Loading...
HomeMy WebLinkAboutNCC222384_NOT Closeout Documents_20240422 ECEIVE RAPR162024 I) ew GREENSBORO NORTH CAROLINA Termination of Grading Permit 4/1 1/2024 Brian Hecke Koury Corporation 2275 Vanstory Street Suite 200 Greensboro, NC 27403 RE: Project Name: S Elm-Eugene Interstate Industrial Park Address: 2933 S Elm-Eugene St Greensboro, NC 27406 36.03134045, -79.79135692 Grading Permit: 3090 Disturbed Acreage: 7.50 Dear Brian Hecke, This office has completed the final inspection on the above referenced project. Permanent ground cover sufficient to restrain erosion had been established. The requirements of the grading permit have been satisfied and the permit is now closed. No further inspections are required by this office, and the self-inspections required under the NCG010000 permit can cease. If this site was permitted after April 1, 2019, a Notice of Intent should have been filed with the NC Department of Environmental Quality. Please file a Notice of Termination with that Department to close your NCG010000 permit at this time. This can be done online at deci.nc.gov/ncg01. If you have any questions, please feel free to contact me at 336-317-5609 Sincerely, Christopher Johnson, Soil Erosion Inspector Sediment and Erosion Control City of Greensboro PO BOX 3136 • GREENSBORO NC 27402-3136 •WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) 640