection based on prior sampling experience, likely availability, potential for human consumption, and general trophic level. Other similar genera of fish were collected when the primary target genera were unavailable. Duke Energy personnel collected six individuals of each taxa from each sampling area. Individuals retained for analysis were those considered of sufficient size for human consumption (>_6a g). As recommended by the US Environmental Protection Agency (USEPA),fish were retained such that the size of the smallest 2 Fish Tissue Monitoring of the Yadkin River and High Rock lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station individual would not be less than 75%of the total length of the largest fish within each genus group when possible (USEPA 2000). 2.3 Laboratory Analysis Fish were processed for metals analysis at the Duke Energy Trace Element Laboratory located in New Hill, NC. Fish were thawed and skeletal muscle was fileted off using a carbon-steel scalpel. Muscle tissue from each individual fish was homogenized,weighed to the nearest 0.001 g,completely dried in a desiccator.The dried weight was recorded and used to calculate a dry weight to fresh weight ratio for that fish.Approximately 0.1 g of dried tissue was analyzed for each fish using X-ray fluorescence.Quality control was achieved utilizing analytical standards, replicates,and certified reference materials. 3 Results and Discussion During the study period (2018-2022), 180 individuals representing eight species were captured and analyzed from the Yadkin River and High Rock Lake (Table 3-1).These species included Alabama Bass Micropterus hensholli, Largemouth Bass M.salmoides, Black Crappie Pomoxis nigromaculatus, Bluegill Lepomis macrochirus, Green Sunfish L. cyanellus, Redbreast Sunfish L. ouritus, Redear Sunfish L. microlophus,and Warmouth L. gulosus.A full list of individual fish and associated trace element concentrations is presented in Appendix A. Table 3-1. Numbers and total length ranges(mm)of different species of fish collected for element analyses in the three sampling areas of the Yadkin River and High Rock Lake during 2018-2022. UP DI DN Total Number Total length Total length Number range range Number length range Alabama Bass 2 293-410 — — Black bass Largemouth 26 276-499 30 247-515 30 288-471 (Micropterus) Bass Black Crappiel 2 272-278 — — Bluegill 22 140-178 20 142-176 28 146-183 Green Sunfish — 1 175 — Sunfish Redbreast — 1 177 1 171 (Lepomis) Sunfish Redear Sunfish 7 159-183 8 155-250 1 186 Warmouth 1 191 — — 1 Black Crappie were kept as a surrogate for black bass because these species are in the same feeding guild(NCDENR 2006). 3 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station 3.1 Arsenic All fish collected during 2018-2022 were below the USEPA screening value for recreational anglers of 1.2 µg/g(fresh weight)for arsenic(USEPA 2000; Figure 3-1). 3.2 Selenium All fish collected during 2018-2022 were below USEPA screening value for recreational anglers of 20 µg/g(fresh weight)for selenium (USEPA 2000; Figure 3-1). 3.3 Mercury Sunfish collected during 2018-2022 were below the USEPA screening value for recreational anglers of 0.4 µg/g(fresh weight)for mercury(USEPA 2000; Figure 3-1).Of the 88 black bass sampled during the five-year study period, one exceeded the mercury screening value. Mercury concentrations generally increased with fish size, regardless of the collection area.This individual was in the top quartile of size for all black bass collected.Therefore,this elevated mercury concentration was a function of bioaccumulation. 4 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Sunfish Black bass 1.0 1.a Arsenic Arsenic 0.$ 1 2 pglg 0.8 1.2 N919 + a 0.6 * 0.6 * • 0.4 0.4 • 0.2 0-2 0.0 0.0 UP DI DN UP DI DN 1.4 1.4 Selenium Selenium 1-2 20 µ9r9 12 20 Nglg • 1.0 1.0 0.8 0.8 w 0 0.6 0.6 • CO := 0.4 0.4 c0 02 0-2 0.0 1 0.0 UP DI DN UP DI DN 0.5 a.5 Mercury Mercury R-4 Y919 • 0.4 p9lg 0.4 0.4 • 03 0.3 • 0.2 • 02 0.1 � � • 0,1 4 00 D9 UP DI DN UP DI DPI Figure 3-1. Box plots of trace element analysis of fish muscle tissue for sunfish and black bass collected from three areas of the Yadkin River and High Rock Lake during 2018-2022. Boxes and whiskers show the 10th, 25th,50th, 75th,and 90th percentiles. Individual outliers are represented by points. Values under each element are U5EPA screening values for recreational anglers. 5 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station 4 Summary All fish collected during the 2018-2021 study period were below the USEPA screening levels for recreational anglers for arsenic and selenium. One black bass exceeded the screening level for mercury. However, mercury concentrations in black bass collected at the DI area were not elevated compared to those collected upstream of the Buck ash basin discharge when accounting for size of fish.These patterns match samples reported from the same areas in 2014 (Duke Energy 2014). 5 References Duke Energy.2013.Trace elements monitoring in fish tissue study plan. Duke Energy Corporation. Charlotte, NC. Duke Energy.2014.Arsenic,selenium,and mercury monitoring in fish muscle tissue from upper High Rock Lake, NC. Duke Energy Corporation.Charlotte, NC. Duke Energy.2019. Fish tissue monitoring of the Yadkin River. Duke Energy Corporation.Charlotte, NC. NCDENR. 2006.Standard operating procedure. Biological monitoring.Stream fish community assessment program. Environmental Sciences Section, Division of Water Quality, North Carolina Department of Environmental and Natural Resources. Raleigh, NC. USEPA.2000.Guidance for assessing chemical contaminant data for use in fish advisories.Vol. 1. Fish sampling and analysis.Third edition. EPA 823-B-00-007. United States Environmental Protection Agency,Office of Water, Washington, DC. 6 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Appendix A Arsenic, selenium, and mercury concentrations (fresh weight) in axial muscle of fish from the Yadkin River and High Rock Lake during 2018-2022 Dry-to- fresh Collection Length Weight As Se Hg weight Fish species Location month (mm) (g) W/O (µg/g) W/O ratio Bluegill UP November 2018 140 52 0.16 0.49 <0.06 0.20 Bluegill UP November 2018 178 120 0.14 0.33 <0.06 0.19 Bluegill UP November 2018 165 86 0.15 0.31 <0.06 0.20 Bluegill UP November 2018 178 112 0.15 0.39 0.07 0.20 Bluegill UP November 2018 159 75 0.14 0.36 <0.06 0.20 Bluegill UP November 2018 144 54 0.15 0.48 <0.06 0.20 Alabama Bass UP November 2018 410 972 0.20 0.31 0.23 0.24 Black Crappie UP November 2018 278 324 0.23 0.23 <0.06 0.20 Black Crappie UP November 2018 272 293 0.18 0.32 <0.06 0.20 Largemouth Bass UP November 2018 499 2403 0.17 0.31 0.30 0.20 Largemouth Bass UP November 2018 348 719 0.16 0.31 0.12 0.20 Largemouth Bass UP November 2018 411 1098 0.17 0.34 0.19 0.20 Bluegill DI November 2018 152 60 0.13 0.40 0.11 0.17 Bluegill DI November 2018 152 62 0.13 0.52 <0.05 0.17 Bluegill DI November 2018 153 60 0.13 0.46 0.06 0.17 Bluegill DI November 2018 167 75 0.17 1.18 <0.06 0.20 Bluegill DI November 2018 158 75 0.14 0.70 0.06 0.19 Bluegill DI November 2018 158 70 0.14 0.36 <0.05 0.18 Largemouth Bass DI November 2018 452 1723 0.17 0.48 0.35 0.20 Largemouth Bass DI November 2018 343 669 0.14 0.40 0.15 0.19 Largemouth Bass DI November 2018 407 1131 0.17 0.62 0.18 0.20 Largemouth Bass DI November 2018 430 1238 0.19 0.34 0.22 0.20 Largemouth Bass DI November 2018 415 1156 0.19 0.32 0.15 0.21 Largemouth Bass DI November 2018 383 947 0.15 0.34 0.13 0.20 Bluegill DN October 2018 176 98 0.13 0.20 <0.05 0.17 Bluegill DN October 2018 170 83 0.13 0.22 <0.05 0.17 Bluegill DN October 2018 164 74 0.14 0.26 <0.06 0.20 Bluegill DN October 2018 155 64 0.14 0.21 <0.06 0.19 Bluegill DN October 2018 152 58 0.16 0.32 <0.06 0.20 Bluegill DN October 2018 152 57 0.15 0.23 <0.06 0.20 Largemouth Bass DN October 2018 288 315 0.20 0.22 <0.06 0.20 Largemouth Bass DN October 2018 319 399 0.23 0.21 <0.06 0.20 Largemouth Bass DN October 2018 374 752 0.20 0.26 0.07 0.21 Largemouth Bass DN October 2018 378 775 0.22 0.25 0.11 0.22 Largemouth Bass DN October 2018 306 371 0.20 0.25 <0.06 0.21 Largemouth Bass DN October 2018 334 516 0.17 0.23 <0.06 0.20 Bluegill UP September 2019 166 90 0.14 0.53 0.08 0.19 Bluegill UP September 2019 153 65 0.14 0.53 0.08 0.19 Bluegill UP September 2019 148 60 0.13 0.34 <0.06 0.20 Bluegill UP September 2019 153 64 0.14 0.44 0.06 0.19 A-1 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Dry-to- fresh Length Weight As Se Hg weight Fish species Location Sample date (mm) (g) (µg/g) (µg/g) (µg/g) ratio Bluegill UP September 2019 163 72 0.14 0.31 <0.05 0.18 Bluegill UP September 2019 158 76 0.13 0.43 0.05 0.18 Largemouth Bass UP September 2019 328 428 0.15 0.35 0.09 0.20 Largemouth Bass UP September 2019 371 730 0.17 0.35 0.11 0.21 Largemouth Bass UP September 2019 457 1367 0.17 0.35 0.22 0.21 Largemouth Bass UP September 2019 427 1196 0.18 0.37 0.32 0.21 Largemouth Bass UP September 2019 338 496 0.18 0.27 0.10 0.20 Largemouth Bass UP September 2019 439 1273 0.14 0.25 0.27 0.16 Bluegill DI September 2019 157 69 0.13 0.54 0.06 0.19 Redear Sunfish DI September 2019 250 258 0.13 0.68 0.08 0.19 Redear Sunfish DI September 2019 207 140 0.16 0.70 0.07 0.20 Redear Sunfish DI September 2019 202 133 0.16 0.59 0.08 0.20 Redear Sunfish DI September 2019 244 252 0.17 0.56 0.13 0.20 Redear Sunfish DI September 2019 220 195 0.15 0.68 0.09 0.20 Largemouth Bass DI September 2019 344 534 0.17 0.37 0.09 0.20 Largemouth Bass DI September 2019 293 342 0.15 0.38 0.10 0.20 Largemouth Bass DI September 2019 305 419 0.17 0.50 0.09 0.20 Largemouth Bass DI September 2019 300 346 0.15 0.40 0.12 0.20 Largemouth Bass DI September 2019 274 292 0.15 0.34 0.10 0.20 Largemouth Bass DI September 2019 294 296 0.12 0.27 0.07 0.15 Bluegill DN May 2019 170 94 0.15 0.29 0.07 0.18 Bluegill DN May 2019 173 115 0.18 0.28 <0.04 0.19 Bluegill DN May 2019 175 106 0.13 0.45 <0.05 0.19 Bluegill DN May 2019 169 85 0.14 0.24 <0.05 0.18 Bluegill DN May 2019 169 82 0.15 0.25 0.06 0.18 Bluegill DN May 2019 169 92 0.14 0.28 <0.04 0.18 Largemouth Bass DN May 2019 411 1017 0.19 0.24 0.12 0.20 Largemouth Bass DN May 2019 381 726 0.25 0.22 0.13 0.20 Largemouth Bass DN May 2019 416 948 0.16 0.17 0.07 0.15 Largemouth Bass DN May 2019 405 1010 0.20 0.24 0.14 0.20 Largemouth Bass DN May 2019 410 1009 0.22 0.23 0.12 0.19 Largemouth Bass DN May 2019 380 774 0.24 0.25 0.09 0.21 Bluegill UP June 2020 143 65 0.15 0.63 <0.06 0.20 Bluegill UP October 2020 177 108 0.14 0.53 <0.06 0.19 Bluegill UP October 2020 173 95 0.13 0.48 <0.05 0.18 Bluegill UP October 2020 163 85 0.15 0.38 0.12 0.20 Redear Sunfish UP June 2020 164 78 0.15 0.48 0.08 0.19 Redear Sunfish UP October 2020 159 68 0.19 0.56 <0.06 0.20 Largemouth Bass UP June 2020 420 1410 0.19 0.28 <0.06 0.20 Largemouth Bass UP June 2020 487 1823 0.18 0.28 <0.06 0.20 Largemouth Bass UP June 2020 381 880 0.18 0.30 <0.06 0.21 Largemouth Bass UP June 2020 447 1355 0.17 0.30 0.09 0.20 Largemouth Bass UP June 2020 447 13SS 0.18 0.35 <0.06 0.20 Largemouth Bass UP October 2020 460 1460 0.13 0.26 0.05 0.15 Bluegill DI June 2020 163 83 0.12 0.43 <0.06 0.19 Bluegill DI June 2020 167 99 0.14 0.53 0.06 0.20 Bluegill DI June 2020 150 69 0.14 0.31 0.06 0.19 Bluegill DI June 2020 150 67 0.13 0.53 <0.05 0.18 Bluegill DI June 2020 153 82 0.14 0.45 0.21 0.20 A-2 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Dry-to- fresh Length Weight As Se Hg weight Fish species Location Sample date (mm) (g) (µg/g) (µg/g) (µg/g) ratio Bluegill DI June 2020 143 63 0.17 0.34 <0.06 0.20 Largemouth Bass DI June 2020 395 1082 0.18 0.34 <0.06 0.20 Largemouth Bass DI June 2020 310 476 0.19 0.34 0.10 0.20 Largemouth Bass DI June 2020 331 601 0.19 0.34 <0.06 0.21 Largemouth Bass DI June 2020 387 824 0.20 0.32 0.09 0.21 Largemouth Bass DI June 2020 314 523 0.20 0.32 0.13 0.21 Largemouth Bass DI June 2020 413 1362 0.17 0.34 <0.06 0.20 Bluegill DN May 2020 163 93 0.15 0.28 0.06 0.18 Bluegill DN May 2020 169 99 0.19 0.34 <0.06 0.20 Bluegill DN May 2020 170 102 0.15 0.26 0.07 0.18 Bluegill DN May 2020 150 72 0.16 0.26 0.09 0.20 Bluegill DN May 2020 150 66 0.17 0.46 <0.06 0.21 Bluegill DN May 2020 153 72 0.15 0.27 <0.06 0.19 Largemouth Bass DN May 2020 469 1670 0.18 0.26 <0.06 0.20 Largemouth Bass DN May 2020 460 1488 0.17 0.26 <0.06 0.20 Largemouth Bass DN May 2020 391 960 0.20 0.25 <0.06 0.21 Largemouth Bass DN May 2020 452 1218 0.15 0.31 <0.05 0.18 Largemouth Bass DN May 2020 471 1475 0.18 0.25 <0.06 0.19 Largemouth Bass DN May 2020 425 1158 0.20 0.25 <0.06 0.21 Bluegill UP June 2021 153 71 0.13 0.48 0.06 0.19 Bluegill UP June 2021 154 78 0.15 0.43 <0.06 0.20 Bluegill UP June 2021 142 65 0.15 0.56 <0.06 0.20 Redear Sunfish UP June 2021 180 113 0.14 0.95 <0.06 0.19 Redear Sunfish UP June 2021 172 100 0.14 0.64 <0.06 0.20 Redear Sunfish UP June 2021 162 97 0.17 0.49 <0.06 0.20 Largemouth Bass UP June 2021 464 1891 0.17 0.32 0.29 0.21 Largemouth Bass UP June 2021 422 1247 0.17 0.29 0.17 0.21 Largemouth Bass UP June 2021 445 1478 0.16 0.33 0.14 0.21 Largemouth Bass UP June 2021 443 1436 0.20 0.27 0.33 0.20 Largemouth Bass UP June 2021 392 1000 0.17 0.33 0.12 0.21 Largemouth Bass UP June 2021 366 735 0.15 0.38 0.12 0.20 Bluegill DI June 2021 142 61 0.13 0.43 <0.06 0.19 Bluegill DI June 2021 155 82 0.14 0.42 0.09 0.20 Bluegill DI June 2021 149 69 0.16 0.39 <0.06 0.19 Bluegill DI June 2021 158 86 0.16 0.37 <0.06 0.19 Redbreast Sunfish DI June 2021 177 129 0.17 0.50 0.07 0.21 Redear Sunfish DI June 2021 162 79 0.16 0.60 <0.06 0.20 Largemouth Bass DI June 2021 410 1081 0.20 0.36 0.23 0.21 Largemouth Bass DI June 2021 405 1151 0.15 0.25 0.09 0.18 Largemouth Bass DI June 2021 456 1520 0.18 0.36 0.29 0.20 Largemouth Bass DI June 2021 433 1238 0.21 0.43 0.16 0.21 Largemouth Bass DI June 2021 474 1835 0.19 0.38 0.17 0.21 Largemouth Bass DI June 2021 480 1677 0.18 0.35 0.31 0.21 Bluegill DN April2021 183 128 0.16 0.30 0.09 0.20 Bluegill DN Apri12021 175 113 0.15 0.31 0.07 0.20 Bluegill DN Apri12021 166 94 0.18 0.25 <0.06 0.20 Bluegill DN April 2021 165 91 0.16 0.48 <0.06 0.20 Bluegill DN April 2021 166 102 0.16 0.28 0.06 0.18 Redear Sunfish DN April 2021 186 141 0.16 0.31 <0.06 0.21 A-3 Fish Tissue Monitoring of the Yadkin River and High Rock Lake Near Buck Combined Cycle Station(2018-2022) Buck Combined Cycle Station Dry-to- fresh Length Weight As Se Hg weight Fish species Location Sample date (mm) (g) (µg/g) (µg/g) (µg/g) ratio Largemouth Bass DN April 2021 460 1500 0.19 0.23 0.18 0.20 Largemouth Bass DN April 2021 340 533 0.21 0.24 0.12 0.20 Largemouth Bass DN April 2021 382 897 0.20 0.24 0.13 0.20 Largemouth Bass DN April 2021 405 1006 0.21 0.23 0.12 0.20 Largemouth Bass DN April 2021 440 1055 0.22 0.25 0.19 0.21 Largemouth Bass DN April 2021 470 1744 0.15 0.21 0.29 0.16 Bluegill UP June 2022 163 92 0.15 0.51 <0.06 0.20 Bluegill UP June 2022 150 78 0.16 0.41 <0.06 0.20 Bluegill UP June 2022 154 74 0.18 0.39 <0.06 0.20 Redear Sunfish UP June 2022 183 103 0.13 0.80 <0.06 0.20 Redear Sunfish UP June 2022 176 101 0.18 0.67 <0.06 0.21 Warmouth UP June 2022 191 153 0.14 0.37 0.14 0.19 Alabama Bass UP June 2022 293 312 0.19 0.29 0.08 0.20 Largemouth Bass UP June 2022 359 611 0.19 0.26 0.14 0.20 Largemouth Bass UP June 2022 292 398 0.20 0.30 <0.06 0.21 Largemouth Bass UP June 2022 336 689 0.18 0.32 0.09 0.21 Largemouth Bass UP June 2022 276 289 0.18 0.37 0.07 0.21 Largemouth Bass UP June 2022 362 712 0.17 0.37 0.13 0.21 Bluegill DI June 2022 148 69 0.14 0.39 0.06 0.20 Bluegill DI June 2022 151 76 0.18 0.30 <0.06 0.19 Bluegill DI June 2022 176 98 0.14 0.33 <0.06 0.19 Green Sunfish DI June 2022 175 112 0.13 0.23 0.10 0.18 Redear Sunfish DI June 2022 155 72 0.16 0.63 0.06 0.19 Redear Sunfish DI June 2022 225 231 0.17 0.55 0.09 0.21 Largemouth Bass DI June 2022 515 2206 0.19 0.35 0.37 0.20 Largemouth Bass DI June 2022 451 1224 0.17 0.48 0.25 0.19 Largemouth Bass DI June 2022 447 1339 0.23 0.32 0.14 0.20 Largemouth Bass DI June 2022 451 1224 0.21 0.36 0.43 0.22 Largemouth Bass DI June 2022 460 1495 0.17 0.37 0.26 0.19 Largemouth Bass DI June 2022 289 375 0.19 0.31 <0.06 0.20 Bluegill DN May 2022 146 67 0.15 0.28 0.06 0.19 Bluegill DN May 2022 162 92 0.16 0.28 0.07 0.19 Bluegill DN May 2022 182 118 0.16 0.29 0.07 0.19 Bluegill DN May 2022 175 114 0.18 0.27 <0.06 0.20 Bluegill DN May 2022 152 82 0.15 0.25 <0.05 0.18 Redbreast Sunfish DN May 2022 171 105 0.15 0.43 0.07 0.22 Largemouth Bass DN May 2022 441 1156 0.26 0.25 0.25 0.21 Largemouth Bass DN May 2022 468 1447 0.24 0.23 0.23 0.20 Largemouth Bass DN May 2022 444 1156 0.17 0.29 0.29 0.19 Largemouth Bass DN May 2022 425 1109 0.17 0.28 0.17 0.20 Largemouth Bass DN May 2022 340 539 0.17 0.30 0.10 0.20 Largemouth Bass DN May 2022 402 960 0.20 0.25 0.09 0.21 A-4 Young, Brianna A From: Young, Brianna A Sent: Thursday, February 2, 2023 10:47 AM To: Bednarcik, Jessica L Cc: Cahoon, Steve Subject: Buck Steam Station (NCS000578) and Buck Combined Cycle Station (NCS000554) Good morning, The Division of Energy, Mineral, and Land Resources (DEMLR) Stormwater Permitting Program acknowledges receipt of your renewal application for coverage under NPDES Permit Number NCS000554. Please continue to comply with all conditions and monitoring requirements in your current NPDES stormwater permit. As long as you have submitted a complete renewal request package and maintain compliance with those permit conditions, stormwater discharges from this facility are authorized by that permit until the Division issues a renewal permit or notifies you of an alternative action. The renewal package also included a rescission request for NCS000578. These requests will be reviewed at the same time. Please note that due to the current backlog and staff shortages, review of this permit renewal is not scheduled until 2024, however this schedule is subject to change. Please let me know if you have any questions in the interim. Thank you, Brianna Young, MS(she/her/hers) Industrial Individual Permits Coordinator Stormwater Permitting Program NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR) Brianna.Young@ncdenr.gov(e-mail preferred) 919-707-3647 (office) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 ,�: D_ E � � NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public during this challenging time. 1