Loading...
HomeMy WebLinkAboutNCC231107_NOT Closeout Documents_20240404 SEDIMENTATION INSPECTION REPORT (City of Winston-Salem/Forsyth County) Winston-Salem Field Operations Department Permit#: Erosion Control Division LEN2300013 P.O. Box 2511 Date: 3-22-24 Winston-Salem, NC 27102 Report by: David Evans--CESSWI Revised 3-3-22 Phone: 336-399-9700 Project: CAROLINA PUBLIC WAREHOUSE Location: 3600 PENN AVE. 1. Pictures: ("x"One)Yes: No:X 2. Potential for NPDES Violation: ("x"One) Yes: No: X Describe: 3. Weather and soil conditions: Clouds 58d damn Initial inspection: ("x"One) Yes: No:X 4. Is site currently under notice of violation? ("x"One) Yes: No:X 5. Is the site in compliance with S.P.C.A.and rules? ("x"One) Yes: X No: If no,check violations below: 6. Violations: ("X"all applicable sections) ()--- No approved plan, [UDO Sec.8.4.6(G);&G.S.113A-57(4)and 15A N.C.A.C4B.0107(c)] ()--- Failure to follow approved plan,[UDO Sec.8.4.19(A);&G.S.113A-61.1] ()--- Failure to submit revised plan,[UDO Sec.8.4.17(B)(5);&G.S.113A-54.1(b)and 15A N.C.A.C.4B.0118(a)] ()--- Failure to provide adequate groundcover,[UDO Sec.8.4.6(D)(1)(b);&G.S.113A-57(3);&15A N.C.A.C.4B.0007(b)or 15A N.C.A.C.4B.0124(e)] ()--- Insufficient measures to retain sediment on site,[UDO Sec.8.4.6(D)(1)(a);&G.S.113A-57(3)] ()--- Failure to take all reasonable measures,[UDO Sec.8.4.4(B);&15A N.C.A.C.4B0105] ()--- Inadequate buffer zone, [UDO Sec.8.4.6(A);&G.S.113A-57(1)] ()--- Graded slopes and fills too steep,[UDO Sec.8.4.6(B)(1)(a,b,c);&G.S.113A-57(2)or 15A N.C.A.C.4B.0124(d)] ()--- Unprotected exposed slopes, [UDO Sec.8.4.6(B)(1)(f);&G.S.113A-57(2)] ()--- Failure to install and maintain erosion control measures,[UDO Sec.8.4.12;& 15A N.C.A.C.4B.0113] ()--- Failure to keep current self-inspection records,[G.S.113A-54.1&15A NCAC 04B.0131] ()--- Other(describe): 7. Contact made with(name): Jimmy Poore Title Contractor 8. Contact Method: phone#() email(X—jimmy@wilsoncovington.com) letter() person() 9. Corrective actions needed: 10. Comments:(X)No devices in place O Additional devices needed()Devices need maintenance()Devices in&functioning ()No seeding noted()Partially seeded(X)Areas seeded(NO)Off-site sedimentation(X)Project in compliance Building done. Site stable.No erosion problems. FINAL. Office use only: Cityworks () Excel () Financially responsible contact ()