HomeMy WebLinkAboutNCC241997_Site Plan or Location Map_20240702 DowSign Envelope ID:7AE91482-1C81-4470-802F-C7EF3B573575 PROJECT NARRATIVE �� �:.''. i�S THE PROPOSED NEW BERN SUBSTATION-230Kv LINE-EXPANSION PROJECT IS LOCATED IN NEW ►`\ BERN,NORTH CAROLINA.THE EXPANSION WORK FOR THE PROJECT WILL INVOLVE EXTENDING4....f DU KE ��'� i� „5 /►* �#�T.. OFF THE WEST EDGE OF THE EXISTING PAD 250'TO CREATE A NEW PAD.A NEW PERMANENT ����`�`�-� •��lc. FENCE WILL BE INSTALLED AROUND THE WEST PERIMETER OF THE NEW PAD UNTIL THE 500Kv �a ,�y-�M " , YARD IS BUILT.TWO ACCESS DRIVES AND ONE ACCESS DRIVE MODIFICATION WILL BE ADDED TO ��������� ������� �' THE SITE IN ORDER TO ACCESS THE PROPOSED CONTROL STRUCTURE ENCLOSURE AND CRITICAL ���4�� SUBSTATION INFRASTRUCTURE. ���1 PROJE T THE EXISTING SUBSTATION OCCUPIES A PARCEL OF 42.07 AC 182.48 IN THE CITY OF NEW BERN'Slilti� ��� �ocarlox JURISDICTION AND ZONED A-5(AGRICULTURAL DISTRICT).AN ELECTRICAL SUBSTATION IS E N E ® ` � � CONSIDERED A MINOR UTILITY USE AND IS PERMITTED IN THE A-5 ZONING DISTRICT WITH A SPECIAL USE PERMIT. THE EXPANSION AREA WILL IMPACT EXISTING JURISDICTIONAL STREAMS.THE PLAN WILL INCLUDE lipeAltibie PROGRESS A TABLE THAT QUANTIFIES TEMPORARY AND PERMANENT IMPACTS TO WETLANDS.THESE IMPACTS WILL BE ADDED TO PERMIT SUBMISSION TO THE UNITED STATES ARMY CORPS OF ENGINEERS.APPROPRIATE PERMITS WILL BE ACQUIRED FOR WETLAND DISTURBANCE NORTH& SOUTH CAROLINA STATE NAP THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT-OF-WAY AND NEW BERN 2 3 0 kV SUBSTATION EXPANSION GENERAL NOTES: THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO 1. FIELD SURVEY PERFORMED BY SGC SURVEYING NC,PLLC,SURVEYED ON MAY 04,2023,CERTIFIED ON ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS.MEASURES INCLUDE SILT FENCE,TREE OCTOBER 13,2023.THE BEARINGS SHOWN ARE REFERENCED TO NAD83 NORTH CAROLINA STATES PLANE PROTECTION FENCE,SILTN FENCE ROCK OUTLETS,CHECK DAMS,INLET PROTECTION,TEMPORARY NEW BERN NORTH C A R O L I N A ALL ALL DISTANCES, SHOWN ARE HORIZONTAL FEET.ALL ELEVATIONS S E SHOWN ARE VERTICAL FEET. DIVERSION DITCHES,AND TEMPORARY SKIMMER BASINS.PREDEVELOPMENT CONDITIONS WILL BE 2. ALL MATERIALS,CONSTRUCTION,WORKMANSHIP SHALL MEET DUKE ENERGY PROGRESS,LLC(DEP) RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN r) SPECIFICATIONS,STANDARDS AND DESIGN. AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE 3. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE"MANUAL OF ACCIDENT DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND DEP PROJECT N O. E19015401 PREVENTION IN CONSTRUCTION"ISSUED BY AGC OF AMERICA,INC.,AND THE SAFETY AND HEALTH STABILIZED RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE.EROSION CONTROL REGULATIONS FOR CONSTRUCTION ISSUED BY THE U.S.DEPARTMENT OF LABOR. MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ.GRADING OF THE SITE 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY EXISTING PAVEMENT OR EXISTING IS DESIGNED TO ACCOMMODATE PROPOSED DRAINAGE PATTERNS USING CULVERTS AND LATITUDE: 35.1411970 UTILITIES THAT ARE DAMAGED DUE TO CONSTRUCTION ACTIVITY.. PERMANENT DITCHES.THE PROJECT IS ANTICIPATED TO START IN 2024. 5. CONTRACTOR IS REQUIRED TO REDLINE ANY FIELD CHANGES ON DRAWINGS UPON COMPLETION OF LONGITUDE: -77.123886° CONSTRUCTION.NOTE ANY DEVIATIONS FROM THE ORIGINAL PLANS.PLANS ARE TO REFLECT THE ACTUAL F F LOCATION AND MATERIALS. 701 \A/. NC 55 HWY. EARTHWORK/EROSION: fl V V i 6. SITE DISTURBANCE IS MORE THAN 1 ACRE THEREFORE AN EROSION CONTROL PERMIT WILL BE OBTAINED. PROJECT INFORMATION ALL ADDITIONAL EROSION CONTROL ITEMS THAT ARE INSTALLED THAT ARE NOT SHOWN ON THE PLANS, /'/i / SHALL BE APPROVED BY THE LOCAL AGENCY OR DEP REPRESENTATIVE BEFORE INSTALLING IN ORDER TO • APPROVE FOR PAYMENT. ITEMS NOT APPROVED WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. 7. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH NCGO1 GROUND STABILIZATION DUKE ENERGY PROGRESS,LLC ' REQUIREMENTS. LANDOWNER 411 FAYETTEVILLE ST 8. THE LOCATION OF THE TOPSOIL STOCKPILE SHALL BE COORDINATED WITH DEP REPRESENTATIVE. RALEIGH,NC 27601 j' &i, �C 9. ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF OFF-SITE IN A STATE PERMITTED LANDFILL. ,,ss 10. UNLESS NOTED OTHERWISE,ALL TREES NOT MARKED TO BE REMOVED ARE NOT TO BE DISTURBED.THEY DEWBERRY ENGINEERS INC. ' ./ ,-- /£'` i ARE TO BE PROTECTED FROM DAMAGE BY EQUIPMENT DURING CONSTRUCTION. ENGINEER 9300 HARRIS CORNERS PARKWAY,SUITE 220 /' / STREETS: CHARLOTTE,NC 28269 PH:704.509.9918 - _ /''� /' ' / 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL MEASURES IN AND/OR _ 1 / / ADJACENT TO NCDOT RIGHT-OF-WAY.ALL METHODS SHALL CONFORM TO THE MANUAL ON UNIFORM SGC SURVEYING NC,PLLC j / TRAFFIC CONTROL DEVICES(MUTCD)AND NCDOT STANDARDS. SURVEYOR 624 NEW BRIDGE ST,SUITE 600 / ' 12. WORK WITHIN THE NCDOT RIGHT-OF-WAY SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. JACKSONVILLE,NC 28540 /' 1 PH:919.920.3258 _ /� /' �/� / UTILITIES: PARCEL ID 8-218-019 \ , /' �� 13. EXISTING UTILITY LOCATIONS SHOWN,IF ANY,ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD ,x /' // a� PRIOR TO BEGINNING WORK.CONTRACTOR SHALL CONTACT NC ONE CALL CENTER AT 1-800-632-4949(OR DEED BOOK AND PAGE • \ ``\ i i / / a/ /, 811)FOR LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION.NO SUBSURFACE NUMBER D.B.0671,PG.0173 Q UTILITY INVESTIGATION HAS BEEN CONDUCTED AT THIS TIME. C'.../ 14. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING UNDER,AROUND,AND/OR ADJACENT SITE ZONING A-5 AGRICULTURAL DISTRICT / /" /j// TO EXISTING POWER LINES. i ' / // / ENVIRONMENTAL: TOTAL ACREAGE OF 182.48 AC i / �.`♦�� ' PARCEL AREA i�i ,♦ 16. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE.THE SITE LIES WITHIN AN AREA PF ACREAGE OF LAND TO BE ♦♦♦♦���� MINIMAL FLOOD HAZARD(ZONE X)AS REFERENCED PER THE NATURAL&CULTURAL RESOURCES REPORT DISTURBED 15.19 AC(661,523 SF) DATED SEPTEMBER 2023 PARCEL ID:8-218-019 .AREA / `' 17. THE EXISTING PARCEL IS 182.48 ACRES WITH AN APPROXIMATE EXISTING TREE SAVE AREA OF 120.04 ACRES EXISTING IMPERVIOUS , "°�+..,,, JURISDICTION .�:•_� , ///\\\ (65.8%)THE PROPOSED SUBSTATION EXPANSION WILL REDUCE THE TREE SAVE AREA TO 117.00 ACRES AREA% 1.74/ _ .- ��.�I \\\ \ /�� (64.1%).AN EXISTING BUFFER IS PRESENT ALONG THE PROPERTY LINE ADJACENT TO THE PROPERTY. PROPOSED ADDITIONAL 1.76 AC(76,452 SF) �♦♦ - \ v IMPERVIOUS AREA \ r • PROPOSED ADDITIONAL . \\ . ♦ �'I - / MIGRATORY BIRD HOTLINE IMPERVIOUS AREA 0.96/0 - ` ' STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY TOTAL SITE IMPERVIOUS SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, AREA 4.94 AC(215,131 SF) 47 SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO °'� I PROJECT LOCATION BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND TOTAL SITE IMPERVIOUS 11 i _ -. CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. ,, AREA 2.71/o \ RIVER BASIN NEUSELU .r \ N CAROLINAS:800.573.3853 U mik. N SUBWATERSHED N/A j \\\ \\ -- -- - SPILL REPORTING HOTLINE cc IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS Z \ ' -/ REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER O 43 REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR z \-- ---� NG- SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS Q 4 / DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL,CONTACT ONE OF 0- '- THE DUKE ENERGY SPILL REPORTING HOTLINES AT: VICINITY MAP CAROLINAS&MIDWEST:800.527.3853 W SCALE:1"=500' Z O Sheet List Table 7 Planimetric Survey 4 15 Phase 1 ESC 23 Substation Profile 10 Sheet Number Sheet Title 8 Planimetric Survey 5 16 Phase 2 ESC 24 Details-ESC 1 Cover Sheet 9 Planimetric Survey 6 17 Phase 3 ESC 25 Details-ESC 2 m 2 Recombination Plat 1 10 Planimetric Survey 7 18 Phase 4 ESC 26 Details-Site co N 3 Recombination Plat 2 11 Demolition Plan 19 Grading Plan 27 Details-Storm M w 12 Overall Site Plan 20 Access Roads Plan and Profile-ROAD A P&P 28 NCGO1 Details 4 Planimetric Survey 1 m 13 Site Plan 21 Access Roads Plan and Profile-ROAD B&C P&P 29 NCGO1 Details w 5 Planimetric Survey 2 _ Z 6 Planimetric Survey 3 14 Staking Plan- _ 22 Access Roads Plan and Profile-ROAD E P&P 6" Dewberry® �' DUKE E NEW BERN SUBSTATION iEXPANSION Dewberry Engineers Inc. , ENERGY® 9300 HARRIS CORNER PKWY COVER SHEET C E19015401 03/15/2024 75%SITE DESIGN LLE BML BML SUITE 220 PROGRESS CHARLOTTE,NC 28269 B E19015401 01/30/2024 50%SITE DESIGN LLE BML BML PHONE: 704.509.9918 A E19015401 01/10/2024 25%SITE DESIGN LLE BML BML FAX: 704.509.9937 N BETS#F-0929 SIZE IDORawNG RDC-83756 SHEET 1 OF 29 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50130466 dewturty.Com