Loading...
HomeMy WebLinkAboutNCC223744_NOT Signed Certification_20240408 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT{Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral &Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: N C_L X3 7 Name of Project:Fi3-Farr NI) ► if-6-it•1 (rt4 l?tsis ribu.4 ^ PLC "e„n}-- Pr)r s r l7 Per NC General Statute 143-215.68(1), any person who knowingly makes any false statement, representation, or certification in any application, record,report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true, complete, and accurate. 1' Legally Responsible Organizational Entity(must match eNOT): Pia ��"- \144 &c.- *Legally Responsible Person{must match eNOT): [f la ,(1 *Title of Legally Responsible Person: PfnitGk- Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: • 'Signature: Date: i y * IMPOR ANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Part IV,Section 8, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B,Item(6)of the NCG010000 permit.