Loading...
HomeMy WebLinkAboutNCC191891_NOT Closeout Documents_20240418 T • ROY COOPER aig; Governor ELIZABETH S.BISER i Secretary , • WILLIAM E.TOBY VINSON,JR Interim Director NORTH CAROLINA Environmental Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on-site inspection of the subject site. This report is intended to provide you with information concerning the status of the site • as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earlies possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely Land Quality Section Mooresville Regional Office i G" North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 v Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Stanly Project: Uwharrie Trail Apartments River basin: Yadkin-PeeDee Person financially responsible:Uwharrie Trail,LLC-Mark C Morgan,Manager Project#: STANL-2020-006 Address: 2408 Lake Oak,PO Box 16038,High Point,NC 1. Project Location: Hilco Street,Albemarle Pictures: No 2. Weather and soil conditions: Light rain,60's F,no activity Initial inspection: No 3. Is site currently under notice of violation? Yes - 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: January 26,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must he requested by-theTermitteevia a Notice-of- Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions,please contact me at Joshawa.Billiot@ncdenr.gov or by phone at(704)235-2133. Reported by: Joshawa Billiot Others present: Lily Kay Date of inspection: January 24,2024 Time arriving on site: 12:50 PM Time leaving site: 01:20 PM cc: