Loading...
HomeMy WebLinkAboutSW5240102_Supplement-EZ Form_20240423 SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name Jeffery Way Commercial 2 Project Area(ac) 2.06 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 0 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is stream bank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 1 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title Keith P Gettle, PE/Principle 28 Organization: Gettle Engineering and Design, PLLC 29 Street address: 3616 Waxwing Ct 30 City,State,Zip: Wake Forest, NC 27587 31 Phone number(s): (919)210-3934 32 Email: Kpgettle@gmail.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete:and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 0 ,0111111,11,/,7 16 CAp Jo \\\ 94/// x. ../te.22.7...e,e6)- p • FEss/o•.!A SEAL Signature of Designer _ 030913 � NE2_+ . �illllil����' Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Bioretention Cell 5 Total drainage area(sq ft) 69696 6 Onsite drainage area(sq ft) 69146 7 Offsite drainage area(sq ft) 550 8 Total BUA in project(sq ft) 61028 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) sf New BUA not on subdivided lots(subject to 10 permitting)(sf) sf 11 Offsite BUA(sq ft) sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 24974 sf -Sidewalk(sq ft) 1634 sf -Roof(sq ft) 20000 sf -Roadway(sq ft) -Future(sq ft) sf -Other, please specify in the comment box below(sq ft) 14420 sf New infiltrating permeable pavement on subdivided 13 lots(sq ft) sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf 16 Existing BUA that is already permitted(sq ft) N/A 17 Existing BUA that will be removed(sq ft) 18731 sf 18 Percent BUA 68% 19 Design storm(inches) 5.4 in 20 Design volume of SCM(cu ft) 6177 cf 21 Calculation method for design volume Rational ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s). Other=Gravel Area,Parking to inlude paved area and drive aisle BIORETENTION CELL 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 4864 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 Does the SCM have retaining walls,gabion walls or other engineered 6 side slopes? No Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional'? Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 417.50 19 Bottom of the bioretention cell(fmsl) 419.50 20 Ponding depth of the design storm(inches) 10 in 21 Surface area of the bioretention cell(square feet) 5645 sf 22 Design volume of SCM (cu ft) 6177 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 10 in 25 Height of peak attenuation outlet above the planting surface(in) 12 in 26 Infiltration rate of the in situ soil(inch/hour) 1 in/hr 27 Diameter of the underdrain pipes(if applicable) 4 in 28 Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 421.5 30 Elevation of the planting surface(fmsl) 423 31 other)? Grass 32 Media depth(inches) 30 in 33 Percentage of medium to coarse washed sand by volume 85% 34 Percentage of fines(silt and clay)by volume 10% 35 Percentage of organic matter by volume 10% 36 Type of organic material Pine Bark 37 Phosphorus Index(P-Index)of media(unitless) 29 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch,if applicable(inches) 2 in 41 Type of mulch,if applicable Pine Bark 42 How many clean out pipes are being installed? 7 43 Type of pretreatment that will be used: Grass/Rip rap ADDITIONAL INFORMATION Please use this space to provide any additional information about the 44 bioretention cell(s): Grass pre-treatment for the surface runoff from the parking lot to the SCM. Inflow pipes discharge to rip rap aprons as noted on the plans. Bioretention 1 10:14 AM 4/18/2024