Loading...
HomeMy WebLinkAboutNCC220971_Annual Fee NOD Letter (2024 Fee)_20240416 a ROY COOPER Govemor ELIZABEIH S.BISER �. Srecretruy WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Intern"Director EnWonmenta(Qual ty 4/16/2024 Liberty Point Two, LLC Attn: Daniel Granzyk 5603 New Garden Village Drive Greensboro, NC 27410 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC220971-2024 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 3/1/2024 and was due on 4/1/2024.The annual fee applies to the following construction site: Liberty Point Industrial Park-Lots 2&3 5360&5430 Corporation Drive, Hope Mills, NC Cumberland County Certificate of Coverage No. NCC220971 NC Reference No. NCG01-2022-0971 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Kieu Tran at kieu.tran@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612