Loading...
HomeMy WebLinkAboutNCC215601_NOT Closeout Documents_20240418 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: lredell Project: lredell Co Gov Center South Parking River basin: Yadkin-PeeDee Person financially responsible:lredell County-Beth Mull.County Manager Project#: IREDE-2022-004 Address: 200 South Center Street,PO Box 788,Statesville,NC 28677 1. Project Location: Evergreen Street,Mooresville Pictures: No 2. Weather and soil conditions: Sunny.workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): NONE Title: Inspection report: Sent Report Date given/sent: March 27.2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO I)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO1-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01,2019,under the old permit system,are not required to take any additional actions.The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Owen Swavely Others present: Date of inspection: March 26,2024 Time arriving on site: 3:00 PM Time leaving site: 3:05 PM CC: