Loading...
HomeMy WebLinkAboutNCC221565_NOT Closeout Documents (2)_20240422 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Davie Project: Highland Place River basin: Yadkin-PeeDee Person financially responsible:D.R.Horton,Inc.-Jessica Meyer Project#: DAVIE-2022-006 Address: 4008 Mendenhall Oaks Pkwy Suite 101,High Point, 1. Project Location: Ijames Church Rd.,Mocksville Pictures: Yes-Digital 2. Weather and soil conditions: 70's,Clear,Workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: April 22,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact me at seth.towne@deq.nc.gov or by phone at(336)776-9721. Reported by: Seth Towne Others present: Date of inspection: April 16,2024 Time arriving on site: 12:50 PM Time leaving site: 1:10 PM