Loading...
HomeMy WebLinkAboutNCC213378_Notice of Termination_20240417 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 4/17/2024 10:46:42 AM (NOT Submittal) Approve by Kieu Tran 4/22/2024 9:48:31 AM (NOT Request Review-NCC213378) • The task was assigned to DEMLR NCG01 NOT Review Team.The due date is:April 22,2024 5:00 PM 4/17/2024 10:46:43 AM • The task was assigned to Kieu Tran by round robin distribution 4/17/2024 10:46:43 AM Q� Notice of Termination (NOT) Request - NPDE,�tz_ Stormwater Permit for . • Use this form to submit a Notice of Termination(NOT)request for a project covered under the N.C.NPDES General Permit for Construction Activities NCG010000(or NCG250000). If approved,the Certificate of Coverage (COC)will be rescinded. Certificate of NCC213378 Coverage(COC)No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status May be blank if N/A May be blank if N/A PAID May be blank if N/A 2023 Annual Fee Status 2024 Annual Fee Status COC Expiration Date PAID May be blank if N/A 3/31/2029 May be blank if N/A Information associated with this permit: Project Name Ridgeback Solar, LLC Lots Covered by this This information is especially helpful when more lots were added with Modifications since the original permit Permit COC(if issuance. applicable) No longer visible on the initial form(data not captured from initial application) Address York Martin Rd., Liberty, NC County Randolph Latitude 35.8667 Longitude -79.5815 Permittee Listed Pure Power Contractors, LLC Legally Responsible Justin Taylor Individual NC Reference No. NCG01-2021-3378 E&SC Plan ID RANDO-2019-023 Original NOI Tracking 54602 No. Date COC Originally Most Recent Prior Rescission Date?(If Issued Issuance/Renewal Date Applicable) 06/04/2021 04/01/2024 Checked again at Review Step Reason for Rescission/Termination Request: Reason for Project Closed-Out Termination of Sale(Another Owner/Operator obtained new COC) Coverage* Mistake or Invalid Coverage Other Additional More information about the basis of this request,if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Erosion Control Plan 4/12/2024 Close-out Date Erosion Control Plan Ridgeback Solar-Final Stormwater Inspection.pdf 115.9KB Close-out Must be PDF format Documentation North Carolina General Statute 143-215.6B(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. "This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature Type Name* Matthew Perry Title* Senior Project Manager Organization* Pure Power Contractors Date* 04/17/2024 Email for matthew.perry@purepowercontractors.com Confirmation* Contact Telephone* 8284219364 NOT Certification Ridgeback Solar-Notice of Termination-Signed.pdf 64.47KB Form Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) sean.chastain@purepowercontractors.com Original Permittee CC'd on Notification Emails Email justin.taylor@purepowercontractors.com Original Site Contact cc'd on Notificaiton Emails Email sean.chastain@purepowercontractors.com