Loading...
HomeMy WebLinkAboutNCC213671_NOT Closeout Documents_20240417 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: Lake Royale Lots River basin: Tar-Pamlico Person financially responsible:D.R.Horton-Terramor,LLC-Pablo Reiter, Project#: FRANK-2021-039 Division President Address: 7208 Falls of Neuse Road,Suite 201,Raleigh,NC 1. Project Location: Sledge Road,Louisburg Pictures: No 2. Weather and soil conditions: Sunny,Dry,Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: April 16,2024 9. Corrective action needed: 10. Comments: Site was previously inspected on 12/28/23.Landscaping crew was observed working on lot on Sacred Fire Rd.Fresh sod near road,and straw with no emergent groundcover in sloped back half of lot.Inspection report was not sent for 12/28/23. 3/25/24 inspection showed that lot on Sacred Fire Rd has now adequately established permanent vegetative groundcover.Project is now ready to be closed. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mattie Frazier Others present: Date of inspection: March 25,2024 Time arriving on site: 4:20 PM Time leaving site: 4:45 PM cc: